Mads Gaml, Head of ITS, City of Copenhagen 1 ITS COPENHAGEN CITY TRAFFIC MANAGEMENT SYSTEM OF COPENHAGEN HURDLES AND LEARNINGS

Upload: others

Post on 31-Jan-2021

1 views

Category:

Documents


1 download

TRANSCRIPT

  • • Mads Gaml, Head of ITS, City of Copenhagen

    1

    ITS COPENHAGENCITY TRAFFIC MANAGEMENT SYSTEM OF COPENHAGEN

    HURDLES AND LEARNINGS

  • COPENHAGENS AMBITION ON GREEN MOBILITY

  • CONTRIBUTE TO THE POLICY GOALS OF THE CITY

    KPI’s on various modalities on selected corridors where they have the highest priority, and service levels to support green mobility

  • ITS COPENHAGEN SOLUTIONS

    4

  • EVOLUTION OF INTELLIGENT TRANSPORT SOLUTIONS IN CITY OF COPENHAGEN

    PPI2014

    ITS Copenhagen Project 2015 – 2018

    Traffic Management PlatformSensor network

    ecoDrivingVMS signs

    Intelligent Street Lighting

    Traffic Model, Socrates 2.0 & C-MobILE2017->

    KPI’s on corridors2014

    Modernizing all 360 TLC

    2013-2015

    COMPASS4D2013-2016

    ecoDriving2014

    Traffic Tower2015 ->

    Climate Plan2013

    ITS action plan2014

  • OPEN ITS COPENHAGEN ARCHITECTURE

    • Preventing that the city is blocked by a vendor lock-in or by the costs that come with scaling up.

    • Designed to be able to keep on building and including new and promising ideas and technologies.

    • Three forms of openness are required, i.e.:

    • technical (modular, open interfaces)

    • operational openness (easy to use, transparent no hidden costs)

    • open data (a stimulation for innovation in itself)

  • DATA NEEDED FOR OPERATIVE TRAFFICMANAGEMENT, PLEASE!

    • Travel time for cars, bussesand cyclists

    • Number of stops for carsand cyclists

    • Travel time reliability for busses and cars

    • Time pedestrians have for crossing the intersections

  • EASY ACCESS TO CAR DATA

  • …BUS OPERATOR IS NOT A DATA PROVIDER

  • …AND DATA FOR BIKES AND PEDESTRIANS

    Dette billede efter Ukendt forfatter er licenseret under CC BY-SA

    http://commons.wikimedia.org/wiki/File:Saint_Andrew's_cross_(red).svghttps://creativecommons.org/licenses/by-sa/3.0/

  • CHALLENGE: REAL-TIME DATA FOR NETWORK MANAGEMENT ON BICYCLE CORRIDORS AND HOT SPOTS ON PEDESTRIANS…

    • GPS from bikes avaiable by GoBike(provider of shared bicycle service in Copenhagen)

    • GoBike provided access to data

    • 1 month: 130K trips

    • 100+ stations

    • trip-based:

  • …NEED A DIFFERENT APPROACH ON HOW TO GET BIKE AND PEDESTRIAN DATA FOR OPERATIVE TRAFFIC MANAGEMENT

    • Given that bicycle travel time is largely determined by:• Individual target speed

    • Traffic lights

    • .. we can closely approximate travel time with a Monte Carlo simulation using:• actual traffic light phases

    • actual bicycle volume (counts)

    • .. in order to:• inform traffic operator

    • communicate to cyclists (VMS)

  • The Swedish Road Authority, The Danish Road AuthorityStochholms StadCity of Copenhagen

  • COOPERATION WITH DIFFERENT VENDORS

    • Using RSMP as the main component for connecting equipment to traffic management platform

    • European standards within ITS

    • Using existing network and data in new ways

    • Open project up for new vendors

    • Development of RSMP protocol to match need of the city

    Interlinking business models by interlinking workflows

  • CREATE CONTINUOUSLY IMPROVEMENTS BY USING AND REUSING DATA IN NEW WAYS

    15

  • REACHING FOR AN AGILE APPROACH

  • NEW PROCESS IN COPENHAGN

    Scope of project from

    strategic level

    Report resultsto senior

    management

    Monitoring of scenarios in traffic

    management center

    Scenario design

    Test and implementation

    of scenarios

    Operative use of scenarios

    Evaluation

    Scenario Re-design

    1 2 …

    Time period: 1-3 months

    Test and implementationof REDESIGNED

    scenarios

    Evaluation

    Operative use of re-designed

    scenario

    Organisation: 2-3 persons (1 project manager)

    Teams support from team management

    Detailedscenario design

  • THANK YOU

    • Contact information

    • Head of ITS Program: Mads Gaml

    • E-mail: [email protected]

    • Phone: +45 2051 2774

    mailto:[email protected]