vtrans rail bridge management program

12
VTRANS RAIL BRIDGE MANAGEMENT PROGRAM prepared for the SENATE T RANSPORTATION COMMITTEE on TUESDAY FEBRUARY 3RD, 2015 BY Dan Delabruere Erin Charbonneau Stephen Smith Rail Program Director Rail Bridge Management Engineer GIS Project Supervisor CONTENTS p. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Program Overview p. 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rail Bridge Inspection Form p. 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection Rating Code Definition p. 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Subdivision Map p. 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VTR Northern p. 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VTR “Southern” p. 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Green Mountain p. 8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connecticut River p. 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Montpelier & Barre p. 10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity & Looking Ahead p. 11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity Analysis Map

Upload: others

Post on 26-Mar-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

prepared for the

SENATE TRANSPORTATION COMMITTEE on

TUESDAY FEBRUARY 3RD, 2015

BY

Dan Delabruere Erin Charbonneau Stephen Smith

Rail Program Director Rail Bridge Management Engineer GIS Project Supervisor

CONTENTS p. 1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Program Overview

p. 2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Rail Bridge Inspection Form

p. 3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Inspection Rating Code Definition

p. 4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Subdivision Map

p. 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VTR Northern

p. 6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VTR “Southern”

p. 7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Green Mountain

p. 8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Connecticut River

p. 9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Montpelier & Barre

p. 10 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity & Looking Ahead

p. 11 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Load Capacity Analysis Map

Page 2: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

RAIL BRIDGE MANAGEMENT PROGRAM The FRA established Federal safety requirements for railroad bridges in 2010 under 49 CFR Part 237. VTrans established a Rail Bridge Management Program in September 2012 in accordance with these regulations. The program is responsible for collecting and maintaining an inventory of rail bridges, their condition, and making recommendations on repairs, strengthening or replacement of components or entire structures. These regulations also mandate that annual safety inspections are performed for each bridge, and that all bridges have an initial determination of load capacity completed by September 2017.

There are 214 rail bridges on State-owned property. The State is responsible for 165 of those bridges, with the railroad operator responsible for the remaining 49 bridges through existing lease agreements.

STATEWIDE BRIDGE INVENTORY

Summary: # Spans 1 2 3 4 5 6 7 8 9 10 11 Total

# Bridges 171 25 9 3 1 2 1 1 0 0 1 214

STATEWIDE INSPECTION CONDITION RATING

Key: 1 2 3 4 5 6 7 8 9 N H

Failure Imminent Critical Serious Poor Fair Satisfactory Good Very Good Excellent Not Applicable Hidden

29 39 35 53

9

13 11 9

16

VTRNorthern

VTRSouthern

GreenMountain

Conn.River

Montpelier& Barre

Bridge Responsibility

STATE - 165 RAILROAD - 49

21 25 14

38

9

17

15

8 14

4

VTRNorthern

VTRSouthern

GreenMountain

Conn. River Montpelier& Barre

State Bridge Load Capacity

Analysis Complete No Analysis Analysis Scheduled

0 0 7

16

58 57

26 1 0 0 0 0 1

7 17

58 60

20 1 1 0 0

1 2 3 4 5 6 7 8 9 N H

Target: 4+

2013

2014

Based on 165 state-responsible bridges

Page 1

Page 3: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

Page 2

Page 4: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

VTrans Railroad Bridge Management Program

Rating Code Definitions The purpose of the rating system is to ensure consistency in classifying structures with an appropriate code and to provide a corrective reaction for the identified condition. The rating system attempts to provide an overall understanding of a structure’s condition and is based on an inspector applying appropriate condition rating codes. The following summarizes this relationship:

Key – Explanation of Double Letter Codes:

N/A Not Applicable

AA Continue to inspect structure on a one year cycle.

BB No rehabilitative measures are required for the next time the structure is to be inspected.

CC Structure’s component(s) can be treated effectively or improved with accelerated maintenance procedures and/or replacement of structural component(s) to extend service life.

