Page 1: 2010 11-05-14 STOPAQ Training Presentation

1

STOPAQ Application

Guidelines & Training Manual

Dr. Fikry [email protected] date: October 2010

Page 2: 2010 11-05-14 STOPAQ Training Presentation

2

Contents

• General preparation of a pipeline for STOPAQ application

• STOPAQ Coating to repair pipeline

• Pipeline Coating with STOPAQ for Rehabilitation

– Seamless Pipeline

– Longitudinal Seam Pipeline

• Risers Coating

• Field Joint (Girth weld) Coating

• Flange Coating

Dr Fikry [email protected]

Page 3: 2010 11-05-14 STOPAQ Training Presentation

3

Coating repairs with STOPAQ

General

• The pipe section that needs to be coated must be excavated sufficiently to

have enough clearance around it.

• Ensure excavation of 0.3m under the pipe section.

• The working area must be kept dry during application.

• Check regularly to ensure the pipe section stays above dew point i.e. with no

condensation.

Page 4: 2010 11-05-14 STOPAQ Training Presentation

4

Coating repairs with STOPAQ

Surface Preparation & Quality Control

• The old damaged coating must be removed from

the pipe surface that needs to be re-coated.

Finish as square as possible. The surface to be

coated must be clean and dry and free of loose

parts.

• At the spot where connection to the bitumen/PE

is, this must be bevelled under an angle of 30°.

The base surface must be dry and clean.

• Should abnormalities be found around the repair

spot, then consult with

Anti Corrosion Technology. If the coating consists

of asbestos bitumen, then the applicable

regulations for removal must be followed.

Page 5: 2010 11-05-14 STOPAQ Training Presentation

5

Coating repairs with STOPAQ

Application of STOPAQ CZH Wrappingband

• The first wrapping must be applied tightly to the

bitumen/PE after it has been brushed or grit

blasted.

• Start by wrapping one straight band on each end

of the pipe section to cover 50mm of the existing

coating.

• Then continue spiral wrapping the STOPAQ CZH

Wrappingband over itself maintaining a minimum

10mm overlap.

Page 6: 2010 11-05-14 STOPAQ Training Presentation

6

Coating repairs with STOPAQ

Application of STOPAQ PVC Outerwrap

• The STOPAQ PVC Outerwrap provides the

primary mechanical strength to STOPAQ CZH

Wrappingband.

• Start tightly wrapping one straight band over the

STOPAQ CZH Wrappingband on one end of the

pipe section.

• The continue to spiral wrap STOPAQ PVC

outerwrap tightly on the STOPAQ CZH

Wrappingband maintaining a minimum 30%

overlap.

• On both sides, leave 3mm of STOPAQ CZH

Wrappingband visible.

Page 7: 2010 11-05-14 STOPAQ Training Presentation

Coating repairs with STOPAQ

Application of STOPAQ UV cured Polyester outerwrap

• STOPAQ UV cured Polyester outerwrap is applied over the

STOPAQ CZH Wrappingband or PVC outerwrap in situations where

protection against heavy mechanical strength is necessary.

• The STOPAQ UV cured Polyester outerwrap must be kept dry,

clean and out of direct exposure to light.

• Immediately before application, pre-cut STOPAQ UV cured

Polyester outerwrap to size.

• Remove any grease with isopropanol (CAS-nr 67-63-0) and

condensation with a dry rag.

• UV-lamps must be used for hardening. Daylight contains UV-A light.

Taking weather conditions into consideration, it is advisable to have

UV-lamps available at the working area.

• After hardening the product can be painted with an appropriate PU

coating.

• There is a “water curing” version of this outerwrap, so please

consult ACT if this is a more suitable option.

Page 8: 2010 11-05-14 STOPAQ Training Presentation

8

Pipeline coating

• Apply first STOPAQ CZH wrappingband wrapping

squarely.

• Apply next wrappings with a minimum overlap of

10mm. On field joint sections, overlap by 50%. Apply

wrapping with a light tension. End squarely.

