Page 1: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

90%

CO

NTR

AC

T DO

CUM

ENTS

C

ON

TRA

CT D

OC

UMEN

TS

WBG031014203505BOI

City of Nampa Wastewater Treatment Plant Phase I Upgrades: Group A–Liquid Stream Upgrades

December 2014

Volume 6—Supplementary InformationVolume 5—Design DetailsVolume 3—Specifications (Division 26 through Division 44)Volume 2—Specifications (Division 02 through Division 23)Volume 1—Specifications (Division 00 through Division 01)

Page 2: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,
Page 3: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,
Page 4: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,
Page 5: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

1 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      0300   CONCRETE                  

0310‐051    FORM SNAP‐TIE HOLE 

0315‐001    PLASTIC WATERSTOP 

0315‐003    HYDROPHILIC/GROOVE WATERSTOP 

0315‐011    WATERSTOP JOINTS 

0315‐012    WATERSTOP CONNECTION 

0315‐021    WATERSTOP PROTECTOR 

0315‐131    WALL CONSTRUCTION JOINT SPACING 

0315‐133    CONCRETE PLACEMENT SEQUENCE 

0315‐141    SLAB CONSTRUCTION JOINT 

0315‐142    SLAB CONSTRUCTION JOINT 

0315‐151    WALL VERTICAL CONSTRUCTION JOINT  

0315‐154    WALL BASE CONSTRUCTION JOINT 

0315‐192    BUILDING SLAB ON GRADE SAWN CONTROL JOINT 

0315‐211    BASE SLAB EXPANSION JOINT 

0315‐212    BASE SLAB EXPANSION JOINT   

0315‐216    ELEVATED SLAB EXPANSION JOINT 

0315‐228    SLAB EXPANSION JOINT TREATMENT 

0315‐232    WALL VERTICAL EXPANSION JOINT 

0315‐233    WALL VERTICAL EXPANSION JOINT 

0315‐239    WALL EXPANSION JOINT TREATMENT 

0315‐253    WALL OR SLAB FUTURE CONSTRUCTION 

0330‐001    OPENING REINFORCING 

0330‐002    OPENING REINFORCING 

0330‐003    TYPICAL WALL CORNER AND INTERSECTION REINFORCING 

0330‐004    REINFORCING AT HORIZONTAL CONSTRUCTION JOINT 

0330‐005    VERTICAL WALL REINFORCING / DOWEL PLACEMENT 

0330‐016    PIPE ENCASEMENT 

0330‐017    PIPE ENCASEMENT 

0330‐018    PIPE ENCASEMENT AT SLAB 

0330‐020    CONCRETE CLOSURE COLLAR 

0330‐021    PIPE COLLAR 

Page 6: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

2 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      0300   CONCRETE (CONTINUED)             

0330‐041    SLAB AT DOOR OPENING 

0330‐051    STAIR LANDING 

0330‐056    CONCRETE EQUIPMENT PAD ‐ TYPE A DETAIL 1 OF 5 

0330‐056    CONCRETE EQUIPMENT PAD ‐ TYPE C DETAIL 2 OF 5 

0330‐056    CONCRETE EQUIPMENT PAD ‐ TYPE G DETAIL 3 OF 5 

0330‐056    CONCRETE EQUIPMENT PAD ‐ TYPE H DETAIL 4 OF 5 

0330‐056    CONCRETE EQUIPMENT PAD – NOTES DETAIL 5 OF 5 

0330‐057    ANCHOR BOLT DETAILS 

0330‐061A    PIPE SUPPORT – CONCRETE SADDLE – DETAIL 1 OF 2 

0330‐061B    PIPE SUPPORT – CONCRETE SADDLE – DETAIL 2 OF 2 

0330‐080    CONCRETE CURB 

0330‐083    CONCRETE STEP 

0330‐101    CONNECTION OF NEW CONCRETE TO EXISTING 

0330‐105    ADHESIVE DOWEL 

 

SERIES      0400   MASONRY               

0422‐001    CMU WALL CORNERS (SINGLE AND DOUBLE MAT) 

0422‐002    CMU OPENING REINFORCING 

0422‐003    CMU OPENING REINFORCING 

0422‐004    REINFORCED CMU WALL 

0422‐005    CMU WALL PIER 

0422‐006    CMU WALL COLUMN 

0422‐046    MASONRY ANCHOR BOLT 

 

SERIES      0500  METALS                 

0514‐020    TYPICAL BEAM CONNECTION – ALUMINUM 

0514‐056    BEAM/WALL CONNECTION ‐ ALUMINUM 

0521‐002    STEEL JOIST SEAT/EXTERIOR WALL 

0521‐022    TYPICAL K JOIST BRIDGING 

0521‐023    JOIST BRIDGING/WALL CONNECTION 

0531‐001    DECKING LEDGER SUPPORT ANGLE 

Page 7: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

3 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      0500   METALS (CONTINUED)             

0531‐016    METAL DECK/NON‐BEARING WALL CLOSURE PLATE 

0531‐021    ROOF DECK OPENING 

0551‐001A    STAIR DETAILS – ALUMINUM DETAIL 1 OF 2 

0551‐001B    STAIR DETAILS – ALUMINUM DETAIL 2 OF 2 

0551‐002    STAIR LANDING WITH SUPPORTS – ALUMINUM 

0552‐001    RAILING ‐ 3 RAIL – ALUMINUM ‐ DETAIL 1 OF 4 

0552‐001    RAILING W/ EXTENSION – 3 RAIL STAIR – ALUMINUM ‐ DETAIL 2 OF 4 

0552‐001    RAILING POST ANCHORAGE TYPE A – ALUMINUM DETAIL 3 OF 4 

0552‐001    RAILING POST ANCHORAGE TYPE D – ALUMINUM DETAIL 4 OF 4 

0553‐001    HYDROPHILIC/GROOVE WATERSTOP 

0554‐001    CHECKERED FLOOR PLATE – ALUMINUM 

0558‐002    BEAM SEAT CLOSURE PLATE 

0559‐031    WEIR DETAILS 

 

SERIES      0600  WOOD, PLASTIC, AND COMPOSITES       

0682‐041    WEIR DETAILS 

 

SERIES      0700  THERMAL AND MOISTURE PROTECTION        

0753‐002    COPING (MASONRY WALL) 

0753‐004    BASE FLASHING 

0753‐006    ROOF/OVERFLOW DRAIN (METAL DECK) 

0762‐003    OVERFLOW/ROOF DRAIN NOZZLE 

0762‐004    SPLASHBLOCK 

 

SERIES      0800  OPENINGS                           

0811‐003    HM DOOR HEAD (CMU) 

0811‐004    HM DOOR JAMB (CMU) 

0851‐002    WINDOW HEAD AND SILL 

0871‐001    DOOR SILL 

0890‐002    LOUVER HEAD AND SILL 

 

Page 8: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

4 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      1000  SPECIALTIES             

1014‐013    ROOF DRAIN SIGN 

1014‐014    OVERFLOW ROOF DRAIN SIGN 

1014‐015    PEPS ELECTRICAL BUILDING SIGN 

1014‐016    AERATION BASIN 3 SIGN 

 

SERIES      2200  PLUMBING               

2210‐725    TYPICAL HOSE REEL – POST MOUNT 

 

SERIES      2300  HVAC               

2331‐102    TYPICAL DUCT SUPPORT 

2377‐100    CONDENSATE DRAIN TRAP 

 

SERIES      2600  ELECTRICAL                 

2605‐002    DEVICE MOUNTING, WALL OR COLUMN 

2605‐003b    DEVICE MOUNTING, NON FUSED DISCONNECT SWITCH 

2605‐004    DEVICE MOUNTING, AT RAILING 

2605‐005b    DEVICE MOUNTING, MOTOR CONTROL STATION 

2605‐007b    DEVICE MOUNTING, RAILING MOUNTED EQUIPMENT SUPPORT 

2605‐007c    DEVICE MOUNTING, RAILING MOUNTED EQUIPMENT SUPPORT 

2605‐011a    DEVICE MOUNTING, PEDESTAL 

2605‐011b    DEVICE MOUNTING, PEDESTAL 

2605‐013    DEVICE MOUNTING, AT RAILING 

2605‐100b    TERMINATION OF SHIELDED INSTRUMENTATION CABLE 

2605‐101    MSC CABLE TERMINATION 

2605‐202    GROUND TEST WELL 

2605‐203    CONDUIT GROUNDING 

2605‐204    PAD MOUNTED TRANSFORMER GROUNDING 

2605‐206    GROUND ELECTRODE 

2605‐208    GROUND BUS 

2605‐300    CONDUIT RACKING SYSTEM 

2605‐301    CONDUIT RACKING SYSTEM 

Page 9: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

5 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      2600  ELECTRICAL (CONTINUED)             

2605‐302    CONDUIT RACKING SYSTEM, VERTICAL 

2605‐303    CONDUIT TO EQUIPMENT FROM CEILING 

2605‐304    CONDUIT ENTRANCE 

2605‐305    CONDUIT TRANSITION AND SUPPORT 

2605‐307    CONDUIT UNDERGROUND ENTRANCE 

2605‐308b    WATERTIGHT WALL CONDUIT SEAL 

2605‐309    FLUSH CONDUIT STUB 

2605‐310    SLAB PENETRATION 

2605‐312    FLASHING 

2605‐400b             DUCT BANK 

2605‐400c              DUCT BANK 

2605‐420    UNDERGROUND CONDUIT IN NON‐PAVED AREAS 

2605‐423b    TRENCH AND CONDUIT PLACEMENT 

2605‐424    TRAFFIC TRENCH AC TOPPING 

2605‐443a    MANHOLE‐WITH GROUNDING 

2605‐443b    MANHOLE‐WITH GROUNDING 

2605‐444    HANDHOLE 

2605‐445    CONDUIT HANDHOLE/MANHOLE ENTRANCE 

2605‐446    CONDUIT HANDHOLE/MANHOLE ENTRANCE 

2605‐448    CABLE RACK 

2605‐700    CABLE TRAY SUPPORT 

2605‐702    CONDUIT DROP INTO CABLE TRAY 

2605‐703    OVERHEAD FEED FROM CABLE TRAY 

2605‐704    UNDERFLOOR FEED FROM CABLE TRAY 

2622‐006    TRANSFORMER MOUNTING 

2622‐007    DRY TYPE TRANSFORMER MOUNTING 

2650‐003    TYPICAL LIGHT POLE BASE IN SUPPORT WALL 

2650‐004    TYPICAL LIGHT POLE BASE TO STEEL SUPPORT BEAMS 

2650‐102    EXTERIOR BUILDING LIGHT CONTROL 

2650‐105    MULTI‐POLE LIGHTING CONTACTOR CONTROL 

2656‐207    PAVED AREA LIGHT POLE FOOTING 

Page 10: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

6 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      3100  EARTHWORK                  

3123‐120    TYPICAL PIPE TRENCH CROSSING 

3123‐918    LAWN AREA TRENCH BACKFILL SECTION 

3125‐142    INFILTRATION TRENCH & GALLERY 

 

SERIES      3200  EXTERIOR IMPROVEMENTS                                                     

3212‐211    TYPICAL AC PAVEMENT SECTION 

3213‐241    TYPICAL CONCRETE STOOP 

3213‐247    SIDEWALK‐STOOP (& STOOP‐FFE) INTERFACE 

3215‐260    GRAVEL SURFACING 

3231‐410    CHAIN LINK FENCE 

 

SERIES      3300  UTILITIES                                                     

3305‐731    PIPE CONNECTION – CONC TO DI 

3305‐741    PIPE VENT 

 

SERIES      3400  TRANSPORTATION                                     

3471‐810    TYPICAL BOLLARD 

 

SERIES      4000  PROCESS INTEGRATION            

4005‐500    PIPE SUPPORT – SADDLE SUPPORT PEDESTAL TYPE – ADJUSTABLE 

4005‐501    PIPE SUPPORT – SADDLE SUPPORT PEDESTAL TYPE – NON‐ADJUSTABLE 

4005‐503    PIPE SUPPORT – WALL MOUNT 

4005‐508    PIPE SUPPORT – WALL MOUNTED MEDIUM 

4005‐511    PIPE FLANGE SUPPORT 

4005‐554    OVERHEAD PIPE HANGER 

4027‐154    NON‐FREEZE POST HYDRANT 

4027‐602    MECHANICAL JOINT WALL PIPE 

4027‐604    TYPE B PIPE SLEEVE 

4027‐605    STEEL WALL PIPE 

4027‐607    WALL PIPE PENETRATION SEAL 

4027‐610    WALL PENETRATION SEAL 

Page 11: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

City of Nampa, Idaho Nampa WWTP Phase 1 Upgrades - Project Group A

Index for Design Details

7 DECEMBER 2014 INDEX FOR DESIGN DETAILS

Detail      Detail 

Number    Description 

SERIES      4000  PROCESS INTEGRATION (CONTINUED)       

4027‐642    STOP AND DRAIN VALVE BOX 

4091‐162G    DISSOLVED OXYGEN PROBE INSTALLATION 

4091‐210    THERMAL MASS FLOW ELEMENT INSTALLATION FOR PROCESS AIR SERVICE 

4091‐219    MAGNETIC FLOWMETER INSTALLATION 

4091‐253    ULTRASONIC LEVEL ELEMENT INSTALLATION – CONCRETE ROOF 

4091‐265    SUBMERSIBLE LEVEL TRANSDUCER STILLING WELL 

4091‐275F    TYPICAL FLOAT TYPE LEVEL SWITCH INSTALLATION 

4091‐304A    PRESSURE SWITCH AND INDICATOR INSTALLATION 

4091‐304D    OFFLINE ANNULAR SEAL FOR PRESSURE INSTRUMENTS  

4091‐305A    PRESSURE CONNECTION INSTALLATION 

4091‐305B    PRESSURE CONNECTION INSTALLATION 

4091‐382    CASE MOUNTED INSTRUMENTS – STANCHION 

4091‐383    STANCHION SUPPORT FOR CASE MOUNTED INSTRUMENTS 

4091‐384    RAIN HOOD INSTALLATION 

4091‐385    TYPPICAL HANDRAIL MOUNTING FOR CASE MOUNTED INSTRUMENTS 

4091‐386    SHORT WALL MOUNTED PANEL INSTRUMENT INSTALLATION 

4091‐388    WALL MOUNTED PANEL OR INSTRUMENT INSTALLATION 

4091‐391    SUPPORT BRACKET 

4091‐406BG    TYPICAL POWER PANEL DISTRIBUTION FOR PANELS WITH EXTERNAL LOCAL UPS 

 

Page 12: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

 

Page 13: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2.

1.

NOTES:

DRY PACK METHOD SHALL BE AS SPECIFIED USING STEEL TOOLS.

SIDE OF W ALL

INSIDE OR W ATER

INSERTS EACH FACE

USE CONICAL TYPE

UNIFORM IN EACH DIRECTION.

APPROXIM ATELY EQUAL HORIZONTALLY AND VERTICALLY AND SHALL BE

THE SPACING OF FORM TIES ON EXPOSED PORTIONS OF W ALLS SHALL BE

SEE NOTES

NONSHRINK GROUT,

FILL W ITH DRY PACK

W ATERSTOP

SPECIFIED, TYP

DEPTH OF CONE AS

EXPOSED FACE OF W ALL

0310-051.dgn 12/2/2014

NTS

FORM SNAP-TIE HOLE

0310-051

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 14: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0315-001.dgn 12/2/2014

SIZE

4"

6"

9"

4

6

8

TYP

5/32"

4"x3/16"

6"x3/8"

9"x3/8"

3/16"

3/8"

3/16"

3/8"

1"

7/8"

1.

2.

3.

4.

NON-ROUND CENTER BULBS SHALL HAVE A MINIM UM OUTSIDE DIMENSION OF 'D'.

SEE SPLICE DETAIL

"A"

NOTES:

ALL RIBS, TYP

1/8" PROJECTION

@ CTR BULB

THICKNESS

"B"-MIN STEM THICKNESS

"E"-MIN BULB

FACE OF W S

EA SIDE, EA

NO. OF RIBS

"F"-APPROXIM ATE

OUTSIDE DIA

"D"-CENTER BULB

@ OUTSIDE

THICKNESS

"C"-MIN STEM

CONSTRUCTION JOINTS.

SIMILAR W ATERSTOPS W ITHOUT CENTER BULB M AY BE SUBSTITUTED AT

BULB TYPE W ATERSTOP SHOW N IS REQUIRED FOR EXPANSION AND CONTROL JOINTS.

SHOW N OTHERW ISE.

USE 6 INCH W ATERSTOPS IN ALL CONSTRUCTION JOINTS UNLESS SPECIFICALLY

3/8" 3/8"

3/4" 1/4"

1/4"

1/4"

"A" "B" "C" "D" "E" "F"

0315-011

0315-001

NTS

PLASTIC W ATERSTOP

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 15: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,
Page 16: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

VERTICAL ELL VERTICAL TEE VERTICAL CROSS

FLAT ELL FLAT CROSS

ALL W ELDS SHALL BE PER W ATERSTOP M ANUFACTURER'S RECOM MENDATIONS.

NOTE:

FLAT TEE

JOINTS

SHOW N BELOW FOR IN-PLANE

JOINTS & W ELD SIMILAR AS

MITER CORNERS OF VERTICAL

W ELD

SECONDW ELD

FIRST

W ELD

SECOND

W ELD

FIRST

W ELD

THIRD

0315-011.dgn 12/2/2014

NTS

W ATERSTOP JOINTS

0315-011

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 17: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

CONCRETE WALL

NOTES:

SUBMIT DETAILS OF SPLICING AND LOCATION.

5.

4.

1.

2.

3.

FOR CONCRETE PLACEMENT SEQUENCE, SEE

FOR PLASTIC WATERSTOP DETAILS, SEE

0315-133

SLAB

CONCRETE

SLAB JOINT

WATERSTOP IN BASE

WALL JOINT

WS IN VERTICAL

SEE NOTE 3.

INTERSECTIONS,

BOND WS AT ALL

BASE SLAB JOINT

FOOTING OR

WS IN WALL

OR BASE SLAB

CONCRETE FOOTING

TO CONTINUOUS LONGITUDINAL WATERSTOP IN WALL BASE FOR COMPLETE SEAL.

BOND OR SPLICE ALL HORIZONTAL TRANSVERSE WATERSTOPS IN BASE SLAB JOINTS

WATERSTOP IN WALL BASE FOR COMPLETE SEAL, SEE FLAT CROSS JOINT.

BOND OR SPLICE ALL VERTICAL WATERSTOPS IN WALL JOINTS TO LONGITUDINAL

0315-154

0315-011

0315-001

0315-012.dgn 2014\12\08

NTS

WATERSTOP CONNECTION

0315-012

SEE

CONSTRUCTION JOINT,

WS IN WALL BASE

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 18: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

6"

M AX

6"

MA

X

1 1/4"

3/4

"1 1/4"

1 1/2"

4 1/2"

1.

2.

3.

NOTES:

CORNER DETAIL

0315-001

PROTECTORS

W ATERSTOP

12 GA SST

SLAB

W ALL OR

CLAND JOINTS.

ALL EDGES, CORNERS,

PROVIDE SEALANT AT

PLATE AT FREE ENDS.

12 GAGE SST CLOSURE

PROVIDE W ATERTIGHT

SEE NOTE 3

CENTERS EA SIDE,

STAGGER FOR 2'-0"

ANCHORS @ 1'-0" OC,

3/8" DIA SST ADHESIVE

PROTECTIVE CAPS

SEE

CTRD IN W ALL OR SLAB,

6" PLASTIC W ATERSTOP

SEE .

