zurich – gotthard – milan - stadt zürich · ecoplan /ibr rurbance meeting study zurich –...

28
ECOPLAN /IBR RURBANCE Meeting Study Zurich Gotthard Milan NEAT and the need for cooperative government action within urban-rural interconnections Zurich, 20.9.2013 Matthias Amacher, Stefan Suter (Ecoplan) Jürg Inderbitzin (IBR)

Upload: others

Post on 16-Sep-2019

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR

RURBANCE Meeting

Study Zurich – Gotthard – Milan

NEAT and the need for cooperative government action within urban-rural

interconnections

Zurich, 20.9.2013‏

Matthias Amacher, Stefan Suter (Ecoplan)

Jürg Inderbitzin (IBR)

Page 2: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 2

1. Gotthard corridor and the NEAT

2. Beneficiaries and economic effects of the NEAT

3. Chances and risks

4. Needs and potentials for cooperative government action

5. Goals of the study

Contents

Page 3: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 3

1 Gotthard corridor and the NEAT

What are the main characteristics of the corridor?

What is the NEAT?

What happens when the NEAT opens in 2016/19?

NEAT: Neue Eisenbahn-Alpentransversale

NRLA: New Railway Link through the Alps

Page 4: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 4

Gotthard corridor and the NEAT

The corridor:

2 countries (Switzerland and Italy)

2 different languages (and some dialects)

Swiss part (CH): 5 Cantons and 413 communities

9 Mio. inhabitants (CH: 1.1 Mio.) of which 65% live in urban areas

Alps (Gotthard mountain) as a natural border

NEAT:

Two new railway tunnels: Gotthard and Ceneri

Zurich - Milan by train within 2:40h (today: 3:30h)

Page 5: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 5

The Gotthard corridor and the NEAT

2016

2019

Page 6: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 6

Gotthard corridor: Urban and rural areas

Lombardy (Milan)

Regiosuisse Gemeindetypen

Metropolräume

Städtische Gemeinden und Agglo

Periurbaner ländlicher Raum

Alpine Tourismuszentren

Peripherer ländlicher Raum

Zürich

Knonaueramt

Zimmerberg

Uri

Innerschwyz

Einsiedeln

March-Höfe

Zug

Tre Valli

Locarno Bellinzona

Lugano

Mendrisio

Erstfeld

Bodio

Arth-Goldau

Chiasso

Gotthard-Basistunnel

Ceneri base tunnel

Metropolitan area

Other urban areas

Periurban rural areas

Touristic areas

Peripheral rural area

Regiosuisse Gemeindetypen

Metropolräume

Städtische Gemeinden und Agglo

Periurbaner ländlicher Raum

Alpine Tourismuszentren

Peripherer ländlicher Raum

Zürich

Knonaueramt

Zimmerberg

Uri

Innerschwyz

Einsiedeln

March-Höfe

Zug

Tre Valli

Locarno Bellinzona

Lugano

Mendrisio

Erstfeld

Bodio

Arth-Goldau

Chiasso

Gotthard-Basistunnel

Page 7: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 7

Gotthard corridor: Urban and rural areas

Lombardy (Milan)

Regiosuisse Gemeindetypen

Metropolräume

Städtische Gemeinden und Agglo

Periurbaner ländlicher Raum

Alpine Tourismuszentren

Peripherer ländlicher Raum

Zürich

Knonaueramt

Zimmerberg

Uri

Innerschwyz

Einsiedeln

March-Höfe

Zug

Tre Valli

Locarno Bellinzona

Lugano

Mendrisio

Erstfeld

Bodio

Arth-Goldau

Chiasso

Gotthard-Basistunnel

Ceneri base tunnel

Metropolitan area

Other urban areas

Periurban rural areas

Touristic areas

Peripheral rural area

Regiosuisse Gemeindetypen

Metropolräume

Städtische Gemeinden und Agglo

Periurbaner ländlicher Raum

Alpine Tourismuszentren

Peripherer ländlicher Raum

Zürich

Knonaueramt

Zimmerberg

Uri

Innerschwyz

Einsiedeln

March-Höfe

Zug

Tre Valli

Locarno Bellinzona

Lugano

Mendrisio

Erstfeld

Bodio

Arth-Goldau

Chiasso

Gotthard-BasistunnelMetropolitan

and other

urban areas

Metropolitan

and urban

areas

Rural area

Page 8: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR

Gotthard corridor: Abstraction

Gotthard Ceneri

Zurich / ZG / SZ UR & TI (N) TI (S) Lombardy

40-50min Max. time savings: 10-20min

Metropolitan

and other

urban areas

Metropolitan

and other

urban areas

Rural area

Rural area

Metropolitan

and other

urban areas

8

Page 9: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 9

What happens to travel time (by train)?

Gotthard Ceneri

Zurich / ZG / SZ UR & TI (N) TI (S) Lombardy

-10-20 min

No significant effect (or even loss)

-50-60 min

Milan Lugano Zurich

-40 min

Bellinzona Schwyz Altdorf

No significant effect

Zug

Page 10: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 10

2 Beneficiaries and effects of the

NEAT

Who will benefit from the NEAT?

Economic effects: Example of tourism

Do commuters benefit?

Page 11: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 11

Who benefits from speed-up?

