85 Vote 8: Roads and Transport VOTE 8 DEPARTMENT OF ROADS AND TRANSPORT Infrastructure to be appropriated R 1 244 980 000 Responsible MEC MEC for Roads and Transport Administering department Department of Roads and Transport Accounting officer Head of Department 1. STRATEGIC OVERVIEW OF INFRASTRUCTURE PROGRAMME Strategic objectives The infrastructure programme of the department is guided by the following departmental strategic priorities: To provide a balanced and equitable road network; and To plan, regulate and facilitate the provision of public and freight transport services. Core functions The main forcus of the department is the maintenance of the provincial road network, linked to the provincial outcome of creating decent work. Also of key importance is improving access to the road network for the people in the previously disadvantaged areas through spatial reprioritisation of capital and maintenance of roads which will ensure that citizens in these disadvantaged areas can access economic opportunities. The provision of transport infrastructure entails planning, construction, maintenance and protection of the provincial road network. The department maintains approximately 4 759 kilometres of the provincial road network (surfaced and gravel roads). The traffic on the road network is considered heavy and about 18 percent of the road network carries between 5 000 and 10 000 vehicles per day. There is about 1 418 kilometres of paved provincial road that carries more than 10 000 vehicles per day. A total of 22 billion vehicle-kilometers is travelled annually on the provincial paved road network, thus maintenance of the road network is of utmost importance. As part of providing an integrated and environmentally sustainable public transport system, the department will also construct intermodal facilities and transfer facilities through the cooperation of national and local authorities. The department also promotes and regulates public transport through the office of Transport Registrar and Gauteng Operating License Board Business incorporating transformation of the bus and taxi industries as well as the integration of Gautrain into the public transport network and commuter rail system. The department is responsible for developing certain planning guidelines for a socio-economic infrastructure investment framework and for site development plans for provincial facilities in Gauteng and it plays an inter- governmental role in the establishment and maintenance of urban transport information management systems (intelligent transport systems). Legislative mandate Core legislation that regulates the department’s activities include the following: Skills Development Act, 97 of 1998; Occupational Health and Safety Act, 181 of 1993; Standards Act, 29 of 1993 and in particular the associated National Building Regulations;Architectural Profession Act, 44 of 2000;Construction Industry Development Board, 38 of 2000; Engineering Profession Act, 46 of 2000; Landscape Architectural Profession Act, 45 of 2000; Project and Construction Management Professions Act, 48 of 2000;

Upload: others

Post on 20-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

85

Vote 8: Roads and Transport

VOTE 8

DEPARTMENT OF ROADS AND TRANSPORTInfrastructure to be appropriated R 1 244 980 000Responsible MEC MEC for Roads and TransportAdministering department Department of Roads and Transport Accounting officer Head of Department

1. STRATEGIC OVERVIEW OF INFRASTRUCTURE PROGRAMME

Strategic objectivesThe infrastructure programme of the department is guided by the following departmental strategic priorities: • To provide a balanced and equitable road network; and • To plan, regulate and facilitate the provision of public and freight transport services.

Core functionsThe main forcus of the department is the maintenance of the provincial road network, linked to the provincial outcome of creating decent work. Also of key importance is improving access to the road network for the people in the previously disadvantaged areas through spatial reprioritisation of capital and maintenance of roads which will ensure that citizens in these disadvantaged areas can access economic opportunities.

The provision of transport infrastructure entails planning, construction, maintenance and protection of the provincial road network. The department maintains approximately 4 759 kilometres of the provincial road network (surfaced and gravel roads). The traffic on the road network is considered heavy and about 18 percent of the road network carries between 5 000 and 10 000 vehicles per day. There is about 1 418 kilometres of paved provincial road that carries more than 10 000 vehicles per day. A total of 22 billion vehicle-kilometers is travelled annually on the provincial paved road network, thus maintenance of the road network is of utmost importance.

As part of providing an integrated and environmentally sustainable public transport system, the department will also construct intermodal facilities and transfer facilities through the cooperation of national and local authorities.

The department also promotes and regulates public transport through the office of Transport Registrar and Gauteng Operating License Board Business incorporating transformation of the bus and taxi industries as well as the integration of Gautrain into the public transport network and commuter rail system.

The department is responsible for developing certain planning guidelines for a socio-economic infrastructure investment framework and for site development plans for provincial facilities in Gauteng and it plays an inter-governmental role in the establishment and maintenance of urban transport information management systems (intelligent transport systems).

Legislative mandateCore legislation that regulates the department’s activities include the following: • Skills Development Act, 97 of 1998; • Occupational Health and Safety Act, 181 of 1993; • Standards Act, 29 of 1993 and in particular the associated National Building Regulations;Architectural

Profession Act, 44 of 2000;Construction Industry Development Board, 38 of 2000; • Engineering Profession Act, 46 of 2000; • Landscape Architectural Profession Act, 45 of 2000; • Project and Construction Management Professions Act, 48 of 2000;

86

Estimates for Capital Expenditure

• Property Valuers Profession Act, 47 of 2000; and • Quantity Surveyors Profession Act, 49 of 2000.

2. REVIEW OF THE 2011/12 FINANCIAL YEAR

2.1 Roads infrastructure

DesignThe designs on the Tarlton, K154 (Phase 1) and R25 roads have been completed over the 2011/12 financial year. The land acquisition of K46 (Phase 1) and K71 (Phase 2) have progressed during the financial year with substantial payments being made, however the other land projects as per the 2011 Estimates of Capital Expenditure will be completed once the designs have been finalised on these projects.

Designs on the following Maize Triangle roads continued through the year and will be finalised in subsequent financial years: • K11 • R82 • K164

ConstructionThe construction projects purpose is to construct, upgrade, rehabilitate and manage the execution of transport infrastructure in order to have a complete transport network which provides access and mobility for the people of Gauteng in execution of economic and social activities. This is all done in pursuit of economic growth and investments through the provision of appropriate transport systems and socio-economic infrastructure.

The projects under construction are grouped into two classes namely Capital Projects which involves the upgrading rehabilitation and construction of provincial roads and the 20 Prioritised Township Projects (20PTP), which involves the upgrading of gravel roads in previously disadvantaged black communities including deteriorated or gravel arterial township roads. In both project classes job creation, skills development and contractor development are priority aspects which are enhanced through the project management systems.

The achievements related to construction include: • The finalisation of the K29 Malibongwe road (Phase 3), from the N14 highway to the Lanseria airport. • The finalisation of the Road R55 (K71) - Voortrekker Road between Wierda Road and Main road in Laudium. • Road LE3 is one of the 20PTP projects located in Soshanguve in Tshwane. It has being upgraded from gravel

to surfaced, and included the construction of the related stormwater infrastructure and paving.

MaintenanceThe purpose of maintenance is to maintain provincial roads, preserving them to their original design and includes routine maintenance, safety maintenance, reseals and re-gravelling. The preventative maintenance programme was revived in the current financial year and mainly funded the following roads: • There has been budget allocated to the rehabilitation of the N14, specifically the sinkhole that has not been

given attention over the last financial years. The work commenced in the 4th quarter and is expected to continue over the 2012/13 financial year.

• The project to perform heavy rehabilitation on the M1 highway (between the Buccleugh interchange and Corlett drive) has commenced in the 4th quarter.

• The project to perform heavy rehabilitation on the Ben Schoeman highway (between the Brakfontein interchange and Potgieter street in Pretoria city centre) has commenced in the 4th quarter.

There has been site handover to perform rehabilitation on the Tarlton as well as the R25 Bapsfontein roads. These projects have commenced in the 4th quarter and will continue into the following financial year. Furthermore, there are light rehabilitations and reseals currently being performed on a total of 15 projects throughout the province.

87

Vote 8: Roads and Transport

2.2 Transport projects

Intermodal Public Transport Facilities (IPTN)Construction on the Bophelong and Zandspruit IPTNs has been in progress during the financial year and is anticipated to continue into the following financial year. The planning for the Vereeniging and Germiston IPTNs has progressed well and there are clear indications that the construction can commence in the following financial year.

Non-Motorised Transport (NMT)A total of 17km walkways have been constructed in Metsweding and West Rand municipalities. This project will continue in the following financial year within different locations throughout the province.

Transport Operating Licensing Administration Boards (TOLABS)The plan was for the department to implement 2 TOLABS in the current financial year, Tshwane and Derek Masoek, and as such significant budget allocations were made for both projects. However, the delays in the Derek Masoek project resulted in the budget being reprioritised to other areas that were experiencing pressure during the 2011 Adjustment budget process. In relation to Tshwane, which includes 2 phases, refurbishment of the existing location as well as the construction of testing facilities, there has been significant progress over the last 2 quarters of the financial year. All the testing equipment has been procured and the project is expected to close in the following financial year.

2.3 Special Projects

20 Prioritised Townships ProgrammeThe 20 prioritised townships programme that has been running over the last few financial years is continuing as scheduled. The achievements related to this in the 2011/12 financial year were: • The finalisation of Bolani road in Jabulani, Soweto. The construction is intended to eliminate the traffic

congestion around the area. Only the retentions will be paid in the 2012/13 financial year. • Road LE3 is one of the 20PTP projects located in Soshanguve, Tshwane. It has been upgraded from gravel

to surfaced road, and included the construction of the related stormwater infrastructure and paving.

3. OUTLOOK FOR THE 2012/13 FINANCIAL YEAR

The table below sets out the total infrastructure budget, which amounts to R1.2 billion, R2 billion and R2.2 billion for the 2012/13, 2013/14 and 2014/15 financial years respectively. The budget over the MTEF is less than previous financial years as it does not include any allocations in respect of the Gautrain as the construction stage thereof has been completed.

