  • 7/29/2019 108th HSJV Weekly Meeting

    1/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    P ease Turn o your

    mobile! Or Switch to

    vibration mode!

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Check! Right Now!

  • 7/29/2019 108th HSJV Weekly Meeting

    2/24

  • 7/29/2019 108th HSJV Weekly Meeting

    3/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    4/24

    3/3/20

    NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS

    ACTIONACTION

    BYBY

    DUEDUE

    DATEDATE STATUSSTATUS

    Two organizations will come back on next Seoyong

    1ow u msson

    of HSE Findings

    improve HSE reporting on site at their

    respective workplaces.

    Younchang

    PB

    Meeting

    2High HSE

    Findings

    Findings were rated as per established

    scoring system. Advan got the highest HSE

    findings. The organization will come back on

    next meeting with a comprehensive plans.

    AdvanNext

    Meeting

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    5/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    HSE Personnel mu st be vis ible at al l t imes in si te, his work mott oHSE Personnel mu st be vis ible at al l t imes in si te, his work mott o the f i rs t the f i rs t

    to come and t he last to leave the siteto come and t he last to leave the site . Where task is cri t ic al he should be in. Where task is cri t ic al he should be in

    constant watch and work closely with supervisor in charge.constant watch and work closely with supervisor in charge.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    6/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Descript ionDescript ion ::

    HJSV made a ceremonial meeting to launch 100HJSV made a ceremonial m eeting to l aunch 100--days of f ree incidents anddays of f ree incidents and

    quali ty problems. During such occasion monthl y awards were also givenquali ty problems. During such occasion monthl y awards were also given

    to the best subcontractor, individual and spot awards.to the best subcontractor, individual and spot awards.

    4

    4

    1. Signage for notifying the

    facility

    2. Person in charge signage

    2

    3

    4

    1

    6

    5. Hand Sanitizing Solution

    (Hand Sanitizers)

    6. Patch & Sand

    . a y ec s or ean ng

    4. Ventilation o f all dir ection

    BARAKAH NUCLEAR POWER PLANT PROJECT

    - Prevent urine leakage on

    the ground

    Descript ionDescript ion ::

    Recommended standard for t oi let to be used in Power Block.Recommended standard for t oi let to be used in Power Block.

  • 7/29/2019 108th HSJV Weekly Meeting

    7/24

    3/3/20

    7. Deodorizing Balls

    - To minimize bad odor.

    7

    9

    8. White bucket for urine &

    maximum level marked

    BARAKAH NUCLEAR POWER PLANT PROJECT

    89. Disinfectants

    -To decontaminate u rineinstantly.

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    8/24

    3/3/20

    Item

    Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total

    For theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    CumFor theWeek

    Cum

    Near Misses 0 0 0 0 0 2 0 5 0 0 0 0 0 7 0 0

    Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0

    (This Week From Feb 23 Mar 1, 2013)

    First Aid Cases(FA) 0 1 0 0 0 0 0 6 0 3 0 2 0 12 0 0

    MedicalTreatment Cases

    (MTC)0 0 0 0 0 3 0 3 0 0 0 0 0 6 0 0

    Restricted Work

    Cases (RWC) 0 1 0 1 0 0 0 1 0 0 0 0 0 3 0 0

    LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    Property/Vehicle

    Accid ents 0 1 0 1 0 2 1 5 0 1 0 0 1 10 0 0

    Environmental0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop

    Power Block Cut Off Wall, Wharf Area, Concrete Block Area

    * : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 6 (2013)

    e ease

    Forthisweek Cumulative

    OneStrike Policy 4 111*

    Source: CAR, Near Miss, Observation Cards and Walkthrough

    AreaNo. of No. of KEPCO

    SUBCON

    (This Week From Feb 23 March 01 , 2013)

    KEPCO&HSJV SUBCON

    Anc il lary

    Area5 68 11 57

    Camp

    Area4 19 16 3

    Office

    Area5 88 8 80

    Power

    150

    200

    250

    300

    243

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Block 5 300 57 243

    Village 1 5 82 9 73

    Village 2 5 8 0 8

    Total Findings 565

    0

    50

    AncillaryArea

    CampArea

    OfficeArea

    PowerBlock

    Village1 Village2

    11 16 8

    57

    90

    57

    3

    73

    8

  • 7/29/2019 108th HSJV Weekly Meeting

    9/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From Feb 23 March 01 , 2013)

