what is a work breakdown structure?

49
Managing a project can be daunting.

Upload: kenny-hirschmann

Post on 01-Nov-2014

6.774 views

Category:

Technology


0 download

DESCRIPTION

A presentation that defines a Work Breakdown Structure and how to create one. It is focused on the eLearning industry.

TRANSCRIPT

Page 1: What is a Work Breakdown Structure?

Managing a project can be daunting.

Page 2: What is a Work Breakdown Structure?

With so many variables, it's easy to get overwhelmed.

Page 3: What is a Work Breakdown Structure?

Where do I begin?

Page 4: What is a Work Breakdown Structure?

When building a house you start with the foundation.

Page 5: What is a Work Breakdown Structure?
Page 6: What is a Work Breakdown Structure?

A Work Breakdown Structure (WBS) is the foundation of a project plan.  1

1.2

1.1.1 1.2.1

1.1 1.3

1.2.1.1

1.2.2

1.3.1

1.3.2 1.1.2

Page 7: What is a Work Breakdown Structure?

Work Breakdown Structure (WBS)

"A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables."

As defined by the Guide to the Project Management Body of Knowledge

Page 8: What is a Work Breakdown Structure?

What benefits does it provide?

Page 9: What is a Work Breakdown Structure?
Page 10: What is a Work Breakdown Structure?

2. Facilitates delegation by creating…

…small chunks of work.  

Page 11: What is a Work Breakdown Structure?

3. Simplifies cost estimation, scheduling and risk analysis.

Page 12: What is a Work Breakdown Structure?

How do I get started?

Page 13: What is a Work Breakdown Structure?

you need to gather all relevant information.   This includes a statement of work, task analysis, schedule of deliverables, milestones, project scope statement, problem analysis, design documentation or other relevant documentation.

First  

Page 14: What is a Work Breakdown Structure?

We will take you through the process of developing a Work Breakdown Structure for a new program in Dog Whispering that we are creating this year.

Welcome to Practicum University

Page 15: What is a Work Breakdown Structure?

 The team at PU has gathered all of their documentation and the leadership team is now ready to start working on a plan to develop the program.

Page 16: What is a Work Breakdown Structure?

There are many tools you can use to create the WBS like mind-mapping tools, Powerpoint or Word. We will use the industry standard diagramming software, Microsoft Visio with the WBS Modeler Add-in.

Page 17: What is a Work Breakdown Structure?

Start with the first level that represents the whole project.  This should be numbered 1.0.

Page 18: What is a Work Breakdown Structure?

The second level will vary depending on whether the WBS is Product-based or  Process-based.

Page 19: What is a Work Breakdown Structure?

A Product-based WBS is broken down into a series of deliverables in the second level.  These deliverables should capture 100% of the project scope.

Page 20: What is a Work Breakdown Structure?

A Process-based WBS is broken down into a series of phases in the second level.  Each phase may or may not have a deliverable, but all major project phases should be included.

Page 21: What is a Work Breakdown Structure?

An example of a process-based WBS might be to use the stages of ADDIE as the 5 major phases of the second level.

Page 22: What is a Work Breakdown Structure?

For the purposes of our example we will use a product-based WBS.  Development of the new program can be broken down into these stages: Needs Analysis, Curriculum Proposal, Course Development Plan, Accreditation Package, Implementation, and Evaluation Plan.

Page 23: What is a Work Breakdown Structure?

At this point we enter a stage of the process called decomposition to further break the work down in to smaller and more manageable chunks of work, called Work Packages.

Page 24: What is a Work Breakdown Structure?

How small and specific should Work Packages be?

Page 25: What is a Work Breakdown Structure?

A general rule that you might want to use is called the 8/80 rule.  No work package should be less than 8 hours of work, or more than 80 hours of work.

80

8

Page 26: What is a Work Breakdown Structure?

The process of decomposition can be done by an individual, or by the whole team.  It all depends on what makes sense for your project. Still, two minds are usually better than one!

Page 27: What is a Work Breakdown Structure?

But you don't necessarily need to reinvent the wheel!

Page 28: What is a Work Breakdown Structure?

If you've already completed a similar project, you may already have a template you can follow for decomposition.  Perhaps PU has already followed this process for other programs.

Page 29: What is a Work Breakdown Structure?

It is critical that you and your team try to account for every task that is necessary to complete the project.  Mistakes here will only cost the project more time and perhaps more money later.

Page 30: What is a Work Breakdown Structure?