Table 1: MTEF allocations

CategoryR Thousands

2012/13 2013/14 2014/15

Medium Term Estimated Budgets

New Infrastructure 63,150 156,800 130,000

Upgrading and Additions 429,019 629,604 716,799

Rehabilitation and Refurbishment 181,469 479,400 214,564

Maintenance 571,342 778,681 1,066,528

Other 0 0 25,014

TOTAL 1,244,980 2,044,485 2,152,905

New infrastructure assetsThe category of infrastructure payments includes the construction of the Vereeniging, Pienaarspoort and Germiston Intermodal Public Transport Facilities. The department will also be identifying other facilities to construct over the MTEF period within the Tshwane, Ekurhuleni and Johannesburg municipalities, however the actual locations thereof are still to be determined.

88

Estimates for Capital Expenditure

Upgrades and additionsThe projects that form part of this category include, but are not limited to, those within the Maize Triangle, the maintenance of rural roads that continue to be a provincial priority, other construction projects that are continuing into the MTEF, the public transport projects that relate to the construction of walkways along the routes with a high volume of pedestrians, as well as the upgrading of the Driver License Testing Centres (DLTCs) across the province.

Rehabilitation, renovations and refurbishmentsThe preventative maintenance budget falls under this item. This will cover a range of roads in the province.

Maintenance and repairsThis item is constituted of the maintenance of: • The provincial road network • Weighbridges

The ongoing in-house and outsourced maintenance programmes also form part of this category of infrastructure.

3.1 Roads infrastructure

Design and Traf c EngineeringThe Design directorate has been allocated with a total of R82 million for the 2012/13 financial year and this will be utilised for the proclamation of road reserves, maintenance of weighbridges as well as for the road designs of some roads. There will also be research conducted on the D1814, whereby testing of the roller compacted concrete will be conducted. The major deliverables for this financial year will be the following:

Proclamation of road reserves • K71 Wierda road; • K11 Between the golden highway and the P1-1; • K46 William Nicol; • K69 Lynwood to Mamelodi; • K142; and • K60 extensin of Rivonia road to PWV9.

Road designs • Completion of the designs on the second phase for gravel roads in 5 regions, namely Nooitgedacht, Rust

de Winter, Hammanskraal, Winterveld and Magaliesburg; • K154 and K77 as part of the Gauteng highlands project that has been initiated; • K69 Lynwood to Mamelodi; and • K69 between Megawatt park and Corporate Park.

ConstructionThe focus within this sub-unit will be within the following projects: • The upgrading of Voortrekker road (R55) between Wierda Road (M10, Sunderlandridge) and Main Road

(M26, Laudium) - P66/1; • Doubling of Old Vereeniging Road between Eikenhof (D766) and Walkerville (D1073) ; • Tarring of Cayman Road as an access road to the Eye of Africa Development (phase 2); • Upgrading of road K154 from a gravel road to a surfaced carriageway as part of the Gauteng Highlands

project (Eikenhof); and • Upgrading of Nederveen Road (R103), from Leondale Forsdick Road (R554) to Barry Marias Road (R21).

MaintenanceThe unit will focus on the regravelling of 250 kilometers of road and the heavy rehabilitation of amongst others: • Ben Schoeman Highway between Brankfontein Interchange in Centurion and Potgieter Street in Tshwane; • M1 Highway between Corlett Drive and Bucchleu Interchange; • R25 linking Gauteng and Mpumalanga; • R511 linking Laudium and Diepsloot; and • Repairs to the sinkhole and rehabilitation of the N14.

89

Vote 8: Roads and Transport

Finally, in support of the Rural Development Strategy the unit will continue to support the improvement of road infrastructure in the identified rural development nodes of Winterveld, Magaliesberg, Rust de Winter, Hammanskraal and Nooitgedacht.

3.2 Transport projects

Intermodal Public Transport FacilitiesThe department will be focusing on the construction of 3 facilities within the province, within the Vereeniging and Germiston areas; and will commence planning for the Pienaarspoort transport facility. There are other facilities that are planned over the MTEF.

Non-Motoroised TransportThe completion of the West Rand and Metsweding District municipalities in the previous financial year will result in the payments of the retentions in line with the contract in the 2012/13 financial year. The Department will be focusing on the construction of walkways and bicycle lanes in Ekurhuleni, Sedibeng (along the Wessil Mota street) as well as Tshwane (along the Phatudi and Hinterland streets). The planning and construction of the NMTs in other areas within the province will occur over the MTEF.

TOLABSThe plan is for the department to implement 2 TOLABS in this financial year, Tshwane, which is a project that commenced in the 2011/12 financial year, and Germiston. The resources have been allocated as such to allow these projects to proceed accordingly.

Driver License Testing Centres (DLTCs)The department has been allocated with adequate resources in order to commence with the upgrading of the Temba, Mabopane and Xavier centres; finalise the establishment of the Kliptown centre, as well as commence with the planning process for the const ruction of new centres in Kagiso, Faranani and Mamelodi in subsequent financial years.

3.3 SPECIAL PROJECTS

20 Prioritised Townships ProgrammeIn order to contribute to inner city urban renewal through the construction of road linkages, the department will complete the next phase of the construction of roads within the 20 prioritised townships, mainly focusing on the upgrading of gravel roads to tarred for the following roads: • Mogo street in Tshwane; • Sekweri street in Refilwe; • Thulani B: Roads 2219–2221, 2226-2231, 2238.

90

Estimates for Capital Expenditure

ANNEXURE A: SOME ROAD PROJECTS UNDERTAKEN IN 2011/12

Bophelong Taxi Rank Zandspruit Taxi Rank

Road markings – In-house maintenance

Pothole Patching – Outsourced maintenance

91

Vote 8: Roads and Transport

20 PTP – LE3 (Soshanguve) 20 PTP – Bolani Road – Jabulani, Soweto

Voortrekker Road – Phase 2 completed

Voortrekker Road – Phase 1 under construction

92

Estimates for Capital Expenditure

DEPA

RTM

ENT

OF R

OADS

& T

RANS

PORT

INFR

ASTR

UCTU

RE P

ORTF

OLIO

FOR

201

2 M

TEF

Infr

astr

uctu

re In

vest

men

t Cat

egor

ies

Prog

ram

me

Proj

ect S

tatu

sNo

. of p

roje

cts

2012

/13

Budg

et20

13/1

4 Bu

dget

2014

/15

Budg

etNe

wTa

xi Ra

nks (

Willi

am N

icol; B

eyers

Nau

se; B

ophe

long;

R55

Kyala

mi)

Reten

tion

2 R

5,80

0 R

- R

-

Publi

c Tran

sport

Nod

al tra

nsfer

facili

ties (

Lerat

ong;

Vand

erbijlp

ark;

Veree

niging

; Germ

iston

; Pien

aarsp

oort)

Feas

ibility

3 R

1,50

0 R

31,0

00

R 90

,000

Tend

er2

R 43

,400

R

74,6

00

R 29

,800

Interm

odal

Publi

c Tran

sport

Facili

ty (K

rugers

dorp)

Identi

fi ed

1 R

- R

2,50

0 R

10,2

00

Rood

epoo

rt De

sign

1 R

1,75

0 R

2,50

0 R

-

Shov

akalu

la Bic

ycle

Projec

tIm

pleme

ntatio

n 0

R 7,

000

R 7,

000

850

0\

Drive

r Lice

nce T

estin

g Cen

tre (K

liptow

n, Ka

giso,

Faran

ani,

Mame

lodi)