    Issued

    NearMissNearMiss

    CARCAR

    0 0 0 0

    0 59 177 236

    Findings TotalKE

    P

    C

    O

    H

    S

    J

    V

    S

    U

    B

    C

    O

    N

    Open Closed

    KEPCO HSJV Subcon KEPCO SubconHSJV

    0 0 0 0 0 0

    0 1 0 0 58 177

    BARAKAH NUCLEAR POWER PLANT PROJECT

    TOTALTOTAL

    OC&

    WFOC

    &

    WF 0 42 287 329

    0 101 464 565

    0 0 0 0 42 287

    0 1 0 0 100 464

  • 7/29/2019 108th HSJV Weekly Meeting

    10/24

    3/3/20

    for the Period Total Open

    CompanyFe bru ar y TOTA L

    2013 OPEN

    Youn Chang 1 1

    Total 1 1

    Company

    Feb23 March01,2013

    CCAP CAR/NM

    YounChang 1

    Total 1

    BARAKAH NUCLEAR POWER PLANT PROJECT

    (This Week From Feb 23 March 01, 2013)

    3741

    4751

    68

    ElectricalSafetySigns,Barriers&barricades

    MaterialManagementAccess&Egress

    PPE

    77

    81111

    1515

    1618

    2225

    2829

    35

    H f

    PTW

    HotWorksEnvironmental

    Training

    Hand&PowerToolsFallProtection

    Lifting

    Documents

    ColorCodingPlant&EquipmentWorkingatHeight

    WasteManagementFirePrevention

    Scaffolding

    BARAKAH NUCLEAR POWER PLANT PROJECT

    111

    23

    56

    0 10 20 30 40 50 60 70 80

    ManualHandlingConfinedSpace

    LOTO

    RoadSafetyExcavation

    PoorIlluminationSupervision

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 108th HSJV Weekly Meeting

    11/24

    3/3/20

    Management personnelshould lead in the use of

    mandatory PPE ( Power

    Proper storage of chemical at

    the workplace (Batch Install handrail for stairway

    utilized as access & egress

    1 32

    Block, Advan)

    Use of appro ved PPE whenperforming welding works

    (TGB1, D&I)

    Electricians must wear full

    body harness during

    termination works at height

    (CWDC, Gusan PB)

    ,

    Removal of unnecessary

    combustible material from the

    shop (Ancillary, Younchang

    PB)

    Transfer of cement materials

    blocking entrance of building(STC, Hanlim E&C)

    (Power Block, Samjin)

    Clearing of spoil materials at

    entrance of CWIC.

    (CWIC, WBG)

    Ladder must be clamped at

    both sides (RCB, Seoyong

    PB)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Replacement of damaged

    gloves (Ancillary, Younchang

    PB)

    PPE Material Management

    Observe proper arrangement

    of tools and materials kept

    inside the building

    (STC, Jonghap)

    Access and Egress

    Removal of obstruc tion

    (timber & jacks) at the access

    way (Village 1, Towers Tech)

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    12/24

    3/3/20

    700

    8004550

    KEPCO/HSJV

    SUBCON

    (This Week From Feb 23 March 01, 2013)

    100

    200

    300

    400

    500

    600

    101520253035 Manpower

    BARAKAH NUCLEAR POWER PLANT PROJECT

    00

    Seoyo

    ng

    Seoyong(PB)

    TowersTech

    Gusan

    Gusan(PB)

    Eunm

    in

    Jongh

    ap

    Jonghap(PB)

    YounCha

    ng

    YounChang(PB)

    Hwach

    on

    W

    BG

    Hila

    lco

    Advan

    Hanlim

    Uw

    ell

    YooA

    HyundaiC&I

    Sam

    jin

    Euge

    ne

    Daemyu

    ng

    Seob

    on

    D

    &I

    AlRa

    eel

    DO

    W

    Sam

    ho

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    13/24

    3/3/20

    14.0

    FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)

    Source: CAR, Near Miss, Walkthroughand Observation Card reported by

    KEPCO & HSJV

    0.0

    2.0

    4.0

    6.0

    8.0

    10.0

    .

