2017 facilities masterplan west shore community college

241
MMA October 2017 2017 Facilities Masterplan West Shore Community College Scottville, Michigan

Upload: others

Post on 13-Jan-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 Facilities Masterplan West Shore Community College

MMA

October 2017

2017 Facilities Masterplan

West Shore Community College

Scottville, Michigan

Page 2: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Contents

1. Introduction

2. Summary A. Background / Purpose of Master Plan Update B. Planning Goals C. Planning Guidelines D. Planning Process E. Recommendations

3. WSCC History, Mission & Goals

4. Facility Overview A. Site B. Administrative & Conference Center C. Arts & Sciences Center D. Public Safety / Recreation Center E. Technical Center F. Maintenance Building G. Auto Repair Maintenance Building H. Ice Arena I. Schoenherr Campus Center J. Other

5. Cost Summaries

6. Implementation Strategy

7. Facilities Assessment & Deferred Maintenance Capital Planning Report. 2016 Update

8. Deferred Maintenance Report

Contents

Page 3: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 1 - 1

West Shore Community College commissioned Mathison | Mathison Architects to update the Facilities Master Plan first developed in 2000, with additional updates in 2003, 2004, 2006, 2007, 2008, 2010, 2011, 2012, 2013, 2014, 2015, and 2016. This plan is intended to guide the physical development of the College in ways that respect the environment, maxi-mize existing assets, and reflect its mission and vision for the future. It fur-ther reflects established priorities at WSCC as it strives toward excellence in educational opportunity for all.

We appreciate and acknowledge the assistance of WSCC Administration for their contributions to this update, including their time, interest, advice and constructive thoughts. In particular, the guidance and organization of Interim President Scott Ward were most appreciated during the entire process.

Mathison | Mathison Architects

Thomas R. Mathison, FAIA, REFP, NCARBPrincipal

1. Introduction

Page 4: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 2

The Summary for this Facilities Master Plan Update report includes the following:

A. Background / Purpose of Master Plan Update

B. Planning Goals

C. Planning Guidelines

D. Planning Process

E. Recommendations

2. Summary

Page 5: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 3

A. Background / Purpose of Master Plan Update

In 2000, West Shore Community College commissioned a Facilities Master Plan, completed that same year and updated annually to guide the future physical development of the College in ways that reflect its mission and vision for the future. Specific recommendations were developed with corresponding budgets to guide financial planning to achieve the recommended facility improvements.

Since that time, several major projects have been accomplished: a Science Wing Addition to the Arts & Sciences Center (2002); a new Ice Arena (2002); connection to the City of Ludington municipal sewer system (2004); a new Auto Repair Maintenance Building (2004); the Manistee County Center, which opened in 2007, the new Schoenherr Campus Center (2008), the renovation and expansion of the Arts & Sciences Center in September, 2010, improvements at the Administration Center in 2011, and reroofing and pool/locker room remodeling work at the Recreation Center in 2012, 2013, and 2014.

In 2014, glass was replaced at the Ice Arena, flooring was replaced at the Music rehearsal spaces in the Arts & Sciences Center, parking lot and walking lighting was replaced, and there is ongoing work toward total replacement of the existing dam. Construction for a new storage building at the Auto Maintenance Center is also being completed, in conjunction with several small out-buildings and nursery shed. Currently the College is in the midst of planning a major renovation and expansion of the Technical Center, funded in part via the State of Michigan Capital Outlay process. .

Today, the College is comprised of seven major buildings, and several small outbuildings. The seven buildings total approximately 302,000 SF, with a total current replacement value estimated at over $67.3 million.

2. Summary

Page 6: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 4

2. Summary

In order to continue to look forward in the interest of meeting the needs of students for course offerings and facilities, and to include updated data on deferred maintenance issues, WSCC commissioned this update to its Master Plan in 2017. It should be mentioned that the Deferred Maintenance Report, updated in 2016, describes the current general condition of the facilities at WSCC as “good”, with buildings ranging in age from new to 40 years:

“Though the life expectancy of some building materials and systems has been reached, solid construction and good maintenance practices have helped to keep those materials (i.e., original windows, doors and HVAC systems) in as good condition as can be expected. Several original systems including roofs, windows, doors and HVAC system components are beginning to reach time for replacement and are being addressed by the College in a timely manner.”

The goal of this update is to provide West Shore Community College with a comprehensive roadmap for meeting facilities and deferred mainte-nance issues over the next 5 years. It should be stated that the recom-mendations documented in this section (Section 2) are presented without prioritization for each building / facility at WSCC. Selected prioritized projects and accompanying costs are presented in Sections 5 and 6 of this Update.

Just as change has created the need for this facilities master plan, future changes will continue to make the planning process dynamic. While this master plan report makes recommendations to retain an attractive, ser-viceable physical environment that is responsive to the changing needs of WSCC, it is not rigid or static. To be an effective consensus-building and decision-making tool, this facilities master plan should be seen as a flexible document, able to be periodically evaluated and revised as new ideas emerge.

Page 7: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 5

B. Planning Goals

Like the 2000 Facilities Master Plan, as well as its updates in through 2016, this update includes the following specific goals:

1. Identify sites for new construction, or expansion on or off campus.

2. Identify and plan sites for possible additional parking facilities, including pedestrian and vehicular traffic patterns.

3. Recommend a plan to maximize the value of existing physical assets.

4. Recommend a plan for responding to emerging and changing physical needs as they relate to technology.

5. Maintain stewardship of the natural environment.

6. Assist in establishing priorities and cost estimates for a five-year Facilities Master Plan.

7. Consider design consistency, renovations, retrofits and maintenance.

8. Incorporate provisions within the Facilities Master Plan that will adhere to the necessary comprehensive 5-year planning documents for Capital Outlay, as required by the State of Michigan, State Budget Office.

2. Summary

Page 8: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 6

C. Planning Guidelines

This update observes WSCC guidelines for shaping future facilities and environments:

• WSCC facilities, programs and services must be focused on the needs of students, creating the optimum environment for learning and growth.

• WSCC is committed to making educational services available to all, taking full advantage of emerging technologies, partnerships, and networks.

• Environmental quality and barrier-free issues must be considered in all facilities.

• Maintaining and enhancing the natural and built environment is important to the College.

• Facilities must be flexible and provide a variety of learning environments toward the enhancement of lifelong learning.

• WSCC is committed to being responsive to the changing needs of its component communities

2. Summary

Page 9: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 7

D. Planning Process

Following input, this document was created to be submitted to the WSCC Board of Trustees for their consideration and approval, with the intent that it will become the College Facilities Master Plan.

Input included data gathered from a separate Space Needs Assessment Report, completed in 2015.

In addition to meetings, the planning effort also included a review of the 2016 “Facilities Inventory, Assessment and Deferred Maintenance Capital Planning Report”. The purpose of this updated study was to:

• Provide an inventory of the College’s facilities

• Determine the general condition of the buildings and grounds

• Determine a Facilities Condition Index (FCI) for each building and the College as a whole.

• Assist the College in meeting the goals of its Strategic Plan through timely maintenance of the campus buildings.

2. Summary

Page 10: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 8

E. Recommendations

Based upon observations of site and building features, as well as an analysis of gathered information, several recommendations are presented in the following categories:

1. Site Recommendations2. Administrative Building Recommendations3. Public Safety / Recreation Center Recommendations4. Technical Center Recommendations 5. Arts & Science Center Recommendations 6. Schoenherr Campus Center Recommendations 7. Ice Arena Recommendations8. Technology Recommendations9. Environmental Recommendations

Renovation of the Technical Center is the top priority project.

2. Summary

Page 11: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 9

1. Site Recommendations

A. Preserve unique WSCC sensitive outdoor environment.

Preservation of the unique and environmentally sensitive outdoor quality of West Shore Community College continues to be the first and guiding priority for all changes, improvements, expansion, and development within the College campus. It is a community asset for its beauty and environmental benefits to the College’s service area.

More specifically, WSCC should manage its natural resources for the sustained health of the environment, and for the benefit of WSCC course offerings, affiliated community programs, and collaborative efforts of local organizations and individuals by means of the following:

Planned landscaping and horticultural improvements, using native species and low maintenance plant materials;

• Monitoring existing campus flora to identify trees and shrubs to be removed and indigenous species to be enhanced;

• Identifying and enhancing wildlife habitats in the variety of environments found on campus;

• Developing and maintaining campus nature trails and interpretive programs, including the restoration of existing trails.

B. Upgrade the water system.

The college should pursue options to improve water quality and treatment for long-term best results and connection with a municipal water supply in the long term. As of 2017, solicitations have been prepared to design a water connector to the City of Ludington system, with construction anticipated in 2018.

2. Summary - Recommendations

Page 12: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 10

C. Development of a Campus-Wide Emergency Generator

There is an opportunity to sustain continuous operations in times of power outages and to reduce annual electrical operating costs through the development of this emergency generator. Bids for this generator are being received with a current preliminary estimated cost of $720,000 for 1.5 MW generator capacity.

D. Future Student Housing

Due to student interest and changing demographic factors the College is considering a feasibility study to determine the viability of developing student housing. The scope of this study may include an assessment of student characteristics; enrollment trends; an analysis of the housing market; focus group sessions; student housing demand projections; and recommendations for the mix, size and charges for student housing rental units along with suggestions for unit features and common-area amenities. This study is planned to be completed in 2018. This master plan identifies a potential future site for housing for approximately 120 beds and associated parking.

E. Future Agricultural Sciences Program

In the fall of 2016 a new agricultural program through Michigan State University will begin. In the fall of 2015 the West Shore ESD started holding agricultural science programming on campus including the placement of a temporary chicken coop. With desired expansion by the ESD for their program and possible implementation of a WSCC/MSU program, additional space needs may be required for agricultural science including specialized classroom space and outdoor space(s) for hands-on learning. Currently, three out-buildings and a nursery building have been constructed near the Auto Maintenance Center.

2. Summary - Recommendations

Page 13: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 11

F. New interior campus road and parking circulation system.

The new interior circulation road and parking system has been implemented as new facilities were added or expanded on campus. New parking and drives were completed in association with the new Schoenherr Campus Center, including a new entrance at Stiles Road. Also, parking and drive improvements were completed as part of the proposed expansion of the Arts & Sciences Center and at the Administrative & Conference Building.

Continued improvements should be made to clearly identify parking areas from driving lanes and walking paths. Supplemental wayfinding should be added to clarify directions for drivers to reach the Administrative and Conference Center. Consideration should be given to the designation of some parking areas for staff and faculty parking. Possible new student housing will also impact campus circulation for both vehicle and pedestrian.

G. Development of Athletic Fields and associated

improvements at the Recreation Center area of

campus.

To develop greater coordination of athletic and recreational programming, the College should relocate and develop open fields near the Recreation Center for soccer, softball and other general recreation and organized sports. A frisbee golf course has been installed. In addition, tennis courts and outdoor basketball capability should be considered, particularly in the context of potential on campus student housing.

The cross-country trail should be redeveloped and enhanced with fitness stations and compatible recreation functions, suitable for use by students and the community. The cross-country pavilion should be retained. Parking capacity should be provided to accommodate more intense use of the new field areas and the Recreation Center.

2. Summary - Recommendations

Page 14: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 12

2. Summary - Recommendations

H. Consider a new entrance from Sugar Grove Road to

provide access to the Ice Arena / Recreation Center.

As programs and events grow at the Ice Arena and at the Recreation Center, and with the potential development of new athletic fields, greenhouse facility, and alternative energy sources, the vehicular traffic volume on campus will grow. A second, convenient access route to this part of campus should be considered to provide safe and uncongested travel.

I. Replace the boardwalk and stair from the Administration

Center plaza to the creek below. Create a footbridge to

span the creek and new stairs on the opposite bank.

Once an educational asset to the campus and specific curricula to study outdoor environments and ecosystems, this area is currently in very poor condition. At its lowest level, it is closed due to damage and disrepair. The footbridge is gone and the stairs on the opposite bank are in disrepair.

In 2017, plans were developed to renovate the existing stairs and landings, and to add a footbridge across the stream to join a new stair on the opposite bank to connect with the existing foothpath system. bids were received and the Colege is currenlty considering next steps for implementation.

J. Alumni Sculpture Park

In 2017, initial concepts for a potential alumni sculpture park were considered, in order to add outdoor sculpture settings to the campus and to recognize he contributions of College alumni. A site location in the center campus area, outside the Schoenherr Center is being considered for further design development.

Page 15: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 13

2. Summary - Recommendations

2. Administrative & Conference Building

Formerly known as the Campus Center, this building is used for administration and office functions, classrooms, and kitchen/food service. It was built in 1969 as the first building on the WSCC campus. It currently includes 26,000 SF on one floor, with a partial basement for mechanical equipment.

The building has received several improvements:

• Kitchen fire suppression and vent hoods were replaced.

• The ceiling at the fire pit area has been replaced. The stepped area at the fire pit has been partially covered with a new flooring system to create barrier-free access from one interior pavilion directly to the other, and to expose the original fireplace.

• The outdoor patio and surrounding landscape, as well as the building boiler, was replaced in 2011.

• Exterior glass was replaced with a more energy-efficient glass system. Exterior doors have been replaced.

Recommendations

A. Remodel the Conference Spaces

The north section of the building houses classrooms and the former main dining room for the College. Renovation of these spaces would improve their utilization as innovation space, teaching spaces, conference break-out spaces and dining space by providing better acoustic separation from the kitchen and dishwashing areas.

Page 16: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 14

2. Summary - Recommendations

B. Improve electrical distribution and technology

infrastructure.

Currently the electrical distribution system is functioning at maximum capacity. Redevelopment of existing spaces and functions will require corresponding enhancement of the electrical distribution system to serve those needs in the short and long-term future. This includes upgrading data wiring.

C. Expand the foyer for greater flexibility, pre-function

capability, and for improved traffic flow.

Page 17: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 15

2. Summary - Recommendations

3. Public Safety / Recreation Center

The Public Safety / Recreation Center, is the location of the Law Enforcement Program at WSCC, as well as programs for athletics, fitness, and natatorium. It is used by students, staff, and is available for community use. It was built in 1975 and includes 47,710 SF on two floors.

The building has received several improvements recently:

• A portion of the roof was replaced in 2009.

• The gymnasium floor was replaced in 2009.

• The natatorium whirlpool was replaced in 2009.

• All exterior doors and doors from the natatorium to adjacent corridors were replaced in 2007.

• The boiler system was replaced in 2010, as were most HVAC controls.

• The gymnasium and natatorium lighting was replaced with fluorescent fixtures in 2010.

• A relocated athletic office was implemented in 2011, as well as limited improvements to the women’s locker room and gymnasium.

• Following significant storm damage, the entire roof and associated trim and metal fascia panels were installed in 2013.

• Exhaust fans for the pool area were replaced in 2013.

• Structural investigation of the bowed gym wall in 2013 indicates that the wall is stable. Water infiltration has stopped.

• Pool locker rooms and the pool ceiling renovation were completed in 2014.

• New roofing and mansard metal roofing was installed in 2014.

• The building elevator was recently refurbished.

• Recently, the MSU Extension Office has located in the office area

at the main building entrance at the upper level.

Page 18: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 16

2. Summary - Recommendations

Recommendations:

A. Renovate the building for expanded programming.

As WSCC continues to adapt to the changing needs of the community, this area could be well used as classroom space, conference space, administration space or expanded CTE, continuing education, community education, and physical education programming. Currently the space is being used by the Law Enforcement program. The option also exists to capture the area below the roof at the entrance to increase the office area in the future.

B. New canopy at the north entrance.

This will enhance arrivals on the building’s north side with vestibule and canopy protection.

C. Replacement of pool infrastructure components.

The pump and piping infrastructure supporting the pool needs to be replaced or renovated. The pool requires re-tiling and the original piping connecting the mechanical room to locations under the pool needs to be replaced.

Page 19: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 17

2. Summary - Recommendations

4. Technical Center

The original Technical Center was built in 1969 as vocational / technical classroom and lab space. It includes 32,600 SF on one floor, and it received renovation in 2004. A major addition of 39,200 SF was completed in 1993, including space for classrooms and labs.

Recent improvements include:

• New roofing at the Welding Lab in 2009.

• Boilers were replaced and temperature controls were updated in 2010.

• Rooftop units were replaced in 2009.

• Carpeting was replaced in 2009.

• Lighting in the atrium was replaced with fluorescent lighting.

• Entry vestibules at the north entrances were added in 2005.

• A new welding lab makeup air unit was installed.

• In 2013, the domestic water heater for the entire building was replaced, and associated circulation pumps were added.

Recommendations:

A. Major renovation and expansion of the building are

currently underway.

Includes upgraded toilet rooms, remodeled offices and classroom spaces, common spaces, and information center, as well as electrical improvements, and expansion of the welding lab.

Page 20: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 18

2. Summary - Recommendations

5. Arts and Sciences Center

The original Arts and Sciences Center was built in 1970, with a science wing expansion in 2002 and an arts addition in 2010, bringing the total area to 35,000 SF. The building houses science and arts classrooms, studios, labs, gallery space, music classrooms and auditorium space.

In 2013, two chiller compressors were replaced at the science wing addition. Flooring was replaced in music studio in 2014-15. A boiler was replaced in 2015 and a snow melt system with heat exchange was installed in 2016 at walks on the West side of the Science wing extending to the South entrance of the Arts and Science Center.

Recommendations:

A. Add approximately 1,700 SF to the existing gallery, and to

provide for additional art storage capacity.

Page 21: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 19

6. Schoenherr Campus Center

The Schoenherr Campus Center was constructed in 2008, and includes 38,000 SF of space over two floor levels for library, bookstore, café’, student activities, business office space, testing center, and counseling services.

Recommendations:

A. Improve acoustic quality of open, two-story space.

B. Reconfigure space at the upper level to accommodate

changing needs for student services, testing requirements,

counseling, and student gathering.

C. Reconfigure the existing Bookstore and the Cafeteria

Kitchen spaces to create an internet cafe experience in

the Bookstore.

2. Summary - Recommendations

Page 22: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 20

7. Ice Arena

The Ice Arena was constructed in 2002 and includes 34,600 SF of athletic space. The facility is owned by Mason County and operated on a 50-year lease/purchase agreement. Recently the ice rink lighting was replaced with fluorescent light fixtures, and repairs to the roof deck were complete. Ceiling fans were installed to provide additional air circulation.

Recommendations:

A. Add officials’ locker room.

B. Remodel existing officials’ locker room for women’s locker

room.

C. Add multipurpose space.

2. Summary - Recommendations

Page 23: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 21

2. Summary - Recommendations

8. Auto Repair Maintenance Building

The Auto Repair Maintenance Building was constructed in 2005 and includes 8,700 SF, including an Auto Lab, two classrooms and two Agriscience classrooms for use by CTE students.

Recommendations:

A. None

Page 24: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 22

9. Technology Recommendations

A. Enhance technologies supporting distance learning.

B. Provide scheduled annual replacement of computers,

peripherals and network hardware.

C. Continue the WSCC initiative to enhance a wireless

campus.

Page 25: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 2 - 23

10. Environmental Recommendations

A. Continue to evolve sustainable “green” building standards

and culture for WSCC.

The awareness of the benefits and application of sustainable design principles has lead to campus-wide green building standards, which will result in improved energy efficiency and consistency across the entire campus.

The encouragement for LEED-certified new construction and major remodeling to obtain capital funding from the State of Michigan adds to the College’s commitment to environmentally-conscious design, materials, and systems.

The Schoenherr Campus Center achieved a Silver LEED rating, and the Arts & Sciences Center achieved a Gold LEED rating. The current improvements planned at the Technical Center are aimed to achieve a LEED rating when completed.

2. Summary - Recommendations

Page 26: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 3 -24

It is important to recognize the heritage and history of West Shore Community College as it looks to the future. Stated below are statements from the WSCC Board of Trustees Statements of Vision, Customer Orientation Philosophy, Mission, and Core Values for the College which was adopted by the Board of Trustees in May 2002. The College adopted a new Strategic Plan in late 2014: Transform 2017: A Blueprint for

Success.

History of the CollegeThe people of the area voted to establish West Shore Community College in 1967, and in 1968 the college began serving the needs of students. The college district includes all of Mason County, Manistee County, and parts of Lake, Newaygo, and Oceana counties. In the true spirit of a community college, West Shore’s instructional programs prepare students for immediate employment and/or provide a sound two-year base from which they can continue work towards a bachelor’s degree. A seven member board of trustees, elected at-large from the college district, provides leadership and direction for the college’s overall operation.

The campus lies on 360 acres of rolling timberland at the intersection of Stiles Road and Sugar Grove Road, near Scottville. The primary buildings that comprise the core of the College today are:

Schoenherr Campus Center Arts and Sciences Center Recreation Center Technical Center Administrative & Conference Building Ice Arena Auto Repair/Maintenance Center

The Manistee County Center at the Manistee West Shore Medical Center opened in August, 2007.

In 1996, the community passed a ten-year millage to maintain and enhance college facilities. The proceeds from this millage provide a cause for evaluating and prioritizing facility improvements and expansion. This millage was renewed for another ten-year period in 2006, and it was passed again in August 2015, for another ten years.

3. History, Mission & Goals

Page 27: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 3 -25

Vision Statement of the College“Our vision is to be one of the premier community colleges in America, driven by a passion for:

• assuring student success; • serving our entire community, and • pursuing greatness.”

Mission Statement of the College“West Shore Community College’s Mission is to make our community a better place in which to learn, live, work and prosper.”

Core Values “West Shore Community College values people first. As we pursue greatness we are guided by these values:

• LEARNING: Creating opportunities for gaining core abilities, workplace skills, and lifelong personal growth.

• INTEGRITY: Honoring our commitments and promises with openness and mutual respect.

• EXCELLENCE: Striving for greatness through a positive attitude and continuous improvement.

• INCLUSIVENESS:

Building community through teamwork, collaboration and outreach.

• CREATIVITY:

Opening our minds and the minds of our students to infinite possibilities.

3. History, Mission & Goals

Page 28: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 3 -26

3. History, Mission & Goals

Four Strategic Directions

• Foster Student Success

• Serve Our Communities

• Strengthen Our Organization

• Innovate and Collaborate

Page 29: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 27

A. Site

The College occupies 360 acres of rolling timberland between Scottville, Manistee and Ludington. The site includes a portion of the Lincoln River, as well as a pond created by a dam structure at a tributary to the river.

The site varies from heavy wooded areas, with steep slopes along the river, to rolling grasslands and a pine tree farm.

The wooded land north and northwest of the Administrative & Conference Building and the Technical Center are important to the image of the College. This is a mix of hardwoods and pines, which protects the lower, northern slopes and streambed below.

Since the summer of 2000, WSCC has had a “Green Team”, working in cooperation with the Administration and the Facilities Maintenance Department on environmental issues affecting the campus. Through it, a campus-wide conversation about sustainability has produced tangible results in WSCC policy, including an inventory of indigenous species at WSCC, and the development of a rain garden. The Green Team was also instrumental in guiding sustainable features of the addition to and renovation of the Arts & Sciences Center.

Utilities

The site is served by a private water well system. The quality of the water is consistently questioned and tested. Following a professional study to evaluate the current water system and to offer optional long-term solutions, the College upsized the existing well serving the main campus and added an additional well in order to meet the water usage needs expected with the completion of the new Campus Center. In addition, the College installed a second well to provide redundancy and back-up for the current well along with providing for the future expansion of campus facilities.

There have been discussions in the past of linking the campus to a municipal water system from the City of Ludington. Currently, a solicitation has been prepared for the design of a connector to the

4. Facility Overview

Page 30: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 28

City of Ludington water system. Ultimately, a public water system would enhance the quality of the water service to the campus, including potable water and fire suppression capability. The existing three wells on campus would then be used for irrigation.

Sanitary sewerage is handled by a direct connection to the municipal sewer system of Ludington.

Electrical capacity to the campus is adequate, and was improved with an electrical loop system throughout the campus. However, electrical distribution within each building remains a concern. The College is host to a major power substation at the entrance to the campus on Stiles Road. This is visually screened by maturing landscaping surrounding the station.

Consumers Energy Company has proposed to enter into an agreement with WSCC to construct a campus-wide emergency generator, transformer, and transfer switch that will allow the campus to go off the grids in times of emergency. Reduced electrical rates to the College as a result of this improvement would substantially reduce the annual operating cost of electrical energy for the College going forward.

Storm water runoff and management is not a major problem on campus, though there is erosion in some areas (i.e., near the Recreation Center). Also, the elimination of the few remaining storm water ditches along internal walks and drives via underground storm water piping leading to a retention basin would make a smoother and safer transition across lawns and paved surfaces for pedestrians. Eliminating the ditches would also reduce maintenance.

The College recently completed (2015) a dam repair project at the North end of the existing pond.

Telephone and cable service extends from Sugar Grove Road to the center of campus.Gas service is buried from Stiles Road and extends to the center of campus.

4. Facility Overview

Page 31: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 29

Drives and Parking

Inadequate definition of driveway lanes and parking areas have consistently been mentioned by stakeholders as a drawback to the parking area west of the Technical Center. Wayfinding to the Administrative and Conference Building is also regularly cited.

The central location of the parking lot at the Schoenherr Campus Center makes it a parking lot of choice for staff and students – it fills quickly and remains full. Parking on grass areas is common. Identification of a separate area for staff parking has been discussed as a potential remedy to ease this pressure.

In terms of traffic flow through the campus, the primary concern is the dead-end road access to the Recreation Center and Ice Arena. The drive is defined, along the Arts and Sciences Center parking lot, by the planting of small trees. This separation has been effective; however, transition from that parking lot to the roadway is still a concern.

Traffic often moves too fast along the road near the Recreation Center where slopes are steep. Adjacent pedestrian walks to this road add to the safety problem. Also, the vehicle drop-off area at the Recreation Center entrance is too small for busses to be serviced adequately. The drive along the west side of the Recreation Center is narrow, too close to the building, and was repaved in 2002, as was the road to the Recreation Center and the Ice Arena. The parking area on the east side of the Recreation Center is in good condition.

Parking and general access to the Administrative & Conference Building is limited, though it was improved and expanded for better access by service vehicles and parking for the public.

Parking at the Arts and Sciences Center is adequate, and it serves as an overflow for events at the Recreation Center.