Once  the  WBS  has  been  completed  it  might  be  necessary  to  build  a  WBS  Dic:onary.    The  WBS  Dic:onary  is  a  document  that  describes  each  work  package  in  detail.

Page 31: What is a Work Breakdown Structure?

Here is the completed WBS for PU's Dog Whispering program.

Page 32: What is a Work Breakdown Structure?

Now that you've broken the project down into manageable chunks of work, you can more easily estimate time, cost and staffing for the project. By estimating the amount of time each work package "should" take, as well as the role assigned to that task, you can estimate the cost of that task.

Page 33: What is a Work Breakdown Structure?

You can develop a table that shows each of these fields in sequence, but there's another way to visualize this information. The Gantt Chart.

Page 34: What is a Work Breakdown Structure?

The power of the Gantt Chart is that it is a simple and clear way to not only show the length of time of each task, but also visualize task dependencies.

Page 35: What is a Work Breakdown Structure?

Task  #1  

Task  #2  

Task  #3  

A  Task  Dependency  is  the  rela:onship  in  which  a  task  relies  on  the  comple:on  (or  par:al  comple:on)  of  another  task  or  tasks  before  it  can  begin.

Page 36: What is a Work Breakdown Structure?

Task  #1  

Task  #2  

Task  #3  

Total Time

Task dependencies determine the total length of time for each stage in the project, and thus the overall timeline of the project.  Therefore, the Gantt Chart is a tool that can help us determine the overall timeline for a project.

Page 37: What is a Work Breakdown Structure?

There are many different programs that can help you create a Gantt Chart including one of the most widely used tools for project planning and management, Microsoft Project.

Page 38: What is a Work Breakdown Structure?

Here is a Gantt Chart produced in Microsoft Project for the Dog Whisperer program at PU.

Page 39: What is a Work Breakdown Structure?
Page 40: What is a Work Breakdown Structure?

To  build  a  project  you  must  start  with  the  founda:on.

Page 41: What is a Work Breakdown Structure?

The foundation of a project is the Work Breakdown Structure.

1

1.2

1.1.1 1.2.1

1.1 1.3

1.2.1.1

1.2.2

1.3.1

1.3.2 1.1.2

Page 42: What is a Work Breakdown Structure?

The Work Breakdown Structure will help you to define the project's scope, estimate time, cost and staffing, make delegation of tasks simpler and identify risks.

Page 43: What is a Work Breakdown Structure?

The  process  starts  by  gathering  all  the  necessary  informa:on  and  your  key  team  members.    The  more  heads,  the  beHer!

Page 44: What is a Work Breakdown Structure?

The first two levels of a WBS must encompass 100% of the project process.

Page 45: What is a Work Breakdown Structure?

Use the process of decomposition to break the project down to manageable chunks using the 8/80 rule.

80

8

Page 46: What is a Work Breakdown Structure?

Clarify each work package by creating a WBS Dictionary.

Page 47: What is a Work Breakdown Structure?

Organize  the  tasks  into  a  GanH  Chart  to  highlight  dependencies  and  determine  the  overall  :meline.

Page 48: What is a Work Breakdown Structure?
Page 49: What is a Work Breakdown Structure?

Credits Slide  2  -­‐  Scream  by  Edvard  Munch.    Retrieved  from:  hHp://1.bp.blog  spot.com/-­‐JFyqLFg67hU/TaxbHC02ngI/AAAAAAAAADs/  0mIK8c8NJm0/s1600/thescream.jpg  

Slide  4  -­‐  Retrieved  from:  hHp://www.flickr.com/photos  /pgoyeHe/2280685630/  

Slide  12  -­‐  Retrieved  from:  hHp://office.microsof.com/en-­‐us/images/  results.aspx?ex=2&qu=start#ai:MP900422560%7Cmt:0%7C  

Slide  27  -­‐  Retrieved  from:  hHp://i.images.cdn.fotopedia.com/  flickr-­‐3784879602-­‐hd/Tokyo_and_Vicinity/Further_Afield/Edogawa-­‐ku/  Kasai_Rinkai_Park/Diamond_and_Flower_Ferris_Wheel/Ferris_wheel_  and_sunset_croulds_at_Kasai_Rinkai_Park.jpg  

Slide  32  –  Hourglass  Retrieved  from:  hHp://images.wikia.com/witcher/  images/3/3a/Hourglass_2.png  Dollar  -­‐  hHp://www.sparkthemagazine.com/wp-­‐content/uploads/2011/  09/dollar-­‐sign.png