SKAGIT COUNTY ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT
(ROCKPORT CASCADE RD) · PROJECT No. ES8700-1 SRFB PROJECT No. 14-1246C SEC. 34, T. 35N., R. 10E., W.M.
Skagit County, Washington
SKAGIT RIVER
/
VICINITY MAP NTS
SKAGIT COUNTY OFFICIALS SOARD OF COMMISSIONERS •KENNETH A DAHLSTEDT, CHAIR •LISA JANICKI, COMMISSIONER •RON WESEN, COMMISSIONER
PUBLIC WORKS •DAN BERENTSON, DIRECTOR
?4 c . ~Jh_- l--~. 1 e, PAUL A. RANDALL-GRUTTER, P.E., COUN'Y ENGINEER DATE
SKAGIT COUNlY PU!!l,!C_WORKS DEPARTMENT 1800 CONTINENTAL PLACE MOUNT VERNON, WA 98273 360- 416- 1438 CONTACT: JENNIFER SWANSON
SKAGIT RIVER SYSTEM COOPER A TI\'£ 11426 MOORAGE WAY LA CONNER, WA 98257 360-446-7228 CONTACT: DEVIN SMITH
HYDRAULIC ENGINEERING NA 1\JRAL SYSID1S DESIGN 305 FLORA STREET BELLINGHAM, WA 98225 360-656- 5207 CONTACT: L£1F EMBERTSON
NOTES:
CIVIL AND S]RUCTURAL ENGINEERING KPFf CONSUL TING ENGINEERS 1601 5TH AVENUE, SUITE 1600 SEA TILE, WA 98101 206-622-5822 CONTACT: ANNE SlREUFERT
GEOTECHNICAl ENGINEERING GEOENGINEERS 600 DUPONT STREET BELLINGHAM, WA 98225 360-647-1510 CONTACT: SEAN COOL
1. DATA FOR THIS SURVEY WAS GATHERED IN MARCH 2010 & AUGUST 2017 BY RELD TllA'ltRSE UTILIZING ELECTRONIC DATA COU£C110N.
2. EQUIPMENT USED: THEOMAT 00'01.5" EOM: ± 2 PPM, ;I; 3 MM
3. HORIZONTAL DAlUM & BASIS Of COORDINATES: NAO 83\91 WASHINGTON STATE PLANE, NORTH ZONE \IERllCAL OAlUM: NAVO 88
DURING 'lHE MONTH OF MARCH 2011, PACIRC SUR'iE\'lNG & ENGINEERING, INC USED REAL TIME KINEMAllC GPS METHODS TO LOCALIZE ON 6 WASHINGTON STATE DEPARTMENT OF TRANSPORTATION GEODETIC MONUMENTS. THE DATA WAS SIMULTANEOUSLY ADJJSTED AS ONE NETWORK.
WASHINGTON STATE GEOOEllC SER'ilCES MONUMENTS (PIO# 1583, 3555, 7150, 7188, AND 7207} WERE USED TO ESTABLISH HORIZONTAL POSITIONS. THE UNCONSTRAINED CLOSURE OF THE CONTROL POINTS RESULltO IN ERROR ELLIPSES OF LESS THAN 13MM (0.04 FEET). CONVENTIONAL SUR'v£Y TRA'v£RSE AND SIDE- SHOTS l'f£RE ACCOMPLISHED UTILIZING THESE POINTS.
WASHINGTON STATE GEODETIC SERVICES MONUMENTS (PIO# 1583, 3555, 7150, 7188, 7196 AND 7207) WERE USED TO ESTABLISH VERllCAl POSITIONS. THE RMS CLOSURE OF THESE CONTROL POINTS RESULTED IN VERTICAL ERROR EWPSES Of LESS THAN 2(1jM (0.06 ml).
REAL TIME KINEMA nc OBSERVATIONS WERE COllECTED \li1TH ONE TOPCON GR3 RECEIVER AS A BASE STATION AND ONE TOPCON GR3 RECEIVER CONFIGURED AS A ROVER. ALL POINTS WERE OCCUPIED FOR A MINIMUM OF 200 EPOCHS.
CALL TWO (2) BUSINESS DAY BEFORE YOU DIG
NAVO 88 1- 800- 424- 5555
DRAWN BY DESIGNED BY
kpff RAJ AJK CAll rwo ~USl~[SS ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT SHEET
CHECKED SY APPROVED BY om ~ff 0~[ YOU DIG PKG AMS
DATE 1-~00-m-ssss DEC. 19, 2017 1601 Sth Avenue, Suite 1600
S C A L E: Seattle~ WA 98101
ROCKPORT CASCADE RD
COVER SHEET AND VICINITY MAP CV1 BY CHO. APPR. REVISION J O 8 No. : 1700504 N.T.S. 206.622.5822
www.kpff.com
---·-- - ----·-··---------------------------------------------- - ----------- - ----- - - ------------------------ ---- - - --~
ABBREV/A TIONS ABT AB()()T
SUMMARY OF QUANTITIES ABUT ABUTI.IENT
SHEET INDEX APPROX APPROX/MA TEL Y
ITEM NO. SPEC. ITEM NAME UNIT QUANllTY BH BORE HOLE PATCH
1 1-09.7 UOBIUZAnON LS 1 BRG BEARING SHEET NO. DRAWING NO. DESCRIPllON BTYtN BETYlfEN
2 1-05.4-SP CONTRACTOR SIJR'ff:YING LS 1 BOT BOTT(}I,( 1 CV/ CO'ff:R SHEET ANO VICINITY MAP J 1- 05.4 RECORD ORA 'MNGS LS 1 CG CENTER OF GRAVITY 2 CV<' SHEET INDEX, SUMMARY OF QUANnnES ANO ABBREVIAnONS 4 1-0115 SPCC PLAN LS 1 CIP CAST-IN-PLACE
J CVJ PROPOSED PRo.ECT SEQUENCING 5 1-09.6-SP UNANnCIPA TEO SITE WORK 00/.. EST € CENTERUNE
6 1-02.6-SP TYPE B PROGRESS SCHEDULE LS 1 CU? CLEAR 4 ALOI ROAOWA Y AUGNMENT CNTR CENTER
7 2-02.5 REMOVAL OF STRUCTURES ANO OBSTRUCnONS LS 1 CONC CONCRETE 5 AL02 ROAOWA Y AUGNMENT
AC 8 2- 01.5 CLEARING ANO GRUBBING 1 CONST CONSTRUcnON 6 ALOJ ROAOWA Y AUGNMENT 9 8-11.5 REMOVING GIJARORAIL LF 304 CONT CONnNU()()S 7 SPOT SITE PREPARAnON ANO TESC 10 2-0J.5 ROAOWA Y EXCAVA nON INCL. HAUL CY 195 OJA DIAMETER 8 SP02 SITE PREPARAnON ANO TESC 11 2-0J.5 GRA 'ff:L BORROW INCi... HAUL TON 5,852 EA EACH
9 GR01 GRADING PLAN 12 2-0J.5 EMBANKMENT COUPAcnON CY 3,164 EL ELEVAnON
13 2- 0J.5 CHANNEL EXCAVA nON INCi... HAUL CY 2,118 EO EQUAL
10 GR02 GRADING PLAN EXIST EXISnNG 11 ROOT ROAOWA Y PLAN 14 8-15.5 QUARRY SPALLS TON 24 EXT EXTERIOR
12 R002 ROAOWA Y PLAN 15 2-09.5 STRUCTURE EXCAVA nON C/..ASS A INCi... HAUL CY 910 FF FAR FACE
LS GALV GALVANIZED 16 2-09.5 SHORING OR EXTRA EXCAVA nON, Cl... A 1 13 RPO/ ROAOWA Y PROFILE
17 6- 02.5 ST. RE/NF. BAR LB 75,627 GIR GIRDER 14 TS01 TYPICAL ROAOWA Y S£cnONS 18 6-02.5 EPOXY-COA TEO ST. RE/NF. BAR LB 3,249 GR GRADE
HUA HOT MIX ASPHALT 15 TC01 TRAmc CONTROi.. PLAN 19 6-02.5 GRA 'ff:L BACKFILL FOR WALL CY 515 H, HOR/l HORIZONTAL 16 SI GENERAL STRUCTURAL NOTES 20 6-02.5 DEFICIENT STRENGTH CONC. PRICE AOJJSTI.IENT CALC 1 H.S. HIGH STRENGTH 17 S2 BRIDGE PLAN ANO ELEVA nON 21 6-02.5 PRESTRESS£0 CONC. GIRDER {tlrJ90G) LF 1,020 INCL INCLUDING
18 SJ TYPICAL S£CnON 22 6-02.5 ELAST(}l,(ERIC BEARING EA 20 INT INTERIOR
23 6- 06.5 BRIDGE RAILING TYPE J-TUBE LF 408 JT JOINT 19 S4 PROPOSED CONSTRUCnON SEQUENCE LOC LOCAnON 20 S5 FWNOA nON LA Y()()T
24 6-025 CONC. C/..ASS 4000 FOR BRIDGE CY 464 MAX MAXIMUM 25 6-08.5 WATERPROOF MEMBRANE SY 218 MIN U/NIMUM 21 S6 ABUTI.IENT PLAN ANO ELEVA nON 26 8-15.5 HEAVY LOOS£ RIPRAP CY 390 NF NEAR FACE
22 Sl ABUTI.IENT DETAILS 27 4-04.5 CRUSHED SURFACING BAS£ C()()RS£ TON 1,230 NO NUMBER 23 SB 'MNGWALL S£CnONs ANO DETAILS 28 4-05.5 CRUSHED SURFACING TOP CWRS£ TON 188 NTS NOT TO SCALE
24 S9 FRAMING PLAN 29 5- 04.5 HMA C/..ASS 1/2' PG 64-22 TON 284 oc ON CENTER
JO 8-01.5 ESC LEAD DAY 65 PAVliT PA'ff:MENT
25 S10 BEARING DETAILS PC POINT OF CURVA TUR[ 26 S11 GIRDER SCHEDULE 31 8-01.5 STABIUZEO CONSTRUCnON ENTRANCE SY JJ5 PCF P()()NOS PER CUBIC FEET
27 S12 GIRDER DETAILS 1 32 8-01.5 WAmE LF 1,060 Pl POINT OF INTERSECnON JJ 8-01.5 SEEDING. FERnUZING. MULCHING AC 1 PSF PWNOS PER SQUARE FOOT
28 SIJ GIRDER DETAILS 2 34 2- 125 CONSTRUCnON GEOTEXnLE FOR PERMANENT EROSION CONTROL SY J8 PT POINT OF TANGENCY
29 S/4 INTERMEDIATE DIAPHRAGMS 35 8-11.5 BEAM GIJARORAIL TYPE JI LF 196 PVC POINT OF 'ff:RnCAL CUR'ff
JO S15 ENO DIAPHRAGM J6 8-11 SP BEAM GIJARORAIL TRANSmON SECnON TYPE 21 EA 8 PVI POINT OF 'ff:RnCAL INTERS£CnON PVT POINT OF 'ff:RnCAL TANGENCY
JI S/6 BRIDGE RA/UNG DETAILS I 37 8-11.5 BEAM GIJARORAIL TRANSlnON SECnON TYPE 23 EA 2 REF REFERENCE 32 Sil BRIDGE RA/UNG DETAILS 2 J8 8-11 BEAM GIJARDRAIL NON- FLARED TERMINAL EA 2 RE/NF REINFORCEMENT
JJ S18 BRIDGE RA/UNG DETAILS J 39 8- 22 PAINT UN[ LF 2,238 REO'O REQUIRED
34 SCI RIPRAP PLAN 40 8-22.5 PLASnc STOP LINE LF 24 RO ROAD
41 1-10.5 PORTABLE TEMPORARY TRAmC CONTROi.. SIGNAL LS I ROW RIGHT OF WAY
42 1-10.5 PRo.ECT TEMPORARY TRAffiC CONTROi.. LS I SHLOR SHWLOER SIM SIUILAR
4J 1-10.5 CONSTRUCnON SIGN C/..ASS A SF 101 SPA SPACING SPEC SPECIF/CA nON STA STAnON STD STANDARD S)'l,f S)'l,!U[ TR/CAL TEMP TEMPORARY TYP TYPICAL UNO UNLESS NOTED OTHER'MS£ V. 'ff:RT ,,umcAL l+r!T ',tf/GHT
FOOT . INCH
DRAWN BY DESIGNED BY
kpff t!,,, ,,- ~ ILLABOT CREEK AUUVIAL FAN RESTORATION PROJECT SHEET RAJ AJK CAll !WO ~USIN[SS ,.., • ,.., A :'( coo ROCKPORT CASCADE RD CHECKED BY APPROVED BY om moR[ mu DIG ·• ,1.~rp~ PKG AMS
DATE 1-soo-m-ssss CV2 DEC. 19, 2017 1601 Sth Avenue, Suite 1600 ~ . ....,,. ---~, SHEET INDEX, SUMMARY OF QUANTITIES AND ABBREVIATIONS ~-.. --~~ ~ S C A L E: Seattle, WA 98101
J O B No. : 1700504 N.~ S 206.622.5822 I/ ~ om ~' ~ Skagit River NO. DATE BY CHO. APPR. REVISION www.kpff.com _ _ , .,., .-, S,r:• tem eoo,,.,,,tJve
1?' .,, M "' <..,
I
~ ~ §, l~ .9-~
"' ,{! .. <:: § 6 ~ ~ ~ ~ ~ .,,. c:, ~ ~ -:;,: ~ ~ i:ll s::; .., s::;
~ ~ ..., c:,
~ ~ "' c:,
1 '6
iti !': ~
.\
NO.
_-F_,_, ____ F
DATE
ROCKPORT CASCADE RD At 2 5+oo N58'20'14.14"£
RLL UUITS
BY CHO. APPR . REVISION
FINAL GRADING OUTSIDE ROW BY OTHERS
FINAL GRADING OUTSIDE ROW BY OTHERS
MST BRIDGE
SECTION 34, T. JS N., R. 10£., W. M. SKAGIT COUNTY, WA
AU UM/TS
PLAN 0 20 40 60
~ I I SCALE IN FEET
FINAL GRADING OUTSIDE ROW BY OTHERS
FINAL GRADING OUTSIDE ROW BY OTHERS
EAST BRIDGE
EX/SllNG RIGHTOfC WAY
EX/SllNG BRIDGE NO. 40094 TO REMAIN
- - -e---c- - c
CD- INSTALLATION OF CONSTRUCTION DETOUR IS TO 8[ COMPLETED BY OTHERS PRIOR TO BEGINNING BRIDGE AND ROADWAY CONSTRUCTION.
CD- CLOS[ ROAD TO TRAFFIC BETWEEN DETOUR TIE-INS, AND ROUTE TRAFFIC ONTO DETOUR.
Q)- INSTALL EROSION CONTROL {SP01-SP02}.
©- COMPLETE STRUCTURAL EXCAVATION ~i- -~I AND COMPLETE CHANNEL [XCA VA TION WITHIN COUNTY ROW. ~ SEE NOTE 1.