THREADED CONNECTORS,

REBAR MECHANICAL

ANCHORS TO CLEAR

ADJUST SPACING OF

W HERE APPLICABLE,

PLATE CONTINUOUS

12 GA SST

SEE NOTE 3

SEE

FOR FUTURE CONSTRUCTION,

THREADED CONNECTORS

DOW ELS W / MECHANICAL

MAX

1/4"

3/4

"

0315-253

0315-253

0315-021.dgn 12/2/2014

NTS

W ATERSTOP PROTECTOR

0315-021

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 19: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

10'-0" MIN

20'-0" M AX

40'-0" M AX

CJ SPACING

10'-0" MIN

20'-0" M AX

1.

2.

CJ S

PA

CIN

G

40

'-0

" M

AX

CJ S

PA

CIN

G

10

'-0

" M

IN

20

'-0

" M

AX

20

'-0

" M

AX

LOCATE W ALL CONSTRUCTION JOINTS AS SHOW N, UNLESS INDICATED OTHERW ISE.

40'-0" M AX

CJ SPACING

10'-0" MIN

20'-0" M AX

10

'-0

" M

IN4

0'-

0" M

AX

POURS W ITH SPECIFICATION 03 30 00.

COORDINATE CONSTRUCTION JOINT LOCATIONS AND TIME BETW EEN CONCRETE

0315-151

PLAN

NOTES:

SEE

VERTICAL CJ, TYP

0315-131.dgn 12/2/2014

NTS

W ALL CONSTRUCTION JOINT SPACING

0315-131

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 20: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

STEP 2

STEP 4

STEP 3

STEP 1

STEP 1

STEP 2

STEP 3

STEP 4

FINISH PLACING CONCRETE ABOVE THE W ATERSTOP TO TOP OF SLAB.

CONCRETE SLAB

PLASTIC W ATERSTOP

NOTES:

SEE PLANS

FOR JOINT TYPE,

SLAB AND FOOTING POURS W ITH HORIZONTALLY PLACED PLASTIC W ATERSTOPS.

PLACEMENT SEQUENCE SHOW N REQUIRED ON BOTH SIDES OF JOINTS, IN ALL CONCRETE

THOROUGHLY.

PLACE CONCRETE BELOW W ATERSTOP FIRST, REM OVE ALL AIR VOIDS BY VIBRATING

IMPRESSION, PROCEED W ITH STEP 3.

LARGER THAN 1/4 INCH IN DIAMETER IS PRESENT ANYW HERE IN THE W ATERSTOP

END. IF A CONTINUOUS IMPRESSION IS CONFIRMED, PROCEED W ITH STEP 4. IF A VOID

CONCRETE. CONTINUE THIS PROCEDURE ALONG THE ENTIRE POURED JOINT, END TO

OF THE W ATERSTOP, INCLUDING EDGE OF BULB, SHOULD BE VISIBLE IN THE FRESH

TO CONFIRM THERE ARE NO AIR VOIDS, LIFT W ATERSTOP. A CONTINUOUS IMPRESSION

VIBRATED, AND STEP 2 REPEATED.

IMPRESSION, ADDITIONAL CONCRETE SHALL BE PLACED UNDER THE W ATERSTOP,

IF A VOID LARGER THAN 1/4 INCH IN DIAMETER IS PRESENT IN THE W ATERSTOP

0315-133.dgn 12/2/2014

NTS

CONCRETE PLACEMENT SEQUENCE

0315-133

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 21: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

NOTE:

2

1

1'-0" 1'-0"

5"

TYP

FOR CONCRETE PLACEMENT AROUND W ATERSTOP, SEE

SLAB THICKNESS

10"

2" CLR

9"9"

3/8" TOOLED JOINT

#4@ 12"SIDE OF JOINT

2 - #4 CONT EA

THROUGH JOINT

REINF CONTINUOUS

TYP CENTERED SLAB

W ATERSTOP, TYP

BOND TO INTERSECTING

6" PLASTIC W ATERSTOP,

ROUGHEN AND CLEAN

0315-133

0315-141.dgn 12/2/2014

NTS

SLAB CONSTRUCTION JOINT

0315-141

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 22: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2" CLR,

TYP

T

0315-133

WATERSTOP, TYP

TO INTERSECTING

WATERSTOP, BOND

6" PLASTIC

THROUGH JOINT

CONTINUOUS

TYP SLAB REINF

T&B, EA SIDE OF JOINT

TYPICAL SLAB REINF

3/8" TOOLED JOINT

ROUGHEN AND CLEAN

THIC

KN

ES

S

SL

AB

0315-142.dgn 2014\12\08

NTS

SLAB CONSTRUCTION JOINT

0315-142

2.

1.

0315-154

SEE NOTE 2

NOTE:

DETAIL .

WATERSTOP DEPTH = T/2 OR 6 1/2" MAXIMUM WHEN USED IN CONJUNCTION WITH

FOR CONCRETE PLACEMENT AROUND WATERSTOP, SEE

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 23: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

ROUGHEN AND CLEAN

FOR LOCATIONS, SEE

ALL REINFORCING CONTINUOUS ACROSS JOINT.1.

2.

NOTES:

PLAN

0315-131

T

T/2

INDICATED ON PLANS

LAP REINF AS

FROM TOP OF W ALL

CONTINUOUS, STOP 1 1/2"

6" PLASTIC W ATERSTOP

TH

ICK

NE

SS

WA

LL

0315-151.dgn 12/2/2014

NTS

W ALL VERTICAL CONSTRUCTION JOINT

0315-151

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 24: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

CL

R

SECURE W ATERSTOP IN-PLACE AS SPECIFIED.

1.

2.

EQUAL

NOTES:

3 1

/2"

W ATERSTOP

6" PLASTIC

JOINT

CONSTRUCTION

SEE PLANS

SLAB TOP REINF

LOCATION OF BASE

FACE, 1" CLEAR OF REINFORCEMENT.

FOR W ALLS W ITH SINGLE M AT OF REINFORCING LOCATE W ATERSTOP ON LIQUID

0315-154.dgn 12/2/2014

NTS

W ALL BASE CONSTRUCTION JOINT

0315-154

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 25: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0315-192.dgn 2014\12\05

NTS

NTS

1.

T/4

2" 2"

T/2

2" 2"

T/4

SINGLE REINFORCING MAT

DOUBLE REINFORCING MAT

TT

NOTES:

JOINT

1/8" SAWCUT

THROUGH JOINT

BOTTOM BAR CONT

JOINT

TOP BARS AT

TERMINATE ALLJOINT

1/8" SAWCUT

JOINT

CONTINUOUS THROUGH

EVERY OTHER BAR

REINFORCING AND LOCATE SAWCUT.

CONTRACTOR SHALL USE STRING LINE OR OTHER POSITIVE MEANS TO PLACE

BUILDING SLAB ON GRADE SAWN CONTROL JOINT

CONCRETE

PLACEMENT OF SLAB

FILLER 28 DAYS AFTER

FILL WITH JOINT

CONCRETE

PLACEMENT OF SLAB

FILLER 28 DAYS AFTER

FILL WITH JOINT

0315-192

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 26: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1

2

1'-0"6"

FOR CONCRETE PLACEMENT AROUND W ATERSTOP, SEE

CLR

NOTE:

0315-228

0315-133

2"3/4"

5"

10"

EA SIDE OF JT

#4@ 12"

EA SIDE OF JT

2 - #4 CONT

CONCRETE PAD

UNREINFORCED

6"x18"

AT JOINT, TYP

REINFORCING

STOP SLAB

TOOLED EDGE, TYP

3/8" RADIUS

JOINT TREATMENT

W ATERSTOP, TYP

BOND TO INTERSECTING

6" PLASTIC W ATERSTOP

SLAB THICKNESS

ROOFING FELT

2 LAYERS OF

0315-211.dgn 12/2/2014

NTS

BASE SLAB EXPANSION JOINT

0315-211

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 27: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3/4" 2"

CLR

NOTE:

FOR CONCRETE PLACEMENT AROUND W ATERSTOP, SEE

T

T/2

0315-228

0315-133

W ATERSTOP, TYP

BOND TO INTERSECTING

6" PLASTIC W ATERSTOP,

CONCRETE PAD

UNREINFORCED

6" x 1'-6"

ROOFING FELT

2 LAYERS OF

MA

X

5"

TH

ICK

NE

SS

SL

AB

JOINT TREATMENT

AT JOINT, TYP

STOP SLAB REINFORCING

3/8" RADIUS TOOLED EDGE

0315-212.dgn 12/2/2014

NTS

BASE SLAB EXPANSION JOINT

0315-212

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 28: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

JOINT TREATMENT

FOR CONCRETE PLACEMENT AROUND W ATERSTOP, SEE

0315-228

0315-133

CLR

2"3/4"

T/2

T

NOTE:

W ATERSTOP, TYP

BOND TO INTERSECTING

6" PLASTIC W ATERSTOP,

MA

X

5"

TH

ICK

NE

SS

SL

AB

AT JOINT, TYP

STOP SLAB REINF

1/2" CHAMFER, TYP

TOOLED EDGE, TYP

3/8" RADIUS

0315-216.dgn 12/2/2014

NTS

ELEVATED SLAB EXPANSION JOINT

0315-216

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 29: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3/4"

3/4"

3"

0315-228.dgn 12/2/2014

NTS

SLAB EXPANSION JOINT TREATMENT

M ATERIAL

BACKUP

W ATERSTOP

LIQUID SIDE SURFACE

SECTION

AT LIQUID HOLDING SLABS

(SEE NOTE 2)

SEALANT

W ATERSTOP

FILLER

PREM OLDED JOINT

JOINT FILLER

BITUMINOUS PREM OLDED

NOTES:

W ATERSTOP

JOINT FILLER, EA SIDE OF

BITUMINOUS PREM OLDED

SECTION

AT NON-LIQUID HOLDING SLABS

CONTAINMENT.

LIQUID HOLDING SLABS INCLUDING AREAS FOR TEMPORARY SECONDARY

EMBEDDED IN FIRST SLAB POUR.

ATTACH PREM OLDED JOINT FILLER W ITH 8d GALVANIZED NAILS @ 1'-0" SPACING

2.

1.

1/2" OF TOP OF SLAB

FILLER TO W ITHIN

POURABLE JOINT

SEALANT

0315-228

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 30: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

9" 6"

2"

1.

2.

3.

4.

MIN

0315-012

0315-239

PLAN

NOTES:

1/2" CHAMFER, TYP

AND TO #5 VERTICALS, TYP

DOW EL, TIE TO DOW EL

2 - #3 HAIRPINS AT EA

BASE SLAB, SEE NOTE 4

BOND TO W ATERSTOP IN

9" PLASTIC W ATERSTOP,

CAST THIS W ALL SECTION FIRST

2" CLR

3/4"

1" CLR

T/2

T

1'-6"

TAPE TO BAR FOR W ATERTIGHT SEAL.

1" ID x 2" PLASTIC CAP W ITH 1" POLYSTYRENE BETW EEN END OF DOW EL AND END CAP.

FROM FACE OF W ALL INSTEAD OF T/2 INDICATED.

FOR W ALLS W ITH THICKNESS OF 10" THRU 24". FOR 10" W ALLS LOCATE DOW ELS 4"

COATING AS SPECIFIED.

COATING SHALL CONSIST OF A CORROSION RESISTANT COATING PLUS A LUBRICANT

FROM BOTTOM OF W ALL AND AT 2'-0" M AX SPACING. ALIGN AND TIE-IN-PLACE TO REINF.

1" DIA x 3'-0" SM OOTH COATED BAR DOW ELS. LOCATE AT 1'-0" M AX FROM TOP AND 2'-0"

W ALL, AND SPLICE TO W ATERSTOP IN W ALL BASE CONSTRUCTION JOINT. SEE

BEND VERTICAL JOINT W ATERSTOP OVER TO CENTERLINE OF W ALL IN BOTTOM 2'-0" OF

EXTERIOR FACE

NOTE 3

FACE OF W ALL

INTERIOR (W ATERSIDE)

SEE NOTE 2

2" CLR AT JOINT

HORIZ REINF TO

EXTEND

REINF

TYP VERT

JOINT TREATMENT

SE

E N

OT

E 1

WA

LL

TH

ICK

NE

SS

TYP TYP

0315-232.dgn 12/2/2014

NTS

W ALL VERTICAL EXPANSION JOINT

0315-232

EA FACE AT HAIRPINS, TYP

ADDITIONAL #5 VERT

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 31: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

9" 6"

1.FOR W ALLS GREATER THAN 24" THICK.

2.

3.

TYP

MIN

0315-239

NOTES:

PLAN

COATING AS SPECIFIED.

COATING SHALL CONSIST OF A CORROSION RESISTANT COATING PLUS A LUBRICANT

OF W ALL AND AT 2'-0" M AX SPACING. ALIGN AND TIE IN PLACE TO REINFORCING.

1" DIA x 3'-0" SM OOTH COATED STEEL BAR DOW ELS. LOCATE AT 1'-0" M AX FROM T & B

CAST THIS W ALL SECTION FIRST

1'-6"

3/4"

2" CLR

TYP

6"

6"

T/2

T

1" CLR

OF CAP. TAPE TO BAR FOR W ATERTIGHT SEAL.

1" ID x 2" PLASTIC EXP CAP W ITH 1" POLYSTYRENE BETW EEN END OF DOW EL AND END

SEE NOTE 2

TREATMENT

JOINT

#5 VERTICAL

BELOW DOW ELS TIE TO

4" CLR ABOVE AND

SET OF DOW ELS. LOCATE

2 - #3 HAIRPINS AT EA

NOTE 3

AT HAIRPINS

ADDTIONAL #5 EA FACE

AND TO #5 VERTICALS

TIE TO DOW ELS

EA SET OF DOW ELS.

2 - #3 HAIRPINS AT

1/2" CHAMFER, TYP

REINF

TYP VERT

IN BASE SLAB

BOND TO W ATERSTOP

9" PLASTC W ATERSTOP

2" CLR AT JOINT

HORIZ REINF TO

EXTEND

SE

E N

OT

E 1

WA

LL

TH

ICK

NE

SS

0315-233.dgn 12/2/2014

NTS

W ALL VERTICAL EXPANSION JOINT

0315-233

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 32: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

PLAN

3/4"

3"

0315-239A.dgn 12/2/2014

W ATERSTOP

IN FIRST W ALL POUR

1'-0" SPACING EMBEDDED

W ITH 8d GALV NAILS AT

OF W ATERSTOP, ATTACH

JOINT FILLER, EA SIDE

BITUMINOUS PREM OLDED

FEET BELOW GRADE

SURFACE TO TW O

EXTERIOR EXPOSED

BEHIND BRICK OR BELOW GRADE

OR EXTERIOR SURFACE

SECONDARY CONTAINMENT)

(INCLUDING AREAS FOR TEMPORARY

LIQUID SIDE SURFACE

INTERIOR EXPOSED SURFACE,

M ATERIAL

BACKUP

JOINT FILLER

PREM OLDED

SEALANT

0315-239

NTS

W ALL EXPANSION JOINT TREATMENT

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 33: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

T/2

T/2

1.

2.PROVIDE PROTECTIVE INSERTS FOR THREADED CONNECTORS.

6" PLASTIC W ATERSTOP

FUTURE CONSTRUCTION JOINT

T

NOTES:

PROTECTOR

W ATERSTOP

ON PLANS

OR W ALL REINF OR AS NOTED

SPACING OF CONCRETE SLAB

DOW ELS TO M ATCH SIZE AND

0315-253.dgn 12/2/2014

NTS

W ALL OR SLAB FUTURE CONSTRUCTION

0315-253

JOINT.

DETAILS SHOW N ARE APPLICABLE FOR FUTURE EXPANSION AT A CONSTRUCTION

0315-021

LOCK IN PLACE W / LOCKNUT, TYP

MIDPOINT OF COUPLING SLEEVE AND

ON DOW ELS. THREAD DOW ELS TO

MECHANICAL THREADED CONNECTORS

THREADED CONNECTORS

INTO MECHANICAL

FUTURE REINF THREADED

FUTURE CONCRETE SLAB OR W ALL

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 34: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1'-6"

LAP

2.

3.

4.

5.

6.

OPNG OPNG

1.

DO NOT W ELD REINFORCEMENT TO PIPE SLEEVES AND INSERTS.

FOR OPENINGS LARGER THAN 8'-0", REINFORCE SAME AS FOR 8'-0" OPENINGS.

SEE NOTE 1

PROVIDE MINIM UM LAP, SEE GENERAL STRUCTURAL NOTES.

NOTES:

CUT BAND "B"

STEEL REINF

CUT BAND "A"

STEEL REINF

SEE NOTE 1EA LAYER OF REINF

AT EA CORNER FOR

ADD 1 - #5x4'-0" DIAG

LARGER THAN 8"

OF REINF FOR OPNGS

OPNG +8", IN EA LAYER

1 - #5 HOOP, DIA OF

OTHERW ISE ON PLANS.

STRUCTURES AND ALL STRUCTURAL CONCRETE SLABS UNLESS INDICATED

TYPICAL FOR ALL OPENINGS IN CONCRETE W ALLS OF BELOW GRADE AND HYDRAULIC

0330-001.dgn 12/2/2014

NTS

OPENING REINFORCING

0330-001

TOTAL AREA ON EACH SIDE OF OPENING.

SPACE AT 3 BAR DIAMETERS (OR 3" MINIM UM) ON CENTER. LOCATE HALF OF

CUT, SEE NOTE 6 & 7

EQUAL BAND "B" BARS

TOTAL AREA OF BARS

CUT, SEE NOTE 6 & 7

BAND "A" BARS

BARS EQUAL

TOTAL AREA OF

7.

EXTRA REINFORCEMENT W HICH W ILL FIT, AT THE BAR SPACING IN NOTE 6.

AT OPENINGS W ITHIN 12" OF AN INTERSECTING W ALL OR SLAB, PROVIDE ONLY THE

FACE), INCLUDING DOW ELS AND CORNER BARS, TYPICAL.

PROVIDE A MINIM UM OF 2 "A" BARS AND 2 "B" BARS EACH SIDE OF OPENING (1 EACH

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 35: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

"A" BAR

"B" BAR

1.

2.

3.DO NOT W ELD REINFORCEMENT TO PIPE SLEEVES AND INSERTS.

SEE NOTE 1

PROVIDE MINIM UM LAP, SEE GENERAL STRUCTURAL NOTES.

"A" BARS EF

AREA OF 2

NOTES:

ELEVATION

EA LAYER OF REINF

AT EA CORNER FOR

ADD 1 - #5x4'-0" DIAGONAL

OPENINGS

ELEVATED FLOOR LEVEL

LEVEL W ALLS FOR

DOW ELS FROM LOW ER

OPENING. PROVIDE M ATCHING

"A" BARS EF REQD BELOW

EF REQD AND AREA OF 2

SLAB ON GRADE, #5 DIAGONAL

IF OPENING LOCATED ABOVE

HEIGHT

EXTEND FULL STORY

M ATCHING DOW ELS,

OF OPENING W /

EACH FACE, EACH SIDE

AREA OF 2 "B" BARS

SLAB

FLOORW IDTH

8'-0" M AX

LOUVERS

OR

DOORW AY

W INDOW ,

W ALLS UNLESS INDICATED OTHERW ISE ON PLANS.