    4.4 4.7

    0.9 1.0

    7.9

    1.0 1.0

    3.1

    0.5

    2.32.9

    9.4

    2.5 3.03.6

    6.2

    0.2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem

    1.JointInspection willbecarriedoutbyAreaManagementTeam.2.SpotTrainingwillbegiven toworkersaboutmajorfindings3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby ADVAN

    Legend : (I) Infra, (PB) Power Block

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    14/24

    3/3/20

    Total No. of Findings: 54Access&Egress,10

    MaterialManagement,2

    WorkingatHeight,2

    Plant&Equipment,1

    ColorCoding,1 HotWorks,1Documents,

    1 Training,1

    Cause Nos

    Access&Egress 10

    PPE 10

    Control Measure Due Date

    Clearingof materialsthat

    blocksaccess.Maintain

    accessfreeofobstruction

    Alw ays

    Signs,Barriers&Housekeeping,2

    WasteManagement,2

    Lifting,2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Motivatemanagement

    personneltoleadintheuse

    ofmandatory

    PPE

    Alw ays

    PPE,10Scaffolding,6ElectricalSafety,4

    FallProtection,3FirePrevention,3

    Barricades,3

    Source: CAR, Near Miss, Walkthrough and Observation Card

    Top Hazards

    Total No. of Findings: 50

    Access&Egress,6

    Plant&Equipment,2

    ColorCoding,1ConfinedSpace,1 Documents,1 excavation,1

    FallProtection,1

    PPE,1

    Cause Nos

    Access &Egress 6

    Scaffolding 5

    Control Measure Due Date

    Ensureaccessareingood

    condition(nonslip),even

    distanceofstairsteps,and

    removal of obstruction.

    Alw ays

    Scaffolding,5

    ElectricalSafety,3Housekeeping,3

    Lifting,3Environmental,2

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Workers shoulduse

    inspectedscaffold,

    completeguardrails,and

    mobilewithengaged

    outriggers.

    Alw ays

    FirePrevention,4

    MaterialManagement,4

    Signs,Barriers&Barricades,4

    WasteManagement,4

    WorkingatHeight,4

    Source: CAR, Near Miss, Walkthrough and Observation Card

  • 7/29/2019 108th HSJV Weekly Meeting

    15/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    AREAAREA : In take Basin(Al: Intake Basin (Al RaeelRaeel) February 27,2013) February 27,2013

    Initial Action TakenInitial Action Taken

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    16/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

    InspectionInspection DateDate AttendeesAtt endees RemarkRemark

    Commit tee Inspec tion 2013-02-26 HSJV, KEPCO, HSE Managemen t Team 03 Find ings

    Weekly Inspection 2013-02-27 HSJV HSE Team 18 Findings

  • 7/29/2019 108th HSJV Weekly Meeting

    17/24

    3/3/20

    4

    5

    6

    FindingsperCompany Total

    4NotHookingFindingsperCausal

    3

    5

    21 1

    21

    21

    0

    1

    2

    D&I Gusan(PB) Hilalco JongHap Seobon Seoyong(PB) WBG YounChang YounChang(PB)

    BARAKAH NUCLEAR POWER PLANT PROJECT

    1

    1

    1

    1

    2

    2

    3

    0 0.5 1 1.5 2 2.5 3 3.5 4 4.5

    IncompleteLanyardNoSignage

    LackAwarenessScaffoldNoInspection

    IncompleteAccess/PlatformAbsenceofFallProtection

    WrongPosition

    Key item : Working At Heights

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    18/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Around Inter sect ion betw een war ehouse and rebar sho p i n Anc ill ary Area.

    Description STP without f ences and proper signage, all control valves are exposed to potentialaccidents/incidents.

    Actiontaken Installed full barricade and appropriate signage.

    Status CLOSED

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Between AB wall and CPB at power block area

    Description Stagnant water that may lead to generate algae/bacteria.

    Actiontaken Dewatering operation immediately conducted t o drain the stagnant w ater

    Status CLOSED

  • 7/29/2019 108th HSJV Weekly Meeting

    19/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Around dewat ering pond at i ntak e basi n area

    Description Oil leakage from the shovel oil tank due to hitt ing the rocks while operating.

