works approval application supporting information ...€¦ · malaga, wa 6090 08 9248 3505 works...

38
Cleartech Waste Management Pty Ltd, Unit 2, 390 Victoria Road, Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech Transfer Station 2 40 Mulgul Road, Malaga, WA 6090

Upload: others

Post on 30-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

Cleartech Waste Management Pty Ltd, Unit 2, 390 Victoria Road,

Malaga, WA 6090 08 9248 3505

Works Approval Application Supporting Information

Cleartech Waste Management

Pty Ltd

Cleartech Transfer Station 2

40 Mulgul Road, Malaga, WA 6090

Page 2: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

2

[Type text] [Type text]

List of Tables .................................................................................................................................................. 2

List of Figures................................................................................................................................................. 3

1.0 EXECUTIVE SUMMARY ................................................................................................................................... 4

2.0 INTRODUCTION ....................................................................................................................................................... 5

2.1 Background .............................................................................................................................................................. 5

2.2 SITE DETAILS .................................................................................................................................................... 7

2.3 Location of Premises ............................................................................................................................... 7

2.4 Site Description ........................................................................................................................................ 8

2.5 Surrounding Land Use .................................................................................................................................. 9

2.6 Current Site Conditions ................................................................................................................................. 9

2.7 Physical & Environmental Setting ........................................................................................................... 10

2.8 Regional Hydrology .................................................................................................................................. 10

2.9 Regional Geology .................................................................................................................................... 10

2.10 Regional Hydrogeology ......................................................................................................................... 10

3.0 PROPOSAL DESCRIPTION ....................................................................................................................................... 11

3.1 Overview ......................................................................................................................................... 11

3.2 Forecast Waste Types & Volumes ......................................................................................................... 12

3.3 Operating Hours ................................................................................................................................................. 12

3.4 Waste Acceptance Procedure ............................................................................................................. 13

3.5 Description of Operations ................................................................................................................. 13

3.6 Waste Processing ............................................................................................................................ 15

3.7 Chemical Treatment ................................................................................................................................. 15

3.8 Waste Dispatch ..................................................................................................................................................... 15

3.9 Description of Project Infrastructure ........................................................................................................... 16

4.0 LOCAL GOVERNMENT AUTHORITY ....................................................................................................................... 19

4.1 Part IV Environmental Protection Act 1986, Environmental Impact Assessment. ................................. 19

4.2 Part V Environmental Protection Act 1986, Environmental Management ............................................. 19

5.0 LOCAL GOVERNMENT AUTHORITY ....................................................................................................................... 19

6.0 STAKEHOLDER AND COMMUNITY CONSULTATION ............................................................................... 19

7.0 ENVIRONMENTAL IMPACTS & MITIGATION MEASURES ................................................................................ 20

7.1 lntroduction.......................................................................................................................................................... 20

7.2 Methodology ................................................................................................................................................ 20

7.3 Construction Phase ...................................................................................................................................... 24

-Air Emissions ........................................................................................................................................................ 24

-Dust emissions ..................................................................................................................................................... 25

-Odour emissions .................................................................................................................................................. 26

-Noise and vibrations ..................................................................................................................................... 26

-Light emission ............................................................................................................................................... 27

-Water Quality ............................................................................................................................................... 27

Page 3: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

3

[Type text] [Type text]

-Discharge to land .......................................................................................................................................... 28

-Waste Management. .................................................................................................................................... 29

-Dangerous Goods. ........................................................................................................................................ 30

7.4 Operational Phase ....................................................................................................................................... 31

-Air Emissions ................................................................................................................................................ 31

-Dust emissions .............................................................................................................................................. 32

-Odour emissions ........................................................................................................................................... 33

-Noise and vibrations ..................................................................................................................................... 33

-Light emission ............................................................................................................................................... 34

-Water Quality ............................................................................................................................................... 34

-Discharge to land .......................................................................................................................................... 35

-Waste Management. ................................................................................................................................... 36

-Dangerous Goods ......................................................................................................................................... 37

BIBLIOGRAPHY .................................................................................................................................................... 38

List of Tables

Table 1 - Prescribed Premises Category ................................................................................................................. 4

Table 2 - Site Details .............................................................................................................................................. 8

Table 3 - Surrounding Land Use ............................................................................................................................ 9

Table 4 - Forecast Waste Types and Volumes ..................................................................................................... 12

Table 5 - Site Storage Volumes and Locations ..................................................................................................... 14

Table 6 - Likelihood (Probability) Scale ............................................................................................................... 21

Table 7 - Consequence Levels ............................................................................................................................. 22

Table 8 - Risk Matrix ............................................................................................................................................ 23

Table 9 - Definition of Risk Ratings ...................................................................................................................... 23

List of Figures

Figure 1 - Malaga Industrial Precinct of Perth, Western Australia ......................................................................... 7

Figure 2 – 40 Mulgul Road, Malaga .......................................................................................................................... 8

Figure 3 - Works Approval Application Area ....................................................................................................... 10

Figure 4 - Site Layout Plan ................................................................................................................................... 17

Figure 5 - Site Operational Plan ........................................................................................................................... 18

Figure 6 - Risk Management Process .................................................................................................................. 20

Page 4: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

4

[Type text] [Type text]

1.0 EXECUTIVE SUMMARY

This report has been prepared to support a Works Approval application by Cleartech Waste Management Pty

Ltd for the establishment of a Waste Transfer Facility (WTF), Cleartech Transfer Station 2 (CTS2) at 40 Mulgul

Road, Malaga.

The license application is for the operation of prescribed premises under part V of the Environment Protection

Act and the proposed categories and throughputs per annum (PA) are detailed in the table below.

Table 1 - Prescribed Premises Category ( from Schedule 1 of the Environmental Protection Regulations 1987)

CATEGORY

DESCRIPTION

PRODUCTION CAPACITY CATEGORY

DESIGN PRODUCTION CAPACITY

61 Liquid Waste Facility 100 tonnes or more PA 5000 tonnes PA

61A Solid Waste Facility 1,000 tonnes or more PA 5000 tonnes PA

Activities on site will include:

• Controlled waste receipt and storage;

• Bulk & Packaged controlled waste storage and consolidation;

• Bulk & Packaged waste transfer to approved recycling, treatment and/or disposal

facilities by road transport;

The operation will incorporate the following pollution control measures:

• Appropriate buffer distances to residences;

• All traffic areas sealed

• Appropriately sized storm water control systems

• All controlled waste to be stored and processed on impermeable surfaces

• Where required bunding/storage areas to comply with relevant Australian Standards (AS 1940)

• All waste to be contained in sealed tanks, containers and drums to minimize escape of odors

• Unloading areas on impermeable surfaces with perimeter bunds to prevent ingress of rainwater or e g r e s s

of spills.