DD Structure listed in long term rehabilitation program for rehabilitation within the next five to ten year period.

EE Structure listed in intermediate term rehabilitation program for rehabilitation within the next two to five year period.

FF Structure listed in short term rehabilitation program for rehabilitation within the next two year period. Requires periodic monitoring of identified structural concern(s).

GG Immediate rehabilitation necessary.

HH Structure has failed and is to remain out of service pending reconstruction.

Condition Rating Condition Description Implied Reaction Key H Hidden Not Applicable N/A N Not Applicable Not Applicable N/A 9 Excellent No Action AA 8 Very Good No Action AA 7 Good No Action AA 6 Satisfactory Improve Maintenance BB 5 Fair Periodic Maintenance CC 4 Poor Long Term Rehabilitation DD 3 Serious Intermediate Term Rehabilitation EE 2 Critical Short Term Rehabilitation FF 1 Failure Imminent Emergency Declaration GG 0 Structural Failure Replace Structure HH

Page 3

Page 5: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

!! !!""""""

!!""!!

!!!!!!!!!!!!!!!!!!!!

!!"" !!""!!"" !!!!!!

""""

!!!!!!!! !!!! !!!!!!!!!

!"" !!""!! !!!! !!!!!!!!!!!! !!""!

!!!!!!!

!!!!!!!!!!!!

!! """"!!!! ""!!!!!!""""!! ""!! ""!!!! !!!!!!!!!!

!!!! !!!!"" !!!!!! !!!!""

!!!!!!!!!!!!""""""

!!!!!!!! !!"""" !!

""!! !!!!!!!!

!! !!!!!!

!!!! ""!!!! ""!!

!! ""!!!!""!!

!!!!"" !!""""!

!""!! """

"!!

""!!"" !!!! !!!!!!

!!!!!! !!!!!! !! ""!!!!!!!!!!"" !!!!!!"" !!!!"" !!!! !!!!

!!!!

""""

!!""""!!!!!!!!!!!!!!!!!!!!!!!!!!!!

!!!!""

!!

!!

!!

!!

!!!!

!!

""

VTR NorthernSubdivision42 Bridges

GMRC BellowsFalls Subdivision44 Bridges

WACR Conn.River Line

69 Bridges

VTR SouthernSubdivision50 Bridges

WACR M&BSubdivision9 Bridges

Stephen SmithStephen Smith

0 10 20 305

Scale in Miles

State OwnedRailroad Bridges

Service Layer Credits: Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China

Overview

""!! State Responsible Bridge (165)

Railroad Responsible Bridge (49)

Page 6: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

VERMONT RAILWAY – NORTHERN

INVENTORY

Summary: # Spans 1 2 3 4 Total

# Bridges 18 7 3 1 29

INSPECTION CONDITION RATING

1

15

3 2 9

7

2 6

Span Superstructure Types

Culvert

Slab

Masonry Arch

Beam Span

Deck Plate Girder

Thru Plate Girder

Deck Truss

Thru Truss969'

246'

628'

594'

67'

33'

248'

14'

Thru Truss

Deck Truss

Thru Plate Girder

Deck Plate Girder

Beam Span

Masonry Arch

Slab

Culvert

Superstructure Length1

0 0 0 0

9

13

6

1 0 0 0 0 0 0

1

9

14

4

1 0 0 0

1 2 3 4 5 6 7 8 9 N H

Rating History

2013

2014

0123456789

Target: 4+

Rutland - - - - - - - - - - - - - - - - - - - - - - - - - Burlington

Rating by Bridge

There are 42 Bridges on this line, 29 of which are the responsibility of the State.

• All 29 bridges had an Annual Inspection during 2014. • 8 Load Capacity Analyses remain to be completed by September 2017.

o 6 are scheduled to be completed by 6/30/15. o 2 will be finalized when the programmed projects are constructed.

