![Page 1: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/1.jpg)
1117/07/2019 1
Summer Flexibility ForumUK Power NetworksJuly 2019
![Page 2: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/2.jpg)
#flexibilityfirstWiFi NetworkTBC
Questions & feedback www.sli.do
Flexibility Forum #UKPNFlexForum
![Page 3: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/3.jpg)
Introduction
Photo by George Bohunicky on Unsplash
![Page 4: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/4.jpg)
Time Item Speaker3pm – 3.05pm Welcome from Chair Molly Webb
3.05 – 3.25pm Flexibility Commitment & Roadmap Progress Sotiris Georgiopoulos
3.25– 3.40pm Update on tender market – from market report Stathis Mokkas and Sam Do
3.40 – 3.55pm Q&A Sotiris / Stathis / Sam3.55pm– 4.15pm Break All
4.15pm – 4.50pm Tender feedback – How was it for you? Panel discussion: Linda Taylor – AMP Clean Energy Valts Grintals – Kaluza Simon Daniel – Moixa Sotiris Georgiopoulos
4.50pm – 4.55pm Chair to introduce Future View Molly Webb
4.55pm – 5.10pm Innovation Flexible Energy Trials Dr Giulia Privitera
5.10pm – 5.25pm Next steps: Active Networks Management Dr Phil Blythe 5.25pm – 5.30pn Q&A5..30pm – 5.40pm Summary and conclusion Barry Hatton
5.45pm – 7pm Drinks reception on roof terrace (weather dependent) All
Agenda
![Page 5: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/5.jpg)
5
Flexibility Commitments
Photo by Karsten Würth (@karsten.wuerth) on Unsplash
Sotiris GeorgiopoulosHead of Smart Grid Development
![Page 6: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/6.jpg)
Flexibility is at the core of our DSO strategy
![Page 7: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/7.jpg)
Key Flexibility Roadmap Principles
Maximise available opportunities using economic principles
Improve accessibility Market testing Neutrality• Co‐design new arrangements• Adoption of digital platforms• Contribute to standardisation
• Open all LR capex at high voltage• Trials for EV‐driven constraints
• Publish info on size & location ahead of tenders
• Publish tender framework, assessment criteria, tender results
![Page 8: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/8.jpg)
Driving a national approach to FlexibilityYou can view the full Flexibility Commitment document on the ENA website here:http://www.energynetworks.org/assets/files/ENA%20Flexibility%20Commitment%20Our%20Six%20Steps%20for%20Delivering%20Flexibility%20Services.pdf
Great Summary of all DNO Flexibility Initiativeshttp://www.energynetworks.org/electricity/futures/flexibility-in-great-britain.html
ENA Flexibility Workstream Consultation EventWednesday 10th July (London), 16th July Glasgowhttp://www.energynetworks.org/electricity/futures/open-networks-project/open-networks-project-stakeholder-engagement/events.html
![Page 9: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/9.jpg)
9
UKPN’s ways of working – Learning by doing …or in plain English
![Page 10: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/10.jpg)
10
Progress since Autumn 2018
• Clarity on value of flexibility
• Reduce participation threshold
• Published deferral value
• Reduced to 50kW (from 100kW, from 500kW)
• Visibility of market
• Longer contracts • Longer lead-in times
• Declare market size by 2023 + 200MW
• Four year contracts• Doubled lead-in time
• Improved tender interface
• Simplified customer experience
• First to partner with Piclo
• Introduced framework agreement
You asked We did
![Page 11: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/11.jpg)
ESO
DSO
–HV
DSO
–LV
Planning & scheduling(Near‐Time)
Network development / Connections(Ahead)
Operations(Real‐Time)
DSO commercial product portfolio
11
Key:
Current
In progress
Flexible connections
LV Flex Product(Constraint Management)
Power Potential – Reactive power
Reinforcement deferral constraint management
Maintenance constraint management
Contracted services dispatch
Contracted services dispatch
Capacity based pricing
Market‐based constraint management
Dynamic / locational DUoS
Dynamic/ locational DUoS
Capacity‐based pricing
Post‐fault restoration support
Capacity‐based pricing
Dynamic / locational DUoS
Flex Connections dispatch (LIFO/Prorata)
Dynamic/locational DUoS
![Page 12: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/12.jpg)
Summary
• We are creating meaningful DSO flexibility opportunities
• We are defining the future of local flexibility together
