Update on ISO 17078 Standards Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078

Upload: lucian-vaughn

Post on 01-Jan-2016

33 views

Category:

Documents


4 download

DESCRIPTION

Update on ISO 17078 Standards. Wayne Mabry Coordinator - Gas Lift Manufacturing Leader of ISO Task Group 17078. Objectives. Review situation of ISO 17078.1 Side Pocket Mandrels Specification Review situation of ISO 17078.2 Flow control devices Review situation of ISO 17078.3 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Update on ISO 17078 Standards

Update on ISO 17078 Standards

Wayne Mabry

Coordinator - Gas Lift Manufacturing

Leader of ISO Task Group 17078

Page 2: Update on ISO 17078 Standards

2 WJM

Objectives

• Review situation of ISO 17078.1– Side Pocket Mandrels Specification

• Review situation of ISO 17078.2– Flow control devices

• Review situation of ISO 17078.3– Latches and KOT Specification

• Time Line

Page 3: Update on ISO 17078 Standards

3 WJM

ISO 17078-1

     

  

  

ISO/WD 17078‑1Petroleum and Natural Gas Industries 

Down hole equipment Part 1: Side Pocket Mandrels

Page 4: Update on ISO 17078 Standards

4 WJM

Environmental Service GradeEnvironmental service grades

Table A-1

Grade El -- Standard service Non-sour service

Grade E2 -- Stress corrosion cracking service

H2S (sour) service1

Grade E3 -- CO2 service CO2 service2

Grade E4 -- Special service Special service requirements defined by the user/purchaser

Environmental servicegrades

Characteristics

____________________

1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.

Page 5: Update on ISO 17078 Standards

5 WJM

Design Verification Grade

D1 D2 D3 Documentation Hist. Record Required Required

See B.1 -- 1 See B.2 -- 1 See B.3 – 1

 Design review (burst, Required Required Requiredcollapse, tolerance) See B.1 -- 2 See B.2 -- 2 See B.3 – 2 Burst & collapse pressure Not required Burst & collapse Not requiredtest to destruction @ See B.1 -- 3 See B.2 -- 3 See B.3 – 3 ambient temperature Pressure testing @ rated Required Required Requiredtemperature See B.1 -- 4 See B.2 -- 4 See B.3 – 4 Internal pressure cycles Not required 10 cycles 10 cycles

See B.1 -- 5 See B.2 -- 5 See B.3 – 5 Finite element analysis / Not required Not required Burst & collapsestrain gauge See B.1 – 6 See B.2 -- 6 See B.3 – 6 Flow control – install/pull @ 12 o'clock @ 12,3,6 o'clock @ 12,3,6 o'clockwith kick-over tool See B.1 -- 7 See B.2 -- 7 See B.3 – 7 Slick line operational test Not required Not required Requiredwith kick-over tool See B.1 -- 8 See B.2 -- 8 See B.4 - 8 

Table B-1

Page 6: Update on ISO 17078 Standards

6 WJM

Product Validation Grade

V1 V2 V3 Internal pressure test 100% 100% 100%

See C.1 -- 1 See C.2 -- 1 See C.3 -- 1 External pressure test 0% 5% 100%

See C.1 -- 2 See C.2 -- 2 See C.2 -- 2 Internal diameter drift test 100% 100% 100%

See C.1 -- 3 See C.2 -- 3 See C.2 -- 3 External diameter drift test 100% 100% 100%

See C.1 -- 4 See C.2 -- 4 See C.2 -- 4 Installation/removal method – 0% 5% 100%kick-over tool See C.1 -- 5 See C.2 -- 5 See C.2 -- 5

Table C-1

Page 7: Update on ISO 17078 Standards

7 WJM

Quality Control Grade

Q1 Q2 Q3 Hardness testing 100% 100% 100%

See D.1 -- 1 See D.2 -- 1 See D.3 -- 1 Non-destructive examination Not required 5% 100%

See D.1 -- 2 See D.2 -- 2 See D.3 -- 2 For Q2, select one preferred method from the four listed methods of non-destructive testing.For Q3, radiographic examination is required.

Surface magnetic particle examination. Liquid penetrant examination.

Radiographic examination. Ultrasonic examination.

 Documentation 100% coc 100% coc plus 100% coc plus

See D.1 -- 3 See D.2 -- 3 See D.3 -- 3 

Table D-1

Page 8: Update on ISO 17078 Standards

8 WJM

ISO 17078-2

     

  

ISO/WD 17078‑2Petroleum and Natural Gas Industries

Down hole equipmentPart 2: Flow control devices

Page 9: Update on ISO 17078 Standards

9 WJM

Environmental Service GradeEnvironmental service grades

Table A-1

Grade El -- Standard service Non-sour service

Grade E2 -- Stress corrosion cracking service

H2S (sour) service1

Grade E3 -- CO2 service CO2 service2

Grade E4 -- Special service Special service requirements defined by the user/purchaser

Environmental servicegrades

Characteristics

____________________

1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.