1 Superstructure length data differs from 2013 data based on updated, more accurate inventory information.

Page 5

Page 7: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

VERMONT RAILWAY – SOUTHERN The VTR “Southern” is a combination of the B&R and Hoosick Subdivisions and the Bennington Branch.

There are 50 Bridges on this line, 39 of which are the responsibility of the State.

• All 39 bridges had an Annual Inspection during 2014. • 14 Load Capacity Analyses remain to be completed by September 2017.

o 11 are scheduled to be completed by 6/30/15 o 3 will be finalized when the programmed projects are constructed.

INVENTORY

Summary: # Spans 1 2 3 4 5 6 Total

# Bridges 31 5 1 0 0 2 39

INSPECTION CONDITION RATING

1 1 2 2

18

20

4 1

7

Span Superstructure Types

Other

Slab

Masonry Arch

Beam Span

Deck Plate Girder

Thru Plate Girder

Deck Truss

Thru Truss

Timber Trestle 114'

543'

1405'

858'

81'

71'

24'

13'

12'

Thru Truss

Deck Truss

Thru Plate Girder

Deck Plate Girder

Timber Trestle

Beam Span

Masonry Arch

Slab

Other

Superstructure Lengths1

3

8

19

8

1 0 0 1

9

20

7

1 0 1 0 0

1 2 3 4 5 6 7 8 9 N H

Rating History

2013

2014

0123456789

Target: 4+

Hoosick, NY - - - - - - - - - - - - - - - - - - - - - - - - Rutland

Rating by Bridge

1 Superstructure length data differs from 2013 data based on updated, more accurate inventory information.

Page 6

Page 8: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

GREEN MOUNTAIN There are 44 Bridges on this line, 35 of which are the responsibility of the State.

• All 35 bridges had an Annual Inspection during 2014. • 21 Load Capacity Analyses remain to be completed by September 2017.

o 4 will be finalized when the programmed projects are constructed.

INVENTORY

Summary: # Spans 1 2 3 4 Total

# Bridges 30 4 0 1 35

INSPECTION CONDITION RATING

1 4

6

1

6 11

6

7

Span Superstructure Types

Culvert

Slab

Masonry Arch

Beam Span

Deck Plate Girder

Thru Plate Girder

Deck Truss

Thru Truss917'

734'

894'

508'

10'

76'

54'

14'

Thru Truss

Deck Truss

Thru Plate Girder

Deck Plate Girder

Beam Span

Masonry Arch

Slab

Culvert

Superstructure Lengths1

1

3

11 11

9

0 1 1

2

12 13

6

0 0 0 0

1 2 3 4 5 6 7 8 9 N H

Rating History

2013

2014

0123456789

Target: 4+

Bellows Falls - - - - - - - - - - - - - - - - - - - - - - - Rutland

Rating by Bridge

1 Superstructure length data differs from 2013 data based on updated, more accurate inventory information.

Page 7

Page 9: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

WACR – CONNECTICUT RIVER There are 69 Bridges on this line, 53 of which are the responsibility of the State.

• All 53 bridges had an Annual Inspection during 2014. • 15 Load Capacity Analyses remain to be completed by September 2017.

INVENTORY

Summary: # Spans 1 2 3 4 5 6 7 8 9 10 11 Total

# Bridges 42 5 1 1 1 0 1 1 0 0 1 53

INSPECTION CONDITION RATING

6 2 8

7

10

11 1 12

33

Span Superstructure Types

Culvert

Slab

Masonry Arch

Beam Span

Deck Plate Girder

Thru Plate Girder

Other

Thru Truss

Timber Trestle 1715'

861'

355'

485'

196'

158'

34'

54'

16'

Thru Truss

Thru Plate Girder

Deck Plate Girder

Timber Trestle

Beam Span

Masonry Arch

Slab

Culvert

Other

Superstructure Lengths1

2 3

16

23

9

0 0

4 3

14

24

8

0 0 0 0

1 2 3 4 5 6 7 8 9 N H

Rating History

2013

2014

0123456789

Target: 4+

White River Junction - - - - - - - - - - - - - - - - Newport

Rating by Bridge

1 Superstructure length data differs from 2013 data based on updated, more accurate inventory information.

Page 8

Page 10: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

WACR – MONTPELIER & BARRE There are 9 Bridges on the WACR – Montpelier & Barre Line, all of which are the responsibility of the State.