• High volume, small asset participation – DSO markets will drive innovation
Photo by Jason Blackeye on Unsplash
![Page 13: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/13.jpg)
Any questions?Visit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
Any questions?Visit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
![Page 14: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/14.jpg)
Market ReportStathis Mokkas and Sam DoFlexibility Team
Photo by Andreas Gücklhorn on Unsplash
![Page 15: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/15.jpg)
15
Winter 18/19 Flexibility tender – Summary
94.76MWCapacity requirement
18.1MWFlexibility Contracts
4 met operational needs
Smaller volumes in 3 zones
28 zones tendered19 prequalified
15 bid
£450kNew revenue streams for
flexibility providers
40% batteries
Transitioning a nascent market from kW to MWs of flexibility
£12mFunding pot for Flexibility
![Page 16: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/16.jpg)
Online dating…
“…Overworked substation seeking supportive battery…”
![Page 17: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/17.jpg)
Counting MWs – From registration to contracts
94.76
69.356.6
23.0 18.1
020406080
100
CapacityRequirement
W19/20
Registration Prequalification Competition Outcome
Capacity (MW) per Stage
39.7
7.6
22.0
Battery DSR Genset
7.6
2.5
8.0
Battery DSR Genset
![Page 18: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/18.jpg)
Flexibility – A network service
Brandon2MW
Lewes Newhaven
7MWRomney Warren
1.5MW
Leighton Buzzard5MW
Provided by…
![Page 19: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/19.jpg)
New experiences, new feedback, further improvementsNew experiences, new feedback, further improvements
SignpostingSignposting Tender timelines & Evaluation processTender timelines & Evaluation process Flexibility contract Flexibility contract
It is never early enough to indicate
constraints
It is never early enough to indicate
constraints
Improved. Additional info & clarifications always welcome
Improved. Additional info & clarifications always welcome
Actions:Actions:
Focus areas:Focus areas:
Lesson:Lesson:
Simplify where possible.
Publish more info in advance, e.g. dispatch
frequency
Simplify where possible.
Publish more info in advance, e.g. dispatch
frequency
Continue to publish areas 6 months ahead of tender
&Develop heat maps 12‐24 months ahead of potential tender
Continue to publish areas 6 months ahead of tender
&Develop heat maps 12‐24 months ahead of potential tender
Make more accessible and less onerous on
providers
Make more accessible and less onerous on
providers
Support Open Networks efforts to standardise contracts
Support Open Networks efforts to standardise contracts
![Page 20: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/20.jpg)
Timeline – the next few months
Completionof tender
Apr 2019
Flexibility Forum
May 2019
Flexibility contracts awarded
8 July 2019
Late July 2019
Publish new Flexibility zones for Q1 2020
Sept2019
Oct2019
Publish Flexibility zones to be re‐tendered Q4 2019Follow with updated
framework.
Close of registration and
bidding for flexibility tender
Nov – Dec2019
![Page 21: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/21.jpg)
Take partVisit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
Take partVisit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
![Page 22: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/22.jpg)
What is the appropriate tender noticeperiod – from signposting to bidding?
• 4‐6 months• 6‐9 months• >9 months
What is the appropriate tender noticeperiod – from signposting to bidding?
• 4‐6 months• 6‐9 months• >9 months
Questions
![Page 23: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/23.jpg)
How much value does DSO Flexibility add toyour business model:
• It’s the main component• It’s an important part
• It’s a nice to have• Minimal
How much value does DSO Flexibility add toyour business model:
• It’s the main component• It’s an important part
• It’s a nice to have• Minimal
Questions
![Page 24: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/24.jpg)
Two years ago we introduced FutureSmart, oneyear ago we produced our Flexibility Roadmap.Do you think we are heading the right direction?
• Yes• Partially
• No
Two years ago we introduced FutureSmart, oneyear ago we produced our Flexibility Roadmap.Do you think we are heading the right direction?
