wfd: north of the border - groundwater clews.pdf · 2017-07-18 · next steps – refine...

21
WFD: North of the border

Upload: others

Post on 07-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

WFD: North of the border

Page 2: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

WFD: North of the border

Page 3: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Key emphasis – predictive based

Limited impact data forces this approach, but…..

Limited existing knowledge...important to assess…

•Why is it at risk?

•Where should we monitor?

•What measures do we need?

Page 4: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

1. GW Bodies

Page 5: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Bedrock Aquifers

(BGS)

Superficial Aquifers

(BGS)

Page 6: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Bedrock Aquifers

(BGS)

Productive bedrock aquifers:

Deep & long flow systems →Major catchments

Low productivity bedrock aquifers:

Shallow & short flow systems →Sub- catchments

Superficial aquifers:

Localised flow – not currently used for subdivision

Page 7: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Simple 3D conceptual models of

•Flow type (fracture, etc)•Storage type•Transmissivity•Flow path length•Flow path depth•Natural chemistry

Mainly for use by non-specialists

GW “Typology”

Page 8: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

2. Risk Assessment

Page 9: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

WFD: North of the border

Receptors

GW body Wetlands GroundwaterRiver and lakes

Vertical pathway Vertical +/- lateral Vertical +/- lateral Vertical pathway

WFD Objectives

Receptor sensitivity

Page 10: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Prediction

Pressure

Pathway

Receptor sensitivity

GWDTE

Abstraction

Proximity & aquifer

Drawdown

Receptor Rivers

Abstraction

Catchment

Flow vs Q95

Page 11: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Bedrock Aquifers

(BGS)

Groundwater Vulnerability

(BGS/MLURI)

••Horizontal pathway term Horizontal pathway term (downgradient receptors)(downgradient receptors)

••StorageStorage

••Vertical pathway termVertical pathway term

Page 12: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Risk Assessment Principles

High predicted impact AND impact data 1a

Mod predicted impact AND impact data 1b

High predicted impact 1b

Moderate predicted impact 2a

Page 13: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

3. Diffuse

Page 14: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Pressure + pathway

Phosphate

Pressure

Page 15: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Pressure +

Pathway +

Receptor+

Impacts

Page 16: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

PirimicarbPressure

+pathway

More localised pressure (horticulture)

+

Relatively high EQS

=

Restricted potential impact on ecosystems

PhosphatePressure

+pathway

Page 17: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

4. Point, mining, abstraction examined similarly

Page 18: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

“By products” for monitoring & guidance

•GIS dataset: vulnerability + aquifers + GW receptors

•Point sources with known impacts on groundwater

•Distributed recharge maps

Page 19: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Next steps

– Refine characterisation outputs (further characterisation)

– Develop monitoring network using risk assessment to prioritise

– Produce procedures guidance to support new Groundwater Protection Policy for Scotland and new regulatory regimes

– Prepare for requirements of GDD

Page 20: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Legislative situation

• Water Environment and Water Services (Scotland) Act 2003 Controlled Activities Regulations (consultation in April; planned to Parliament in September; expected to commence 2005)

• Diffuse Pollution control regime + restoration powers (expected in 2005/6 to commence 2006)

Page 21: WFD: North of the border - Groundwater Clews.pdf · 2017-07-18 · Next steps – Refine characterisation outputs (further characterisation) – Develop monitoring network using risk

Summary

Emphasis on:

1.Predictions

• Simple, but logical concepts (?)

• Consistency / transparency

2.Preparation for the next steps