Page 10: Update on ISO 17078 Standards

10 WJM

Design Verification TestsProbe or Close or

Valve Compatibility Insertion Travel* Load Life Flow Back Check Open* Validation Erosion Shelf

Types Test Test Test Rate Cycle Test Test Test Test Test Test

PPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

IPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Pilot Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes

Differential Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes

Constant F Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

SC – Hyd Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes ---

SC – Elect Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes

Smart Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes

Orifice Yes --- --- --- --- Yes Yes --- Yes Yes ---

Nozzle Vent Yes --- --- --- --- Yes Yes --- Yes Yes ---

Shear Orif Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---

Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes

Chem j w/o Yes Yes --- --- Yes Yes Yes Yes Yes Yes ---

Dump/Kill Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---

Water Inject Yes Yes --- --- Yes Yes Yes --- Yes Yes ---

Dummy Yes --- --- --- --- --- --- --- Yes --- ---

Page 11: Update on ISO 17078 Standards

11 WJM

Design Verification TestsProbe or

Valve Travel* Load Flow Back Check Open Close Leakage Shelf

Types Test Rate Cv Test Leak Test Test Test Rate Test

PPO Yes Yes Yes Yes Yes Yes Yes Yes

PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes

IPO Yes Yes Yes Yes Yes Yes Yes Yes

IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes

Pilot Yes --- Yes Yes Yes Yes Yes Yes

Differential Yes --- Yes Yes Yes Yes Yes Yes

Constant F Yes Yes Yes Yes Yes Yes Yes Yes

SC – Hyd Yes* --- Yes Yes Yes Yes Yes ---

SC – Elect Yes* --- Yes Yes Yes Yes Yes Yes

Smart Yes* --- Yes Yes Yes Yes Yes Yes

Orifice --- --- Yes Yes --- --- --- ---

Nozzle Vent --- --- Yes Yes --- --- --- ---

Shear Orif --- --- Yes Yes Yes* --- Yes ---

Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes

Chem j w/o --- --- Yes Yes Yes Yes Yes ---

Dump/Kill --- --- Yes Yes Yes* --- Yes ---

Water Inject --- --- Yes Yes --- --- --- ---

Dummy --- --- --- --- --- --- --- ---

Page 12: Update on ISO 17078 Standards

12 WJM

ISO 17078.3

     

  

ISO/WD 17078‑3Petroleum and Natural Gas Industries

Down hole equipmentPart 3: Latches and KOT’s

Page 13: Update on ISO 17078 Standards

13 WJM

ISO 17078-3

Page 14: Update on ISO 17078 Standards

14 WJM

ISO Gas-Lift Standard Meeting Schedule

Time Line1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Meeting Topics to be AddressedNo. Location Date Host General 17078.1 17078.2 17078.1

1 Houston, TX 02/05/98 Camco Organize ISO Gas-Lift Committee2 Houston, TX 05/04/98 Camco Draft Outline for ISO Gas-Lift Standard Document

3 Houston, TX 05/10/99 Shell Review Plan for ISO Gas-Lift Documents4 Houston, TX 11/15/99 Shell Review Plan for ISO Gas-Lift Documents

5 Houston, TX 03/01/00 Shell Review Plan for ISO Gas-Lift Documents6 Houston, TX 05/02/00 Shell Review Plan for ISO Gas-Lift Documents7 Atlanta, GA 07/25/00 Decker Tech Review ISO 17078.1 Clauses 3 - 58 Dallas, TX 10/06/00 Decker Tech Review ISO 17078.1 Clauses 6 & 7

9 Houston, TX 02/08-09/01 Weatherford Review Entire ISO 17078.111 Houston, TX 05/22-24/01 Schlumberger Complete (Almost) ISO 17078.1, Begin Work on ISO 17078.212 Houston, TX 07/18/01 Chevron Complete 1st Draft of ISO 17078.1 for WG #4 Review13 Austin, TX 09/04/01 OAC Prepare 1st Draft of ISO 17078.1 for Delivery to WG #414 Austin, TX 10/08-09/01 Univ. of Texas Review 1st Draft of ISO 17078.214 Aberdeen, UK 11/14-15/01 Shell EXPRO Continue Review of ISO 17078.2

15 Houston, TX 2/07-08/02 Prod. Assoc. Continue Review of ISO 17078.2 , Address WG #4 Comments on 17078.1

16 Houston, TX 5/09-10/02 BP Complete 1st Draft of ISO 17078.2 for WG #4 Review, Review ISO 17078.3

17 San Antonio, TX 10/03-04/02 SwRI Continue Review of ISO 17078.3

18 Houston, TX TBD TBD19 Houston, TX TBD TBD20 TBD TBD TBD

1998 1999 2000 2001 2002 2003

Blue CompletedRust ScheduledBlack To Be Scheduled