• Fire services will be designed to comply with relevant Australian Standards and statutory requirements.

The normal operating hours of the facility will be:

• Office: 8.30am to 5pm

• Transfer Facility: 6am to 6 pm Monday to Saturday

The nature of this industry however necessitates the ability from time to time to operate on a 24 hour, 7 day

per week basis, however, this will only be as required.

Environmental management plans have been prepared for the operation of this facility and includes monitoring,

record keeping, audit, training and site induction programs for all employees and contractors. Studies of the

possible impacts associated with this development have been assessed (section 7.0) and a preliminary hazard

assessment has concluded that the proposed development will cause minimal impact on the local environment.

Page 5: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

5

[Type text] [Type text]

2.0 INTRODUCTION

2.1 Background

Cleartech Waste Management Pty Ltd (CWM) is a private waste management business established in 2006.

The director and employees of the company have extensive experience within the waste management and

environmental services industry in Western Australia, Australia and Europe including significant experience

at senior management and board level in both public and private businesses. CWM has successfully been

operating a waste transfer facility (WTF) at Units 3 & 4 390 Victoria Road (CTS) since 2016.

Cleartech Waste Management Pty Ltd proposes to operate a larger waste transfer facility which will receive

packaged controlled wastes from Perth and Western Australian industry primarily manufacturing, oil &

gas, mining, government, healthcare and automotive industries. Waste materials to be received at the

facility include paints, resins, hydrocarbons, solvents, batteries, oils, greases and other controlled wastes. A

full listing of the waste types and volumes is provided later in this document.

Volumes of industrial wastes in Western Australia continue to increase year on year with the continued

expansion of mining and oil & gas sectors and associated support industries. Waste producers continue to

strive for better environmental outcomes to minimise the impact of their operations. Cleartech has been

established to provide technical solutions for difficult or problematic industrial wastes produced by West

Australian industry and to manage them in a safe and sustainable manner maximising reuse and recycling over

traditional treatment and disposal options.

The WTF will receive both bulk and packaged controlled waste which will be inspected, assessed, processed,

consolidated then stored pending despatch from the facility to approved re-use, recycling and disposal facilities in

Western Australia, Australia and potentially overseas.

It is expected that the WTF will have an initial throughput of approximately 5000 tonnes per annum which will

increase up to a design capacity of 10,000 tonnes per annum over five years. At any time the facility will hold

no more than 300 tonnes, will comply with any relevant Australian Standards and hold all the necessary

approvals including dangerous good storage if required.

Benefits that this development will provide include;

• Location and Logistics

• Enhanced Recovery

• Existing Facilities at Capacity

Location and Logistics

The Malaga based facility is strategically located to service industry in the north and east of Perth and is General

Industry zoned. Its location is ideal not only to service the expansion of industry in the northern suburbs of Perth

but also those in Welshpool and Canning Vale. The facility shall provide essential waste management

infrastructure and satisfies the proximity principle by serving these growing industrial areas.

The facility is also well situated with regard to transport links with the Mitchell Freeway and Tonkin Highway

with other major haulage roads readily accessible.

Page 6: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

6

[Type text] [Type text]

Enhanced Recovery With the specialist knowledge and experience of the director and employees of Cleartech the intent of this

facility will be to provide viable reuse and recycling routes for our client's wastes where applicable.

Existing Facilities at Capacity

In addition to the proximity and logistical benefits to waste generators in the North and North-East of

Perth, there is benefit to providing additional waste management capacity to the Perth and Western

Australian region as a whole. Anecdotally, there is evidence that existing facilities both South and

East of the city have been reaching capacity limits and restricting their intake of waste as a result of

the increased volumes being produced as a result of growth in the region on the back of major

construction projects in Perth and the North-West. This bottle-necking of waste disposal could lead

to inappropriate disposal locations or methods being used by some unscrupulous operators.

Waste Types Accepted

The WTF will be licensed to accept all categories of controlled waste as per the Environment

Protection Act (controlled waste) Regulations 2004. The inputs associated with the proposed waste

management transfer facility are outlined in Section 3.0

Page 7: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

7

[Type text] [Type text]

2.2 SITE DETAILS

2.3 Location of Premises

Figure 1 – Malaga Industrial Precinct of Perth, Western Australia

Source:www.maps.google.com.au

CTS2 would be located at 40 Mulgul Road, Malaga, as depicted in figure 1. The premises are located within

the City of Swan, situated centrally in Malaga Industrial Precinct; an area zoned under the Metropolitan

Regional Scheme for General Industry. The proposed premises are located approximately 1,000 meters

south of the nearest residential area in the suburb of Ballajura . Residents in the suburb of Noranda are

approximately 1,,500 meters to the South.

The premises is located approximately 15 kilometers from the coast and the closest surface water body is

located in a protected wetland, located approximately 1,000 meters to the south-west of the premises.

The nearest sensitive receptors are the protected wetlands approximately 1,000 meters to the south-West

and residential areas 1,000 meters to the south. The site location meets the minimum separation distance for

waste depots of 200m from nearest sensitive receptors as recommended by the Office of Environment

Protection Authority (OEPA) Guidance Statement No.3 Separation Distances between Industrial and Sensitive

Land Uses (2005).

Page 8: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

8

[Type text] [Type text]

2.4 Site Description

The site is located on Lot 72, on 390 Victoria Road, Malaga described as Lot 72 on Diagram 97213. (Figure 2).

The legal land description of the site is presented in Table 2 below.

Table 2 - Site Details

Details

Lot 200

Street Address 40 Mulgul Road

Legal Description Lot 200 on plan P065633

Local Government Authority City Of Swan

Zoning General Industry

Figure 2 – 40 Mulgul Road, Malaga

Source:www.maps.google.com.au

Page 9: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

9

[Type text] [Type text]

2.5 Surrounding Land Use

The site is located within a general industrial area and premises in the immediate vicinity include heavy

engineering facilities and heavy industrial premises such as cement batching plants.

The site is surrounded by the following land-uses as identified in Table 3.

Table 3 – Surrounding Land Use

2.6 Current Site Conditions

The site is a fully developed industrial premise on a rectangular shaped parcel of land with a total area of

approximately 4,000m2. Cleartech Waste Management have entered into a formal lease agreement with

the owners of the premises to operate a waste management facility, w h i c h specialises in the receipt,

consolidation, storage and transfer of bulk & packaged controlled wastes.