Feas

ibility

4 R

3,70

0 R

17,2

00

R -

Supp

ly of

Cons

tructi

on Fl

eet

Feas

ibility

- R

- R

20,0

00

R -

Total

for N

ew R

63,1

50

R 15

4,80

0 R

130,

000

Reha

bilita

tion &

Refur

bishm

ent /

Prev

entat

ive

Maint

enan

ce

Heav

y reh

abilit

ation

Tend

er9

R 13

4,43

5 R

- R

-

Desig

n9

R -

R 27

9,30

5 R

122,

388

Light

rehab

ilitati

onDe

sign

3 R

20,4

70

R -

R -

Cons

tructi

on5

R 19

,755

R

145,

863

R 9,

617

Rese

alCo

nstru

ction

12 R

3,48

9 R

44,0

05

R 2,

901

Desig

n1

R 1,

320

R 1,

800

R -

Fog S

pray

Cons

tructi

on1

R 2,

000

R 9,

847

R 68

4

Dilute

d Emu

lsion

Feas

ibility

Vario

us R

- R

380

R -

Projec

ts to

be id

entifi

edIde

ntifi e

dVa

rious

R -

R 65

,000

R

78,9

74

Tota

for Re

habil

itatio

n R

181,

469

R 54

6,20

0 R

214,

564

Maint

enan

ce an

d Rep

airs

Traffi c

sign

alsTe

nder

Vario

us R

4,00

0 R

10,0

00

R 10

,000

Stree

t Ligh

tsDe

sign

Vario

us R

- R

10,0

00

R 10

,000

Storm

wate

rDe

sign

Vario

us R

- R

10,0

00

R 10

,000

Regra

vellin

g of g

ravel

roads

Co

nstru

ction

5 R

25,0

00

R 40

,000

R

50,0

00

Bladin

g of g

ravel

roads

Co

nstru

ction

5 R

5,55

4 R

14,0

04

R 16

,805

Road

mark

ingCo

nstru

ction

0 R

9,03

8 R

18,0

00

R 15

,000

Repa

ir of p

othole

sCo

nstru

ction

5 R

5,15

0 R

23,3

66

R 31

,863

Routi

ne Ro

ad M

ainten

ance

Term

contr

acts

-Ong

oing

69 R

327,

600

R -

R -

Term

contr

acts

-New

5 R

160,

000

R 38

8,56

0 R

772,

560

Cons

tructi

on fl e

et, pl

ant &

equip

ment

maint

enan

ceIm

pleme

ntatio

n -

R 32

,000

R

50,0

00

R 48

,000

Provin

cial w

eighb

ridge

main

tenan

ceTe

nder

Vario

us

R 3,

000

R 1,

580

R 1,

768

Traffi c

surve

y equ

ipmen

t main

tenan

ceTe

nder

Vario

us

R -

R 3,

171

R 3,

557

Shou

lder r

epair

sIde

ntifi e

d Va

rious

R

- R

15,0

00

R 18

,000

Projec

ts to

be id

entifi

edIde

ntifi e

d Va

rious

R

- R

65,0

00

R 78

,975

Total

for M

ainten

ance

R 57

1,34

2 R

648,

681

R 1,

066,

528

93

Vote 8: Roads and Transport

Infr

astr

uctu

re In

vest

men

t Cat

egor

ies

Prog

ram

me

Proj

ect S

tatu

sNo

. of p

roje

cts

2012

/13

Budg

et20

13/1

4 Bu

dget

2014

/15

Budg

etUp

gradin

g & Ad

dition

s

Othe

r

Total

Bud

get f

or DR

&T

Capa

city i

mprov

emen

t (K7

1 -Ph

ase 2

: Proc

lamati

on of

road

reserv

e betw

een K

103

(Wier

da) t

o Lad

ium;

Imple

menta

tion

1 R

2,00

0 R

830

R -

K 46

Willi

am N

icol P

hase

2Te

nder

1 R

- R

4,15

0 R

15,1

20

Cons

tructi

on of

walk

ways

and b

icycle

lane

sDe

sign

4 R

25,0

00

R 22

,850

R

20,0

00

Reten

tion

2 R

1,00

0 R

- R

-

K69

Lynw

ood t

o Mam

elodi,

Kyala

mi to

Joha

nnes

burg,

De

sign

2 R

5,87

0 R

6,38

5 R

11,9

80

K154

, K77

Ph1

Feas

ibility

2 R

2,50

0 R

- R

-

Impro

ving r

oad c

ondit

ionns

in M

aize T

riang

le(K1

64,K7

7 Ph

2)Fe

asibi

lity2

R 9,

000

R 12

,495

R

5,92

5

Upgra

ding o

f roa

ds (V

ootre

kkerr

oad:

R55;

Mali

bong

we; K

154;

Willi

am N

icol; g

ravel

to tar

red su

rface

unde

r 20

PTP;

Nede

rveen

:

R103

; Adc

ock r

oad;

inters

ectio

n at M

amelo

di)

Identi

fi ed

12 R

34,4

80

R 39

0,95

8 R

366,

137

Cons

tructi

on4

R 11

3,32

1 R

12,4

85

R 10

2,95

5

Reten

tion

3 R

13,0

50

R -

R -

Upgra

ding o

f roa

ds (A

lterna

tive r

oute

to N3

at de

sign;

Tarrin

g

of Ca

yman

road

: eye

of Af

rica D

evelo

pmen

t (ph

ase2

) at

cons

tructi

on; R

82 - D

oubli

ng of

Old

Veren

ging R

oad)

Tend

er aw

ard1

R 10

9,84

8 R

- R

-

Cons

tructi

on1

R 5,

000

R -

R -

Lega

lise ro

ad re

serve

s (K-1

4 be

twee

n Chri

s Han

i Flat

s & Cu

llinan

; P4-1

Ned

ervee

n; K1

54 :

Gaute

ng H

ighlan

ds; K

69 Ly

nwoo

d to

Mame

lodi; K

77; K

60; K

198)

Cons

tructi

on of

road

s (Du

al ca

rriage

way b

etwee

n Max

well d

rive

& wo

odme

ad dr

ive; in

terch

ange

betw

een N

14 an

d K72

-Pine

Have

n inte

rchan

ge)

Land

acqu

isition

(K46

; R82

-P1-1;

K11;

K46;

K142

)

Feas

ibility

8 R

11,5

00

R 9,

130

R 11

,340

Identi

fi ed

2 R

- R

73,5

00

R 50

,000

Vario

us5

R 27

,500

R

- R

-

Refur

bishm

ent o

f TOL

ABS

Ekurh

uleni;

Tshw

ane;

Derek

Mas

oek

Cons

tructi

on3

R 17

,100

R

6,00

0 R

-

Repa

irs (M

dlalos

e Link

)

Ultra-

thin s

urfac

ing (N

ooitg

edac

ht; Ru

st de

Wint

er;

Hamm

ansk

raal; W

interv

eld; M

agali

esbu

rg)

Rural

road

surfa

cing (

ultra

thin p

h 2)(

Nooit

geda

cht;

Rust

de

Wint

er; H

amma

nskra

al; W

interv

eld; M

agali

esbu

rg)

Tend

er1

R 4,

000

R 50

0 R

-

Desig

n5

R 4,

500

R 8,

300

R 8,

400

Tend

er5

R 29

,350

R

50,6

00

R 30

,600

DLTC

(Tem

ba, M

abop

ane,

Xavie

r, Thre

e Rive

rs Pa

rk)

Traffi c

sign

al up

gradin

g

Tend

er4

R 7,

200

R 8,

000

R 2,

230

Identi

fi ed

1 R

- R

11,8

00

R 13

,138

Projec

ts to

be id

entifi

edIde

ntifi e

dVa

rious

R -

R 65

,000

R

78,9

74

Total

for U

pgrad

ing an

d Add

itions

R 42

4,21

9 R

682,

983

R 71

6,79

9

Rese

arch:

Testi

ng of

rolle

r com

pacte

d con

crete

Conti

nuou

s1

R 6,

000

Freew

ay im

prove

ment

Sche

meDe

sktop

Stud

y1

R -

R 2,

490

R 5,

040

Safet

y & ca

pacit

y imp

rovem

ents

Vario

usVa

rious

R -

R 9,

131

R 19

,974

Tota

l for

Oth

er R

6,0

00

R 1

1,62

1 R

25,

014

R 1

,244

,980

R

2,0

44,2

85

R 2

,152,

905

94

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

126

New

and R

eplac

emen

t Be

yers

Naud

e (Za

ndsp

ruit)

Taxi

Rank

City o

f Jo’B

urgCo

nstru

ction

of an

inter

moda

l facili

ty /

Taxi

Rank

Reten

tion

3,1

00

- -

127

New

and R

eplac

emen

t Bo

phelo

ng Ta

xi Ra

nk

Emful

eni

Cons

tructi

on of

an in

termo

dal fa

cility

/ Ta

xi Ra

nkRe

tentio

n 2

,700

-

-

128

New

and R

eplac

emen

t Le

raton

g Reg

ional

Interm

odal

Publi

c

Trans

port

Facili

ty

Moga

le cit

yIPT

N Pu

blic T

ransp

ort N

odal

point

/ Tra

nsfer

facili

ty Re

tentio

n -

25,

000

20,

000

125

New

and R

eplac

emen

t Ro

odep

oort

Interm

odal

Publi

c

Trans

port

facilit

y

City o

f Jo’B

urgIPT

N Pu

blic T

ransp

ort N

odal

/Tran

sfer F

acilit

y De

sign

1,7

50

2,5

00

-

129

New

and R

eplac

emen

t Va

nderb

ijlpark

Inter

moda

l Pub

lic

Trans

port

Facili

ty

Emful

eni

IPTN

Publi

c Tran

sport

Nod

al /T

ransfe

r Fac

ility

Reten

tion

- -

2,0

00

130

New

and R

eplac

emen

t Ve

reenig

ing S

tation

Inter

moda

l

Publi

c Tran

sport

Facili

ty

Sedib

eng

IPTN

Publi

c Tran

sport

Nod

al /T

ransfe

r Fac

ility

Reten

tion

20,

450

22,

000

4,8

00

131

New

and R

eplac

emen

t Ge

rmist

on S

tation

Inter

moda

l Pub

lic

Trans

port

Facili

ty

Ekurh

uleni

Publi

c Tran

sport

Nod

al tra

nsfer

Facili

ty Re

tentio

n 2

0,45

0 2

1,00

0 4

,500

132

New

and R

eplac

emen

t Pie

naars

poort

Stat

ion In

termo

dal

Publi

c Tran

sport

Facili

ty

City o

f Tsh

wane

Pu

blic T

ransp

ort N

odal

trans

fer Fa

cility

Reten

tion

4,0

00

33,

600

12,

000

136

New

and R

eplac

emen

t Kru

gersd

orp S

tation

Inter

moda

l

Publi

c Tran

sport

Facili

ty

West

Rand

Publi

c Tran

sport

Nod

al tra

nsfer

Facili

ty Ide

ntifi e

d -

2,5

00

10,

200

137

New

and R

eplac

emen

t Sh

ovak

alula

Progra

mme

All M

unicip

alitie

s Dis

tributi

on of

500

0 bic

ycles

to sc

holar

s inc

luding

cons

tructi

on of

100

0 Bic

ycle

storag

e fac

ilities

.