TYPICAL FOR ALL OPENINGS IN ABOVE GROUND BUILDING CONCRETE

0330-002.dgn 12/2/2014

NTS

OPENING REINFORCING

0330-002

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 36: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

NTS

TYPICAL W ALL CORNER AND INTERSECTION REINFORCING

0330-003

NOTE

3

NO

TE

33

NO

TE

3

NOTE

3

"L"

"L

""L

"

NO

TE

3

NO

TE

3

NO

TE

3NOTE

3

SIN

GL

E R

EIN

FO

RC

ING

MA

T

NO

TE

"L"

"L

""L

"

"G

" B

AR

S

"D

" B

AR

S

"F

" B

AR

S

"E

" B

AR

S

DO

UB

LE

RE

INF

OR

CIN

G M

AT

OT

HE

RW

ISE

NO

TE

D

90

° H

OO

K U

NL

ES

S

ST

D A

CI-

318

TY

PIC

AL

NO

TE

5

LA

P, S

EE

3

NOTE

TH

E D

WG

S

AS

NO

TE

D O

N

90

° H

OO

K O

R

ST

D A

CI-

318

SE

E P

LA

NS

"A

" B

AR

S,

"B

" B

AR

S

"C

" B

AR

S

TH

E D

WG

S

AS

NO

TE

D O

N

ST

D H

OO

K O

R

INT

ER

SE

CT

ION

RE

INF

OR

CIN

G

LA

P W

ITH

CO

RN

ER

AN

D

SH

OW

N O

N D

RA

WIN

GS

,

WA

LL

RE

INF

OR

CIN

G A

S

TY

PIC

AL

HO

RIZ

ON

TA

L

SIZ

E A

ND

SP

AC

ING

.

UN

LE

SS

OT

HE

RW

ISE

NO

TE

D,

"B

" A

ND

"C

" B

AR

S A

RE

TH

E S

AM

E S

IZE

AN

D S

PA

CIN

G A

ND

"F

" A

ND

"G

" B

AR

S A

RE

TH

E S

AM

E

OF

TH

E T

WO

RE

INF

OR

CIN

G B

AR

S B

EIN

G S

PL

ICE

D.

"L

AP

LE

NG

TH

" A

S R

EQ

UIR

ED

BY

TH

E G

EN

ER

AL

ST

RU

CT

UR

AL

NO

TE

S.

US

E T

HE

LA

P L

EN

GT

H A

S R

EQ

UIR

ED

FO

R T

HE

SM

AL

LE

R

EX

CE

PT

WH

ER

E O

TH

ER

WIS

E S

HO

WN

ON

TH

E D

RA

WIN

GS

, T

HE

LE

NG

TH

IN

DIC

AT

ED

AS

"N

OT

E 5

" S

HA

LL

BE

EQ

UA

L T

O O

NE

L =

LE

NG

TH

OF

WA

LL

PA

RA

LL

EL

TO

TH

E B

AR

LE

NG

TH

IN

QU

ES

TIO

N.

10 F

EE

T, O

R 1

.0 T

IME

S T

HE

HE

IGH

T O

F T

HE

WA

LL

, E

XC

EP

T T

HA

T I

N N

O C

AS

E S

HA

LL

IT

BE

LE

SS

TH

AN

2 F

EE

T.

EX

CE

PT

WH

ER

E O

TH

ER

WIS

E S

HO

WN

ON

TH

E D

RA

WIN

GS

, T

HE

LE

NG

TH

IN

DIC

AT

ED

AS

"N

OT

E 3

" S

HA

LL

BE

TH

E L

ES

SE

R O

F L

/4,

AS

NO

TE

D F

OR

TH

E R

EIN

FO

RC

ING

BE

TW

EE

N T

HE

CO

RN

ER

S O

R I

NT

ER

SE

CT

ION

S.

TH

E S

IZE

AN

D S

PA

CIN

G S

HA

LL

BE

TH

E S

AM

E A

S T

HE

WA

LL

HO

RIZ

ON

TA

L R

EIN

FO

RC

ING

SH

OW

N O

N T

HE

WA

LL

SE

CT

ION

S O

R

WH

ER

E T

HE

CO

RN

ER

OR

IN

TE

RS

EC

TIO

N R

EIN

FO

RC

ING

SIZ

E A

ND

SP

AC

ING

IS

NO

T S

HO

WN

, N

OT

ED

OR

TA

BU

LA

TE

D O

N T

HE

PL

AN

S,

BA

R S

IZE

AN

D S

PA

CIN

G.

AN

D I

NT

ER

SE

CT

ION

S S

HA

LL

BE

FA

BR

ICA

TE

D A

ND

IN

ST

AL

LE

D W

ITH

SP

LIC

ES

LO

CA

TE

D W

HE

RE

SH

OW

N R

EG

AR

DL

ES

S O

F

AN

D P

ER

MIT

PR

OP

ER

PL

AC

EM

EN

T, F

OR

SIZ

E A

ND

SP

AC

ING

SE

E P

LA

NS

. A

LL

HO

RIZ

ON

TA

L R

EIN

FO

RC

ING

AT

CO

RN

ER

S

TY

PIC

AL

HO

RIZ

ON

TA

L W

AL

L C

OR

NE

R A

ND

IN

TE

RS

EC

TIO

N R

EIN

FO

RC

ING

LA

YO

UT

IS

SH

OW

N T

O A

VO

ID C

ON

GE

ST

ION

NO

TE

S:

6.

5.

4.

3.

2.

1.

INT

ER

SE

CT

ION

RE

INF

OR

CIN

G

WIT

H C

OR

NE

R A

ND

ON

WA

LL

SE

CT

ION

S, L

AP

INT

ER

SE

CT

ION

S A

S S

HO

WN

BE

TW

EE

N C

OR

NE

RS

AN

D

HO

RIZ

WA

LL

RE

INF

OR

CIN

G

NO

TE

5, T

YP

LA

P, S

EE

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 37: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-004.dgn 12/2/2014

NTS

0330-004

NOTES:

>22

16, 18, 20

12, 14

10

W ALL THICKNESS (INCHES)

#8

#7

#6

#5

MINIM UM BAR SIZE

3.

2.

1.

0330-003

CONSTRUCTION JOINT

AT INTERMEDIATE

AT BASE SLABAT ELEVATED SLAB

4'-

0"

4'-

0"

4'-

0"

CONST JOINT CONST JOINTCONST JOINT

W S

W S

W S

SEE NOTES

@ 6" EF,

HORIZ BARS

SEE NOTES

@ 6" EF,

HORIZ BARS

SEE NOTES

@ 6" EF,

HORIZ BARS

W HICHEVER IS GREATER.

BAR SIZE SHOW N ON THE DRAW INGS OR THE MINIM UM BAR SIZE IN THE TABLE BELOW ,

HORIZONTAL BAR SIZE FOR THE 4’-0” ZONE SHALL BE THE TYPICAL W ALL HORIZONTAL

PROVIDE ADDITIONAL BARS FOR 6” SPACING.

STRUCTURES. W HERE TYPICAL W ALL HORIZONTAL BARS ARE AT 12” SPACING,

HORIZONTAL W ALL CONSTRUCTION JOINTS IN LIQUID CONTAINING AND BELOW -GRADE

PROVIDE HORIZONTAL BARS AT 6” SPACING EACH FACE IN THE FIRST 4’-0” ABOVE ALL

ABOVE, SEE .

PROVIDE CORNER BARS AT 6" SPACING EACH FACE TO LAP W ITH THE BARS SHOW N

REINFORCING AT HORIZONTAL CONSTRUCTION JOINT

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 38: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-005.dgn 12/2/2014

NTS

0330-005

VERTICAL W ALL REINFORCING / DOW EL PLACEMENT

EMBEDMENT LENGTH

ACI MINIM UM HOOK

SIZE

BAR

EMBED

MIN

#4 7"

#5 9"

#6

#7

#8

#9

#10

11"

12"

14"

16"

17"

W ALL DOW ELS

REINFORCING

W ALL VERTICAL

SLAB REINFORCINGCJ

LENGTH

EMBEDMENT

MIN HOOK

DO

WE

L L

EN

GT

H A

S

RE

QU

IRE

D

LA

P

0315-154

TOP OF SLAB

M AY BE EXTENDED DOW N TO

LAP, W ALL VERTICAL REINFORCING

GREATER THAN REQUIRED

INDICATED ON DRAW INGS IS

W HERE THE DOW EL LENGTH

W ALL SECTIONNOTE:

IS MET, SEE TABLE ABOVE

MINIM UM HOOK EMBEDMENT LENGTH

OF SLAB REINFORCING, PROVIDED

ABOVE BOTH LAYERS OF BOTTOM M AT

HOOKS M AY BE PLACED DIRECTLY

HOOKS ARE SHOW N ON DRAW INGS,

REGARDLESS OF HOW W ALL DOW EL

2.

1.

HOOKS FOR W ALL DOW ELS M AY BE PLACED IN ANY ORIENTATION IN PLAN.

TO AND BE TIED OFF TO BOTTOM M AT OF SLAB REINFORCING.

UNLESS NOTED OTHERW ISE, ALL DOW EL HOOKS SHALL EXTEND

OF SLAB

CONCRETE COVER AT UNDERSIDE

HOOKS HAVE REQUIRED MINIM UM

OF SLAB REINFORCING, PROVIDED

BOTH LAYERS OF BOTTOM M AT

HOOKS M AY BE PLACED AT OR BELOW

HOOKS ARE SHOW N ON DRAW INGS,

REGARDLESS OF HOW W ALL DOW EL

ON

DR

AW

ING

S

IND

ICA

TE

D

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 39: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3" CLR,

0330-016.dgn 12/2/2014

TYP

1.

2.

1'-0" 1'-0"TYP

2 - #5 EACH SIDE

CONSTRUCTION JOINT

SECTION

ENCASEMENT RISER

0330-001

0330-017

0330-018

NOTES:

2'-0"4"

SLAB THICKNESS

AROUND PIPE SEE

TYPICAL OPENING REINF

ENCASEMENT

TIES CONT TO END OF

BOTTOM "U" SECTION OF

AND LARGER, SEE

SECTION APPLIES TO PIPES W / DIAMETERS 18" AND SM ALLER. FOR 20" DIAMETER PIPES

GROSS END AREA

EQUAL TO ENCASEMENT

AREA BELOW VERT PIPE RISER

PROVIDE LEVEL BEARING

TOGETHER. SEE

W HEN PIPE ENCASEMENT IS CLOSER THAN 4" TO SLAB ABOVE, TIE SLAB & ENCASEMENT

IN ALL CONSTRUCTION JOINTS

CONTINUOUS ALL AROUND

HYDROPHILIC W ATERSTOP

ENCASEMENT REINF

TYPICAL PIPE

AROUND

8" MIN ALL

CONTINUOUS

7 - #5

#5 TIES @ 12"

NOTES

GENERAL STRUCTURAL

LAP LENGTH, SEE

NTS

PIPE ENCASEMENT

0330-016

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 40: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

H=10 FEET

REINF

PIPE ENCASEMENT TABLE

20 THRU 30

36 THRU 42

48 THRU 54

UP TO 60

8

10

10

10

#5@ 12"

#5@ 12"

#6@ 12"

#6@ 12"

H=20 FEET

REINF

10

10

10

10

#5@ 12"

#6@ 12"

#7@ 12"

#6@ 6"

H=30 FEET

REINF

10

10

10

#5@ 12"

#7@ 12"

#7@ 6"

#7@ 6"

H=40 FEET

REINF

10

10

12

14

#6@ 12"

#6@ 6"

#7@ 6"

#7@ 6"

PIP

E O

D T

YP

EA

CH

FA

CE

3"

CL

R

LA

P L

EN

GT

H

TYP EA SIDE

"REINF" T&B

2.

3.

4.

2"

OPTIONAL CONSTRUCTION JOINT

1.

MIN

4"

5.

"H" IS FILL HEIGHT OR W ATER DEPTH OR COMBINATION ABOVE PIPE.

1 1

/2"

FOR ENCASEMENT AT PIPE RISER, SEE .

6.HYDROPHILIC W ATERSTOP CONTINUOUS ALL AROUND IN ALL CONSTRUCTION JOINTS.

T

TT

T (in) T (in) T (in) T (in)

14

0330-016

0330-016

0330-016

0330-018

NOTES:

(IN.)

PIPE DIA

AND TW O. SEE NOTE 2.

HEAVY DARK LINE INDICATES BREAK BETW EEN ONE LAYER OF REINFORCING

SEE NOTE 2 FOR T = 8"

"REINF" T&B, SEE TABLE.

TOGETHER. SEE .

W HEN PIPE ENCASEMENT CLOSER THAN 4" TO SLAB ABOVE, TIE SLAB & ENCASEMENT

SEE DETAIL .

THIS DETAIL APPLIES TO PIPE DIAMETER OF 20" AND LARGER. FOR SM ALLER THAN 20",

AND SIDES

2" CLR, TYP TOPT

YP

CL

R,

TYP ALL AROUND

LONGITUDINAL,

#4@ 12"

BOTTOM OF SLAB, SEE NOTE 5

6

NOTE

SEE

SIM .

FOR T=8" REINFORCING SHALL BE ONE LAYER AND CENTERED IN SLABS OR W ALLS.

NO

TE

S

ST

RU

CT

UR

AL

SE

E G

EN

ER

AL

PIPE ENCASEMENT

END CLEARANCE, TYP

PLACEMENT AND

AS REQD FOR PIPE

SIDE, ROTATE HOOK

"REINF" TYP EACH

0330-017

0330-017.dgn 12/2/2014

NTS

IMPERIAL3003STRUCTURALCONCRETE

PIPE ENCASEMENT

ENGLISH (US)

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 41: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1.

2.

TYP

#5@ 12"

#5@ 12"1'-0" 1'-0"

SEE NOTE 2

MIN

1

2

MIN

#5@ 12"

TYP

FOR LOCATION & JOINT TYPE

OR CONTROL JOINT, SEE PLANS

CL SLAB EXP, CONTRACTION

TO ALLOW JOINT M OVEMENT (1" MIN)

RUBBER ALL AROUND COUPLING

CLOSED CELLULAR SPONGE

0330-016 0330-017

SECTION

JOINT DETAILNOTES:

10"

4"

2'-0"

10"

10"

4 1

/2"

10"

2'-0"

ENCASEMENT AND BOTTOM OF SLAB IS LESS THAN 4".

TIE PIPE ENCASEMENT TO SLAB AS SHOW N W HEN DISTANCE BETW EEN PIPE

NOT SHOW N

TYPICAL SLAB REINF

OF SLAB ABOVE

1'-0" INTO TOP

EXTEND VERTS & BEND

+6"

LENGTH

COUPLING

JOINT

CONSTRUCTION

AT ENCASEMENT

THICKEN SLAB

SLAB JOINT, SEE SLAB JOINT DETAILS

ENCASEMENT JOINT TYPE SAME AS

#5@ 12", TYP

FOR CONT SEAL

SLAB JOINT

W ATERSTOP IN

JOINT. W ELD TO

IN ENCASEMENT

W ATERSTOP

6" PLASTIC

AT JOINT

DISCONTINUOUS

ENCASEMENT REINF

#5@ 12" TYPICAL

SLAB EXPANSION & CONTROL JOINTS

(W ITHOUT THRUST TIES) AT ALL

LOCATE PIPE FLEX COUPLING

SLAB JOINT

CENTERED ON

PIPE JOINT

6" PLASTIC W S IN ENCASEMENT JOINTS. W ELD TO W S IN SLAB JOINTS.

0330-018.dgn 12/2/2014

NTS

PIPE ENCASEMENT AT SLAB

0330-018

SEE &

PIPE ENCASEMENT REINF

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 42: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-020NTS

CONCRETE CLOSURE COLLAR

1'-0" 1'-0"

#4x1'-9"@ 12",

MIN 4

2 - #5 HOOPSO

D

PIP

E

TO EACH PIPE

W IRE SECURELY

ROOFING FELT,

EARTH, 6" MIN

UNDISTURBED

M ATERIALL TO

COMPACTED GRANULAR

AROUND,TYP

6" MIN ALL

AROUND, TYP

6" MIN ALL

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 43: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1'-

0"

CO

LL

AR

PIPE

PIPE OD + 2'-0" SQ

#5@ 12" EW

0330-001

PLAN/SECTION

ELEVATION

SHOW N

AND LAP AS

OF OPNG BEND

2 - #5 EA SIDE

PIPE OD + 4"

2 - #5 HOOPS

AROUND PIPE

1'-0", TYP

SEE PLANS

W ALL THICKNESS,

PIPE OD + 4"

2 - #5 HOOPS

PERIMETER

AROUND

#5 @ 12" ALL

FOR STEEL PIPE

SEEP RINGSEE

W ALL OPENING REINF

0330-021.dgn 12/2/2014

NTS

PIPE COLLAR

0330-021

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 44: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

4'-0"

INTERIOR

EXTERIOR

THICKNESS

TYP SLAB

W ALL & SLAB EDGE

PJF BEYOND AT BLDG

ROOFING FELT

2 LAYERS

SURFACE

EXTERIOR

OPENING

DOOR

REINF

SLAB

TYPICAL

W IDTH + 2'-0" EA END

ADDL #5 x OPNG

@ DOOR OPNG

STEP DOW N 1'-0"

EXTERIOR FDN W ALL

EA END

W IDTH + 2'-0"

2 ADDL #5 x OPNG

THICKNESS

TYP SLAB

BEARING W ALL

IN INTERIOR

DOOR OPENING

0330-041.dgn 12/2/2014

NTS

SLAB AT DOOR OPENING

0330-041

6" SPACING

TYP FOR

ALTN W /

ADDL #4@ 12"

4'-0"

6" SPACING

ALTN W / TYP FOR

ADDL #4@ 12"

1'-

0"

MIN

W ALL & SLAB EDGE

PJF BEYOND AT BLDG

W IDTH + 2'-0" EA END

2 ADDL #5 x OPNG

REINF CONT

SLAB

TYPICAL

2'-0"

2'-0"

TYP

@ DOOR OPNG

STEP DOW N 1'-0"

INTERIOR FDN W ALL

EA END, TYP

W IDTH + 2'-0"

2 ADDL #5 x OPNG

ROOFING FELT

2 LAYERS

1/2" PJF

1'-

0"

MIN

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 45: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3/4"

3/4" CHAMFER

#3 TIES @ 6"

1 1

/2"

CL

R

1'-

6"

1 1

/2"

CL

R

6"

1'-0"

LANDING W IDTH (SEE PLANS)

10"

4 1

/2"

EW T&B

#4@ 12"

ALL AROUND

3/4"x10" KEYW AY

0330-051.dgn 12/2/2014

NTS

STAIR LANDING

0330-051

EA END

CONNECTORS

THREADED

MECHANICAL

#6 DOW ELS W ITH

3/4" KEYW AY &

2 - #6 T&B, PROVIDE

SEE PLANS

STAIR CONN,

#5 EF

DOW ELS

#4@ 12"

W ALL FORMING

CONNECTORS TO FACILITATE

MECHANICAL THREADED

PROVIDE DOW ELS W /

CONTRACTOR'S OPTION TO

NOTE:

FOR RAILING SEE PLANS.

CONCRETE W ALL

CONTINUOUS

& RAILING ANCHORS

TO CLEAR STAIR

REINFORCING

LOCATE BEAM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 46: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-056NTS

1.

2.