The site currently comprises:

• Warehouse

• Office/toilet/amenities

• Roadways & parking areas

The site is currently serviced with appropriate industrial/utility services including reticulated water and sewer ,

electricity and telecommunications. All external roads are constructed and all buildings and roadways are

present.

Direction from Site

Separating Features

Land Use

Comments

North

Fencing & Main Road

Road – Mulgul Road Industrial premises and vacant land across road

Industrial Premises

East Fence Industrial Premises – heavy

earth moving machinery storage

Industrial Premises

South Fence Industrial Premises Industrial Premises

West Fence Industrial Premises Industrial Premises

Page 10: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

10

[Type text] [Type text]

Figure 3 – Works Approval Application Area

2.7 Physical & Environmental Setting

The site is located at 40 Mulgul Road in Malaga relatively central in the industrial precinct. The site and

immediate surrounding areas are generally level. The elevation of the site is approximately 35m AHO

(Australian Height Datum). Groundwater in the area typically fluctuates between 5 and 8m AHO. The

separation distance to underlying groundwater is approximately 30m and the direction of flow is east to

west.

2.8 Regional Hydrology

The nearest surface water body is an unnamed lake located approximately 700m to the south-east of the

site. The site is located within the Lightning Swamp bushland area .

2.9 Regional Geology

Reference to published geological maps1

indicates the superficial geology underlying the local area

comprises floodplain deposits including medium to fine sands with limestone layers, silt, clay and gravel

adjacent to main drainage channels.

2.10 Regional Hydrogeology

Groundwater in the area typically fluctuates between 5 and 8m AHO. The separation distance to

underlying groundwater is approximately 30m and direction of flow east to west.

1 Government of Western Australia, Department of Mines and Petroleum, Geoview.wa (online]. Available at

http://mapserver.doir.wa.gov .au/GeoVIEW2/viewer.html?Title=GeoVIEW.WA

Page 11: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

11

[Type text] [Type text]

3.0 PROPOSAL DESCRIPTION

3.1 Overview

CTS proposes to operate a waste transfer facility (WTF) for the acceptance, consolidation, storage and

transfer off-site of bulk and packaged controlled wastes. We also propose to do a small amount of

treatment to chemical waste. Activities on site shall include;

• Controlled waste receipt and storage;

• Controlled waste consolidation and storage;

• Chemical treatment and absorption/immobilisation of limited types of waste

• Controlled waste transfer to approved recycling, treatment and/or disposal facilities by road transport;

Infrastructure associated with this facility shall include: • Packaged waste stores

• Vehicle unloading area

• Waste receipt, inspection and sorting area

• Chemical treatment and absorption/immobilisation

• Bin storage area

Cleartech Waste Management propose to store liquid controlled wastes within low permeability bunded

areas that allow the recovery of liquid in the event of spillage. For liquid waste stored in packages, the

capacity of the spill containment compound is at least 100% of the volume of the largest package plus 20%

of the storage capacity up to 10,000L, together with 10% of the storage capacity between 10,000L and

100,000L and 5% above 100,000L.

The bunded areas within the premises will meet the requirements described below;

• Be chemically resistant to the substances store;

• Be designed such that chemical which may react dangerously if they come into contact, are in

separate bunds in the same compound or in different compounds;

• Be controlled such that the capacity of the bund is maintained at all times

Page 12: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

12

[Type text] [Type text]

3.2 Forecast Waste Types & Volumes

Table 4 provides indicative volumes of waste the facility can be expected to receive over the next 3 years . The waste types accepted on site will include all categories of controlled waste however the main waste types have been grouped together for the purpose of this table.

Table 4 - Forecast Waste Types and Volumes

Waste Type Container 2017/18 Tonnes 2018/19 Tonnes

2019/20

Tonnes Drums/containers contaminated with

controlled waste residues

Packaged 150 180 220

Pharmaceutical wastes

Packaged 50 75 100

Herbicides & pesticides

Packaged 40 50 60

Solvents, paint & resins (includes

water based)

Packaged 150 180 220

Oil sludge & oil contaminated solids,

filters and hoses

Packaged 100 125 150

Coolants, detergents, surfactants,

emulsifiers and wetting agents

Packaged 50 60 70

Cyanides Packaged 50 60 70

Metal bearing wastes

Packaged 50 60 70

Acids & alkalis Packaged 100 120 150

Oxidisers & reducing agents

Packaged 30 40 50

Greases, tars & creosotes

Packaged 50 60 70

Batteries Packaged 100 125 150

Lab chemicals Packaged 70 85 100

Lead contaminated fire assay waste

Packaged 100 125 150

Food waste Packaged 50 75 100

It is anticipated that 75% of packaged waste received will be in load sizes of 10 tonnes or smaller.

3.3 Operating Hours

The normal operating hours of the facility will be:

• Office: 7:30am to 5:00pm

• Transfer Facility: 7:00am to 5:00pm

The nature of this industry however necessitates the ability from time to time to operate on a 24 hour,

7-day per week basis, however, this will only be on an as required basis.

Page 13: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

13

[Type text] [Type text]

3.4 Waste Acceptance Procedure

All waste materials will be assessed prior to quotation and collection following documented health, safety,

environmental and quality (HSEQ) procedures and Environmental Protection (Controlled Waste)

Regulations 2004. Upon receipt all materials will be inspected and assessed to ensure compliance prior

to processing and storage pending off-site transfer for re-use or disposal.

The main stages and control documents in this process include:

Waste assessment & evaluation form (includes analysis and MSDS as appropriate)

• Job Sheet & manifest

• Company Quotation and Conditions

• Controlled Waste Tracking Form

• Waste or Dangerous Goods Transport Document (if applicable) & labels

• Waste Acceptance Form

• Site Inspection Checklist

All stages of the assessment, quotation, collection, receival, processing and dispatch are monitored and

audited as part of the company 's HSEQ management system.

3.5 Description of Operations

Waste Types & Classification

The facility will be licensed to accept all controlled waste categories Indicative waste types and volumes

have been provided as part of this submission section 3.2. The facility will accept both packaged and bulk

controlled wastes.

Delivery Method

It is anticipated that waste will be delivered by flat deck vehicles or curtain-sided vehicles and vacuum/bulk

tanker and the average load size will be less than 10 tonnes.

Each waste load received will be inspected and assessed prior to unloading in the designated unloading area.