Parking at the Recreation Center and Ice Arena is adequate for most uses. The upper level handles most of the load, while the lower level allows for handicap parking and access to the Recreation Center.

4. Facility Overview

Page 32: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 30

Handicap access from the upper parking lot to the front entrance is difficult. The lower lot can accommodate expansion.

The addition of the new Schoenherr Campus Center, as well as the adjacent parking and drive improvements has made a significant improvement from the campus entry at Stiles Road to the Arts & Science Center parking lot. With changing traffic patterns, the western-most section of paved parking surface could be removed and the site returned to a natural state.

With the installation of solar arrays at the Technical Center, a charging station for electric vehicles located here could augment alternative energy programming at WSCC and serve the needs of electric vehicle drivers.

Many of the walks around the Technical Center are asphalt. They are often difficult to distinguish from drive surfaces. There are no curb separations between drives and walks at any location.

Walks

The campus is generally pedestrian-friendly. However, there is significant pedestrian traffic on roadbeds between classes, particularly between the Arts and Sciences Center and the Recreation Center. Additional walks are needed here to provide adequate safety. The potential of a pedestrian bridge across the creek between the Administrative and Conference Center and the Recreation Center has been mentioned.

In general, there is a need for supplemental exterior building signage for pedestrians to identify individual buildings at the center of campus.

4. Facility Overview

Page 33: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 31

Outdoor Recreation

At the center of campus, with increased density of buildings and foot traffic, the College should consider the addition of outdoor site amenities to enhance the full utilization of the site.

Outside the periphery of the area of main campus buildings, there are three main nature trail systems along the creek bed and extending into the upland grass and open spaces. These are often used by biology students. Portions of the trails are also used for cross-country running events. Requests have been made to create cross-country ski trails, as well as an outdoor fitness trail.

There are several bridges at various locations along the creek trail, which require maintenance. However, the trails are not handicap accessible and the walks and bridges are in need of repair or replacement.

A softball diamond exists near the Sugar Grove entrance. Touch football, soccer, and other recreational sports occur in the upland grass areas of the campus. The level area west of the Recreation Center could be developed into an open recreation area for field sports.

Softball, tennis facilities and outdoor basketball facilities could also be added near the Recreation Center for greater student, faculty, and community use.

The pavilion along the pond near the Recreation Center is used extensively by families in the community for picnics and other events. The pavilion in the upland area east of the Recreation Center is used for athletic and other events.

4. Facility Overview

Page 34: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 32

4. Facility Overview

Future Land Use Considerations

Student Housing

Due to student interest and changing demographic factors the College is planning a feasibility study to determine the viability of developing student housing. The scope of this study may include an assessment of student characteristics; enrollment trends; an analysis of the housing market; focus group sessions; student housing demand projections; and recommendations for the mix, size and charges for student housing rental units along with suggestions for unit features and common-area amenities.

Agricultural Sciences

The College is currently in discussion with Michigan State University regarding the development of an agricultural sciences program. In the fall of 2015 the West Shore ESD started holding agricultural science programming on campus including the placement of a temporary chicken coop. With desired expansion by the ESD for their program and possible implementation of a WSCC/MSU program, additional space needs may be required for agricultural science including specialized classroom space and outdoor space(s) for hands-on learning.

Public Service Center

Recently, a 3.1-acre property on US-31, including a former 5,500 SF medical building, has been idientified as a potential site for the WSCC Law Enforcement Program, offering attributes not available on the main WSCC campus. The WSCC Board of Trustees has authorized a due diligence process to determine the suitability for this building and site to be used by the Law Enforcement Program, and ffor possible expanded use by related programs, such as EMS training, and fire training.

Page 35: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 33

AS

ITE

Octo

ber

2017

Replace Decks,

Bridge, Stairs

at Creek

Future Housing

- 120 Beds

Future Parking

11 Sub-Station

Planned

Expansion

Proposed

Expansion

Proposed

Expansion

Page 36: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 34

4. Facility Overview

B. Administrative & Conference Building

The Administrative & Conference Building was the first building on the campus of West Shore Community College, built in 1970. The building exists on two levels. The main level is approximately 26,000 SF. A small lower level includes a mechanical room and storage facilities.

The existing building is organized in three basic sections:

1. The center section is comprised of two large, hexagonal shaped gathering spaces for conference activities;

2. An eastern wing for administration, business office, IT, and Human Resources functions;

3. And a north wing for kitchen and dining space, as well as classrooms/conference rooms.

From a site perspective, the Administrative & Conference Building is the most remote building from major parking areas, though the College expanded parking area to roughly 50 spaces in 2008. It, nevertheless, is perceived as a remote building, requiring extra effort for students to reach and utilize.

The building exterior is comprised of brick and glass walls, with standing-seam metal, sloped roof areas over the lounges and mechanical equipment serving the kitchen, and mansard roof areas at the building perimeter. The brick appears to be in good condition, and the glass panels, replaced in 2011, allow clear views through the lounge spaces to the wooded environment along the creek. Roofing systems were replaced in 2002.

Upgrades have been made recently to the HVAC and electrical systems, and the data center was relocated. It should be noted that there is a natural water spring under the existing boiler room, which may be the cause of some drainage problems existing at the lower back side of the building.

Page 37: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 35

The electrical service equipment appears to be in good condition. However, additional receptacle panels are required, as the present panels are full. With increased use of computers and other technology, more panels are required. The existing fire alarm system appears to be in adequate condition.

Generally, the lighting is satisfactory. However, lighting should be upgraded in office areas to better serve computer use.

The patio area (hardscape and landscape) between the building and the creek was replaced in 2011. This is now an attractive and useful extension of the building functions. The wood stair and landings from the plaza area to the creek are in disrepair and closed to the public. Plans are in place to renovate the exxisting stairs and ecks, and to add a pedestrian bridge over the creek leading to a new stair on the opposite bank to connect with existing nature trails.

Center Section

On the interior, the entrance to the building opens to a semi-private foyer which directs visitors right or left. This is a key orientation point. However, this is a point of constriction, functionally. From here, one must pass through the gathering spaces to get to the east (administrative) wing or north (conference) wing. The large gathering spaces are among the best architectural spaces on campus and are attractive in their own right. However, because they are also circulation spaces, their use a conference space is limited.

The ceiling and upper walls and lighting are in good condition and are attractive, except in the area of the fireplace “pit”, which needs to be remodeled. Flooring in all areas has been replaced recently.

East Wing

The east wing houses Administrative Offices, Business Offices, Human Resources Offices, and IT staff.

4. Facility Overview

Page 38: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 36

4. Facility Overview

The Business Office has been upgraded recently with new furnishings and finishes. There is significant space in this area that is unused or underutilized.

The College Administrative Offices, including the Board Room are organized along the north wall of the east wing. This area has been gradually upgraded over recent years. The IT department has added 50 wireless access points across campus.

North Wing

The existing north wing houses the kitchen, two classrooms, the MBT room and public toilet rooms. The conference/gathering space (formerly the College cafeteria) has excellent views from two sides to the natural environment toward the creek and is a popular location for small meetings.

The kitchen produces a significant amount of food for regular food service and special functions across the entire campus. With the modest new food service function at the Schoenherr Campus Center, the existing kitchen plays a dual role to produce food items, as well as serve as education/training space for Tech Prep programs. Remodeling in this area should include better traffic flow between the kitchen and banquet spaces, acoustic treatment to reduce noise transfer from the kitchen to adjacent spaces, better climate control, storage space for records and computer equipment, as well as office and storage space for Tech Prep programs.

The MBT Room serves as a large gathering/conference area to better serve banquet functions and conference needs. The finishes, furnishings and lighting were updated recently.The Tech Prep Room (formerly the MBT Room) is well-used and has been updated with new windows, finishes, furnishings, lighting, comfort control, and A/V capabilities. A new exterior vestibule was added to allow direct access from the outside adjacent parking area.

Page 39: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 37

BE

XIS

TIN

G P

LA

N -

AD

MIN

ISTR

ATIO

N &

CO

NF

ER

EN

CE

BU

ILD

ING

Octo

ber

2017

Page 40: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 38

BP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

- A

DM

INIS

TR

ATIO

N &

CO

NF

ER

EN

CE

BU

ILD

ING

Octo

ber

2017

RENOVATION

Page 41: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 39

C. Arts and Sciences Center

The Arts and Sciences Center was the third building on the campus of WSCC, built in 1971. The building is on one level and contains approximately 35,000 SF. In 1997, Room 315 was remodeled, and in 1999, the Theater and Rooms 301 and 303 were remodeled. In 2002, a 17,700 SF Science Wing Addition was completed. In 2010, a major expansion and remodeling of existing space consolidated the arts programs to this location and provided new space for faculty offices, new general classrooms, new art studios, new music rehearsal spaces, and an expanded theatre and back-of-house spaces to support the theatre arts. This addition received a LEED-Gold rating.

This building is organized in four basic sections:

1. The north end is the location for the theater, theater support spaces, and music rehearsal spaces.

2. The center section is the location for the fine arts and gallery spaces.

3. The south end is the location of classrooms and faculty offices.

4. West side is the science wing addition.

From a site perspective, the Arts and Sciences Center lies adjacent to a major parking lot and to the drive leading to the Recreation Center. A geo-thermal heating/cooling system was installed north of the new faculty offices as part of the recent remodeling / expansion project.

Also, the south entrance is closest to the parking lot, and as a result of the recent remodeling project, it is easily identified as a major entry to the building.

The building exterior is comprised of brick and glass walls, with metal mansard roof areas over the theater and distance learning rooms and metal mansard roof areas at the building perimeter. The roof was replaced in 2002 and as part of the 2010 remodeling project for the arts remodeling and expansion. The brick exterior appears to be in good condition.

4. Facility Overview

Page 42: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 40

In 2015, a boiler was replaced, and a new snow-melt system with heat exchange was installed in 2016 at walks on the West side of the Science Wing extending to the South entrance of the Arts and Science Center.

Theater

On the interior, the north end of the building houses the theater and support spaces. The theater proper was remodeled with new seating and floor finish in 1999. The space is a comfortable, intimate venue for a variety of productions. Over the years, the theater has been creatively modified from a recital format to full stage production capability.

The remodeling in 2010 provided additional stage space, additional access to backstage areas, fly space for scenery, expanded scene shop and storage spaces, new dressings rooms and expanded storage space. There is direct access between the music rehearsal spaces and the backstage areas.

Fine Arts and Gallery

The center of the building includes the newly relocated art programs, including graphic design, two-dimensional art, and three-dimensional art instruction spaces. In addition, a new gallery space located on the main corridor provides greater visibility and access to the public for art shows and traveling exhibits.

As the gallery matures and grows, there is increasing need for secure, organized, and climate-controlled storage of art collections.

Classrooms and Faculty Offices

The south end of the building includes the distance-learning room, two expanded classrooms, two new classrooms and new faculty offices.

The corridor outside the former faculty offices was widened as part of the 2010 remodeling and expansion project, and this widened corridor now serves as the primary link to the south parking lot, so the entrance at the south end of the building is heavily used. An enhanced vestibule and entrance element provides better climate control and a more clear definition of a major entry point. There is an ongoing need for additional office space for adjunct faculty members.

4. Facility Overview

Page 43: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 41

CE

XIS

TIN

G P

LA

N -

AR

TS

& S

CIE

NC

ES

CE

NTE

RO

cto

ber

2017

Page 44: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 42

C

PR

OP

OS

ED

IM

PR

OV

EM

EN

TS

- A

RTS

& S

CIE

NC

ES

CE

NTE

RO

cto

ber

2017

PROPOSED ADDITION

RENOVATION

Page 45: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 43

D. Public Safety / Recreation Center

The Public Safety / Recreation Center was built in 1976 and consists of two levels. The upper level includes about 12,200 SF, and the lower level includes about 35,510 SF.

The building is organized in two basic areas:

1. The upper level includes open spaces formerly used for the music and visual arts programs prior to the completion of the Arts & Sciences Center expansion and remodeling in 2010. Today, this level is used primarily by the Law Enforcement Program. The office area at the main entrance is occupied by the MSU Extension Office.

2. The lower level includes physical education space, such as the arena, wellness center, racquetball court, swimming pool, locker rooms, and storage facilities.

From a site perspective, the Public Safety / Recreation Center is located across the creek, up the hill from the Arts and Sciences Center and the Administrative & Conference Building. It lies at the end of a dead-end drive and parking area. The Ice Arena is located opposite the upper parking area.

Outside the lobby to the Public Safety / Recreation Center, outdoor seating area should be considered for student and patron waiting and gathering.

Two parking lots serve this building, including the primary parking lot to the east (upper lot) and a secondary lot to the north (lower lot). There is a need for a carport structure in the north lot for protection of WSCC vehicles and a canopy at the north entrance to the building. The north lot and building entrance are barrier-free. To the west is a large, open level area of grass that could be used for future fields, parking, tennis courts, etc. To the north is a large, grassy area where two former sewage lagoons were removed in 2005, as a result of connection to the municipal sewer system. The building exterior is comprised of brick and glass walls, with laminated wood beams at the building entrance, and a slightly

4. Facility Overview

Page 46: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 44

sloping roof with perimeter parapet. The brick appears to be in good condition, and the glass is effective in bringing in natural light to areas such as the Wellness Center.

In 2013, the entire roof and mansard sections were replaced with materials and finishes to match the other buildings on campus. Other items mentioned in the Deferred Maintenance Report include the need for possible replacement of the humidity control and piping valves for the pool, as well as replacement of the main HVAC system control boards. Rusting hollow metal doors and frames at entries were replaced with aluminum storefront systems in 2007.

In 2016, the existing elevator was refurbished.

Upper Level

On the interior, the main entrance includes a lobby space, stair and elevator to the lower level, and offices for the MSU Extension Program.

This upper level also includes open classroom space. Some interior walls were added to create separation of internal spaces for the Law Enforcement Program.

The former music rooms at the upper level are in good condition and had been used for community choir, community instrument ensemble, collegiate show choir, and the college music program. These rooms now house the Law Enforcement program and they are air-conditioned

Lower Level

At the lower level are the arena, the wellness center, weight room, racquetball court, pool, lockers rooms and storage. The interior arena walls have recently been painted, lighting has been improved, and the arena flooring has been replaced.

A portable stage and sections of portable bleachers are available for concerts and special events in the arena, though the existing sound system and acoustics are poor. For the types of athletic and cultural performance events held in the arena, acoustical treatments should be added, and a permanent sound system should be installed. The

4. Facility Overview

Page 47: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 45

existing arena is not air-conditioned and the existing HVAC equipment is controlled by a mix of pneumatic and digital controls.

The Wellness Center continues to increase in use and popularity with college students and the greater community, and it has been recently expanded as a result of converting one of the racquetball courts into a new weight room in 2005. The former weight room was remodeled for expanded wellness center equipment. Exercise equipment is replaced in accordance with the College’s planned equipment replacement cycle. The Wellness Center is air-conditioned.

In 2014, the pool area was renovated to include new acoustical ceiling treatment. Locker rooms and toilet rooms were renovated. The whirlpool was previously renovated as a separate project. In the pool area, all pool related piping and valves should be replaced. Existing air handler and controls should be upgraded, and the arena should be assessed for air conditioning or increased air-changes to improve ventilation and patron comfort.

The Recreation Office was relocated in 2011 near the intersection of the two corridors at the lower level for maximum control and exposure to corridor traffic. New windows were added between the corridor and area spaces, allowing observation of arena activities from the new Recreation Office.

In general, the following represent possible new programs or activities anticipated in a remodeled, upgraded, or expanded Recreation Center:

• Climbing wall• Day spa in conjunction with therapeutic massage program

and/or spa management program (steam room or sauna would need to be added)

• Activity pool, with water slide and play pool• Concessions area (for use during tournaments)• Student recreation opportunities, in the context of potential

future student housing on site.

4. Facility Overview

Page 48: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 46

DE

XIS

TIN

G P

LA

NS

- R

EC

RE

ATIO

N C

EN

TE

RO

cto

ber

2017

Page 49: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 47

DP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

- R

EC

RE

ATIO

N C

EN

TE

RO

cto

ber

2017

RENOVATION

RENOVATION

Page 50: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 48

E. Technical Center

The Technical Center was built in three phases, and it currently includes about 75,400 SF on one level. Originally built in 1970, it received additions in 1990 and 1992, with additional renovations to sections in 1999 and 2004. Vestibules on the north side of the building were added in 2005.

This building is organized in two basic sections:

1. The south half, which houses the original portion of the building, including tech prep classes, welding lab, and technology offices

2. The north half, built in 1990 and 1992, which houses computer labs, nursing classrooms, general classrooms, and secretarial studies, as well as administrative offices and conference space.

From a site perspective, this building is in view of the campus entrance on Stiles Road. It is also a primary destination of many WSCC students and is a heavily utilized building. It is the single largest building on campus, and it hosts the largest parking areas and a major bus pickup and drop-off area. The building contains a

main atrium space at its center to draw students from the parking lot, through the building, to the center of campus beyond.

The building exterior is consistent with the materials of other buildings on campus: brick and glass. The roof atrium material here is standing-seam metal, similar to the other buildings on campus, and is in good condition. Remaining roof areas should be replaced in the next five years.

A new welding lab makeup air unit was recently installed, and in 2013, the domestic water heater for the entire building was replaced, and associated circulation pumps were added.

HVAC improvements are needed in the area of DDC controls and the economizer system on one AHU.

Electrical distribution panels are at capacity.

4. Facility Overview

Page 51: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 49

The College has a 15-year agreement, beginning July 1, 2006 and ending June 30, 2021, with the Mason-Lake Intermediate School District (ISD) for its Technical Preparation Partnership (Tech Prep). The majority of the classes are held in the Technical Center. Under this agreement, the ISD shares costs with the College for its presence on campus. Any future planned changes in College facilities should include consideration of the Tech Prep needs and programs, particularly in the Tech Center where the program administration resides.

To meet the ongoing need for larger lecture spaces to hold up to 85 students, remodeling of rooms such as #213/215 should be considered. Rooms #228 and #230 could also be modified to meet the joint needs of WSCC and the ISD electronics program.

In general, as other buildings on campus have been updated, there is a need for general updating of finishes in the Technical Center, particularly in the older south half of the building, as well as the creation of better spaces for student gathering, informal study, and formal group study space. Reorganizing existing faculty offices to create student study space and enclaves could help meet this demand.

Some improvements have been made recently by furnishing the central atrium with some seating and tables for students to meet and work together. Better lighting and acoustical treatment in this area would improve it further.

The Technical Center is currently in the design phase of a major capital improvement project, where many of the above recommendations will be implemented. This project will also include energy efficient features such as occupancy sensors, new ventilation

capacity at the welding area, and LED lighting.

4. Facility Overview

Page 52: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 50

EE

XIS

TIN

G P

LA

N -

TE

CH

NIC

AL C

EN

TE

RO

cto

ber

2017

Page 53: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 51

EP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

- T

EC

HN

ICA

L C

EN

TE

RO

cto

ber

2017

ADDITION

RENOVATION

Page 54: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 52

F. Maintenance Building

The existing maintenance building is a pre-engineered type structure of approximately 4,000 SF, first built in 1975. It has been expanded several times with similar construction. It houses a variety of heated and cold storage areas, from building supplies to vehicles and large equipment.

In general, the existing building is in questionable condition. The building is not insulated and is suitable only for storing items not requiring climate control.

Because of the lack of storage within each campus building, most of the supplies and deliveries for the campus are made to this building and stored, at least temporarily, until they can be delivered, in smaller parcels, to their destination buildings and departments. The lack of climate control is a concern for storing materials for any length of time.

Currently an addition of 1,200 SF is being planned to be added at the South end of the building. This addition will house offices and support space for maintenance personel.

4. Facility Overview

Page 55: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 53

G. Auto Repair / Maintenance Center

The Auto Repair Maintenance Center was completed in 2005, and it currently includes 8,700 SF on one level. The building, a pre-engineered building, was built through a cooperative venture between the Mason-Lake Intermediate School District (ISD) and the College. Future planned changes in this facility will include consideration of the Tech Prep needs and programs.

This building is separated by a hallway and is organized in two basic sections:

1. The west portion, which houses the ISD Tech Prep auto repair program, faculty office, and one classroom along with one other ISD classroom;

2. The east portion houses space fo the Agriscience program.

To provide additional storage for the Auto Repair program, the Theatre program and general College use, a flexible storage building has been built across the parking lot. Currently concrete aprons are being completed.

4. Facility Overview

Page 56: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 54

H. Ice Arena

The West Shore Community Ice Arena, completed in 2002, is a pre-engineered building containing four locker rooms, a pro-shop, concession area, a skate rental area, and a National Hockey League-size ice surface, with bleacher seating capacity for 320 spectators. Total area is 34,600 SF on one level.

The facility, which is owned by Mason County and operated by West Shore Community College on a 50-year lease, was funded by donations from the West Shore Community College foundation, along with funds from West Shore Community College, Mason County, Manistee County, and a grant from the State of Michigan. The regional facility provides figure skating, hockey, and open skating opportunities for all the citizens of the area. The College maintains the building and recently completed some humidity control and interior ceiling improvements, as well as an upgraded fire-suppression system.

There is a need to add a multi-use space adjacent to the office area for use as classroom space and community space.

With the growth of women’s hockey, there is a need for a women’s locker room. Proposed plans show the creation of a neew referee’s locker roomm, and the conversion of te former referee locker room for use as the women’s locker rroom.

4. Facility Overview

Page 57: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 55

RENOVATION

EXPANSION

EXPANSION

HP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

- W

ES

T S

HO

RE

IC

E A

RE

NA

Octo

ber

2017

Page 58: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 56

I. Schoenherr Campus Center

The Schoenherr Campus Center was completed and occupied in 2008 as the philosophical and literal center of campus and campus life. It contains approximately 38,000 SF of space over two floors. The east end of the building includes a new campus library. The west end of the building is a two-story area including a new bookstore, food service capability, and student service offices and functions. The open atrium area is used for multiple functions, including dining, informal gathering, and studying. In the center of the atrium is a two-story element with recreation area on the ground level, and study space on the upper level. The remainder of the upper level includes classrooms, offices, counseling services and professional development space.

The Schoenherr Campus Center received a LEED-Gold rating.

By its nature, the Schoenherr Campus Center is an active place, with attendant noise levels that are high during peak periods. Modifications should be made at the cashier windows during peak periods to attenuate the noise infiltration from the common area to the Student Services office area.

There is a need to expand the capacity and reconfigure the layout of the Testing and Learning Center on the upper level. The Faculty Innovation Center was recently reconfigured and repurposed.

Also, on the lower level, there is a desire to reconfigure the Bookstore and the cafeteria kitchen to create an internet cafe-type experience in the Bookstore.

4. Facility Overview

Page 59: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 57

IE

XIS

TIN

G L

EV

EL 0

1 P

LA

N -

SC

HO

EN

HE

RR

CA

MP

US

CE

NTE

RO

cto

ber

2017

Page 60: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 58

IE

XIS

TIN

G L

EV

EL 0

2 P

LA

N -

SC

HO

EN

HE

RR

CA

MP

US

CE

NTE

RO

cto

ber

2017

Page 61: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 59

IP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

LE

VE

L 0

1 P

LA

N -

SC

HO

EN

HE

RR

CA

MP

US

CE

NTE

RO

cto

ber

2017

RENOVATION

Page 62: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 60

IP

RO

PO

SE

D IM

PR

OV

EM

EN

TS

LE

VE

L 0

2 -

SC

HO

EN

HE

RR

CA

MP

US

CE

NTE

RO

cto

ber

2017

RENOVATION

Page 63: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 4- 61

J. Other Buildings

There are several other buildings on campus:

Diesel Building

The Diesel Building is at the far east end of the campus property and is used primarily for storage of miscellaneous maintenance equipment. It gets its name from its original use as a location for teaching diesel technology.

An adjacent former portable classroom structure houses theatre-related scenery, props, and costumes. It is scheduled to be demolished following the removal and relocation of its contents.

Barn

The barn is an original fixture to the site before the property was a college campus. It is a traditional wood timber frame structure with vertical wood siding, and it is used for storage of miscellaneous items.

Two Security Houses

The campus includes two houses, original to the campus, which are being used as housing for security personnel. Both are two- story wood-framed dwellings, in good condition, and maintained annually. Both houses have been remodeled recently including new roofs and full kitchen remodeling.

Maintenance Building

The Maintenance Building was recently expanded to provide space for the relocation of Maintenance Staff offices.

4. Facility Overview

Page 64: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 62

For each WSCC building, the following pages contain cost information related to the specific recommendations identified in Section 2. The first spreadsheet summarizes the construction costs and project costs for each building, as well as the overall campus site. They are listed in the order of priority. Connection to the municipal water source is listed as a separate cost based on previous studies obtained by the College.

The Construction Cost is the cost one would expect to receive when soliciting competitive bids for construction from general contractors or construction managers. It includes the cost of materials and labor to install the materials, as well as a reasonable factor for contractor overhead and profit.

The Project Cost includes the Construction Cost and other costs required to complete the project for use by the College. These include budgets for professional design fees and reimbursable expenses, plan review fees, material and construction testing services, movable furniture, moveable equipment, technology systems and a contingency. For fiscal planning by WSCC, the Project Costs should be used.

It should be stated that the costs for on-campus technology systems are presented as a component of each building / facility budget.

In addition, the Project costs include a figure for completing deferred maintenance projects, derived from the 2016 update of the Facilities Assement and Deferred Maintenance Capital Planning Report. See Section 7.

5. Cost Summaries

Page 65: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 63

Co

st

Su

mm

ary

- A

ll P

roje

cts

West

Sh

ore

Co

mm

un

ity C

olleg

e

Octo

ber,

2017

Pro

jec

tP

rio

rity

Co

ns

tru

cti

on

Co

st

Pro

jec

t C

os

t

Tech

nic

al C

en

ter

14,7

80,0

00

$

5,3

78,8

00

$

Pu

blic S

afe

ty / R

ecre

ati

on

Cen

ter

23,1

31,0

10

$

4,6

96,5

17

$

Sch

oen

herr

Cam

pu

s C

en

ter

3456,0

00

$

725,0

42

$

Wate

r C

on

necti

on

43,4

00,0

00

$

3,4

00,0

00

$

Cam

pu

s-W

ide E

merg

en

cy G

en

era

tor

5720,0

00

$

720,0

00

$

Ice A

ren

a

6342,4

79

$

$ 600,0

00

Ad

min

istr

ati

ve &

Co

nfe

ren

ce B

uild

ing

72,0

97,0

30

$

2,9

87,0

25

$

Art

s &

Scie

nces C

en

ter

8339,1

27

$

479,0

16

$

Sit

e Im

pro

vem

en

ts -

Fie

lds/C

ou

rts, R

oad

Ext.