Imple

menta

tion

7,0

00

7,0

00

8,5

00

133

New

and R

eplac

emen

t IPT

N Pu

blic T

ransp

ort N

ode

Deve

lopme

nt

City o

f Joh

anne

sburg

Publi

c Tran

sport

Nod

al tra

nsfer

Facili

ty Re

tentio

n -

3,0

00

30,

000

134

New

and R

eplac

emen

t IPT

N Pu

blic T

ransp

ort N

ode

Deve

lopme

nt

City o

f Tsh

wane

Pu

blic T

ransp

ort N

odal

trans

fer Fa

cility

Reten

tion

- 3

,000

3

5,00

0

135

New

and R

eplac

emen

t IPT

N Pu

blic T

ransp

ort N

ode

Deve

lopme

nt

Ekurh

uleni

Publi

c Tran

sport

Nod

al tra

nsfer

Facili

ty Re

tentio

n -

- 3

,000

138

New

and R

eplac

emen

t Co

nstru

ction

of a

new

DLTC

at

Klipto

wn

Joha

nnes

burg

Cons

tructi

on of

a ne

w DL

TCRe

tentio

n 2

,400

2

00

-

139

New

and R

eplac

emen

t Co

nstru

ction

of a

new

DLTC

at

Kagis

o

West

Rand

Cons

tructi

on of

a ne

w DL

TCRe

tentio

n 4

33

5,0

00

-

140

New

and R

eplac

emen

t Co

nstru

ction

of a

new

DLTC

at

Faran

ani

Ekurh

uleni

Cons

tructi

on of

a ne

w DL

TCRe

tentio

n 4

33

5,0

00

-

141

New

and R

eplac

emen

t Co

nstru

ction

of a

new

DLTC

Mame

lodi

City o

f Tsh

wane

Cons

tructi

on of

a ne

w DL

TCRe

tentio

n 4

34

7,0

00

-

124

New

and R

eplac

emen

t Co

nstru

ction

fl eet,

plan

t and

equip

ment

supp

ly.

All re

gions

Purch

ase o

f con

struc

tion fl

eet,

plant

and e

quipm

ent.

Tend

er -

20,

000

-

142

Reha

bilita

tion a

nd Re

furbis

hmen

tTa

rlton R

oad D

1726

(10

km)

Kruge

rsdorp

Heav

y reh

abilit

ation

Tend

er 2

2,00

0 2

6,00

0 6

,726

95

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

143

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

40/1

(28.

56KM

) R55

0 Nig

el

to Eik

enho

ff

Beno

niLig

ht Re

habil

itatio

nCo

nstru

ction

1,0

69

- -

144

Reha

bilita

tion a

nd Re

furbis

hmen

tK1

09 (9

.22K

M) r

oad t

o

Baps

fontei

n

Beno

niRe

seal

Cons

tructi

on 1

,218

-

-

145

Reha

bilita

tion a

nd Re

furbis

hmen

tK1

75 (R

568)

10.

52km

from

18.4

8-7.9

6km

Beno

niLig

ht Re

habil

itatio

nCo

nstru

ction

2,4

81

- -

148

Reha

bilita

tion a

nd Re

furbis

hmen

tR4

2 (1

7.15

km) f

rom 1

7.98

-

35.1

7km

Beno

niLig

ht Re

habil

itatio

nCo

nstru

ction

5,3

63

12,

436

-

149

Reha

bilita

tion a

nd Re

furbis

hmen

tR4

2 ( 2

0.97

km)

Beno

niDil

uted E

mulsio

nTe

nder

2,0

00

380

-

150

Reha

bilita

tion a

nd Re

furbis

hmen

tRo

ad D

2442

(6.1

6 km

) Zith

oben

i

to Br

onkh

orspru

it

Bron

khors

tpruit

Heav

y reh

abilit

ation

Tend

er 1

4,60

6 1

,459

-

151

Reha

bilita

tion a

nd Re

furbis

hmen

tR2

5 (2

6km)

Kemp

ton Pa

rk to

Bron

khors

priut

Bron

khors

tpruit

Heav

y reh

abilit

ation

Tend

er 2

6,04

9 5

0,00

0 3

0,00

0

152

Reha

bilita

tion a

nd Re

furbis

hmen

tP3

9/1(

15km

) (Era

smia

to

Kruge

ersdo

rp)

Derde

poort

Heav

y reh

abilit

ation

Tend

er 2

2,50

0 2

5,62

6 6

,132

153

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

22/1

(10k

m) (E

lardu

s Park

to

Kemp

ston)

Derde

poort

Light

Reha

bilita

tion

Tend

er 1

3,85

5 3

0,00

0 5

,717

154

Reha

bilita

tion a

nd Re

furbis

hmen

tP2

49/1

(10k

m) (F

rom

Harte

bees

poort

to D

iesplo

ot)

Derde

poort

Heav

y reh

abilit

ation

Tend

er 2

7,72

1 3

0,00

0 6

,180

155

Reha

bilita

tion a

nd Re

furbis

hmen

tD2

518

(1.2

km) H

ornek

to

Kame

eldrift

Derde

poort

Heav

y reh

abilit

ation

Tend

er 5

,200

6

06

-

156

Reha

bilita

tion a

nd Re

furbis

hmen

tD3

27 (1

8.66

km)(

From

Hamm

ansk

raal to

Boe

kenh

outsk

loof

Derde

poort

Heav

y reh

abilit

ation

Tend

er 3

,624

5

98

-

158

Reha

bilita

tion a

nd Re

furbis

hmen

tD2

129

Kame

eldrift

Road

(13.

79

km) (

From

Molo

to to

Kame

eldrift

)

Derde

poort

Heav

y reh

abilit

ation

Tend

er 5

,000

1

1,33

4 -

160

Reha

bilita

tion a

nd Re

furbis

hmen

tM1

(P20

6/1)

(9.2

4 km

)Kru

gersd

orpRe

seal

Cons

tructi

on -

20,

000

-

161

Reha

bilita

tion a

nd Re

furbis

hmen

tP2

41/1

(19.

21 km

)Kru

gersd

orpRe

seal

Cons

tructi

on 7

46

- -

162

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

26/1

(7.4

6 km

) N14

(Sink

hole)

Kruge

rsdorp

Heav

y reh

abilit

ation

Tend

er -

35,

000

-

164

Reha

bilita

tion a

nd Re

furbis

hmen

tP7

3/1

Potch

esfst

room

(9km

) R54

.Kru

gersd

orpRe

seal

Cons

tructi

on 8

04

- -

165

Reha

bilita

tion a

nd Re

furbis

hmen

tD7

62/1

(10.

96 km

)Kru

gersd

orpRe

seal

Cons

tructi

on 4

16

- -

166

Reha

bilita

tion a

nd Re

furbis

hmen

tD2

150

(7.3

4 km

) Seb

oken

g to

Oran

ge Fa

rm

Veree

niging

Rese

alCo

nstru

ction

305

-

-

167

Reha

bilita

tion a

nd Re

furbis

hmen

tP2

43/1

(18.

13 km

) Vere

ening

ing

to Bu

lfur

Veree

niging

Light

Reha

bilita

tion

Tend

er 6

,615

8

55

-

96

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

170

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

75 (2

0.47

km) V

ande

rbijlp

ark to

Potch

stroo

m

Veree

niging

Light

Reha

bilita

tion

Identi

fi ed

6,0

90

- -

171

Reha

bilita

tion a

nd Re

furbis

hmen

tP4

6/1

(16.

88 km

)Vere

enigi

ng

to Alb

erton

Veree

niging

Light

Reha

bilita

tion

Identi

fi ed

4,7

52

- -

172

Reha

bilita

tion a

nd Re

furbis

hmen

tP7

3/1

Vand

erbijlp

ark to

Oran

ge

Farm

(6.9

7 km

) R54

.

Veree

niging

Rese

alTe

nder

1,3

20

9,0

00

-

173

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

58/1

(24.

6km)

(Ben

Sch

oema

n

Road

- From

Preto

ria to

Jhb)

Derde

poort

Light

Reha

bilita

tion

Tend

er -

20,

000

-

174

Reha

bilita

tion a

nd Re

furbis

hmen

tP3

9/1

(HER

ONBR

IDGE

RD)

Kruge

rsdorp

Heav

y reh

abilit

ation

Tend

er -

40,

000

30,

000

175

Reha

bilita

tion a

nd Re

furbis

hmen

tP7

3/1

(N12

to R5

58) 5

kmKru

gersd

orpHe

avy r

ehab

ilitati

onTe

nder

- -

3,0

00

176

Reha

bilita

tion a

nd Re

furbis

hmen

tK4

0 (A

tterbu

ry roa

d) Ph

ase 2

Derde

poort

Rese

alIde

ntifi e

d -

10,

000

-

177

Reha

bilita

tion a

nd Re

furbis

hmen

tK4

0 (A

tterbu

ry roa

d) Ph

ase 1

Derde

poort

Heav

y reh

abilit

ation

Tend

er 7

,735

7

72

-

178

Reha

bilita

tion a

nd Re

furbis

hmen

tD2

159

(Farm

all ro

ad)

Kruge

rsdorp

Heav

y reh

abilit

ation

Tend

er -

8,5

00

850

179

Reha

bilita

tion a

nd Re

furbis

hmen

tD2

759

(Molo

to)De

rdepo

ortFo

g spra

yIde

ntifi e

d -

9,8

47

684

180

Reha

bilita

tion a

nd Re

furbis

hmen

tD1

027

(Ced

ar Rd

)Kru

gersd

orpRe

seal

Identi

fi ed

- 5

,005

5

01

181

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

75 (2

0.47

km) V

ande

rbijlp

ark to

Potch

stroo

m Ph

ase 2

Veree

niging

Light

Reha

bilita

tion

Identi

fi ed

- 4

0,69

0 -

182

Reha

bilita

tion a

nd Re

furbis

hmen

tP4

6/1

(16.