®- REMOVE EXISTING CUL VERT {SHEET SP02}.
DRAWN BY RAJ
®- CONSTRUCT BRIDGE ABUTMENTS AND BACKFILL STRUCTURAL EXCAVATION (4 TOTAL).
(J)- COMPLETE ROADWAY FILL AND PAV/NG (SHEETS GR01-GR02 AND RD01-RD02).
®- INSTALL SCOUR PROTECTION (SHEET set).
®- COMPLETE BRIDGE CONSTRUCTION.
@- ROUTE TRAFFIC ONTO NORTH LANE OF BRIDGES.
®- REMOVE CONSTRUCTION DETOUR AND CONNECT CHANNELS (BY OTHERS).
@- INSTALL GUARDRAIL AT FORMER DETOUR LOCATION.
@ - OPEN FULL ROAD TO TRAFFIC.
DESIGNED BY AJK CAll !WO BUSIN[SS
CHECKED BY APPROVED BY DAYS Bff 0~[ YOU DIG kpff PKG AMS
DATE 1-soo-m-ssss DEC. 19, 2017 1601 5th Avenue, Suite 1600
S C A L E: Seattle, WA 98101
J O B No. : 1700504 AS NOTED 206.622.5822 www.kpff.com
NOTES.· 1. LIMITS OF STRUCTURAL EXCA VATION AND CHANNEL
EXCAVATION SHOWN ARE THE APPROX/MA TE AREA REQUIRED TO LAY BACK THE SOIL. ACTUAL MEASUREMENT AND PAYMENT SHALL BE PER 2-09 OF THE SPECIF/CATIONS.
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
PROPOSED PROJECT SEQUENCING
NAVO 88
SHEET
CV3
-"
'
J
~ "" --..J SC I
ei g_ ., g, ts cl: 5-" ·~
5-§l
~ " :2 e -E
~ 1j ., 6 0 1l
"" ..,. c:,
~ ~ c,;-gl ~ I a ~ ~ -K.j
qj I;:
§ ~
~ ....:
' ~ c:,
"' ..,-c:,
" -ls
~ " c:, <.,
] qj
1 NO.
/ /
/ /
/
/ /
/
/
/ /
/
/ /
/'
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT COUNTY, WA
I I
c>""-...J.,
""-""-\,\0""- o-.0~ s<.;,,'r ,P ~sso'<--
0,-S \\) -\'<--~ o'<--~ I
/ ROW
- -- -- L,,,, -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- J -- -- -- -- - - - -,,,,71~ G I
/ /
/ /
/ /
,,,, / £
/ C: / .~ / I;;,
/ ;;! /
2oa+oo 209+00 A 1 LINE 210+00 211+00 / 212+00 ~ BEGIN PROJECT--------------- - --- - - - --- - - - --- - ----1 NSB'20'l 4.l4"E ___ --1 --- - --- - -+--- - --- - --+-- - --- - ---+- - // 7 --- 1- --- - --- - j
A 1 208+00.00 / 1 ~ N:540594.18 'S! ROCKPORT CASCADE RD /
/ s E:1477554.28 /// ~
1 ! - -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- .,.7 ///,,-£ -- -- -- -- -- -- -- -- :
,,,,,,,, I SURVEY MONUMENTS
POINT# NORlHING EASTING ELEVATION DESCRIPTION 20 541249.0272 1478594.1292 324.69 SET SCRIBED "X" ON CONC BRIDGE OVER ILLABOT CREEK, MIDDLE OF BRIDGE, NORlH SIDE, 3' OFF GUARDRAIL 30 541509.7865 1479005.7427 315.09 SET TRAVERSE REBAR W' PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, EAST OF BRIDGE, JUST EAST OF TWO TRACK 40 540759.6668 1477796.0526 317.09 SET TRAVERSE REBAR W/ PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, UNDER OVERHEAD TRANSMISSION LINES 41 541033.0681 1478242.9466 314.33 SET TRAVERSE REBAR WI PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, 20' SOUlHWESTERLY OF 24" CULVERT CROSSING 50 541319.9254 1477908.0243 314.16 SET TRAVERSE REBAR W/ PLASTIC CAP, IN OVERHEAD TRANSMISSION LINE CORRIDOR UNDER WESTERLY TRANSMISSION LINE 60 541882.1942 1478151.8384 302.31 SET TRAVERSE REBAR W/ PLASTIC CAP, SOUlHWEST SIDE OF ILLABOT CREEK, NEAR TOP OF BANK, 780' NORlHWESTERLY OF BRIDGE
DRAWN BY DESIGNED BY
kpff ····-TLC JRG CAll lWO BUSINESS
'((l CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG PDS PDS
DATE 1-800-424-5555 I• I DEC. 21, 2017 1601 5th Avenue, Suite 1600
' ~ S C A L E: Seattle, WA 98101
J O B No. : 1700504 1"=20' 206.622.5822 DATE BY CHD. APPR. REVISION www.kpff.com -- "V"/ ..
/
/ /
/
/
•• Skagit River System Cooperative
,,,,,,,,,, I 10 20 40
1 inch = 20 feet
LEGEND: -- - -- CENTERLINE
-- -- RIGHT OF WAY
- - - - EASEMENT
CONTROL POINT
ILLABOT CREEK ALLUVIAL FAN RESTORATION SHEET
ROCKPORT CASCADE RD
ROADWAY ALIGNMENT AL01
-"
'
J
~ "" --.J SC I
ei g_ ., g, ts cl: 5-" ·~
5-§l
~ " :2 e .E
~ 1j ., 6 0 1l
"" ..,. c:,
~ ~ c,;-gl ~ I a ~ ~ -K.j
qj I;:
§ ~
~ -:
' ~ c:,
"' ..,-c:,
" -ls
~ " c:, <.,
] qj
1
/ /
/
/ /
/
/ /
/
/ /
/ /
/
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT COUNTY, WA
TAX PARCEL P45724
RYAN TREE FARM LLC
I / I
I / ~Ro_w I ~f- - - -- -- -- -- -- -~ -~ - - -- -- -- -- -- -- -- -- -- - -11 C:>i °S! ~ I ~
;-~ _____ ~ ___________ ~QQ _______ -t ___ ~+.Q.0- _ -----4 ~~ _ ~c~2,R~S~scA
6
DE ~-· __ 1- ___ £~.; .. ~~-~~ ___________ ~ ____ -~·; c:i N582014.14 E 216+00 217+00 g: ~ ~
i~ - - - - - _ _,__. - - - - - - :~ - ROC~ CASCADE RD- - - - - - - - - - - - - - - - - j: ~~ I
w~ I P45724 RYAN TREE FARM LLC
I I
I I
0 10 20 40
1 inch = 20 feet
SURVEY MONUMENTS POINT# NORlHING EASTING ELEVATION DESCRIPTION LEGEND:
20 541249.0272 1478594.1292 324.69 30 541509.7865 1479005.7427 315.09
SET SCRIBED "X" ON CONC BRIDGE OVER ILLABOT CREEK, MIDDLE OF BRIDGE, NORlH SIDE, 3' OFF GUARDRAIL SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, EAST OF BRIDGE, JUST EAST OF TWO TRACK -- - -- CENTERLINE
40 540759.6668 1477796.0526 317.09 SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, UNDER OVERHEAD TRANSMISSION LINES -- -- RIGHT OF WAY 41 541033.0681 1478242.9466 314.33 SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, 20' SOUlHWESTERLY OF 24" CULVERT CROSSING 50 541319.9254 1477908.0243 314.16 SET TRAVERSE REBAR W PLASTIC CAP, IN OVERHEAD TRANSMISSION LINE CORRIDOR UNDER WESTERLY TRANSMISSION LINE - - - - EASEMENT 60 541882.1942 1478151.8384 302.31 SET TRAVERSE REBAR WI PLASTIC CAP, SOUlHWEST SIDE OF ILLABOT CREEK, NEAR TOP OF BANK, 780' NORlHWESTERLY OF BRIDGE
a CONTROL POINT
NO.
DRAWN BY DESIGNED BY
kpff ····-
•• ILLABOT CREEK ALLUVIAL FAN RESTORATION SHEET TLC JRG CAll lWO BUSINESS
'((l CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG ROCKPORT CASCADE RD PDS PDS
DATE 1-800-424-5555 I• I AL02 DEC. 21, 2017 1601 5th Avenue, Suite 1600
' ~ ROADWAY ALIGNMENT S C A L E: Seattle, WA 98101
Skagit River J O B No. : 1700504 1"=20' 206.622.5822
DATE BY CHD. APPR. REVISION www.kpff.com -- "V"/ .. System Cooperative
-"
'
J
ft .,, ...J '< I
~ ~ " f ~
3-
-~ " .9-§l
~ " :2 ] Ji ~ 6 <> is ~
~ ~ ~ :gJ
~ I
~ ~ -"" iii Li"
! ~ ....:
' ~ C,
"' ..,-C,
" -ls
~ " C,
<.,
] iii
1
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT COUNTY, WA
~ROW
l- -- -- -- -- ___/" --- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -
~ I 01 I.LI I I.LI VI \ 0 ..., 219+00 22o+oo A 1 LINE 221+00 222+00 223+00 ~ - --- - --- -1 --- - --- - - - --- - -- - N58'20'1'Li~ - -~ - --- 1- --- - --- - 1--- - --- - - - --- - - - ----~
~ END PROJECT VI
I I,,,~ ROCKPORT CASCADE RD A 1 223+oo.oo
~5.;_; ~• 'S! N:541381.56
!:c :::E
I I
I I
E:1478831.00
- - - - - - - - - - - - - -- - ~- - - - - - - - - - - - - - - -
f- Y'. ow mw <r: 0::: :::Ju
~ROW
I I
0 10 20 40
SURVEY MONUMENTS POINT# NORlHING EASTING ELEVATION DESCRIPTION
20 541249.0272 1478594.1292 324.69 SET SCRIBED "X" ON CONC BRIDGE OVER ILLABOT CREEK, MIDDLE OF BRIDGE, NORlH SIDE, 3' OFF GUARDRAIL 30 541509.7865 1479005.7427 315.09 SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, EAST OF BRIDGE, JUST EAST OF TWO TRACK 40 540759.6668 1477796.0526 317.09 SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, UNDER OVERHEAD TRANSMISSION LINES 41 541033.0681 1478242.9466 314.33 SET TRAVERSE REBAR W PLASTIC CAP, NORlH SIDE OF CASCADE ROCKPORT RD, 20' SOUlHWESTERLY OF 24" CULVERT CROSSING 50 541319.9254 1477908.0243 314.16 SET TRAVERSE REBAR W PLASTIC CAP, IN OVERHEAD TRANSMISSION LINE CORRIDOR UNDER WESTERLY TRANSMISSION LINE 60 541882.1942 1478151.8384 302.31 SET TRAVERSE REBAR WI PLASTIC CAP, SOUlHWEST SIDE OF ILLABOT CREEK, NEAR TOP OF BANK, 780' NORlHWESTERLY OF BRIDGE
DRA'hN BY DESIGNED BY ---------------, l----+----+---+---f-----+-------------1 TLC JRG CAll lWO BUSINESS kpff 1: ,;;·;-~ e ~
~~ ~-·"-·~ 1---1-----+----+---+---+---------------1CHEi6~ BY APPR~~ BY DAYS 8£FOR[ YOU DIG 1------+----+---+----+---+------------+--DATE 1-BQQ-424-5555
NO. DATE BY CHD. APPR.
DEC. 21, 2017
REVISION J O B No. : 1700504 S C A L E:
1"=20'
1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com __ -v .
1.. System Cooperative
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
ROADWAY ALIGNMENT
1 inch = 20 feet
LEGEND: -- - -- CENTERLINE
-- -- RIGHT OF WAY
- - - - EASEMENT
a CONTROL POINT
SHEET
AL03
---==--~ -- -
- ::::-
;
LEGEND: a1aum Ill/ U/ REMOVE CULVERT
- -- - RIGHT OF WAY
- - - - - - - - - - - - SAWCUT
---F--- FILL LINE
---c--- CUT LINE
I I I I I I I l REMOVE GUARDRAIL
~ WAffiE
- - - - - CLEARING AND GRUBBING
l~ I STABILIZED CONSTRUCTION ENTRANCE
r-................................................................ J REMOVE ASPHALT CONCRETE PAVEMENT, ~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::] FULL DEPTH
....:
~ ~
/
/ /
/
CONSTRUCTION NOTES: 1. STABILIZED CONSTRUCTION ENTRANCE (15'X100') TO
BE CONSTRUCTED IN ACCORDANCE WITH WSDOT STD PLAN NO. 1-80.10-02.
I\
EROSION AND SEDIMENT CONTROL NOTES: 1. THE ESC FACILITIES SHO\\N ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL
CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
2. THE ESC FACILITIES SHO\\N ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR THE ANTiaPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS.
3. ALL QEARING, GRUBBING, AND GRADING SHALL BE CONTAINED WITHIN THE LIMITS ESTABLISHED BY THE ENGINEER. ALL VEGETATION OUTSIDE DESIGNATED LIMITS SHALL REMAIN UNDISTURBED.
4. ALL STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND PROTECTED FROM EROSION BY MECHANICAL OR VEGETATIVE MEANS.
5. ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY SEEDING, MULCHING, MATTING, OR PLASTIC COVERING. FROM OCT. 1 TO APRIL 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPT. 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 7 DAYS.
0 10 20 40
1 inch = 20 feet
6. ALL POLLUTANTS OTHER THAN SEDIMENTS THAT OCCUR ON-SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWA TER. PER CURRENT VERSION OF DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WA.
7. SEDIMENTS TRANSPORTED ONTO A ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWl:EPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING SHALL BE ALLOWl:D ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. ALL COSTS ASSOCIATED WITH THIS WORK SHALL BE INCIDENTAL TO THE VARIOUS BID ITEMS.
8. CLEARING AND GRUBBING LIMITS SHALL EXTEND 5-FEET BEYOND THE CUT /FILL LINES AND OTHER CONSTRUCTION LIMITS OR WITHIN THE RIGHT OF WAY LINE. WA mES OR SILT FENCE SHALL BE INSTALLED AT LIMITS OF CLEARING AND GRUBBING OR AS NECESSARY. STATION AND OFFSETS OF SILT FENCE ARE APPROXIMATE.