    Actiontaken Cleaned, disposed of cont aminated soil properly, sent the shovel to m aintenance shop i nMusafa.

    Status CLOSED

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Hilalco work shop at power block.

    Description Hazardous materials form oil neglected in front of chemical storage , and mixed with othertypes of substances at the same area.

    Actiontaken Form oil kept ins ide the chemical storage, and stored hazardous materials by typescomplying with the BNPP-HSE-P41 procedure.

    Status CLOSED

  • 7/29/2019 108th HSJV Weekly Meeting

    20/24

    3/3/20

    HAZARDOUS SKIP METAL SKIP WOOD SKIP

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Hilalco workshop at power block area.

    Description Improper waste management and segregation.

    Actiontaken Arrange t he ho usekeepin g t eam wi th Su perv iso r an d seg regat ed w aste as per EMP-P01.

    Status CLOSED

    CONCRETE SKIP

    METAL SKIP

    Hazardous

    Cans

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Location Seoyong workshop at power block area

    Description Improper waste management and segregation.

    Actiontaken Immediately segregated the waste, and conducted spot training on w aste managementfrom HSJV HSE team.

    Status CLOSED

  • 7/29/2019 108th HSJV Weekly Meeting

    21/24

    3/3/20

    No.0 DateAction by

    CompanyDescription Status

    Closing

    Date

    Expiration

    DateRef . No . Mai n Ar ea Su b-Ar ea Is su ed B y

    Issuer

    Company

    1 27- Feb -13 Al RaeelOil leakage from the shovel oil tank du e to

    hitting the rocks while operating.Closed 2-Mar-13 5-Mar-13 2013-0588

    Intake

    Basin

    Dewaterin

    g PondHSJV

    Renato

    Ponce

    2 27-Feb-13 Hi lal coHazardous materials form oil neglected in

    front of chemical storage , and mixed with

    other types of substances.

    Closed 3-Mar-13 5-Mar-13 2013-0589Power

    Block

    Workshop

    AreaHSJV

    Renato

    Ponce

    3 27- Feb -13 Seo yo ng

    Improper waste management and

    segregation concrete waste skip bin

    dumped with mixed garbage and

    construct ion waste. Metal skip bin dumped

    with hazardous materials chemical cans.

    Closed 3-Mar-13 5-Mar-13 2013-0590 Anci llaryLaydown

    YardHSJV

    Renato

    Ponce

    BARAKAH NUCLEAR POWER PLANT PROJECT

    4 27-Feb-13 Hi lal co

    Improper waste management & segregation,

    cross contamination of recyclable waste on

    hazardous, metal & wood skip bins,

    lack of supervision

    Closed 3-Mar-13 5-Mar-13 2013-0593Power

    Block

    Workshop

    AreaHSJV

    Renato

    Ponce

    5 27-Feb-13 HSJV

    There was stagnant water that may l ead to

    an environment in which Algal/Bacteria

    easily proliferate in the area of behind the

    AUX bui ldi ng Uni t #1.

    Closed 3-Mar-13 9-Mar-13000000161

    5

    Power

    Block

    AUX

    BuildingENEC

    Ahmed Al

    Neaimi

    WASTEMANAGEMENTUPDATE

    Week=21/02/2013 27/02/2013

    Thisweek Lastweek

    Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)

    Paper 88 0 45 72 0 0

    Metal 48 0 45 32 0 0

    Construction 112 225 0 120 495 90

    Concrete 0 0 0 0 0 0Wood(Good) 0 0 45 0 0 0Wood(Bad) 328 450 0 192 180 0

    Plastic 120 0 0 72 0 0

    BARAKAH NUCLEAR POWER PLANT PROJECT

    Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea

    Recycle Treatedwaste(GMET)toRecyclingPlants

    Municipal 0 240 0 0 288 0Hazardous 0 90 0 0 16 0

    TotalSolidWaste 696 1005 135 13.43% 504 979 90 9.19%

  • 7/29/2019 108th HSJV Weekly Meeting

    22/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    23/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT

    BARAKAH NUCLEAR POWER PLANT PROJECT

  • 7/29/2019 108th HSJV Weekly Meeting

    24/24

    3/3/20

    BARAKAH NUCLEAR POWER PLANT PROJECT