Once received the waste will then be placed into an inspection and processing area (if packaged) or transferred

to a holding tank (if bulk) awaiting a more detailed assessment prior to allocation of storage and off-site dispatch.

Dispatch Method

Packaged waste will be dispatched by site via road transport in loads sizes typically between 10 to 20 tonnes.

Bulk wastes shall be dispatched from site via road transport in loads typically between 10 and 20 tonnes in

vacuum or bulk liquid tankers.

All controlled waste dispatched from site shall be via controlled waste licensed vehicles.

Page 14: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

14

[Type text] [Type text]

Storage of Waste

Once waste received on site is assessed and consolidated/aggregation it shall be allocated a storage

bay appropriate to its characteristics. The site will have the following segregated storage areas:

Combustible Liquids (hydrocarbons)

Non-Hazardous Solids & Liquids

Flammable Solids & Liquids

Corrosive Solid & Liquids

Oxidising Solids & Liquids

Environmentally Hazardous Solids & Liquids

Toxic Solid & Liquids

Table 5 below gives an indication of the expected types & volumes of waste to be held on site at any

time along with the respective capacities on site for that waste category.

Table 5 - Site Storage Volumes and Locations

Category Expected Quantity

Container Type Location Capacity

Combustible <5 Tonnes Package Non-DG Storage area 10 Tonnes

Non Dangerous <10 Tonnes Package Non-DG Storage area 20 Tonnes

Flammable <5 Tonnes Package DG Storage area 3 20 Tonnes

Corrosive <5 Tonnes Package DG Storage area 8 10 Tonnes

Oxidising <1 Tonne Package DG Storage area 5 2 Tonnes

Environmentally Hazardous

<2 Tonnes Package DG Storage area 9 5 Tonnes

Toxic <2 Tonnes Package DG Storage area 6 5 Tonnes

All packaged waste will be stored in compliance with the relevant Australian Standards and Codes of Practice for the storage of Dangerous Goods. The expected quantity is the normal operating volumes expected to be stored at the facility. Volumes of waste on site will be managed to ensure sufficient capacity at all times.

All packaging received on site will either be:

Reused - in the event any waste is delivered to site in a reusable container all efforts to return the container to the customer or to reuse the container will be made Recycled - wherever possible empty containers shall be drained and/or cleaned to be free of residue and recycled. Disposed - Containers and packaging that is not reusable or not residue free will be incorporated into landfill waste for disposal as appropriate.

Page 15: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

15

[Type text] [Type text]

3.6 Waste Processing

The predominant form of processing on-site will be the consolidation of smaller packaged waste

(<200 litres) volumes into larger containers to facilitate the safe, environmentally efficient and

operationally effective manner of shipment off-site for re-use, recycling or disposal.

Once waste is received and accepted on site it will be assessed by technically qualified personnel and will

then be processed according to the following criteria:

• Physical Form

• Hazard - reactivity, flammability, acidity etc.

• Waste type & contaminants

• Package quality , size and type

Similar waste streams are assessed and compatibility checked to ensure suitable for consolidation

prior to transfer of contents into 200 and 1,000 litre containers. Liquids will be transferred via gravity

discharge, vacuum or compressor driven air pumps.

3.7 Chemical Treatment

Smaller selected waste streams will be treated on site. Treatment processes will include:

• Oxidation - Reduction (REDOX) neutralisation

• Acid – Base neutralisation

• Absorption of small quantities i.e. <1 tonne per week of non-reactive liquid/sludge waste such as herbicides, pesticides, drilling mud, laboratory samples, oil sludge, etc. Disposal of absorbed material will be to class 2 landfill.

Neutralised/treated liquid waste will then be consolidated and sent for disposal as per the processes

described in section 3.6, above.

3.8 Waste Dispatch

Once packaged wastes have been aggregated into suitable loads for dispatch, this is typically 10 to 20

tonnes in size however can be less depending on the nature of the material. The aggregated waste

is dispatched to approved reuse, recycling, treatment or disposal facilities both within Western

Australia , other states in Australia and potentially overseas.

All controlled wastes greater then 200kg dispatched from the facility will be tracked as per the

Environmental Protection (Controlled Waste) Regulations and additionally any waste sent inter-state

would be accompanied by the required interstate waste movement approvals as regulated by the

National Environment Protection Measure (NEPM) for inter-state waste movements. Any waste

materials requiring to be sent overseas for recycling will be accompanied by the appropriate Federal

approvals as per the Basel Convention.

Page 16: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

16

[Type text] [Type text]

3.9 Description of Project Infrastructure

The general infrastructure required is already in place and includes:

• Sealed roadways

• Utilities - water, power, telecommunications

• Stormwater control systems and site drainage

• Covered operational and storage areas

• Concrete loading, storage and processing areas

• Office

• Warehouse

• Security Gates and Perimeter fence

• Lighting

The key infrastructure to be installed associated with this project shall be:

• Package waste store - pallet racking in warehouse with segregated bunded areas by dangerous

goods/hazard class

• Bunded vehicle loading & unloading area

• Bunded waste receipt, inspection and storage areas

• Dangerous Goods storage containers for small quantities of dangerous goods - oxidising and toxic

materials

• Fire services as required by Australian Standards

• Security cameras to be installed to cover all operational areas.

All infrastructure required such as sealed roadways, parking areas, offices, warehouse building and

utilities are already present on-site and require no further modification.

Page 17: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

17

[Type text] [Type text]

Figure 4 - Site Layout Plan

Page 18: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

18

[Type text] [Type text]

Figure 5 - Site Operational Plan

Page 19: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

19

[Type text] [Type text]

4.0 LOCAL GOVERNMENT AUTHORITY

4.1 Part IV Environmental Protection Act 1986, Environmental Impact Assessment

This proposal has not been referred for assessment under Part IV Environmental Protection Act 1986.

4.2 Part V Environmental Protection Act 1986, Environmental Management

As a prescribed premise under Schedule 1 of the Environmental Protection Regulation 1987, CTS will require a license to operate.

• Environmental Protection Regulation 1987.

• Environmental Protection (Unauthorized Discharges) Regulation 2004.

• Environmental Protection (Controlled Waste) Regulation 2004.

5.0 Local Government Authority

The Local Government Authority is the City of Swan.

The site currently is zoned General Industry and has the appropriate planning approval to operate as a waste transfer facility.

6.0 Stakeholder and Community Consultation

Due to location and scale of the proposed activity the requirement for community consultation has been assessed and deemed not required for this application.

As part of the application for license the proposed development will be advertised.