9. DISTURBED AREAS SHALL BE SEEDED, FERTILIZED, AND MULCHED PER SPEaFICATIONS SECTION 8-01.
..,-c:,1---~--~--~----~--------------~----=~~-------------------------------------------------------------------~------< DRA'hN BY DESIGNED BY " -ls kpff ILLABOT CREEK ALLUVIAL FAN RESTORATION SHEET TLC JRG CAll lWO BUSINESS
CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG ROCKPORT CASCADE RD PDS PDS
DATE 1-800-424-5555 SP01 DEC. 21, 2017 1601 5th Avenue, Suite 1600 SITE PREPARATION AND TESC S C A L E: Seattle, WA 98101
NO. DATE BY CHD. APPR. REVISION J O B No. : 1700504 1"=20' 206.622.5822 www.kpff.com
~ "" si.: Uj I
~ ~ " f ~
3-
-~ " .9-§l
~ " :2 ] LEGEND: Ji ~
a1aum Ill/ U/ REMOVE CULVERT
6 - -- - RIGHT OF WAY <> is ~
- - - - - - - - - - - - SAWCUT
~ ~
---F--- FILL LINE
---c--- CUT LINE
~ I I I I I I I l REMOVE GUARDRAIL :gJ
~ ~ WAffiE I
~ ~
- - - - - CLEARING AND GRUBBING
l~ I STABILIZED CONSTRUCTION ENTRANCE -"" iii Li"
r-................................................................ J REMOVE ASPHALT CONCRETE PAVEMENT, ~::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::] FULL DEPTH
Ee ~ ..,. ~ ....:
' ~ C,
"' ..,-C,
" -ls
~ " C,
<.,
] iii
1 NO. DATE BY CHD. APPR.
(\ 0
CONSTRUCTION NOTES: 1. STABILIZED CONSTRUCTION ENTRANCE (15'X100') TO
BE CONSTRUCTED IN ACCORDANCE WITH WSDOT STD PLAN NO. 1-80.10-02.
DRA'hN BY DESIGNED BY TLC JRG CAll lWO BUSINESS
CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG PDS PDS
DATE 1-800-424-5555 DEC. 21, 2017
S C A L E: REVISION J O B No. : 1700504 1"=20'
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT OUNTY, WA
EROSION AND SEDIMENT CONTROL NOTES: 1. THE ESC FACILITIES SHO\\N ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUNCTION WITH ALL
CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
2. THE ESC FACILITIES SHO\\N ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR THE ANTiaPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS.
3. ALL QEARING, GRUBBING, AND GRADING SHALL BE CONTAINED WITHIN THE LIMITS ESTABLISHED BY THE ENGINEER. ALL VEGETATION OUTSIDE DESIGNATED LIMITS SHALL REMAIN UNDISTURBED.
4. ALL STOCKPILES ARE TO BE LOCATED IN SAFE AREAS AND PROTECTED FROM EROSION BY MECHANICAL OR VEGETATIVE MEANS.
5. ALL EXPOSED AND UNWORKED SOILS SHALL BE STABILIZED BY SEEDING, MULCHING, MATTING, OR PLASTIC COVERING. FROM OCT. 1 TO APRIL 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 2 DAYS. FROM MAY 1 TO SEPT. 30, NO SOILS SHALL REMAIN UNSTABILIZED FOR MORE THAN 7 DAYS.
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
6. ALL POLLUTANTS OTHER THAN SEDIMENTS THAT OCCUR ON-SITE DURING CONSTRUCTION SHALL BE HANDLED AND DISPOSED OF IN A MANNER THAT DOES NOT CAUSE CONTAMINATION OF STORMWA TER. PER CURRENT VERSION OF DEPARTMENT OF ECOLOGY STORMWATER MANAGEMENT MANUAL FOR WESTERN WA.
7. SEDIMENTS TRANSPORTED ONTO A ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR SWl:EPING AND BE TRANSPORTED TO A CONTROLLED SEDIMENT DISPOSAL AREA. STREET WASHING SHALL BE ALLOWl:D ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. ALL COSTS ASSOCIATED WITH THIS WORK SHALL BE INCIDENTAL TO THE VARIOUS BID ITEMS.
8. CLEARING AND GRUBBING LIMITS SHALL EXTEND 5-FEET BEYOND THE CUT /FILL LINES AND OTHER CONSTRUCTION LIMITS OR WITHIN THE RIGHT OF WAY LINE. WA TTILES OR SILT FENCE SHALL BE INSTALLED AT LIMITS OF CLEARING AND GRUBBING OR AS NECESSARY. STATION AND OFFSETS OF SILT FENCE ARE APPROXIMATE.
9. DISTURBED AREAS SHALL BE SEEDED, FERTILIZED, AND MULCHED PER SPEaFICATIONS SECTION 8-01.
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
SITE PREPARATION AND TESC
\
0
40
SHEET
SP02
---==--~ -- - --
- ::::-
;
LEGEND: --r-- Fill LINE
--c-- CUT LINE
t/://7/}// >j QUARRY SPALL PAD
....:
~ ~
/
/ /
/
I\ 1 inch = 20 feet
C) ,., 0 N
..,-c:,i------.----.---,r--.-----,--------------,=::-;-:::-:--=:-:----;<;,=""""'=-.--------,,-------------,-----"""T""------------,----------------------------------------1 DRA'hN BY DESIGNED BY
kpff e " -ls TLC JRG CAll lWO BUSINESS ILLABOT CREEK ALLUVIAL FAN RESTORATION SHEET
CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG ROCKPORT CASCADE RD
PDS PDS
DATE 1-800-424-5555 GR01 DEC. 21, 2017 1601 5th Avenue, Suite 1600 GRADING PLAN S C A L E: Seattle, WA 98101
NO. DATE BY CHD. APPR. REVISION J O B No. : 1700504 1"=20' 206.622.5822 www.kpff.com
ft .,, 9c (,j I
~ ~ " f ~
3-
-~ " .9-§l
~ ' " :2
J ] Ji ~ 6 <> is ~
~ ~ ~ :gJ
~ I
~ ~ -"" iii Li" Ee
c{l
"' ~ ....:
' ~ C,
"' ..,-C,
" -ls
~ " C,
<.,
] iii
1 NO.
LEGEND: --r-- Fill LINE
--c-- CUT LINE
t/://7/}// >j QUARRY SPALL PAD
1. SEE lllABOT CREEK CHANNEL RESTORATION - PHASE 2 SHEETS IN APPENDIX OF SPECIAL PROVISIONS FOR FINISHED GRADE IN CHANNELS.
DATE BY CHD. APPR. REVISION
(\ 0
DRAWN BY DESIGNED BY TLC JRG
CHECKED BY APPROVED BY PDS PDS
DATE DEC. 21, 2017
J O B No. : 1700504
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT OUNTY, WA
EDGE OF PAVEMENT/FACE OF GUARDRAIL
WING WALL
QUARRY SPALL PAD NTS
kpff CAll lWO BUSINESS DAYS 8£FOR[ YOU DIG
1-800-424-5555 1601 5th Avenue, Suite 1600
S C A L E: Seattle, WA 98101
1"=20' 206.622.5822 www.kpff.com
GRADE BREAK
FINISHED GRADE
VARIES, SEE PLAN 25'
(
6• KEY_/' QUARRY SPALlS (4 IN)
DEPTH
SECTION A
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
GRADING PLAN
\
0
40
SHEET
GR02
/
/
LEGEND: I I I I
~:::::::::::::::::::: ::::::j
....:
~ ~
GUARDRAIL
RIGHT OF WAY
ASPHALT PAVEMENT
/
___L /
/ /
/ /
/ /
/ /
/ /
/ /
/ /
/
1. CONSTRUCT GUARDRAIL NON-FLARED TERMINAL IN ACCORDANCE WITH WSDOT STD PLAN C-22.40-06.
2. CONSTRUCT BEAM GUARDRAIL TYPE 31 IN ACCORDANCE WITH WSDOT STD PLAN C-20.10-04.
3. CONSTRUCT GUARDRAIL TRANSITION TYPE 21 AND TYPE 23 IN ACCORDANCE WITH WSDOT STD PLAN C-25.20-06 AND C-25.26-03.
4. ATTACH THRIE BEAM TO BRIDGE BARRIER USING DESIGN F CONNECTION IN ACCORDANCE WITH WSDOT STD PLAN C-7 A, AND SHEET S18.
5. REFER TO SHEET S3 FOR PAVEMENT SECTION ON BRIDGES .
/ /
/ /
/
/
/ /
STA. Al 212+50.00, 11.78' RT BEGIN PAVEMENT
BEGIN 25: 1 TAPER MATCH EXISTING
-------7' /
/ /
/
/
/ /
/ /
/ /
TA. Al 212+50.00, 11.80' LT BEGIN PAVEMENT BEGIN 25: 1 TAPER MATCH EXISTING
STA. Al 213+00.87, 14.00' RT END 25: 1 TAPER
/
/ /
/
/
/ /
/
STA. Al 213+03.96, 14.00' LT END 25: 1 TAPER
;..,
BEAM GUARDRAIL TYPE 21
·~ NON-FLARED GUARDRAIL TRANSITION w, ,__-------~i-------------------a~~-TER MIN Al ~ TYPE 21 ~ el
~ ixi ~ ______;t; -
.;;
BEAM GUARDRAIL TYPE 31
I I
0 10 20 40
1 inch = 20 feet
..,-c:,1-----~--~~-~--~--~-------------------~~~~~----------------------~----------------------------------------------~--------< DRAWN BY DESIGNED BY " -ls kpff ILLABOT CREEK ALLUVIAL FAN RESTORATION SHEET TLC JRG CAll lWO BUSINESS
CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG ROCKPORT CASCADE RD PDS PDS
DATE 1-800-424-5555 RD01 DEC. 21, 2017 1601 5th Avenue, Suite 1600 ROADWAY PLAN S C A L E: Seattle, WA 98101
NO. DATE BY CHD. APPR. REVISION J O B No. : 1700504 1"=20' 206.622.5822 www.kpff.com
ft .,, §i! I
~ ~ " f ~
3-
-~ " .9-§l
~ ' " :2
J ] Ji LEGEND:
~ I I I I
6 <> is ~
~ ~
~:::::::::::::::::::: ::::::j
~ :gJ
~ I
~ ~ -".J iii
Li" Ee
c?l .., ~ ....:
' ~ C,
"' ..,-C,
" -ls
~ " C,
<.,
] iii
1 NO. DATE
BEAM GUARDRAIL TYPE 31
STA. Al 216+32.50, 14.00' LT STA. Al 215+27.50, 14.00' LT BEGIN PAVEMENT
TA. Al 215+27.50, 14.on' lT END PAVEMENT "'