91,6

53,0

00

$

1,9

84,4

01

$

TO

TA

L16,9

18,6

46

$

20,9

70,8

01

$

Page 66: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 64

Pu

blic S

afe

ty / R

ecre

ati

on

Cen

ter

We

st

Sh

ore

Co

mm

un

ity C

oll

eg

e

Octo

be

r, 2

01

7

De

scri

pti

on

Are

a

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($

)

C

on

str

uc

tio

n C

os

ts$2,7

46,5

00

Bu

ild

ing

Ad

dit

ion

s:

Ca

nop

y a

t n

ort

h e

ntr

ance

500

100

$

$50,0

00

Bu

ild

ing

Re

no

va

tio

ns

:

U

ppe

r L

eve

l 11,6

00

145

$

$1,6

82,0

00

P

ool L

eve

l7,3

00

115

$

$839,5

00

P

ool I

nfr

astr

uctu

reLS

$175,0

00

Co

ntr

acto

r G

.C.'s

and

O.H

.&P

. (

14

%):

$384,5

10

Co

ns

tru

cti

on

To

tal fo

r th

e P

ub

lic S

afe

ty C

en

ter:

$3,1

31,0

10

A/E

Fe

es (

8%

)$316,6

19

Re

imbu

rsa

ble

Exp

en

se

s (

8%

of A

E f

ee)

$25,3

29

Loca

l A

gen

cy P

lan R

evie

w$1,5

00

Te

stin

g a

nd

In

sp

ectio

n S

erv

ice

s (

by O

wn

er)

$7,5

00

Fu

rnitu

re,

Fix

ture

s,

an

d E

quip

me

nt

(by O

wn

er)

*$100,0

00

Te

ch

no

logy E

quip

me

nt

(by O

wn

er

@ 8

%)

$287,8

35

De

ferr

ed M

ain

ten

an

ce

Ba

cklo

g (

1-5

Ye

ars

)$466,9

30

Co

ntin

ge

ncy (

10%

)$359,7

94

Pro

ject

To

tal fo

r P

ub

lic S

afe

ty / R

ecre

ati

on

Ce

nte

r$4,6

96,5

17

Page 67: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 65

Sc

ho

en

he

rr C

am

pu

s C

en

ter

We

st

Sh

ore

Co

mm

un

ity

Co

lle

ge

Octo

be

r, 2

01

7

Descri

pti

on

Are

a

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($)

C

on

str

ucti

on

Co

sts

$400,0

00

Bu

ild

ing

Ren

ovati

on

s:

U

pper

Level R

em

odelin

g8,0

00

26

$

$208,0

00

L

ow

er

Level R

em

odelin

g2,4

00

80

$

$192,0

00

Contr

acto

r G

.C.'s

and O

.H.&

P. (

14%

):$56,0

00

Co

nstr

ucti

on

To

tal fo

r th

e S

tud

en

t C

en

ter:

$456,0

00

A/E

Fees (

8%

)$48,8

99

Reim

burs

able

Exp

enses (

8%

of A

E fee)

$3,9

12

Local A

gency P

lan R

evie

w$1,5

00

Testing a

nd Insp

ection S

erv

ices (

by O

wner)

$7,5

00

Furn

iture

, F

ixtu

res, and E

quip

ment (b

y O

wner)

*$40,0

00

Technolo

gy E

quip

ment

$12,0

00

Defe

rred M

ain

tenance B

acklo

g (

1-5

Years

)$99,6

65

Contingency (

10%

)$55,5

67

Pro

ject

To

tal fo

r S

tud

en

t C

en

ter

$725,0

42

Page 68: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 66

Art

s &

Sc

ien

ce

s C

en

ter

We

st

Sh

ore

Co

mm

un

ity C

oll

eg

e

Octo

be

r, 2

01

7

De

scri

pti

on

Are

a

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($

)

C

on

str

uc

tio

n C

os

ts$297,4

80

Bu

ild

ing

Ad

dit

ion

s:

G

alle

ry

808

255

$

$206,0

40

A

rt S

tora

ge

472

145

$

$68,4

40

Bu

ild

ing

Re

no

va

tio

ns

:

E

xis

ting A

dja

ce

nt

Sp

ace

s

200

115

$

$23,0

00

Co

ntr

acto

r G

.C.'s

and

O.H

.&P

. (

14

%):

$41,6

47

Co

ns

tru

cti

on

To

tal fo

r th

e A

rts

& S

cie

nc

es

Cen

ter:

$339,1

27

A/E

Fe

es (

8%

)$32,7

71

Re

imbu

rsa

ble

Exp

en

se

s (

6%

of A

E f

ee)

$1,9

66

Loca

l A

gen

cy P

lan R

evie

w$750

Te

stin

g a

nd

In

sp

ectio

n S

erv

ice

s (

by O

wn

er)

$4,0

00

Fu

rnitu

re,

Fix

ture

s,

an

d E

quip

me

nt

(by O

wn

er)

*$15,0

00

Te

ch

no

logy E

quip

me

nt

(by O

wn

er

@ 4

%)

$14,8

96

De

ferr

ed M

ain

ten

an

ce

Ba

cklo

g (

1-5

Ye

ars

)$33,2

67

Co

ntin

ge

ncy (

10%

)$37,2

39

Pro

ject

To

tal fo

r A

rts

& S

cie

nc

es

Cen

ter

$479,0

16

Page 69: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 67

Ad

min

istr

ati

ve

& C

on

fere

nc

e B

uil

din

gW

es

t S

ho

re C

om

mu

nit

y C

oll

eg

e

Octo

be

r, 2

01

7

De

scri

pti

on

Are

a (

SF

)

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($

)

C

on

str

uc

tio

n C

os

ts$1,8

39,5

00

Bu

ild

ing

Re

no

va

tio

ns

:

N

ew

Fo

yer

3,2

50

182

$

$591,5

00

P

ort

ions o

f E

xis

ting B

uild

ing

12,0

00

104

$

$1,2

48,0

00

Co

ntr

acto

r G

.C.'s

and

O.H

.&P

. (

14

%):

$257,5

30

Co

ns

tru

cti

on

To

tal fo

r th

e A

dm

in &

Co

nf.

Bu

ild

ing

:$2,0

97,0

30

A/E

Fe

es (

8%

)$201,9

08

Re

imbu

rsa

ble

Exp

en

se

s (

8%

of A

E f

ee)

$16,1

53

Loca

l A

gen

cy P

lan R

evie

w$1,5

00

Te

stin

g a

nd

In

sp

ectio

n S

erv

ice

s (

by O

wn

er)

$2,5

00

Fu

rnitu

re,

Fix

ture

s,

an

d C

om

pute

rs (

by O

wn

er)

*$55,0

00

Te

ch

no

logy E

quip

me

nt

(by O

wn

er

@ 8

%)

$186,1

18

De

ferr

ed M

ain

ten

an

ce

Ba

cklo

g (

1-5

Ye

ars

)$197,3

76

Co

ntin

ge

ncy (

10%

of

Co

nstr

.To

tal +

De

f. M

ain

.)$229,4

41

Pro

ject

To

tal fo

r A

dm

inis

trati

ve &

Co

nfe

ren

ce

Bld

g.:

$2,9

87,0

25

Page 70: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 68

Ice A

ren

aW

es

t S

ho

re C

om

mu

nit

y C

oll

eg

e

Octo

be

r, 2

01

7

De

scri

pti

on

Are

a (

SF

)

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($

)

C

on

str

uc

tio

n C

os

ts$300,4

20

Ice A

ren

a R

en

ov

ati

on

an

d E

xp

an

sio

n

R

eno

vate

Off

icia

ls' R

oo

m f

or

Wo

me

n's

Locke

r R

oo

m300

121

$36,3

00.0

0

N

ew

mu

ltip

urp

ose

ro

om

1,2

00

164

$196,8

00.0

0

N

ew

off

icia

ls' l

ocke

r ro

om

340

198

$67,3

20.0

0

Co

ntr

acto

r G

.C.'s

and

O.H

.&P

. (

14

%):

$42,0

59

Co

ns

tru

cti

on

To

tal fo

r Ic

e A

ren

a$342,4

79

A/E

Fe

es (

8%

)$30,1

38

Re

imbu

rsa

ble

Exp

en

se

s (

8%

of A

E f

ee)

$2,4

11

Loca

l A

gen

cy P

lan R

evie

w$1,5

00

Fu

rnitu

re,

Fix

ture

s,

an

d E

quip

me

nt

(by O

wn

er)

*$105,0

00

Te

ch

no

logy E

quip

me

nt

(by O

wn

er

@ 8

%)

$27,3

98

Te

stin

g a

nd

In

sp

ectio

n S

erv

ice

s (

by O

wn

er)

$7,5

00

De

ferr

ed M

ain

ten

an

ce

Ba

cklo

g (

1-5

Ye

ars

)$49,3

26

Co

ntin

ge

ncy (

10%

)$34,2

48

Su

b T

ota

l fo

r Ic

e A

ren

a$600,0

00

TO

TA

L f

or

Ice

Are

na

$600,0

00

Page 71: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 5 - 69

Sit

e I

mp

rove

me

nts

- R

ec

rea

tio

n F

ield

s/C

ou

rts

, R

oa

d E

xte

ns

ion

We

st

Sh

ore

Co

mm

un

ity C

oll

eg

e

Octo

be

r, 2

01

7

Descri

pti

on

Are

a (

SF

)

$/S

F

Bu

dg

et

($)

To

tal fo

r It

em

($)

C

on

str

ucti

on

Co

sts

$1,4

50,0

00

Sit

e Im

pro

vem

en

ts

N

ew

road a

ccess to Ice A

rena

LS

$630,0

00.0

0

A

thle

tic f

ield

s a

t R

ecre

atio

n C

ente

rLS

$360,0

00.0

0

T

ennis

court

s (

4)

LS

$190,0

00.0

0

S

ola

r gre

enhouse

LS

$170,0

00.0

0

D

ecks, S

tairs, B

ridge a

t A

dm

inis

trativ

e C

ente

rLS

$100,0

00.0

0

Contr

acto

r G

.C.'s

and O

.H.&

P. (

14%

):$203,0

00

Co

nstr

ucti

on

To

tal fo

r S

ite Im

pro

vem

en

ts$1,6

53,0

00

A/E

Fees (

8%

)$145,4

64

Reim

burs

able

Exp

enses (

8%

of A

E fee)

$11,6

37

Local A

gency P

lan R

evie

w$1,5

00

Testing a

nd Insp

ection S

erv

ices (

by O

wner)

$7,5

00

Contingency (

10%

)$165,3

00

Su

b T

ota

l fo

r S

ite Im

pro

vem

en

ts$1,9

84,4

01

TO

TA

L f

or

Sit

e Im

pro

vem

en

ts$1,9

84,4

01

Page 72: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 6 - 70

Since the completion of the 2000 Plan, the College has completed a new Science Wing Addition to the Arts & Sciences Center, new campus signage, connection to the local municipal sanitary sewer system, remodeling of a portion of the Tech Center, a new Ice Arena, an education center in partnership with West Shore Medical Center in Manistee, a new Auto Repair Maintenance Building, the new Schoenherr Campus Center, an expanded and remodeling Arts & Sciences Center, replacement and enhancement of the outdoor patio area at the Administrative and Conference Center, renovation of the Recreation Center, and multiple small additions and remodeling projects across campus.

Moving forward, based upon the recommendations and the information gathered during this update of the College master plan, we believe the following represents an appropriate implementation strategy for West Shore Community College. It should be stated that, though these are listed in prioritized order, the actual implementation of a specific priority may occur in a different order, depending on funding opportunities and programs not yet known.

Priority 1:

Renovation and Expansion of the Technical

Center

Currently in the design phase through the Capital Outlay funding process. Construction to begin in 2018.

Cost: $ 5,378,750

Priority 2:

Remodel the Public Safety / Recreation

CenterRemodel to include roofing, HVAC, toilet rooms, and classrooms. Provide general upgrades of finishes throughout the building.

Cost: $ 4,696,517

6. Implementation Strategy

Page 73: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 6 - 71

Priority 3:

Remodel upper level and bookstore area of

Schoenherr Campus Center

Remodel the upper level to expand and reconfigure the testing center and create new student study space. Reconfigure the Bookstore and cafeteria kitchen space on the loweer level to create an internet cafe-type experieince in the Bookstore.

Cost: $ 725,042

Priority 4:

Connect to the City of Ludington municipal water

system.

Cost: $3,400,000

Priority 5:

Campus-Wide Emergency Generator

Add equipment and capacity to the existing electrical system to allow WSCC to act as an emergency shelter and to operate successfully in the event of a power outage. Improved energy rates will reduce annual energy operating costs for the College.

Cost: $ 720,000

Priority 6:

Expansion and Renovation of Ice Arena

Development of a multipurpose space, and new officials’ locker room, as well as renovation of the existing official’s room for a women’s locker rooom.

Cost: $ 600,000

6. Implementation Strategy

Page 74: 2017 Facilities Masterplan West Shore Community College

AMM 2017 Campus Facilities Master Plan Section 6 - 72

6. Implementation Strategy

Priority 7:

Remodel the Administrative & Conference Building

Remodel north wing spaces for Tech Prep classroom, as well as conference and community use. Remodel all toilet rooms. Add new foyer. Replace existing exterior decks and stairs at the creek, including new bridge.

Cost: $2,987,025

Priority 8:

Addition to Arts & Sciences CenterAdd new gallery and art storage space adjacent to the existing gallery.

Cost: $ 479,016

Priority 9:

Site improvements

Development of outdoor learning space, athletic fields, recreation-al fields, tennis courts, outdoor basketball courts, cross-country trail, and fitness trail at the Recreation Center, with complementary features for College and public use. Provide parking area.

Road extension from Ice Arena to Sugar Grove Road

Deck and bridge replacement at the Administration Building

Cost: $ 1,984,401

Page 75: 2017 Facilities Masterplan West Shore Community College

AMM 2016 Campus Facilities Master Plan

lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
Deferred Maintenance Report
lmstankowski
Typewritten Text
lmstankowski
Typewritten Text
Page 76: 2017 Facilities Masterplan West Shore Community College

AMM 2016 Campus Facilities Master Plan Section 8 - 2

Bui

ldin

g / C

ampu

s / A

ll A

sses

sed

Faci

litie

s C

ompa

rison

Rep

ort

Wes

t Sho

re C

omm

unity

Col

lege

July

, 201

6Pr

iorit

y Is

sues

Dat

a0-

5 Ye

ar C

umul

ativ

e D

ata

Year

B

uild

ing

Pct.

Of

Pct.

ofPc

t. of

Pct.

ofFa

cilit

yB

uilt

Are

a (S

F)To

tal S

FC

RV

Tota

l CR

VD

MB

/16

Tota

l DM

BFC

I/16

Rat

ing/

16D

MB

/16

Tota

l DM

BFC

I/16

Rat

ing/

16D

MB

/13

FCI/1

3R

atin

g/13

DM

B/1

3FC

I/13

Rat

ing/

13A

ll as

sess

ed fa

cilit

ies

66,3

09,2

00$

Bld

g.M

ain

Cam

pus

279,

510

100.

0%66

,309

,200

$

100.

0%30

7,09

0$

10

0%2,

513,

551

$28

4,41

6$

1,

812,

359

$

01A

dmin

. & C

onf.

Bld

g.

1969

26,0

009.

3%6,

168,

000

$

8.

7%24

,672

$

8.0%

0.4%

GO

OD

222,

048

$

8.

8%3.

6%G

OO

D(fo

rmer

Cam

pus

Cen

ter)

10,5

30$

0.

2%G

OO

D99

,509

$

1.

9%G

OO

D

02Te

chni

cal C

ente

r (or

igin

al)

1969

32,6

0011

.7%

6,85

0,42

2$

10.1

%59

,599

$

19.4

%0.

9%G

OO

D64

1,88

5$

25.5

%9.

4%FA

IR45

,722

$

0.8%

GO

OD

146,

918

$

2.

4%G

OO

D

02.1

Tech

nica

l Cen

ter (

add

ition

)19

9239

,200

14.0

%9,

249,

278

$

13

.6%

-$

0.

0%0.

0%G

OO

D44

6,74

0$

17.8

%4.

8%G

OO

D-

$

0.0%

GO

OD

178,

634

$

2.

2%G

OO

D

03A

rts

& S

cien

ces

Cen

ter

1970

35,0

0012

.5%

11,0

89,0

84$

14

.4%

-$

0.

0%0.

0%G

OO

D33

,267

$

1.

3%0.

3%G

OO

D(o

rigin

al a

nd 2

01 a

dditi

on)

-$

0.

0%G

OO

D-

$

0%

GO

OD

03.1

Art

s &

Sci

ence

s C

ente

r 20

0217

,700

6.3%

6,08

7,31

6$

7.9%

21,9

14$

7.

1%0.

4%G

OO

D11

7,48

5$

4.7%

1.9%

GO

OD

(200

2 A

dditi

on)

-$

0.

0%G

OO

D41

,099

$

0.

9%G

OO

D

04R

ecre

atio

n C

ente

r19

7547

,710

17.1

%10

,960

,800

$

17.4

%17

5,37

3$

57

.1%

1.8%

GO

OD

532,

695

$

21

.2%

5.4%

FAIR

123,

855

$

1.2%

GO

OD

690,

650

$

6.

6%FA

IR

05Ic

e A

rena

2002

34,6

0012

.4%

5,06

8,60

0$

12.3

%-

$

0.0%

0.0%

GO

OD

289,

417

$

11

.5%

5.7%

FAIR

74,3

90$

1.

0%G

OO

D51

7,01

1$

7.0%

FAIR

06A

uto

Rep

air a

nd

2005

8,70

03.

1%1,

343,

800

$

2.

6%25

,532

$

8.3%

1.9%

GO

OD

130,

349

$

5.

2%9.

7%FA

IRM

aint

enan

ce C

ente

r29

,919

$

1.9%

GO

OD

130,

700

$

8.

3%FA

IR

07Sc

hoen

herr

2007

38,0

0013

.6%

9,49

1,90

0$

13.0

%-

$

0.0%

0.0%

GO

OD

99,6

65$

4.0%

1.1%

GO

OD

Cam

pus

Cen

ter

$0.

0%G

OO

D7,

838

$

0.1%

GO

OD

Page 77: 2017 Facilities Masterplan West Shore Community College

AMM 2016 Campus Facilities Master Plan Section 8 - 3

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

01:A

dministrative&Co

nferen

ceBu

ilding

CRV:

6,16

8,00

0$

Immed

.Va

lue

15Yrs.

Value

610

Yrs.

Value

11+Yrs.

Value

System

%%

$%

$%

$%

$

Structure

0.18

1,11

0,24

0$

0.00

$0.00

$0.08

88,819

$0.92

1,02

1,42

1$

Roof

0.05

308,40

0$

0.00

$0.04

12,336

$0.08

24,672

$0.88

271,39

2$

Glazing

0.07

431,76

0$

0.00

$0.00

$0.05

21,588

$0.95

410,17

2$

Clad

ding

0.06

370,08

0$

0.00

$0.00

$0.05

18,504

$0.95

351,57

6$

HVAC

0.16

986,88

0$

0.10

98,688

$0.02

19,738

$0.10

98,688

$0.78

769,76

6$

Plum

bing

0.09

555,12

0$

0.00

$0.00

$0.10

55,512

$0.90

499,60

8$

Prim

ary/Second

ary

0.05

308,40

0$

0.00

$0.00

$0.10

30,840

$0.90

277,56

0$

Distrib

ution

0.04

246,72

0$

0.10

24,672

$0.12

29,606

$0.18

44,410

$0.60

148,03

2$

Lightin

g0.04

246,72

0$

0.00

$0.07

17,270

$0.12

29,606

$0.81

199,84

3$

Voice/Da

ta0.02

123,36

0$

0.00

$0.03

3,70

1$

0.12

14,803

$0.85

104,85

6$

Ceilings

0.03

185,04

0$

0.00

$0.03

5,55

1$

0.05

9,25

2$

0.92

170,23

7$

Walls

0.05

308,40

0$

0.00

$0.05

15,420

$0.10

30,840

$0.85

262,14

0$

Doors

0.03

185,04

0$

0.00

$0.00

$0.05

9,25

2$

0.95

175,78

8$

Floo

rs0.04

246,72

0$

0.00

$0.02

4,93

4$

0.10

24,672

$0.88

217,11

4$

Code

(fire,A

DA,etc.)

0.04

246,72

0$

0.00

$0.02

4,93

4$

0.13

32,074

$0.85

209,71

2$

Immed

.Site

0.05

308,40

0$

0.00

$0.20

61,680

$0.10

30,840

$0.70

215,88

0$

6,16

8,00

0$

DMB

123,36

0$

175,17

1$

564,37

2$

5,30

5,09

7$

FCI

2.0%

DMB05Yrs.

298,53

1$

FCI

4.8%

Page 78: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 18%

1,11

0,24

0$

2005

:

2008

:

2010

:

2013

:

2016

No

chan

ges

repo

rted.

P

ast w

ater

leak

s fro

m u

nder

grou

nd s

prin

g re

paire

d, o

ther

wis

e no

rep

orte

d pr

oble

ms.

Str

uctu

re s

uppo

rtin

g pa

tio a

rea

(par

tial b

asem

ent)

sho

ws

wat

er in

filtr

atio

n bu

tno

str

uctu

ral d

amag

e (s

ee im

med

iate

site

not

es).

Sto

rm w

ater

dra

inag

e pr

oble

ms

due

to u

nder

size

d ro

of d

rain

and

dam

aged

out

lets

to c

reek

.B

roke

n, c

ompr

omis

ed d

rain

tile

cau

sing

bac

kups

in b

asem

ent (

mec

hani

cala

reas

). F

loor

set

tling

due

to w

ater

.C

oncr

ete

heav

ing

at D

oor

121

- cau

sing

doo

r to

bin

d.

Sto

rm d

rain

pro

blem

s an

d ba

sem

ent d

rain

bac

kup

reso

lved

by

rout

ine

root

cut

ting

to c

ontro

l pro

blem

.Fl

oor s

ettle

men

t nea

r kitc

hen

repa

ired

(200

5)C

oncr

ete

heav

ing

at D

oor 1

21 -

caus

ing

door

to b

ind.

No

chan

ges

repo

rted.

Issu

e fro

m 2

008

rem

ain.

Doo

r 121

stic

king

pro

blem

reso

lved

. Sto

rm d

rain

pro

blem

s re

solv

ed.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Str

uctu

re0

08

92

CR

V o

f S

yste

m

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Yea

r B

uilt:

196

9

Par

tial b

asem

ent.

Lim

ited

reno

vatio

n pe

rform

ed (

2007

/200

8). B

ooks

tore

, st

uden

t ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew C

ampu

s C

ente

r B

uild

ing.

New

cla

ssro

om v

estib

ule

adde

d to

allo

w d

irect

acc

ess

to

clas

sroo

m (

2009

, $50

,000

)15

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

Mai

n C

ampu

s

AMM 2016 Campus Facilities Master Plan Section 8 - 4

Page 79: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 5%30

8,40

0$

2005

:

2008

:

2010

Roo

f ins

pect

ed a

nnua

lly. N

o re

porte

d pr

oble

ms,

no

activ

e le

akin

g.

2013

:

No

chan

ges

2016

:

No

chan

ges

repo

rted.

S

ingl

e pl

y E

PD

M r

oof (

1986

) an

d or

igin

al c

emen

t sha

kes

dete

riora

ted

and

fund

ed fo

r re

plac

emen

t in

2002

.S

hake

s to

be

repl

aced

with

pre

finis

hed

met

al r

oof.

(per

form

ed in

200

2)

New

EP

DM

roo

f (20

02).

Sha

kes

repl

aced

with

pre

finis

hed

met

al.

Gut

ter

at m

ain

entr

y in

adeq

uate

ly s

lope

d, w

ater

doe

sn't

drai

n pr

oper

ly, c

ausi

ng ic

e da

ms.

Gut

ter

deep

er th

an it

is w

ide

- may

cau

se fu

ture

pro

blem

s. M

inim

al in

sula

tion

betw

een

met

al r

oof a

nd g

utte

r ov

er 1

11 &

112

, cau

ses

icin

g pr

oble

ms

Num

erou

s sm

all r

oof l

eaks

repa

ired

(200

8)

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

48

88

CR

V o

f S

yste

m

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. Boo

ksto

re,

stud

ent s

ervi

ces

offic

es, c

afet

eria

rel

ocat

ed to

new

Cam

pus

Cen

ter

Bui

ldin

g.

New

cla

ssro

om v

estib

ule

adde

d to

allo

w d

irect

acc

ess

to c

lass

room

(20

09,

$50,

000)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 5

Page 80: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 7%43

1,76

0$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Orig

inal

dou

ble

pane

uni

ts, i

n fa

ir co

nditi

on.

Som

e br

oken

sea

ls c

ausi

n g c

loud

ing

in v

ario

us a

reas

of b

uild

ing,

esp

ecia

lly in

loun

ge a

reas

.

Hol

low

met

al fr

ames

adj

acen

t to

door

s sh

owin

g ex

cess

ive

rust

ing.

Som

e cl

eane

d an

d re

pain

ted.

Woo

d lin

tels

- m

oist

ure

bein

g fo

rced

out

of w

ood

affe

cts

abili

ty o

f pai

nt to

adh

ere

- ong

oing

mai

nten

ance

issu

e al

l aro

und

build

ing.

No

chan

ges

repo

rted

Win

dow

fram

es a

nd s

eals

are

det

erio

rate

d, a

llow

ing

wat

er in

to b

uild

ing.

Sys

tem

at e

nd o

f life

and

due

for r

epla

cem

ent.

App

roxi

mat

ely

40%

of w

indo

w s

yste

m is

fund

ed fo

r rep

lace

men

t.