88 km

)Vere

enigi

ng to

Albert

on Ph

ase 2

Veree

niging

Light

Reha

bilita

tion

Identi

fi ed

- 3

1,43

0 -

183

Reha

bilita

tion a

nd Re

furbis

hmen

tD1

146(

9.57

km)(

From

Horn

esne

k

to Ka

meeld

rift) P

hase

2

Derde

poort

Rese

alIde

ntifi e

d -

- 2

,400

184

Reha

bilita

tion a

nd Re

furbis

hmen

tP1

26/1

(From

Ruim

sig)

Kruge

rsdorp

Heav

y reh

abilit

ation

Tend

er -

- 3

,000

185

Reha

bilita

tion a

nd Re

furbis

hmen

tK1

75 (R

568)

Br

onkh

orstsp

ruit

Light

Reha

bilita

tion

Identi

fi ed

- -

3,0

00

186

Reha

bilita

tion a

nd Re

furbis

hmen

tP2

/ 5

(Cull

inan)

Bron

khors

tsprui

tHe

avy r

ehab

ilitati

onTe

nder

- -

3,0

00

187

Reha

bilita

tion a

nd Re

furbis

hmen

tD4

83 (R

515

- Cull

inan R

oad)

Bron

khors

tsprui

tHe

avy r

ehab

ilitati

onTe

nder

- -

3,0

00

188

Reha

bilita

tion a

nd Re

furbis

hmen

tR4

2 (P

101/

1 fro

m De

lmas

Road

to N1

7)

Beno

niHe

avy r

ehab

ilitati

onTe

nder

- 7

,000

1

5,00

0

189

Reha

bilita

tion a

nd Re

furbis

hmen

t55

Derde

poort

Heav

y reh

abilit

ation

Tend

er -

- 5

,000

190

Reha

bilita

tion a

nd Re

furbis

hmen

tN1

2Kru

gersd

orpHe

avy r

ehab

ilitati

onTe

nder

- -

4,0

00

191

Reha

bilita

tion a

nd Re

furbis

hmen

tHa

ns S

trydo

m (M

amelo

di)De

rdepo

ortHe

avy r

ehab

ilitati

onTe

nder

- 2

4,41

0 2

,500

192

Reha

bilita

tion a

nd Re

furbis

hmen

tR8

2 (b

etwee

n R55

4 Le

nasia

Road

and R

554

Albert

on)

Kruge

rsdorp

Light

Reha

bilita

tion

Identi

fi ed

- 4

,452

3

50

193

Reha

bilita

tion a

nd Re

furbis

hmen

tW

itkop

pen R

oad (

betw

een M

ega

Watt

Park

and S

unnin

ghill

Hosp

ital)

Kruge

rsdorp

Light

Reha

bilita

tion

Identi

fi ed

- 6

,000

5

50

194

Reha

bilita

tion a

nd Re

furbis

hmen

tR8

0 Ma

bopa

ne H

ighwa

y Hair

pin

bend

north

boun

d

Derde

poort

Heav

y reh

abilit

ation

Tend

er -

18,

000

2,0

00

97

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

195

Reha

bilita

tion a

nd Re

furbis

hmen

tLu

cas M

ango

pe be

twee

n

Hamm

ansk

raal a

nd M

abop

ane

Derde

poort

Heav

y reh

abilit

ation

Tend

er -

- 2

,000

196

Upgra

des a

nd Ad

dition

sTra

ffi c En

ginee

ring

All re

gions

Traffi c

Sign

als U

pgrad

ingDe

sign

- 1

1,80

0 1

3,13

8

New

projec

ts to

be id

entifi

edVa

rious

To be

deter

mine

d -

65,

000

78,

974

1Ma

inten

ance

and R

epair

sTra

ffi c En

ginee

ring

All re

gions

Maint

enan

ce of

Spe

cializ

ed Tr

affi c

Surve

ying F

acilit

ies.

Desig

n -

3,1

70

3,5

57

2Ma

inten

ance

and R

epair

sTra

ffi c En

ginee

ring

All re

gions

Maint

ain Pr

ovinc

ial W

eighb

ridge

sDe

sign

3,0

00

1,5

80

1,7

68

3Ma

inten

ance

and R

epair

sTra

ffi c si

gnals

main

tenan

ce.

All re

gions

Maint

enan

ce of

traffi

c sig

nals.

Cons

tructi

on 4

,000

1

0,00

0 1

0,00

0

4Ma

inten

ance

and R

epair

sSt

reet li

ghts

maint

enan

ce.

All re

gions

Maint

enan

ce of

stree

t ligh

ts.De

sign

- 1

0,00

0 1

0,00

0

5Ma

inten

ance

and R

epair

sSt

ormwa

ter in

frastr

uctur

e

maint

enan

ce.

All re

gions

Maint

enan

ce of

storm

water

struc

tures

and b

ridge

sDe

sign

- 1

0,00

0 1

0,00

0

6Ma

inten

ance

and R

epair

sBE

NONI

ROUT

INE M

AINT D

EPAR

TBe

noni

Road

s blad

edIde

ntifi e

d 1

,025

2

,756

3

,308

7Ma

inten

ance

and R

epair

sBR

ONKH

ORST

SPRU

IT RO

UTIN

E

MAIN

T DEP

ART

Bron

khors

tpruit

Road

s blad

edIde

ntifi e

d 1

,411

3

,793

4

,552

8Ma

inten

ance

and R

epair

sKR

UGER

SDOR

P ROU

TINE M

AINT

DEPA

RT

Kruge

rsdorp

Road

s blad

edIde

ntifi e

d 6

10

1,6

59

1,9

90

9Ma

inten

ance

and R

epair

sDE

RDEP

OORT

ROUT

INE M

AINT

DEPA

RT

Derde

poort

Road

s blad

edIde

ntifi e

d 1

,657

3

,506

4

,207

10Ma

inten

ance

and R

epair

sVE

REEN

IGIN

G RO

UTIN

E MAIN

T

DEPA

RT

Veree

niging

Road

s blad

edIde

ntifi e

d 8

50

2,2

90

2,7

48

11Ma

inten

ance

and R

epair

sBE

NONI

ROUT

INE M

AINT D

EPAR

TBe

noni

Regra

vellin

gIde

ntifi e

d 5

,000

8

,000

1

0,00

0

12Ma

inten

ance

and R

epair

sBR

ONKH

ORST

SPRU

IT RO

UTIN

E

MAIN

T DEP

ART

Bron

khors

tpruit

Regra

vellin

gIde

ntifi e

d 5

,000

8

,000

1

0,00

0

13Ma

inten

ance

and R

epair

sKR

UGER

SDOR

P ROU

TINE M

AINT

DEPA

RT

Kruge

rsdorp

Regra

vellin

gIde

ntifi e

d 5

,000

8

,000

1

0,00

0

14Ma

inten

ance

and R

epair

sDE

RDEP

OORT

ROUT

INE M

AINT

DEPA

RT

Derde

poort

Regra

vellin

gIde

ntifi e

d 5

,000

8

,000

1

0,00

0

15Ma

inten

ance

and R

epair

sVE

REEN

IGIN

G RO

UTIN

E MAIN

T

DEPA

RT

Veree

niging

Regra

vellin

gIde

ntifi e

d 5

,000

8

,000

1

0,00

0

16Ma

inten

ance

and R

epair

sBE

NONI

ROUT

INE M

AINT D

EPAR

TBe

noni

Black

top pa

tching

(poth

ole re

pairs

)Ide

ntifi e

d 7

85

4,3

68

5,9

56

17Ma

inten

ance

and R

epair

sBR

ONKH

ORST

SPRU

IT RO

UTIN

E

MAIN

T DEP

ART

Bron

khors

tpruit

Black

top pa

tching

(poth

ole re

pairs

)Ide

ntifi e

d 7

33

2,2

11

3,0

15

18Ma

inten

ance

and R

epair

sKR

UGER

SDOR

P ROU

TINE M

AINT

DEPA

RT

Kruge

rsdorp

Black

top pa

tching

(poth

ole re

pairs

)Ide

ntifi e

d 2

,507

8

,021

1

0,93

8

19Ma

inten

ance

and R

epair

sDE

RDEP

OORT

ROUT

INE M

AINT

DEPA

RT

Derde

poort

Black

top pa

tching

(poth

ole re

pairs

)Ide

ntifi e

d 4

7 4

,768

6

,502

98

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

20Ma

inten

ance

and R

epair

sVE

REEN

IGIN

G RO

UTIN

E MAIN

T

DEPA

RT

Veree

niging

Black

top pa

tching

(poth

ole re

pairs

)Ide

ntifi e

d 1

,078

3

,999

5

,453

21Ma

inten

ance

and R

epair

sCo

nstru

ction

fl eet,

plan

t and

equip

ment

supp

ly.

