  • 8/2/2019 Wind Power Final

    1/38

    WIND POWER PLANTS

    Submitted By :

    Rahul Kalathil 095077Karan Gandhi 095073

    Gaurav Kamath 095079

    Nikunj Sodhani 095

    Mohit Thawani 095

  • 8/2/2019 Wind Power Final

    2/38

    WIND ENERGY

    Wind are caused by uneven heating of the atmosphere by the sun

    and irregular of earth surface. Hot air reducing the pressure at the surface

    while going up, cooler air going down the result is the wind. The air has

    mass when it is in motion it have energy of motion.

    WHY WIND ENERGY?

    Wind power is renewable. Winds will keep on blowing, it makes

    sense to use them.

    WIND POWER PLANT

    Also known as a wind farm, a group of wind turbines connected

    together and its output going to a common power provider system.Operation, control, and maintenance functions are centralized through a

    network of computerized monitoring systems. Special training team

    provide visual inspection ,maintenance, and repair operations.

  • 8/2/2019 Wind Power Final

    3/38

    WIND MILL

  • 8/2/2019 Wind Power Final

    4/38

    WIND TURBINE BLADE

  • 8/2/2019 Wind Power Final

    5/38

    BERNOULLIS PRINCIPLE

  • 8/2/2019 Wind Power Final

    6/38

    LIFT

  • 8/2/2019 Wind Power Final

    7/38

    TYPES OF WINDMILL

  • 8/2/2019 Wind Power Final

    8/38

  • 8/2/2019 Wind Power Final

    9/38

    WIND TURBINE HUB

  • 8/2/2019 Wind Power Final

    10/38

    THE GENERATOR

  • 8/2/2019 Wind Power Final

    11/38

    TOWER COMPONENTS

  • 8/2/2019 Wind Power Final

    12/38

    BLOCK DIAGRAM

  • 8/2/2019 Wind Power Final

    13/38

    MOUNTINGS

    12

    3

    1.Wind Speed Indication2.Lightning Conductor3.Wind Direction Indicator

  • 8/2/2019 Wind Power Final

    14/38

    ROTATIONAL ACCELERATION DURING RUN-AWAY.

  • 8/2/2019 Wind Power Final

    15/38

    CONTROL AND SAFETY SYSTEMS The high demands on reliability require systems that are simple

    enough to be robust, but at the same time give the possibility for

    necessary supervision.

    The number of sensors and other active components need to be

    limited as far as possible, however the necessary components must be

    of the highest possible quality.

    The control system has to be constructed so that there is a high degree

    of internal control, and to a certain degree the system must be able to

    carry out its own fault finding.

  • 8/2/2019 Wind Power Final

    16/38

    CENTRIFUGAL RELEASE UNIT

    HCU placed on the high speed shaft of thegearbox

  • 8/2/2019 Wind Power Final

    17/38

    TIP BRAKE

  • 8/2/2019 Wind Power Final

    18/38

    MECHANICAL BRAKES

  • 8/2/2019 Wind Power Final

    19/38

    1. The speed of the wind in those locations should be high to produce large

    amount of energy.

    2. The farms should be build on higher altitudes .

    3. Mutual inference in the working of the wind turbines should be check by

    observing their effects because they really affects the output power.

    4. Check out effects of the wind farms or the wind turbines on the environment

    5. Another important factor also carefully observe that what are the effects of

    the wind farms on the grid stations because it really helpful for the production

    of the power.

    SITE SELECTION WIND POWER PLANT

  • 8/2/2019 Wind Power Final

    20/38

    GREEN ENERGY TO GRID AT DHULELOCATION OF PROJECT ACTIVITY

  • 8/2/2019 Wind Power Final

    21/38

    PROJECT ACTIVITYS CONTRIBUTION TO SUSTAINABLEDEVELOPMENT

    Reduction in greenhouse

    gases, mainly carbon dioxide Reduction in energydemand (marginally) in thestate grid

    Capacity building and

    employment generation inrural areas

    Reducing pollution load onthe atmosphere (SOx, NOx)

    Conserving fossil fuel and

    making them available forother useful purposes

    Helps increasing thepenetration of renewablepower composition in the

    grid

  • 8/2/2019 Wind Power Final

    22/38

    Duration of the projectactivity:

    Starting date: 24/10/2005 Expected operational

    lifetime of the projectactivity: 20 years 0months

  • 8/2/2019 Wind Power Final

    23/38

    ESTIMATED AMOUNT OF EMISSION REDUCTIONSOVER THE CHOSEN CREDITING PERIOD:

    Year Annual estimation of emission

    reductions in tonnes of tCO2

    e 2008 2009 38,098 2009 2010 38,098 2010 2011 38,098 2011 2012 38,098

    2012 2013 38,098 2013 2014 38,098 2014 2015 38,098 2015 2016 38,098 2016 2017 38,098

    2017 2018 38,098 Total estimated reductions (Tonnes of CO2e)

    380,980 Total number of crediting years Ten

  • 8/2/2019 Wind Power Final

    24/38

    ILLUSTRATION OF THE PROJECT ACTIVITY BOUNDARY

    660Vmain

    transformer

    33kV

    sub stationend users

  • 8/2/2019 Wind Power Final

    25/38

    TECHNOLOGY APPLIED High co-efficient of power formaximum harnessing of wind powerby a rotor fitted with high

    performance blades

    Increased efficiency

    Advance hydrodynamic fluid

    coupling to absorb peak loads andvibrations

    Integrated power transmission

    mechanism

    Well-designed four level safetysystems ensuring maximumprotection against damages

  • 8/2/2019 Wind Power Final

    26/38

    Duration of the projectactivity:

    Starting date: 24/10/2005 Expected operational

    lifetime of the projectactivity: 20 years 0months

  • 8/2/2019 Wind Power Final

    27/38

    General data: Generated power 1500 kW Number of Units 3 Available Q4 2011

    Design Data: Operational area 4-25 m/s Nominal rotor speed 17,3

    rpm Generator Asynchronous, 4-

    6 poles, nominal frequency50HZ

    Power control Stall/ pitchcontrol

    Yaw Control Active through

    adjustment of 5 gears

  • 8/2/2019 Wind Power Final

    28/38

    Yaw Control Pitch Control

  • 8/2/2019 Wind Power Final

    29/38

    ON SHORE & NEAR SHORE

  • 8/2/2019 Wind Power Final

    30/38

    OFF SHORE

  • 8/2/2019 Wind Power Final

    31/38

    FUTURISTIC DESIGNS

  • 8/2/2019 Wind Power Final

    32/38

  • 8/2/2019 Wind Power Final

    33/38

    AIRBORNE HELIUM WIND TURBINES

  • 8/2/2019 Wind Power Final

    34/38

    Wind is free.

    Produces no waste or greenhouse gases.

    The land of wind farms can be used for

    farming.

    Wind farms can be tourist attractions.

    A good method of supplying energy to

    remote areas.

    ADVANTAGES

  • 8/2/2019 Wind Power Final

    35/38

    The wind is not always predictable. Some days have no

    wind.

    Suitable areas for wind farms are often near the coast, where

    land is expensive.

    Some people feel that covering the landscape with these

    towers is unsightly.

    Can affect television reception if you live nearby.

    Can be noisy.

    DISADVANTAGES

  • 8/2/2019 Wind Power Final

    36/38

    Generation of electricity using wind turbine is free of

    pollution so we can use it as a renewable energy generation

    as wind is a renewable and free of cost.

    If we choose the perfect location for the install farm than

    we get continuous electricity without cut-off but the

    problem is amount of electrical energy is not so much as

    energy generated from non-renewable sources. For higher

    amount of energy generation using wind power plant more

    land for wind farm.

    CONCLUSION

  • 8/2/2019 Wind Power Final

    37/38

    REFERENCES http://en.wikipedia.org/w/index.php?title=Wind_power_in_India.htm www.kth.se/ees/foranstallda/polopoly/2.13600/etk/research/publications/modules/publications_p

    olopoly/reports/2006/XR-EE-EEK_2006_009.pdf

    Special issue Bonus Info- Autumn 1999 http://www.mahaurja.com/PG_WE_Overview.html http//:www.meda.org Supply order dated 26th December, 2005 signed between MSPL Limited and Suzlon Energy Limited. Operation & Maintenance contract between MSPL Limited and WEG Supplier (Suzlon Energy

    Limited)

    Letter from State Bank of India dated 15 May, 2006 , Reference page no: 9 , 13 & 55. http://unfccc.int www.mspllimited.com www.windpowerindia.com Ministry of Non-Conventional Energy Sources, Government of India: http://mnes.nic.in

    UNFCCC document Clean Development Mechanism, Project Design Document Form (CDM-PDD),Version 03 Tool for the demonstration and assessment of additionality Version 04, EB 36 Central Electricity Authority: CO2 Baseline Database Version 3.0

  • 8/2/2019 Wind Power Final

    38/38