Page 20: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

20

[Type text] [Type text]

7.0 ENVIRONMENTAL IMPACTS & MITIGATION MEASURES

7.1 Introduction

A qualitative Environmental Risk Assessment (ERA) has been undertaken to:

• Identify the type of impact (hazards) associated with the proposed operation;

• Analyze the probability (likelihood) and significance (consequence) of the impacts occurring to

determine the level of the risk;

• Evaluate the impacts to assess the extent and nature of management required;

• Identify and assess mitigation measures to determine the best management options to

mitigate impacts; and

• Determine the level of residual risk following the implementation of mitigation measures.

7.2 Methodology

The ERA has been prepared in accordance with Australian Standard AS 4360 Risk management Guidelines, 2004 (AS4360-2004) . The risk management process is illustrated as follows:

Figure 7 - Risk Management Process (Standards Australia, 1999)

Page 21: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

21

[Type text] [Type text]

The following aspects I receptors have been assessed as part of the ERA:

• Air Quality (Dust and Odor);

• Noise and Vibration ;

• Water Quality (Surface Water and Groundwater);

• Soil;

• Flora and Fauna;

• Weeds and Feral Animals;

• Culture (Aboriginal and European) and Heritage ;

• Waste Management (Solid and Liquid Waste) ;

• Health and Safety Management;

• Traffic Management; and

• Dangerous Goods.

The definition of risk according to AS4360-2004 is "the chance of something happening that will have an impact on objectives ". The assessment of risk is a factor of the likelihood of an impact occurring and the consequences of the impact occurring in relation to a particular receptor. The combinat ion of these aspects will determine the level of risk of the impact.

The following tables outline the criteria that have been used to assess the likelihood and consequences of potential impacts occurring for the proposed operation. Potential impacts have been assessed for operational phase of the project.

The likelihood of an impact arising is defined in Table 7. The likelihood relates to the probability of a potential hazard I impact occurring.

Table 6 - Likelihood (Probability) Scale

Category Description Score

Almost Certain

Is expected to occur in most circumstances. Almost certain or the most likely and expected result. Has a >90% chance of occurring if the risk is not mitigated.

10

Likely Will probably occur in most circumstances. Quite possible I not unusual. Has a 60-90% chance of occurring if the risk is not mitigated. 6

Possible Might occur at some time. Would be a remotely possible coincidence. Has a 40- 60% chance of occurring if the risk is not mitigated. 3

Unlikely

Could occur at some time. Would be remotely possible coincidence. Has a 10- 30% chance of occurring if the risk is not mitigated. 2

Rare May occur only in exceptional circumstances. Less than 10% chance of occurring if the risk is not mitigated. 1

2 AS 4360 Risk management Guidelines, 2004

Page 22: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

22

[Type text] [Type text]

Table 7 – Consequence Levels

Category Description Score

Catastrophic

A major event which could cause severe or irreversible damage to the natural and I or human environment, including the following: • major legislative, regulatory or policy breach including regulatory intervention or prosecution; • Extensive long term detrimental environmental and social impacts; and • Widespread, permanent or persistent damage to ecosystems including the eradication of endangered species or habitats, or the destruction of cultural heritage sites.

20

Major

An event which could have a substantial and permanent consequence to the natural and I or human environment, including the following: • Legislative, regulatory or policy breach; • Widespread long term detrimental environmental and social impact; and • Localised damage to ecosystems including the eradication of endangered species or habitats, or the destruction of cultural heritage sites.

10

Moderate

An event which could create substantial temporary or minor permanent damage to the natural and I or human environment, including the following: • Contract or policy breach; • Localised short term detrimental environmental and social impacts; and • Localised temporary I repairable damage to ecosystems including the eradication of endangered species or habitats, or the destruction of cultural heritage sites.

5

Minor

An event, which could have temporary and minor effects to the natural and I or human environment, including the following: • Localised minor short-term detrimental environmental and social impacts; and • Minor temporary damage to ecosystems or cultural heritage sites.

2

Negligible No detrimental impact on the natural and I or human environment is measured or envisaged. 1

Page 23: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

23

[Type text] [Type text]

Once the likelihood and consequence has been defined for potential impacts, the level of risk associated with the impacts have been determined to give an overall risk rating, as presented in table 9.

The level of risk is calculated by Likelihood x Consequence = Risk Rating.

Table 8 - Risk Matrix

Likelihood

Consequence

Catastrophic 20 Major

10 Moderate 5 Minor

2 Negligible

1

Almost Certain 10

200 100 50 20 10

Likely 6

120 60 30 12 6

Possible 3

60 30 15 6 3

Unlikely 2

40 20 10 4 2

Rare 1

20 10 5 2 1

Table 9 - Definition of Risk Ratings

Risk Rating Risk Category Description

>90-200 Extreme Immediate action is required. Appropriate measures are to be developed to mitigate and manage the potential impacts associated with risks.

>20-90 High Management / long-term risk reduction is required. Appropriate measures are to be developed to mitigate and manage the potential impacts associated with risks.

>6-20 Medium Management of risks is required. Risks can be mitigated by implementing reasonable / standard management measures.

0-6 Low

Acceptable risks are assessed and controlled as required. No specific management measures are required or risks can be directly managed through design measure, general mitigation measures and safety controls.

The risk rating for potential impacts assumes that no management I mitigation measures will be put in place and determines the inherent (uncontrolled) risk. Mitigation measures have been recommended for potential impacts and the risk rating revised to determine the level of residual risk remaining, following the implementation of these measures.

Mitigation measures have been identified in accordance with hierarchy of control measures as follows:

• Elimination - Eliminate the hazard from the project altogether (i.e. eliminate a hazardous task that is not required);

• Substitution - Replace a process with a less hazardous one;

• Isolation - Isolate the hazard from receptors through the use of barriers etc.;

• Engineering - Redesign work procedures I processes to reduce the hazard;

• Administrative - Provide construction workers with training, instruction, supervision, job rotation and safe work procedures to prevent impacts I incidents.

Page 24: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

24 [Type text] [Type text]

7.3 Construction Phase

Air Emissions

Objectives: • Comply with relevant regulatory requirements in relation to air quality

• Minimise gaseous emissions from the proposed construction works for the protection of health and the environment

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Exhaust emissions

Vehicles and machinery

The proposed construction works will include activities; traffic movements that will involve the use of machinery and vehicles. This will result in increased emissions of Carbon Dioxide. The scale however of the proposed works are very minor and can be considered negligible (less than one or two vehicle movements per day)

Planned Low 6 • Exhaust emissions will be minimised by undertaking regular inspections to ensure that plant, vehicles and equipment is well maintained and in good working order.