All re

gions

Maint

enan

ce of

cons

tructi

on fl e

et, pl

ant a

nd eq

uipme

nt.Ide

ntifi e

d 3

2,00

6 5

0,00

0 4

8,00

0

22Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 8

,400

-

-

23Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 8

,400

-

-

24Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

25Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 8

,400

-

-

26Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

27Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

28Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

29Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

30Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBe

noni

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

33Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

34Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

35Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

36Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

37Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

38Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

39Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

40Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

41Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

42Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

43Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

44Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

45Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceBr

onkh

orstpr

uitOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

49Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

50Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

51Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

52Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

53Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

54Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

55Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

56Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

57Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

58Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

99

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

59Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

60Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

61Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

62Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

63Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

64Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

65Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

66Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

67Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceKru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

72Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

73Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

74Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

75Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

76Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

77Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

78Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

79Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

80Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

81Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

82Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

83Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

84Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

85Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

86Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

87Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceDe

rdepo

ortOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

91Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

92Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

93Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

94Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

95Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

96Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

97Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

98Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

4,2

00

- -

99Ma

inten

ance

and R

epair

sOu

tsourc

ed Ro

utine

Main

tenan

ceVe

reenig

ingOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

8,4

00

- -

100

Maint

enan

ce an

d Rep

airs

Outso

urced

Routi

ne M

ainten

ance

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

101

Maint

enan

ce an

d Rep

airs

Outso

urced

Routi

ne M

ainten

ance

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

102

Maint

enan

ce an

d Rep

airs

Outso

urced

Routi

ne M

ainten

ance

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 4

,200

-

-

100

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

106

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Beno

niOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

25,

600

25,

600

25,

600

107

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Bron

khors

tsprui

tOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

25,

600

25,

600

25,

600

108

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Derde

poort

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 2

5,60

0 2

5,60

0 2

5,60

0

109

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Kruge

rsdorp

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 5

7,60

0 5

7,60

0 5

7,60

0

110

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d 2

5,60

0 2

5,60

0 2

5,60

0

111

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Beno

niOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

- 3

2,00

0 3

2,00

0

112

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Bron

khors

tsprui

tOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

- 3

2,00

0 3

2,00

0

113

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Derde

poort

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

32,

000

32,

000

114

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Kruge

rsdorp

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

72,

000

72,

000

115

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

32,

000

32,

000

116

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Beno

niOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

- -

64,

000

117

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Bron

khors

tsprui

tOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Identi

fi ed

- -

64,

000

118

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Derde

poort

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

- 6

4,00

0

119

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Kruge

rsdorp

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

- 1

28,0

00

120

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

Veree

niging

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

- 6

4,00

0

121

Maint

enan

ce an

d Rep

airs

Revis

ed ou

tsourc

ed ro

utine

maint

enan

ce

All re

gions

Outso

urced

Ong

oing r

outin

e main

tenan

ceIde

ntifi e

d -

28,

560

28,

560

122

Maint

enan

ce an

d Rep

airs

Road

Mark

ingAll

regio

nsOu

tsourc

edIde

ntifi e

d 9

,033

1

8,00

0 1

5,00

0

123

Maint

enan

ce an

d Rep

airs

Shou

lder R

epair

sAll

regio

nsOu

tsourc

edIde

ntifi e

d -

15,

000

18,

000

New

projec

ts to

be id

entifi

odVa

rious

To be

deter

mine

d -

65,

000

78,

974

101

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

197

Upgra

des a

nd Ad

dition

sK7

1 (P

hase

2):

Procla

matio

n of

road r

eserv

e betw

een K

103

(Wier

da

Rd) t

o Lau

dium

Tshwa

neSu

rvey a

nd La

nd ac

quisit

ionCo

nstru

ction

2,0

00

830

-

198

Upgra

des a

nd Ad

dition

sK4

6 W

illiam

Nico

l (Ph

ase 1

)

Procla

matio

n of r

oad r

eserv

e:

Fourw

ays t

o PW

V 5

Moga

leSu

rvey a

nd La

nd ac

quisit

ionIm

pleme

ntatio

n 5

,000

2

,490

-

199

Upgra

des a

nd Ad

dition

sK1

64 (N

ew Co

nstru

ction

):

Procla

matio

n of r

oad r

eserv

e

(Betw

een 9

04 an

d 905

)

Emful

eni

Surve

y and

Land

acqu

isition

Imple

menta

tion

500

4

15

-

200

Upgra

des a

nd Ad

dition

sK1

1 be

twee

n Gold

en H

ighwa

y to

P1-1

(R82

) Proc

lamati

on of

road

reserv

e:

Emful

eni

Surve

y and

Land

acqu

isition

Imple

menta

tion

10,

000

2,4

90

2,1

00

201

Upgra

des a

nd Ad

dition

sK1

5 Ph

ase 3

: Do

bson

ville

to

Lerat

ong

Sowe

toRe

view

detai

l des

ign .

Draf

t ten

der d

ocue

mnts

Desig

n -

- -

202

Upgra

des a

nd Ad

dition

sK4

6: P

WV

5 to

Dieps

loot/

N14:

Procla

matio

n of r

oad r

eserv

e

Moga

leSu

rvey a

nd La

nd ac

quisit

ionIm

pleme

ntatio

n 1

0,00

0 1

,660

3

,360

203

Upgra

des a

nd Ad

dition

sK1

54: G

auten

g High

lands

:

Grac

eview

Acce

ss Rd

to ol

d

Veree

niging

(R82

/P2-a

one l

ane

projec

tion (

Phas

e 2)

Meraf

ong

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Tend

er 6

,000

4

,150

8

40

204

Upgra

des a

nd Ad

dition

sK7

7: G

auten

g High

lands

: Eliz

abeth

Rd to

K154

(Pha

se 1

)

Meraf

ong

EIA, P

relim

and

Detai

l Des

ign &

draft

tend

er

docu

menta

tion

Tend

er 3

,000

3

,480

-

205

Upgra

des a

nd Ad

dition

sK7

7: G

auten

g High

lands

: Eliz

abeth

Rd to

K154

(Pha

se 2

)

Meraf

ong

Surve

y and

Land

acqu

isition

Tend

er 2

,000

2

,490

-

206

Upgra

des a

nd Ad

dition

sK5

4 Tsa

maya

Ave t

o P15

4-1(K

22),

(SPT

N)

Tshwa

neEIA

,New

Deta

il Des

ign &

Tend

er do

cume

ntatio

n sing

le

carra

ge w

ay

Identi

fi ed

- 2

,490

-

207

Upgra

des a

nd Ad

dition

sK6

9: Ly

nwoo

d roa

d to

Mame

lodi

(SPT

N)

Tshwa

neEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nTe

nder

5,2

00

1,6

60

420

208

Upgra

des a

nd Ad

dition

sK6

9: Ly

nwoo

d to M

amelo

di:

Procla

matio

n (SP

TN)

Tshwa

neSu

rvey a

nd La

nd ac

quisit

ionTe

nder

6,0

00

1,2

45

-

209

Upgra

des a

nd Ad

dition

sK5

4 Tsa

maya

Ave t

o P15

4-1(K

22)

procla

matio

n (SP

TN)

Tshwa

neSu

rvey a

nd La

nd ac

quisit

ionIde

ntifi e

d -

6,2

25

-

210

Upgra

des a

nd Ad

dition

sK1

42 P

roclam

ation

(POA

)Mo

gale

Surve

y and

Land

acqu

isition

Imple

menta

tion

2,5

00

830

2

,940

211

Upgra

des a

nd Ad

dition

sK6

0 be

twee

n Meg

awatt

park

(Kya

lami R

d) to

Corpo

rate P

ark:

Kyala

mi /

N1 (S

ectio

n 1) (

SPTN

)

Joha

nnes

burg

Surve

y and

Land

acqu

isition

Tend

er 1

,500

1

,245

-

102

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

212

Upgra

des a

nd Ad

dition

sUp

grade

grav

el roa

d with

new

RCC

mater

ial (C

ullina

n)

Joha

nnes

burg

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Comp

leted

670

-

-

213

Upgra

des a

nd Ad

dition

sK6

0 Pr

oclam

ation

of ro

ad re

serve

:

K73

(exte

nsion

of Ri

vonia

rd to

PWV

9 (P

71-1

(Main

Rd) (

SPTN

)

Joha

nnes

burg

Surve

y and

Land

acqu

isition

Cons

tructi

on 4

,000

3

,320

-

214

Upgra

des a

nd Ad

dition

sNo

oitge

dach

t (P

hase

1)

Bron

khors

tpruit

Outso

urced

Ong

oing r

outin

e main

tenan

ceCo

nstru

ction

900

1

,660

1

,680

215

Upgra

des a

nd Ad

dition

sRu

st de

Wint

er (P

hase

1)

Bron

khors

tpruit

Outso

urced

Ong

oing r

outin

e main

tenan

ceCo

nstru

ction

900

1

,660

1

,680

216

Upgra

des a

nd Ad

dition

sHa

mman

skraa

l (Ph

ase 1

)Tsh

wane

Outso

urced

Ong

oing r

outin

e main

tenan

ceCo

nstru

ction

900

1

,660

1

,680

217

Upgra

des a

nd Ad

dition

sW

interv

eld (P

hase

1)

Tshwa

neOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Cons

tructi

on 9

00

1,6

60

1,6

80

218

Upgra

des a

nd Ad

dition

sMa

galie

sburg

(Pha

se 1

)Kru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Cons

tructi

on 9

00

1,6

60

1,6

80

219

Upgra

des a

nd Ad

dition

sK1

4 be

twee

n Chri

s Han

i Flat

s and

Cullin

un

Tshwa

neSu

rvey a

nd La

nd ac

quisit

ionCo

nstru

ction

- 4

15

-

220

Upgra

des a

nd Ad

dition

sK1

64 (N

ew Co

nstru

ction

) :

Procla

matio

n of r

oad r

eserv

e

(Betw

een 9

04 an

d 905

)

Emful

eni

Surve

y and

Land

acqu

isition

Tend

er -

415

4

20

221

Upgra

des a

nd Ad

dition

sR8

2 (P

1/1)

Old

Veree

niging

road

(Pha

se 2

): Re

view

desig

ns to

comp

lete u

pgrad

ing of

road

betw

een

Walke

rville

and V

ereen

iging

(De

Deur)

Emful

eni

EIA, D

etail D

esign

Revie

w &

Tend

er do

cume

ntatio

n dua

l

carra

ge w

ay

Imple

menta

tion

- 8

30

2,2

97

222

Upgra

des a

nd Ad

dition

sR8

2 (P

1-1) (

phas

e1 &

2)

Procla

matio

n of r

oad r

eserv

e:

betw

een

Eken

hof,

Walke

rville

and

De D

eur

Emful

eni

Surve

y and

Land

acqu

isition

Imple

menta

tion

- 8

30

840

223

Upgra

des a

nd Ad

dition

sK1

1 be

twee

n Gold

en H

ighwa

y

to P1

-1 (R

82):