• All 9 Bridges had an Annual Inspection completed during 2014. • All 9 Load Capacity Analyses have been completed.

INVENTORY

Summary: # Spans 1 2 3 Total

# Bridges 6 1 2 9

INSPECTION CONDITION RATING

4

2

3

5

Span Superstructure Types

Beam Span

Deck Plate Girder

Thru Plate Girder

Thru Truss

637'

223'

104'

117'

Thru Truss

Thru Plate Girder

Deck Plate Girder

Beam Span

Superstructure Lengths1

1

2

3

2

1

0 0

1

2

3

2

1

0 0 0 0

1 2 3 4 5 6 7 8 9 N H

Rating History

2013

2014

0123456789

Target: 4+

Rutland - - - - - - - - - - - - - - - - - - - - - - - - - Burlington

Rating by Bridge

1 Superstructure length data differs from 2013 data based on updated, more accurate inventory information.

Page 9

Page 11: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

STATEWIDE LOAD CAPACITY Load Capacity Analyses have been performed on 107 of our bridges.

17 Load Capacity Analsyes are scheduled to be completed by 6/30/15.

An additional 9 will be completed when construction of the programmed bridge project is completed.

The remaining 32 are required to be complete by September 2017.

Results from Annual Safety Inspections, or In-Depth Inspections, may require updated Load Capacity

LOAD CAPACITY ANALYSIS

LOOKING AHEAD

Estimated yearly activities: Task Historic FY15 FY16 FY17 FY18 FY19 FY20 FY21 - 26 Initial Load Capacity Analysis 66 58 32 9 0 0 0 0 Updated Load Capacity Analysis 0 0 10 10 5 5 5 Annual Inspection 165 165 165 165 165 165 165 Detailed Inspection* 58 32 19 19 17 17 17 Underwater Inspection* 0 17 17 17 17 17 17 Bridge Maintenance Yes Yes Yes Yes Yes Yes Yes Data Maintenance Yes Yes Yes Yes Yes Yes Yes *Estimated 10-year cycle Scheduled to

be complete by end of FY 2015

> 286K 60

< 286K 47

Rating Scheduled

26

Not Rated 32

Corresponds to map on the next page

Page 10

Page 12: VTRANS RAIL BRIDGE MANAGEMENT PROGRAM

!! !!

!!

!!""XX""""""""XX

XX!!!! XX!!

XX$$XX$$ ""!! !!XXXX $$XX $$""!!XX!!$$ """"$

$!!!!

!!!!

XXXX XXXX""!!!!

$$XX """"""!!""""!!!!!!XX

""!!$$$$$$

!!!!!!!!XX!! XXXX!!$$

XX !!XX

!!!!$$ XX$$$$$$!!

XX$$

!!

XX!!XX!!

!!XX!! XX!! XX""""!!XXXX!!!!XX!!XX

""

XXXXXX!!!!!!XXXX""

$$$$

!!

!!

XX

$$XX

""!!

""$$

""

!!

$$

!!$$

!! ""

XX

XX

XX

XX

!!

!!

""

$$

XX""

!!!!""

!!XX

!!

!!

""!!XX

XX!!

""

""XX""

$$

""

!!

VTR NorthernSubdivision

GMRC BellowsFallsSubdivision

WACR Conn.River Line

VTR 'Southern'Subdivision

WACR M&BSubdivision

Service Layer Credits: Sources: Esri, HERE, DeLorme, TomTom, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL,Stephen SmithStephen Smith

0 10 205

Scale in Miles

State ResponsibleRailroad Bridges

Load Capacity!! Capacity > 286k

XX Capacity < 286k

$$ Load Capacity Analysis Scheduled"" No Load Capacity Analysis