All

win

dow

s re

plac

ed w

ith n

ew a

lum

inum

fram

e in

sula

ted

units

.

Gla

zing

00

595

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

AMM 2016 Campus Facilities Master Plan Section 8 - 6

Page 81: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 16%

986,

880

$

2005

:

2008

:

2010

:

2013

:

2016

:R

epla

ced

one

com

pres

sor f

or th

e S

outh

Lou

nge

Exi

stin

g ro

ofto

p un

it is

cur

rent

ly d

own

- in

the

proc

ess

of b

eing

repl

aced

in 2

016.

AC

rep

lace

d fo

r lo

unge

are

a. D

ata

cent

er (

room

131

) re

loca

ted,

coo

ling

prob

lem

res

olve

d. B

ooks

tore

are

a to

o w

arm

- so

me

adju

stm

ents

mad

e to

bal

ance

/add

res

ista

nce.

Roo

m

131

too

hot.

Con

trol

s - m

ostly

pne

umat

ics,

ther

mos

tats

req

uire

onl

y no

rmal

per

iodi

c ca

libra

tion.

Thr

ee a

ir ha

ndlin

g un

its -

one

requ

ires

bala

ncin

g, tw

o m

ake

exce

ssiv

e no

ise.

B

oile

r ex

haus

t bei

ng p

ulle

d in

to b

uild

ing

thro

ugh

firep

lace

flue

.Man

ual d

ampe

rs a

t fire

plac

e. F

irepl

ace

upgr

aded

to g

as.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Mos

t of H

VA

C s

yste

m o

rigin

al, i

n go

od c

ondi

tion

for

age.

New

a/c

con

dens

er fo

r ca

fete

ria in

stal

led,

200

1. N

ew a

/c fo

r lo

unge

are

as in

stal

led

2002

. Sou

thea

st e

nd o

f bui

ldin

g ha

s ba

lanc

ing

prob

lem

s fro

m s

ubdi

visi

on o

f spa

ce. C

oolin

g in

adeq

uate

in d

ata

cent

er a

nd te

leco

m c

lose

ts d

ue to

equ

ipm

ent h

eat l

oad.

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly. B

oile

r end

rew

elde

d to

reso

lve

leak

ing

prob

lem

. Boi

ler o

rigin

al, a

t end

of l

ife, b

ut fu

nctio

ning

and

wel

l mai

ntai

ned.

Boo

ksto

re

relo

cate

d to

new

Cam

pus

Cen

ter.

HVA

C in

old

spa

ce re

wor

ked

durin

g re

nova

tion,

ove

rhea

ting

prob

lem

s re

solv

ed. B

oile

r exh

aust

bac

kdra

ft th

roug

h fir

epla

ce fl

ue re

solv

ed a

s m

uch

as

poss

ible

thro

ugh

dam

per a

djus

tmen

t. O

rigin

al k

itche

n H

VAC

func

tioni

ng, n

o re

porte

d pr

oble

ms.

AH

U in

bas

emen

t nee

ds n

ew d

rive

shaf

t and

reba

lanc

ing

of fa

ns to

pre

vent

con

tinue

d be

arin

g fa

ilure

. AH

U in

offi

ce a

rea

need

s ne

w d

rive

shaf

t (w

orn)

. Eva

pora

tor f

an p

ulle

ys a

nd b

earin

gs a

re a

t end

of l

ife a

nd d

ue fo

r rep

lace

men

t. A

ll A

HU

s du

e fo

r com

plet

e in

spec

tion

and

over

haul

.

Sys

tem

CR

V o

f S

yste

m

HV

AC

Kitc

hen

vent

hoo

d re

plac

ed, f

ire s

uppr

essi

on s

yste

m in

stal

led.

(201

0) B

asem

ent A

HU

driv

e sh

aft r

epla

ced.

Offi

ce a

rea

AH

U d

rive

shaf

t rep

lace

d. B

alan

ce o

f HVA

C s

yste

m is

orig

inal

and

fu

nctio

ning

, but

maj

ority

of p

robl

ems

from

200

8 re

mai

n. T

he s

yste

m is

at e

nd o

f life

and

due

for r

epla

cem

ent (

cont

rols

, roo

f top

uni

ts, b

oile

rs, e

tc.).

Maj

or H

VAC

wor

k pe

rform

ed. N

ew D

DC

con

trols

inst

alle

d. B

oile

rs re

plac

ed w

ith (2

) new

Loc

hinv

ar K

nigh

t con

dens

ing

boile

rs. (

2) n

ew ro

ofto

p A

C c

onde

nser

uni

ts in

stal

led.

(1) n

ew A

ir ha

ndlin

g un

it in

stal

led.

$

7810

210

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. Boo

ksto

re,

stud

ent s

ervi

ces

offic

es, c

afet

eria

rel

ocat

ed to

new

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to a

llow

dire

ct a

cces

s to

cl

assr

oom

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 7

Page 82: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 6%37

0,08

0$

2005

:

2008

:

2010

:

2013

:

2016

No

chan

ges

repo

rted.

No

chan

ges

repo

rted

No

chan

ges

repo

rted,

no

repo

rted

prob

lem

s.

No

chan

ges

repo

rted.

Bric

k in

goo

d co

nditi

on.

No

repo

rted

pro

blem

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

05

95

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 8

Page 83: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 9%55

5,12

0$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Wat

er p

ress

ure

fluct

uatio

ns (

60 p

si-3

0 ps

i) ty

pica

l thr

ough

out c

ampu

s.Fl

ush

sens

ors

chan

ged

back

to m

anua

l typ

e as

they

fail.

Hot

wat

er ta

nk r

epla

ced.

Tan

k ga

uges

rep

lace

d (2

005)

, lim

it co

ntro

ls m

ay n

otbe

acc

urat

e.

New

DD

C c

ontr

ols

inst

alle

dB

oile

rs r

epla

ced

with

(2)

new

Loc

hinv

ar K

nigh

t con

dens

ing

boile

rs(2

) ne

w r

oofto

p A

C c

onde

nser

uni

ts in

stal

led

(1)

new

Air

hand

ling

unit

inst

alle

d

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.M

ain

kitc

hen

drai

n re

quire

s ro

ot c

uttin

g ev

ery

2-3

year

s. P

lan

is to

repl

ace

with

new

larg

er d

rain

line

dur

ing

futu

re p

arki

ng lo

t wor

k.D

ishw

ashe

r roo

m d

rain

nee

ds 1

" air

gap,

but

dra

in d

esig

n/lo

catio

n no

t pro

vidi

ng a

dequ

ate

spac

e fo

r rep

air.

New

Loc

hinv

ar w

ater

hea

ter i

nsta

lled.

No

othe

r pro

blem

s re

porte

d.

Orig

inal

hot

wat

er ta

nk –

ope

rate

s, b

ut a

t end

of l

ife.

Wat

er s

ofte

ner

– no

rep

orte

d pr

oble

ms.

Fixt

ures

– m

ostly

orig

inal

, no

repo

rted

pro

blem

s.Fl

ush

valv

es u

pgra

ded

to s

enso

r ty

pe, n

o re

port

ed p

robl

ems.

Mai

n ki

tche

n dr

ain

repl

aced

(200

9) to

reso

lve

bloc

kage

issu

es. N

o re

porte

d pr

oble

ms.

Dis

hwas

her r

oom

dra

in re

paire

d (2

009)

.N

o re

porte

d pr

oble

ms.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

010

90

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce60

% A

dmin

istr

atio

n

AMM 2016 Campus Facilities Master Plan Section 8 - 9

Page 84: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 5%30

8,40

0$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d. S

yste

m s

till f

unct

ioni

ng a

t cap

acity

.

Prim

ary

from

on-

site

sub

stat

ion.

Pow

er to

bui

ldin

gs th

roug

h ne

w c

ampu

s-w

ide

loop

sys

tem

, ste

pped

dow

n at

bui

ldin

g. N

o re

port

ed p

robl

ems.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges,

no

repo

rted

prob

lem

s.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

dbl

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

010

90

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 10

Page 85: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 4%24

6,72

0$

2005

:

2008

:

2010

:

2013

:

2016

:

At m

axim

um c

apac

ity, a

dditi

onal

circ

uits

nee

ded.

Stil

l fun

ctio

ning

at c

apac

ity.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges,

sys

tem

stil

l fun

ctio

ning

at c

apac

ity.

No

repo

rted

chan

ges,

sys

tem

stil

l fun

ctio

ning

at c

apac

ity.

No

repo

rted

chan

ges,

sys

tem

stil

l fun

ctio

ning

at c

apac

ity.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n10

1812

60

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 11

Page 86: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 4%24

6,72

0$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

chan

ges

repo

rted.

Fixt

ures

con

tinue

to b

e up

grad

ed a

s ne

cess

ary

and

as p

art o

f oth

er p

roje

cts.

Roo

ms

103,

106

, 111

, 112

upg

rade

d, b

alan

ce o

f bui

ldin

g is

old

er fl

uore

scen

t fix

ture

s.P

enda

nt fi

xtur

es o

bsol

ete,

lens

es u

nava

ilabl

e, b

ut r

equi

re n

o m

ore

than

typi

cal m

aint

enan

ce.

Fixt

ures

bei

ng u

pgra

ded

with

ele

ctro

nic

balla

sts

and

T8 la

mps

as

nece

ssar

y.

New

ligh

ts in

stal

led

in n

ew s

uspe

nded

cei

lings

at M

BT

and

Caf

é'

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

07

1281

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 12

Page 87: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 2%12

3,36

0$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

prob

lem

s.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

Fibe

r to

eac

h bu

ildin

g (1

998)

Net

wor

k sw

itche

s on

4-y

ear

upgr

ade

cycl

eW

irele

ss in

stal

led.

No

repo

rted

pro

blem

s

Upg

rade

d 19

96+

/-, a

t cap

acity

for

build

ing.

Mas

ter

cloc

k sy

stem

dis

able

d.

Voi

ce/D

ata

03

1285

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 13

Page 88: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 3%18

5,04

0$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

2x2

susp

ende

d til

es in

goo

d co

nditi

on; e

xpos

ed w

ood

deck

in g

ood

cond

ition

.G

lue-

on 1

2x12

tile

s at

low

er c

eilin

g in

loun

ge s

pace

s

No

repo

rted

pro

blem

s.

12x1

2 til

es in

fire

pit

area

det

achi

ng d

ue to

pas

t roo

f lea

ks. D

ryw

all c

eilin

g ab

ove

will

like

ly re

quire

repl

acem

ent a

t sam

e tim

e (a

ppro

x. 6

00 S

F)

Dam

aged

are

as o

f cei

ling

repa

ired,

no

repo

rted

prob

lem

s.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

03

592

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 14

Page 89: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 5%30

8,40

0$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Mos

tly g

ypsu

m b

oard

, som

e pa

inte

d co

ncre

te b

lock

, in

good

con

ditio

n. W

alls

rep

aint

ed o

n re

gula

r sc

hedu

le.

Som

e gy

psum

boa

rd c

rack

ing

and

poor

ly c

once

aled

join

ts in

ren

ovat

ions

-Roo

m 1

01, R

oom

128

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

510

85

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 15

Page 90: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 3%18

5,04

0$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Ext

erio

r –

orig

inal

hol

low

met

al d

oors

, in

fair

cond

ition

, som

e re

pairs

mad

e.H

ardw

are

near

end

of l

ife, b

ut fu

nctio

ning

. Doo

r re

plac

emen

t pla

nned

for

futu

re, n

ot fu

nded

. Thr

esho

lds

and

som

e cl

oser

s re

plac

ed d

urin

g A

DA

wor

k.In

terio

r –

woo

d, in

goo

d co

nditi

on. M

ost h

ardw

are

knob

sty

le.

Rem

ovab

le m

ain

front

doo

r m

ullio

n -w

orn

and

rust

ed, d

ue fo

r re

plac

emen

t.In

terio

r w

ood

door

s be

ing

refin

ishe

d at

toile

t roo

ms

No

chan

ges

repo

rted.

Mai

n en

try d

oors

repl

aced

with

new

alu

min

um fr

ame

full-

lite

door

s.O

ther

ext

erio

r doo

rs re

plac

ed in

bui

ldin

g co

re a

nd in

nor

th w

ing.

Sou

th w

ingd

oors

stil

l req

uire

repl

acem

ent.

All

exte

rior d

oors

now

repl

aced

with

new

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

05

95

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 16

Page 91: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 4%24

6,72

0$

2005

:

2008

:

2010

:

2013

:

2016

No

chan

ges

repo

rted.

Som

e ca

rpet

orig

inal

, in

poor

con

ditio

n in

loun

ge. C

arpe

t rep

lace

d in

offi

cear

eas,

food

cou

rt; b

alan

ce o

f car

pet f

unde

d fo

r re

plac

emen

t. Q

uarr

y til

e da

mag

ed fr

om

wat

er le

ak -

repl

aced

, no

repo

rted

pro

blem

s.

Car

pet r

epla

ced

in r

emai

ning

spa

ces

(200

2-03

).Is

olat

ed c

rack

ing

of q

uarr

y til

e th

roug

hout

bui

ldin

g. R

epai

rs p

lann

ed.

Qua

rry

tile

dam

age

repa

ired

(200

5).

No

repo

rted

chan

ges,

no

repo

rted

prob

lem

s.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

210

88

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 17

Page 92: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 4%24

6,72

0$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Not

spr

inkl

ed, e

xcep

t for

fire

sup

pres

sion

in k

itche

n an

d gr

ill a

rea.

Fire

ala

rms

upgr

aded

with

str

obes

and

hor

ns.

Exi

t lig

hts

upgr

aded

, but

no

batte

ry b

acku

p. E

mer

genc

y lig

hts

on b

atte

ry b

acku

p, n

o re

port

ed p

robl

ems.

No

fire

stop

ping

aro

und

pipe

s go

ing

thro

ugh

rate

d w

all b

etw

een

boile

r ro

om a

nd e

lect

ric e

quip

men

t roo

m. D

oor

betw

een

spac

es r

ated

, but

pro

pped

ope

n.K

itche

n eq

uipm

ent u

p to

dat

e.A

DA

com

plia

nt to

ilet r

oom

add

ed. T

hres

hold

s an

d cl

oser

s up

grad

ed fo

r A

DA

.K

nob

hard

war

e th

roug

hout

on

inte

rior

door

s.

Kitc

hen

fire

supp

ress

ion

outd

ated

, may

be

gran

dfat

here

d in

. Con

firm

with

cod

e of

ficia

ls if

upg

rade

nee

ded.

Em

erge

ncy

light

ing

requ

ired

in in

terio

r en

clos

ed r

oom

s.

Fire

sto

ppin

g ad

ded

arou

nd th

roug

h-w

all p

ipin

g be

twee

n bo

iler r

oom

and

ele

ctric

al e

quip

men

t roo

m.

Exi

t lig

htin

g up

grad

ed a

t mos

t loc

atio

ns.

Em

erge

ncy

light

ing

inst

alle

d in

inte

rior e

nclo

sed

room

s (2

007)

Kitc

hen

fire

supp

ress

ion

syst

em re

plac

ed (2

010)

.M

ost d

oor h

ardw

are

conv

erte

d to

leve

r sty

le.

No

repo

rted

prob

lem

s.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

510

85

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 18

Page 93: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

26,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

% 5%30

8,40

0$

2005

:

2008

:

2010

:

2013

:

2016

:W

ood

deck

and

sta

irs a

t cre

ek p

lann

ed fo

r rep

lace

men

t.

Pla

za a

rea

unsa

fe d

ue to

pav

emen

t cra

ckin

g, h

eavi

ng, s

inki

ng. C

oncr

ete

step

s de

terio

rate

d. C

ompl

ete

repa

ving

and

gra

ding

wor

k ne

eded

. Som

e w

ater

leak

ing

thro

ugh

plaz

a in

to b

asem

ent m

echa

nica

l roo

ms.

No

pave

men

t pro

blem

s at

ent

ries.

Site

ligh

ting

repl

aced

.

At p

atio

are

a - c

oncr

ete

cove

r on

rei

nfor

cing

ste

el s

palli

ng a

nd fl

akin

g, e

xpos

ing

stee

l, ed

ge b

eam

s se

vere

ly d

eter

iora

ted.

Som

e ex

terio

r st

airs

pat

ched

, rep

aire

d, m

ost

in p

oor

cond

ition

. C

ompl

ete

repl

acem

ent o

f pat

io r

ecom

men

ded.

Site

ligh

ting

upda

ted

durin

g co

nstr

uctio

n of

new

Cam

pus

Cen

ter.

Hot

wat

er s

now

mel

t sys

tem

add

ed to

inne

r-ca

mpu

s w

alkw

ays.

Pat

io a

nd p

atio

sta

irs c

ontin

uing

to d

eter

iora

te.

Gro

und

unde

r pat

io s

tairs

was

hing

out

, req

uire

s re

plac

emen

t of s

and.

Mai

n bu

ildin

g pa

rkin

g lo

t rep

lace

d (p

arki

ng lo

t not

par

t of a

sses

smen

t).D

eck

repl

acem

ent i

s es

timat

ed a

t $15

0,00

0, b

ut n

ot y

et fu

nded

.

Ent

ire p

laza

dec

k, ra

iling

s an

d st

airs

repl

aced

. New

wat

erpr

oof m

embr

ane,

con

cret

e st

ruct

ure

repa

ired,

dec

king

repl

aced

with

con

cret

e pa

vers

, new

ste

ps in

stal

led.

Woo

d de

ck a

t riv

er is

sch

edul

ed fo

r rem

oval

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

2010

70

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Mai

n C

ampu

sP

artia

l bas

emen

t. Li

mite

d re

nova

tion

perfo

rmed

(20

07/2

008)

. B

ooks

tore

, stu

dent

ser

vice

s of

fices

, caf

eter

ia r

eloc

ated

to n

ew

Cam

pus

Cen

ter

Bui

ldin

g. N

ew c

lass

room

ves

tibul

e ad

ded

to

allo

w d

irect

acc

ess

to c

lass

room

(20

09, $

50,0

00)

Yea

r B

uilt:

196

915

% C

lass

room

s25

% K

itche

n/Fo

od S

ervi

ce

60%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 19

Page 94: 2017 Facilities Masterplan West Shore Community College

EX

CE

SS

GO

OD

$123

,360

$123

,360

$02.

00%

0-5

Yea

r C

umul

ativ

e D

ata

FCI

RA

TIN

G

4.8%

GO

OD

$0$2

98,531

DM

B

$175

,171

Sum

mar

y -

Bui

ldin

g N

o: 0

1 -

Ad

min

& C

onf

eren

ce B

uild

ing

(fo

rmer

Cam

pus

Cen

ter)

Pri

ori

ty Is

sues

Dat

aD

MB

EX

CE

SS

FCI

RA

TIN

G

CR

V T

ota

ls:

Imm

edia

te1-

5 yr

s6-

10 y

rs

$564

,372

$5,3

05,0

97

11+

yrs

AMM 2016 Campus Facilities Master Plan Section 8 - 20

Page 95: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

02:TechnicalCen

ter(orig

inal)

CRV:

6,85

0,42

2$

Immed

.Va

lue

15

Value

610

Value

11+

Value

System

%%

$%

$%

$%

$

Structure

0.18

1,23

3,07

6$

0.00

$0.02

24,662

$0.03

36,992

$0.95

1,17

1,42

2$

Roof

0.05

342,52

1$

0.00

$0.85

291,14

3$

0.05

17,126

$0.10

34,252

$

Glazing

0.05

342,52

1$

0.00

$0.30

102,75

6$

0.50

171,26

1$

0.20

68,504

$

Clad

ding

0.06

411,02

5$

0.00

$0.04

16,441

$0.10

41,103

$0.86

353,48

2$

HVAC

0.16

1,09

6,06

8$

0.00

$0.02

21,921

$0.10

109,60

7$

0.88

964,53

9$

Plum

bing

0.1

685,04

2$

0.00

$0.02

13,701

$0.10

68,504

$0.88

602,83

7$

Prim

ary/Second

ary

0.06

411,02

5$

0.00

$0.00

$0.05

20,551

$0.95

390,47

4$

Distrib

ution

0.06

411,02

5$

0.12

49,323

$0.08

32,882

$0.08

32,882

$0.72

295,93

8$

Lightin

g0.04

274,01

7$

0.00

$0.04

10,961

$0.10

27,402

$0.86

235,65

5$

Voice/Da

ta0.02

137,00

8$

0.00

$0.02

2,74

0$

0.10

13,701

$0.88

120,56

7$

Ceilings

0.04

274,01

7$

0.00

$0.02

5,48

0$

0.08

21,921

$0.90

246,61

5$

Walls

0.05

342,52

1$

0.00

$0.05

17,126

$0.10

34,252

$0.85

291,14

3$

Doors

0.04

274,01

7$

0.00

$0.08

21,921

$0.12

32,882

$0.80

219,21

4$

Floo

rs0.03

205,51

3$

0.00

$0.05

10,276

$0.10

20,551

$0.85

174,68

6$

Code

(fire,A

DA,etc.)

0.03

205,51

3$

0.05

10,276

$0.05

10,276

$0.05

10,276

$0.85

174,68

6$

Immed

.Site

0.03

205,51

3$

0.00

$0.00

$0.05

10,276

$0.95

195,23

7$

CRV

6,85

0,42

2$

DMB

59,599

$58

2,28

6$

669,28

6$

5,53

9,25

1$

FCI

0.9%

DMB

641,88

5$

FCI

9.4%

AMM 2016 Campus Facilities Master Plan Section 8 - 21

Page 96: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

18%

1,23

3,07

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

repo

rted

pro

blem

s

No

repo

rted

pro

blem

s

Set

tlem

ent a

t lin

tel a

bove

OH

doo

r be

twee

n w

eldi

ng a

nd m

achi

ne to

ol la

bs.

No

repo

rted

cha

nges

. Set

tlem

ent d

oes

not a

ppea

r to

be

wor

seni

ng.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

23

95

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 22

Page 97: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%34

2,52

1$

2005

:

2008

:

2010

:

2013

:

2016

:N

ew r

oof i

nclu

ded

in p

lann

ed im

prov

emen

ts u

nder

cap

ital o

utla

y pr

ogra

m.

Ant

icip

ated

con

stru

ctio

n in

201

8.

***W

eldi

ng la

b ro

om (

245)

roo

f rep

lace

men

t TO

P P

RIO

RIT

Y.

Orig

inal

roo

f rep

lace

d w

ith G

oody

ear

EP

DM

in 1

990.

Oth

er r

oofin

g is

Dur

olas

t EP

DM

(19

98).

Met

al r

oofin

g in

stal

led

on m

ansa

rds

in 1

994.

No

repo

rted

pro

blem

s

Sin

gle

ply

roof

ove

r ro

om 2

45 d

ue fo

r re

plac

emen

t.N

orth

roo

f are

a du

e fo

r re

plac

emen

t with

in 5

yea

rs, i

f mai

ntai

ned.

Bal

ance

of r

oof i

nsta

lled

in 2

005,

no

repo

rted

pro

blem

s.

Wel

ding

lab

room

(24

5) r

oof r

epla

ced

(200

9). P

robl

ems

reso

lved

.R

oof i

nspe

cted

ann

ually

. Rep

lace

men

t not

ant

icip

ated

in s

hort

term

.

Roo

f nea

r en

d of

life

, but

no

repo

rted

pro

blem

s. R

oof o

f bot

h or

igin

al a

nd a

dditi

on s

ched

uled

for

repl

acem

ent w

ithin

10

year

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Roo

f0

855

10

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 23

Page 98: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%34

2,52

1$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Orig

inal

aw

ning

-type

win

dow

s, s

eldo

m o

pene

d, n

o re

port

ed p

robl

ems.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

No

repo

rted

cha

nges

or

prob

lem

s.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

030

5020

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 24

Page 99: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

16%

1,09

6,06

8$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Fum

e ho

ods

rem

oved

dur

ing

reno

vatio

n. F

ans

rem

ain

on r

oof,

need

to b

e re

mov

ed.

New

AC

roo

ftop

units

inst

alle

d ab

ove

room

s 22

4-28

4, n

o re

port

ed p

robl

ems.

Con

trol

s a

mix

of e

lect

roni

c an

d pn

eum

atic

. Pne

umat

ic c

ontr

ols

in u

nits

for

room

s 22

3,22

5,22

7,22

9,23

1 de

terio

rate

d, h

ave

wat

er in

sys

tem

. due

for

repl

acem

ent w

ithin

5 y

ears

.M

akeu

p ai

r un

it fo

r ro

om 2

44A

unn

eces

sary

, can

be

rem

oved

.M

akeu

p ai

r un

it fo

r ro

om 2

45 u

nrel

iabl

e, d

ue fo

r re

plac

emen

t - R

EP

LAC

E D

UR

ING

RO

OF

RE

PLA

CE

ME

NT

PR

OJE

CT.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Hig

h hu

mid

ity p

robl

ems

near

roo

ms

242,

244

, cau

sing

cei

ling

tiles

to s

ag -

inve

stig

ate

and

corr

ect t

o pr

even

t con

tinue

d da

mag

e.A

ir ha

ndlin

g un

its fu

nctio

ning

.Fe

w fu

me

hood

s, in

stal

led

late

r (r

oom

s 24

0, 2

42).

Lab

s be

ing

relo

cate

d to

futu

re b

uild

ing.

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly.

Pne

umat

ic c

ontr

ols

for

room

s 22

3,22

5,22

7,22

9,23

1 re

paire

d, N

o re

port

ed p

robl

ems.

New

exh

aust

hoo

ds a

nd m

akeu

p ai

r un

its in

stal

led

abov

e w

eldi

ng s

tatio

ns (

2002

, 200

4). I

ndoo

r ai

r qu

ality

impr

oved

.

Sys

tem

CR

V o

f S

yste

m

HV

AC

Boi

lers

rep

lace

d w

ith 4

Loc

hinv

ar K

nigh

t sta

ged

boile

rs (

2009

).R

oofto

p un

its r

epla

ced

(200

9).

Pne

umat

ic s

yste

m c

ontr

ols

repl

aced

with

DD

C.

No

chan

ges

repo

rted

.

$

8810

20

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 25

Page 100: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%41

1,02

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed

No

chan

ges

repo

rted

No

chan

ges

repo

rted

, no

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

Bric

k, n

o re

port

ed p

robl

ems.