TYPE A

NOTES:

0330-101

10" M AX

REQD, 3 1/2" MIN,

PAD HEIGHT AS

CALCULATIONS

ANCHORAGE

OR AS REQUIRED BY

2" MIN ALL AROUND

FOR THICKNESS SEE PLANS

SLAB OR SLAB ON GRADE,

EXST OR NEW SUSPENDED

TO PLACING PAD

ROUGHEN & CLEAN PRIOR

CONSTRUCTION JOINT,

@ 12" OC @ PERIMETER

#4 ADHESIVE DOW EL

3/4" CHAMFER, TYP

EQUIPMENT PAD

EQUIPMENT

FOR PAD HT > 4"

#4@ 12" EW , 1 1/2" CLR

FOR PAD HT < 4",

#3@ 12" EW , 1" CLR

UNLESS NOTED OTHERW ISE.

EQUIPMENT SHALL BE 3 1/2" HIGH,

CONCRETE PADS FOR ELECTRICAL

ANCHORS SPECIFIED.

TO PAD IS REQUIRED, USE CONCRETE

W HEN ANCHORAGE OF EQUIPMENT

GENERAL NOTE:

FOR GENERAL NOTES SEE DETAIL 5 OF 5.

CONCRETE EQUIPMENT PAD - TYPE A DETAIL 1 OF 5

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 47: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DETAIL 2 OF 5

0330-056C.dgn 12/2/2014

NTS

0330-056

CONCRETE EQUIPMENT PAD - TYPE C

GENERAL NOTE:

FOR GENERAL NOTES SEE DETAIL 5 OF 5.

MIN

#4@ 12" EW

1"

"X"

TYPE C

M AX

1 1/2"

THICKNESS NOT SHOW N SEE PLANS

SUSPENDED SLAB; FOR REINF AND

FOR PAD HT > 10"

ADDL #4@ 6"

AROUND

3" MIN ALL

NOTE 7

SEE

OF OPNG EW

2 MIN EA SIDE

BOLT SLEEVE

ANCHOR

CONSTRUCTION JOINT

LARGER)

FOR AB 3/4" OR

PER PAD (#5@ 12"

#4@ 12" MIN 4

OPENINGS > 6"

#4 OR FOR

3/4" CHAMFER, TYP

OF PAD

2 - #4 @ TOP

DETAILS

ANCHOR BOLT

SEE NOTES &

ANCHOR BOLT,

NON-SHRINK GROUT

1 1/2" FLUID

EQUIPMENT BASE4 1/2" MIN ALL AROUND

FORM TO RETAIN GROUT

PLANS & EQUIP MFR

OPNG SIZE, VERIFY W /

OPNG IF "X" > 1'-6"

#4@ 12" BARS AT

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 48: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DETAIL 3 OF 5

0330-056G.dgn 12/2/2014

NTS

0330-056

CONCRETE EQUIPMENT PAD - TYPE G

4"

1

1.5

6"

MIN

MIN

NOTE:

TYPE G

MIN6"

ALL AROUND

EDGE OF SLAB

THICKENED

6"

#5 CONT

CLR FROM TOP SURFACE

#5@ 12" EW AT 2"

TYP

CHAMFER,

3/4"

GRADE

FINISH

SEE NOTE

ANCHORS,

CONCRETE

EQUIPMENT

ON PLANS

NOTED OTHERW ISE

6" MIN, TYP UNLESS

ANCHORS SPECIFIED.

TO PAD IS REQUIRED, USE CONCRETE

W HEN ANCHORAGE OF EQUIPMENT

GENERAL NOTE:

FOR GENERAL NOTES SEE DETAIL 5 OF 5.

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 49: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DETAIL 4 OF 5

0330-056H.dgn 12/2/2014

NTS

0330-056

CONCRETE EQUIPMENT PAD - TYPE H

4"

1

1.5

6"

#5@ 12" EW T&B

MIN

1'-

0"

MIN

MIN

NOTE:

10"

TYPE H

TYP

CHAMFER,

3/4"

ALL AROUND

EDGE OF SLAB

THICKENED 2 - #5 CONT

GRADE

FINISH

EQUIPMENT

SEE NOTE

ANCHORS,

CONCRETEON PLANS

NOTED OTHERW ISE

6" MIN, TYP UNLESS

ANCHORS SPECIFIED.

TO PAD IS REQUIRED, USE CONCRETE

W HEN ANCHORAGE OF EQUIPMENT

GENERAL NOTE:

FOR GENERAL NOTES SEE DETAIL 5 OF 5.

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 50: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-056NTS

DETAIL 5 OF 5CONCRETE EQUIPMENT PAD NOTES

1.

2.

3.

4.

5.

6.

7.

8.

AB DIA (IN.)

MIN PAD HT (IN.)

1 2

7 10 11 15 18 21 24

1/2 5/8 3/4 7/8 1 1/4 1 3/8 1 1/2 1 3/4

8 1/2 12 1/2 16 1/2

EQUIPMENT BASES SHALL BE INSTALLED LEVEL UNLESS INDICATED OTHERW ISE.

9.

NOTES:

0330-057

INDICATED BY THE M ANUFACTURER AND APPROVED BY THE ENGINEER.

PAD SIZE SHALL BE MINIM UM INDICATED OR AS SHOW N ON THE PLANS OR AS

SHALL BE 8 TIMES THE BOLT DIAMETER.

M OVEMENT OF 1/2" IN ALL HORIZONTAL DIRECTIONS. THE MINIM UM SLEEVE LENGTH

ANCHOR BOLT SLEEVES SHALL BE USED TO PROVIDE MINIM UM ANCHOR BOLT

SURROUNDING FLOOR SLAB AFTER THE EQUIPMENT PAD.

TYPE "D" PAD SHALL BE USED ONLY W HERE SPECIFICALLY INDICATED. PLACE THE

PAD IS BEING PLACED.

A TEMPLATE OR OTHER ACCEPTABLE MEANS, M ATCHING THE BASE PLATE, W HILE

APPROVED BY THE ENGINEER. ANCHOR BOLTS SHALL BE HELD IN POSITION W ITH

BOLTS SHALL BE DETERMINED BY THE EQUIPMENT M ANUFACTURER AND AS

THE SIZE, NUMBER, TYPE, LOCATION, AND THREAD PROJECTION OF THE ANCHOR

SHALL NOT BE EXPOSED TO VIEW .

THE NON-SHRINK GROUT IS PLACED. W EDGES OR SHIMS THAT ARE LEFT IN PLACE

W EDGES, SHIMS, OR LEVELING NUTS SHALL BE USED TO SUPPORT THE BASE W HILE

MINIM UM SHOW N, USE TYPE "B" EQUIPMENT PAD W ITH BLOCKOUT.

EQUIPMENT OR PIPING ELEVATION REQUIRE A PAD HEIGHT LESS THAN THE

KEEP ANCHOR BOLT ABOVE SUPPORTING SLAB (SEE TABLE BELOW ). W HERE

HEIGHT OF PADS SHALL BE MINIM UM REQUIRED FOR ANCHOR BOLT CLEARANCE TO

4" MINIM UM EDGE DISTANCE IN EACH DIRECTION.

AND APPROVED BY THE ENGINEER. ANCHORS SHALL BE INSTALLED W ITH

THAN 3/4" DIAMETER W HEN APPROVED BY THE EQUIPMENT M ANUFACTURER

OF CAST-IN-PLACE ANCHOR BOLTS FOR EQUIPMENT ANCHOR BOLTS LESS

AT CONTRACTOR'S OPTION, CONCRETE ANCHORS M AY BE USED IN LIEU

AFTER BOLTS ARE ALIGNED. SEE .

ANCHOR BOLT DIAMETER. SLEEVES SHALL BE FILLED W ITH NON-SHRINK GROUT

THAN BOLT DIAMETER AND A M AXIM UM INTERNAL DIAMETER 3" GREATER THAN

ANCHOR BOLT SLEEVES SHALL HAVE A MINIM UM INTERNAL DIAMETER 1" GREATER

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 51: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-057.dgn 12/2/2014

0330-057

NTS

ANCHOR BOLT DETAILS

MIN

d +

1",

MIN

4d

4d

MIN

1.

2.

MFR REQD OR 8d

NO

N-S

HR

INK

GR

OU

T

SL

EE

VE

, S

EE

NO

TE

2

M ATERIAL TO M ATCH BOLT.

12d1"

CLR

1"

CLR

0330-056

EL

EV

AT

ION

AN

CH

OR

BO

LT

BL

OC

KO

UT

MA

CH

INE

RY

AN

CH

OR

BO

LT

DE

TA

IL

NOTES:

AN

CH

OR

BO

LT

RE

TR

OF

IT

BY

MF

R

OR

AS

RE

QD

SIZ

E A

S S

HO

WN

AN

CH

OR

BO

LT

,

OR 8d

MFR REQD

INS

IDE

DIA

ME

TE

R

d +

1",

MIN

BE

AM

SL

AB

OR

ST

RU

CT

UR

AL

TO

P O

F

GR

OU

T

W/

NO

N-S

HR

INK

FIL

L B

LO

CK

OU

T

BO

LT

DE

TA

IL

AN

CH

OR

EQ

UIP

ME

NT

SE

E T

YP

ICA

L

GR

OU

TTO

GR

OU

TIN

G

CA

ST

AN

D P

RIO

R

AF

TE

R C

ON

C I

S

TO

P B

Y C

UT

TIN

G

RE

MO

VE

FO

RM

AT

SL

EE

VE

AS

SP

EC

IFIE

D

AN

CH

OR

BO

LT

SE

E N

OT

E 2

3" D

IA M

IN,

WA

SH

ER

,

1/8

" P

LA

TE

AS

RE

QD

PR

OJE

CT

ION

CO

NC

TO

P O

F

BY

MF

R

OR

AS

RE

QD

SIZ

E A

S S

HO

WN

AN

CH

OR

BO

LT

,

AS

RE

QD

PR

OJE

CT

ION

AL

L A

RO

UN

D

3" C

LR

,

EQ

PT

PA

D

TO

P O

F C

ON

C

OR

BE

AM

CO

NC

SL

AB

PA

D H

EIG

HT

CO

NC

EQ

PT

MIN

12d

TO

P O

F C

ON

C

AS

RE

QD

PR

OJE

CT

ION

AL

L A

RO

UN

D

ED

GE

, C

LE

AN

RO

UG

HE

N

GR

OU

T

NO

N-S

HR

INK

FIL

L W

ITH

AS

RE

QD

DE

PT

H

HO

LE

IN

EX

ST

CO

NC

6d

, 4

" M

IN C

OR

ED

AND NOTES NOT SHOW N SEE

FOR CONCRETE EQUIPMENT PAD DETAILS

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 52: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-061NTS

DETAIL 1 OF 2

6"D

D/4

2"

2" CLR,

TYP

CL

R

1 1

/2"

60° 60°

NEW OR EXST

CONCRETE SLAB,

SPACING

VERTICAL

#5@ 12" M AX

6"

30°

6"

#3

W ITH 90° HOOK

EMBEDDED DOW ELS

ADHESIVE ANCHOR OR

TO PIPE DURING POURING

FELT SECURE TIGHT

2 LAYERS OF ROOFING

GROUT, POURABLE

1" MIN NON-SHRINK

SEE PLAN

FOR ELEVATION,

TABLE

SADDLE, SEE

W IDTH "B" OF

AT TOP OF CONCRETE

"V", EXTEND TO 1 1/2" CLR

VERTICAL REINFORCING

TYPE "A" SADDLE

(2 x

D, M

AX

)

VA

RIE

S

MININDICATED ON PLANS

PIPE STRAP W HERE

0330-105

PIPE SUPPORT - CONCRETE SADDLE

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 53: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-061NTS

DETAIL 2 OF 2PIPE SUPPORT - CONCRETE SADDLE

3 3

/4"

2 1

/4"

4"

1 1/2"

PIP

E S

TR

AP

1 1

/2"

2 1

/4"

1/4

"

3/1

6

1 1/2"

18

"

16

"

12

"

10

"

8"

6"

B

WID

TH

SA

DD

LE

#6

@1

2"

#6

@1

2"

#5

@1

2"

#5

@1

2"

#5

@1

2"

#5

@1

2"

V

RE

INF

OR

CIN

G

VE

RT

ICA

L

3/8

"x

3"

3/8

"x

3"

1/4

"x

3"

1/4

"x

2"

3/1

6"x

2 1

/2"

3/1

6"x2"

S

ST

RA

P S

IZE

PIP

E

8'-

0"

6'-

0"

4'-

0"

3'-

0"

2'-

0"

1'-

6"

W

WID

TH

FO

OT

ING

2'-

0"

2'-

0"

2'-

0"

2'-

0"

2'-

0"

2'-

0"

C

DE

PT

H

FO

OT

ING

2 (

EF

)

2 (

EF

)

2 (

EF

)

2 (

EF

)

1 (

CT

RD

)

1 (

CT

RD

)

RE

INF

OR

CIN

G

LA

YE

RS

OF

NO

TE

S:

221111

ST

RA

PS

NO

. O

F

6.

5.

4.

3.

2.

1.

#5

@6

"

#5

@6

"

#5

@1

2"

#5

@1

2"

#5

@1

2"

#5

@1

2"

A

RE

INF

OR

CIN

G

PIP

E S

AD

DL

E T

AB

LE

FA

BR

ICA

TIO

N,

SE

E N

OT

ES

5 &

6

SE

E T

AB

LE

, H

OT

- D

IP G

AL

VA

NIZ

E A

FT

ER

BA

R S

TR

AP

"S

" B

EN

T T

O O

D O

F P

IPE

,

(5/8

" T

HK

FO

R D

> 4

8")

PL

1/2

"x3"x4"

PR

OV

IDE

3/4

" B

Y S

TR

AP

WID

TH

PL

US

1" W

IDE

NE

OP

RE

NE

PA

D B

EL

OW

ST

RA

P.

AT

SU

BM

ER

GE

D C

ON

DIT

ION

S,

ST

RA

P S

HA

LL

BE

ST

AIN

LE

SS

ST

EE

L.

FO

R L

OC

AT

ION

S W

HE

RE

PIP

E S

TR

AP

IS

RE

QU

IRE

D, S

EE

DR

AW

ING

S. U

NL

ES

S I

ND

ICA

TE

D O

TH

ER

WIS

E A

ST

RA

P I

S N

OT

RE

QU

IRE

D.

US

E T

YP

E 'A

' S

AD

DL

E I

N A

LL

LO

CA

TIO

NS

WH

ER

E A

SL

AB

(N

EW

OR

EX

IST

ING

) O

CC

UR

S. U

SE

TY

PE

'B

' IN

OT

HE

R L

OC

AT

ION

S.

FO

RM

3/4

" B

EV

EL

ON

AL

L E

XP

OS

ED

CO

RN

ER

S O

F S

UP

PO

RT

.

TO

HO

OK

AR

OU

ND

VE

RT

ICA

LS

, 1 1

/2" C

LE

AR

OF

CO

NC

RE

TE

FO

R "

B"=

10" O

R T

HIC

KE

R, U

SE

2 L

AY

ER

S O

F R

EIN

FO

RC

ING

, T

UR

N H

OR

IZO

NT

AL

BA

RS

90°

SA

DD

LE

(U

SE

1" D

IA F

OR

D >

48")

LE

VE

LIN

G N

UT

S C

TR

IN

3/4

" D

IA A

NC

HO

R B

OL

TS

WIT

H

12" E

MB

ED

ME

NT

60

"<

D<

72

"

48

"<

D<

60

"

36

"<

D<

48

"

24

"<

D<

36

"

12

"<

D<

24

"

D<

12

"

D

DIA

ME

TE

R

PIP

E

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 54: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0330-080NTS

CL

R

1 1

/2" THAN 9"

W IDTH IS LARGER

FACE W HEN CURB

#5@ 12" PLACE EA

W IDTH EXCEEDS 9"

LOCATE EF W HEN

HEIGHT LESS THAN 12"

MIN 2 BARS FOR CURB

HEIGHT EXCEEDS 12".

#5@ 12" W HEN CURB

2 - #5 @ TOP &

ON PLAN

OF CURB AS NOTED

W IDTH AND HEIGHT

CONCRETE CURB

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 55: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,
Page 56: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

T/2

T/2

3/4"

3/4

"

TT

W ALL - PLAN

SLAB - SECTION

0315-003

0330-105

DAM AGE EXISTING REINFORCING

OF SLAB, USE CARE NOT TO

x CONT KEYW AY FULL DEPTH

THEN CHIP TO REM OVE 3/4"

CONCRETE TO 3/4" DEPTH

SAW -CUT SURFACES OF

STRUCTURES, SEE

AND DRY BELOW GRADE

FOR ALL W ATER HOLDING

GRADE STRUCTURES)

(EXTERIOR - DRY BELOW

STRUCTURES)

(INTERIOR - W ATER HOLDING

W ET FACE OF W ALL OR SLAB

EXISTING

DRY FACE

NOTED OTHERW ISE ON PLANS

#6@ 12" TYPICAL UNLESS

CONCRETE, SEE

INTO EXISTING

DRILL AND ADHESIVE ANCHOR

REINFORCING BAR DOW ELS,

SEE NOTES ABOVE

W ET FACE

DRY FACE

0330-101.dgn 12/2/2014

NTS

CONNECTION OF NEW CONCRETE TO EXISTING

0330-101

AND CLEAN

TO FULL 1/4" AMPLITUDE

OF EXISTING CONCRETE

ROUGHEN SURFACE

W ATERSTOP

SURFACE FOR HYDROPHILIC

GRIND CONT SM OOTH

W ATERSTOP

SURFACE FOR HYDROPHILIC

GRIND CONT SM OOTH

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 57: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2.FOLLOW ADHESIVE M ANUFACTURER'S INSTRUCTIONS FOR INSTALLATION.

3.

4.

#7

#6

#5

#4

#3

3 1/2"

4"

5"

6"

7"

12 1/2"

8"

13"

16"

20"

7" 22"

#9 24"NOTES:

#8

2 1/2"

7 1/2"

5"

8"

10 1/2"

14"

15"

11"

MINIM UM

EMBEDMENT A

MINIM UM

EMBEDMENT B

MINIM UM

EDGE DIST

DOW EL

SIZE

T1.

UNLIMITED EDGE DISTANCE

LIMITED EDGE DISTANCE

DOW ELING.

CONFORM TO THE REQUIREMENTS OF SPECIFICATION SECTION 03 63 00, CONCRETE

NEW W ALL OR SLAB

FACE OF EXISTING W ALL OR SLAB

EXISTING REINFORCING

BY ADHESIVE M ANUFACTURER

HOLE DIA AS RECOM MENDED

MINIM UM RECOM MENDED EMBEDMENT IF GREATER.

USE MINIM UM EMBEDMENTS SHOW N, EXCEPT USE M ANUFACTURER'S

ALTERNATING DOW ELS AT MINIM UM EDGE DISTANCE FROM OPPOSITE FACES.

DRAW INGS. W HERE 2 ROW S OF DOW ELS INDICATED, STAGGER SPACING & LOCATE

LOCATE DOW ELS CENTERED IN W ALL OR SLAB UNLESS OTHERW ISE NOTED ON

AND SPACING

FOR SIZE

SEE DRAW INGS

REBAR DOW ELS,

SLAB EXTENSION

NEW W ALL OR

MIN EDGE DISTANCE

MINIM UM EMBEDMENT "B"

T/2, SEE NOTE 4

EMBEDMENT "A"

MINIM UM

EXISTING REINFORCING

STRUCTURAL NOTES

STD LAP LENGTH, SEE GENERAL

END OF EXISTING W ALL OR SLAB

STRUCTURAL NOTES

SEE GENERAL

STD LAP LENGTH,

0330-105.dgn 12/2/2014

NTS

ADHESIVE DOW EL

0330-105

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 58: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2.