• Current complaint management procedures, including a community complains register, which re implemented at the site.

Site Manager Pre, during and post construction works

Negligible 2

Air pollution from chemical application

Spraying of paints

The spraying of paints/chemicals can result in reduced air quality. It is expected that paint and other chemical will be used during the construction works. The scale however of the proposed works are very minor and can be considered negligible.

Planned Low 6 • If paint and chemicals with the potential to become air borne particulates are required to be used during the construction works, spraying will not be undertaken during windy/rainy conditions

Site Manager Pre, during and post construction works

Low 4

Air pollution from smoke generation

Wildfires and burning of materials

Smoke generation can be cause by wildfires and burning of materials (deliberate and accidental) and may pose a health risk to workers, surrounding communities and the environment. The proposed construction works could include activities; welding and grinding, storage of dangerous goods, poor site practises e.g. incorrect disposal of used cigarettes.

Random High 30 • No burning of vegetation or other materials will be permitted on site.

• Smoking will be permitted in designated areas only. Appropriate disposal facilities for used cigarettes will be provided.

• Health and safety incident management procedures that are currently employed at the site through the HSEQ Management System will be implemented.

• All staff will be inducted prior to construction works commencing and made aware of the site HSEQ Management System, health and safety issues and fire risks.

• No hot works will be carried out on total fire ban days.

• Storage areas for dangerous goods will be complaint with the relevant legislation.

• All construction works will have appropriate training in the handling of Dangerous Goods and Hazardous materials and chemicals

Site Manager Pre, during and post construction works

Low 6

Page 25: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

25

[Type text] [Type text]

Dust emissions

Objectives:

• Comply with relevant regulatory requirements in relation to air quality. • Minimize gaseous, particulate and odor emissions from proposed construction works for the protection of health and the environment.

Impact Source Details Variability Inherent

Risk Mitigation/Management

Measures Responsibility Timing

Residual Risk

Air pollution from dust generation

Machinery, vehicles and plant

The proposed construction works may include activities; traffic movements and the minor concrete works. Exposed areas will be limited as no earthworks are proposed as part of the construction works. It is expected that construction works will produce minimal dust as all roadways are sealed.

Planned Low 6 None Required Site Manager Pre, during and post construction works

Low 6

Page 26: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

26

[Type text] [Type text]

Odour emissions

Objectives:

• Comply with relevant regulatory requirements in relation to air quality.

• Minimise odour emissions from proposed construction works for the protection of health and the environment.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Odour Emissions

Spraying of chemicals/paint

The spraying of chemicals may reduce air quality. It is expected that paint and other chemicals will be used during the construction works. The scale however of the proposed works are very minor and can be considered negligible.

Planned Low 6 If paint and chemicals with the potential to increase the odour emissions are required to be used during the construction works, spraying will not be undertaken during windy conditions.

Site Manager Pre, during and post construction works

Low 6

Noise and vibrations

Objectives:

• Comply with relevant regulatory requirements in relation to vibration and noise levels. • Minimise adverse noise and vibration impacts on surrounding areas.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Noise and vibration

Machinery, vehicles

The proposed construction works may include activities; provision of services, installation of barriers and signs and traffic movements which may result in noise and vibration generation. Noise and vibration may pose a health risk to workers and a nuisance to adjacent properties. However, the site is located in an industrial area away from major communities. The duration of any such activity is expected to be short and therefore impacts are therefore not considered to be significant.

Planned Low 6 • Works will be undertaken in accordance with the HSEQ Management System noise management procedures.

• Affected adjacent land users will be notified when work is likely to cause

• Speed limits will be implemented on site

Site Manager Pre, during and post construction works

Low 6

Page 27: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

27

[Type text] [Type text]

Light emission

Objectives:

• Reduce the potential for light emission impact.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Light Night Time Operations

Site is located within an existing industrial area and will not have significant night time construction works.

Planned Negligible 2

Not required Site Manager N/A Negligible 2

Water Quality Objectives:

• Maintain existing quality of water in receiving water bodies and groundwater. • Manage contaminated water and limit the risk of contamination to receiving water bodies.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spills, leaks during the construction phase may cause pollution of surface water and groundwater

Machinery & Equipment

The proposed construction work may include the following site activities which may result: • Handling, transportation and treatment of liquid wastes such a fuel, oil and lubricants. • Spills, leaks or accidental releases of these substances may occur during the operation of construction equipment on site.

Planned Medium 15

• Stormwater that is potentially contaminated will be segregated from clean stormwater and isolated to storm drain. • Storage areas for fuels, oils, and chemicals will be surrounded by an impervious bund in accordance with the relevant Australian Standards for the storage of Dangerous Goods. • Cleaning of equipment will be undertaken in appropriate areas in a manner, which prevents or minimizes pollution waters. • Work will be undertaken in accordance with the site HSEQ Management System spill management procedures currently employed at the site. • Spill containment equipment kits will be available on site.

Site Manager Pre, during and post construction works

Low 6

Page 28: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

28

[Type text] [Type text]

Discharge to land

Objectives:

• Prevent the contamination of underlying soil.

• Manage runoff from stockpile areas.

• Reduce the potential for erosion and sedimentation

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spills and /or leaks during construction works causing soil contamination and land degradation by soil erosion

Machinery & Equipment

All stages if the construction phase may involve moving or stationary plant and equipment. Spills, leaks or accidental releases of hazardous substances may occur during the operation, storage or re- fuelling of plant and equipment, which may impact on soil quality.

Planned Medium 15 • Storage areas for fuels, oils, and chemicals will be surrounded by an impervious bund in accordance with the relevant Australian Standards for the storage of Dangerous Goods. • Cleaning of equipment will be undertaken in appropriate areas in a manner, which prevents or minimizes pollution waters. • Work will be undertaken in accordance with the site HSEQ Management System spill management procedures currently employed at the site. • Spill containment equipment kits will be available on site.

Site Manager During construction works

Low 6

Page 29: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

29

[Type text] [Type text]

Waste Management

Objectives:

• Minimize generation of waste

• Minimize waste exposure to environment

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Waste Generation

Construction Waste will be generated during the proposed construction works. Solid waste will generally comprise of: • Packaging materials (plastic, cardboard, paper and pellets) • Scrap material • Putrescible waste • Concrete waste/adhesives/paint If the waste ins not managed correctly it can cause the degradation of land and the attraction of weeds and/or pest species.