Min

or c

rack

abo

ve 2

45G

bet

wee

n or

igin

al b

uild

ing

and

addi

tion.

Cra

ck in

bric

k at

lint

el in

sid

e of

Roo

m 2

47.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

410

86

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 26

Page 101: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

10%

685,

042

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Wel

l rep

lace

d. S

tora

ge ta

nk u

nuse

d, c

ould

be

rem

oved

.W

ater

pre

ssur

e flu

ctua

tions

(60

psi

-30

psi)

typi

cal t

hrou

ghou

t cam

pus.

Hot

wat

er ta

nk d

ue fo

r re

plac

emen

t. In

adeq

uate

hot

wat

er s

uppl

y co

mpe

nsat

ed b

y ne

w o

n-de

man

d he

ater

s, b

ut s

uppl

y st

ill in

suffi

cien

t. N

o lo

op o

n H

W s

uppl

y lin

es -

take

s se

vera

l m

inut

es fo

r H

W to

rea

ch fi

xtur

es.

Som

e se

dim

ent i

n ho

t wat

er ta

nks

(due

to w

ell w

ater

).To

ilet p

artit

ions

rep

lace

d in

200

0.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.U

tility

/han

d w

ash

sink

s in

roo

m 2

45 p

ast e

nd o

f life

, due

for

repl

acem

ent.

Dom

estic

wat

er h

eate

r re

plac

ed, c

ircul

atin

g pu

mp

adde

d.

Sin

ks in

roo

m 2

45 u

pgra

ded.

Dom

estic

HW

tank

due

for

repl

acem

ent (

see

2005

not

es).

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

210

88

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 27

Page 102: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%41

1,02

5$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Prim

ary

from

on-

site

sub

stat

ion.

Pow

er to

bui

ldin

gs th

roug

h ne

w c

ampu

s-w

ide

loop

sys

tem

, ste

pped

dow

n at

bui

ldin

g. N

o re

port

ed p

robl

ems.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

rep

aire

d as

req

uire

d. N

o re

port

ed p

robl

ems.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 28

Page 103: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%41

1,02

5$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Dis

trib

utio

n pa

nels

ope

ratin

g at

cap

acity

.

Upg

rade

of p

hase

1 p

lann

ed d

urin

g la

b re

nova

tions

.

Wel

ding

lab

pane

ls a

t cap

acity

, add

ition

al p

anel

s re

quire

d.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n12

88

72

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 29

Page 104: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%27

4,01

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Con

vert

ing

to L

ED

ligh

ting

as n

eede

d an

d pl

anne

d as

par

t of t

he c

apita

l out

lay

proj

ect.

Con

stru

ctio

n in

201

8.

Cor

ridor

ligh

ting

upgr

aded

to T

8 2x

2 la

y-in

fluo

resc

ent (

2006

).

No

repo

rted

pro

blem

s or

cha

nges

.

Mos

tly n

ew, n

o re

port

ed p

robl

ems,

just

typi

cal m

aint

enan

ce.

Cor

ridor

s ar

e un

der-

lit. U

pgra

de fi

xtur

es w

ithin

1-5

yea

rs to

cor

rect

pro

blem

.S

outh

end

cla

ssro

om li

ghtin

g re

plac

ed.

No

chan

ges

repo

rted

. Lig

htin

g up

grad

ed o

n re

gula

r ba

sis

as n

eede

d.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

04

1086

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 30

Page 105: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

2%13

7,00

8$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

.

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

pro

blem

s, o

r ch

ange

s.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

No

repo

rted

pro

blem

s.

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Wire

less

inst

alle

d in

sel

ect l

ocat

ions

.N

etw

ork

switc

hes

on 4

-yea

r up

grad

e cy

cle.

No

repo

rted

pro

blem

s.

Voi

ce/D

ata

02

1088

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 31

Page 106: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%27

4,01

7$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

. A

ll ne

w c

eilin

gs p

lann

ed a

s pa

rt o

f cap

ital o

utla

y pr

ojec

t. C

onst

ruct

ion

in 2

018.

Mos

tly s

uspe

nded

cei

lings

. Som

e sa

ggin

g fro

m h

umid

ity in

roo

ms

242,

244

.

Dam

aged

and

sag

ging

cei

ling

tiles

rep

lace

d as

par

t of r

enov

atio

n. N

o re

port

ed p

robl

ems.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

02

890

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 32

Page 107: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%34

2,52

1$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

.

Mos

tly c

oncr

ete

bloc

k th

roug

hout

. Wal

ls r

epai

nted

on

regu

lar

sche

dule

. No

repo

rted

pro

blem

s.

Wal

ls r

epai

nted

sin

ce 2

003.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

510

85

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 33

Page 108: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%27

4,01

7$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

.

Ext

erio

r –

typi

cal s

teel

doo

rs, n

o re

port

ed p

robl

ems.

Doo

r to

roo

m 2

38 r

uste

d, d

ue fo

r re

plac

emen

t.In

terio

r –

stee

l, ge

nera

lly in

goo

d co

nditi

on, s

ome

plas

tic la

min

ate

com

ing

off o

rigin

al in

terio

r do

ors,

due

for

refin

ishi

ng.

Ent

ranc

e do

ors

and

fram

es r

ustin

g an

d at

end

of l

ife. d

ue fo

r re

plac

emen

t.

Ext

erio

r - d

oors

rep

lace

d (2

007)

.In

terio

r - d

amag

ed p

last

ic la

min

ate

door

s re

paire

d an

d re

pain

ted.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

812

80

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 34

Page 109: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%20

5,51

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

.

Cla

ssro

om fl

oorin

g du

e fo

r re

plac

emen

t dur

ing

reno

vatio

n.

Car

pet r

epla

ced.

Som

e Q

uarr

y til

e cr

acke

d, r

epla

ced

as r

equi

red.

Qua

rry

tile

repa

ired

and

regr

oute

d as

req

uire

d.R

oom

s 23

7, 2

39 c

arpe

t pas

t end

of l

ife, d

ue fo

r re

plac

emen

t.

All

carp

et r

epla

ced

(200

9).

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

510

85

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 35

Page 110: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%20

5,51

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

.

No

emer

genc

y lig

htin

g, n

o ba

ttery

bac

kup

on e

xit l

ight

ing

Som

e fir

e al

arm

hor

ns n

ot a

udib

le in

cla

ssro

oms,

fire

ala

rm s

yste

m n

ot fu

lly A

DA

com

plia

nt

Em

erge

ncy

light

ing

upgr

aded

- on

bat

tery

sys

tem

. Exi

t lig

htin

g cu

rren

tly b

eing

upg

rade

d - o

n ba

ttery

sys

tem

.Fi

re A

larm

tied

into

new

bui

ldin

g sy

stem

, but

lack

s st

robe

s.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)5

55

85

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 36

Page 111: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

32,6

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%20

5,51

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted

. A

ntic

ipat

e sn

owm

elt s

yste

m to

be

plan

ned

for

front

(w

est)

ent

ranc

e.

Sof

fit li

ghtin

g up

grad

ed (

1998

)S

ome

pave

men

t hea

ving

at e

ntry

.

Irrig

atio

n sy

stem

- sp

rinkl

er h

eads

nee

d ad

just

ing

to e

limin

ate

wat

er s

tain

s on

bui

ldin

g.

Site

ligh

ting

upda

ted

durin

g co

nstr

uctio

n of

new

Cam

pus

Cen

ter.

No

repo

rted

cha

nges

.

No

repo

rted

cha

nges

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Mai

n C

ampu

sA

dditi

on: 1

990

Tech

pre

p cl

assr

oom

s (2

40-2

44)

and

loun

ge (

238)

ren

ovat

ed in

199

9La

bs r

enov

ated

to c

lass

room

s in

200

4 w

hen

scie

nce

labs

rel

ocat

ed to

new

fa

cilit

y

Yea

r B

uilt:

196

940

% V

oc-T

ech

60%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 37

Page 112: 2017 Facilities Masterplan West Shore Community College

Imm

edia

te

59,9

99$

$

582,

286

$

6

69,2

86

$

5,5

39,2

51

GO

OD

DM

BE

XC

ES

S

641,88

5$

Sum

mar

y -

Bui

ldin

g N

o: 0

2 -

Tech

nica

l Cen

ter

(ori

gin

al)

Pri

ori

ty Is

sues

Dat

aD

MB

EX

CE

SS

FCI

RA

TIN

G

1-5

Yrs

.6-

10 Y

rs.

11+

Yrs

.

CR

V T

ota

ls

59,9

99$

$0

0.9%

GO

OD

0-5

Yea

r C

umul

ativ

e D

ata

FCI

RA

TIN

G

299,

363.

0$

9.4%

AMM 2016 Campus Facilities Master Plan Section 8 - 38

Page 113: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

02.1:TechnicalCen

ter(ad

ditio

n)

CRV:

9,24

9,27

8$

Immed

.Va

lue

15

Value

610

Value

11+

Value

System

%%

$%

$%

$%

$

Structure

0.19

1,75

7,36

3$

0.00

$0.03

52,721

$0.05

87,868

$0.92

1,61

6,77

4$

Roof

0.05

462,46

4$

0.00

$0.25

115,61

6$

0.65

300,60

2$

0.10

46,246

$

Glazing

0.05

462,46

4$

0.00

$0.10

46,246

$0.20

92,493

$0.70

323,72

5$

Clad

ding

0.06

554,95

7$

0.00

$0.00

$0.05

27,748

$0.95

527,20

9$

HVAC

0.15

1,38

7,39

2$

0.00

$0.05

69,370

$0.15

208,10

9$

0.80

1,10

9,91

3$

Plum

bing

0.1

924,92

8$

0.00

$0.02

18,499

$0.10

92,493

$0.88

813,93

6$

Prim

ary/Second

ary

0.06

554,95

7$

0.00

$0.02

11,099

$0.05

27,748

$0.93

516,11

0$

Distrib

ution

0.06

554,95

7$

0.00

$0.05

27,748

$0.10

55,496

$0.85

471,71

3$

Lightin

g0.04

369,97

1$

0.00

$0.05

18,499

$0.05

18,499

$0.90

332,97

4$

Voice/Da

ta0.02

184,98

6$

0.00

$0.02

3,70

0$

0.05

9,24

9$

0.93

172,03

7$

Ceilings

0.04

369,97

1$

0.00

$0.00

$0.05

18,499

$0.95

351,47

3$

Walls

0.05

462,46

4$

0.00

$0.05

23,123

$0.05

23,123

$0.90

416,21

8$

Doors

0.04

369,97

1$

0.00

$0.05

18,499

$0.10

36,997

$0.85

314,47

5$

Floo

rs0.03

277,47

8$

0.00

$0.10

27,748

$0.20

55,496

$0.70

194,23

5$

Code

(fire,A

DA,etc.)

0.03

277,47

8$

0.00

$0.05

13,874

$0.05

13,874

$0.90

249,73

1$

Immed

.Site

0.03

277,47

8$

0.00

$0.00

$0.05

13,874

$0.95

263,60

4$

9,24

9,27

8$

DMB

$44

6,74

0$

1,08

2,16

6$

7,72

0,37

2$

FCI

0.0%

DMB

446,74

0$

FCI

4.8%

AMM 2016 Campus Facilities Master Plan Section 8 - 39

Page 114: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

19%

1,75

7,36

3$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Sla

b m

ovem

ent a

t atr

ium

ent

ranc

es c

ause

d pa

st d

oor

stic

king

pro

blem

s.S

ome

settl

ing

at c

orne

rs a

long

nor

th w

all o

f pha

se 3

add

ition

, wal

ls a

nd fl

oor

show

ing

crac

ks.

Diff

eren

tial m

ovem

ent b

etw

een

Pha

se 2

and

Pha

se 3

No

new

set

tlem

ent c

rack

s.A

triu

m d

oor

stic

king

pro

blem

res

olve

dS

ettle

men

t cau

sing

tran

som

win

dow

cra

ck a

t eas

t ent

ry

Slo

ped

tran

som

win

dow

s ab

ove

entr

y ve

stib

ule

rem

oved

(no

w o

pen

fram

es o

nly)

to r

esol

ve g

lass

cra

ckin

g. S

truc

tura

l mov

emen

t con

tinue

s.

No

repo

rted

cha

nges

.

See

gla

zing

not

es fo

r ve

stib

ule

tran

som

sol

utio

n.

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

35

92

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus Y

ear

Bui

lt: 1

992

20%

Lab

80%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 40

Page 115: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%46

2,46

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Sch

edul

ed to

be

repl

aced

as

part

of c

apita

l out

lay

prog

am.

Con

stru

ctio

n in

201

8

No

chan

ges

repo

rted

.

Fire

ston

e E

PD

M in

stal

led

in 1

993.

No

repo

rted

pro

blem

s

Roo

f in

good

con

ditio

n. P

reve

ntiv

e m

aint

enan

ce a

t cor

ners

, cur

bs, s

umm

er 2

005.

Roo

f ins

pect

ed a

nnua

lly. R

epla

cem

ent n

ot a

ntic

ipat

ed in

sho

rt te

rm.

Roo

f nea

r en

d of

life

, but

no

repo

rted

pro

blem

s. R

oof o

f bot

h or

igin

al a

nd a

dditi

on s

ched

uled

for

repl

acem

ent w

ithin

10

year

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Roo

f0

2565

10

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 41

Page 116: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%46

2,46

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

repo

rted

pro

blem

s.

Tran

som

win

dow

at e

ast e

ntra

nce

crac

king

due

to s

ettli

ng.

Slo

ped

tran

som

win

dow

s ab

ove

entr

y ve

stib

ule

rem

oved

(no

w o

pen

fram

es o

nly)

to r

esol

ve g

lass

cra

ckin

g. S

truc

tura

l mov

emen

t con

tinue

s.

No

repo

rted

cha

nges

. Ins

talla

tion

of p

olyc

arbo

nate

pan

els

abov

e ve

stib

ule

unde

r co

nsid

erat

ion

to c

lose

ves

tibul

es a

nd p

reve

nt g

lass

failu

re.

Win

dow

s in

tran

som

abo

ve v

estib

ule

repl

aced

. New

uni

ts a

re u

nder

size

d to

allo

w m

ovem

ent w

ithou

t bre

akag

e.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

010

2070

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 42

Page 117: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

15%

1,38

7,39

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

DD

C c

ontr

ols

faili

ng (

7 zo

nes)

Diff

user

spr

ings

faili

ng, r

equi

re o

ngoi

ng m

aint

enan

ce.

Eco

nom

izer

sys

tem

on

one

AH

U fa

iling

, req

uirin

g re

pair.

Par

ts a

re d

iffic

ult t

o ob

tain

.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

8 M

cQua

y pa

ckag

e R

TUs

Air

dist

ribut

ion

in p

hase

s 2

and

3 pr

oble

mat

ic, e

cono

miz

er d

ampe

rs m

alfu

nctio

ning

.A

ir ha

ndlin

g un

its fu

nctio

ning

, exc

ept f

or r

outin

e fa

ilure

of m

otor

bra

cket

s (e

quip

men

t des

ign

flaw

)

Sys

tem

/ C

om

po

nent

No

tes

2 of

7 D

DC

con

trol

zon

es r

epla

ced

with

ther

mos

tats

.**

* C

ompr

esso

rs fa

iling

on

RTU

s 5,

6,8.

Eac

h un

its h

as 2

com

pres

sors

, all

at e

nd o

f life

, due

for

repl

acem

ent w

ithin

5 y

ears

. TO

P P

RIO

RIT

YFa

iled

econ

omiz

er s

yste

m r

epai

red

(200

7)

Sys

tem

CR

V o

f S

yste

m

HV

AC

All

roof

top

units

rep

lace

d (2

008)

. New

DD

C c

ontr

ols

inst

alle

d.N

o re

port

ed p

robl

ems.

No

chan

ges

repo

rted

.

$

8015

50

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 43

Page 118: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%55

4,95

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

chan

ges

repo

rted

No

chan

ges

repo

rted

, no

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

Bric

k, n

o re

port

ed p

robl

ems.

No

repo

rted

pro

blem

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

05

95

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 44

Page 119: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

10%

924,

928

$

2005

:

2008

:

2010

:

2013

:

2016

:S

inks

add

ed in

the

Nur

sing

are

a.

On-

dem

and

wat

er h

eate

rs s

ched

uled

for

repl

acem

ent w

ith s

ingl

e H

W ta

nk.

Flus

h va

lves

upg

rade

d to

sen

sor

syst

em a

s re

quire

d.W

ater

less

urin

als

repl

aced

with

plu

mbe

d un

its d

ue to

freq

uent

mai

nten

ance

issu

es a

nd s

anita

tion

conc

erns

.To

ilet p

artit

ions

due

for

repl

acem

ent.

Som

e se

dim

ent i

n ho

t wat

er ta

nks

(due

to w

ell w

ater

).

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.To

ilet r

oom

s in

Pha

se 3

hav

e no

HW

loop

on

HW

sup

ply

lines

- ta

kes

seve

ral m

inut

es fo

r H

W to

rea

ch fi

xtur

es.

Gas

fire

d H

W ta

nk in

stal

led

(200

5)

Dom

estic

HW

sup

ply

prob

lem

res

olve

d w

ith a

dditi

on o

f circ

ulat

ing

pum

ps.

Dom

estic

HW

pro

blem

s co

ntin

ue. N

o re

port

ed c

hang

es.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

210

88

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 45

Page 120: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%55

4,95

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Prim

ary

from

on-

site

sub

stat

ion.

Pow

er to

bui

ldin

gs th

roug

h ne

w c

ampu

s-w

ide

loop

sys

tem

, ste

pped

dow

n at

bui

ldin

g. N

o re

port

ed p

robl

ems.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

rep

aire

d as

req

uire

d. N

o re

port

ed p

robl

ems.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

25

93

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 46

Page 121: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%55

4,95

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

eart

h gr

ound

, pro

blem

rem

edia

ted.

Onl

y 11

0v a

vaila

ble

in b

uild

ing.

Ade

quat

e ci

rcui

ts a

vaila

ble.

220V

for

heat

ed s

idew

alk

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

510

85

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 47

Page 122: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%36

9,97

1$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d. C

onve

rting

ligh

t fix

ture

s to

LE

D a

s fix

ture

s ar

e re

plac

ed.

New

ligh

ting

bein

g te

sted

in a

triu

m to

impr

ove

light

leve

ls.

New

atr

ium

fluo

resc

ent l

ight

ing

prov

ides

ade

quat

e lig

ht le

vels

.N

o re

port

ed p

robl

ems.

Typi

cal m

aint

enan

ce o

nly,

exc

ept t

hat i

ndire

ct fi

xtur

es in

atr

ium

too

clos

e to

bea

ms,

cau

sing

hea

t bui

ldup

that

lead

s to

pre

mat

ure

lam

p fa

ilure

and

bea

m s

hrin

kage

.

Fixt

ures

in a

triu

m r

emov

ed a

nd r

efitt

ed in

200

2 to

add

ress

lam

p fa

ilure

.Li

ght l

evel

s in

atr

ium

inad

equa

te, e

spec

ially

at n

ight

.

No

chan

ges

repo

rted

. Lig

htin

g up

grad

ed o

n re

gula

r ba

sis

as n

eede

d.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

05

590

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 48

Page 123: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

2%18

4,98

6$

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

pro

blem

s, o

r ch

ange

s.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Wire

less

inst

alle

d in

sel

ect l

ocat

ions

.N

etw

ork

switc

hes

on 4

-yea

r up

grad

e cy

cle.

No

repo

rted

pro

blem

s.

Voi

ce/D

ata

02

593

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Mai

n C

ampu

sP

hase

2 -

1992

Pha

se 3

- 19

93V

estib

ules

add

ed (

2005

)N

ursi

ng la

bs c

onne

cted

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 49

Page 124: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%36

9,97

1$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Mos

tly s

uspe

nded

cei

lings

, ope

n to

woo

d de

ck in

atr

ium

.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 50

Page 125: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%46

4,46

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Mos

tly b

rick

and

conc

rete

blo

ck th

roug

hout

, som

e dr

ywal

l in

offic

es. W

alls

rep

aint

ed o

n re

gula

r sc

hedu

le. N

o re

port

ed p

robl

ems.

Cra

ckin

g at

nor

th e

xter

ior

wal

l and

whe

re in

terio

r w

alls

mee

t nor

th w

all.

No

chan

ges

repo

rted

.

No

repo

rted

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

55

90

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 51

Page 126: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%36

9,97

1$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Ext

erio

r –

alum

inum

at a

triu

m a

nd n

orth

end

, ste

el d

oors

els

ewhe

re, n

o re

port

ed p

robl

ems.

Inte

rior

– w

ood,

gen

eral

ly in

goo

d co

nditi

on.

Faile

d lo

ckse

ts r

epla

ced

as r

equi

red,

ong

oing

rep

lace

men

t typ

ical

.C

lass

room

doo

r ha

rdw

are

need

s ro

utin

e ad

just

men

t.To

ilet r

oom

doo

rs s

how

ing

wea

r.

Doo

r ha

rdw

are

repl

aced

with

new

lock

sets

as

they

fail

to r

esol

ve a

djus

tmen

t pro

blem

s.

No

repo

rted

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

510

85

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan

e a o s

m w dg

Section 8 - 52

Page 127: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%27

7,47

8$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Som

e sl

ate

tiles

in a

triu

m p

oppe

d, r

epla

ced.

Car

pet f

ailin

g, s

eam

s de

terio

rate

d.

Sla

te in

atr

ium

con

tinui

ng to

chi

ps a

nd c

rack

. Som

e til

es c

rack

ing

thro

ugho

ut b

uild

ing.

Car

pet r

epla

ced

(200

5)

Sla

te in

atr

ium

rep

lace

d (2

007)

.C

arpe

t - N

o re

port

ed p

robl

ems.

Atr

ium

tile

s re

plac

ed a

s re

quire

d.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

1020

70

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 53

Page 128: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%27

7,47

8$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Spr

inkl

ed; A

DA

com

plia

nt; b

atte

ry b

acku

p on

em

erge

ncy

light

ing.

Toile

t roo

ms

AD

A c

ompl

iant

.

No

emer

genc

y lig

htin

g in

som

e in

terio

r ro

oms

( 20

3, 2

16)

. Bat

tery

bac

kup

fluor

esce

nt a

dded

to r

esol

ve is

sue

Acc

essi

ble

door

ope

rato

rs a

dded

(20

05)

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

55

90

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 54

Page 129: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

39,2

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%27

7,47

8$

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

repo

rted

pro

blem

sS

ite li

ghtin

g up

date

d du

ring

cons

truc

tion

of n

ew C

ampu

s C

ente

r.

No

repo

rted

pro

blem

s or

cha

nges

.

No

repo

rted

pro

blem

s or

cha

nges

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)M

ain

Cam

pus

Pha

se 2

- 19

92P

hase

3 -

1993

Ves

tibul

es a

dded

(20

05)

Nur

sing

labs

con

nect

ed

Yea

r B

uilt:

199

220

% L

ab80

% C

lass

room

AMM 2016 Campus Facilities Master Plan Section 8 - 55

Page 130: 2017 Facilities Masterplan West Shore Community College

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

$0 $

1

78,6

34

$

814,

968

$

7,2

38,3

98

$446

,740

4.8%

GO

OD

FCI

$0E

XC

ES

S

Sum

mar

y -

Bui

ldin

g N

o: 0

2.1

- Te

chni

cal C

ente

r (a

dd

itio

n)

DM

BR

ATI

NG

Pri

ori

ty Is

sues

Dat

aE

XC

ES

SFC

I$0

$00.

0%G

OO

D

0-5

Yea

r C

umul

ativ

e D

ata

DM

B

CR

V T

ota

ls

RA

TIN

G

AMM 2016 Campus Facilities Master Plan Section 8 - 56

Page 131: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

03:Arts&Sciences

Center

(orig

inalan

d20

10)

CRV:

11,089

,084

$Im

med

.Va

lue

15

Value

610

Value

11+

Value

System

%%

$%

$%

$%

$

Structure

0.2

2,21

7,81

7$

0.00

$0.00

$0.00

$1.00

2,21

7,81

7$

Roof

0.05

554,45

4$

0.00

$0.00

$0.05

27,723

$0.95

526,73

1$

Glazing

0.05

554,45

4$

0.00

$0.00

$0.05

27,723

$0.95

526,73

1$

Clad

ding

0.06

665,34

5$

0.00

$0.00

$0.00

$1.00

665,34

5$

HVAC

0.15

1,66

3,36

3$

0.00

$0.02

33,267

$0.10

166,33

6$

0.88

1,46

3,75

9$

Plum

bing

0.09

998,01

8$

0.00

$0.00

$0.05

49,901

$0.95

948,11

7$

Prim

ary/Second

ary

0.05

554,45

4$

0.00

$0.00

$0.05

27,723

$0.95

526,73

1$

Distrib

ution

0.04

443,56

3$

0.00

$0.00

$0.05

22,178

$0.95

421,38

5$

Lightin

g0.04

443,56

3$

0.00

$0.00

$0.05

22,178

$0.95

421,38

5$

Voice/Da

ta0.04

443,56

3$

0.00

$0.00

$0.05

22,178

$0.95

421,38

5$

Ceilings

0.04

443,56

3$

0.00

$0.00

$0.05

22,178

$0.95

421,38

5$

Walls

0.05

554,45

4$

0.00

$0.00

$0.05

27,723

$0.95

526,73

1$

Doors

0.03

332,67

3$

0.00

$0.00

$0.05

16,634

$0.95

316,03

9$

Floo

rs0.04

443,56

3$

0.00

$0.00

$0.05

22,178

$0.95

421,38

5$

Code

(fire,A

DA,etc.)

0.04

443,56

3$

0.00

$0.00

$0.00

$1.00

443,56

3$

Immed

.Site

0.03

332,67

3$

0.00

$0.00

$0.05

16,634

$0.95

316,03

9$

CRV

11,089

,084

$DM

B$

33,267

$47

1,28

6$

10,584

,531

$FCI

0.0%

DMB

33,267

$FCI

0.3%

AMM 2016 Campus Facilities Master Plan Section 8 - 57

Page 132: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1

Use

Typ

es:

%

20%

2,21

7,81

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Set

tling

of f

loor

at d

ress

ing

room

s.P

revi

ous

settl

emen

t of f

loor

cau

sed

floor

cra

ck th

roug

h m

iddl

e of

med

ia c

ente

r an

d un

der

slab

dra

in li

nes

from

roo

f to

back

up

- rep

aire

d bu

t fut

ure

settl

emen

t may

occ

ur.