LAP

LA

P

LAP

LA

P

3 TYP VERTS

1.

NOTES:

INTERIOR CORNEREXTERIOR CORNER

INTERIOR CORNEREXTERIOR CORNER

BARS SIZE & SPG

M ATCH TYP HORIZ

CORNER BARS

BAR SIZE & SPACING

M ATCH TYP HORIZ

CORNER BARS

CORNERS ONLY

BARS AT

W ITHIN HORIZ

LOCATE VERTS

5 TYP VERTS,VERTS

3 TYP

FAR FACE

HOOK AT

STANDARD 90°

FAR FACE

HOOK AT

STANDARD 90°

VERTS

2 TYP

0422-001.dgn 12/2/2014

NTS

0422-001

W ALLS

OF CELL

1/2" CLR

BARS AT

TYP VERT

CM U W ALL CORNERS (SINGLE & DOUBLE M AT)

DOUBLE M AT PLAN

SINGLE M AT PLAN

LAP=48 BAR DIAMETERS OR 2'-0" MINIM UM UNLESS OTHERW ISE NOTED.

OPENINGS, CONTROL JOINTS, OR CORNERS LESS THAN 6'-0" IN LENGTH.PROVIDE A STANDARD 90° HOOK EACH END ON ANY HORIZONTAL BAR BETW EEN

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 59: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0422-002A.dgn 12/2/2014

NTS

CM U OPENING REINFORCING

0422-002

1.

2.

3.

4.

5.

"W "

"H

"

NOTE 1

NO

TE

1

2'-8"

TYP

"D"

NOTE 1

1'-0"

LOCATE #4 ARCH BARS CENTERED IN 8" W ALLS, AND EACH FACE IN 12" W ALLS.

NOTES:

0422-001

OR LESS, UNLESS NOTED OTHERW ISE. SEE PLANS FOR LARGER OPENINGS.

TYPICAL FOR ALL OPENINGS W ITH (W , H, OR D) 2'-0" OR GREATER AND 4'-0"

W ITH M ATCHING FOUNDATION DOW ELS.

AND EACH FACE IN SINGLE GROUT CELL IN 12" W ALLS. LAP 48 BAR DIAMETERS

LOCATE VERTICAL BARS CENTERED IN 2 ADJACENT CELLS IN 8" W ALLS,

REINFORCING AROUND CORNER PER DETAIL

AT OPENINGS LOCATED W ITHIN 2'-8" OF CORNER, CONTINUE HORIZONTAL

CM U OPENING REINFORCING

HORIZONTAL REINFORCING TO 2'-8" BEYOND FURTHEST OPENING.

AT ADJACENT OPENINGS W ITH LESS THAN 8'-0" W ALL BETW EEN, CONTINUE

8" BOND BEAM

SEE NOTES 2 & 3

& BELOW OPNG,

2 - #5 ABOVE

BLOCK

8" LINTEL

SEE NOTE 4

SIDE OF OPNG,

(FULL HT) EA

VERTICAL BARS

2 TYP W ALL

BARS, NOTE 5

#4 TOP ARCH

SOLID GROUT

CIRCULAR OPNG,

BLOCK FOR

SAW CUT

OPNG ABOVE

RECTANGULAR

SHOW N FOR

REINF SIM AS

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 60: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

NTS

CM U OPENING REINFORCING

5.

W

<2'-

8"

8"

16

"

24

"

32

"

48

"

- -

1 2 2 2 2

1 1 2 21

1 1 2 3 3

8"

8"

16

"

24

"

24

"

8" W

AL

LS

#3

@8

"

#3@

16"

#3@

24"

CM

U O

PE

NIN

G R

EIN

F S

CH

ED

UL

E

>2'-

8"<

4'-

0"

>4'-

0"<

6'-

0"

>6'-

0"<

8'-

0"

>8'-

0"<

10'-

0"

W

<2'-

8"

8"

16

"

24

"

32

"

48

"

- -

2 2 2 2 2

2 2 2 22

2 2 4 6 6

8"

8"

16

"

24

"

24

"

#3

@8

"

#3@

16"

#3@

24"

>2'-

8"<

4'-

0"

>4'-

0"<

6'-

0"

>6'-

0"<

8'-

0"

>8'-

0"<

10'-

0"

12" W

AL

LS

"W

"

"H"

1.

2.

3.

4.

NO

TE

S:

RE

INF

OR

CIN

G C

ON

TIN

UO

US

TO

2'-

8" B

EY

ON

D F

UR

TH

ES

T O

PE

NIN

G.

HE

IGH

T. W

HE

RE

TH

ER

E I

S L

ES

S T

HA

N 8

'-0" B

ET

WE

EN

AD

JA

CE

NT

OP

EN

ING

S, E

XT

EN

D

OF

OP

EN

ING

EX

CE

PT

TH

AT

WH

EN

"H

" O

R "

W" E

XC

EE

DS

2'-

0", "C

" B

AR

S S

HA

LL

EX

TE

ND

FU

LL

EX

TE

ND

"C

" B

AR

S 4

8 B

AR

DIA

ME

TE

RS

, B

UT

NO

T L

ES

S T

HA

N 2

'-0

" B

EY

ON

D T

OP

AN

D B

OT

TO

M

SID

E O

F T

HE

OP

EN

ING

S.

"A

" A

ND

"B

" B

AR

S S

HA

LL

EX

TE

ND

48

BA

R D

IAM

ET

ER

S,

BU

T N

OT

LE

SS

TH

AN

2'-

0" E

AC

H

90°

HO

OK

8" L

INT

EL

SE

CT

ION

8" C

MU

WA

LL

12" C

MU

WA

LL

135°

HO

OK

12" L

INT

EL

SE

CT

ION

NO

TE

5

RE

INF

OR

CIN

G,

AD

DL

HO

RIZ

ON

TA

L

SC

HE

DU

LE

DE

PT

H,

SE

E

LIN

TE

L

LIN

TE

L B

LO

CK

0422-003

WA

LL

HO

RIZ

ON

TA

L R

EIN

FO

RC

EM

EN

T.

HO

RIZ

ON

TA

L R

EIN

FO

RC

EM

EN

T A

T 1

2" F

RO

M B

OT

TO

M O

F L

INT

EL

. M

AT

CH

SIZ

E O

F T

YP

ICA

L

FO

R L

INT

EL

DE

PT

HS

EQ

UA

L T

O O

R G

RE

AT

ER

TH

AN

48

" P

RO

VID

E A

DD

ITIO

NA

L L

AY

ER

OF

DE

PT

H

LIN

TE

L

SIZ

E,

SP

G

ST

IRR

UP

BA

RS

"A

"

BA

RS

"B

"

BA

RS

"C

"

WID

TH

JAM

B

DE

PT

H

LIN

TE

L

SIZ

E,

SP

G

ST

IRR

UP

BA

RS

"A

"

BA

RS

"B

"

BA

RS

"C

"

WID

TH

JAM

B

WID

TH

JAM

B

WID

TH

JAM

B

DEPTH

LINTEL

IN 1

2" W

AL

LS

)

(1 E

F)

PE

R C

EL

L

WA

LL

S, T

WO

PE

R C

EL

L I

N 8

"

(ON

E C

EN

TE

RE

D

SID

E,

SE

E N

OT

E 2

"C

" B

AR

S E

AC

H

ON

TH

E D

RA

WIN

GS

.

US

E B

AR

QU

AN

TIT

IES

AN

D S

IZE

S G

IVE

N I

N L

INT

EL

SC

HE

DU

LE

UN

LE

SS

OT

HE

RW

ISE

NO

TE

D

WA

LL

SE

CT

ION

S.

FO

R B

AR

SIZ

ES

, M

AT

CH

TY

PIC

AL

WA

LL

RE

INF

OR

CIN

G A

S S

HO

WN

ON

TH

E B

UIL

DIN

G

SE

E N

OT

E 3

BO

UN

DA

RY

AR

EA

WIT

HIN

SH

AD

ED

GR

OU

T A

LL

CE

LL

S

BO

ND

BE

AM

"B

" B

AR

S I

N

LIN

TE

L B

LO

CK

"A

" B

AR

S I

N

SC

HE

DU

LE

"A

" B

AR

S S

EE

RE

INF

OR

CIN

G

HO

RIZ

ON

TA

L

LIN

TE

L B

OT

TO

M

"A

" B

AR

S

LE

NG

TH

AS

ST

IRR

UP

, S

AM

E

BA

R A

T T

OP

OF

HO

RIZ

ON

TA

L

TY

P W

AL

L

SE

E S

CH

ED

UL

E

AS

RE

QD

ST

IRR

UP

S

SE

E S

CH

ED

UL

E

AS

RE

QD

ST

IRR

UP

S

LE

NG

TH

AS

"A

" B

AR

S

ST

IRR

UP

, S

AM

E

BA

R A

T T

OP

OF

HO

RIZ

ON

TA

L

TY

P W

AL

L

BA

RS

SE

E S

CH

ED

UL

E

RE

INF

OR

CIN

G "

A"

HO

RIZ

ON

TA

L

LIN

TE

L B

OT

TO

M

RE

INF

OR

CIN

G

VE

RT

ICA

L

TY

P C

MU

WA

LL

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 61: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0422-004A.dgn 12/2/2014

1.

2.

3.

4.

5.

6.

STAGGER SPLICES IN ADJACENT HORIZONTAL BARS IN THE SAME COURSE BY 2'-0".

PROVIDE DOW EL BARS IN FOUNDATION TO M ATCH ALL VERTICAL REINFORCING.

FOR ADDED REINFORCING AT W ALL INTERSECTIONS AND CORNERS, SEE

7.FOR HORIZONTAL REINFORCING AT OPENINGS SEE COLUM N AND PIER DETAILS.

8.DO NOT PLACE VERTICAL CONDUIT IN THE SAME CELL AS VERTICAL REINFORCING.

NOTES:

ELEVATION

0422-003

0422-003

0422-001

REINF

VERT

TYP

REINF

HORIZ

TYP

DETAIL

GROUT EACH SIDE OF OPENING AS NOTED IN TYPICAL OPENING REINFORCING

NOTE 2

SEE

LAP ALL OTHER VERTICAL BARS 72 BAR DIAMETERS.

LAP VERTICAL REINFORCING W ITH W ALL DOW ELS 48 BAR DIAMETERS (2'-0" MIN),

SEE NOTE 2

DIA LAP,

48 BAR

FIRST COURSE

HORIZ BAR IN

COLUM N, SEE NOTE 7

W ALL PIER OR

CONCRETE

TOP OF

SEE NOTE 4

DOW ELS,

REINF SEE

OPENING

CM U

NOTE 8

SEE

STRUCTURAL NOTES.

FACILITY. FOR MINIM UM REINFORCING REQUIREMENTS, SEE GENERAL

FOR TYPICAL W ALL REINFORCING, SEE W ALL SECTIONS AND DETAILS FOR EACH

LEVELS

FLOOR

ROOF AND

AT ALL

W ALL AND

TOP OF

BARS AT

HORIZ

2 TYP

SEE NOTE 2

LAP, TYP,

72 BAR DIA

TYP

MIN,

2'-0"

0422-004

NTS

REINFORCED CM U W ALL

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 62: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

NTS

CM U W ALL PIER

0422-005

OP

EN

ING

OP

EN

ING

OP

EN

ING

1/2"

1.

2.

OP

EN

ING

OP

EN

ING

OP

EN

ING

3.

2'-

8" T

O 4

'-0

"

(SE

E N

OT

E 3

)

2'-

8" T

O 4

'-0

"

(SE

E N

OT

E 3

)

WH

ER

E P

IER

S A

RE

CE

NT

ER

ED

BE

LO

W B

EA

M B

EA

RIN

G,

RE

DU

CE

TIE

SP

AC

ING

TO

8".

3'-

4" T

O 6

'-0

"

(SE

E N

OT

E 3

)

3'-

4" T

O 6

'-0

"

(SE

E N

OT

E 3

)

NO

TE

S:

12

" C

MU

WA

LL

CO

RN

ER

PL

AN

CO

RN

ER

PL

AN

8" C

MU

WA

LL

INT

ER

IOR

PL

AN

INT

ER

IOR

PL

AN

0422-0

01

0422-0

03

0422-0

01

0422-0

03

0422-0

03

0422-0

03

0422-0

06

TY

P

PE

R

"C

" B

AR

S

EA

CH

FA

CE

BO

ND

BE

AM

@ 1

6" I

N

#3 T

IES

BE

AM

EA

FA

CE

TIE

S I

N B

ON

D

#3

@1

6"

TYP

CLR

SO

LID

GR

OU

T P

IER

S F

UL

L W

AL

L H

EIG

HT

.

TY

P

PE

R

"C

" B

AR

S

IN B

ON

D B

EA

M

#3@

16" T

IES

TY

P E

A E

ND

OF

PIE

R

"C

" B

AR

S P

ER

TY

P E

A E

ND

OF

PIE

R

"C

" B

AR

S P

ER

S

IM

RE

INF

OR

CIN

G, S

EE

TY

P C

OR

NE

R

WA

LL

PIE

RS

2'-

8" A

ND

LE

SS

, S

EE

WA

LL

CO

LU

MN

DE

TA

IL

FO

R 8

" C

MU

WA

LL

PIE

RS

2'-

0" A

ND

LE

SS

, A

ND

FO

R 1

2" C

MU

HO

OK

90°

HO

OK

90°

VE

RT

ICA

L

TY

P

HO

OK

90°

S

IM

RE

INF

OR

CIN

G, S

EE

TY

PIC

AL

CO

RN

ER

BO

ND

BE

AM

TIE

S I

N

#3

@1

6"

HO

OK

90°

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 63: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2'-

8" O

R L

ES

SO

PE

NIN

G

OP

EN

ING

OP

EN

ING

2'-

8" O

R L

ES

S

1/2"

CLR

2'-

0" O

R L

ES

SO

PE

NIN

G

18

HO

OK

8" C

MU

WA

LL

CO

RN

ER

PL

AN

NO

TE

:

12" C

MU

WA

LL

CO

RN

ER

PL

AN

INT

ER

IOR

PL

AN

INT

ER

IOR

PL

AN

04

22

-00

10422-0

03

0422-0

03

0422-0

01

0422-0

03

NTS

CM U W ALL COLUM N

0422-006

OP

EN

ING

OP

EN

ING

0422-0

03

2'-

0" O

R L

ES

S

1/2

" C

LR

TY

P

TY

P

PE

R

"C

" B

AR

S

BE

AM

BL

OC

K

@ 8

" I

N B

ON

D

#3

TIE

S

BE

ND

S

135°

BE

AM

BL

OC

K

@ 8

" I

N B

ON

D

#3

TIE

S

TY

P

PE

R

"C

" B

AR

S

EN

D O

F C

OL

UM

N

TY

P E

AC

H

"C

" B

AR

S P

ER

S

IM

RE

INF

OR

CIN

G, S

EE

TY

P C

OR

NE

R

S

IM

RE

INF

OR

CIN

G, S

EE

TY

P C

OR

NE

R

BE

ND

S

135°

BE

AM

BL

OC

K

IN B

ON

D

#3@

8"

HO

OK

18

GR

OU

T W

AL

L C

OL

UM

NS

FU

LL

WA

LL

HE

IGH

T.

BE

AM

BL

OC

K

IN B

ON

D

#3@

8"

(4 B

AR

S M

IN I

N C

OL

UM

N)

TY

P E

AC

H E

ND

OF

PIE

R

"C

" B

AR

S P

ER

S

IM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 64: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

Db

21"+

Db = DIAMETER OF BOLT

"LE

" M

IN"L

E"

MIN

NOTE:

CLR

1/2"

NOTED OTHERW ISE

#5x4'-0" MIN UNLESS

CM U

LENGTH "LE"

EMBEDMENT

HORIZONTAL CELLS

SOLID GROUT

NTS

M ASONRY ANCHOR BOLT

0422-046

BOLT

ALL AROUND

1" MIN GROUT

SEE PLANS

ANCHOR BOLT,

MEMBER

SUPPORTED

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 65: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0514-020.dgn 12/2/2014

0514-020

NTS

3

2

1

1.

2.

5"

VARIES2 1/2"

2 3/4"

ALUMINUM

2 1

/2"

2 1

/2"

2 1

/2"

2 1/2"

10 7 1/2"

7-8-9

5-6 1 3"

4

AL 4x4x5/16"

NOTES:

2 1/2" DIMENSION TYPICAL EXCEPT 2" FOR 4" BEAM.

NOTE:

BOLTS AS SPECD

3/4" DIA SST

FL

AN

GE

CO

PE

D B

EA

M

1 1

/4" M

IN @

BEAM W EB

TO ENCLOSED

PROVIDE ADDL BOLT

1 ROW CONN ONLY,

AL 6x4x3/8",

DEPTH, INCHES

NOMINAL BEAM

BOLTS

ROW S OF

OF ANGLE

LENGTH

W EB.

BOLTS TO ENCLOSED

EQUAL TO NUMBER OF

NUMBER OF ROW S IS

ON FRAMING PLANS.

DETAILED OTHERW ISE

SCHEDULE UNLESS

SHALL CONFORM TO

ALL FRAMING CONNECTIONS

TYPICAL BEAM CONNECTION - ALUMINUM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 66: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0514-056.dgn 12/2/2014

0514-056

NTS

BEAM/W ALL CONNECTION - ALUMINUM

2 1/2"3"

4"

TYP

3"

3"3"

4"

TYP

6"

TY

P

3 1/2"

1 1/4"

1 1

/4"

2 1

/2"

2 1

/2"

TY

P

2 1/2"

AL BEAM

BE

AM

DE

PT

HS

7, 8 O

R 9

7" MIN

EMBED

3"3"

6"

3 1/2"

1 1/4"

2 1

/2"

2 1

/2"

TY

P

AL BEAM

TY

P

1 1

/4"

TYP

4"

6"

10

" O

R 1

2"

BE

AM

DE

PT

H

6" MIN

3 1

/2"

6" MIN3 1

/2"

6" MIN

3 1

/2"

EMBED

7" MIN

EMBED

7" MIN

NOTES:

1.2 1/2" DIMENSION TYPICAL EXCEPT 2" FOR 4" BEAMS.

2.

3.

6"

MA

X

DE

PT

H

BE

AM

TURN, AND LOCK W ITH DOUBLE NUT.

SLOTTED HOLES IN BEAM W EB AT ONE END. TIGHTEN NUTS SNUG TIGHT, BACK OFF 1/2

W HERE BOTH ENDS OF BEAM ARE ATTACHED TO A W ALL, PROVIDE LONG HORIZONTALLY

ANCHORS

SST ADHESIVE

W / 4 - 3/4" DIA

SST 4x3 1/2x3/8x0'-8 1/2" LENGTH FOR 4" BEAM)

ANCHORS (0'-2 3/4"

2 - 3/4" DIA SST ADHESIVE

SST 6x4x3/8x0'-3" W /

ANCHORS

SST ADHESIVE

W / 6 - 3/4" DIA

SST 4x3 1/2x3/8x1'-2 1/2"

MIN6"

MIN6"

MIN6"

NO

TE

2

MIN

, S

EE

NO

TE

2

MIN

, S

EE

NO

TE

2

MIN

, S

EE

SLOTTED HOLES IN BEAM W EB)

(PROVIDE SHORT HORIZONTAL

2 - 3/4" DIA SST BOLTS

M AINTAINING SPACING AND EDGE DISTANCE AS SHOW N.