• Yes• Partially
• No
Questions
![Page 25: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/25.jpg)
Q&AQ&A
![Page 26: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/26.jpg)
Future Smart microsite: http://futuresmart.ukpowernetworks.co.uk/
Flexibility Roadmap: http://futuresmart.ukpowernetworks.co.uk/wp‐content/themes/ukpnfuturesmart/assets/pdf/futuresmart‐flexibility‐roadmap.pdf
Flexibility tenders framework landing page: https://www.ukpowernetworks.co.uk/internet/en/have‐your‐say/listening‐to‐our‐
connections‐customers/flexibility‐services.HTML
Flexibility revenues per area document: https://www.ukpowernetworks.co.uk/internet/en/have‐your‐
say/documents/Flexible%20Zones%20‐%20Revenue%20Range%20per%20Area.pdf
Future Smart microsite: http://futuresmart.ukpowernetworks.co.uk/
Flexibility Roadmap: http://futuresmart.ukpowernetworks.co.uk/wp‐content/themes/ukpnfuturesmart/assets/pdf/futuresmart‐flexibility‐roadmap.pdf
Flexibility tenders framework landing page: https://www.ukpowernetworks.co.uk/internet/en/have‐your‐say/listening‐to‐our‐
connections‐customers/flexibility‐services.HTML
Flexibility revenues per area document: https://www.ukpowernetworks.co.uk/internet/en/have‐your‐
say/documents/Flexible%20Zones%20‐%20Revenue%20Range%20per%20Area.pdf
Links
![Page 27: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/27.jpg)
Break
Photo by NordWood Themes on Unsplash
![Page 28: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/28.jpg)
Linda Taylor – AMP Clean EnergyValts Grintals – KaluzaSimon Daniel – Moixa
Linda Taylor – AMP Clean EnergyValts Grintals – KaluzaSimon Daniel – Moixa
Debate: Lessons learned
![Page 29: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/29.jpg)
Dr Giulia PriviteraLow Carbon Technologies Delivery ManagerDr Giulia PriviteraLow Carbon Technologies Delivery Manager
Innovation Flexible Energy TrialsInnovation Flexible Energy Trials
![Page 30: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/30.jpg)
30
Low Carbon Ready
Efficient And
Effective
Future Ready
UK Power NetworksInnovation Strategy
Our Innovation Strategy
![Page 31: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/31.jpg)
20192010-13
Our Journey20182014-17
Low Carbon London
FlexiblePlug & Play EV trialsenergywise
![Page 32: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/32.jpg)
32
We consulted a number of industry stakeholders on applicability of EV smart charging models in the UK and to form our position
Smart Charging and industry wide solution
![Page 33: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/33.jpg)
Industry-wide solutions (2023+)Interim solutions (2021-23)Market trials (2019-20)
To investigate how DNO can support the market to manage smart charging
Shift - Smart Charging Market Trials
24h
Custom
er
demand (kW)
24h
Custom
er
access (kW)
Core capacity
Optional capacity purchase
Peak pricing
24h
Custom
er
DUoS
Price
“High”
“Low” “Low”
FlexibilityProcurement
Capacity based pricing
Time of UseDUoS
![Page 34: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/34.jpg)
V2G opportunities - TransPower
Commercial Fleets ‘at work’ Public ‘on route’ Residential ‘at home’
![Page 35: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/35.jpg)
Unblocking fleet transition“World’s biggest commercial EV trial” targeting 3,000 commercial vehicles
Depot Charging
Home Charging
Mixed Charging
Photo: Casey Gutteridge/Uber/PA/CC BY-SA 3.0
![Page 36: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/36.jpg)
20192010-13
Our Journey20182014-17
Low Carbon London
FlexiblePlug & Play
Urban EnergyClubEV trialsenergywise
![Page 37: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/37.jpg)
Empowering people to participate in emerging flexibility market
Time poor
Fuel poverty
Lack of flexibility in use of energy
Lackof digital skills
Lack of engagement in the energy market
Lack ofspace
Who might be left behind in the future?
![Page 38: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/38.jpg)
38
Our journey is aligned to the flex roadmap
Flexibility is playing a role in the EV transition
Our trials are uncovering new opportunities in flexibility
Networks have a role in ensuring no one is left behind
Conclusions
![Page 40: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/40.jpg)
Active Network ManagementSotiris Georgiopoulos & Dr Phil Blythe
Photo by Richard R Schünemann on Unsplash
![Page 41: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/41.jpg)
The story so farFlexible Plug and Play trial (Peterborough/March) ‐ Success
Flexible DG rollout (FPP/Norwich) ‐ Success
Business process, BAU Handover and Training
DERMS trial (Power Potential) ‐ Ongoing
Regional Development Programme (ANM south coast) ‐Ongoing
Standard ANM System
2012 ‐ 2014
2015 ‐ 2016
2015 ‐ 2018
2017 ‐ 2019
2017 ‐ 2019
2018– ED1 / ED2
![Page 42: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/42.jpg)
Active Network Management System benefits
.
42
Cover all three UKPN licenced regions Integrating innovation projects Phased rollout to all voltage levels
Solution characteristics
Distributed Energy Resource Management Constraint Management Operational forecasting and offline simulation Commercial capabilities (E2E flexibility provider management)
Key capabilities
Key Outcomes Flexible connections available at all areas from Q4 2019 Connection of c200MW of connections projects in the pipeline Enabling management/dispatch of flexibility contracts
![Page 43: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/43.jpg)
Any questions?Visit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
Any questions?Visit
www.sli.do and enter event Flexibility Forum
and code #UKPNFlexForum
![Page 44: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/44.jpg)
Conclusion
Photo by William Santos on Unsplash
![Page 45: UK Power Networks July 2019 · 23.0 18.1 0 20 40 60 80 100 Capacity Requirement W19/20 Registration Prequalification Competition Outcome ... Evaluation process Flexibility contract](https://reader033.vdocument.in/reader033/viewer/2022050519/5fa2b6f685c6656f4e0c8169/html5/thumbnails/45.jpg)
Join us on the terrace