“Management of Operational “Management of Operational Safety in RWYs” Safety in RWYs” VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop 1. Airports – Brazil 2. INFRAERO 3. Changes 4. Investments 5. Achievements/Gains VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop SUMMARY 2

Upload: vandat

Post on 07-Feb-2019

216 views

Category:

Documents


0 download

TRANSCRIPT

“Management of Operational “Management of Operational Safety in RWYs”Safety in RWYs”

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

1. Airports – Brazil

2. INFRAERO

3. Changes

4. Investments

5. Achievements/Gains

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

SUMMARY

2

Airports of Brazil

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

2.500 aerodromes of Brazil

700 aerodromes of public administration

66 airports of Infraero administration

3

INFRAERO

“Provide infrastructure and airport services and

air navigation services, contributing to national

integration and sustainable development of the

country.”

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Mission:

4

INFRAERO

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Responsible for:

66 airports

34 Logistics Cargo Terminals (1.14 Mil ton/year)

Billing: US$ 1.9 Bi

5

66 Infraero airports administration:

• 78 Runway – 7.4 Mil m2

• 400 Taxiway – 3.5 Mil m2

• Aprons – 5.0 Mil m2

• Total – 15.9 Mil m2

INFRAERO - Pavement

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

6

Aeroporto Internacional

Aeroporto Nacional

Sede

Grupamento de Navegação Aérea – GNAe Unidade Técnica de Aeronavegação – UTA

Superintendência Regional

7

In the 66 airports managed by Infraero operate 97% ofthe movement of air transportation in Brazil. Equivalentto 2.6 million aircraft takeoffs and landings per year.

It was estimated the movement of 186 millionpassengers in 2011 at 19.8% increase compared to2010.

INFRAERO

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

8

Infraero had 09 rubber removal equipments (Woma andLemasa pump) and 01 high-performance device (Rucker/ Waterblasting) in evaluation;

13 friction measuring equipment - cfme (ASFT, MuMetere Skiddometer).

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

SITUATION IN 2009

9

RUCKER - Equipament WOMA / LEMASA

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Rubber removal equipment

10

SITUATION IN 2009

MuMeter MK-6 Skiddometer (BV-11)

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Friction measuring equipment (cfme)

11

SITUATION IN 2009

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

ASFT (Airport Surface Friction Tester)

Friction measuring equipment (cfme)

12

SITUATION IN 2009

The demand for air travel in the domestic market hasincrease significantly since 2009.

The increase of the domestic market reached 21.17%from January to July 2011. The increase of internationalflights operated by brazilian companies was 17.46%.

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

CHANGES – INCREASE OF CIVIL AVIATION

13

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Annual increase of passengersthan previous year.

0,00%

5,00%

10,00%

15,00%

20,00%

25,00%

20062007

20082009

2010

6,36%8,19%

2,13%

13,49%

21,25%

14

CHANGES – INCREASE OF CIVIL AVIATION

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Annual increase of Aircraft Movementthan previous year.

0,00%

2,00%

4,00%

6,00%

8,00%

10,00%

12,00%

14,00%

16,00%

20062007

20082009

2010

4,20%6,21%

4,47%

7,62%

15,60%

15

CHANGES – INCREASE OF CIVIL AVIATION

The brazilian legislation that regulates the proceduresfor monitoring friction on runways was updated in 2009,increasing the friction measurement tests, of 268 to 529per year (increase of 97.4%).

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

16

CHANGES – LEGISLATION

One equipment with high performance technology forrubber removal was purchased in 2007 forevaluation. The solution was accepted.

In 2009/11, more 11 runway rubber removalequipment were purchased.

► US$ 12,6 million

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

17

INVESTMENTS

LAVRITA equipament

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Rubber removal equipment

18

INVESTMENTS

Infraero has an internal program to develop solutions,called “Projeto Ideia em Acão”, which led to the designthe pilot project aimed at customizing a vehicle fortraction and transport of a Skiddometer BV-11.

This pilot project was used for the specification of 18friction measuring equipment (cfme) being acquired.

► US$ 5 million

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

INVESTMENTS

19

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

“Projeto Idéia em Ação”

Friction measuring equipment (cfme)

20

INVESTMENTS

Grip Tester

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Friction measuring equipment (cfme)

21

INVESTMENTS

18 Foreign Object (F.O)Removal Equipment (2010/11)

► US$ 8,3 millions

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

22

INVESTMENTS

33 tractors / sweepers acquired in 2008/09.

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

► US$ 3,2 millions.

23

INVESTMENTS

For maintenance of the 78 runways (RWY):

• 21 Runway Rubber Removal (RRR)

• 31 Continuous Friction Measuring Equipment (cfme)

• Contracts with companies to provide this services

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

24

SITUATION IN 2011

SITUATION: 2009 - 2011

10

21

13

31

0

5

10

15

20

25

30

35

2009 2011

RRR

CFME

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

25

■ 31 Continous frictionmeasuring equipment

■ 21 Runway RubberRemoval equipament

4 3

23

4 3

2

2

3 2

4 34 3

4 2

Distribution of RRR and CFME - 2011

1

3

26

Infraero invested US$ 29.1 millions between 2009 and2011:

11 runway rubber removal;

18 continous friction measuring equipment;

18 foreign Object (F.O) Removal Equipment;

33 tractor / sweepers of Foreign Objects.

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

27

INVESTMENTS - SUMMARY

ACHIEVEMENTS / GAINS

- Decrease of the interference (time) in the airportoperation;

- Improvements in monitoring and maintenance of RWY.

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

28

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

- Improvements of the Management Operational Safety;

- Development of the Brazilian market in the provision ofspecialized services and supply of equipment, that canmeet South America.

29

ACHIEVEMENTS / GAINS

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

30

1. Airports – Brazil

2. INFRAERO

3. Changes

4. Investments

5. Achievements/Gains

SUMMARY

“The heart of a creative organization is to help each one to maximize their potential”

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

31

THANK YOU!

VIII Airports Pavement Seminar & VI FAA Airport Pavement Workshop

Any Question?

Eng. Wallace T. Sampaio

[email protected]

32