Col

lege

to c

onsi

der

rero

utin

g ro

of d

rain

line

s th

roug

h ce

iling

spa

ce.

Floo

r se

ttlin

g pr

oble

m p

ersi

sts,

sub

floor

dra

in b

acku

p pr

oble

m s

till o

ccur

s 2

or m

ore

times

per

yea

r.

Floo

r stil

l une

ven,

but

set

tlem

ent s

tabi

lized

.U

nder

floo

r dra

ins

in m

edia

cen

ter -

pro

blem

reso

lved

.

Set

tlem

ent a

nd d

rain

age

issu

es re

solv

ed a

s pa

rt of

reno

vatio

n.

No

repo

rted

prob

lem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

00

100

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)

Yea

r B

uilt:

197

0

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

25%

Aud

itoriu

m35

% L

ab

40%

Cla

ssro

om

Mai

n C

ampu

s

AMM 2016 Campus Facilities Master Plan Section 8 - 58

Page 133: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%5%

554,

454

$

2005

:

2008

:

2010

2013

2016

:N

o ch

ange

s re

porte

d.

Sin

gle

ply

EP

DM

roo

f and

orig

inal

cem

ent s

hake

man

sard

s re

plac

ed in

200

1.M

ansa

rds

repl

aced

with

pre

finis

hed

stee

l.D

iffer

entia

l set

tlem

ent o

f bui

ldin

g ha

s al

tere

d ro

of s

lope

cau

sing

pon

ding

on

roof

whe

re d

rain

s ar

e no

w h

ighe

r th

an a

djac

ent r

oof a

reas

.

Roo

f lea

ks a

t Com

mon

s, th

eate

r an

d ro

om 3

05 r

epai

red

(200

3)P

ondi

ng o

n ro

of n

ot r

esol

ved.

Roo

f dra

ins

mod

ified

to re

dire

ct a

nd c

ontro

l out

flow

and

elim

inat

e po

ndin

g.

Ent

ire ro

of a

nd a

ll ro

of c

ondu

ctor

s an

d un

derfl

oor p

ipin

g re

plac

ed a

s pa

rt of

reno

vatio

n.

No

repo

rted

prob

lem

s.

CR

V o

f S

yste

m

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 59

Page 134: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%55

4,45

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o re

porte

d pr

oble

ms.

Orig

inal

Alu

min

um fr

ames

, som

e op

erab

le. I

nsul

ated

gla

zing

is fo

ggin

g up

as

seal

s fa

il at

mos

t win

dow

s.

Fogg

ing

prob

lem

has

wor

sene

d, a

ffect

ing

appr

oxim

atel

y 40

-45%

of w

indo

ws.

Har

dwar

e in

goo

d co

nditi

on, g

aske

ts b

egin

ning

to s

how

det

erio

ratio

n

No

chan

ges

repo

rted.

Win

dow

s re

plac

ed a

s pa

rt of

reno

vatio

n

No

repo

rted

prob

lem

s.

Gla

zing

00

595

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

AMM 2016 Campus Facilities Master Plan Section 8 - 60

Page 135: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

15%

1,66

3,36

3$

2005

:

2008

:

2010

:

2013

:

2016

:

HV

AC

for

thea

ter

repl

aced

dur

ing

reno

vatio

n B

oile

r (n

atur

al g

as, 1

.5m

BTU

) in

spec

ted

perio

dica

lly, i

n fa

ir co

nditi

on. W

ater

is tr

eate

d to

pre

vent

cor

rosi

on.

Chi

ller

unit

still

in o

pera

ting

cond

ition

, but

par

ts r

emai

n di

fficu

lt to

obt

ain

Hea

ting

pipe

insu

latio

n in

boi

ler

room

may

con

tain

asb

esto

s at

elb

ows.

Air

hand

ling

units

for

libra

ry a

nd r

oom

305

orig

inal

, req

uire

typi

cal m

aint

enan

ce o

nly.

Uni

t ven

tilat

ors

in b

alan

ce o

f bui

ldin

g - r

unni

ng, b

ut m

otor

s ar

e fa

iling

.Li

brar

y fin

tube

s an

d ca

bine

t uni

t hea

ters

in g

ood

cond

ition

.R

oom

303

Roo

ftop

unit

mot

or r

epla

ced

in 2

004.

Pne

umat

ic c

ontr

ols

- no

repo

rted

pro

blem

s. C

ompr

esso

r in

wor

king

con

ditio

n.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Chi

ller

unit

orig

inal

, at e

nd o

f life

, but

ope

ratin

g. P

arts

diff

icul

t to

obta

in.

Boi

ler

orig

inal

but

upg

rade

d, n

o re

port

ed p

robl

ems.

New

er r

oofto

p un

its in

thea

ter

(200

1) a

nd r

oom

s 30

1, 3

03 (

1999

).

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly.

Uni

t ven

tilat

or m

otor

s in

room

s 30

1,30

3 re

plac

ed.

Sys

tem

CR

V o

f S

yste

m

HV

AC

Sys

tem

repl

aced

with

new

VA

V gr

ound

-sou

rce

geot

herm

al h

eat p

ump

syst

em (3

8 w

ells

, 34

heat

pum

ps).

Con

trols

repl

aced

with

DD

C.

Hea

t pum

ps lo

cate

d ab

ove

ceili

ngs

- may

be

diffi

cult

to a

cces

s fo

r mai

nten

ance

.

Hea

t pum

ps w

orki

ng w

ell,

but a

re re

porte

d as

diff

icul

t to

acce

ss. N

o re

porte

d pr

oble

ms.

$

8810

20

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 61

Page 136: 2017 Facilities Masterplan West Shore Community College

Rep

lace

d bo

iler i

n 20

15.

Rep

lace

d tw

o ou

tsid

e A

/C c

ompr

esso

rs (o

f a to

tal o

f 6)

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

6%66

5,34

5$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Bric

k, n

o re

port

ed p

robl

ems.

Mas

onry

in g

ood

shap

eFa

scia

and

sof

fit p

aint

ed in

200

1

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

00

100

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 62

Page 137: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

9%99

8,01

8$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Cam

era

sent

thro

ugh

drai

n lin

es b

ut n

o ob

stru

ctio

ns n

oted

. (20

02)

Cam

pus

now

on

city

sew

er. D

rain

line

obs

truc

tion

near

sci

ence

win

g ad

ditio

n.N

ew w

ell i

n 20

02 -

serv

es A

SC

, CC

, TC

and

new

Aut

o/m

aint

. Bui

ldin

g,pr

essu

re fl

uctu

ates

(30

-60p

si).

Fauc

ets

in to

ilet r

oom

s re

plac

ed in

200

1, w

orki

ng w

ith ty

pica

l rep

airs

, but

nea

r en

d of

life

.S

uppl

y lin

es -

mix

of g

alva

nize

d an

d co

pper

- or

igin

al, n

o re

port

ed p

robl

ems.

Toile

t par

titio

ns r

epla

ced

durin

g re

nova

tion,

but

toile

t roo

ms

due

for

gene

ral u

pgra

ding

.D

rinki

ng fo

unta

ins

leak

ing

- due

for

repl

acem

ent

Orig

inal

plu

mbi

ng a

nd fi

xtur

es, n

o re

port

ed p

robl

ems.

Toile

t par

titio

ns r

epla

ced

in 2

000.

Mai

n do

mes

tic w

ater

hea

ter

repl

aced

in 1

980s

, no

repo

rted

pro

blem

s.S

epar

ate

80ga

l hea

ter

in g

ood

cond

ition

.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

. (20

07).

Cam

era

sent

thro

ugh

drai

n lin

es b

ut n

o ob

stru

ctio

ns n

oted

. (20

07)

Wor

st s

ink

hard

war

e re

plac

ed, b

alan

ce a

wai

ting

repl

acem

ent w

ith re

nova

tion.

Drin

king

foun

tain

s re

plac

ed (2

007)

.

No

repo

rted

prob

lem

s.

All

plum

bing

repl

aced

as

part

of re

nova

tion.

Toi

let r

oom

s re

nova

ted,

now

mee

t AD

A.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 63

Page 138: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%55

4,45

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Prim

ary

from

on-

site

sub

stat

ion.

Pow

er to

bui

ldin

gs th

roug

h ne

w c

ampu

s-w

ide

loop

sys

tem

, ste

pped

dow

n at

bui

ldin

g. N

o re

port

ed p

robl

ems.

OK

- B

ackh

oe c

ut li

ne d

urin

g co

nstr

uctio

n. L

ine

repa

ired.

Sw

itchg

ear,

orig

inal

- no

rep

orte

d pr

oble

ms

Und

ergr

ound

line

s un

der

docu

men

ted,

sur

vey

requ

ired.

Und

ergr

ound

util

ity s

urve

y be

ing

upda

ted

(200

8).

Ele

ctric

al s

yste

m u

pgra

ded

as p

art o

f ren

ovat

ion.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

dbl

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 64

Page 139: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Pan

els

at c

apac

ityE

lect

rical

upg

rade

s fu

nded

for

2002

.

Ele

ctric

al u

pdat

es s

till r

equi

red,

pan

els

at c

apac

ity.

No

GFI

exc

ept i

n br

eakr

oom

.

No

chan

ges

repo

rted.

Ele

ctric

al s

yste

m u

pgra

ded

as p

art o

f ren

ovat

ion.

No

repo

rted

prob

lem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 65

Page 140: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Ligh

ting

syst

em, i

nclu

ding

thea

ter l

ight

ing,

repl

aced

as

part

of re

nova

tion.

Orig

inal

T12

fixt

ures

, exc

ept f

or r

oom

s 30

1, 3

03 (

1999

) an

d 30

5 (1

997)

-up

grad

ed to

T8.

No

repo

rted

pro

blem

s.Th

eate

r lig

htin

g –

no r

epor

ted

prob

lem

s.M

edia

cen

ter

light

ing

– no

rep

orte

d pr

oble

ms.

Orig

inal

thea

ter

light

ing

func

tioni

ng, b

ut in

effic

ient

and

req

uire

s fre

quen

t lam

p ch

ange

s. C

onsi

der

upgr

ade

to im

prov

e ef

ficie

ncy.

Lam

ps a

nd b

alla

sts

upgr

aded

to T

8 as

req

uire

d.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

00

595

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 66

Page 141: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Wi-F

i add

ed to

all

build

ings

.

Sys

tem

upg

rade

d as

nee

ded

as p

art o

f ren

ovat

ion.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Net

wor

k sw

itche

s on

4-y

ear

upgr

ade

cycl

e.N

o re

port

ed p

robl

ems.

Inte

rnet

and

tele

phon

e m

ain

line

ente

r th

roug

h th

is b

uild

ing

– no

rep

orte

d pr

oble

ms.

New

dat

a lin

es th

roug

hout

bui

ldin

g.

Voi

ce/D

ata

00

595

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 67

Page 142: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

2x2

susp

ende

d ce

iling

s th

roug

hout

bui

ldin

g, b

eing

rep

lace

d w

here

wat

er d

amag

ed fr

om p

ast r

oof l

eak.

Cof

fere

d su

spen

ded

ceili

ng in

med

ia c

ente

r di

fficu

lt to

mai

ntai

n du

e to

des

ign.

New

cei

lings

in r

oom

s 30

1, 3

03.

Orig

inal

cei

lings

rem

ain

in g

ood

cond

ition

.

No

chan

ges

repo

rted.

Cei

lings

repl

aced

with

a m

ix o

f sus

pend

ed a

nd o

pen

as p

art o

f ren

ovat

ion.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 68

Page 143: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

5%55

4,45

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Con

cret

e bl

ock

and

bric

k.G

ypsu

m b

oard

wal

ls in

libr

ary

and

offic

es.

Wal

ls r

epai

nted

on

regu

lar

sche

dule

. No

repo

rted

pro

blem

s.

Typi

cal o

ngoi

ng r

epai

ntin

g.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 69

Page 144: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%33

2,67

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Ext

erio

r –

orig

inal

hol

low

met

al d

oors

, in

fair

cond

ition

, som

e re

pairs

mad

e.H

ardw

are

wea

ring

out.

Rep

lace

men

t pla

nned

for

futu

re, n

ot fu

nded

.In

terio

r –

woo

d, n

o re

port

ed p

robl

ems.

Ext

erio

r - d

oors

rus

ting

and

hard

war

e at

end

of l

ife, e

spec

ially

at t

he S

outh

ent

ry a

nd b

acks

tage

doo

rs. d

ue fo

r re

plac

emen

t.In

terio

r - S

olid

cor

e w

ood

door

s du

e fo

r re

finis

hing

.

No

chan

ges

repo

rted.

Rep

lace

d as

par

t of r

enov

atio

n.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 70

Page 145: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

Floo

ring

repl

aced

in tw

o m

usic

room

s in

201

5.

New

car

pet t

hrou

ghou

t.Q

uarr

y til

e in

cor

ridor

s, n

o re

port

ed p

robl

ems.

VC

T in

dre

ssin

g ro

oms

in g

ood

cond

ition

.

New

car

pet i

n lib

rary

and

in th

eatr

e.S

tage

floo

r re

plac

ed (

2002

).

No

chan

ges

repo

rted.

Rep

lace

d as

par

t of r

enov

atio

n. M

ix o

f car

pet,

conc

rete

, bam

boo,

lino

leum

and

vin

yl.

No

repo

rted

prob

lem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 71

Page 146: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

4%44

3,56

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Thea

ter

area

and

med

ia c

ente

r w

orkr

oom

spr

inkl

ed.

AD

A c

ompl

iant

toile

t roo

m a

dded

.O

rigin

al fi

re a

larm

sys

tem

, due

for

upgr

ade

in 2

002.

Fire

ala

rm s

yste

m u

pgra

ded

with

hor

ns a

nd s

trob

es in

200

2 as

par

t of s

cien

ce w

ing

addi

tion.

Bui

ldin

g on

bac

kup

gene

rato

r fo

r em

erge

ncy

light

ing

and

fire

supp

ress

ion.

No

chan

ges

repo

rted.

Fire

ala

rm s

yste

m, f

ire s

uppr

essi

on s

yste

m, e

mer

genc

y lig

htin

g an

d ex

it lig

htin

g re

plac

ed a

s pa

rt of

reno

vatio

n.B

uild

ing

fully

AD

A c

ompl

iant

.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

00

100

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 72

Page 147: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

35,0

00 s

fFl

oo

rs:

1U

se T

ypes

:

%

3%33

2,67

3$

2005

:

2008

:

2010

:

2013

:

2016

:

New

sno

w m

elt a

nd h

eat e

xcha

nger

in 2

015.

Ent

ry w

alks

in g

ood

cond

ition

, muc

h w

ill b

e re

plac

ed w

ith a

dditi

on.

Bui

ldin

g so

ffit l

ight

ing

wor

king

, wal

kway

ligh

ting

at n

orth

end

of b

uild

ing

repl

aced

.

Som

e de

terio

ratio

n of

asp

halt

wal

ks a

t nor

th a

nd s

outh

ent

ries.

Hea

ted

wal

k at

sou

th e

nd c

onst

ruct

ed a

s pa

rt o

f bui

ldin

g ad

ditio

n.

Hot

wat

er s

now

mel

t sys

tem

add

ed to

inne

r-ca

mpu

s w

alkw

ays.

Asp

halt

wal

ks re

plac

ed a

s pa

rt of

pro

ject

.S

ite li

ghtin

g up

date

d du

ring

cons

truct

ion

of n

ew C

ampu

s C

ente

r.

Bui

ldin

g lig

htin

g, b

uild

ing

entry

pad

s an

d su

rrou

ndin

g si

dew

alks

upg

rade

d as

par

t of r

enov

atio

n.

No

chan

ges

repo

rted.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Bui

ldin

g N

o: 0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)M

ain

Cam

pus

2010

Ent

ire b

uild

ing

reno

vate

d, n

ew 6

,800

SF

addi

tion

cons

truc

ted

($6,

900,

00)

Yea

r B

uilt:

197

025

% A

udito

rium

35%

Lab

40%

Cla

ssro

om

AMM 2016 Campus Facilities Master Plan Section 8 - 73

Page 148: 2017 Facilities Masterplan West Shore Community College

11,0

89,0

84$

0$

33,2

67 $

471

,286

$

1

0,58

4,53

1 C

RV

To

tals

11,0

89,0

84$

$0

$00.

00%

GO

OD

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I$/

YR

MA

INTA

INR

ATI

NG

Sum

mar

y -

Bui

ldin

g N

o:0

3 -

Art

s &

Sci

ence

s C

ente

r (o

rig

inal

& 2

010

add

itio

n)

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

$ 33

,267

$00.

3%$

221,

782

GO

OD

AMM 2016 Campus Facilities Master Plan Section 8 - 74

Page 149: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

03.1:Arts&Sciences

Center

(200

2Ad

ditio

n)

CRV:

6,08

7,31

6$

Immed

.Va

lue

15

Value

610

Value

11+

Value

System

%%

$%

$%

$%

$

Structure

0.2

1,21

7,46

3$

0.00

$0.03

36,524

$0.05

60,873

$0.92

1,12

0,06

6$

Roof

0.05

304,36

6$

0.00

$0.05

15,218

$0.15

45,655

$0.80

243,49

3$

Glazing

0.03

182,61

9$

0.00

$0.00

$0.05

9,13

1$

0.95

173,48

9$

Clad

ding

0.07

426,11

2$

0.00

$0.00

$0.00

$1.00

426,11

2$

HVAC

0.18

1,09

5,71

7$

0.02

21,914

$0.04

43,829

$0.10

109,57

2$

0.84

920,40

2$

Plum

bing

0.1

608,73

2$

0.00

$0.00

$0.05

30,437

$0.95

578,29

5$

Prim

ary/Second

ary

0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Distrib

ution

0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Lightin

g0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Voice/Da

ta0.02

121,74

6$

0.00

$0.00

$0.05

6,08

7$

0.95

115,65

9$

Ceilings

0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Walls

0.05

304,36

6$

0.00

$0.00

$0.05

15,218

$0.95

289,14

8$

Doors

0.03

182,61

9$

0.00

$0.00

$0.05

9,13

1$

0.95

173,48

9$

Floo

rs0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Code

(fire,A

DA,etc.)

0.04

243,49

3$

0.00

$0.00

$0.05

12,175

$0.95

231,31

8$

Immed

.Site

0.03

182,61

9$

0.00

$0.00

$0.05

9,13

1$

0.95

173,48

9$

CRV

6,08

7,31

6$

DMB

21,914

$95

,571

$36

8,28

3$

5,60

1,54

8$

FCI

0.4%

DMB

117,48

5$

FCI

1.9%

AMM 2016 Campus Facilities Master Plan Section 8 - 75

Page 150: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

20%

1,21

7,46

3$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Yea

r B

uilt:

200

2

100%

Lab

Mai

n C

ampu

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

35

92

Set

tlem

ent a

nd s

hrin

kage

cra

ckin

g at

wes

t wal

l of r

oom

352

(po

or c

onst

ruct

ion

join

t fill

ed w

ith e

xces

sive

mor

tar)

.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges.

No

repo

rted

chan

ges.

AMM 2016 Campus Facilities Master Plan Section 8 - 76

Page 151: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%5%

304,

366

$

2005

:

2008

:

2010

2013

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

CR

V o

f S

yste

m

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

515

80

EP

DM

- m

echa

nica

lly a

ttach

ed, n

o re

port

ed p

robl

ems

No

chan

ges

repo

rted.

Roo

f ins

pect

ed a

nnua

lly.

Som

e m

inor

leak

s un

der i

nves

tigat

ion,

pos

sibl

y ca

used

by

loos

e pi

ece

ofm

etal

from

rece

nt w

inds

torm

s cu

tting

roof

mem

bran

e.

No

repo

rted

leak

s or

pro

blem

s.

AMM 2016 Campus Facilities Master Plan Section 8 - 77

Page 152: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

3%18

2,61

9$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

00

595

Alu

min

um fr

ame,

gas

fille

d, o

pera

ble

case

men

ts.

Inte

rior

borr

owed

lite

s w

ith d

ispl

ay b

etw

een

clas

sroo

m &

cor

ridor

.N

o re

port

ed p

robl

ems

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

repo

rted

chan

ges

or p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 78

Page 153: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

18%

1,09

5,71

7$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

2

(4)

Bur

nham

boi

lers

, Yor

k A

HU

, gro

und-

mou

nted

chi

ller,

no

repo

rted

pro

blem

s

11+

yrs

6-10

yrs

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly.

Sys

tem

CR

V o

f S

yste

m

HV

AC

Two

of s

ix c

ompr

esso

rs o

n ch

iller

faile

d, re

mai

ning

four

stil

l fun

ctio

ning

, chi

ller o

pera

ting

norm

ally

. Rep

lace

men

t is

not u

rgen

t

Two

faile

d co

mpr

esso

rs re

plac

ed. N

o re

porte

d pr

oble

ms.

$

8410

4

AMM 2016 Campus Facilities Master Plan Section 8 - 79

Page 154: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

7%42

6,11

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

00

100

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges.

Bric

k w

ith m

etal

fasc

ia. N

o re

port

ed p

robl

ems

AMM 2016 Campus Facilities Master Plan Section 8 - 80

Page 155: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

10%

608,

732

$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Pla

n to

con

nect

with

city

wat

er s

yste

m a

s a

sepa

rate

pro

ject

in th

e fu

ture

.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

sTh

is b

uild

ing

is th

e di

strib

utio

n po

int o

f the

cam

pus

wat

er s

yste

m.

Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

05

95

Mai

n dr

ain

line

obst

ruct

ed, m

ay n

ot b

e sl

oped

ade

quat

ely.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.M

ain

drai

n lin

e m

odifi

ed, o

bstru

ctio

n pr

oble

m re

solv

ed.

No

repo

rted

chan

ges.

No

repo

rted

chan

ges

or p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 81

Page 156: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

d pr

oble

ms.

AMM 2016 Campus Facilities Master Plan Section 8 - 82

Page 157: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

05

95

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

repo

rted

chan

ges.

AMM 2016 Campus Facilities Master Plan Section 8 - 83

Page 158: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

00

595

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

2 x

4 de

ep c

ell p

arab

olic

in c

lass

room

s, 2

x 4

acr

ylic

in c

orrid

or, s

uspe

nded

dire

ct/in

dire

ct in

hig

h ba

y, c

ompa

ct fl

uore

scen

t dow

nlig

hts

in c

orrid

or.

No

repo

rted

pro

blem

s

No

repo

rted

chan

ges.

Lig

htin

g up

grad

ed a

s ne

cess

ary.

AMM 2016 Campus Facilities Master Plan Section 8 - 84

Page 159: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

2%12

1,74

6$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Voi

ce/D

ata

00

595

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

chan

ges

or p

robl

ems.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Net

wor

k sw

itche

s on

4-y

ear

upgr

ade

cycl

e.N

o re

port

ed p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 85

Page 160: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

2 x

2 te

gula

r A

CT

typi

cal,

som

e pe

rfora

ted

met

al p

anel

, som

e gy

p so

ffits

& v

estib

ule

ceili

ngs.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 86

Page 161: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

5%30

4,36

6$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

05

95

Pai

nted

CM

U. W

alls

rep

aint

ed o

n re

gula

r sc

hedu

le. N

o re

port

ed p

robl

ems.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

repo

rted

chan

ges.

AMM 2016 Campus Facilities Master Plan Section 8 - 87

Page 162: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

3%18

2,61

9$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

05

95

Ext

erio

r - a

lum

inum

Inte

rior

- woo

d w

ith s

idel

ight

s, s

ome

visi

on p

anel

s, A

DA

har

dwar

e.N

o re

port

ed p

robl

ems.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

repo

rted

chan

ges.

AMM 2016 Campus Facilities Master Plan Section 8 - 88

Page 163: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

05

95

She

et v

inyl

in c

orrid

or, V

CT

in la

bs, C

arpe

t in

clas

sroo

ms.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 89

Page 164: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

4%24

3,49

3$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

05

95

Spr

inkl

edN

o re

port

ed p

robl

ems

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 90

Page 165: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

17,7

00sf

Flo

ors

:1

Use

Typ

es:

%

3%18

2,61

9$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Mai

n C

ampu

s Yea

r B

uilt:

200

210

0% L

ab

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Hea

ted

wal

ksN

o re

port

ed p

robl

ems

Hot

wat

er s

now

mel

t sys

tem

add

ed to

inne

r-ca

mpu

s w

alkw

ays.

Site

ligh

ting

upda

ted

durin

g co

nstru

ctio

n of

new

Cam

pus

Cen

ter

No

repo

rted

chan

ges

or p

robl

ems.

No

repo

rted

chan

ges

or p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 91

Page 166: 2017 Facilities Masterplan West Shore Community College

%

6,08

7,31

6$

21

914

9557

1 $

368

,283

$

5,6

01,5

48

$/Y

R M

AIN

TAIN

RA

TIN

G11

7485

$01.