Users: Tourists/visitors on day/weekend trips and business travellers‏

No car available/needed

Traveling with low weight luggage

Working during travel (business travel, students)

:Economy‏

Firms with high public (train) transport dependency

Specific: Tourism and dependent products and services

Page 12: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR

12

The example of tourism: Economic effects

Tourism (hotels,

restaurants,

services)

Retail business (food, luxury, clothes)

Entertainment

business (concerts, festivals,

activities)

Cultural

institutions (museums, libraries,

galleries)

Financial

institutions (banks, insurance)

Transportation (train, bus,

cable car, taxi)

Industry and trade (production)

Co

nstr

uctio

n

Visitors: Tourists and business travellers Needs: hotels, restaurants, shops, travel services, information, meeting

rooms, taxi, public transport, financial services

Transport

Page 13: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR

13

Do commuters benefit?

Why is there limited benefit for commuters?

Commuters with more than 1 hour travel time: 9%

Only few commuters use the Gotthard route by train even within the

«1-hour-limit»

With NEAT: Only one new connection may fall within this «1-hour-limit»

Gotthard: Uri (Altdorf) - Bellinzona

But: Depends on quality of InterCity (Tunnel-) access of Altdorf

At least one «end» is relatively small sized (inhabitants, employees,

workplaces)

Page 14: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 14

3 Chances and risks

What are the chances of NEAT-opening?

What are the risks of NEAT-opening?

Page 15: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 15

What are the chances arising?

Decline of psychological borders (language, Alps, national borders,

distance)

Access to new touristic markets: More tourists

Faster access to customers

Locational advantages (firms and inhabitants)

Milan Lugano Zurich

Tunnels

Bern

Basel

Germany

France

Lombardy

Veneto

Piemonte

Access to new touristic markets

Page 16: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 16

What are the risks?

Over-centralisation in urban areas

Bypassing of rural areas (specific: rural and alpine parts of UR and TI)

Strengthening the dependency on tourism

Shift from multi-day tourists to one-day tourists

Intensified competition (financial sector in Zurich/Lugano – Milan)

Milan Lugano Zurich

Tunnels

Centralisation

Page 17: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 17

4 Needs and potentials for

government action

Who will act first given the new infrastructure?

Why should governments act?

Why should governments act together?

Page 18: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 18

Who will act in the first round?

:Reactions‏

Inhabitants and businesses optimize their behavior automatically

Adapting to the new conditions introduced by NEAT

=> a matter of the private sector

Page 19: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 19

Why should governments act (together)?

Governments take single action to‏

use or raise chances

avoid risks

support private actors to do so

Governments do this when chances / risik are recognised

Governments take bilateral or multilateral action to‏

Use synergies: «together, we can do it better / cheaper»

Avoid common risks or share risks: «risk for my neighbour is a risk for all

of us»

Page 20: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 20

5 Goals of the Study

What will we do?

What can be done by governments?

What are the goals of the study?

Page 21: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 21

What will we do in the study?

Informing actors:

Show current state of the corridor

Show the probable effects of the NEAT, risks and chances

Connecting actors:

Bring partners together for discussion

3 workshops: «North», «Tessin» and «Italy»

Developing ideas for common action:

Proposals for specific policy measures

Design of possible processes for implementation

Page 22: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 22

What kind of measures?

Three types of measures:

Direct: Develop common projects that can be implemented now

Indirect: Set framework conditions for a more efficient future project

development

Mid and long term: Push «soft» factors like «trust», «common

identity»

=> Study focus on direct measures

Page 23: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 23

What kind of measures?

… Measures that‏

affect urban-rural interconnection

affect north-south interconnection

address chances / risks triggered by NEAT

cannot be implemented by taking unilateral action

will not be implemented by others (private actors)

Page 24: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 24

Summary: What is the goal of the study?

Develop measures that can be implemented as a cooperation

between urban and rural areas, south and north

which cannot be carried out taking unilateral action

and use chances / avoid risks triggered by NEAT

With restrictions: Two main thematic fields remain:

Reduce costs by a common supply of public goods & services

Overcome locational disadvantages by combining locational

advantages

Page 25: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 25

Examples: Common supply of public goods &

services

General: Start common projects in public transport, education,

cultural institutions, health, tourism

Joint supply and ordering of administrative services

Common information channels / platforms, informal discussion

platforms

Create fund to promote Italian-German (or vice versa) translation

of signs on public ground, information-brochures or public web

sites

Page 26: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 26

Examples: Combining locational advantages

Model: «Locational advantage of neighbours is my own advantage»

Draw a map of locational advantages / industry clusters and use in

joint business location promotion do this also for touristic

infrastructure

List strengths (and weaknesses) of urban and rural areas in the

corridor

Introduce mechanisms to exchange building zones (urban area has

zones for businesses, bulding zones for housing available in rural

areas)

Page 27: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR 27

Discussion

Ideas? Opinions?

Examples?

Page 28: Zurich – Gotthard – Milan - Stadt Zürich · ECOPLAN /IBR RURBANCE Meeting Study Zurich – Gotthard – Milan NEAT and the need for cooperative government action within urban-rural

ECOPLAN /IBR

www.ecoplan.ch

28

www.hslu.ch/ibr