TO CLIP ANGLES AS REQUIRED TO LOW ER ANCHORS TO CLEAR REINFORCING W HILE

INSTALLATION. FIELD LOCATE BEAM REINFORCING PRIOR TO FABRICATION. ADD LENGTH

DO NOT CUT EXISTING CONCRETE BEAM TOP REINFORCING DURING DRILL-IN ANCHOR

NOTE 1

SEE

2 1/2",

W ALL OR BEAM

EXISTING CONCRETE

IN BEAM W EB)

SLOTTED HOLES

SHORT HORIZONTAL

BOLTS (PROVIDE

2 - 3/4" DIA SST

AL BEAM

INSTALLATION

FLANGE FOR BEAM

COPE BOTTOM

W ALL OR BEAM

CONCRETE

EXISTING

ANGLE 3"@ 45°

CLIP BOTTOM OF

ANGLE 3"@ 45°

CLIP BOTTOM OF

INSTALLATION

FLANGE FOR BEAM

COPE BOTTOM

W ALL OR BEAM

EXISTING CONCRETE

IN BEAM W EB)

SHORT HORIZONTAL SLOTTED HOLES

3 - 3/4" DIA SST BOLTS (PROVIDE

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 67: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2

2

1 1

/2"

CL JOIST

1/2"

0558-002

0531-001

CLR

MIN

BETW EEN JOISTS

SUPPORT ANGLE

DECKING LEDGER

0521-002.dgn 12/2/2014

NTS

STEEL JOIST SEAT/EXTERIOR W ALL

0521-002

t

t3

NOTE

SEE

NOTES:

5" FOR 'LH' SERIES JOISTS

2 1/2" FOR 'K' SERIES JOISTS

JOIST SEAT DEPTH VARIES

BEARING W ALL

M ASONRY EXTERIOR

4.

3.

2.

1.

TW O 5/8x6" HEADED ANCHOR STUDS AT 6" GAGE.

FOR SPANS SHORTER THAN 40 FEET, PROVIDE BEARING PLATE 1/2x4x11" W ITH

JOIST. t = FILLET W ELD SIZE.

USE 1/8" W ELD FOR K SERIES JOIST AND 1/4" W ELD FOR LH SERIES

FILL VOID AROUND JOIST W ITH FIRESAFING.

PROVIDE CLOSURE PLATES EACH SIDE OF W ALL BLOCKOUT SIMILAR TO

JOISTS BEFORE COMPLETING W ALL ABOVE.

PROVIDE BLOCKOUT DEPTH AS REQUIRED FOR SETTING JOISTS, 8" MIN, OR SET

NUTS & W ASHERS

2 - 3/4" ANCHOR BOLTS,

PLAN

SECTION

7"

7"

1 1

/2"

TY

P

1 1/4", TYP

MA

X4

"

TY

P

CONTINUOUS

UNITS W / EXTERIOR FACE SHELL

SAW -CUT AND INSTALL M ASONRY

SEE NOTE 4

JOIST BEARING PL 1/2x4x11"

6"

CENTERED ON W ALL

CL JOIST BEARING

ELEVATION, SEE PLANS

TOP OF STEEL

DEPTH, NOTE 1

BLOCKOUT

ELEVATION

JOIST BEARING

W / 2 - #5 BELOW BEAM SEAT

8" BOND BEAM CONTINUOUS

STEEL DECKING

REQD TO CLR

CORNER AS

NOTCH

STEEL JOISTS

HOLE, TYP

SHORT SLOTTED

CLOSURE NOTE 2

BLOCKOUT

2"2"

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 68: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0521-023

TYP

NOTED

ASNOTED

AS

METAL DECKING

0521-022.dgn 12/2/2014

NTS

TYPICAL K JOIST BRIDGING

0521-022

M ASONRY W ALL

CONCRETE OR

DECKING LEDGER

0531-001

, TYP

CONNECTION

SEE PLANS

SIZE & SPACING,

STEEL JOIST, FOR

CONNECTION

TO JOIST

BRIDGING

MFR STD

SPECS, TYP

STEEL JOIST INSTITUTE

BRIDGING PER

HORIZONTAL JOIST

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 69: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

4"

1/2" CLR

1/2" CLR

0521-023.dgn 12/2/2014

NTS

0521-023

JOIST BRIDGING/W ALL CONNECTION

JOIST BRIDGING

JOIST BRIDGING

3/16

3/16 1

1

ANCHORS

OR ADHESIVE

3/4" ANCHOR BOLT

L4x3x3/8x0'-3"

BRIDGING CONNECTION - OPTION 1

SECTION

SECTION

BRIDGING CONNECTION - OPTION 2

4"

1 1/4"

L4x3x3/8x0'-3"

1/2" M ACHINE BOLT

ANCHOR

BOLT OR ADHESIVE

3/4" ANCHOR

NOTES:

2.

1.

M ASONRY W ALL

CONCRETE OR

M ASONRY W ALL

CONCRETE OR

OR COMBINED CONNECTION CAN BE USED.

OPTION 1 OR 2 CAN BE USED FOR TOP OR BOTTOM BRIDGING CONNECTIONS,

M ANUFACTURER REQUIREMENTS

MINIM UM BRIDGING CONNECTION SHOW N. COORDINATE W ITH JOIST

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 70: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

STEEL DECKING

1 3

/4"

2 1

/2"

1 1

/2"

1/2" CLR

1/2" CLR

DECKING AT ANGLE TO W ALL

DECKING NORM AL TO W ALL

STEEL DECKING

3"

NOTED

W ELD AS

AT 2'-0" ON CENTER

W ITH 5/8" ANCHOR BOLTS

L 3x3x1/4" x CONTINUOUS

M ASONRY W ALL

NOTED

W ELD AS

SEE PLANS

ROOF SLOPE,

PLANS

TST EL, SEE

W ORK POINT

SEE PLANS

TST EL,

THROUGH ALL CONTROL JOINTS

BAR, CONTINUOUS, INCLUDING

2 - TYPICAL HORIZONTAL

(BEND PLATE TO M ATCH SLOPE)

ANCHOR BOLTS @ 2'-0" OC

BENT PL 1/4 x CONT W / 5/8"

0531-001.dgn 12/2/2014

NTS

DECKING LEDGER SUPPORT ANGLE

0531-001

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 71: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

CL W ALL

NOTE:

STEEL DECKING

FIRE SAFING

CL

R

2"

MFR, TYP EA SIDE OF W ALL

CLOSURE STRIP BY DECKING

CONTINUOUS NEOPRENE

SCREW S @ 6" OC, TYP

#10 SST SELF TAPPING

DECKING SPAN IS PARALLEL TO W ALL.

NEOPRENE CLOSURE STRIPS NOT REQUIRED W HERE

EA SIDE OF W ALL, LLV

STEEL, BENT PLATE TYP

CONTINUOUS GALV

L5x3x20 GAGE x

0531-016.dgn 12/2/2014

NTS

METAL DECK/NON-BEARING W ALL CLOSURE PLATE

0531-016

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 72: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

OPENING LENGTH

CL

OS

UR

E

CL

OS

UR

E

6'-

0"

< W

2.

L 4

x3x1/4

(L

LV

)

SUPPORT

SUPPORT

"W

"

3/1

6

3/1

6

"L"

WA

LL

, T

YP

TY

P3

/16

3/1

6

1.

NO

TE

S:

OP

EN

ING

CL

OS

UR

E

L 3

x3

x1

/4

NA

2'-

0" <

W <

4'-

0"

4'-

0" <

W <

6'-

0"

7'-

6" <

L

L 5

x3x1/4

(L

LV

)

SU

PP

OR

T

NA

6'-

0" <

L <

7'-

6"

DE

CK

SP

AN

L 4

x3x1/4

(L

LV

)L

< 6

'-0"

METAL DECK SPAN

"W

""W

""W

"

OP

EN

ING

S 1

'-0

" T

O 2

'-0

"

3/1

6

WA

LL

SU

PP

OR

T

PL

AN

OP

EN

ING

S 2

'-1

" T

O 6

'-0

"

PL

AN

SE

CT

ION

@ 5

" G

A,

, S

IM

DIA

CO

NC

AN

CH

OR

S

LO

NG

W/

2 -

5/8

"

L 5

x3

x1

/4x

0'-

8"

0531-0

01

0531-0

02

0531-0

01

JO

IST

OR

BE

AM

SU

PP

OR

T

FR

AM

ING

CO

NN

EC

TIO

NS

NTS

ROOF DECK OPENING0531-021

DECK

SPAN

TY

P

L2

x2

x3

/16

",

TY

P

24" M

AX

12" T

O

DE

CK

ME

TA

L R

OO

F

TY

P

L2

x2

x3

/16

",

JO

IST

OR

BE

AM

OF

ME

TA

L

TO

P C

HO

RD

2 1/2"

WID

TH

OP

EN

ING

O

R

DE

CK

/WA

LL

CO

NN

,

SE

E S

CH

ED

SU

PP

OR

T A

NG

LE

,

RE

INF

OR

CE

ME

NT

.

RE

FE

R T

O S

PE

CIF

ICA

TIO

NS

FO

R S

MA

LL

ER

DE

CK

OP

EN

ING

PIE

CE

S F

OR

EQ

UA

L A

TT

AC

HM

EN

TS

.

FA

LL

AT

SU

PP

OR

TS

PA

RA

LL

EL

TO

DE

CK

SP

AN

, P

RO

VID

E F

ILL

ER

SP

AN

@ 6

" O

N C

EN

TE

R. W

HE

RE

VA

LL

EY

OF

DE

CK

ING

DO

ES

NO

T

DE

CK

ING

. A

TT

AC

H M

ET

AL

DE

CK

ING

TO

SU

PP

OR

TS

PA

RA

LL

EL

TO

DE

CK

ING

SP

AN

WIT

H S

PE

CIF

IED

FA

ST

EN

ER

S A

T E

AC

H V

AL

LE

Y O

F

AT

TA

CH

ME

TA

L D

EC

KIN

G T

O A

LL

SU

PP

OR

TS

PE

RP

EN

DIC

UL

AR

TO

CO

NN

EC

TIO

N

SU

PP

OR

T

SE

E W

AL

L

OR

BE

AM

JO

IST

CL

ME

TA

L

CO

NN

EC

TIO

N

BE

AM

SU

PP

OR

T

SE

E J

OIS

T O

R

EN

D

TY

P E

A

SE

E S

CH

ED

AN

GL

E,

SU

PP

OR

T

SE

E N

OT

E 1

DE

CK

ING

AT

TA

CH

ME

NT

,

AS

RE

QD

CO

PE

AN

GL

E

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 73: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3/1

6

G

11"

3/1

6

G

MIN 6"6"

MIN

3"

3"

11"

LA

ND

ING

11"

LA

ND

ING

1"TYP

1"TYP

4"

6 1

/2"

6"

3/1

63/1

6

NO

TE

S:

1.

2.

3.

ST

AIR

HA

ND

RA

IL N

OT

SH

OW

N.

4.

5.

3"

GR

AT

ING

11"

3"

3"

1"+/-

6.

AL

L F

AS

TE

NE

RS

SH

AL

L B

E S

TA

INL

ES

S S

TE

EL

.

7.

2 1

/2"

4 1/2"

EX

CE

PT

AS

NO

TE

D

DETAIL 1 OF 2

SL

OT

TE

D H

OL

ES

W/

11/1

6x2 1

/2"

3/8

" A

L B

OT

PL

AT

E

GR

AT

ING

W/

T.O

.

TR

EA

D F

LU

SH

INS

TA

LL

FIR

ST

CO

NN

S

IM

2 -

RO

W B

EA

M/W

AL

L

FA

CE

AN

GL

E N

EA

R

SIN

GL

E A

L

SE

E P

LA

NS

CO

NC

BE

AM

,

PR

IOR

TO

FA

BR

ICA

TIO

N.

FIE

LD

VE

RIF

Y D

IME

NS

ION

S A

ND

EL

EV

AT

ION

S

CO

NC

AN

CH

OR

S

2 -

5/8

" D

IA S

ST

DE

TA

IL

RIS

ER

PL

AT

E

SE

E P

AR

TIA

L

SE

E P

LA

NS

ME

TA

L B

EA

M,

05

14

-02

00

51

4-0

56

12/2/20140551-001A.dgn

NTS

0551-001

STAIR DETAILS - ALUMINUM

TY

P

1" O

VE

RL

AP

,

TO

P C

ON

NE

CT

ION

- A

LU

MIN

UM

TO

P C

ON

NE

CT

ION

- C

ON

CR

ET

E

PL

AN

SE

CT

ION

BO

TT

OM

CO

NN

EC

TIO

N

LA

ND

ING

CO

NN

EC

TIO

N -

AL

UM

INU

ML

AN

DIN

G C

ON

NE

CT

ION

- C

ON

CR

ET

E

TY

P

1" O

VE

RL

AP

,

SL

OT

TE

D H

OL

ES

W/

11/1

6x2 1

/2"

3/8

" A

L B

OT

PL

AT

EE

XC

EP

T A

S N

OT

ED

SIM

CO

NN

2 -

RO

W B

OL

TE

D

TY

P

SE

E D

WG

S,

RIS

ER

S,

UN

IFO

RM

GS

-2, S

IM

GR

OU

T

NO

N-S

HR

INK

IN S

TR

ING

ER

SL

OT

TE

D H

OL

ES

HO

RIZ

ON

TA

LL

Y

SH

OR

T

W/

T.O

. C

ON

C

TR

EA

D F

LU

SH

INS

TA

LL

FIR

ST

NO

TE

7,

TY

P

PL

AT

E D

ET

AIL

.

HA

ND

RA

IL E

XT

EN

D R

ISE

R P

LA

TE

PE

R F

UL

L R

ISE

R

TR

EA

D T

O B

E 3

3/4

" M

AX

. F

OR

ST

AIR

S W

ITH

PIC

KE

T

BE

TW

EE

N T

OP

OF

RIS

ER

PL

AT

E A

ND

BO

TT

OM

OF

DE

TA

IL U

NL

ES

S N

OT

ED

OT

HE

RW

ISE

. C

LE

AR

AN

CE

FO

R R

ISE

R P

LA

TE

SE

E P

AR

TIA

L R

ISE

R P

LA

TE

3"

4"

1 1/2"2"

6" 3" 6"

4 1/2"

ST

RIN

GE

R

ST

AIR

TY

P

SE

AL

TY

P

SE

AL

TY

P

TR

EA

D,

SE

E P

LA

NS

WID

TH

SE

E P

LA

NS

WID

TH

TY

P

SE

E D

WG

S,

RIS

ER

S,

UN

IFO

RM

ST

AIR

SL

OP

E

VA

RIE

S W

/

ME

TA

LS

AN

D C

ON

CR

ET

E A

S S

PE

CIF

IED

.

PR

OV

IDE

PR

OT

EC

TIO

N F

OR

DIS

SIM

ILA

R

GS

-2, S

IM

PL

AT

FO

RM

ED

GE

OF

W/

T.O

. C

ON

C

TR

EA

D F

LU

SH

INS

TA

LL

FIR

ST

CO

NC

AN

CH

OR

2 -

3/4

" D

IA

TY

P

TR

EA

D,

TY

P

TR

EA

D,

TY

P

TR

EA

DS

,

GR

AT

ING

TY

P

TR

EA

DS

,

GR

AT

ING

BO

LT

ED

TR

EA

DS

AN

D H

AN

DR

AIL

CO

NN

EC

TIO

NS

.

ST

AIR

MA

NU

FA

CT

UR

ER

TO

CO

OR

DIN

AT

E

OT

HE

RW

ISE

NO

TE

D O

N P

LA

NS

.

ST

RIN

GE

RS

TY

PIC

AL

EX

CE

PT

WH

ER

E

AM

ER

ICA

N S

TA

ND

AR

D C

12

x7

.41

AL

UM

INU

M

VA

RIE

S

PL

3/8

x3

x

EN

D A

L

NE

AR

FA

CE

SIN

GL

E A

L A

NG

LE

TY

P

TR

EA

D,

W/

T.O

. G

RA

TIN

G

TR

EA

D F

LU

SH

INS

TA

LL

FIR

ST

SH

OW

N S

EE

BE

LO

W.

FO

R N

OT

ES

NO

T

NO

TE

:

SH

OW

N S

EE

BE

LO

W.

FO

R N

OT

ES

NO

T

NO

TE

:

IN S

TR

ING

ER

SL

OT

TE

D H

OL

ES

HO

RIZ

ON

TA

LL

Y

SH

OR

T

NO

TE

7,

TY

P

NO

SIN

G,

TY

P

PL

AT

FO

RM

ED

GE

OF

TY

P

SE

E D

WG

S,

RIS

ER

S,

UN

IFO

RM

ST

RIN

GE

R

ST

AIR

NO

TE

7,

TY

P

NO

SIN

G,

TY

P

6"

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 74: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

2'-3" OR LESS

2'-9" OR LESS

3'-3" OR LESS

4'-7" OR LESS

1" x 3/16"

1 1/4" x 3/16"

1 1/2" x 3/16"

1 3/4" x 3/16"

TREAD BEARING BARS

DETAIL 2 OF 2

NOTED ON PLANS

STAIR TREADS

PLAN

PARTIAL RISER PLATE

FULL RISER PLATE

BOTTOM CLOSURE PLATE

STRINGER

OTHERW ISE

3'-0" UNLESS

W ALL UNO

CLR FROM

6" OC

IN 1/4" DIA HOLE AT

TEK SCREW , 1" LONG

SST SELF-TAPPING

MA

X

6" OC

IN 1/4" DIA HOLE AT

TEK SCREW , 1" LONG

SST SELF-TAPPING

M OUNTING PL

AND STRINGER

CLEAR GROUT

BENT PL TO

COPE 3/16"

MA

X

3/16" AL BENT PL

3/16" AL BENT PL

SEE NOTE 7

8" GAGE AL PLATE

MA

X

MA

X

NOTED ON PLANS

OTHERW ISE

1'-0" MIN UNLESS

12/2/20140551-001B.dgn

NTS

0551-001

STAIR DETAILS - ALUMINUM

SEE NOTE 7

RISER PLATE

TREAD

GRATING

2" 1 1/2"

1/4

"

1/2"

3 3

/4"

3 3

/4"

1/8

"

6"

STAIR SLOPE

VARIES W /

W IDTH

STAIRW AY

TREAD

ALUMINUM

END M AX 12" OC

6" FROM EACH

CONC ANCHORS,

5/8" DIA SST

EACH END M AX 12" OC

ANCHORS, 6" FROM

5/8" DIA SST CONC

3/16" AL BENT PL

11" GAGE AL PLATE

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 75: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0551-002NTS

STAIR LANDING W ITH SUPPORTS - ALUMINUM

TYP

VARIESSTAIR W IDTH3 1/2"

3/16

3"

VARIES

RIS

ER

4"

TYP

TYPE B

3/16

STRINGERSTYPE A

STRINGERS

NOTES:

1.

2.