c;;: ~
BEAM GUARDRAIL TYPE 31 ~
STA. Al 216+32.50, 14.00' RT BEGIN PAVEMENT
GUARDRAIL
RIGHT OF WAY
ASPHALT PAVEMENT
BY CHD. APPR. REVISION
BEAM GUARDRAIL TYPE 31
GUARDRAIL TRANSITION GUARDRAIL TRANSITION TYPE 21 TYPE 21
GUARDRAIL TRANSITION GUARDRAIL TRANSITION TYPE 21 TYPE 21
BEAM GUARDRAIL TYPE 31
1. CONSTRUCT GUARDRAIL NON-FLARED TERMINAL IN ACCORDANCE WITH WSDOT STD PLAN C-22.40-06.
2. CONSTRUCT BEAM GUARDRAIL TYPE 31 IN ACCORDANCE WITH WSDOT STD PLAN C-20.10-04.
3. CONSTRUCT GUARDRAIL TRANSITION TYPE 21 AND TYPE 23 IN ACCORDANCE WITH WSDOT STD PLAN C-25.20-06 AND C-25.26-03.
4. ATTACH THRIE BEAM TO BRIDGE BARRIER USING DESIGN F CONNECTION IN ACCORDANCE WITH WSDOT STD PLAN C-7 A, AND SHEET S18.
5. REFER TO SHEET S3 FOR PAVEMENT SECTION ON BRIDGES.
DRAWN BY DESIGNED BY TLC JRG CAll lWO BUSINESS
CHECKED BY APPROVED BY DAYS 8£FOR[ YOU DIG PDS PDS
DATE 1-800-424-5555 DEC. 21, 2017
S C A L E: J O B No. : 1700504 1"=20'
SECTION 34, T. 35 N., R. 10£, W. M. SKAGIT COUNTY, WA
STA. Al 218+42.50, 14.00' LT BEGIN PAVEMENT
GUARDRAIL TRANSITION TYPE 21
GUARDRAIL TRANSITION
STA. Al 218+42.50, 14.00' RT TYPE 21 BEGIN PAVEMENT
TA. Al 217+37.50, 14.00' RT END PAVEMENT
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
STA. Al 219+54.13, 14.00' LT BEGIN 25: 1 TAPER
BEAM GUARDRAIL TYPE 31
BEAM GUARDRAIL TYPE 31
STA. Al 219+59.77, 14.00' RT BEGIN 25: 1 TAPER
GUARDRAIL TRANSITION TYPE 23
GUARDRAIL TRANSITION TYPE 23
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
ROADWAY PLAN
STA. Al 219+96.10, 12.21' LT END PAVEMENT END 25: 1 TAPER MATCH EXISTIING
TA. Al 219+96.10, 11.00' LT END WHITE EDGE LINE MATCH EXISTING
221+00 1----
TA. Al 219+96.11, 12.57' RT END PAVEMENT END 25:1 TAPER MATCH EXISTIING
I I
0 10 20 40
1 inch = 20 feel
SHEET
RD02
-:
~ ~
360 ,-----,-------,-----,-----,------,------,-----,-----,------,------,------,----,------,------,------,----,------,------,--------.------,-----,----,------,
350 1-----+-----+----+-----+----+-----+-----+----+-----+---+------+-------t----+-----+---+------+----1-----+-----+----+-----+----t-----+-------I PVI 214+25.00 PVI EL=321.11
100· vc 340 1-----+----+-----+---+------+-----+-----+---+-----+-----+-------t---+-----+-----+---1----,---+-----+-----+----1-----;-+-----+-----+---+--------l
8 d
~ ~ N~
330 1------+----+------+----+-------l----+----t------+-~ CLC·l-~t---+-----+----+-----+----+----+---
0 0
~~ +"' ~7 ~- ~
"-
8 ~~ J: 1'-i N I( ~ u::l+------+-----+-----+------i r FINIS1ED GRADE
360
350
340 z: 0
~ ::::, z: ;:::: z:
330 0 u
"" e t:;:
320 1-_- _-_-_- _-+-_-_-_- _- _-+-f----_- _- _-+-_- _- _- _-_+-_- _- _-_-_-+_- _- _-_-_--+--_-_-_- _- _-+-_-_-_- _- _+-~--~ ~,0.§!50!!%t===± =:::::± ::;::::::;;:::::::;:~ ~===~~ ==:ti~~:±=:"""""~ ===F ==~ =====t==~ ===t====t====f==~ 2.44%
I 320 ~ _, - -----------
0
8 ----- -----~[~X:TI~;~~E--- ----- -----310 1------+----+------+----+-------1----+----1------+---~o, 0u,-----+-----+----+----+---------= 1~ ----+----+------+----+-------1----+----1------+----+--------<
~ [X)
0 g·~ + "' ~7
-' > u.J
~7 ~~
300 1-----+-----+---+------+----+------+-----+----+-----+----+-----+-~1=00·~v=c-+----1-----+-----+---+------+----+------+-----+---+------+----+--------l "-
I
~VI 213+10.00 i VI EL=318.31
290 t-----+-----+----+-----+----+-----+-----+----+-----+---+------+-------t----------+------+----1-----+-----+----+-----+----+-----+---~ I 211+20 211+60 212+00 212+40 212+80 213+20 213+60 214+00 214+40 214+80 215+20
310
300
290
360 .---------------------------------------------------------------------------------, 360
350 1-----+----+-----+---+------+-----+------t---+-----+-----+-------t---+-----+-----+-------t---+-----+-----+----l----+-----+-----+---+--------l 350
~
~ ra· ~ 340 1------+----+------+----+-------l----+----t------+----+------+----+-------l----+----t------+----+------+----+-------l----+----t---~;---1= ~:-· ------t-----i 340 ~ NI"")
~ ~1J ~ 8 330 1-----+---+----+---+-----t----+----t-----+---+----+---+-----t----+----t-----+---+----+---+-----t----+----t-----t-+---+-------, 330
E L--1---1---...i.--...i.-___J$L-+ --+ --+ --I~FI-NI-SH-ED-~-A~D-E--t----t----t---h --r --==r=-=::-::-:=t=-=-==-==r====r --, --r -1.T2
~_% _________ _ 5: 0.f0% _J -~ _1_ ii: 320 1-----+-----+----+-----+----+-----+-----+----+-----+---+------+-------t----+--- ~ -.--~ -+------+----1-----+-----+----+-----+---~-t-----+-------I 320 -------; ----- ---------- --- -----------~----- ---------- ----- --rE:S~:~:: i ~ ; ~ La.I I"") ~I"") tl 310 1-----+---+----+---+-----t----+----t-----+---+----+---+-----t----+------+1'-i ~1---+----+---+-----t----+----t-----+--i-J·-11+----+----1 310
Uu..l 1;;:u::l ~ "-
1501 vc PVI 219+20.00
300 1-----+----+-----+----+-------1----+----1-----+----+-----+----+-------1----+----1-----+----+-----+--<>-VI-Etl-323;5u---~ ----1----+----1-----+----+-------< 300
290 .__ __ ....__ __ _._ __ __.. ___ ..__ __ _.._ __ ___._ __ __.. ___ ..__ __ _._ __ __,__ __ ___. ___ ..__ __ _._ __ __,__ __ ___. ___ ....__ __ _._ __ __,__ ___ .__ __ ....__ __ _._ __ __._ ___ .__ _ ___, 290
216+00 216+40 216+80 217+20 217+60 218+00 218+40 218+80 219+20 219+60 220+00
A 1 - PROFILE H: 1'=20'; V: 1'=10'
~ ... a, ... ... VI
0 10 20 40
1 Inch = 20 ft. HORZ 0 5 10 20
1 inch = 10 ft. 'IERT
..,-c:,--~-----~--~--------------------------~----------------------~----------------------------------------------~---------< DRA'hN BY DESIGNED BY " -ls kpff ····-
•• ILLABOT CREEK ALLUVIAL FAN RESTORATION TLC JRG CAll lW0 BUSINESS
'((l CHECKED BY APPROVED BY DAYS 8£F0R[ YOU DIG ROCKPORT CASCADE RD PDS PDS
DATE 1-800-424-5555 I• I DEC. 21, 2017 1601 5th Avenue, Suite 1600
'~ ROADWAY PROFILE S C A L E: Seattle, WA 98101
Skagit River J O B No. : 1700504 H: 1'=20'; V: 1'=10' 206.622.5822
NO. DATE BY CHD. APPR. REVISION www.kpff.com -- "V "/ .. System Cooperative
SHEET
RP01 '" 1 ..._ _ __._ __ ----t....__ ...... __ ..._ __ ,__ ______________ ___,. ________ ..._ _____ ___,. ____________ ....._ ____ ,____. __________ .._ ___________________________________ ...._ ____ ____,
r ~ h: I
ei g_ ., g, ts cl: 5-" ·~
5-§l
~ " :2 e -E
~ 1j ., 6 0 1l
"" ..,. c:,
~ ~ c,;-gl ~ I a ~ ~ -K.j
qj I;:
§
"' ~ ....:
' ~ c:,
"' ..,-c:,
" -ls
~ " c:, <.,
] qj
1
R/W I
I I I I I I I I I
-r----------------------1
I I I I I I I I I I -----------T _______ _
I I I I I I I I I I I -,-------------------1
40'
5'
STA 212+50.00 TO STA 214+40.00
STA 216+32.50 TO STA 217+37.50
2.5' 3' SHOULDER
5'
5'
DRA'hN BY DESIGNED BY ---------------... l----+----+---+--f----+-------------1 TLC JRG CAll lWO BUSINESS t----t----+---+----+---+----------------1CHEi6~ BY APPR~~ BY DAYS 8£FOR[ YOU DIG 1-----+----+----+-----+--+-------------+--DATE 1-BQQ-424-5555
DEC. 21, 2017 S C A L E:
NO. DATE BY CHD. APPR. REVISION J O B No. : 1700504 AS NOTED
2· 1
11' LANE
i Al
11' LANE
PROFILE GRADE PIVOT POINT
3' SHOULDER
1 EXISTING GRADE 2· 2 ____________ [ ___________ _
A1 ROADWAY SECTION NTS
STA 212+50.00 TO STA 215+27.50 STA 216+32.50 TO STA 217+37.50 STA 218+42.50 TO STA 219+96.11
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
40'
2.5' 5'
5'
CONSTRUCTION NOTES: (D HMA CL 1 /2 IN PG 64-22
@ CRUSHED SURFACING TOP COURSE
@ CRUSHED SURFACING BASE COURSE
@ GRAVEL BORROW INCL. HAUL
@ BEAM GUARDRAIL ft'PE 31 IN ACCORDANCE 'MTH WSDOT STD PLAN C-20.10-04, C-22.40-06, C-25.20-06, AND C-25.26-03.
R/W I
I I I I I I I I I --------------------r---1
I I I I I I I I I
__________________ 1---
STA 212+50.00 TO STA 213+47.00
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
TYPICAL ROADWAY SECTIONS
SHEET
TS01
-:
~ ~
EH ~@All I@~~
36"X18" B/0 G20-2
SECTION 34, T. 35 N., R. 10£, W. M. / SKAGIT COUNTY, WA /
sr. 211'60.ao, 11.sd)_T0 / / / :6 / / / / / / BEGIN SAFETY TR~C DRUMS •"''f:/ /_ ~ ' / /
/ •"'" STA. 212+60.00, 4.00 LT / / END SAFElY TRAFFIC DRUMS /
/ •"'" / / // ~ /
/ / •"'" •tc'/ // / •"'"/ •"'" /
/ / "'" / // /~1/ /' /
____/ ~ ~ - - - / -2 ~ / ~ --- - -- - -- - ~ -
NOTES:
/ /
/ /
30"X36" W20-1
500'
/ /
-~~ / /1/•"'"
•"'"/ •"'" 500'
30"X36" W20-4 24"X24" W13-1P
1. REFER TO STD SPEC H0.3(3)K AND 9-35.14 FOR ADDITIONAL INFORMATION.
2. POST MOUNT SIGNS FOR LOCATIONS IN PLACE LONGER THAN 3 DAYS.
3. TEMPORARY ILLUMINATION IS REQUIRED AT STOP BARS AT NIGHT.
4. SAFElY TRAFFIC DRUMS SHALL BE PLACED 10' -0" ON CENTER \l,1-IERE CALLED OUT ON THE PLANS.
30"X36" W3-3
50'
DETOUR ROUTE BY OTHERS
STA. 211+60.00, 20.00' RT 24"X30" B/W
LEGEND:
R4-7b
~11(0)f llt:liU: !>IHI
[Rl[ID)
I:? STA. 211+10.00, 6.00' RT TEMP STOP BAR 24" R10-6
o SAFElY TRAFFIC DRUMS
- PORTABLE SIGNAL
I TYPE "B" WARNING LIGHT
~ TEMPORARY ILLUMINATION
~~ WORKZONE
PHASE 1 DETOUR ALTERNATING ONE-WAY TRAFFIC
PORTABLE TEMPORARY SIGNAL CONTROLLED 1"=100'
STA. 219+85.00, 4.00' LT BEGIN SAFElY TRAFFIC DRUMS
250' STA. 222+35.00, 11.10' LT END SAFElY TRAFFIC DRUMS
223+00 ROCKPORT CASCADE RD
STA. 222+35.00, 20.00' RT 24"X30" B/W R4-8b
50' 500'
~11(0)f 1-m,nu: IIIHI
[Rl[ID)
I:? STA. 222+85.00, 6.00' RT TEMP STOP BAR 24" R10-6
ROADWAY CENTERLINE
EDGE OF PAVEMENT
NOTES:
30"X36" W3-3
500' 500'
g~ IAAL lfi' IKL
30'X36" W20-4 24'X24' W13-1P
1. TEMPORARY TRANSVERSE RUMBLE STRIP ARRAYS SHALL BE INSTALLED AND REMOVED 'MiEN WORK ZONE SIGNS ARE INSTALLED AND REMOVED.
2. INSTALL THREE ARRAYS, SPACED AT 150' ON CENTER, 100' PRIOR TO W3-3 SIGN ..
3. DO NOT INSTALL TEMPORARY TRANSVERSE RUMBLE STRIPS ON HORIZONTAL CURVES.
4. INSTALL TEMPORARY TRANSVERSE RUMBLE STRIPS PER MANUFACTURER'S RECOMMENDATIONS.
TEMPORARY RUMBLE STRIP ARRAY DETAIL NTS
0
HD ~llllm !l@~K
36"X18" B/0 G20-2
30"X36" W20-1
I I
50 100
1 inch = 100 feel
200
..,-c:,1-----------------------------~------~----------------------------------------------------------------~-----1 DRAWN BY DESIGNED BY " -ls TLC JRG
CHECKED BY APPROVED BY PDS PDS
DATE DEC. 21, 2017
NO. DATE BY CHD. APPR. REVISION J O B No. : 1700504
CAll lWO BUSINESS DAYS 8£FOR[ YOU DIG
1-800-424-5555 S C A L E: AS NOTED
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
ILLABOT CREEK ALLUVIAL FAN RESTORATION ROCKPORT CASCADE RD
TRAFFIC CONTROL PLAN
SHEET
TC01
"" i ~ I
es ~ .~ "' .'3-
':;:,-
"' ~ q; "" § 6 ~ ~
<.5
0 is "' ~ c!; iS ~ :;,;
i,; (;:
§ .... .... ~ Oi c:, I ~ ~ ..-, c:,
"' -ls ~ c!§:
E ~ i,;
1
GENERAL STRUCTURES NOTES 1. ALL MATERIAL AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF THE
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION 'STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION~ DA TED 2016, AMENDMENTS AND PROJECT SPECIAL PROVISIONS.
2. THE STRUCTURE HAS BEEN DESIGNED IN ACCORDANCE WITH THE REQUIREMENTS OF THE AASHTO LRFD BRIDGE DESIGN SPECIF/CATIONS SE'IENTH EDITION - DA TED 2014 THROUGH 2016 INTERIM REVISIONS.
J SEISMIC DESIGN OF THE STRUCTURE HAS BEEN COMPLETED USING: PGA = 0.25 As = 0.32 Sos = 0.76 So, = 0.38 SITE CLASS = D
FOR ABUTMENT WALLS AND WING WALLS: UNIFORMLY DISTRIBUTED LATERAL SEISMIC
LOAD = lH PSF
4. DESIGN LOADS.· DEAD LOAD:
CONCRETE - 155 PCF SUPERIMPOSED DEAD LOAD FOR ASPHALT O'IERLA Y - 140 PCF
I.M..1QAk 'IEHICLE - ASHTD HL93 W/IMPACT SURCHARGE - 250 PSF
EARTH PRESSURE: LATERAL - 35 PCF EQUIVALENT ACTl'IE FLUID PRESSURE
- 440 PCF EQUIVALENT PASS/'IE FLUID PRESSURE
5. UNLESS OTHERWISE SHOWN IN THE PLANS THE CONCRETE CO'IER MEASURED FROM THE FACE OF THE CONCRETE TO THE FACE OF ANY REINFORCING STEEL SHALL BE THREE INCHES AT THE BOTTOM OF THE FOOTINGS, TWO INCHES AT THE TOP OF THE FOOTINGS, AND ONE AND ONE HALF INCHES AT ALL OTHER LOCATIONS.
6. ALL CAST-IN-PLACE CONCRETE SHALL BE CLASS 4000, UNO.
7. REINFORCING STEEL SHALL BE ASTM A706, GRADE 60.
8. ALL EXTERIOR CORNERS AND EDGES SHALL HA 'IE A 3/4" CHAMFER AND ALL INTERIOR CORNERS SHALL HA 'IE A 3/4' FILLET UNO.
9. ALL EXISTING DIMENSIONS AND ELEVATIONS SHALL BE 'IERIFIED IN THE FIELD BY THE CONTRACTOR PRIOR TO WORK. CONTRACTOR SHALL CONTACT PROJECT ENGINEER WITH ANY DISCREPANCIES.
10. THE GEOTECHNICAL REPORT PROVIDED BY GEOENGINEERS, DATED OCTOBER 12, 2017, WAS USED FOR DESIGN.
II. THE HYDRAULIC REPORT PROVIDED BY NATURAL S'fSTEMS DESIGN, DATED NO'IEMBER 9, 2017, WAS USED FOR DESIGN.
12. HMA PLACEMENT, INCLUDING PRIMER MEMBRANE AND FABRIC WATERPROOFING, SHALL BE INSTALLED IN ACCORDANCE WITH SECTION 6-08 OF THE PROJECT SPECIF/CATIONS.
LEGEND
@ 1 IDENTIFIES SECTION, VIEW OR DETAIL
TAKEN OR SHOWN
B ~ ON BRIDGE SHEET NO
TAKEN OR SHOWN ON THE SAME SHEET
w DENOTES EPOXY COATED RE/NF
TP-1-$- TEST PIT BY GEOENGINEERS, 2017
B-1+ 'JORING BY GEOENGINEERS, 2011
DR AWN BY RAJ
DESIGNED BY AJK
1---- -+------1---+--+-- ---1- ------ - --- -------1 CHECKEO BY APPROVED BY AMS
NO. DATE BY CHO. APPR. RE VISION
PKG
DATE DEC. 19, 201 7
J O B No. : 1700504 S C A L E:
N. T.S.
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
ILLABOT CREEK ALLUVIAL fAN RESTORATION PROJECT ROCKPORT CASCADE RD
GENERAL STRUCTURAL NOTES
- - ------------------- ------ ---- ---
SHEET
S1
~
~ ~ 6; <::,
~ ~
CIP CONCRETE WNGWA/.L TYP
BRIDGE RA/UNG, TYP EXIST GRADE IOO YEAR FLOOD
PLAN
SCALE IN FEET
PROPOSED FINISH GRADE A T PROFILE UN[, TYP
100 YEAR FLOOD EST £L JI 4.10
O PROFILE £ST EL 314.10
__________ _::u~~:·_TYP ___ ~....Jm~-~~~~~~~~~!~~~~~~~f~~~~~~~~~~~~~~t~:immiaiiU----===as.=~=---•B~,fij~:_~~~~~~~~~~~~J~_;~;:,,;_;.;J,;:.,:_:~~~~JJ!e'~-~-~~-~-=-~-~-~-=__=:e-~--~-~-=-~---------------------- - - --------------
EL 302.41
REF UN£ £L 290.00
NOTES: I. Sff ILLABOT CRffK CHANNEL R£STORA TION - PHASE 2
SHffTS IN APPENDIX OF SPECIAL PROWS/ONS FOR FINISHED GRADE IN CHANNELS.