Planned Low 6 • Works will be undertaken in accordance with the site HSEQ Management System spill management procedures currently employed at the site. • Where available, waste suitable for reused or recycled. The waste management system will follow the waste hierarchy (Reduce; Reuse: Recycle: Responsible Disposal) • The site will be left in a clean and tidy state on completion of the works. • All waste will be stored in appropriate containers and protected from adverse weather and vermin. All waste disposal containers will be clearly labelled. • Materials and products with recycled content will be proposed for the works wherever these are cost and performance competitive and they are environmentally preferable to the non-recycled alternative. • Toilet facilities will be provided for workers during construction works. • All personnel will be provided with training on waste management.

Technical Manager

Pre, during and post

construction works

Low 4

Page 30: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

30

[Type text] [Type text]

Dangerous Goods

Objectives:

• Identify potential risk and potential mitigation measures

• Ensure site workers are aware of environmental obligations relating to the site works to reduce the risk of an environmental incident

• Protect health, environmental and property on site and in the surrounding area

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spill and /or leaks during construction works causing soil and groundwater contamination

Construction The construction works may involve the use of the chemicals, including Dangerous Goods. Spills, leaks or accidental releases of hazardous substances may occur which may impact on water quality and pose a risk to the health of construction workers.

Planned High 30 • Storage areas for Dangerous Substances/Goods will be complaint with the relevant Australian Standards for the storage of Dangerous Goods. • Spill contaminated equipment kits will be available on site. • Storage areas will be available clearly labelled with the quantity and characteristics of chemical stored. Safety Data Sheets (SDS) will be available which indicate the appropriate action to be taken in the event of a spill. • All spills or incidents must be reported to the Technical Manager and, if required, to the appropriate Regulatory Authority. • Daily site inspections will record any spills or no-compliances and the corrective action taken.

Technical Manager

Pre, during and post construction works

Low 6

3 AS 1940-2004 The storage and handling of flammable and combustible liquids

Page 31: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

31

[Type text] [Type text]

-

7.4 Operational Phase

Air Emissions

Objectives:

• Comply with relevant regulatory requirements in relation to air quality

• Minimise gaseous emissions from the proposed during the operation phase for the protection of health and the environment.

Impact Source Details Variability Inherent Risk

Mitigation/Management Measures Responsibility Timing Residual Risk

Exhaust emissions

Storage and processing areas

The operations may involve the use of machinery and vehicles including trucks and forklifts. This would result in increased emissions of Carbon Dioxide.

Continuous Medium 12

• Exhaust emissions will be minimised by regular inspections to ensure that plant, vehicles and equipment are well maintained and in good working order. • Using of motor vehicle requiring anti- pollution device. • Complaint management procedures which are currently employed at the site as part of the Site HSEQ Management system

Technical Manager

During operation

Low 6

VOC's emission

Storage areas

VOC's emissions may occur from the transport and the handling of waste in the unloading, processing and storage areas. All wastes will be in sealed in packages and tanks therefore impacts are not considered to be significant.

Planned Low 6 Complaint management procedures, which are currently employed at the site as part of the Site Based Management Plan, including the maintenance of a community complaints register, will be implemented in order to identify areas where emissions are significant problem.

Technical Manager

During operation

Low 6

Air pollution from smoke generation

Storage VOC's emissions may occur from the transport and the handling of waste in the unloading, processing and storage areas. All wastes will be in sealed in packages and tanks therefore Impacts are not considered to be significant.

Random High 30 • No burning of vegetation of other materials will be permitted on site. • Smoking will be permitted in designated areas only. Appropriate disposal facilities for used cigarettes will be provided • Health and safety and incident management procedures which are currently employed at the site through the HSEQ Management System will be implemented • All staff will be inducted prior to the operations commencing and made aware of the HSEQ Management System, Site Based Management Plan, health and safety issues and fire risks.

• Appropriate safety programs will be implemented including nominated medical arrangements, firefighting equipment, evacuation procedures and first aid provision.

• Storage areas for Dangerous Substances/ Goods will be compliant with the relevant legislation.

• All site workers will have appropriate training in the handling of Dangerous Substances/ Goods and Hazardous materials and chemicals.

Technical Manager

During operation

Low 6

Page 32: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

32

[Type text] [Type text]

Dust emissions

Objectives:

• Comply with relevant regulatory requirements in relation to air quality.

• Minimise gaseous , particulate and odor emissions from proposed construction works for the protection of health and the environment.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Air pollution from dust generation

Storage areas Air pollution from dust may occur from the following activities: • traffic movements (trucks and private vehicles /day through the site).

Continuous/Discontinuous Medium 12 • General housekeeping practises will be implemented to prevent the accumulation of waste materials that may generate dust. • All traffic areas are sealed • Complaint management procedures, which are currently employed at the site, as a part of the HSEQ Management Plan, including the maintenance of a complaints register, will be implemented in order to identify areas where dust management is a significant problem.

Technical Manager

During operation

Low 4

Page 33: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

33

[Type text] [Type text]

Odour emissions

Objectives:

• Comply with relevant regulatory requirements in relation to air quality.

• Minimise odour emissions from proposed construction works for the protection of health and the environment.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Odour emissions

Storage and processing areas

During the processing and storing of waste materials air pollution from odour may occur.

Continuous/Planned Medium 12

• Packaged and bulk waste to be stored in sealed containers

• Waste materials accepted to be risk assessed prior to acceptance to identify odour or other risks

• General housekeeping practices will be implemented to prevent the accumulation of waste materials that may generate odour.

• Community notification will be undertaken where appropriate when work is likely to cause odour impact on the public.

Technical Manager

During operation

Low 6

Noise and vibrations

Objectives:

• Comply with relevant regulatory requirements in relation to vibration and noise levels.

• Minimise adverse noise and vibration impacts on surrounding areas.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Noise and vibration

Waste Transfer Operations

The following site activities which may result in noise and vibration generation: • Handling and transportation of waste • Treatment of waste • Truck movement Noise and vibration may pose a health risk to workers and a nuisance to adjacent properties. However, the site is located in an industrial area away from major communities. Impacts are therefore not considered to be significant.

Continuous Low 6 • Works will be undertaken in accordance with the HSEQ Management System noise management procedures currently employed at the site. • Speed limits will be implemented on site to control noise generation from traffic movements.

Technical Manager

During operation

Low 4

Page 34: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

34

[Type text] [Type text]

Light emission

Objectives:

• Reduce the potential for light emission impact

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Light emissions

Night lighting

Site is located within an existing industrial area and will not have significant night-time operational works.

Planned Low 4 Non required Technical Manager

During operation

Low 4

Water Quality

Objectives:

• Maintain existing quality of water in receiving water bodies and groundwater.