AL GRATING

AL GRATING

1"

1"

AL I 4x2.64

0553-001

0551-001

0514-020

0551-001

0551-001

0553-001

PLANS

SEE

ONE SIDE

CONN,

BOLTED

W / STD

BEYOND

STRINGERS

STAIR

DW

GS

SE

E

TYP

RUN

OR AS SHOW N ON PLANS

EQUALS STAIR W IDTH

GROUT

1"+/- NON-SHRINK

TREADS

SIM TO

NOSING

GROUT

1"+/- NON-SHRINK

DETAIL

TOP CONN

CONN SIM TO

CONC W ALL

STRINGER TO

DISSIMILAR METALS AND CONCRETE

PROVIDE PROTECTION FOR

W / 4 - 5/8" SST BOLTS

0'-2 1/2" EA SIDE

AL L 6x3 1/2x1/4x

ANCHORS

W / 2 - 5/8" CONC

AL PL 1/2x4x8 BASE

EA END OF BEAM

PIPE COLUM N,

2" SCHED 40 AL

GRATING SUPPORT

AL L3x3x1/4

STRINGERS

@ 1'-0" OC TO

5/8" SST BOLTS

ANCHORS

W / 2 - 5/8" CONC

AL PL 1/2x4x8 BASE

FOR LOCATION SEE PLANS

2" SCHED 40 AL PIPE COLUM N,

SUPPORT

AL L2x2x1/4 GRATING

STRINGERS, 2 MIN

@ 1'-0" TO

5/8" SST BOLTS

1'-0" OC

ANCHORS @

5/8" CONC

AL L3x3x1/4 W /

STAIR RAILING NOT SHOW N.

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 76: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1'-

3"

9"

1'-1 1/2"

1'-1 1/2"

3'-

6" R

AIL

ING

2" 2"

TYP

END OF RAIL

NOTES:

1.

2.

4"

3/16

3/4"

3/8"

FASTEN RAIL TO W ALL FLANGE PER M ANUFACTURER'S RECOM MENDATIONS.

3.

W ALL FLANGE TO BE M OUNTED TO W ALL W ITH (2) 3/8" DIA SST W EDGE ANCHORS.

1'-

0", T

YP

MIN

, T

YP

DETAIL 1 OF 4

SEE SPECS

W ALL FLANGE,

W ASHER

NYLON

1/8" THICK

THREAD

W ITH 1/2"

1 1/4" STUD

3/8" DIA x

MA

X

1/4

"T

YP

4"

POST, TYP

CL CONCRETE

EDGE OF

BOARD

TOE

@ 6'-0" M AX

EQUAL SPACES

SEE PLANS

FOR W IDTH

M AX

6'-0"

TY

P

CL

PO

ST

,

SPECIFIED. ANODIZE FINISH AFTER ALL W ELDING AS SPECIFIED.

AT CONTRACTOR'S OPTION FABRICATE HINGES OR PROVIDE OTHER HINGES AS

0552-001B.dgn 12/2/2014

AS SPECIFIED

GATE SYSTEM

POST BEYOND

AS SPECIFIED

RAILING SYSTEM

SEE DETAIL BELOW

RAIL TERMINAL, TYP,

THE PLANS, SEE DETAILS

W HEN INDICATED ON

CONC RAILING CURB

6" HIGH x 10" W IDESEE DW GS

ANCHORAGE,

FOR TYPE OF

ELEVATION

HINGE

PLAN

ELEVATION

RAIL TERMINAL

PLAN

PL 3/8x2

3'-

0" R

AIL

ING

US

E W

ITH

6" C

UR

B

SPECIFIED

TYP AS

TOE BOARD,

6"

0552-001

NTS

RAILING - 3 RAIL - ALUMINUM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 77: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DETAIL 2 OF 4

0552-001G.dgn 12/2/2014

CLR

RAILING DETAIL W ITHOUT LANDING

CL

RBRACKET

1'-

1 1

/2"

RAILING SECTION

1.

2.

4"

1'-0"

EQUAL SPACING

1 1/2"

1 1

/2"

HANDRAIL

1'-1 1/2"

HANDRAIL

PROVIDE TOE BOARD AT LANDING W HERE REQUIRED.

CONC STAIRS SIM

METAL STRINGER SHOW N,

MIN

5'-0" M AX

SEE DETAIL BELOW

W HERE NO LANDING REQD

OF INTERMEDIATE LANDING,

LOCATE POST AT EACH END

ANCHORAGE DETAIL

SEE RAILING POST

AS SPECIFIED

SYSTEM

RAILING

3'-

0"

3'-

0"

RETURN ENDS OF HANDRAIL TO GUARD AT BOTH ENDS.

SYSTEM

RAILING

GUARD

HANDRAIL SEE NOTE 2

FOR RETURN AT

MIN

1'-0" EXTENSION

11"

3'-

6" M

IN

3'-

6" M

IN

6"

0552-001

NTS

RAILING W / EXTENSION - 3 RAIL STAIR - ALUMINUM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 78: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

6 1/4"

3 1

/2"

PROVIDE PROTECTION FOR DISSIMILAR METALS AND CONCRETE PER SPECIFICATIONS.

DETAIL 3 OF 4

MIN

8"

MIN5"

SPECIFIED

ANCHORS AS

4 - SST CONC

0552-001XA.dgn 12/2/2014

NOT BE PERMITTED

OTHER REASON W ILL

POST ALIGNMENT OR ANY

GROUT, ETC FOR RAILING

THE USE OF SHIMS, W EDGES,

SIT SOLIDLY ON CONCRETE.

THE BASEPLATE SHALL

BASE AS SPECIFIED

TOP M OUNTED POST

FIELD CUT TO FIT

ALUMINUM RAILING POST,

PLAN

ELEVATION

TYPE "A"

NOTE:

NTS

0552-001

RAILING POST ANCHORAGE TYPE A - ALUMINUM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 79: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

PROVIDE PROTECTION FOR DISSIMILAR METALS AND CONCRETE PER SPECIFICATIONS.

DETAIL 4 OF 4

0552-001XD.dgn 12/2/2014

BEAM

STRINGER

STAIR

SIDE, TYP

STAIRW AY OR PLATFORM

BOLT HEADS AT

AS SPECIFIED

SST BOLTS,

RAILING POST

ALUMINUM

AS SPECIFIED

POST BRACKET

SIDE M OUNTED

PLAN

ELEVATION

TYPE "D"

NOTE:

0552-001

NTS

RAILING POST ANCHORAGE TYPE D - ALUMINUM

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 80: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0553-001

3.

4.

5.

6.

7.

GRATING THICKNESS TABLE

3'-6"

4'-0"

4'-6"

5'-0"

5'-6"

6'-0"

6'-6"

2"

1"

1"

1"

11.

10.

8.

M AXIM UM

SPAN

ALUMINUMSTEEL

1 1/4"

1 1/2"

1 3/4"

1 3/4"

2 1/4"

2 1/4"

1 1/4"

1 1/4"

1 1/2"

1 1/2"

7'-0" 2 1/2"1 3/4"

GRATING SPAN SEE PLAN.

4"

EQPT

OPNG

GRATING

GENERAL NOTES:

12.

ALTHOUGH BOTH M AY NOT BE INCLUDED IN PROJECT.

AS SPECIFIED. THIS STANDARD DETAIL INCLUDES 2 TYPES,

TYPE OF M ATERIAL USED SHALL BE AS SHOW N ON PLANS OR

GRATING THICKNESS

AS REQD FOR

VERTICAL LEG

TRIM 1/4" THICK

BANDING BAR

@ 1'-6" CENTERS

3/8"x6" ANCHORS

GREATER THAN 1/2" AND AS SPECIFIED.

GRATING SUPPORTS SHALL NOT BE LESS THAN 1/4" NOR

THE HORIZONTAL CLEARANCE BETW EEN THE GRATING AND

NTS

LIGHT DUTY GRATING

GS-2 - ONE SIDED

BAND ALL EDGES. M ATCH DEPTH OF BEARING BAR.

2.

1.

1/4"

SEE NOTE 12

DIMENSION,

MIN BEARING

GS-1

EQUIPMENT OPENINGS

GS-3

GS-2 - TW O SIDED

DIMENSION, SEE NOTE 12

MIN BEARING

THICKNESS

GRATING

THICKNESS

GRATING

EMBEDMENT

CENTERS, 6" MIN

ANCHORS @ 1'-6"

5/8"x6" CONC

THICKNESS

GRATING

THICKNESS

GRATING

ENDED SUPPORTS, TYP

1/4" PL W ELDED AT OPEN

BEARING BAR

AND CLAMP AS SPECIFIED

W ELDED THREADED STUD

EMBEDDED ANGLE W ITH

ATTACH GRATING TO

DIMENSION, SEE NOTE 12

MIN BEARING

CONDITIONS, SEE PLAN

FOR SIZE AND END

SUPPORTING BEAM,

CONDITIONS, SEE PLAN

FOR SIZE AND END

SUPPORTING BEAM,

GRATING

BEARING BAR

CLAMP AS SPECIFIED

TO BEAM W ITH

ATTACH GRATING

CLAMP AS SPECIFIED

TO BEAM W ITH

ATTACH GRATING

BEAM FLANGE

TO FAR SIDE OF

EXTEND GRATING

GRATING

BEARING BAR

GRATING

W ITH CLAMP AS SPECIFIED

ATTACH GRATING TO ANGLE

L 3"x3"x1/4"

BEARING BAR

GRATING

APPLICABLE GRATING TYPE.

SHALL BE AS TABULATED IN "GRATING THICKNESS TABLE" FOR

UNLESS NOTED OTHERW ISE ON PLANS, GRATING THICKNESS

9.

TO GRATING

OPENINGS, W ELD

STOP ALL AROUND

1/4" BAR TOE

HYDROPHILIC/GROOVE W ATERSTOP

NOT USED

(100 PSF)

INDICATED OTHERW ISE.

W IDTH OR W EIGH M ORE THAN 150 POUNDS, UNLESS

INDIVIDUAL GRATING SECTIONS SHALL NOT EXCEED 3'-0" IN

SUBMITTED TO THE ENGINEER PRIOR TO FABRICATION.

SHOP DRAW INGS BASED ON FIELD DIMENSIONS SHALL BE

THICKNESSES SHOW N IN TABLES BY 1/4".

FOR SERRATED BEARING BARS, INCREASE GRATING

STEEL.

TO BE EMBEDDED IN CONCRETE SHALL BE TYPE 316 STAINLESS

TO BE SAME AS GRATING, EXCEPT METAL SUPPORTS THAT ARE

M ATERIAL FOR SUPPORTS OF STEEL AND ALUMINUM GRATING

BARS.

SEE SPECIFICATIONS FOR SPACING OF BEARING AND CROSS

BEARING BAR THICKNESS FOR GRATING TO BE 3/16" MINIM UM.

GRATING DEPTH GREATER THAN 2 1/4"

DEPTH 2 1/4" OR LESS, MIN BEARING HORIZONTAL = 2" FOR

MINIM UM BEARING HORIZONTAL DIMENSION = 1" FOR GRATING

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 81: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

ST

IFF

EN

ER

SP

AC

ING

, S

EE

TA

BL

E

TA

BL

E

5'-

0"

4'-

0"

NO

TE

S:

TY

P2

-6

ED

GE

OF

OP

EN

ING

PLATE

3/8"

3/1

6

L2x1 1

/2x1/4

'W' C

OV

ER

PL

AT

E W

IDT

H

1'-

6"

1'-

3"

1'-

6"

1'-

6"

3'-

0"

2'-

6"

2'-

6"

2'-

0"

1'-

3"

1'-

6"

1'-

3"

1'-

3"

1'-

0"

L<

2'-

6"

2'-

6"<

L<

3'-

6"

3'-

6"<

L<

4'-

0"

4'-

0"<

L<

4'-

6"

4'-

6"<

L<

5'-

0"

5'-

0"<

L<

5'-

6"

5'-

6"<

L<

6'-

0"

6'-

0"<

L<

6'-

6"

6'-

6"<

L<

7'-

0"

7'-

0"<

L<

7'-

6"

NO

NE

L2

1/2

x1

1/2

x1

/4

L2

1/2

x1

1/2

x1

/4

L3x2x1/4

L3x2x1/4

L3

1/2

x2

1/2

x1

/4

L3

1/2

x2

1/2

x1

/4

L4x3x1/4

L4x3x1/4

-

4'-

0"

4'-

0"

4'-

0"

3'-

0"

12" M

AX

6"

MA

X

1 3

/8"

7/8

"1/4

1/2

"

TY

P

3"

1"

1 1/2"1 1/2"

3/1

6

TY

P

1"

CO

VE

R P

LA

TE

CO

VE

R P

LA

TE

NO

TE

:

3/1

6

2 5/8"

3/4

" D

IA x

2 5

/8" R

OD

CO

VE

R P

LA

TE

EQL EQL

CO

VE

R S

TIF

FE

NE

RS

LIF

TIN

G E

YE

TY

PE

"A

"

PL

AN

SE

CT

ION

LIF

TIN

G E

YE

TY

PE

"B

"

NO

TE

:

TH

IS D

ET

AIL

AP

PL

IES

AT

TY

PE

"C

"

CO

VE

RS

AN

D O

TH

ER

AIR

TIG

HT

CO

VE

RS

.

ED

GE

PL

AT

E D

ET

AIL

12/2/20140554-001.dgn

NTS

CHECKERED FLOOR PLATE - ALUMINUM

0554-001

TY

P

SE

E P

LA

N

ST

EE

L F

LA

T B

AR

ST

IFF

EN

ER

S

WH

ER

E R

EQ

D,

SE

E D

ET

AIL

AN

D T

AB

LE

ST

EE

L A

NC

HO

RS

AT

18"

CE

NT

ER

S H

OO

K 2

" A

S S

HO

WN

1/2

" M

AX

1/4

" M

AX

3/1

63

/8" D

IA x

6" S

TA

INL

ES

S

ST

AIN

LE

SS

ST

EE

L L

2x2x1/4

"

TY

P

SE

E P

LA

N

1/4

" M

AX

1/2

" 3/4

"

7/8

"

1/2

" M

AX

3/1

6

TY

P

SE

E P

LA

N

OP

EN

ING

SP

AN

,

7/8

"1

/2" 3/4

"

1/4

" M

AX

1/2

" M

AX

3/1

63/8

" D

IA x

6" S

TA

INL

ES

S

ST

EE

L A

NC

HO

RS

AT

18"

1/2

"x3/4

"

ST

AIN

LE

SS

ST

EE

L B

AR

1/4

" S

TA

INL

ES

S

ST

EE

L F

LA

T H

EA

D

SC

RE

WS

WIT

H 2

SQ

NU

TS

WE

LD

TO

L

AT

12" C

TR

S A

LL

AR

OU

ND

1/8

" T

HIC

K x

1 1

/2" C

ON

T

NO

TE

:

TH

IS D

ET

AIL

AP

PL

IES

AT

OP

EN

ING

S T

HA

T R

EQ

UIR

E

AIR

TIG

HT

CO

VE

RS

.

1 3

/8"

3/8

"x

3/4

" S

TA

INL

ES

S

3/1

6

OP

EN

ING

SP

AN

OP

EN

ING

SP

AN

CO

VE

R T

YP

E "

A"

CO

VE

R T

YP

E "

B"

CO

VE

R T

YP

E "

C"

EA

CO

RN

ER

TO

L, O

NE

AT

NU

TS

WE

LD

WIT

H 2

SQ

HE

AD

SC

RE

WS

ST

EE

L F

LA

T

1/4

" S

TA

INL

ES

S

BA

R

ST

EE

L F

LA

T

ST

AIN

LE

SS

3/8

"x

3/4

"

WE

LD

SE

AL

AN

D O

TH

ER

CO

VE

RS

NO

T I

NT

EN

DE

D T

O B

E A

IRT

IGH

T.

TH

IS D

ET

AIL

IS

AP

PL

ICA

BL

E T

O T

YP

ES

"A

" A

ND

"B

" C

OV

ER

S

NO

TE

:

AB

OU

T C

L

SY

MM

ET

RIC

AL

TY

PE

DE

TA

ILS

VA

RIE

S, S

EE

CO

VE

R

PL

CO

VE

R

CH

EC

KE

RE

D

MA

X

1/4

"

LE

NG

TH

'L

'

OP

EN

ING

SP

AN

SP

AC

ING

ST

IFF

EN

ER

MA

X

SIZ

E

ST

IFF

EN

ER

WID

TH

'W

'

MA

X P

LA

TE

SP

G O

R

ST

IFF

EN

ER

2/3

SP

G O

R

ST

IFF

EN

ER

1/3

WE

LD

SE

AL

CO

VE

R P

L

TY

PE

"C

"

2 1

/4" L

ON

G

TU

BE

3x

3x

0.1

88

PL

AT

E

UN

DE

R C

OV

ER

TU

BE

3x3

CO

RN

ER

S O

N T

UB

E

MA

TC

H R

AD

IUS

OF

CO

RN

ER

S T

O

PL

AT

E, G

RIN

D

1/4

x3

x3

SL

OT

TE

D H

OL

E

CL

OF

1"x2 5

/8"

NE

OP

RE

NE

GA

SK

ET

1/8

" T

HIC

K x

1 1

/2" C

ON

T

ST

AIN

LE

SS

ST

EE

L S

CR

EW

S

DR

ILL

& T

AP

FO

R 1

/4"

SU

PP

OR

T A

NG

LE

EA

EN

D,

1/4

" F

RO

M F

AC

E O

F

AL

PL

3/8

x3

" x

CO

NT

, S

TO

P

PL

1/8

x1

1/4

"x

CO

NT

AL

SP

AC

ER

1/4

"

4" L

ON

G R

OD

3/4

" D

IA x

LO

NG

RO

D

3/4

" D

IA x

2 5

/8"

LIF

TIN

G E

YE

DE

TA

ILS

.

AL

L C

OV

ER

PL

AT

ES

TO

HA

VE

A M

INIM

UM

OF

TW

O E

YE

S A

S S

HO

WN

IN

CO

VE

R P

LA

TE

S A

ND

ST

IFF

EN

ER

S A

RE

AL

UM

INU

M P

LA

TE

S A

ND

AN

GL

ES

.

MA

XIM

UM

WE

IGH

T O

F C

OV

ER

PL

AT

E T

O B

E 1

25 P

OU

ND

S.

MA

XIM

UM

AL

LO

WA

BL

E U

NIF

OR

M D

ES

IGN

LO

AD

= 3

00psf

.

OT

HE

RW

ISE

ON

PL

AN

S.

SH

AL

L B

E S

HO

RT

DIM

EN

SIO

N O

F O

PE

NIN

G U

NL

ES

S N

OT

ED

SP

AN

DIR

EC

TIO

N O

F P

LA

TE

TO

BE

PA

RA

LL

EL

TO

ST

IFF

EN

ER

S,

AN

D

ST

IFF

EN

ER

S T

O B

E P

LA

CE

D L

ON

G L

EG

VE

RT

ICA

L.

6.

5.

4.

3.

2.

1.

CO

VE

RS

AN

D O

TH

ER

AIR

TIG

HT

CO

VE

RS

.

