Systems Planning & ProgrammingAsset Management Division
“taking care of what we have”
It’s a Journey.……
Ahmad JaberSystems Planning & Programming
WASHTO Annual Meeting July 14, 2010
![Page 2: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/2.jpg)
Today’s Presentation
Overview Assets Pavements, Bridges, Culverts, MSE Walls
Measures Condition, Trends
GIS - Graphical Interface
![Page 3: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/3.jpg)
Utah Facts
• Population 2,800,000• Land Area: 84,900 sq
miles (11th Largest State)
• 1640 UDOT Employees
• 5840 Miles (13% of State)
• 16,250 Lane-Miles
![Page 4: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/4.jpg)
The Challenge
![Page 5: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/5.jpg)
“The Final Four”
Take Care of What We Have
Make the System Work Better
Improve Safety
Increase Capacity
UDOT Strategic Goals
![Page 6: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/6.jpg)
Pavement Preservation “Good Roads Cost Less”UDOT Study Published in 1977
![Page 7: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/7.jpg)
”Bad Roads Cost More”
Age
Very Good
Very Poor
Con
diti
on
5 10 30252015
Driving On Lower Quality Roads
![Page 8: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/8.jpg)
7 Steps to Asset Management Implementation
1. Inventory2. Condition Assessment3. Targets4. Deterioration Curves5. Maintenance Strategies 6. Cross Asset Optimization7. Projects
![Page 9: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/9.jpg)
Culvert Inventory
• Inventory is the First Step in Asset Management
![Page 10: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/10.jpg)
MSE Walls
• Inventory Completed
• Condition Determined
• Next Phase
– Establishment of Targets
– Integrate with
Department’s Asset
Optimization Database
![Page 11: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/11.jpg)
Bridge
• Inventory Completed
Every Two Years
• Condition Assessment
Determined at Element
Level
![Page 12: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/12.jpg)
UDOT Strategic Goals
• Pavements that are in good condition today can be maintained by
an appropriate mix of maintenance and preservation treatments that will maximize the system Overall Condition Index (OCI) and prolong the pavement life.
![Page 13: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/13.jpg)
Construction Cost Index
![Page 14: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/14.jpg)
Pavement System Health
Statewide Pavement Condition
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009
Year
% o
f Mile
s
Interstate Arterial Collector
% of miles Fair or Better
based on "Half Car" IRI and Historical Ride Index
![Page 15: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/15.jpg)
Maintenance Management Levels
InterstateRegardless of AADT Miles ~ 935, 16%Lane Miles ~ 27%VMT ~ 53%Combo Truck VMT ~ 63%
Level 1AADT > 2,000 and/or Truck Volumes > 500Miles ~ 2,150, 37%Lane Miles ~ 43%VMT ~ 43%Combo Truck VMT ~ 32%
Level 2AADT < 2,000Miles ~ 2,750, 47%Lane Miles ~ 36%VMT ~ 4%Combo Truck VMT ~ 5%
![Page 16: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/16.jpg)
Total Funding Needs
2011 2014
Pavement
Interstate & Level 1 Preventative Maintenance 79 60
Interstate & Level 1 Major Rehab. And Reconstruction Programmed 180
Level 2 Maintenance 16 18
BridgePreventative Maintenance 25 28
Rehab. And Reconstruction Programmed 58
Total Funding Needs
(Millions of $’s)120 344
18232.5
Red = NeedsBlue = Estimate of Total Available Funds
![Page 17: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/17.jpg)
Diminishing Marginal Returns
Interstate System OCI(1,875 miles 2009 OCI = 89)
65
70
75
80
85
90
95
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Average Annual Funding (millions)
Ove
rall
Con
ditio
n In
dex
10 20 30 40 50 60 70 80 90 100
The level of funding to obtain the optimal condition level (point of diminishing marginal return) was found to be $60 Million for the Interstate (increasing to $80 million), $50
million for the Level 1 NHS, $60 Million for the Level 1 non-NHS, and $90 million for the Level 2 system, for a total of $260 to $280 Million per year.
![Page 18: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/18.jpg)
UPlan – UDOT’s GIS Graphical Interface
![Page 19: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/19.jpg)
Northern Utah
Folders
Identification
Road ViewPan/Min/Max View
![Page 20: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/20.jpg)
Salt Lake Area – I-215 Belt Route
I-215
![Page 21: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/21.jpg)
Pavement Condition
I-215
![Page 22: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/22.jpg)
I-215 Pavement Condition Values
![Page 23: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/23.jpg)
Pavement Rehab Projects
![Page 24: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/24.jpg)
I-215 Pavement Rehab Project
![Page 25: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/25.jpg)
I-215 Long Range Plan
![Page 26: Utah Transportation Systems Planning](https://reader034.vdocument.in/reader034/viewer/2022042713/5473f94bb4af9fc80a8b553d/html5/thumbnails/26.jpg)
Thank You!