RIPRAP SCOUR PROTECTION APRON, TYP
WfST BRIDGE
£L 302.41
£ST J '-9 1/ 4' MIN VERT CLR AT GIRDER
ELEVATION 0 20 40 t..J-V-1 I
SCALE IN FEET
£L 302.45
NA Tl"f: MA TERIAL. TYP
EAST BRIDGE
60 I
£ST 4'-2 1/2' MIN 'ff:RT CLR A T GIRDER
£L 302.45
PRECAST PRESTRESSED WD39DG BULB TEE GIRDER LOADING: HL-9....;:;_J __
NAVO 88
~1----------,---,---,.---------------.---...,,,.,.--===-:~--------,,------------.--------4-,-----------'T----------------------------------,r-------i DRAWN BY DESIGNED BY
kpff ~
'" ~ E ~ i,;
E
RAJ AJK
CHECKED BY APPROVED BY PKG AMS
DATE DEC. 19, 2017
CAll rwo BUSINm ILLABOT CREEK AUUVIAL FAN RESTORATION PROJECT SHEET
DAYS Bff O~( YOU DIG ROC KPORT CASCADE RD
H~~-4L4-5555 1601 5th Avenue, Suite 1600 BRIDGE PLAN AND ELEVATION S C A L E: Seattle, WA 98101 S2 206.622.5822
~ 1.-....;__._..;;.;_;.;..;;_....1.....;;.;.;---1.....;....;;.;.;...1.--_.....J. ______ .....;;......;_.;;._ _____ ...1..... ______ _,_ _____ ---1.___--"-"'==;.;;;_----'-4--"----...... ----------'----------------------------------.__-------' J O B No. : 1700504 AS NOTED NO. DATE BY CHO. APPR. RE VISION www.kpff.com
BRIDGE RAILING, TYP \
~ ""' "i Sl
I
~ ~ "' -~ ~ -:;::-
Jl ~
"' e 6 1i ., (3
0 .., ,Q ~ .... ~
~ :;.:
s; [;:
E: ~ .... "' ..., --; "' ...!_
~ --<'4
~ s;
~ " .9,
"' ~ s; E: ~ NO. DATE BY CHD. APPR. REVISION
1'- 7 112· 14'-o·
J'- 0" SHlf)R
2" HMA 01-f"RLA Y
PRECAST PRESTRESSED W:J9DC GIRDER, TYP
DRAv.t, BY DESIGNED BY RAJ AJK CAll lWO ~USl~[SS
CHECKED BY APPROVED BY om mo~[ YOU DIG PKG AMS DATE 1-800-41HJJJ
DEC. 19, 2017 S C A L E:
J 0 B No. : 1700504 AS NOTED
11·-o· LANE
31'-J"
28'-0" ROADWAY
f BRIDGE ROCKPORT CASCADE ROAD
TYPICAL SECTION SCALE: 1/2"= 1'-0"
kpff 1601 5th Avenue , Suite 1600 Seattle, WA 98101
206.622.5122 www.kptf.com
11·-o· LANE
14'- o·
J'-o· SHWR
1'-7 112·
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
TYPICAL SECTION
0 2 4
SCALE IN FEET
SHEET
S3
~ "' "' ~
I
~ ~ " .~ ~ ~ ~ ., ~ '3 " % 6 ~
~ () -g "" <::.
~
8 :::: -:;.: ~ E: ~ ... "' "' ,;-; <:s ,-'-. ~ --"' ~ ~ ~ <:,
-~ ] .;
I NO. DATE
PLACE ENO DIAPHRAGM, TrP
BY CHO. APPR.
f ABUTMENT
I
f ABUTMENT
I
f ABUTMENT
I
STEP 1 - SET GIRDERS IN PLACE STEP 2 - EQUALIZE GIRDER CAMBER IF NEEDED, WELD
AND GROUT GIRDER WELD TIE CONNECTIONS
PLACE INTERMmtA TE 0/APHRACMS. TrP
STEP J - PLACE GIRDER STOPS AND PLACE DIAPHRAGMS
STEP 4 - REMOVE GIRDER EQUALIZING EQUIPMENT
BR/OGE RA/UNG
--
STEP 5 - PLACE BRIDGE RAILING AND CURB
PROPOSED BRIDGE SUPERSTRUCTURE CONSTRUCTION SEQUENCE PLAN
DRAl'IN BY DESIGNED BY RAJ AJK CAll !WO ~USIN[SS
CHECKED BY APPROVED BY om ~rroRr mu DIG PKG AMS
DATE 1-soo-m-ssss DEC. 19, 2017
S C A L E: REVISION J O B No. : 1700504 NTS
f ABUTMENT
I
f ABUTMENT
I
f ABUTMENT
I
- _j
kpff ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT SHEET
ROCKPORT CASCADE RD
S4 1601 Sth Avenue, Suite 1600 PROPOSED CONSTRUCTION SEQUENCE Seattle, WA 98101
206.622.5822 www.kpff.com
I I
~ " . I ~
~ -,, '<'i ~
I
i " I ~
V>
~ ".;
" § 6 i:i ~ o -g ~ ~
8 ~ :;.:
;,; c.: E: S:-"' "' ..., ~ ..!_
~ -· "' " ., c::.
~ ~ .!l 1 ;,;
1 NO. DATE BY CHD. APPR.
f f---11£-S_T_AB_U_™_'EN_T_1 __ -=97_'-_,__7' _ _________ '\,----I ~, ~-"
'f llfST ABUT 1 A T PROf/LE LINE
'f llfST ABUT 2 AT PROf/LE LINE
_ __ Rt:}_CKPORT ~ASCADE !!!)------rt-NSB'20'14,14·r
5'-4 112·
12'-J'
tJQID;_ 1. ABUTl,/[NT ifs ARE PERPENDICULAR
TO ROCKPORT CASCADE RD.
REVISION
~ ST BRIDGE
DRAWN BY DESIGNED BY ~AJ AJK
CHECKED BY APPROVED BY PKG AM S
DATE DEC. 19, 2017
J O B No. : 1700504
~ ':.,., .. 1 ... 1
~ ~ -1. 1- ----
~ ~ " " . I _, ~ ~
5'-4 112·
12'-J'
FOUNDATION LAYOUT PLAN SCAL[' 1·= 5'-0'
kpff CAll 1WO BUS!Nm om Bff 0~[ YOU DIG
H00-414-5555 1601 5th Avenue, Suite 1600
S C A L E: Se attle, WA 98101
AS NOTED 206.622.5822 www.kpff.com
f f.--[A_S_T A_B_U™_ 'E,_N_T_1 _ ___,9'--'---r--'-7'--'--- -----'\,~--1 EASr AOOMNr 2
TA A1 17+41. 1 'f EAST ABUT 1 A T PROFILE LINE
- -- - ---It- -- -
5'-4 112·
EAST BRIDGE
ILL.ABOT CREEK ALLUVIAL f'AN RESTORATION PROJECT ROCKPORT CASCADE RD
FOUNDATION LAYOUT
0
~ " _, ~
5 10 15
SCALE IN FEET
SHEET
ss
~ ~
~ ()\
I
~ ~ "' -~ ~ ~
"' ~ .; § 6 ii ~ c .,, J? ~
~
8 :::: :;.:
~ I .,., r<.: ...., 8 ..!_
~ --"' ~ ~ ~ .,
~
·' '<> /4, TYP
• ELEVATION
BRIDGE & ROCKPORT CASCADE ROAD
- -ti """'\_~ I BACK OF PA 'N'T SEAT
STA Al 215+27.50
1 _,, f GIRDER A
I I
I
I
I
TYP--~~ ___________ 1_5_'-7---'-1/2_' _______________________ 15_'-_7 -'-1/;_'2' __________ ~
• ELEVATIONS ARE SHOWN AT TOP OF GROUT PAD AND CENTERUNE OF BEARING. SEE BEARING ELEVATION TABLE
Jl'-J"
0 4 6 ABUTMENT PLAN I i= J SCALE IN FEET w ABUT I SHOWN. OTHER ABurs Sill [ ::r I ! ~ ~ cq ! I tn f BRIDGE & ROCKPORT w rn I , l.J..J l CASCADE ROAD uJ _ L
,J_ '=-~1 r .e!, =-=i I I ~ ~ I I
____.......---.f 1 - - --- - --- -u--- --- - -- - - -- - - "?J_ __ --1
-- _ _ 3l_- - ----- -- - --- --u- - ----- - - --~....--,___ --- ___ J- - ---- ----- ---') (--- ----- ----- ---L___ -r-
- ') ( - - (JI /.:5 ff ') ( GIRDER STOP I 11 ') ( - - '\ ( - - . )
I I ,____Y - ------< SEE SHEET SIO 1 1 I I
) \_ .r+- ---+-y \_ FOR DETAILS _,) ".. -..r----~ ...---- ----. _ _ ) \_
~ / SEE SPACING DETAIL, ~ SHEETS7
/8 NF, /8 FF. /5 TOP BAR O 8"
/8 TOP & BOT O B" MAX
0 2 4 ABUTMENT ELEVATION
'MNGWALL, TYP
BEARING ELEVATION TABLE GIRDER
HfST ABUT. I
HfST ABUT. 2
EAST ABUT. I
EAST ABUT. 2
'MNGWALL, TYP
A 8 C D E 317.68 311.80 311.93 317.80 317.68
318. 14 318.26 318.39 318.26 318.14
318.72 318.84 318.97 318.84 318.72
319.19 319.JI 319.44 319.JI 319.19
NOTES: I. /4 CORNER BAR AND /9 FILLET BARS NOT SHOWN
FOR CLARITY. SEE ~FOR DETAILS.
'\!9 0 4
SCALE IN FEET
DRAWN BY DESIGNED BY l------+---+---+------l--+---------------1 RAJ AJK
1------+---+-- -+------l--+---------------1CHECKED BY APPROVED BY
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
PKG AMS ·'!?
1 1------+---+-- -+-- ----1---+--------------+----c-DATE
CAll 1WO ~USIN[SS DAYS BffOR[ YOU DIG 1-soo-m-m~ kpff
ii) E ,g NO. DATE BY CHD. APPR.
DEC. 19, 2017
REVISION J O 8 No. : 1700504 S C A L E: AS NOTED
1601 5th A.venue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
ABUTMENT PLAN AND ELEVATOIN
SHEET
S6
~ "' "' ol
I
~ §.. §, ·~ ~ :::,. "' ~ ~
" ts <S 11 ~ c; -<> Ji! .i::'._
<!; § :::: :;.;
~ E: ~
"' " ...., "> <:::S
~
~ -· "' ~ ~ ~ <:,
•!!!
1 <ti ~ NO. DATE ""
BY CHO.
/4
/8
NEAR FACE
5'-4 1/2'
/5 TOP BAR
/4 TIE
/8
FAR FACE
/4 0 TOP &- BOT O a• MAX
/
11/NGWALL BEYOND, SEE SHEET S8 FOR DETAILS
6'-10 112·
12·-3•
SECTION SCALE: 3/4·= l'-o•
{ /4 TIE, TYP
APPROX 5• BASED ON HORIZ BAR SPACING
APPROX 1•-4• BASED ON ',fRT BAR SPACING
1112· CLR TYP
ELEVATION TIE SPACING DETAIL SCALE: 3/4·= 1•- 0•
DRAl'IN BY DESIGNED BY RAJ AJK CAll lWO ~USIN[SS
CHECKED BY APPROVED BY DAYS mo~[ YOU DIG PKG AMS
DATE 1-800-41H555 DEC. 19, 2017
S C A L E: APPR. REVISION J 0 B No. : 1700504 AS NOTED
BACKFILL FOR WALLS TO TOP OF S1JBGRADE
BACKFILL FOR DRAIN
kpff 1601 5th Ave nue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
1 • THICK PREUOLDED JOINT FILLER, FULL 1110 TH OF 11/NGWALL AT GIRDER Fl.ANGE
SIU CONE SEALANT
3•, BACKER ROO
JOINT DETAIL SCALE: 3•= 1•- 0• GD
3•, 'llfEP HOLE AT 12' MAX
5•, UNOERDRAIN PIPE TO OUTLET THROUGH IIINGWALL AT BASE OF SLOPE
DRAINAGE DETAIL SCALE: 1/2.=1'-o•
FINISH GRADE
',fRT BAR, TYP
HORIZ BAR, TYP
90' BEND
1• MIN
2• CLR TYP
/4 HOOi( TIE BAR AROUND HORIZ &- '<fRT BARS
180" BEND 111TH STD HOOi(
TIE BAR DETAIL NTS
ALTERNATE HOOl(S ON E'<fRY OTHER TIE BAR {HORIZ &- ',fRT}
IUABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
ABUTMENT DETAI LS
SHEET
S7
t <>;;
Sl I
e5 ~ %,
I ~
"' ~ ., g 6 11 ., (;
0 15 "" <::'..
~ § :::: :;.:
~ Ee dl-.,., " ...., "'i c:, ,-!_
~ -· "" <, ., c:,
~ ~
" •!!1 § -2 <ti
j NO.
TOP OF ABUTMENT WALL
DATE
TOP OF FILLET TOP OF 'MNGWALL
,-
BY CHO. APPR.
f ABUTMENT f BEARING
I
I I I I I I I I Ii I
*SEE 'MNGWALL ELEVATION TABLE. THIS SHEET.