9%12

1746

GO

OD

Sum

mar

y -

Bui

ldin

g N

o:0

3.1

- A

rts

& S

cien

ces

Cen

ter

(200

2 ad

diti

on)

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

CR

V T

ota

ls

6087

316

2191

4$0

0.40

%G

OO

D

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I

AMM 2016 Campus Facilities Master Plan Section 8 - 92

Page 167: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

04:Re

creatio

nCe

nter

CRV:

10,960

,800

$Im

med

.Va

lue

15

Value

610

Value

11+

Value

System

%$

%$

%$

%$

%$

Structure

0.18

1,97

2,94

4$

0.00

$0.05

98,647

$0.05

98,647

$0.90

1,77

5,65

0$

Roof

0.04

438,43

2$

0.00

$0.00

$0.00

$1.00

438,43

2$

Glazing

0.02

219,21

6$

0.00

$0.10

21,922

$0.15

32,882

$0.75

164,41

2$

Clad

ding

0.07

767,25

6$

0.00

$0.05

38,363

$0.05

38,363

$0.90

690,53

0$

HVAC

0.14

1,53

4,51

2$

0.00

$0.10

153,45

1$

0.10

153,45

1$

0.80

1,22

7,61

0$

Plum

bing

0.2

2,19

2,16

0$

0.08

175,37

3$

0.05

109,60

8$

0.05

109,60

8$

0.82

1,79

7,57

1$

Prim

ary/Second

ary

0.04

438,43

2$

0.00

$0.00

$0.05

21,922

$0.95

416,51

0$

Distrib

ution

0.04

438,43

2$

0.00

$0.00

$0.05

21,922

$0.95

416,51

0$

Lightin

g0.04

438,43

2$

0.00

$0.00

$0.05

21,922

$0.95

416,51

0$

Voice/Da

ta0.02

219,21

6$

0.00

$0.00

$0.05

10,961

$0.95

208,25

5$

Ceilings

0.03

328,82

4$

0.00

$0.00

$0.05

16,441

$0.95

312,38

3$

Walls

0.05

548,04

0$

0.00

$0.04

21,922

$0.05

27,402

$0.91

498,71

6$

Doors

0.03

328,82

4$

0.00

$0.07

23,018

$0.05

16,441

$0.88

289,36

5$

Floo

rs0.04

438,43

2$

0.00

$0.00

$0.05

21,922

$0.95

416,51

0$

Code

(fire,A

DA,etc.)

0.04

438,43

2$

0.00

$0.00

$0.05

21,922

$0.95

416,51

0$

Immed

.Site

0.02

219,21

6$

0.00

$0.00

$0.10

21,922

$0.90

197,29

4$

CRV

10,960

,800

$DM

B17

5,37

3$

466,93

0$

635,72

6$

9,68

2,77

1$

FCI

1.6%

DMB

642,30

3$

FCI

5.9%

AMM 2016 Campus Facilities Master Plan Section 8 - 93

Page 168: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

18%

1,97

2,94

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Dra

inag

e pr

oble

m a

long

eas

t sid

e of

bui

ldin

g ca

usin

g si

nkho

le in

par

king

lot a

nd p

artia

l cra

ckin

g in

are

na fl

oor.

Cra

ckin

g ha

s be

en p

atch

ed in

floo

r.S

ever

al m

inor

cra

cks

in a

rena

mas

onry

wal

l. M

oist

ure

pene

trat

ion

thro

ugh

wal

l ret

aini

ng e

arth

on

east

sid

e of

are

na.

Som

e w

ater

thro

ugh

wal

l see

ping

into

wel

lnes

s ce

nter

occ

asio

nally

.

Lack

of c

ontr

ol jo

ints

in a

rena

wal

l are

like

ly c

ause

of c

rack

ing

at e

ast w

all.

Cra

ck in

floo

r (li

kely

due

to c

orne

r se

ttlem

ent)

ope

ning

aga

in, b

ut o

nly

slig

htly

.R

oof d

rain

at W

elln

ess

Cen

ter

redi

rect

ed in

to s

torm

dra

in to

res

olve

was

hout

pro

blem

.

Foun

datio

n dr

ain

syst

em re

plac

ed, w

all a

nd fl

oor c

rack

s re

paire

d, n

o ne

w p

robl

ems

(200

6).

***

TOP

PR

IOR

ITY:

Wat

er in

filtra

tion

at b

ase

of g

ym w

all c

ontin

uing

. Rec

ent r

emov

al o

f bas

e tri

m to

repl

ace

floor

sho

wed

that

wat

er w

as b

eing

hel

d ba

ck b

y tri

m. W

all i

s bo

win

g ve

rtica

lly a

nd

horiz

onta

lly, c

ausi

ng in

crea

sed

crac

king

. An

in-d

epth

stru

ctur

al in

vest

igat

ion

and

cam

era

insp

ectio

n of

foun

datio

n dr

ains

is re

com

men

ded.

Rec

ent g

ym fl

oor r

epla

cem

ent m

ay b

e co

mpr

omis

ed if

stru

ctur

al m

ovem

ent a

nd w

ater

infil

tratio

n co

ntin

ues.

Stru

ctur

al in

vest

igat

ion

of w

all b

owin

g pe

rform

ed. C

ondi

tion

repo

rted

to b

e st

abili

zed

and

will

be

mon

itore

d. W

ater

infil

tratio

n ha

s no

t bee

n an

issu

e si

nce

2010

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

55

90

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Yea

r B

uilt:

197

5

Kiln

roo

m a

dditi

on: 1

994

Rem

odel

ed o

ne r

acqu

etba

ll co

urt t

o w

eigh

t roo

m (

2005

)E

xpan

ded

Wel

lnes

s C

ente

r (2

005)

Hum

an r

esou

rces

offi

ces

relo

cate

d, s

pace

s un

occu

pied

(20

08)

Art

pro

gram

s re

loca

ted

to n

ew A

rts

and

Sci

ence

s C

ente

r (2

010)

20%

Cla

ssro

om30

% N

atat

oriu

m

50%

Ath

letic

Mai

n C

ampu

s

AMM 2016 Campus Facilities Master Plan Section 8 - 94

Page 169: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%4%

438,

432

$

2005

:

2008

:

2010

2013

2016

:N

o ch

ange

s re

porte

d.

Roo

f was

rep

lace

d w

ith s

ingl

e pl

y E

PD

M in

198

9, n

o re

port

ed p

robl

ems.

Som

e m

inor

leak

ing

at th

e ar

ena

roof

in p

ast,

but n

o re

cent

occ

urre

nces

.C

emen

t sha

ke m

ansa

rds

in g

ood

cond

ition

, due

for

repa

intin

g.

Mai

n ro

of in

goo

d sh

ape

- res

eale

d in

200

5. M

ansa

rds

repl

aced

with

met

al.

Und

ersi

zed

roof

dra

ins

and

stor

m d

rain

s ca

usin

g co

ntin

ued

park

ing

lot w

asho

ut a

nd o

ther

pro

blem

s.B

oile

r ro

om r

oof a

t end

of l

ife, d

ue fo

r im

med

iate

rep

lace

men

t.

***G

ym ro

of a

nd b

oile

r roo

m ro

of a

t end

of l

ife, d

ue fo

r rep

lace

men

t. TO

P P

RIO

RIT

Ypr

oble

ms

with

und

ersi

zed

drai

ns re

solv

ed -

no n

ew p

arki

ng lo

t was

hout

pro

blem

s (2

006)

.

(200

9) G

ym a

nd b

oile

r roo

m ro

of re

plac

ed. R

oof i

s in

spec

ted

annu

ally

.N

o re

porte

d pr

oble

ms.

Roo

f rep

lace

d w

ith fu

lly a

dher

ed E

PD

M m

embr

ane,

incl

udin

g ne

w in

sula

tion,

man

sard

fasc

ias

and

curb

ing

for r

oofto

p eq

uipm

ent.

CR

V o

f S

yste

m

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

00

100

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 95

Page 170: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

2%21

9,21

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Orig

inal

and

min

imal

, onl

y at

wel

lnes

s ce

nter

and

art

cla

ssro

oms,

no

repo

rted

pro

blem

s.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted

Gla

zing

010

1575

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

AMM 2016 Campus Facilities Master Plan Section 8 - 96

Page 171: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

14%

1,53

4,51

2$

2005

:

2008

:

Boi

ler

stac

k sh

owin

g co

rros

ion,

rus

ted

thou

gh a

t elb

ow, d

ue fo

r re

plac

emen

t.S

ingl

e bo

iler,

nat

ural

gas

fire

d - n

o m

ajor

rep

airs

, typ

ical

mai

nten

ance

- no

rep

orte

d pr

oble

ms.

AC

uni

t add

ed a

t Roo

m 4

04.

Sep

arat

e ro

of to

p un

its w

ith A

C fo

r cl

assr

oom

s &

offi

ces,

HR

offi

ces

and

wel

lnes

s ce

nter

.Fi

n tu

be r

adia

tors

- no

rep

orte

d pr

oble

ms

AH

Us

- wor

king

but

som

e pr

evio

us fa

ilure

s.P

ool h

umid

ity c

ontr

ol e

xhau

st fa

n sy

stem

orig

inal

, req

uire

s ro

utin

e m

aint

enan

ce.

Pne

umat

ic c

ontr

ols

- Sw

itche

s ne

ed to

be

eval

uate

d. M

ain

cont

rol b

oard

s ob

sole

te, u

nrel

iabl

e an

d at

end

of l

ife, n

ot m

aint

aine

d si

nce

2002

. Sys

tem

due

for

repl

acem

ent.

Sep

arat

e co

ntro

ls in

404

, 425

& 4

26, n

o re

port

ed p

robl

ems.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Are

na, p

ool a

nd r

acke

t bal

l cou

rts

are

not a

ir-co

nditi

oned

.N

ew e

quip

men

t at W

elln

ess

cent

er, n

ew r

oofto

p un

its a

t roo

ms

425,

426

.

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly.

Boi

ler t

uned

up,

som

e co

ntin

ued

tripp

ing

prob

lem

s (2

006)

Boi

ler s

tack

repa

ired

(200

6)B

oile

r exh

aust

fan

mot

or a

t end

of l

ife, d

ue fo

r rep

lace

men

t.O

ffice

AC

RTU

ove

rsiz

ed, o

ne c

ompr

esso

r rem

oved

to im

prov

e ef

ficie

ncy.

No

repo

rted

prob

lem

s..

AH

Us

wor

king

. No

repo

rted

prob

lem

s.P

ool e

xhau

st fa

n m

otor

s an

d co

ntro

ls re

plac

ed, a

ir qu

ality

impr

oved

. Mot

ors

may

con

tinue

to h

ave

high

er th

an n

orm

al fa

ilure

rate

due

to c

hlor

ine

caus

ing

mot

or d

eter

iora

tion.

Pne

umat

ic c

ontro

l sys

tem

repa

ired

and

upgr

aded

, now

func

tions

pro

perly

, No

repo

rted

prob

lem

s.

Sys

tem

CR

V o

f S

yste

m

HV

AC

$

8010

100

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 97

Page 172: 2017 Facilities Masterplan West Shore Community College

2010

:

2013

:

2016

:A

ir-ha

ndle

rs a

nd c

ontro

ls s

houl

d be

upg

rade

d to

DD

C c

ontro

ls.

(Pne

umat

ic c

ontro

ls c

urre

ntly

mix

ed w

ith d

igita

l con

trols

).

Air-

cond

ition

ing

curr

ently

exi

sts

in la

w e

nfor

cem

ent c

lass

room

s, a

nd in

wel

lnes

s ce

nter

. R

emai

nder

of b

uild

ing

is n

ot c

ondi

tione

d.

HVA

C s

yste

m re

plac

emen

t wor

k un

derw

ay d

urin

g as

sess

men

t ($1

90,0

00).

Boi

lers

repl

aced

with

(4) L

ochi

nvar

Kni

ght s

tage

d bo

ilers

with

hea

t exc

hang

es fo

r hea

ting

pool

and

whi

rlpoo

l wat

er (2

010)

.(2

) new

boi

lers

inst

alle

d fo

r dom

estic

hot

wat

er s

uppl

y.

Pne

umat

ic c

ontro

l sys

tem

repl

aced

with

DD

C c

ontro

ls. S

ome

seco

ndar

y pn

eum

atic

s re

tain

ed.

AH

Us

in w

orki

ng c

ondi

tion,

wel

l mai

ntai

ned,

not

repl

aced

.P

ool h

umid

ity c

ontro

l exh

aust

fan

syst

em o

rigin

al, r

equi

res

rout

ine

mai

nten

ance

.

Poo

l exh

aust

fans

repl

aced

.A

HU

sch

edul

ed fo

r rep

lace

men

t with

in 5

yea

rs a

s pa

rt of

pla

nned

air

cond

ition

ing

inst

alla

tion

for g

ym.

Sys

tem

/ C

om

po

nent

No

tes

(co

ntin

ued

)

AMM 2016 Campus Facilities Master Plan Section 8 - 98

Page 173: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

7%76

7,25

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

chan

ges

repo

rted.

Boi

ler r

oom

lint

el re

plac

ed.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

Bric

k. S

ome

min

or d

amag

e by

veh

icle

s on

eas

t sid

e of

bui

ldin

g.Li

ntel

at d

oor

open

ing

into

boi

ler

room

is r

ustin

g.

No

chan

ges

to c

ondi

tions

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

55

90

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 99

Page 174: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

20%

2,19

2,16

0$

2005

:

2008

:

2010

:

Dra

in p

ipin

g in

poo

r co

nditi

on, s

ome

corr

oded

and

spl

it, e

xten

t unk

now

n as

som

e pi

pes

are

burie

d an

d di

fficu

lt to

acc

ess.

Dra

in p

ipin

g in

poo

l mec

hani

cal r

oom

are

away

bac

ks u

p 2-

3 fe

et, s

ome

sect

ions

hav

e fa

iled

in th

e pa

st.

Leve

l one

toile

t roo

ms

fixtu

res

at e

nd o

f life

, due

for

repl

acem

ent.

Res

iden

tial g

rade

sho

wer

fixt

ures

inst

alle

d in

200

2 ar

e fa

iling

, val

ves

not w

ithst

andi

ng a

buse

.To

ilet r

oom

sin

ks n

eed

new

fixt

ures

.W

hirlp

ool s

and

filte

rs u

pgra

ded.

Whi

rlpoo

l dra

ins

are

faili

ng a

nd d

ue fo

r re

plac

emen

t. W

ork

will

req

uire

rem

oval

of w

hirlp

ool t

o ac

cess

pip

ing.

Poo

l pip

ing:

Filt

er s

yste

m s

witc

hed

to c

artr

idge

filte

r. S

ome

valv

es r

epla

ced

with

pla

stic

and

sta

inle

ss s

teel

uni

ts. O

lder

val

ves

due

for

repl

acem

ent s

oon.

Sho

wer

fixt

ures

in m

en a

nd w

omen

’s lo

cker

roo

ms

in n

eed

of r

epla

cem

ent;

eith

er in

poo

r co

nditi

on o

r do

not

mee

t AD

A c

ompl

ianc

e.P

ool p

lum

bing

is in

goo

d co

nditi

on. F

ilter

tank

upg

rade

d in

199

3, p

lan

to s

witc

h fro

m c

artr

idge

sys

tem

to s

and

filtr

atio

n w

hen

cam

pus

conn

ecte

d to

sew

er s

yste

m. S

ome

cast

iron

pi

ping

may

nee

d re

plac

emen

t in

a fe

w y

ears

due

to d

eter

iora

tion.

Toile

t par

titio

ns r

epla

ced

thro

ugho

ut b

uild

ing

- exc

ept l

ocke

r ro

oms.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.W

ater

sof

tene

r add

ed to

reso

lve

valv

e an

d fix

ture

det

erio

ratio

n (2

005)

.W

hirlp

ool d

rain

s re

paire

d w

here

pos

sibl

e.W

hirlp

ool f

iller

pip

ing

begi

nnin

g to

leak

.W

hirlp

ool d

ue fo

r rep

lace

men

t. In

acce

ssib

le d

eter

iora

ted

pipi

ng w

ill b

e re

plac

ed a

t sam

e tim

e.O

lder

poo

l val

ves

repl

aced

as

requ

ired.

Sho

wer

val

ves

repa

ired

as re

quire

d. N

o re

porte

d pr

oble

ms.

Whi

rlpoo

l rep

lace

d. A

ssoc

iate

d dr

ains

, dra

in p

ipin

g an

d fil

ler p

ipin

g re

plac

ed(2

009)

.C

ast i

ron

pipi

ng u

nder

toile

t roo

m fl

oors

sus

pect

ed o

f sig

nific

ant d

eter

iora

tion.

Due

for r

epla

cem

ent.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng8

55

82

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 100

Page 175: 2017 Facilities Masterplan West Shore Community College

2013

:

2016

:Lo

cker

Roo

m re

nova

tion

in 2

014

Cur

rent

ly a

ddin

g va

lves

and

rem

odel

ing

pum

ps fo

r the

poo

l.

Futu

re p

roje

ct w

ill re

plac

e po

ol ti

le a

nd p

ipin

g fro

m th

e po

ol in

to th

e ba

sem

ent.

Sys

tem

/ C

om

po

nent

No

tes

(co

ntin

ued

)

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 101

Page 176: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

4%43

8,43

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Prim

ary

from

on-

site

sub

stat

ion.

Pow

er to

bui

ldin

gs th

roug

h ne

w c

ampu

s-w

ide

loop

sys

tem

, ste

pped

dow

n at

bui

ldin

g. N

o re

port

ed p

robl

ems.

Line

s to

bui

ldin

g up

grad

ed w

hen

new

sew

er li

nes

inst

alle

d 2

year

s ag

o. N

o re

port

ed p

robl

ems.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

d pr

oble

ms.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 102

Page 177: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

4%43

8,43

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

At c

apac

ity w

ithin

bui

ldin

g, n

o fu

ture

circ

uits

ava

ilabl

e.

Sho

rtag

e of

circ

uits

res

olve

d by

elim

inat

ing

unne

eded

circ

uits

, few

er r

equi

red.

No

chan

ges

repo

rted.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

05

95

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 103

Page 178: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

4%43

8,43

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d. C

onve

rting

to L

ED

ligh

t fix

ture

s as

cha

nges

are

mad

e.

Cor

ridor

ligh

ting

on lo

wer

leve

l pla

nned

for r

epla

cem

ent (

$3,0

00).

Gym

and

poo

l lig

htin

g re

plac

ed w

ith T

8 flu

ores

cent

fixt

ures

(201

0).

Low

er le

vel c

orrid

or li

ghtin

g re

plac

ed w

ith T

8 flu

ores

cent

fixt

ures

(200

9).

New

fixt

ures

in 4

02, 4

03, 4

06, 4

25, 4

26. O

rigin

al c

orrid

or fl

uore

scen

t fix

ture

s ob

sole

te, l

ense

s no

t ava

ilabl

e. O

rigin

al a

rena

fluo

resc

ent f

ixtu

res

requ

ire c

onst

ant l

amp

repl

acem

ent.

Upp

er le

vel c

orrid

or fi

xtur

es r

epla

ced

in 2

002.

Bal

last

s re

plac

ed a

nd la

mps

cha

nged

to T

8 as

nec

essa

ry.

Are

na fi

xtur

es r

epla

ced,

no

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

00

595

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 104

Page 179: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

2%21

9,21

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

chan

ges

or p

robl

ems.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Net

wor

k sw

itche

s on

4-y

ear

upgr

ade

cycl

e.N

o re

port

ed p

robl

ems.

Min

imal

, upd

ated

in 1

996-

97 fo

r of

fices

and

cla

ssro

oms,

no

repo

rted

pro

blem

s.

Voi

ce/D

ata

00

595

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 105

Page 180: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

3%32

8,82

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

New

spr

ay-o

n ce

iling

fini

sh in

poo

l, w

elln

ess

cent

er a

nd r

oom

s 42

5, 4

26. A

ll ot

her

room

s ar

e or

igin

al, n

o re

port

ed p

robl

ems.

Spr

ayed

on

acou

stic

cei

ling

finis

h at

poo

l and

Wel

lnes

s C

ente

r sh

owin

g ye

llow

/ora

nge

disc

olor

atio

n. C

ause

unk

now

n an

d m

ay r

equi

re r

epla

cem

ent o

f cei

lings

if it

wor

sens

. If o

nly

clea

ning

req

uire

d, th

e ce

iling

text

ure

will

mak

e cl

eani

ng e

xtre

mel

y di

fficu

lt.

Gym

cei

ling

repa

inte

d (2

005)

.C

eilin

g di

scol

orat

ion

appe

ars

to h

ave

stop

ped

once

ven

tilat

ion

impr

oved

.C

ause

for d

isco

lora

tion

shou

ld b

e in

vest

igat

ed.

No

chan

ges.

Poo

l cei

ling

disc

olor

atio

n ha

s st

oppe

d, b

ut c

ontra

ctor

won

't su

ppor

t cos

t of r

epla

cem

ent o

r rem

oval

.

Poo

l cei

ling

plan

ned

for r

epla

cem

ent a

fter r

oof r

epla

cem

ent.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 106

Page 181: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

5%54

8,04

0$

2005

:

2008

:

2010

:

2013

:

2016

:A

dditi

onal

aco

ustic

trea

tmen

t nee

ded

in a

rena

.

Blo

ck th

roug

hout

, som

e gy

p bo

ard

wal

ls in

ren

ovat

ed c

lass

room

are

as. B

lock

wal

l in

aren

a sh

owin

g m

inor

cra

ckin

g at

col

umn

loca

tions

.

Are

na r

epai

nted

in 2

004,

wel

lnes

s ce

nter

par

tially

rep

aint

ed in

200

5. L

ocke

r ro

oms

due

for

repa

int.

Insi

de fa

ce o

f Are

na e

xter

ior

wal

ls s

how

ing

cont

inue

d cr

acki

ng.

Insi

de fa

ce o

f Are

na e

xter

ior w

alls

repa

ired

afte

r set

tlem

ent p

robl

em re

solv

ed.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

Som

e ac

oust

ical

pan

els

adde

d in

201

3.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

45

91

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 107

Page 182: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

3%32

8,82

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Ext

erio

r –

Orig

inal

hol

low

met

al/g

lass

doo

rs, h

inge

s an

d ha

rdw

are

faili

ng, s

ome

show

poo

r fit

a th

resh

old.

Inte

rior

- Doo

rs in

poo

l are

a ar

e co

rrod

ed/ r

ustin

g ou

t, fla

king

pai

nt

Ext

erio

r: H

ollo

w m

etal

doo

rs a

t ent

ries

and

aren

a ru

stin

g, h

ardw

are

is a

t end

of l

ife, d

ue fo

r re

plac

emen

t.In

terio

r: P

last

ic la

min

ate

door

dam

age

typi

cal.

Doo

rs d

ue fo

r re

finis

hing

.A

rena

inte

rior

hollo

w m

etal

doo

rs n

earin

g en

d of

life

. Har

dwar

e is

faili

ng,

repa

irs a

re c

onsi

dere

d te

mpo

rary

. Har

dwar

e du

e fo

r re

plac

emen

t.

Ext

erio

r: A

ll ex

terio

r doo

rs e

xcep

t one

HM

exi

t doo

r rep

lace

d (2

007)

Inte

rior:

Doo

rs fr

om p

ool t

o co

rrid

or re

plac

ed (2

007)

Bal

ance

of i

nter

ior p

last

ic la

min

ate

door

s st

ill s

how

ing

dam

age

and

hard

war

e pr

oble

ms.

Boi

ler r

oom

doo

r and

fram

e re

plac

ed. N

o ot

her c

hang

es re

porte

d.

No

chan

ges

repo

rted

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

75

88

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 108

Page 183: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

4%43

8,43

2$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

New

car

pet i

n co

rrid

ors

and

offic

es. N

ew fl

oorin

g in

roo

ms

425,

426

. New

rub

ber

floor

in lo

wer

leve

l cor

ridor

s. N

ew q

uarr

y til

e in

upp

er le

vel c

orrid

ors.

New

sho

ck-a

bsor

bing

floo

r in

Wel

lnes

s C

ente

r. S

ynth

etic

gym

nasi

um fl

oor

is o

rigin

al a

nd s

how

ing

age.

Rep

lace

men

t is

bein

g co

nsid

ered

but

not

pre

sent

ly fu

nded

.

New

car

pet n

eede

d in

427

.R

ubbe

r til

e in

leve

l one

cor

ridor

s - a

dhes

ive

faili

ng d

ue to

moi

stur

e le

vels

in c

oncr

ete

slab

ben

eath

.N

ew c

arpe

t in

HR

offi

ce a

rea.

Gym

floo

r re

finis

hed

but n

ot r

epla

ced.

Cra

ckin

g/te

arin

g of

rub

ber

show

ing

agai

n ne

ar c

orne

r se

ttlem

ent a

rea.

Cer

amic

tile

in lo

cker

roo

ms

repa

ired

in 2

005.

Cer

amic

tile

in lo

cker

roo

ms

and

pool

are

a re

paire

d an

nual

ly a

s pa

rt o

f mai

nten

ance

pro

gram

.

Car

pet i

n ro

om 2

47 re

plac

ed (2

007)

.Fa

iling

rubb

er ti

le in

leve

l one

cor

ridor

s re

plac

ed w

ith q

uarr

y til

e (2

006)

.G

ym fl

oor c

rack

ing

stab

ilize

d.

Gym

floo

r rep

lace

d w

ith n

ew ru

bber

floo

r (20

09, $

87,6

00).

Wat

er in

filtra

tion

alon

g w

all n

ot fu

lly re

solv

ed a

nd m

ay d

amag

e ne

w fl

oor.

Wat

er in

filtra

tion

has

not r

etur

ned.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

05

95

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 109

Page 184: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

4%43

8,43

2$

2005

:

2008

:

2010

:

2013

:

2016

:E

leva

tor r

efur

bish

ed in

201

6.

Fire

ala

rm s

yste

m u

pgra

ded

in to

ilets

, wel

lnes

s ce

nter

and

lock

ers

room

s, b

alan

ce o

f sys

tem

orig

inal

. Pul

l sta

tions

wer

e id

entif

ied

as n

eedi

ng to

be

upgr

aded

. AD

A to

ilet r

oom

ad

ded

in 1

998.

Loc

ker

and

show

er r

oom

s do

not

com

ply

with

AD

A.

Ele

vato

r se

als

wer

e no

ted

as p

ossi

bly

leak

ing.

Ele

vato

rs o

n se

rvic

e co

ntra

ct.

Ele

vato

r on

ser

vice

con

trac

t with

Otis

. Ele

vato

r un

relia

ble,

sea

ls le

akin

g an

d pa

rts

diffi

cult

to o

btai

n. E

leva

tor

due

for

repl

acem

ent.

Sho

wer

Roo

m &

lock

ers

upgr

aded

to A

DA

.Le

ver

hard

war

e on

new

er d

oors

, kno

b ha

rdw

are

on o

lder

doo

rs.

Fire

ala

rm p

ull s

tatio

ns u

pgra

ded

in 2

002.

Fire

ala

rm s

yste

m re

paire

d by

Sim

plex

. One

duc

t det

ecto

r stil

l pro

blem

atic

.E

leva

tor m

aint

enan

ce a

nd o

pera

tion

impr

oved

.