• Manage contaminated water and limit the risk of contamination to receiving water bodies.

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spills, leaks during the operation of the waste transfer facility causing pollution of surface water and groundwater

Operation of a waste transfer facility

The operation of the waste transfer facility may include activities which may result: • Handling, disposal and treatment of stormwater • Spills, leaks, accidental releases of these substances may occur which may impact on water quality.

Continuous High 30 • All operational activity to occur in bunded hardstand areas • Stormwater that is potentially contaminated will be segregated from clean stormwater • Storage areas for fuels, oils, and chemicals will be surrounded by an impervious bund in accordance with the relevant Australian Standards for the storage of Dangerous Goods. • Refuelling plant and equipment will be undertaken within bunded areas. • Vehicles washdown will be undertaken in designed bunded area or off-site • Cleaning of equipment will be undertaken in appropriate areas in a manner, which prevents or minimises pollution waters. •Work will be undertaken in accordance with the HSEQ Management System spill management procedures currently employed at the site. • All site workers will have appropriate training in the handling of Hazardous materials, chemicals and spill response. • Spill containment equipment kits will be available on site.

Technical Manager

During operation

Low 6

Page 35: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

35

[Type text] [Type text]

Discharge to land

Objectives:

• Manage runoff from stockpile areas.

• Reduce the potential for erosion and sedimentation

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spills and/or leaks during the operation of the waste transfer facility

Operations of processing and storage areas

Spills, leaks or accidental releases of hazardous substances may occur during the operation, storage or re-fuelling of plant and equipment which may impact on soil quality.

Continuous High 30 • Operations will be undertaken in accordance with the HSEQ Management System spill management procedures currently employed at the site. • Storage areas for fuels, oils and chemicals will be surrounded by an impervious bund in accordance with the relevant Australian Standard for the storage of dangerous goods. • Visual inspection will be undertaken daily to assess the performance of the storage areas • Refuelling plant and equipment will be undertaken within bunded areas. • Cleaning of equipment will be undertaken in appropriate areas in a manner, which prevent or minimises pollution to soil. • Spill containment equipment kits will be available on site.

Technical Manager

During operation

Low 6

Page 36: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

36

[Type text] [Type text]

Waste Management

Objectives:

• Minimize generation of waste

• Minimize waste exposure to environment

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Waste Generation

Operations of

processing and storage

areas

Waste will be generated during operation. Solid waste will generally comprise of: • Packaging materials (plastic, cardboard, paper and pellets) • Scrap material • Putrescible waste • Concrete waste/adhesives/paint If the waste ins not managed correctly it can cause the degradation of land and the attraction of weeds and/or pest species

Planned Low 6 • Operations will be undertaken in accordance with the site HSEQ Management System spill management procedures currently employed at the site. • Where available, suitable waste will be reused or recycled. The waste management system will follow the waste hierarchy (Reduce; Reuse: Recycle: Responsible Disposal) • The site will be left in a clean and tidy state after daily operations. • All waste will be stored in appropriate containers and protected from adverse weather and vermin. All waste disposal containers will be clearly labelled. • All personnel will be provided with training on waste management.

Technical Manager

During operation

Low 4

Page 37: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

37

[Type text] [Type text]

Dangerous Goods

Objectives:

• Identify potential risk and potential mitigation measures

• Ensure site workers are aware of environmental obligations relating to the site works to reduce the risk of an environmental incident

• Protect health, environmental and property on site and in the surrounding area

Impact Source Details Variability Inherent

Risk Mitigation/Management Measures Responsibility Timing

Residual Risk

Spill and /or leaks during operation causing soil and groundwater contamination

Operations of

processing and storage

areas

Operations will involve the use and processing of chemicals, including Dangerous Goods. Spills, leaks or accidental releases of hazardous substances may occur which may impact on water quality and pose a risk to the health of construction workers.

Planned High 30 • Storage areas for Dangerous Substances/Goods will be complaint with the relevant Australian Standards for the storage of Dangerous Goods. • Spill contaminated equipment kits will be available on site. • Storage areas will be available clearly labelled with the quantity and characteristics of chemical stored. Safety Data Sheets (SDS) will be available which indicate the appropriate action to be taken in the event of a spill. • All spills or incidents must be reported to the Technical Manager and, if required, to the appropriate Regulatory Authority. • Daily site inspections will record any spills or non-compliances and the corrective action taken.

Technical Manager

Pre, during and post construction works

Low 6

4 AS 1940-2004 The storage and handling of flammable and combustible liquids

Page 38: Works Approval Application Supporting Information ...€¦ · Malaga, WA 6090 08 9248 3505 Works Approval Application Supporting Information Cleartech Waste Management Pty Ltd Cleartech

38

[Type text] [Type text]

BIBLIOGRAPHY

ADWG, (2004) National Water Quality Management Strategy - Australian Drinking Water Guidelines. National Health and Medical Research Council,

Natural Resource Management Ministerial Council. Australian Government.

ATSDR, (2008) Agency for Toxic Substances and Disease Registry. www.atsdr.cdr.org Australian Standard 1940-2004,The storage and handling of

flammable and combustible liquids.

DEC, (2006) Community Consultation Guideline. Department of Environment and Conservation, Perth.

DEP, (2001a) Reporting on Site Assessments . Department of Environmental Protection, Government of Western Australia.

DEP, (2001b) Potentially Contaminated Activities, Industries and Landuses . Department o f Environmental Protection, Perth.

Department of Environment, (2004), Stormwater Management Manual for Western Australia

Department of Sustainability , Environment, Water, Population and Communities , (2011) Australian Heritage Database. www.environment.gov

.au/cgi-bin/ahdb/search .pl

DoH, (2009) Guidelines for Assessment, Remediation and Management of Asbestos Contaminated Sites in Western Australia . Department of Water,

Perth.

DoW, (2004) Perth Groundwater Atlas online. Department of Water, Perth. www.water.wa.gov.au DoW, (2012) Groundwater Bore Database.

Department of Water, Perth.

Environmental Protection (Controlled Waste) Regulations 2004.

European Commission, (2006) Integrated Pollution Prevention and Control- Reference Document on Best Available Techniques on Emissions from

Storage.

National Pollutant Inventory , (2011) www.npi.gov.au

Standards Australia 1999, Environmental Risk Management - Principles and Process, HB 203:2000, based on AZ/NZS 4360:1999, Risk Management ,

Standards Australia, Sydney , New South Wales, Available at www .standars.co.au