END DIAPHRAGM BEYOND WINGWALL ELEVATION TABLE
ABUTMENT ELEV. A ELEV. B llfST ABUT. 1 316.14 309.08 llfST ABUT. 2 316.61 309.08 EAST ABUT. 1 311.18 309.12
EAST ABUT. 2 317.65 309.12
/4 0 12' MAX FF ,t NF
-------1---o-. -ill 0------- UNDERDRAIN, SEE SHEET Sl FOR DETAILS
WINGWALL ELEVA TION SCALE: 3/4"= 1'-0"
(BR/OGE RAILING NOT SHOWN)
REVISION
DRA'IIN BY DESIGNED BY AJK
CHECKED BY APPROVED BY PKG AMS
DATE DEC. 19, 2017
J 0 B No. : 1700504
ABUTMENT FOOTING BEYOND
kpff CAll lWO BUSIN[SS om mo~[ mu DIG 1-800-424-5555
16015th Avenue, Suite 1600
S C A L E: Seattle, WA 98101
AS NOTED 206.622.5822 www.kpff.com
~ · ' "'
• ~ /4 CORNER BAR AT 12· SPA
• i /6 SPACED (m~~ FF HOR/l
., /6 BAR
/6 FILLET BAR SPACED TO MATCH FF HORIZ /6 BAR
•
/4
1o ·' "'
(3) /4 0 EO SPA
FILLET
SECTION SCALE· 1 • = 1 '-o·
/4 CORNER BAR AT 12" SPA
/6
FAR FACE
/6 FILLET BAR SPACED TO 1,/A TCH FF HOR/l /6 BAR
/4
/6 SPACED TO 1,/A TCH FF HORIZ /6 BAR
FAR FACE
SECTION SCALE- 1'= 1'-0'
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT SHEET
ROCKPORT CASCADE RD
WINGWALL SECTIONS AND DETAILS S8
~ .,, ~
I
~ ~ "' I 5 ~ " § 6 t; ~ 0 -0 ,!.1 ~
~ ~ :;.;
~ 1' ~ c:,
~ .., c:, r-'._
~ -· "' ~ c:,
~ .g
" .!,!
j <ti g :,: NO.
I I f ABUTl,l[NT I
[Q
FR(X>{T FACE OF ABUTl,l[NT WALL
~ ·' ~ BACK OF
·" PA ITT/ENT SEA T ..., .I <o Cl, f'--+-1-- -----------------
~ ~ ~ ·' ~
INTERU[DIA TE DIAPHRAG/,1
[Q
ROCKPORT CASCADE RD
f IN TERU[DIA TE DIAPHRAG/,1
[Q
FR(X>{T FACE OF ABUTl,IENT WALL
f ABUTl,ffNT 2
________ _______ __ ,,_,-+---H- +-~-CIR A
BACK OF PAVEUENT SEAT
- --- - --- - --- - - -- - ---'-t-'-1- +--.· CIR B
~ ------------++--+-...;.--- -------------------------------------------------------------+---+-;+- ~-----------
DATE
~ ·' ~ ·" ..., ·' <o Cl,
~ ~ ~
STA Al 215+27.50 f HfST ABUT I BACK OF PA VEUENT SEAT STA Al 217+37.50 f EAST ABUT I BACK OF PA VEUENT SEAT 1-t-+-r-------------- ---- -
~-------------+-t+-+-1------
BY CHO. APPR.
END OF GIRDER
REVISION
HfLD- "E, TYP SEE SHEET S/3 FOR DETAILS
DRAWN BY DESIGNED BY RAJ AJK CAll rNO BUSINm
CHECKED BY APPROVED BY om Bff OR[ YOU DIG PKG AMS DATE 1-soo-m-ssss
DEC. 19, 2017 S C A L E:
JO B No. : 1700504 AS NOTED
N58'20'14.WE
EDGE 'ltr39DG GIRDER
FRAMING PLAN SCALE: 3/16'= 1'-0'
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.58U www.kpff.com
STA Al 216+32.50 HfST ABUT 2 BACK OF PAVEUENT SEAT STA Al 218+42.50 EAST ABUT 2
------------------,-t---.l- +--f< CIR D BACK OF PAVEUENT SEAT
------------------1-t--tt- +--f< CIR E
£ND OF GIRDER
l:JJ2JL I. 'MNGWAllS NOT SHO'M-1 FOR CLARITY.
ILL.ABOT CREEK ALLUVIAL f'AN RESTORATION PROJECT ROCKPORT CASCADE RD
FRAMING PLAN
8
I SCALE IN FEET
12
SHEET
S9
16
I
t ~
I es ~ %, ·~ ;,.. -::::-"' ~ ~
"' § 1S
1l 6 0 -g ,;,. <::::.
~ :::: :5.:
~ E: ~ c:, ti:; ")
"i c:,
~ ~ --"" <.,
~ ~ ~
-~ 1 "' §
"" NO.
~L-... -v £ND DIAPHRAGI,/
«' 1::i ~ (' GIRDER
~=============::t==============L ~ ~--------1-1 _____ ,4/
£LASTOl./£R/C BEAR/NC PAD C{j S££D£TA/L 6
r ELASTOM[RIC STOP PAD
I ,._. l/2- 'f ,._, l/2" I
f=II,..._____ i~I GIRDER STOP
ELASTOMERIC STOP PAD
-,-hD[R
I I I
: I : I I I I I
118' CAP B£TYrffN £LASTOl,f£RIC STOP PAD AND GIRDER, TYP _J I L_
--------- i --------- r----q~ ! ~ .L___j__-::: ----bE-~=='=~_-=='=~-~~/f---~====- -==~~/ I==_±=±); SCALE: /' = 1·-0·
OUROM£TER HARDNESS = 60 r
1 ..,
K~~r':~,c -v 1
1 --------------t------« -------1 ] -~ ,,,-CONST JOINT W/ STOP PAD, TYP ___,.. Hi,>----------i-------+--- --'... V ROUGHENED SURFACE
I (
DATE BY
r I -
1'-7 11/16' 1'- 7 11/16' I\ I \_ OUTSIDE FACE OF ABUTMENT
GROUT PAD PLAN
--
SCALE: /' = I '- D'
--
J-:RD£R
I I I I I
_j I L"f--mH I / ~ 1/2' RECESS
- -----------:-,--~-'----------~.,~
I - - --------~- -
11/2'_]' AT ff. BRC
'
GROUT PAD ELEVA noN NTS
CHO. APPR. REVISION
r GIRDER
3'- 0 3/8' I
/'-6 3/16' I /'-6 3/16'
~ I
6-u;j---B~I
DRAWN BY DESIGNED BY RAJ AJK
CHECKED BY APPROVED BY PKG AMS
DATE DEC. 19, 2017
J O B No. : 1700504
II \__ 2.30' THICK LAMINA TED ELASTOMER/C BEAR/NC PAD. (2) 1/4' ELASTOM£R/C LA/JS (I-TOP Jc I -BOTTOM) (3) 1/2' £LASTOM£RIC LA/JS (4) 14 CAC£ AASHTO /J 251 SHI/JS B£TW££N EACH LAU.
ELASTOMERIC BEARING PAD DETAIL rf\
SCALE: /' = l'-o· \._J
1/4' COITT? r 14 CA SHI/JS
I
I --
I ---L-------L=:,1;;,,---
SECnON NTS
kpff ----- e CAll IWO ~USIN[SS ij~rg~ DAYS mo~[ YOU DIG ~~~.~ ~ ! /~ ~- .. ~ 1-800-424-5555 1601 Sth Avenue, Suite 1600 I, 'fl!. ~ I ...,_ <--Ai;',
~ ~ S C A L E: Seattle, WA 98101 rl&""'-'-" ~~ ~ 'is,,,N
AS NOTED 206.622.5822 I/ ~ o•,- 't!t>'\ ,v..M\'11 Skagit River www.kpff.com . ........, Sy•tem ~•tlvo
5/8' FROM FACE OF GIRDER TD FACE OF CIRD£R STOP, TYP
NOTES:
- ---------- - --- 1---- __ \_ '\. /
l CROIJTIPAD \_£LASTOM£RIC BEAR/NC PAD
GIRDER STOP DETAIL NTS
I. GIRDER STOPS SHALL BE CONSTRUCTED AFTER GIRDER PLAC£/J£NT.
2. THE ELASTOMERIC STOP PADS SHALL BE C£/JENTED TO CIRDER STOPS WITH APPROITTJ ADHESIVE
BEARING DESIGN TABLE SERVICE 1 LIMIT STA TE
AASHTO METHOD B DESIGN DEAD LOAD REACTION (KIPS)
UVE LOAD REACTION W/0 1/JPACT (KIPS}
UNLOADED HEIGHT {INCHES)
LOADED HEIGHT (DL) {INCHES)
ELASTOI.IER SHEAR /JOOIJLUS O 13' F {PSI)
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
BEARING DETAILS
81).07
61.04
2.30
2.29
165
SHEET
S10
~ "" ~
I
~ ~ §,
l -:;:,.
U)
~ ~
" § 6 ii ~ C) ,:, ,Q ~ .... <:,
2 :::: ::;.;
~ E ~ C,
~ .., C,
...!_
~ ...:
"" Ji ~ ~ .j)
" ] ;,; E ~ NO.
TOP PLAN CIROER ENO DETAILS /JIN CONC
COMP STF?ENGTH FLANGE L£NGTH
t:l £ CIROER (ALONG Pt P2
~ TO CIROER !.'.:! £ JOINT GRADE) ~ ~ b,j
~ B (SEE CIRDER ~~ ~~ ~ - "" 1l:l " ~o NOT[ 1) ~ ~ Qi.;: Qi.;:
'M"390G 3'-1 112· 101'-1" A A l'-9" 1'- 9" 6.25 5.0
AHEAD ON STATION/NG
1 BEARING I BEARING
I SHIPPING SUPPORT I SHIPPING SUPPORT LOCATION LOCATION
: I es ~ ,---1-,_,..... _______ -------1---,- 1- ,-~ I I I I I
t-+--+1--+--+-------, 1------1---+--+-+-1 ,... __ - f--t--i--1- - f-- - __ _... - - - -t-j--i-
DATE
I I 1 I I I I I I
Lr
PLAN LENGTH ALONG CIROER GRADE
GIRDER SCHEDULE LEGEND LL ANO Lr ARE SHIPPING SUPPORT LOCA TJONS AT LEADING ANO TF?AILING
ENOS. RESPECTJ...r:L Y
BY CHD. APPR. REVI SION
DRA\\N BY DESIGNED BY RAJ AJK
CHECKED BY APPROVED BY PKG AMS
DATE DEC. 19, 2017
J 0 B No. : 1700504
GIRDER SCHEDULE NUUBER OF STF?ANOS LOCATION OF C.G. STF?AIGHT STF?ANOS UIOSPAN (SEE CIROER NOT[ 2) STF?ANOS TO [XT[NO ...r:RTJCAL
DEFLECT/ON [ Ff Fo ENO 1 ENO 2 0
.... !;l ~ ~ !'::I ~ ~!.'.:! ~!.'.:!
~ ~ C:0"'( q:,c§ "' ~; i~
~Q ::so
22 11 2 1/2" 4• 8 1/2" Q)To@ Q)TO@ 1 5/8" 4 1/8"
S)'IJU ABT f SPAN ~ ~
~ ~ ~
i;lf <::i ~ I
I
<::i
I
I
<::i
I []
I I
1/8 1/4 3/8 1/2
ENO OF HALF SPAN (VARIES) I SPAN
GIRDER FLANGE THICKENING
kpff fl 'S ~ CAll rNO BUSINm DAYS Bff OR[ YOU OIG ,,•·e ~ (Ji) ,, ,'Llaoo ~ .. ~~ ·~ ~ i ~ v ~~ 1-soo-m-ssss l' ~ • "I; ·---n 1601 5th Avenue, Suite 1600
~ ~ -f. ~ S C A L E: Seattle, WA 98101 11<'1,.,"lil L tt:\~ '1 ...
AS NOTED 206.622,5822 I/ ~ ·HAL~ ~r Skagit River www.kpff.com - ..... .. A System CooperatW.
...
L LL
3'-o· 3'-3"
SHIPPING ANO HANOUNG DETAILS
Lr
3'-3"
Kl> wee U/NIUUU U/NIUUU SHIPPING SHIPPING SUPPORT SUPPORT
ROTATIONAL CNTF?-TO-CNTF? SPRING Y,HffL SPACING
CONSTANT
28000.00 KIP-IN/!?AO 6'-o·
GIRDER NOTES: 1. Pl.AN L£NGTH SHALL BE INCREASED AS NECESSARY TO COMPENSA T[ FOR SHORTENING DUE TO
PRESTRESS ANO SHRINKAGE.
2. ALL PRETfNS/ONEO STF?ANOS SHALL BE 0.6"1 AASHTO 11203 GRADE 270 LOW RELAXATION STF?ANOS. JACKED TO 202.5 KS/.
J. CUT ALL STF?ANOS FLUSH 'MTH THE GIRDER ENOS ANO PAINT 'MTH AN APPRO...r:O EPOXY RESIN, EXCEPT FOR EXTfNDEO STF?ANOS AS SHOWN.
4. T[XT/JRE TOP OF CIROER IN ACCORDANCE WITH STD. SPEC. 6- 02.3{25}H.
5. INSTALL LIFTING EUBEOUENTS IN ACCORDANCE 'MTH STD. SPEC. 6-02.3{25}L. REUO...r: TO 1· BELOW TOP OF GIRDER ANO GRWT 'MTH APPROVED EPOXY GRWT AFT[R ERECTION.
6. CAUTION SHALL BE EXERCISED IN HANDLING ANO PLACING CIROERS. ALL GIRDERS SHALL BE CHECKED BY THE CONTF?ACTOR TO ENSURE THAT THEY ARE BRACED AOEOUATfLY TO PRE...r:NT TIPPING ANO TO CONTF?Ol LA TfRAL BENDING DURING SHIPPING. ONCE ERECTfO, ALL GIRDERS SHALL BE BRACED LA TfRALL Y TO PRE...r:NT TIPPING UNTIL THE 0/APHRAGUS ARE CAST ANO CURED.
7. FOR/IS FOR BEARING PAO RECESSES SHALL BE CONSTF?UCTfO ANO FASTfNEO IN SUCH A /JANNER AS TO NOT CAUSE OAUAGE TO THE CIROER DURING THE STF?ANO RELEASE OPERA TJON.
8. STF?UCTURAL STfEL SHAPES ANO ASSEMBLIES SHALL BE ASTM AJ6. THEY SHALL BE PAJNT[O 'MTH A PRIUER COAT IN ACCORDANCE 'MTH STD. SPEC. 6-07.3{9}. ltfl.0 TIES SHALL BE PA/NT[O 'MTH A FIELD PRIUER COAT OF AN ORGANIC ZINC PAINT AFTfR FIELD ltfl.OING.
9. FOR 0/APHRAGUS. OMIT HO/.ES ANO PLACE INSERTS ON THE INTERIOR FACE OF EXTERIOR CIROERS. PLACE HOLES ANO INSERTS PARALLEL TO 0/APHRAGU CENTERUN£ INSERTS SHALL BE 1•,
UEAOO'MJURKE UX-3 HI-TfNS/Lf, 1•1 U[AOO'MJURKE FX-19 FERRULE INSERT. 1'1 x 5 1/2' 'MWAUS
F22 OPEN FERRU/£ INSERT. 1Y x 4 5/B' OAYTON-SIJPERIOR F-62 FLARED THIN SLAB FERRULE INSERT OR APPROVED EQUAL.