• Use Holiday Detector to check for any voids (spark

test up to 15KV) before applying the outer wrap.

• When applying the STOPAQ PVC outerwrap, 3mm of

the STOPAQ CZH Wrappingband must be visible on

both ends of the pipe section.

Application of STOPAQ CZH Wrappingband on seamless pipes

Page 9: 2010 11-05-14 STOPAQ Training Presentation

9

Pipeline coating

• Use STOPAQ PVC outer wrap to provide

mechanical protection. Apply first STOPAQ PVC

outerwrap wrapping squarely.

• Overlap STOPAQ PVC outerwrap spiral application

by minimum 30%. Finish STOPAQ PVC outerwrap

wrapping always on the lower side of the pipe in

general.

• 3mm of STOPAQ CZH Wrappingband must be

visible on both ends of the pipe section under the

STOPAQ PVC outerwrap.

Application of STOPAQ CZH Wrappingband and PVC outerwrap on seamless pipes

Page 10: 2010 11-05-14 STOPAQ Training Presentation

10

Pipeline coating

• Welds with sharp edges and protrusions must be

dressed by grinding for suitable roundness fillets

• Apply STOPAQ CZH Wrappingband strips

longitudinally to cover the weld line (as illustrated)

• Spirally wrap the whole pipe with STOPAQ CZH

Wrappingband and STOPAQ PVC outwerwrap as previously illustrated.

• Application can be done reinstate existing coating.

the coated surface must be clean and dry to

ensure adequate cohesion of the STOPAQ CZH

Wrappingband. Overlap the existing coating with a

minimum of 5cm.

Application of STOPAQ CZH Wrappingband on pipes with longitudinal weld

Page 11: 2010 11-05-14 STOPAQ Training Presentation

11

Risers Coating

General

• The transition sections of the pipeline from below ground to above ground

causes major concern for corrosion. The STOPAQ System guarantees long-

lasting protection against corrosion where cathodic protection is also less

effective. This system can be strengthened on the outside with STOPAQ UV

cured Polyester outerwrap to protect against any mechanical damage.

• STOPAQ UV cured Polyester outerwrap can be painted with PU if required to

match safety coding colour.

• Application of STOPAQ system is illustrated below.

Page 12: 2010 11-05-14 STOPAQ Training Presentation

12

Risers coating

Surface preparation

• Existing damaged coating must be removed from the pipe surface which is to

be repaired with the STOPAQ system. Masking tape should be used to ensure

a clean and square finish, and to protect the rest of the pipe section.

• The surface to be coated must be clean, dry and free of loose scales. This can

be achieved by wire brushing to Sa 2 and if extremely corroded the surface

must be abrasive blasted to Sa 2.5.

• It is imperative to apply STOPAQ CZH Wrappingband on a dry surface without

oil, grease, and condensate.

Page 13: 2010 11-05-14 STOPAQ Training Presentation

13

Risers coating

Application of STOPAQ CZH Wrappingband

• If there is a circle weld or longitudinal weld on the

riser to be protected, this weld must be firstly

coated with one strip of STOPAQ CZH

Wrappingband prior to the spiral application of the

STOPAQ CZH Wrappingband.

• Application procedure as per the illustration below.

Page 14: 2010 11-05-14 STOPAQ Training Presentation

14

Risers Coating

Application of STOPAQ PVC outerwrap

• The STOPAQ PVC outerwrap gives the primary

mechanical strength to STOPAQ CZH Wrappingband.

It is applied with a little bit of pressure on the

underlying STOPAQ CZH Wrappingband.

• The overlap must be maintained at a minimum of

30%. On both sides 3mm of STOPAQ CZH

Wrappingband must be left visible.

• It is best to apply STOPAQ PVC outerwrap at a

minimum temperature of 15°C and surface must be

dry with no condensation.

Page 15: 2010 11-05-14 STOPAQ Training Presentation

15

Coating of field joints (girth weld)

General

• The field joint can be coated either over the ditch or in the ditch.

• The pipe section must be excavated sufficiently so that it can be handled on

all sides.