TH

E D

ET

AIL

IS

AP

PL

ICA

BL

E T

O T

YP

E "

C"

SE

E D

ET

AIL

CO

VE

RS

,

TY

PE

'C

'

ED

GE

PL

FO

R

12

" C

EN

TE

RS

FL

AT

HE

AD

SC

RE

WS

@

1/4

" S

TA

INL

ES

S S

TE

EL

SE

E P

LA

N

OT

HE

RW

ISE

,

NO

TE

D

3/8

" U

NL

ES

S

AN

D T

AB

LE

SE

E D

ET

AIL

WH

ER

E R

EQ

D,

ST

IFF

EN

ER

S

ST

EE

L L

2x

2x

1/4

"

ST

AIN

LE

SS

CE

NT

ER

S H

OO

K 2

" A

S S

HO

WN

ST

EE

L A

NC

HO

RS

AT

18"

3/8

" D

IA x

6" S

TA

INL

ES

S

SE

E P

LA

N

OT

HE

RW

ISE

,

NO

TE

D

3/8

" U

NL

ES

S

SE

E P

LA

N

OT

HE

RW

ISE

,

NO

TE

D

3/8

" U

NL

ES

S

AN

D T

AB

LE

SE

E D

ET

AIL

WH

ER

E R

EQ

D,

ST

IFF

EN

ER

S

NE

OP

RE

NE

GA

SK

ET

ST

AIN

LE

SS

ST

EE

L L

2x2x1/4

"

CE

NT

ER

S H

OO

K 2

" A

S S

HO

WN

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 82: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0558-002.dgn 12/2/2014

0558-002

NTS

BEAM SEAT CLOSURE PLATE

1"

3"

&

NOTE:

CONTINUOUS

BEAM W HERE W ALL IS

CLOSE OPENING ABOVE

EXTEND PLATES TO

0512-066 0512-067

& BOT

SIDES

TYP

0512-067

GAP AROUND BEAM

PLATE W / M AX 3/16"

FABRICATE CLOSURE

TOP OF W ALL

LEDGER ANGLE.

FOR DETAIL CLOSURES, LOCATE ANCHORS SO THEY DO NOT CONFLICT W ITH

SE

E N

OT

E

4"

SEE

BEAM SEAT,

BLOCKOUT FOR

EDGE OF

AT 6" M AX SPACING

SLEEVE ANCHORS

W ALL W / 1/4" DIA SST

BLOCKOUT, ATTACH TO

PLATES EA FACE OF W ALL

20 GA GALV STL CLOSURE

W / FIRE SAFING

BLOCKOUT

FILL W ALL

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 83: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

ALUMINUM

EL

EV

AT

ION

SE

CT

ION

90°

AL

WE

IR P

LA

TE

WE

IR E

LE

VA

TIO

N

EL

EV

AT

ION

SE

CT

ION

NO

TE

S:

PL

AT

E A

ND

WA

LL

SE

AL

AN

T B

ET

WE

EN

WE

IR

HO

LE

, T

YP

2 1

/2" S

Q

3" 3" 3 1/2"

1"

6 1

/2"

EL

EV

AT

ION

WE

IR

1'-0"

1/4

"

2 1

/2"

1"

3"

WE

IR E

LE

VA

TIO

N

1'-

9" M

AX

4"

VA

RIE

S

EN

D P

LA

TE

LE

NG

TH

VA

RIE

S

1'-

9" O

C,

TY

P

8'-

9",

TY

PIC

AL

WE

IR P

LA

TE

LE

NG

TH

L3

x3

x1

/4x

0'-

9 1

/2"

SL

OT

TE

D H

OL

E I

N A

NG

LE

AN

D (

2)

WA

SH

ER

S I

N H

OR

IZ

3/8

" S

ST

BO

LT

W/

NU

T

HE

AD

SID

E O

F W

EIR

SE

AL

AN

T

PL

AN

HO

LE

, T

YP

2 1

/2" S

Q

6 1

/2"

3" 4"

WE

IR P

LA

TE

AN

D W

AL

L

SE

AL

AN

T B

ET

WE

EN

9 1/2"

1/4

"

2 1

/2"

1 1/2"

2 1/2" 2 1/2"

WE

IR P

LA

TE

LE

NG

TH

LE

NG

TH

VA

RIE

S

EN

D P

LA

TE

10

'-0

",

TY

PIC

AL

2'-

0" M

AX

VA

RIE

S,

2'-

0" O

C,

TY

P

1.

AL

L F

AS

TE

NE

RS

SH

AL

L B

E S

ST

AS

SP

EC

IFIE

D.

AS

SP

EC

IFIE

D.

AL

L P

AR

TS

EX

CE

PT

FA

ST

EN

ER

S S

HA

LL

BE

AL

UM

INU

M

2.

3.

SM

OO

TH

, D

EN

SE

FIN

ISH

.

ST

EE

L T

RO

WE

L T

OP

OF

CO

NC

RE

TE

WA

LL

TO

OB

TA

IN

4 1/2"

ST

RA

IGH

T E

DG

E W

EIR

- T

YP

E A

V-N

OT

CH

WE

IR -

TY

PE

B

NO

TC

HE

S A

T 7

" O

C

3" -

90° 'V

'

EA

PL

1 1

/4"x

2 1

/2"

NO

TC

H E

A E

ND

OF

JT

, T

YP

1/8

" M

AX

WID

TH

4.

AL

WE

IR P

LA

TE

WE

IR E

LE

VA

TIO

N

EA

PL

1 1

/4"x

2 1

/2"

NO

TC

H E

A E

ND

OF

1/8

" M

AX

WID

TH

JT

, T

YP

PL

AN

HE

AD

SID

E O

F W

EIR

OF

PL

AT

E

TY

P 3

SID

ES

SE

AL

AN

T,

MIN

MIN

CO

NC

ED

GE

OF

HO

LE

, T

YP

2 1

/2" S

Q

WA

SH

ER

, T

YP

1/4

"x

5"x

5" A

L

AN

D C

ON

CR

ET

E W

AL

L.

AN

D C

ON

CR

ET

E W

AL

L A

ND

BE

TW

EE

N E

ND

OF

WE

IR P

LA

TE

PR

OV

IDE

CO

NT

INU

OU

S S

EA

LA

NT

BE

TW

EE

N W

EIR

PL

AT

E

WA

SH

ER

, T

YP

1/4

"x

5"x

5" A

L

12/2/20140559-031.dgn

NTS

W EIR DETAILS

0559-031

3"

1'-0"

TO

P O

F C

ON

C

5" S

Q A

L W

AS

HE

R

LO

CK

WA

SH

ER

AN

D

SS

T A

B W

/ S

ST

NU

T &

1/2

" D

IA C

OA

TE

D

SQ

AL

WA

SH

ER

LO

CK

WA

SH

ER

& 5

"

AB

W/

SS

T N

UT

&

1/2

" D

IA C

OA

TE

D S

ST

HO

LE

S I

N A

NG

LE

, T

YP

OF

2

VE

RT

ICA

LL

Y S

LO

TT

ED

W/

NU

T &

WA

SH

ER

IN

2 1

/2"

1/2

" D

IA S

ST

CO

NC

AN

CH

OR

TO

P O

F C

ON

C

HO

LE

, T

YP

2 1

/2" S

Q

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 84: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

3"

1"

EL

EV

AT

ION

SE

CT

ION

2 1

/2"

1/4

" M

IN

4"

3"

3"

AT

6" O

C

NO

TC

HE

S

3"-9

0° 'V

'

3"

WE

IR

EL

EV

AT

ION

4"3"

1"

PL

AN

EL

EV

AT

ION

SE

CT

ION

2 1

/2"

1/4

" M

IN

4 1/2"

2 1/2" 2 1/2"

9 1/2"

EN

D P

LA

TE

LE

NG

TH

VA

RIE

S

VA

RIE

S

2'-

0" M

AX

2'-

0" O

C

TY

P

3 1/2"

1'-0"

NO

TE

S:

3.

4.

3"

3"

9 1/2"

2 1/2"

3"

3"

2 1/2"

12"

6"

1'-0"

AL

L F

AS

TE

NE

RS

SH

AL

L B

E S

ST

AS

SP

EC

IFIE

D.

1.

2.

90

°

8'-

0",

TY

PIC

AL

WE

IR P

LA

TE

LE

NG

TH

SE

AL

AN

T

WE

IR E

LE

VA

TIO

N

6 1

/2"

ST

RA

IGH

T E

DG

E W

EIR

- T

YP

E A

V-N

OT

CH

WE

IR -

TY

PE

B

L3x3x1/4

x0'-

9 1

/2" 1 1/2"

2'-

0" O

C,

TY

P

FR

P W

EIR

PL

AT

E

PL

AN

HE

AD

SID

E O

F W

EIR

OF

PL

AT

E

TY

P 3

SID

ES

SE

AL

AN

T,

LE

NG

TH

VA

RIE

S

EN

D P

LA

TE

JT

, T

YP

1/8

" M

AX

WID

TH

WE

IR P

LA

TE

LE

NG

TH

8'-

0", T

YP

ICA

L

HO

LE

2 1

/2" S

Q

SQ

HO

LE

2 1

/2"

PL

AT

E A

ND

WA

LL

SE

AL

AN

T B

ET

WE

EN

WE

IR

JT

, T

YP

1/8

" M

AX

WID

TH

EA

PL

1 1

/4"x2 1

/2"

NO

TC

H E

A E

ND

OF

EL

EV

AT

ION

WE

IR

AN

D W

AL

L

WE

IR P

LA

TE

SE

AL

AN

T B

ET

WE

EN

HO

LE

, T

YP

2 1

/2" S

Q

HO

LE

, T

YP

2 1

/2" S

Q6 1

/2"

EA

PL

1 1

/4"x2 1

/2"

NO

TC

H E

A E

ND

OF

EL

EV

AT

ION

WE

IR

HE

AD

SID

E O

F W

EIR

SL

OT

TE

D H

OL

E I

N A

NG

LE

AN

D (

2)

WA

SH

ER

S I

N H

OR

IZ

3/8

" S

ST

BO

LT

W/

NU

T

TO

HE

AD

SID

E O

F W

EIR

PL

BU

TT

PL

FIE

LD

BO

ND

ED

1/4

x6x9 1

/2" F

RP

WE

IR

SL

OT

TE

D H

OL

ES

IN

AN

GL

E, T

YP

OF

2

NU

T &

WA

SH

ER

IN

2 1

/2" V

ER

TIC

AL

LY

1/2

" D

IA S

ST

CO

NC

AN

CH

OR

W/

2'-

0" M

AX

VA

RIE

S

AN

D C

ON

CR

ET

E W

AL

L.

AN

D C

ON

CR

ET

E W

AL

L A

ND

BE

TW

EE

N E

ND

OF

WE

IR P

LA

TE

PR

OV

IDE

CO

NT

INU

OU

S S

EA

LA

NT

BE

TW

EE

N W

EIR

PL

AT

E

RE

INF

OR

CE

D P

LA

ST

IC (

FR

P)

AS

SP

EC

IFIE

D.

AL

L P

AR

TS

EX

CE

PT

FA

ST

EN

ER

S S

HA

LL

BE

FIB

ER

GL

AS

S

SM

OO

TH

DE

NS

E F

INIS

H.

ST

EE

L T

RO

WE

L T

OP

OF

CO

NC

RE

TE

WA

LL

TO

OB

TA

IN

PL

WA

SH

ER

AN

D 5

" S

Q F

RP

& L

OC

K W

AS

HE

R

SS

T A

B W

/ S

ST

NU

T

1/2

" x

8" C

OA

TE

D

FR

P W

EIR

PL

AT

EF

RP

PL

WA

SH

ER

NU

T &

LO

CK

WA

SH

ER

AN

D 5

" S

Q

1/2

" D

IA C

OA

TE

D S

ST

AB

W/

SS

T

CO

NC

ED

GE

OF

TO

HE

AD

SID

E O

F W

EIR

PL

BU

TT

PL

FIE

LD

BO

ND

ED

1/4

x6x12" F

RP

WE

IR

WA

SH

ER

, T

YP

1/4

"x5"x5" F

RP

HO

LE

, T

YP

2 1

/2" S

Q

WA

SH

ER

, T

YP

1/4

"x5"x5" F

RP

HO

LE

, T

YP

2 1

/2" S

Q

NTS

W EIR DETAILS

0682-041FRP

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

Page 85: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

CMU WALL

OUTSIDE FACE OF

FLASHING

EPDM MEMBRANE

WITHIN 12" OF ENDS

AT 24" OC MAXIMUM AND

MASONRY ANCHORS

COUNTERSINK 1/2" DIA

COPING SYSTEM

PREFABRICATED METAL

WITH KERF CUTS

2x REQUIRED PT NAILER

0753-002

COPING (MASONRY WALL)NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 86: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

TOP OF ROOF DECK

6"

MINIM

UM

TOP OF ROOF DECK

RIGID ROOF INSULATION

ROOFING

EPDM MEMBRANE

FLASHING

EPDM MEMBRANE

FACE OF FINISHED WALL

0753-004

BASE FLASHINGNTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 87: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

CL

NOT SHOWN, SEE MECHANICAL.

DRAIN PIPES AND LEADERS1.

NOTES:

18" TO EDGE OF SUMP

OD LOCATIONS ONLY

ROOF LOW POINT AT

EXTENSION, 2" ABOVE

OVERFLOW DRAIN

ROOFING

EPDM MEMBRANE

METAL DECKING

3’-0"x5’-0" SUMP

ROOF DRAIN SET IN

UNDERDECK CLAMP

SUMP RECEIVER

FIXED EXTENSION

0753-006

ROOF/OVERFLOW DRAIN (METAL DECK)

OR 18" TO EDGE OF SUMP

CL TO CL OF DRAINS - SEE PLAN

SEE PLAN

TAPERED INSULATION,

ROOF INSULATION

R-38 MINIMUM RIGID

MIN.

R-3

0

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 88: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

WALL

FACE OF FINISHED

SET IN SEALANT

WALL FLANGE

NOZZLE WITH

OVERFLOW

ROOF DRAIN PIPE

OVERFLOW DRAIN OR

WITH SEALANT

FILL VOID AROUND PIPE

0762-003

OVERFLOW/ROOF DRAIN NOZZLE

INSULATED CMU WALL

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 89: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

SECTION

PLAN

1'-4"

2'-4"

1"

4"

GRADE

0762-004

NTS

SPLASHBLOCK

FACE OF WALL

SPLASHBLOCKPRECAST CONCRETE

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 90: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DO

OR H

EIG

HT

4"

SHIM S

PA

CE

SCHEDULED

RAINDRIP WHERE

SCHEDULED

DOOR AS

5 3/4 " 3/4 "

MA

SO

NR

Y O

PE

NIN

G BOTH SIDES

SEALANT, ALL AROUND

REINFORCEMENT

STRUCTURAL FOR

CMU LINTEL, SEE

0811-003

HM DOOR HEAD (CMU)

INSULATE FRAME SOLID

HOLLOW METAL FRAME,

THERMALLY BROKEN

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 91: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DO

OR W

IDT

H2"

SHIM S

PA

CE

SCHEDULED

DOOR AS

5 3/4 " 3/4 "

MA

SO

NR

Y O

PE

NIN

G

BOTH SIDES

SEALANT, ALL AROUND

REINFORCEMENT

STRUCTURAL FOR

CMU WALL, SEE

ANCHORS

STANDARD JAMB

MANUFACTURER’S

0811-004

HM DOOR JAMB (CMU)

INSULATE FRAME SOLID

HOLLOW METAL FRAME,

THERMALLY BROKEN

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 92: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

WIN

DO

W SIZ

ES

HIM S

PA

CE

WIN

DO

W H

EIG

HT

SHIM S

PA

CE

0851-002

WINDOW HEAD AND SILL

(JAMB SIMILAR)

HEAD

SILL

4 1/2 " 3/4 "

2"

2"

SET IN SEALANT

MANUFACTURER,

WINDOW

FLASHING BY

ALUMINUM

GLAZING AS SCHEDULED

BOTH SIDES

SEALANT, ALL AROUND

CMU WALL

THERMALLY BROKEN

ALUMINUM FRAME,

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 93: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

DOOR SILL

0871-001

SCHEDULED

DOOR SHOE AS

SEE CIVIL

PAVING,

DO

OR H

EIG

HT

DOOR AS SCHEDULED

IN SEALANT

SCHEDULED, SET

THRESHOLD AS

SCHEDULED

FLOOR FINISH AS

FLOOR LINE

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 94: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

0890-002

LOUVER HEAD AND SILL

(JAMB SIMILAR)

HEAD

SILL

SET IN SEALANT

MANUFACTURER,

BY LOUVER

FLASHING

SIZ

E

LO

UV

ER O

PE

NIN

G

HEIG

HT

LO

UV

ER O

PE

NIN

G

TYPICAL

SEALANT,CMU WALL

STANDARD CLIP

MANUFACTURER’S

LOUVER

IN 381-BM-501LOUVER AS SCHEDULED

SCHED.PER

3/4 "

1" 304 SS WIRE MESH

NTS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 95: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1014-013

NTS

ROOF DRAIN SIGN

3"

7"

BROWN

BLACK LETTERS

ROOF DRAIN

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 96: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1014-014

NTS

3"

7"

OVERFLOW ROOF DRAIN SIGN

ROOF DRAINOVERFLOW

BROWN

BLACK LETTERS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 97: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1014-015

NTS

5"

18"

PEPS ELECTRICAL

BUILDINGBLACK LETTERS

WHITE

PEPS ELECTRICAL BUILDING SIGN

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 98: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

1014-016

NTS

5"

18"

WHITE

AERATION BASIN 3 SIGN

AERATION BASIN

3

BLACK LETTERS

480770-NAMPA WWTP PHASE 1 UPGRADES - PROJECT GROUP A

Page 99: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

NTS

2210-725

PROVIDE W ITH COVER

100 - FOOT LONG HOSES

MINIM UM OF TW O 1 1/2 INCH,

HOSE REEL TO HOLDCAP PLATE

3’-

0"

3"x3"x1/4" SST HSS

BASIN W ALL

8"x8"x3/8" SST BASE PLATE

4" MINIM UM EMBED

1/2" DIAMETER SST ADHESIVE ANCHORS (4 PLCS)

HOSE REEL

8"

5 1

/2"

9 1

/2"

26"

30"

34"

2"

13"

2"

COVER, OR EQUAL

DIXON FHR-V5 W ITH HSRC26

M ANUFACTURER AND M ODEL

RECOM MENDED SIZE.

BOLTS. M ANUFACTURER

THRU BOLT W ITH SST

TYPICAL HOSE REEL - POST M OUNT

Page 100: Wastewater Treatment Plant Group A–Liquid Stream Upgradesgov.findrfp.com/docs/22989_DesignDetailsVolume1.pdf · Wastewater Treatment Plant Phase I Upgrades: ... SERIES 0600 WOOD,

480770-NAMPA W W TP PHASE 1 UPGRADES - PROJECT GROUP A

A.

B.

C.

1.

2.

3.

4.

5.

6.

7.

8.

RIGID/FLEXIBLE ROUND DUCTW ORK

RECTANGULAR DUCTW ORK

1

2

3

54

6

8

7

GENERAL NOTES

ALL-THREAD ROD

CONFIGURATION

THREAD ROD IN TRAPEZE

KINDORF HANGER W ITH ALL

1" MIN BAND CLAMP

RECOMMENDATIONS

PER SMACNA

ATTACH TO STRUCTURE

METAL SADDLE

STAINLESS STEEL SHEET

OF DUCT

LENGTH EQUALS DIAMETER

NUT W ITH LOCK W ASHER

BOLTS

OR MASONRY EXPANSION

W ITH BEAM CLAMPS

ATTACH TO STRUCTURE

TO STRUCTURE.DO NOT USE POW DER POW ERED FASTENING SYSTEMS TO ATTACH SUPPORTS

SHAPE DEFORM ATION. SUPPORT SYSTEM M UST NOT DAM AGE DUCT, INSULATION, OR CAUSE DUCT

HANGER SIZES SHALL BE IN ACCORDANCE W ITH SM ACNA, LATEST EDITION.

D. ALL SUPPORTS TO BE OF HOT DIPPED GALVANIZED STEEL CONSTRUCTION.

NTS

2331-102

TYPICAL DUCT SUPPORT