10 OEFORUEO ltfl.OEO 'MR[ REINFORCEUENT CONFORU/NG TO SECTION 9-07.7 'MTH OEFORUEO 'MRE CONFORUING TO SECTION 9-07.8 UA Y BE SVBSTJT/JT[O FOR JI/LO srm REINFORCE/JENT IF AASHTO LRFO BRIDGE DESIGN SPECIFICATION REOUIREUENTS (INCLUDING DE...r:LOPUENT ANO ANCHORAGE} ARE UET. ltfl.OEO 'MR[ REINFORCEUENT SHALL HA ...r: THE SAU[ AREA ANO SPACING AS THE U/LO srm REINFORCEUENT THAT IT REPLACES ANO THE )1[L0 STF?ENGTH SHALL BE GREATER THAN OR EQUAL TO 60 KS/. SHEAR STIRRUP LONCITUOINAL 'MRES ANO TACK ltfl.OS SHALL BE EXCLUDED FROM CIROER Hf'BS. LONGITUDINAL 'MRES FOR ANCHORAGE OF Hf'LDEO It/RE REINFORCE/JENT SHALL HA ...r: AN AREA OF 40X OR UORE OF THE AREA OF THE 'MRE BEING ANCHORED BUT SHALL NOT BE 1£SS THAN 04.
11. CIROER Hf'BS SHALL BE SET PLUUB.
ILLABOT CREEK ALLUVIAL f'AN RESTORATION PROJECT SHEET
ROCKPORT CASCADE RD
GIRDER SCHEDULE S 11
~ "' "' vi
I
~ ~ §, ·~ 5. -.:::-"' ~ '.;
" e 6 ii ~ 0
I <!;
8 ~ ::,:
~ E & <:,
~ ~ .!_
~ -:
"' ~ ~ <:,
<:,
-~ 1 i,; g
:;,:
1 PICKUP FORCE
STRANO UFT LOOPS OR H.S. THREAOEO STEEL BARS. SEE GIRDER NOTE 5
3•* OPEN HOLE. AOJJST HOI.E LOCATION 'vfRTICALL Y TO MISS HARPED STRANDS f INTERMEDIATE 0/APHRACM
MULTIPLE UNIT HOI.O OOMI TO STRADDLE HARPING PCNNT
SYMMETRICAL ABOUT f GIRDER ~-c.c. TOTAL HARPED ·"
STRANDS "
--C.C. ~ AL STRAIGHT STRANDS ~
"' ·'
s·
0.4 GIRDER LENGTH i 1 •-0• (TYP.)
BEARING HARPED STRANDS
END TYPE A SPLA 'ffO
GIRDER ELEVA TION SYMMETRICAL ABOUT { or GIROER
MEASURED ALONG GIRDER
6 SPA 03 1/2' 24 SPA O 5• 9•
APPLY APPRO'vfD RETARDANT FOR Jr ETCH TO SIDE FORMS OR Jr ROUGHENED SURFACE TREATMENT BY APPRO'vfD MECHANICAL METHOD. OMIT AT EXTERIOR FACE or EXTERIOR GIRDERS
HARPING PCNNT
HARPED STRANDS BUNDLED BET'rtffN HARPING POINTS
12 SPA O 9• SPA 0 /'-6• MAX
lliJWµ @] /4
,· CLR
ROTA TE HOOKS AS REO'() TO GET MINIMUM CO'vfR, TYP
3•
BARRIER RE/NF. SEE BARRIER SHEETS FOR DETAILS
~/5, TYP
SEE DETAIL EXT EDGE or EXT GIRDERS
6. MIN N THICKEN FLANGE TO
/4 BOT SPA O /'-o· MAX
CONT /4 (2'- o• M,l SPLICE) INS/OE BARRIER RElfF HOOK, TYP
SECTION EXT GIRDER SHOMI INT GIRDER SIMILAR
@m/5
~ Wl2, TYP
@]15
ffi SYMMETRICAL
,· CLR
ROTATE HOOKS AS REO'() TO GET MINIMUM CO'vffl, TYP
3•
LE'vfL, TYP BARRIER RE/NF. SEE BARRIER SHEETS FOR DETAILS
ABOUT I GIRDER
B I B ----+-~----"--------lj JOINT
I
'flµ TOP& /4 BOT
SPA O 1•-0• MAX
SECTION EXT GIRDER SHOMI INT GIRDER SIMILAR
HARPED STRANDS COMPENSATE FOR SUPERELEVA TION SEE •KEYWA Y DETAIL~ ON SI J. OMIT EXT £OGE or EXT GIRDER, BOTH S/OES. TYP
'::::, ·'
PARALLEL TO { GIRDER I I '2•
CLR 10·-o·
TYPICAL END ELEVA TION
SA WTEETH AREA, TYP
SA WTEETH DETAILS SA WTEETH SHALL BE FULL WIO TH O'vfR AREA SHOMI
L• STRAND CHUCK TACK 'llfLDED TO ASTM A36 PL l/2x4x0'- 4 WITH J/4•, HOLE PRIOR TO INSTAWNC ON STRAND, ASTM A/DB 2 J/4.,xl 1/8• STEEL STRAND ANCHOR, OR APPRO'vfD EQUAL, TYP. VERIFY STRAND GRIPS ARE SEATED TIGHTLY IMMEDIATELY BEFORE PLACING DIAPHRAGM CONCRETE. SECURELY TIE ANCHOR TO THE REBAR CAGE TO PREVENT DISPLACEMENT DURING CONCRETE PLACEMENT.
f JOINT I
I
DETAIL EXT EOGE OF EXT GIRDERS
ORA~ BY 1----l----l----!--.+----1------ -----------f RAJ
DESIGNED BY AJK CAll l'WO BUSIN[SS
om Bff OR[ mu DIG 1-soo-m-ssss
kpff 1----!----l-- --!- - .+----!------ - ----------1CHECKED BY PKG
APPROVED BY AMS
NO. DATE BY CHO. APPR. REVISION
DATE DEC. 19, 2017
J O B No. : 1700504 S C A L E:
N T S
1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
~ 1--,
TOP FLANGE SOfF/T LEVEL, TYP
BENDING DIAGRAM (ALL 0/MENSIONS ARE OUT TO OUT} 90 .... 'S -t---t--+---";;;Y .,.,
3/4• CHAMFER OR 0. 5• HALF ROUNO ORIP CROO'vf
([)
I• CHAMFER, TYP
3'-2 3/8.
SECTION REINFORCEMENT ANO STRANDS NOT SHOMI
•• 8 : I MAXIMUM SI.OPE FOR EACH HARPED STRANO
, SEE GIRDER NOTE 9.
ii THICKEN Fl.ANGE TO COMPENSATE FOR SUPERELEVA TION AND CAMBER OUE TO PRESTRESS.
8 1/4.
l'- 1 1/2• a
cm~ I ,._5·a I
p - VARIES FOR SKEYlfO ENDS. 6 - /J OR /4 MAY BE SUBSTITUTED. FIELD BENO/NC IS OPTIONAL. B - PAIRS or[m BARS. OR~ ANO @QjBARS. MAY BE US£0
INTERCHANGEABLY AS BOTTOM Fl.ANGE TIES.
l'-11•a
'%7 DENOTES EPOXY COA TEO 0 - I GIi MAY BE SUBSTITUTEO FOR 2 [g] WITHIN THE 6 SPA. 0 3 1/2•.
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
GIRD ER DETAILS 1
. ....
SHEET
S12
~ "' "'i 1;;
I
~ ~ ~
t ~
"' ~ -., "" § c5 ~ ~ c il ~ .... ~
~ -::;.; ~ E: ~ tic "" .., c:,
K ~ -· °" Jl ~ c5s "' ,!!/
j <ti E: ~ NO.
WELD TIE WELD TIE WELD TIE 1'-6' /JIN 4'-0' /JAX, TYP l+El.O TIE SPACING J'-0' /JAX
1 1/2' CLR
31/2'
«.,-- -
TOP OF GIRDER
2 15/16'
DATE BY CHO. APPR.
3 TYP
EDGE OF BO TT0/1 FLANGE
EDGE OF TOP FLANGE
@m /5 ANO [m ~ 0 5• /JAX EXT GIRDERS OR 8' /JAX INT GIRDERS
GIRDER PLAN STRANDS ANO LONGITUDINAL BARS NOT SHOltN
GIRDER
2• /JIN
. ....
000 STRANO (/IA Y BE ADJJSTED TO EITHER SIDE OF l+EB)
C.G. TOTAL HARPED STRANDS
STRAND PATTERN AT GIRDER END
S't/1/IETRICAL ABOUT f OF GIRDER
GIRDER
7 SPA 0 2 =1-2
4 112·
HARPED STRANO BUNDLE
7 SPA 0 2=1 - 2
STRAND PA TTERN AT f SPAN
REVISION
2 15/16'
C.G. TOTAL STRAIGHT STRANDS
C.G. TOTAL HARPED STRANDS
DRAWN BY DESIGNED BY RAJ AJK
CHECKED BY APPROVED BY PKG AMS
DATE DEC. 19, 2017
J OB No. : 1700504
f INTERIIEO/A TE DIAPHRAC/1
I
FACE OF WEB
ALL KEYWA Y Yr1 TH GROUT---
2'; x 4• S/.IOOTH BAR----
2 N 112•, X 6' 'ltflDED SHEAR STUD
CAll rwo BUSIN[SS DAYS BffOR[ YOU DIG 1-soo-m-ssss S C A L E:
NTS
6', HOLE THROUGH TOP FLANGE. 0/IIT ON EXTERIOR SIDE OF EXTERIOR GIRDER. AO.A/ST RE/NF AS REQIJIRED, TYP
S't/111 ABOUT JOINT
1/4'
3/16
BAR 3 x 1/2 x 0'-6'
SECTION WELD TIE ALT. 1
kpff 16015th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
BEARING WIDTH + 2• SEE BEARING DETAILS SHEET
GIRDER SLOPE
LHfl (AFTER CASTING DECK)
ELEVATION
BEARING RECESS AND BOTTOM FLANGE SPALL PROTECTION DETAIL
1/4
2 N 1/2"; x 5· WELDED SHEAR STUD
OR /4 x 2'-0' /JIN REBAR
S't/111 ABOUT JOINT
1/2' 2 112· 1/4'
SECTION WELD TIE ALT. 2
BAR 1 1/2 x 1 x 0'-4' r FILL K[>'WA Y WITH
11 GROUT
L 2 X 2 X 1/4 X 0'- 6'
S't/lM ABOUT JOINT
1/4' 7/8'
1 1/4'
SECTION KE>'WAY
FILL KE>'WA Y WITH GROUT
FOA/1 BACKER ROD
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
GIRDER DETAILS 2
SHEET
S13
ir---ir-, II :r _ ..J II 11
II l[Il II I II I I I II I J II 11 II 11
II l[I7 II I I I II I J II I ]l __ _Jl
-i "' c;;
I
~ ~ <: ·r
S'--:;::-
"' ~ .; "" e
<5
l½'MIN 5• MAX THREAD
t; ~ c -<> ,!;2 ~
~ § ~ :;.;
~ E ~ ~ "i <:;
,-(_
~ --"' ~ ~ t5 -~ 1 .;
~ NO. DATE BY CHD. APPR.
GIRDER
6. /4 STIRRUPS fJ 1-0 MAX
/1 FULL LENGTH 'MTH 2'-6· MIN SPLICE. T'rP
(2) /4 BT'MI GIRDERS, T'rP
SEE •ANCHOR DETAIL• THIS SHEET. T'rP
GIRDER
f 6·- HOLE FOIi PLACEMENT I ~DIAPHRAGM CONCRETE,
HOLES THROUGH HfB OFJ INTER/OIi GIRDERS, FOIi LOCATIONS SEE S/2
(2) /1 FULL 'MOTH
ELEVATION INTERMEDIATE DIAPHRAGM DIMENSIONS ARE ALONG DIAPHRAGM
FACE OF GIRDER
l /""511/ A-JOl ,._, T>I'
D /'-6·
ANCHOR DETAIL
DRAl'IN BY DESIGNED BY RAa AJK CAll rwo ~USINm kpff CHECKED BY APPROVED BY DAYS moR( YOU OIG PKG AMS
DATE 1-soo-m-ssss DEC. 19, 2017 1601 5th Avenue, Suite 1600
S C A L E: Seattle, WA 98101
REVISION JO B No. : 1700504 N.T S. 206.622.5822 www.kpff.com
f GIRDER
TOP OF GIRDER
~ ·'
f INTERMEOIA TE
I OIAPHRAGI.I
SECTION
/1
/4 STIRRUP
/4, T'rP
/1, (2) BUNDLED
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
INTERMEDIATE DIAPHRAGMS
SHEET
S14
! ..-; ;;,
I
~ ~ §,
~ 5 Ji q)
§ 6 1'.i ~ 0 -8 ~
~ ~ :;,;
~ !: ~ Crj ") ....., "' ,.!_
~ -· "' ~ ~ ~ .l,l j .; ~ NO. DATE ""
BY
15'-71/2"
3• µWnE. (2)µ'WsnRRUPS. ANO µWsnRRUP AT f'-3· MAX
BUTYi. RUBBER SH££TJNG, SE£ DETAIL
DIAPHRAGM
3'-o• WIDE x 1/8• THICK BUTYi. RUBBER SH££TJNG
g• UNDER DIAPHRAGM
f GIRDER
I
ELEVATION TYPICAL END DIAPHRAGM SCALE· 1·= /'-o•
ABUTJ,/ENT
BONO WITH AOHES/',f THIS SURFACE ONLY
BUTYL RUBBER AT DIAPHRAGM DETAIL SCALE· 1·= 1•-0•
DRAWN BY DESIGNED BY RAJ AvK CAll lWO BUSIN[SS
CHECKED BY APPROVED BY om Bff 0~[ YOU DIG PKG AMS
DATE 1-soo-m-ssss DEC. 19, 2017
S C A L E: CHO. APPR. REVISION J 0 B No. : 1700504 AS NOTED
TOP OF PRECAST CONCRETE GIRDER
(J) /6\fl
(2) µ
(3) /6
f BR/OGE
3/e·, x4· 'ELOEO HEAOEO STUD O 12" EA LEG, TYP
PAVEMENT ARMOR DETAIL SCALE· 3•= 1•-0•
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.6Z2.S8Z2 www.kptf.com
BACK OF 3'-8 112· PA ',fMENT SEAT
BUTYi. RUBBER SH££TJNG, SE£ DETAIL 1-----1-~1--1
2·-2 1/2"
SECTION SCALE: 1·= f'-o·
BEARING ANO ABUTJ,/ENT WALL
___ ___ I _____ _
= = ---'J: = =+= = r--- - - -=----~~---t----~ ---1 1 '2• I
OPEN JOINT I
1'-4 1/2• I 1'-4 1/2"
ABUTJ,/ENT WALL
TOP OF PRECAST CONCRETE GIRDER
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
END DIAPHRAGM
SHEET
S15
-r <ci ;;;
I
~ g_ <:
I ~ "' ~
"q;
"' § 6 ii 6 c -<> ,>! ~
c!;
8 :::: :;.
