Page 1: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

HINS PMG

June 2nd, 2006

Page 2: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 2

HINSAgenda

Reactions to the AAC Meeting

Status of the MOUs

Technical Status

Issues

Page 3: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 3

HINSReactions to AAC MeetingCaveat: no official report received yet.

Reaction: Thanks !More on diagnostic later

Corlett (Chair)

Page 4: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 4

HINS

Yes.Agrees with our strategy in terms of

Schedule RiskCost Risk

Activities:Definition of Beam Diagnostic ElementsAllocation of Beam Diagnostic along Beam Line (P.O.)

Agreed:Especially true for SSR1 & SSR2FNAL “entrance”into new field

Page 5: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 5

HINSBeam Diagnostic ElementsElements:

Current transformers (CT): RFQ exit, MEBT exit, RT exit , between the cryostats, end of the linacBeam phase pick-up: after RT section, between the cryostats and at the end of linacInitial tune-up of the cavity field and phase

360 deg slow phase shifter in the transmission line of every cavity, electronically controllableUse RT and SC cavities as a phase pick-up

Beam profile wire scanners (or/and laser scanners)MEBT – at least 1 scanner, 4 scanners after RT cavities, at least 2 scanners at the end of linac

Beam loss monitors – about 20 – distribute along the linacInter-cryostat space should include

CTBPM, includes phase pick-upWire scanner

Hard so far to engage proper AD resources

~Integral Design of RF Cavities

BNL MOU

Page 6: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 6

HINSIs there space for Beam Diagnostic ?

MEBT (2.5 MeV) OK

Page 7: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 7

HINSIs there space for Beam Diagnostic ?

SSR1

SSR1

Add a Solenoid, increaseRT-SC transition space

The first SSR-1 works as a buncherThe second SSR1 is offIncrease the field level in all SSR1 by 10%, the surface field is 31 MV/mMinimal impact on beam quality, more studies are required to insure that no additional emittance growth or beam losses

Page 8: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 8

HINSIs there space for Beam Diagnostic ?Challenge:

Design integrated diagnostic boxDetector/Engineering Manpower issue

AD most logical source for Det.No resource engagement yet

TD most logical source for Eng.No resource available yet

Page 9: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 9

HINSRF StudiesHomeworkNo Progress

Right mix of “Scientist”+”RFEngineer” needed

Page 10: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 10

HINSSpoke Cavities Orientation

Page 11: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 11

HINSAmplitude of E-field, 1 mm offset

7.790E+06

7.791E+06

7.792E+067.793E+06

7.794E+06

7.795E+06

7.796E+06

7.797E+067.798E+067.799E+06

7.800E+06

85 87 89 91 93 95Z(mm)

Ez

X - OFFSETY - OFFSET

Amplitude of E-field, 1 mm offset

0.000E+00

1.000E+06

2.000E+06

3.000E+06

4.000E+06

5.000E+06

6.000E+06

7.000E+06

8.000E+06

9.000E+06

0 50 100 150 200 250 300Z(mm)

Ez

X - OFFSETY - OFFSET

0.03% asymmetry

Investigation of E-field asymmetry on beam dynamic

Electric field distribution in Single Spoke Resonator, β=0.22

Magnitude of electric field along z direction with 1 mm offset in X and Y axis's

Page 12: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 12

HINSAnalysis of HOM in SSRFirst Stage Program: ~4 months

MWS calculations of HOM frequencies, fields profile, R/Q, kick factor and Q external for monopole and dipole modes in SSR up to 3GHzInvestigations of modes trapping possibilities and

manufacturing imperfection With these HOM information, repeat the beam instability simulations and the HOM induced power analysis Resources: Gonin, Romanov, Ostroumov (ANL), etc.

Page 13: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 13

HINS

Page 14: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 14

HINSSpoke Cavity Slow TunerBuild Prototype during summer ‘06Assembly

tooling group @ IB2 (L.Elementi)Time: 1 week

TestingTest & Instrumentation Dept. (R.Carcagno)Meeting scheduled on Jun 6 to define competencies and requirementsTime:

Short period testing @ 4KAt least 1 month (if it works…) @ LN2 T

Where: stand 3 @ IB1When: likely October

Page 15: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 15

HINS

All legitimate questions, addressed by ongoing R&DResources: Nicol/Page for cool-down movements

Terechkine for cryoperm

Page 16: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 16

HINS

LBL MOULBL designed and developed LLRF for the SNS

Page 17: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 17

HINSStatus of the MOUsANL (700 k$) – Beam Simulation, SSR Construction

MOU signed at FNAL and ANL2 reqs in FNAL system

Req #187514, not yet a PO (?), signed by Pier, waiting for J. HallReq #187505, not yet a PO (?), signed by Pier, waiting for J. Hall

Technically, collaborating since “day-0”.

LBL (365 k$) – Electron Cloud, LLRF, Buncher Cav. designMOU signed at FNAL and LBL1 req in FNAL system

Req #187539, not yet a PO (?), signed by Pier, waiting for J. HallTechnically, ball in our park to define buncher cavities specs

BNL (800 k$) – Stripping foil, laser-wire scanner MOU agreed upon (Dave/Alberto work) on May 31st, being signed.

Page 18: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 18

HINS

Reactions to the AAC Meeting

Status of the MOUs

Technical Status

Issues

Page 19: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 19

HINSTechnical Status

Ion SourcePlasmatron setup in MS6, testing LEBTMagnetron in Linac, waiting for long-pulse PS

EE Resources in AD (Steve Hays to deliver in ~2 weeks since last January)Shutdown over, time to move !

Page 20: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 20

HINSTechnical StatusRFQ under procurement

“Procurement visit” to Accsysin May

Accsys to provide Vacuum Vessel calc. to FNAL codeDwgs to FNAL for sign off.End Flange/Vacuum flanges configurationsHold Points & Technical Contacts at FNAL

RFQ + Support + Tuning/commissioning at FNAL~522 k$, contract written, undergoing signature for re-approval of new cost (original was 500 k$)

Page 21: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 21

HINSTechnical StatusRT Prototype

Contract awarded (~40k$ for first cavity)Production Plan providedCopper procured, first Al test pieces machinedCavity at FNAL by end of August (RF in Meson needed at that time ! )PC to be procured in June.

Page 22: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 22

HINSMeson PreparationMockup Tunnel Waveguide Support

Klystron-Modulator Umbrella

Page 23: 02 06 2006 HINS PMG - INDICO-FNAL (Indico)2 Jun 06 – G.A. HINS PMG 12 Analysis of HOM in SSR HINS First Stage Program: ~4 months MWS calculations of HOM frequencies, fields profile,

2 Jun 06 – G.A. HINS PMG 23

HINSISSUESPotential Interference with duration of Capture Cavity testing in Meson in present cave

Suggestion/indications they wish to stay for ~9 months Why ? No cryo ready in new-muon.

RFQ delivery by January 2007. Would like to refurbish area/install ion source ~Nov-Dec ’06

From HINS point of view can only allow ~6 of 9 months

Suggestion of using HINS modulator/pulse transformed (4 msec) for 1.3 GHz Klystron test