EIA, d

etail d

esign

,

tend d

oc

Emful

eni

EIA, N

ew Pr

elimi

nary

and D

etail D

esign

& Te

nder

docu

menta

tion d

ual c

arrag

e way

Identi

fi ed

- 4

,640

8

,400

224

Upgra

des a

nd Ad

dition

sP4

-1 Ne

derve

en rd

(R10

3) fr

om

Leon

dale,

fords

dick R

d (R5

54 to

Barry

Mari

as Rd

)

Ekhu

rulen

iEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nIde

ntifi e

d -

415

-

225

Upgra

des a

nd Ad

dition

sP4

-1 Ne

derve

en rd

(R10

3) fr

om

Leon

dale,

fords

dick R

d (R5

54 to

Barry

Mari

as Rd

). La

nd Pr

oclam

ation

Ekhu

rulen

iSu

rvey a

nd La

nd ac

quisit

ionTe

nder

- 1

,245

5

,040

226

Upgra

des a

nd Ad

dition

sK4

6 W

illiam

Nico

l Pha

se 2

) from

PWV5

to D

iepslo

ot/N1

4: E

IA,

Detai

l, ten

d doc

Moga

leEIA

, New

Deta

il Des

ign &

Tend

er do

cume

ntatio

n dua

l

carra

ge w

ay

Tend

er -

4,1

50

15,

120

103

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

227

Upgra

des a

nd Ad

dition

sK1

54: G

auten

g High

lands

: De

tail

desig

n of K

154

and u

pgrad

e of

D131

3 (P

hase

1)

Meraf

ong

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- 1

,130

-

228

Upgra

des a

nd Ad

dition

sK1

54: G

auten

g High

lands

(Pha

se

1 &

2)

Meraf

ong

Surve

y and

Land

acqu

isition

Identi

fi ed

- 1

,660

4

,200

229

Upgra

des a

nd Ad

dition

sD1

814

betw

een

(P2-5

) K14

and

D483

(Ray

ton) :

Tes

ting

of Ro

ller

comp

acted

conc

rete

Tshwa

neIm

pleme

ntatio

n of R

oller

comp

acted

conc

rete a

s tria

l test

Identi

fi ed

6,0

00

4,9

80

5,0

40

230

Upgra

des a

nd Ad

dition

sK1

64:

betw

een 9

04 an

d P73

-1

(Pha

se 2

)

Sedib

eng

EIA,Re

view

Detai

l des

ign &

Draf

t Ten

der d

ocum

entat

ionIde

ntifi e

d -

415

2

,520

231

Upgra

des a

nd Ad

dition

sK1

64:

betw

een 9

04 an

d P73

-1

(Pha

se 2

)

Sedib

eng

Surve

y and

Land

acqu

isition

Identi

fi ed

- 8

30

1,6

80

232

Upgra

des a

nd Ad

dition

sK1

48:

Inters

ectio

n with

N3

Meraf

ong

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- 2

,490

4

,200

233

Upgra

des a

nd Ad

dition

sK1

48:

Inters

ectio

n with

N3

Meraf

ong

Surve

y and

Land

acqu

isition

Identi

fi ed

- -

1,2

60

234

Upgra

des a

nd Ad

dition

s K9

7 (P

1-3)P

retori

a N4/

-Bona

ccord

to W

interv

eld

Tshwa

neEIA

, Prel

imina

ry de

sign a

nd D

etail D

esign

& Te

nder

docu

menta

tion d

ual c

arrag

e way

Identi

fi ed

- 4

,150

6

,300

235

Upgra

des a

nd Ad

dition

sMo

hlake

ng: E

xt 11

(Req

uest

by

HOD)

Moga

leEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nIde

ntifi e

d -

160

-

236

Upgra

des a

nd Ad

dition

sK7

7: G

racev

iew Ac

cess

Rd Ph

ase 2

Meraf

ong

Surve

y and

Land

acqu

isition

Identi

fi ed

- -

2,1

00

237

Upgra

des a

nd Ad

dition

sK1

42:

Impro

ve ac

cess

to Le

nasia

Moga

leEIA

, Prel

im an

d De

tail D

esign

& dr

aft te

nder

docu

menta

tion

Identi

fi ed

- 2

,490

1

,260

238

Upgra

des a

nd Ad

dition

sK6

0 : C

onstr

uct io

n of a

sing

le

carria

gewa

y from

K73

(exte

nsion

of

Rivon

ia rd

to PW

V 9

(P71

-1 (M

ain

Rd) (

secti

on 2

)

Joha

nnes

burg

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- 4

15

1,2

60

239

Upgra

des a

nd Ad

dition

sK1

01 Fr

om Ro

oihuis

kraal

off ra

mp

to Ne

w roa

d

Ekhu

rulen

iEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nIde

ntifi e

d -

4,1

50

4,2

00

240

Upgra

des a

nd Ad

dition

sP1

6-1 M

agali

esbe

rg by

pass

Moga

leEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nIde

ntifi e

d -

- 5

,054

242

Upgra

des a

nd Ad

dition

sN3

- KZN

Corrid

or: F

easib

ility s

tudy

Meraf

ong

Trans

port

Bran

ch co

nduc

tion f

easib

ility s

tudy

Identi

fi ed

- 8

30

2,5

20

243

Upgra

des a

nd Ad

dition

sK7

7: G

racev

iew Ac

cess

Rd Ph

ase 2

Meraf

ong

EIA, P

relim

inary

desig

n and

Deta

il Des

ign &

Tend

er

docu

menta

tion d

ual c

arrag

e way

Identi

fi ed

- -

885

244

Upgra

des a

nd Ad

dition

sK6

0 be

twee

n Meg

awatt

park

(Kya

lami R

d) to

Corpo

rate P

ark:

Kyala

mi /

N1

Joha

nnes

burg

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- -

2,0

00

245

Upgra

des a

nd Ad

dition

sK1

01:

Upgra

ding o

f inter

secti

on

K101

and K

58

Joha

nnes

burg

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- -

2,0

00

104

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

246

Upgra

des a

nd Ad

dition

sK1

98: N

ew ro

ad fr

om Le

raton

g to

Corel

ett D

rive (

Witp

oortji

e)

Moga

leEIA

, Deta

il Des

ign &

Tend

er do

cume

ntatio

nIde

ntifi e

d -

- 2

,000

248

Upgra

des a

nd Ad

dition

sPW

V 9

from

Sosh

angu

ve to

N14

Joha

nnes

burg/

Moga

le/

Tshwa

ne

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Identi

fi ed

- 2

,490

5

,040

249

Upgra

des a

nd Ad

dition

sK1

70:

Interc

hang

e at N

1-19

and

Golde

n High

way:

Acce

ss to

Evato

n

and S

ebok

eng

Sedib

eng

EIA, D

etail D

esign

& Te

nder

docu

menta

tion

Reten

tion

- -

2,0

00

250

Upgra

des a

nd Ad

dition

sMo

loto C

orrido

r: Fe

asab

ility s

tudy

Tshwa

neTra

nspo

rt B

ranch

cond

uctio

n fea

sibilit

y stud

yRe

tentio

n -

- 8

40

251

Upgra

des a

nd Ad

dition

sCa

yman

road

(D25

29) P

hase

2Me

rafon

gTa

rring o

f Cay

man R

d as a

n acce

ss roa

d to t

he Ey

e of A

frica

Deve

lopme

nt (p

hase

2)

Cons

tructi

on 5

,000

-

-

252

Upgra

des a

nd Ad

dition

sR5

5 (K

71) P

hase

1Tsh

wane

The u

pgrad

ing of

Voort

rekke

r roa

d (R5

5) be

twee

n Wier

da

Rd (M

10, S

unde

rland

ridge

) and

Main

Rd (M

26, L

audiu

m)

- P66

/1

Cons

tructi

on 1

02,0

48

12,

485

-

253

Upgra

des a

nd Ad

dition

sK2

9 ph

ase 3

Kruge

rsdorp

Upgra

ding o

f Mali

bong

we dr

ive be

twen

N14

and L

anse

ria

Airpo

rt inc

luding

a bri

dge a

cross

N14

Reten

tion

10,

000

- -

254

Upgra

des a

nd Ad

dition

sK1

54 ph

ase 1

Sedib

eng

Upgra

ding o

f roa

d K15

4 fro

m a g

ravel

road t

o a su

rface

d

carria

gewa

y . G

auten

g High

land (

Eiken

hof)

Identi

fi ed

24,

000

1,2

00

-

255

Upgra

des a

nd Ad

dition

sK4

6 Ph

ase 1

Jo

hann

esbu

rgUp

gradin

g of W

illiam

Nico

le be

twee

n Witk

oppe

n and

PWV5

Identi

fi ed

- -

102

,955

256

Upgra

des a

nd Ad

dition

sR8

2 (P

1/1)

Old

Veree

niging

road

phas

e 1

Veree

niging

Doub

ling o

f Old

Veren

iging

Road

betw

een E

ikenh

of (ro

ad

D766

) and

Walk

erville

(roa

d D10

73)