• Excavate 0.3m under the lowest pipe part.

• The working area must be kept dry during application.

• Check regularly whether the pipe stays above dew point by means of a dew

point gauge. Drain (if necessary).

• Keep free from rain, but provide sufficient ventilation with regard to dew point.

Page 16: 2010 11-05-14 STOPAQ Training Presentation

16

Coating of field joints (girth weld)

Application of STOPAQ CZH Wrappingband

• Girth weld to be coated as illustrated.

• If there are sharp edges on the welds, they should be

ground off and apply STOPAQ CZH Wrappingband as

illustrated.

• The adjacent coating must be bevelled to an angle of

30°. The coating must be lightly sanded and cleaned

where STOPAQ CZH Wrappingband is applied. Start at

30mm past the circle weld and then wrap a cuff squarely

on the pipe with an overlap of 100mm over its own wrap.

Page 17: 2010 11-05-14 STOPAQ Training Presentation

17

Coating of field joints (girth weld)

Application of STOPAQ CZH Wrappingband

• Apply 2nd wrapping squarely, 30mm over the circle

weld, end with 100mm overlap on the underlying

STOPAQ CZH Wrappingband. Pipes < 30” 5cm overlap

over the existing coating. Pipes > 30” 10cm overlap

over the existing coating.

• The second wrapping is shifted in respect of the first

one, in such a way that the dry joints are not over one

other. Apply wrappings lightly tensioned. Now

• Quality control using spark tester at 15 kV.

• Select the proper outerwrap. STOPAQ PVC outerwrap,

UV cured Polyester, water cured outerglass shield or HSS

all can be used depending on the soil and service

condition.

Page 18: 2010 11-05-14 STOPAQ Training Presentation

18

Coating of underground and above ground flanges

General

• Underground flanges can be protected against corrosion, effectively and

simply, with the STOPAQ system.

• The pipe section that needs to be coated must be excavated sufficiently to

have enough clearance around it.

• Ensure excavation of 0.3m under the lowest pipe section.

• The working area must be kept dry during application.

• Check regularly to ensure that the pipe section and flanges stay above dew

point i.e. with no condensation, and in a temperature above 15 deg C .

Page 19: 2010 11-05-14 STOPAQ Training Presentation

19

Coating of flanges

Application of STOPAQ system for flange protection using

FN4200 gun grade paste, CZH Wrappingband and

PVC outerwrap

• Clean flanges to remove any loose scales, rust,

contamination or old peeling paints. Use hand brushes,

power tools. Remove oil and grease using proper solvent.

• Make sure that steel substrate is dry and its temperature is

above 15 deg C during application of STOPAQ products.

• Apply STOPAQ FN4200 to fill the gap between flange

faces. Use masking tape on the circular faces to get a

neat filling. Remove excess paste with scraper. Remove

masking tape before applying CZH wrappingband.

• Apply STOPAQ FN4200 to cover all bolts and nuts to

achieve homogenous contour all around the flange.

Page 20: 2010 11-05-14 STOPAQ Training Presentation

20

Coating of flanges

Application of STOPAQ CZH Wrappingband and

STOPAQ PVC outerwrap

• Apply STOPAQ CZH Wrappingband on the top of the

flange in such a way that the bolts- and nuts-ends (which

are covered with a layer of STOPAQ FN4200) are extra

protected by the STOPAQ CZH Wrappingband.

• Wrap the whole STOAPQ coated flange with STOPAQ

PVC outerwrap as explained and illustrated in previous

applications in the training presentation. STOPAQ

PVC outerwrap is used to add mechanical strength to

STOPAQ CZH products.

• STOPAQ UV cured Polyester may also be used in case of

heavy mechanical protection is required. Consult ACT for

adequate selection and application.

Page 21: 2010 11-05-14 STOPAQ Training Presentation

21

Please visit the STOPAQ website:

www.stopaq.comor email any queries to: [email protected]

THANKS FOR YOUR COLLABORATION AND SUPPORT

For more information...