~
! ~ .., <:::,
rZ ~ --"' ~ ~ <>
<:::,
-~ 1 <ti E: NO. ~
2'-5 3/4. f POST
TYP
'Rl
BACK OF PAVl,l'T SEAT
3•-5•
5 112·
3/16\/
--
tfiQJI;_
7'-6·
ALL THREADED ROO AT NORTH RAIL, TYP
- -- 4•
,--.. '-'\
'"-
1• GAP UNLESS NOTED OTHERWISE ON DETAIL PLANS.
--
f POST
f POST
I RAIL SPLICE, TYP
2'-6• TYP AT EACH POST, UNO
CR/ND ALL EOCES PRIOR TO GAL VAN/ZING TO ASSURE PROPER FIT
J J/8• ~~~--< TYP 0-0 3/16
MAKE SPLICE TUBE fR()l,I PL 1/4
9'-9 1/8. POST SPACING, TYP
OUMMY JOINT, TYP
PROVIDE CONllNUOUS RAIL O'>f:R 2 OR MORE POSTS
8 3/4.
f POST 10·-o·
MAX SPACING
PLAN NORTH RAIL/NC SHO-.W SOUTH RAIL/NC SIMILAR
f POST
I
ELEVATION
f POST
f POST
I
APPROACH GVARORAIL NOT SHO'ltN FOR CLARITY, SEE S/9 FOR OETAILS
5 3/4.
1• x I 1/2• SLOTTED HOLES FOR 7 /8• DIA BO/.. TS {A307}, TYP
PLAN
~i 5/:;~i[/)!,Jt~: ~:rf! __ R_f1_!._t_S_P._t_l_CE_D_E_TA_IL_S __ SCALE: 3• = l'-o•
PLA TE "D" SCALE: 3/4• = 1'-o•
ORAi™ BY DE~GNED BY
kpff RAJ AJK CAll lWO BUSIN[SS CHECKED BY APPROVED BY ~AYS Bff 0~[ YOU DIG PKG AMS
DATE 1-soo-m-ssss DEC. 19, 2017 1601 5th Avenue, Suite 1600
S C A L E: Seattle, WA 98101
DATE BY CHD. APPR. REVISION J O B No. : I 700504 AS NOTED 206.622.5822 www.kpff.com
~rH <rL~-~~ ~ BARS -=_;,,
DUMMY JOINT DETAIL NTS
f POST
I
f POST
I
7'-6· TYP
RAIL SPLICE
1,·-o· 1
f POST I 2·-5 3/4.
1'-6 I '8• CURB TAPER
'RI
BACK OF PA ',1,/'T SEAT
BARS .A. SPACED AT ,a·oc MAX B[TY,f[N POSTS AT BRIOCE 5•oc MAX BETYtfEN POSTS AT W/NrWAUS
DA TE NUMERALS {INS/OE FACE} SEE STD PLAN [-1 FOR DETAILS
0 1
~ 2
SCALE IN FEET
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
BRIDGE RAILING DETAILS
4
I
SHEET
S16
0.908 FT C.C.
~ +----
THREADED J/4• DIA REDUCED rtf:LD BAS£ STUDx2' LONG WITH (1) PLATE WASHER •c: (1) L(Xl(WASHER AND (1) NUT
(B}::/;'µxCONT {PLACE -,_.,..- ~.......,.AS SHO't/N)---
TACK llfLD ANCHOR PLA TE TO BOI. T HEAD 1l+v PLACES. TYP
fiQJ£.
l'-7 112· ROAD WA Y WIDTH
. ....
HSS 1x4x1/4
HSS 1x4x1/4
SET TOP OF POST J'-6• ABOl-f AN/SH GRADE. CURB AND POST DETAIL
12·
4 112· 4 112· 1 1/2'
SCAL£- 1 1/2• = 1•-0•
PL 1
(4) 1 1/B•i HOI.ES FOR 7/B•i ANCHOR BOI.TS
5•, HO!..[
PL J/8x12x1J, W/ (4) 1•1 HO/.£S
12'
. "
J
TOP OF HUA Ol-f'RLA Y (ROADWAY SVRFACE)
PRECAST PRESTRESSED 'ttFJ9DC GIRDER
LEl-fLINC NUTS {CALV)
::::
<:,
·'
5 sPA AT 4 1/2• UAX. CENTERED ON POST
SECTION NTS
-$-t-----+ . .,.,
~ • ~~ ~ 7/8.,HOI.E
~ " - PL 1/4 ..., . - ~
TYP ,\ 1 1/B V
ANCHOR PLATE DETAILS BASE PLATE DETAILS PLATE WASHER- "C" SCALE: s· = 1'-o· SCAL£· 1 1/2' = 1·-0· SCALE: 1 1/2' = 1•-0•
(4) 7/B., ANCHOR BOLTS THREADED 5• UIN WITH 2 NUTS AND FLAT WASHERS {CAL v,I
~5 BARS •A•
(9
2· 2· ~ -- -V ~
I _,__
I I I I I
~ /: I I--. I I ...
I I I + I
" - - -
ROADWAY .
SIDE ~ -
RAIL TUBE MEMBER
PL J/16x6 J/4xJ J/4 COPE CORNERS J/4• TO PROVIDE ZINC DRAINS
INSTALL ANGLE WITH WASHERS AND SELF LOCK/NC NUTS OR NUTS AND JAM NUTS
(2) J/4., REDUCED BASE llfLDED STUDS ON EACH RAIL CAP AT C/JARDRAIL CONN[CllONS
LEG OF CONN[CllON ANGLE
RAIL CAP DETAILS SCALE: 3' = 1 '-o•
GENERAL NO TES: 1. RAIL ELEUENTS FOR THE STRUCTURAL TUB/NC CONFORU/NC TO
AST/ti SPEC/RCA llON A500 GRADE 8, A618 OR A501.
2. PROVIDE STEEL POSTS AND PLATES CONFORU/NC TO ASTM SPEC/RCA llON AJ6 UNLESS OTHERWISE NOTED.
J. PROVIDE ANCHOR BO/.. TS {GRADE 105) IN ACCORDANCE WITH sPECS SECllON 9-06.5(4).
4. FABRICATE RAIL/NC TO THE HORIZONTAL AND l-f'RllCAL ALIGNMENT OF THE STRUCTURE INSTALL POSTS NORMAL TO GRAD£
5. PROVIDE R[INFORCINC STEEL CONFORM/NC TO ASTM 706 OR AASHTO MJ1 {ASTM A615) GRADE 60.
6. CONCRETE CVRBS SHALL BE CLASS 40000.
1 PROVIDE RAIL SPLICE AS SHO't/N ON SHEET S16.
8. HOT DIP CALVAN/ZED STRUCTURAL STEEL INCLUDING FASTENERS IN ACCORDANCE WITH AASHTO M111/l,(2J2 AFTER FABRICA llON, EXCEPT AS NOTED.
9. CROUT FOR POST BASES SHALL CONFORM TO SECllON XX OF THE PRO.ECT SPEC/RCA llONS.
DESIGN CAPACITIES Pp{POST)= 41.2 KIPS Mp {POST)= 62.7 KIP-FT ltGT.= 2.014 KIP /POST (INCLUDES 7• CVRB) CENTER OF CRA VITY= 0.908 FT
Tef> OF CURB
i cc; vi
I
~ g_ <:
I ~
"' ~
" § <'.:i ii ~ <> <> ,Q ~
~ ~ :;.;
~ E:
~ ~ "i "" ,..,__
~ -:
"' ~ ~ ~
-~ 1 ;,;
j NO. DATE
(2) /"I HOLES THRU EACH RAIL TUBE, EXTEND THRU BOTH Tef> ANO BOTT()/,/ FACES OF TUBE
CL ENO RAIL POST _..---------1
J'-9"
2'-5 J/4"
ENO OF RAIL ELEMENT
1'-6 1/8" CURB TAPER
PLA TE ·o: SEE SHEET Sl6
llfix9
W8xl5
BACK OF PA 'N'T SEAT
PLAN - TRANSITION CONNECTION
12·
f--------~ 0,
~-------'
GUARDRAIL CONNECTION PLATE (SEE DETAILS THIS SHEET}
2·-5·
GUARDRAIL TRANSITION SEE RP-I
THRIE BEAM TERMINAL TYPE "F" CONNECTOR {SEE WS[)OT STANDARD PLAN C-lo)
5/8" GUARDRAIL BO/.. TS
CONNECTION ANGLE "A• {SEE DETAILS THIS SHEET)
THRIE BEAM RAIL ELEMENTS
ELEVATION - APPROACH GUARDRAIL CONNECTION
BY
tiQJL VERIFY AU BO/..T HO/..£ LOCATIONS TO MATCH THRIE BEAM TERMINAL CONNECTOR.
CHO. APPR. REVISION
DRAv.t, BY DESIGNED BY RAJ AJK CAll 1WO BUSIN[SS
CHECKED BY APPROVED BY om Bff 0~[ YOU DIG PKG AMS l-~00-41H555 DATE
DEC. 19, 2017 S C A L E:
J O 8 No. : 1700504 AS NOTED
7 /8" DIA BOI. TS {ASTA/ AJ07} W/S[LF LOCKING NUT OR NUT ANO JAM NUT
I I ,/' 11
II II
<l 11 • ., l I <l.,
~ 11 ~ I I
SECTION SCALE: I 1/2" = 1'-0"
l'-7"
J 1/2"
SECTION SCALE: I 1/2" = 1'-0"
1'-7"
J 112· /'-2·
4
PLATE ·o: SEE SHEET Sl6
11/2"
THRIE BEAM TERMINAL "F" {SEE WS[)OT STANDARD PLAN C-lo}
Pl J/8x4xl'- 7"
(!) J 16
(2) I" DIA HO/..ES
L 4x4xJ/8x/'-7"
(2) 1· DIA HO/..ES IN ',,fRT LEG OF ANGLES
SECTION SCALE: I 1/2" = l'-0" (9
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206,622.5822 www.kpff.com
~
~ ....
~ ""
~ ....
. 0,
7/B"xl 1/4" SLOTTED HO/..ES
• ~ <:, {
-$-
4
1112·
4•
. ~ "
~ "
CONNECTION PLATE
BO/.. T TO BE Fl.USH 'MTH BACK OF PLA TE
+4-~
THRIE BEAM TERMINAL CONNECTOR
CONNECTION ANGLE nA n DETAIL CJ) SCALE: I 1/2" = l'-o·
Pl J/8x4x/'-7"
L4x4xJ/8x/'-7"
12·
4•
~ s. ::? ----+-.-+---+-----+-_; .., +----L....+·
~ §- ----,--i,.J~ ..,
CONNECTION PL l/2xl2xl'-IO"
GUARDRAIL CONNECTION PLATE DETAILS SCALE: I 1/2" = 1'-0"
tiQJL ',,fRIFY AU BO/.. T HO/..E LOCATIONS TO MATCH THRIE BEAM TERMINAL CONNECTOR.
NTS
r 2 1/2"
ORIU ANO TAP 2 HO/..ES FOR 7 /8" DIA BO/.. TS {ASTA/ AJ25} SHOWN THUS$ {SNUG TIGHTEN) SEE DETAIL EB (6) 1· DIA HO/..ES FOR 7/8" OJA BO/.. TS {ASTA/ AJ25} SHOWN THUS. {SNUG TIGHTEN)
ILL.ABOT CREEK ALLUVIAL f'AN RESTORATION PROJECT SHEET
ROCKPORT CASCADE RD
BRIDGE RAILING DETAILS 3 S18
i ~
I
~ ~ " ·~ "' 5.-
-:;:,. "' cl:!
" " § 6 ~ "' 6 0 il "' "'-... c:,
~ ~ :,:
'" [;:
j ... ~ i:: ,-!_ c:, "' --"' al c:,
~ <:,
c:, <:,
.92
j
'" Ee :i!
SECTION 34, T. 35 N. , R. 10[. , W. M. SKAGIT COUNTY, WA
_j / ~
------------------------\ -
CONSTRUCTION GEOTEXTILE
l4EW WEST BRIDGE NORTH-EAST CORNER SHOWN. SCOUR PROTECTION AT OTHER LOCATIONS SIM.
DRAWN BY DESIGNED BY RAJ AJK
t----+-----+---+----+---+------------------, CHECKED BY APPROVED BY PKG AMS
1----+---+--+----+---+----------------+----
NO. DATE BY CHD . APPR. REVISION
D ATE DEC. 19, 2017
J O B No. : 1700504
CORNER OF ABUTMENT BACKWALL AND EDGE OF WINGWALL
CAll rwo ~us1ms ~AYS mo~[ YOU rnG 1-~00-m-JJJJ S C A L E: AS NOTED
kpff 1601 5th Avenue, Suite 1600 Seattle, WA 98101
206.622.5822 www.kpff.com
__g _ _jJ_ _ ~
,--
Skagit River System Cooperative
I
/~
I I I
- -
11 11 11
11 11 11
10·-o· / COMMON BORROW ON TOP OF RIPRAP
r RIPRAP / I 1'1!~~TTl~T
·• 11=111::-'
R~ . c:, _, ....
-
~ CONSTRUCTION GEOTEXTILE
SECTION WEST BRIDGE ABUT 1 SHOWN. SCOUR PROTECTION AT OTHER ABUTMENTS SIM.
TOP OF SCOUR PROTECTION
GENERAL STRUCTURES NOTES
_,,_
EL 306.41 AT WEST BRIDGE EL 306. 45 AT EAST BRIDGE
/. RIPRAP TYPICAL INSTALLATION SEQUENCE EXCAVATE FOR RIPRAP PLACEMENT,· PLACE CONSTRUCTION GEOTEXTILE; PLACE RIPRAP; BACKFILL AS NECESSARY TO TIE TO SURROUNDING GRAD[
2. ALL RIPRAP SHALL BE PLACED WITHIN THE ROW THE RIPRAP PLACED SHALL HA ii' A UNIFORM GRADATION WITH NO INTERNAL SHEAR PLANES.
3. ALL CONSTRUCTION GEOTEXTILE FOR THIS RIPRAP PLAN SHALL MEET THE MATERIAL REQUIREMENTS OF STD SPECS SECTION 9-33 FOR CONSTRUCTION GEOTEXTILE FOR PERMANENT EROSION CONTROL, NON-WOvf'N, HIGH SURVIVABILITY, CLASS 8. REFER TO PERMANENT EROSION CONTROL IN SECTION 2-12 OF THE STD SPECS FOR INSTALLATION REQUIREMENTS.
4. SLOPES FOR RIPRAP SHALL BE NO STEEPER THAN 1.5 TO 1 (HORIZONTAL TO vf'RTICAL) UNLESS OTHERWISE SHOWN OR DIRECTED.
5. RIPRAP SHALL BE "HEAVY LOOSE RIPRAP" AS DESCRIBED IN SECTION 9-13.1(2) OF THE WSDOT STANDARD SPEC/RCA TIONS.
NAVO 88
ILLABOT CREEK ALLUVIAL FAN RESTORATION PROJECT ROCKPORT CASCADE RD
RIP RAP PLAN
SHEET
SC1