Tend

er 1

09,8

48

100

,000

3

3,11

0

257

Upgra

des a

nd Ad

dition

sK6

0Jo

hann

esbu

rgCo

nstru

ction

of a

dual

carria

gewa

y betw

een M

axwe

ll driv

e

and W

oodm

ead d

rive

Desig

n -

1,5

00

-

258

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of S

ekwe

ri stre

et in

Refi lw

e

Refi lw

eUp

gradin

g of g

ravel

road t

o tarr

ed un

der t

he 2

0PTP

progra

mme

Cons

tructi

on 3

,952

2

,000

-

259

Upgra

des a

nd Ad

dition

sTh

ulani

B: Ro

ads 2

219–

2221

,

2226

-2231

, 223

8

Sowe

toUp

gradin

g of g

ravel

road t

o tarr

ed un

der t

he 2

0PTP

progra

mme

Reten

tion

3,0

50

800

-

260

Upgra

des a

nd Ad

dition

sLE

3So

shan

guve

Up

gradin

g of g

ravel

road t

o tarr

ed un

der t

he 2

0PTP

progra

mme

Reten

tion

250

-

-

261

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of B

olani

Road

(Joha

nnes

burg)

Sowe

toUp

gradin

g of g

ravel

road t

o tarr

ed un

der t

he 2

0PTP

progra

mme

Reten

tion

2,8

00

- -

262

Upgra

des a

nd Ad

dition

sMo

go S

treet

in Tsh

wane

Sosh

angu

veUp

gradin

g of g

ravel

road t

o tarr

ed un

der t

he 2

0PTP

progra

mme

Reten

tion

4,2

52

550

-

263

Upgra

des a

nd Ad

dition

sP4

-1Jo

hann

esbu

rgUp

gradin

g of N

ederv

een R

d (R1

03) f

rom Le

onda

le Fo

rsdick

Rd (R

554)

to B

arry M

arias

Rd (R

21)

Desig

n 1

0,50

0 1

32,1

74

110

,000

264

Upgra

des a

nd Ad

dition

sP1

26/K

72 Ph

ase 1

Joha

nnes

burg

Cons

tructi

on of

an in

terch

ange

betw

een N

14 an

d K72

(Pine

Hav

en In

terch

ange

)

Desig

n -

100

,000

1

10,0

00

105

Vote 8: Roads and Transport

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

265

Upgra

des a

nd Ad

dition

sK1

5 ph

ase 3

Joha

nnes

burg

Upgra

ding o

f Adc

ock R

oad f

rom D

obso

nville

and P

rotea

Glen

Identi

fi ed

- 9

9,23

6 1

16,5

00

266

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of S

afatsa

Stre

et in

Sharp

ville

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 3

82

-

267

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of Ro

ad2

Ext

in

Sharp

ville

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 3

88

-

268

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of S

akala

Stre

et an

d

Road

D in

Sha

rpville

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 2

75

-

269

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of Ro

ad A,

Road

B an

d

Road

C in

Sha

rpville

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 1

59

-

270

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of Ro

ad E,

Road

F,

Road

G, R

oad H

, Roa

d J &

Road

K

in Sh

arpvil

le (S

edibe

ng)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 4

46

-

271

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of Ro

ad 3

, Roa

d 4 &

Road

5 in

Sha

rpville

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 2

88

-

272

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of Ro

ad 9

in S

harpv

ille

(Sed

ibeng

)

Sharp

ville

Upgra

ding o

f grav

el roa

d to t

arred

unde

r the

20P

TP

progra

mme

Identi

fi ed

- 2

92

-

273

Upgra

des a

nd Ad

dition

sMd

lalos

e link

Joha

nnes

burg

In-ho

use O

ngoin

g rou

tine m

ainten

ance

Desig

n 4

,000

5

00

-

274

Upgra

des a

nd Ad

dition

s N

ooitg

edac

ht (P

hase

2)

Bron

khors

tpruit

Outso

urced

Ong

oing r

outin

e main

tenan

ceTe

nder

5,8

70

10,

120

10,

120

275

Upgra

des a

nd Ad

dition

sRu

st de

Wint

er (P

hase

2)

Bron

khors

tpruit

Outso

urced

Ong

oing r

outin

e main

tenan

ceTe

nder

5,8

70

10,

120

10,

120

276

Upgra

des a

nd Ad

dition

sHa

mman

skraa

l (Ph

ase 2

)Tsh

wane

Outso

urced

Ong

oing r

outin

e main

tenan

ceTe

nder

5,8

70

10,

120

10,

120

277

Upgra

des a

nd Ad

dition

sW

interv

eld (P

hase

2)

Tshwa

neOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Tend

er 5

,870

1

0,12

0 1

0,12

0

278

Upgra

des a

nd Ad

dition

sMa

galie

sburg

(Pha

se 2

)Kru

gersd

orpOu

tsourc

ed O

ngoin

g rou

tine m

ainten

ance

Tend

er 5

,870

1

0,12

0 1

0,12

0

279

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of w

alk w

ays a

nd

bicyc

le lan

es in

Wes

t Ran

d Dist

rict

Munic

ipality

Rand

fontei

n No

n Moto

rised

Tran

sport

Infra

strus

ture (

Walkw

ays a

nd

cycle

lane

s)

Reten

tion

400

-

-

280

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of w

alk w

ays a

nd

bicyc

le lan

es in

Mets

wedin

g Dist

rict

Munic

ipality

Kung

wini

Non M

otoris

ed Tr

ansp

ort In

frastr

ustur

e (Wa

lkway

s and

cycle

lane

s)

Reten

tion

600

-

-

281

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of w

alk w

ays

and b

icycle

lane

s in E

kurhu

leni

Metro

polita

n Mun

icipali

ty

Ekurh

uleni

Non M

otoris

ed Tr

ansp

ort In

frastr

ustur

e (Wa

lkway

s and

cycle

lane

s)

Cons

tructi

on 8

,333

5

50

-

282

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of 1

0km

of wa

lk wa

ys

and b

icycle

lane

s alon

g Wes

sil

Mota

Stree

t in S

edibe

ng D

istric

t

Munic

ipality

Lese

diNo

n Moto

rised

Tran

sport

Infra

strus

ture (

Walkw

ays a

nd

cycle

lane

s)

Cons

tructi

on 8

,333

1

,150

-

106

Estimates for Capital Expenditure

No.

Proj

ect n

ame

Mun

icipa

lity

Proj

ect d

escr

iptio

n/ ty

pe o

f str

uctu

rePr

ojec

t sta

tus

201

2 M

edui

m T

erm

Est

imat

es

Proj

ect C

lass

ifi ca

tion

R’0

00

201

2/13

Bud

get

201

3/14

Bud

get

201

4/15

Bud

get

283

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of 1

0km

of wa

lk wa

ys

and b

icycle

lane

s alon

g Pha

tudi a

nd

Hinter

land s

treets

in Ci

ty of

Tshwa

ne

Tshwa

neNo

n Moto

rised

Tran

sport

Infra

strus

ture (

Walkw

ays a

nd

cycle

lane

s)

Cons

tructi

on 8

,333

1

,150

-

284

Upgra

des a

nd Ad

dition

sCo

nstru

ction

of w

alk w

ays a

nd

bicyc

le lan

es in

Gau

teng

Gaute

ngNo

n Moto

rised

Tran

sport

Infra

strus

ture (

Walkw

ays a

nd

cycle

lane

s)

Cons

tructi

on -

20,

000

20,

000

285

Upgra

des a

nd Ad

dition

sRe

furbis

hmen

t of T

ransp

ort

Opera

ting L

icens

ing A

dmini

strati

ve

Bodie

s (Tsh

wane

)

City o

f Tsh

wane

Re

furbis

hmen

t of

TOLA

BCo

nstru

ction

10,

200

5,0

00

-

286

Upgra

des a

nd Ad

dition

sRe

furbis

hmen

t of T

ransp

ort

Opera

ting L

icens

ing A

dmini

strati

ve

Bodie

s (D

erek M

asoe

k)

City o

f Jo’B

urgRe

furbis

hmen

t of

Dere

k Mas

oek

Build

ingDe

sign

- 1

,000

-

287

Upgra

des a

nd Ad

dition

sRe

furbis

hmen

t of T

ransp

ort

Opera

ting L

icens

ing A

dmini

strati

ve

Bodie

s (G

ermist

on)

Ekurh

uleni

Refur

bishm

ent o

f TO

LAB

Cons

tructi

on 6

,900

1

,000

-

288

Upgra

des a

nd Ad

dition

sUp

grade

of Te

mba D

LTCCit

y of T

shwa

neUp

grade

of a

DLTC

Desig

n 2

,000

5

60

-

289

Upgra

des a

nd Ad

dition

sUp

grade

of M

abop

ane D

LTCCit

y of T

shwa

neUp

grade

of a

DLTC

Desig

n 2

,000

4

00

-

290

Upgra

des a

nd Ad

dition

sUp

grade

of X

avier

DLTC

Joha

nnes

burg

Upgra

de of

a DL

TCDe

sign

4,0

00

430

-

291

Upgra

des a

nd Ad

dition

sUp

grade

of Th

ree Ri

vers

Park

DLTC

Sedib

eng

Upgra

de of

a DL

TCDe

sign

- 8

40

-

New

projec

ts to

be id

entifi

edVa

rious

To be

deter

mine

d -

65,

000

78,

994

Tota

l for

New

Con

stru

ctio

n 6

3,15

0 1

56,8

00

130

,000

To

tal f

or R

ehab

ilita

tion,

Ref

urbi

shm

ent /

Pre

vent

atov

e M

aint

enan

ce 1

81,4

69

556

,200

2

27,7

02

Tota

l for

Mai

nten

ance

and

Rep

airs

571

,342

6

48,6

81

1,0

66,5

28

Tota

l for

Reh

abili

tatio

n, R

efur

bish

men

t and

Pre

vent

ativ

e M

aint

enan

ce 4

29,0

19

682

,804

7

28,6

95

Tota

l for

Infr

astr

uctu

re S

pend

ing

1,2

44,9

80

2,0

44,4

85

2,15

2,92

5