No

repo

rted

chan

ges

or p

robl

ems.

Som

e A

DA

upg

rade

s m

ade

in w

omen

's lo

cker

room

. Fur

ther

upg

rade

s pl

anne

d in

futu

re.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

05

95

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 110

Page 185: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

47,7

10sf

Flo

ors

:2

Use

Typ

es:

%

2%21

9,21

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Upp

er a

nd lo

wer

par

king

lots

sch

edul

ed fo

r rep

lace

men

t.

Wes

t sid

e ro

ad is

in n

eed

of r

epla

cem

ent,

num

erou

s lo

catio

ns o

f hea

ving

and

cra

ckin

g. S

inkh

ole

in p

avem

ent a

s no

ted

unde

r st

ruct

ure

note

s.N

orth

end

exi

t con

cret

e pa

d is

cra

ckin

g.

Sin

khol

es r

epai

red,

som

e dr

aina

ge p

robl

ems

cont

inue

.R

oad

repa

ved.

Ext

erio

r lig

htin

g up

grad

ed, f

unct

ioni

ng N

orth

exi

t con

cret

e pa

d re

mai

ns c

rack

ed

Par

king

lot s

inkh

ole

prob

lem

reso

lved

with

dra

in li

ne re

pairs

(200

6). P

arki

ng lo

t rep

aire

d.N

orth

exi

t con

cret

e pa

d re

plac

ed w

ith e

lect

ric h

eate

d si

dew

alk

(200

6).

No

repo

rted

chan

ges

or p

robl

ems.

Sig

nific

ant s

ite w

ork

may

be

requ

ired

to re

solv

e w

ater

infil

tratio

n an

d w

all m

ovem

ent i

ssue

s.

Site

wor

k de

term

ined

to b

e un

nece

ssar

y as

wat

er in

filtra

tion

issu

e ap

pear

s re

solv

ed.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

010

90

Bui

ldin

g N

o: 0

4 -

Rec

reat

ion

Cen

ter

Mai

n C

ampu

sK

iln r

oom

add

ition

: 199

4R

emod

eled

one

rac

quet

ball

cour

t to

wei

ght r

oom

(20

05)

Exp

ande

d W

elln

ess

Cen

ter

(200

5)H

uman

res

ourc

es o

ffice

s re

loca

ted,

spa

ces

unoc

cupi

ed (

2008

)A

rt p

rogr

ams

relo

cate

d to

new

Art

s an

d S

cien

ces

Cen

ter

(201

0)

Yea

r B

uilt:

197

520

% C

lass

room

30%

Nat

ator

ium

50%

Ath

letic

AMM 2016 Campus Facilities Master Plan Section 8 - 111

Page 186: 2017 Facilities Masterplan West Shore Community College

%

10,9

60,8

00$

4669

30 $

635

,726

$

9,6

82,7

71

1096

0800

1753

73$0

1.60

%G

OO

D

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I$/

YR

MA

INTA

INR

ATI

NG

6423

03

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te

CR

V T

ota

ls17

5373

1-5

yrs

6-10

yrs

11+

yrs

9426

35.

9%21

9216

FAIR

Sum

mar

y -

Bui

ldin

g N

o:0

4 -

Rec

reat

ion

Cen

ter

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Sys

tem

AMM 2016 Campus Facilities Master Plan Section 8 - 112

Page 187: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

05:IceAren

a

CRV:

5,06

8,600

$Im

med

.Va

lue

15

Value

610

Value

11+

Value

System

%$

%$

%$

%$

%$

Structure

0.2

1,01

3,720

$0.00

$0.00

$0.05

50,686

$0.95

963,034

$

Roof

0.05

253,430

$0.00

$0.05

12,672

$0.05

12,672

$0.90

228,08

7$

Glazing

0.01

50,686

$0.00

$0.00

$0.05

2,53

4$

0.95

48,152

$

Clad

ding

0.06

304,116

$0.00

$0.05

15,206

$0.05

15,206

$0.90

273,704

$

HVAC

0.13

658,91

8$

0.00

$0.10

65,892

$0.10

65,892

$0.80

527,134

$

Plum

bin g

0.04

202,744

$0.00

$0.02

4,05

5$

0.05

10,137

$0.93

188,55

2$

Prim

ary/Second

ary

0.04

202,744

$0.00

$0.00

$0.05

10,137

$0.95

192,60

7$

Distrib

ution

0.04

202,744

$0.00

$0.00

$0.05

10,137

$0.95

192,60

7$

Lightin

g0.04

202,744

$0.00

$0.00

$0.05

10,137

$0.95

192,60

7$

Voice/Da

ta0.01

50,686

$0.00

$0.00

$0.00

$1.00

50,686

$

Ceilings

0.02

101,37

2$

0.00

$0.02

2,02

7$

0.05

5,06

9$

0.93

94,276

$

Walls

0.04

202,744

$0.00

$0.03

6,08

2$

0.05

10,137

$0.92

186,524

$

Doors

0.01

50,686

$0.00

$0.02

1,01

4$

0.05

2,53

4$

0.93

47,138

$

Floo

rs0.03

152,05

8$

0.00

$0.05

7,60

3$

0.05

7,60

3$

0.90

136,85

2$

Code

(fire,A

DA,etc.)

0.02

101,37

2$

0.00

$0.00

$0.05

5,06

9$

0.95

96,303

$

Immed

.Site

0.03

152,05

8$

0.00

$0.00

$0.05

7,60

3$

0.95

144,45

5$

SpecialCon

struction

0.23

1,16

5,778

$0.00

$0.15

174,86

7$

0.10

116,57

8$

0.75

874,334

$

CRV

5,06

8,600

$DM

B$

289,41

7$

342,13

1$

4,43

7,05

2$

FCI

0.0%

DMB

289,41

7$

FCI

5.7%

AMM 2016 Campus Facilities Master Plan Section 8 - 113

Page 188: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

20%

1,01

3,72

0$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Yea

r B

uilt:

200

2

Faci

lity

is o

wne

d by

Mas

on C

ount

y an

d op

erat

ed b

y th

e C

olle

ge o

n a

50 y

ear

leas

e/pu

rcha

se a

gree

men

t.

100%

Ath

letic

Mai

n C

ampu

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

05

95

No

base

men

t - s

lab

on g

rade

. Pre

-eng

inee

red

stee

l tru

ss. N

o w

ater

infil

trat

ion

note

d.no

rep

orte

d pr

oble

ms

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 114

Page 189: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%5%

253,

430

$

2005

:

2008

:

2010

2013

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

CR

V o

f S

yste

m

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

55

90

Slo

ped

roof

ove

r ar

ena

(mat

eria

l not

con

firm

ed -

may

be

EP

DM

), E

PD

M fl

at r

oof o

ver

bala

nce

of b

uild

ing.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

OS

B w

ood

stru

ctur

al d

eck

(fast

ened

to m

etal

pur

lins)

is s

how

ing

sign

ifica

nt s

igns

of m

old

grow

th n

ear t

he w

est e

nd o

f the

bui

ldin

g. D

amag

ed s

ectio

ns w

ill li

kely

requ

ire re

plac

emen

t due

to

long

term

exp

osur

e to

moi

stur

e. B

alan

ce o

f roo

f dec

k w

ill re

quire

an

up-c

lose

insp

ectio

n no

t pos

sibl

e du

ring

this

ass

essm

ent.

Insp

ectio

n of

roof

dec

k re

porte

d th

at in

tegr

ity o

f dec

k is

goo

d. M

old

clea

ned

- see

HVA

C s

ectio

n fo

r pre

vent

ativ

e m

easu

res

take

n to

reso

lve

issu

e.

AMM 2016 Campus Facilities Master Plan Section 8 - 115

Page 190: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

1%50

,686

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

00

595

Min

imal

, no

repo

rted

pro

blem

s.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 116

Page 191: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

13%

658,

918

$

2005

:

2008

:

2010

:

2013

:

2016

:Im

prov

ed a

ir su

pply

and

retu

rn d

uct s

yste

m c

ompl

eted

.

0

HW

boi

ler.

VA

V s

yste

m.

DD

C C

ontr

ols.

(2)

roof

top

units

with

AC

for

lock

er r

oom

s, (

1) w

ith A

C fo

r of

fice

area

.D

esic

cant

whe

el d

ehum

idifi

catio

n sy

stem

(no

AC

) an

d ra

dian

t hea

t for

are

na.

11+

yrs

6-10

yrs

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Sys

tem

/ C

om

po

nent

No

tes

Boi

lers

che

cked

dai

ly a

nd in

spec

ted

twic

e an

nual

ly.

Lock

er ro

om A

HU

leak

ing

cond

ensa

te in

to b

uild

ing.

Com

pres

sor #

1 tri

pped

rela

y re

peat

ed in

pas

t - n

ot c

urre

ntly

a p

robl

em.

***

Des

icca

nt w

heel

deh

umid

ifica

tion

syst

em lo

sing

effi

cien

cy, a

t end

of l

ife, d

ue fo

r rep

lace

men

t. TO

P P

RIO

RIT

Y

Sys

tem

CR

V o

f S

yste

m

HV

AC

Pas

t hum

idity

and

con

dens

atio

n is

sues

hav

e ca

used

sig

nific

ant m

old

grow

th o

n un

ders

ide

of O

SB

woo

d ro

of d

eck

at w

est e

nd o

f are

na.

***D

ehum

idifi

catio

n sy

stem

may

not

be

func

tioni

ng, d

ue fo

r sig

nific

ant r

epai

r or r

epla

cem

ent.

Indo

or A

ir Q

ualit

y co

nsul

tant

has

insp

ecte

d th

e bu

ildin

g; c

olle

ge h

as re

port.

Moi

stur

e an

d m

old

issu

e ab

ove

lock

er ro

om a

rea

likel

y du

e to

poo

r air

circ

ulat

ion

caus

ed b

y pl

acem

ent a

nd d

esig

n of

air

supp

ly a

nd re

turn

duc

ts.

Hig

h hu

mid

ity a

nd n

on-m

ovin

g ai

r abo

ve lo

cker

room

s ca

used

con

dens

atio

n of

wat

er o

n ro

of d

eck.

Inst

alla

tion

of c

omm

erci

al c

eilin

g fa

ns to

mov

e ai

r app

ears

to b

e w

orki

ng to

redu

ce

hum

idity

and

hea

t at c

eilin

g. S

ituat

ion

bein

g m

onito

red.

Long

term

sol

utio

n sh

ould

con

side

r eng

inee

ring

and

inst

alla

tion

of a

n im

prov

ed a

ir su

pply

and

retu

rn d

uct s

yste

m to

mor

e ev

enly

dis

tribu

te a

ir an

d pl

ace

retu

rn d

ucts

clo

ser t

o en

d o

f rin

k.

$

8010

10

AMM 2016 Campus Facilities Master Plan Section 8 - 117

Page 192: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

6%30

4,11

6$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

55

90

Dec

orat

ive

bloc

k th

roug

hout

, with

pre

finis

hed

met

al s

idin

g ab

ove

(are

na o

nly)

.E

IFS

col

umn

cove

rs a

t mai

n en

try

dam

aged

from

abu

se a

nd w

ater

run

off f

rom

ove

rhan

g. S

ome

mild

ew s

tain

s.P

aint

faili

ng o

n un

ders

ide

of r

oof d

eck

at m

ain

entr

y ov

erha

ng.

Sof

fit a

t edg

e of

ent

ry c

anop

y - o

rigin

ally

gyp

sum

, rep

lace

d w

ith re

info

rced

fibe

rgla

ss p

anel

s. P

anel

s ar

e w

arpi

ng a

nd p

oppi

ng lo

ose

from

rive

ts.

Und

ersi

de o

f roo

f dec

k re

pain

ted

(200

7).

EIF

S c

olum

n co

vers

dam

aged

.

Fibe

rgla

ss e

ntry

can

opy

soffi

t pan

els

repl

aced

with

alu

min

um s

idin

g (2

009)

.E

IFS

col

umn

cove

rs re

clad

with

con

cret

e bl

ock

(200

9).

Met

al p

anel

cla

ddin

g at

rear

of b

uild

ing

dent

ed fo

r app

roxi

mat

ely

20 fe

et.

Cau

se u

nkno

wn,

but

falli

ng s

heet

s of

ice

from

the

roof

are

sus

pect

ed.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 118

Page 193: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

4%20

2,74

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

25

93

Floo

r dr

ains

at r

ink

end

need

to b

e ke

pt c

lear

of d

ebris

, cle

aned

reg

ular

ly.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.

No

repo

rted

chan

ges.

No

repo

rted

chan

ges.

AMM 2016 Campus Facilities Master Plan Section 8 - 119

Page 194: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

4%20

2,74

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

d pr

oble

ms.

AMM 2016 Campus Facilities Master Plan Section 8 - 120

Page 195: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

4%20

2,74

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

05

95

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 121

Page 196: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

4%20

2,74

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

00

595

No

chan

ges

repo

rted.

Are

na li

ghtin

g bu

dget

ed fo

r rep

lace

men

t in

2010

.

Fluo

resc

ent 2

x2, o

pen

grid

are

as. S

ome

repl

aced

in lo

cker

roo

ms.

Mer

cury

vap

or in

are

na.

No

repo

rted

pro

blem

s.

Are

na li

ghtin

g re

plac

ed w

ith fl

uore

scen

t fix

ture

s. P

erfo

rman

ce a

nd q

ualit

y of

ligh

ting

impr

oved

.

AMM 2016 Campus Facilities Master Plan Section 8 - 122

Page 197: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

1%50

,686

$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Voi

ce/D

ata

00

010

0

Wi-F

i add

ed to

all

build

ings

.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

Fibe

r to

eac

h bu

ildin

g (1

998)

.C

AT5

E/C

AT6

cab

ling

typi

cal.

Net

wor

k sw

itche

s on

4-y

ear

upgr

ade

cycl

e.N

o re

port

ed p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 123

Page 198: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

2%10

1,37

2$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

02

593

2x2

in o

ffice

s, o

pen

grid

2x2

in p

ro s

hop,

cor

ridor

s an

d lo

cker

roo

ms.

Ope

n to

dec

k in

are

na.

No

repo

rted

pro

blem

s

2x2

lay

in ti

les

plac

ed in

ope

n gr

id in

cor

ridor

to re

duce

hea

t los

s.

No

repo

rted

chan

ges.

Issu

es w

ith u

nder

side

of r

oof d

eck

acco

unte

d fo

r in

stru

ctur

al n

otes

.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 124

Page 199: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

4%20

2,74

4$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

35

92

Pai

nted

blo

ck ty

pica

l, ex

pose

d w

rapp

ed in

sula

tion

in a

rena

.S

ome

Zam

boni

dam

age

at e

nd o

f rin

k.

Zam

boni

dam

age

repa

ired

(200

7).

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 125

Page 200: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

1%50

,686

$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

25

93

Ext

erio

r: H

ollo

w m

etal

, Alu

min

um fr

ame

at b

uild

ing

entr

y an

d rin

k en

try.

No

repo

rted

pro

blem

s.In

terio

r: H

ollo

w m

etal

, No

repo

rted

pro

blem

s..

(2)

mot

oriz

ed o

verh

ead

door

s fo

r Za

mbo

ni -

som

e ty

pica

l Zam

boni

-rel

ated

dam

age,

den

ts.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 126

Page 201: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

3%15

2,05

8$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

55

90

Car

pet i

n of

fice

- shr

eddi

ng a

t sea

ms,

due

for

repl

acem

ent

Rub

ber

floor

ing

- nor

mal

wea

r &

tear

Ska

te r

enta

l are

a - V

CT

Ser

vice

and

sto

rage

- co

ncre

teC

once

ssio

n st

and

- Cer

amic

tile

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 127

Page 202: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

2%10

1,37

2$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

05

95

Spr

inkl

edN

o re

port

ed p

robl

ems.

Spr

inkl

ers

in c

orrid

or n

eed

to b

e lo

wer

ed in

to s

uspe

nded

cei

ling

- cur

rent

ly a

bove

new

lay-

in c

eilin

g.

Spr

inkl

ers

shou

ld b

e re

loca

ted

(see

abo

ve)

Spr

inkl

ers

head

s re

loca

ted

to re

solv

e co

vera

ge is

sue.

AMM 2016 Campus Facilities Master Plan Section 8 - 128

Page 203: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

3%15

2,05

8$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Site

ligh

ting

wor

king

- ju

st r

elam

ped

& c

lean

ed.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 129

Page 204: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

34,6

00sf

Flo

ors

:1

Use

Typ

es:

%

23%

1,16

5,77

8$

2005

:

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

5 Ic

e A

rena

Mai

n C

ampu

sFa

cilit

y is

ow

ned

by M

ason

Cou

nty

and

oper

ated

by

the

Col

lege

on

a 50

ye

ar le

ase/

purc

hase

agr

eem

ent.

Yea

r B

uilt:

200

210

0% A

thle

tic

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Spe

cial

Con

stru

ctio

n0

1510

75

Sys

tem

/ C

om

po

nent

No

tes

Incl

udes

rin

k re

frige

ratio

n sy

stem

, das

her

boar

ds, b

leac

hers

.(2

) rin

k re

frige

ratio

n co

mpr

esso

rs, r

un a

lmos

t con

tinuo

usly

to m

aint

ain

rink.

No

repo

rted

pro

blem

s.

Ref

riger

atio

n sy

stem

com

pres

sors

- to

p en

ds re

built

- ap

prox

. $3,

000

(200

6).

Con

trol s

yste

m e

lect

rical

wor

k do

ne (2

006)

.N

ew c

ompr

esso

rs e

xpec

ted

to b

e ne

eded

by

2018

.

No

repo

rted

chan

ges.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 130

Page 205: 2017 Facilities Masterplan West Shore Community College

%

5,06

8,60

0$

$2

89,4

17

$342

,131

$4

,437

,052

$35,

987

5.7%

$101

,372

FAIR

Sum

mar

y -

Bui

ldin

g N

o:0

5 Ic

e A

rena

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te

CR

V T

ota

ls-

$

1-5

yrs

6-10

yrs

11+

yrs

$5,0

68,6

000

$00.

00%

GO

OD

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I$/

YR

MA

INTA

INR

ATI

NG

$289

,417

AMM 2016 Campus Facilities Master Plan Section 8 - 131

Page 206: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

06:Au

toRe

pairan

dMainten

ance

Center

CRV:

1,34

3,80

0$

Immed

.Va

lue

15

Value

610

Value

11+

Value

System

%$

%$

%$

%$

%$

Structure

0.18

241,88

4$

0.00

$0.00

$0.00

$1.00

241,88

4$

Roof

0.05

67,190

$0.00

$0.00

$0.00

$1.00

67,190

$

Glazing

0.02

26,876

$0.00

$0.00

$0.00

$1.00

26,876

$

Clad

ding

0.08

107,50

4$

0.00

$0.00

$0.05

5,37

5$

0.95

102,12

9$

HVAC

0.16

215,00

8$

0.10

21,501

$0.40

86,003

$0.10

21,501

$0.40

86,003

$

Plum

bing

0.1

134,38

0$

0.00

$0.00

$0.10

13,438

$0.90

120,94

2$

Prim

ary/Second

ary

0.06

80,628

$0.00

$0.00

$0.10

8,06

3$

0.90

72,565

$

Distrib

ution

0.06

80,628

$0.00

$0.00

$0.10

8,06

3$

0.90

72,565

$

Lightin

g0.04

53,752

$0.00

$0.05

2,68

8$

0.05

2,68

8$

0.90

48,377

$

Voice/Da

ta0.02

26,876

$0.00

$0.00

$0.05

1,34

4$

0.95

25,532

$

Ceilings

0.03

40,314

$0.00

$0.00

$0.05

2,01

6$

0.95

38,298

$

Walls

0.05

67,190

$0.00

$0.00

$0.05

3,36

0$

0.95

63,831

$

Doors

0.05

67,190

$0.00

$0.00

$0.05

3,36

0$

0.95

63,831

$

Floo

rs0.04

53,752

$0.00

$0.15

8,06

3$

0.10

5,37

5$

0.75

40,314

$

Code

(fire,A

DA,etc.)

0.03

40,314

$0.10

4,03

1$

0.05

2,01

6$

0.05

2,01

6$

0.80

32,251

$

Immed

.Site

0.03

40,314

$0.00

$0.15

6,04

7$

0.10

4,03

1$

0.75

30,236

$

CRV

1,34

3,80

0$

DMB

25,532

$10

4,81

6$

80,628

$1,13

2,82

3$

FCI

1.9%

DMB

130,34

9$

FCI

9.7%

AMM 2016 Campus Facilities Master Plan Section 8 - 132

Page 207: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

18%

241,

884

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Pre

-eng

inee

red

stee

l bui

ldin

g.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

00

100

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 133

Page 208: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

5%67

,190

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

chan

ges

repo

rted

.

Pai

nted

met

al R

-pan

el ty

pe r

oof -

insu

late

d

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Roo

f0

00

100

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 134

Page 209: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

2%26

,876

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

Min

imal

- at

offi

ce a

rea

only

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

00

010

0

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 135

Page 210: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

16%

215,

008

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

chan

ges

repo

rted

.

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Offi

ce a

rea

- gro

und

mou

nted

DX

/gas

hea

t pac

kage

uni

t. U

nit o

vers

ized

, run

inef

ficie

ntly

, exh

aust

s to

o m

uch

air.

Cla

ssro

oms

- ver

tical

AC

/hea

t uni

t ven

tilat

ors.

Uni

ts u

nrel

iabl

e, o

vers

ized

, run

inef

ficie

ntly

.S

hop

- rad

iant

tube

hea

t, no

AC

- no

rep

orte

d pr

oble

ms.

Sys

tem

/ C

om

po

nent

No

tes

No

chan

ges

repo

rted

.

Sys

tem

CR

V o

f S

yste

m

HV

AC

Cla

ssro

om v

ertic

al u

nit v

entil

ator

s m

odifi

ed to

impr

ove

effic

ienc

y an

d op

erat

ion.

Gro

und

mou

nted

DX

/gas

hea

t uni

t unr

elia

ble,

diff

icul

t to

cont

rol.

Issu

e be

ing

inve

stig

ated

for

reso

lutio

n.C

lass

room

uni

ts a

re n

oisy

, unr

elia

ble.

Noi

se le

vel m

akes

teac

hing

in th

ese

room

cha

lleng

ing,

ofte

n re

quiri

ng u

nits

to b

e tu

rned

off

durin

g le

ctur

es.

$

4010

4010

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 136

Page 211: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

8%10

7,50

4$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

port

ed.

No

chan

ges

repo

rted

No

chan

ges

repo

rted

, no

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

Pai

nted

met

al s

idin

g.

No

repo

rted

pro

blem

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

05

95

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 137

Page 212: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

10%

134,

380

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

repo

rted

pro

blem

s

Sm

all d

omes

tic w

ater

hea

ter

- no

repo

rted

pro

blem

s.

New

bal

last

tank

and

wel

l add

ed to

incr

ease

wat

er v

olum

e an

d re

duce

ove

rall

pres

sure

and

pre

ssur

e flu

ctua

tions

.

No

repo

rted

cha

nges

or

prob

lem

s.

No

repo

rted

cha

nges

or

prob

lem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

010

90

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 138

Page 213: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

6%80

,628

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

rep

aire

d as

req

uire

d. N

o re

port

ed p

robl

ems.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

010

90

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 139

Page 214: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

6%80

,628

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d. N

ew s

tora

ge b

uild

ing

(30'

x80'

- un

der c

onst

ruct

ion)

to b

e fe

d fro

m e

xist

ing

dist

ribut

ion

pane

l in

the

Aut

o R

epai

r Cen

ter

No

prob

lem

s re

port

ed.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

010

90

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 140

Page 215: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

4%53

,752

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d. C

onve

rt to

LE

D fi

xtur

es a

s ch

ange

s ar

e m

ade.

No

chan

ges

repo

rted

No

repo

rted

pro

blem

s or

cha

nges

.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

11+

yrs

Ligh

ting

05

590

T8 fl

uore

scen

t typ

ical

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs

AMM 2016 Campus Facilities Master Plan Section 8 - 141

Page 216: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

2%26

,876

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

pro

blem

s, o

r ch

ange

s.

Cam

pus

phon

e sy

stem

bei

ng s

witc

hed

to V

OIP

sys

tem

.

No

repo

rted

pro

blem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

r

Voi

ce/D

ata

00

595

Mai

n C

ampu

sA

uto

Rep

air

and

Faci

litie

s M

aint

enan

ce O

ffice

s

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 142

Page 217: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

3%40

,314

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

2x2

lay-

in c

eilin

g in

offi

ce, c

orrid

or, c

lass

room

s. O

pen

to d

eck

in a

uto

lab

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 143

Page 218: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

5%67

,190

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Pai

nted

blo

ck a

nd p

aint

ed g

ypsu

m b

oard

. Wal

ls r

epai

nted

on

regu

lar

sche

dule

. In

good

con

ditio

n.

No

repo

rted

pro

blem

s.

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

05

95

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 144

Page 219: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

5%67

,190

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Ext

erio

r:A

lum

inum

fram

e do

ors

at e

ntrie

s, h

ollo

w m

etal

els

ewhe

re. N

o re

port

ed p

robl

ems.

(4)

mot

oriz

ed o

verh

ead

door

s on

aut

o la

b. N

o re

port

ed p

robl

ems

Inte

rior:

Hol

low

met

al ty

pica

l, no

rep

orte

d pr

oble

ms.

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

pro

blem

s or

cha

nges

.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

05

95

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 145

Page 220: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

4%53

,752

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Car

pet:

offic

e, c

lass

room

sV

CT:

cor

ridor

s, to

ilet r

oom

sC

oncr

ete:

Aut

o la

b

No

repo

rted

pro

blem

s

No

chan

ges

repo

rted

.

No

repo

rted

cha

nges

or

prob

lem

s.

No

chan

ges

repo

rted

.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

1510

75

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 146

Page 221: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

3%40

,314

$

2005

:

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

No

repo

rted

pro

blem

s

Pot

entia

l dea

d en

d co

rrid

or fr

om m

ain

corr

idor

to a

uto

lab.

Con

firm

with

cod

e of

ficia

l - d

oor

may

nee

d to

be

mov

ed.

No

repo

rted

cha

nges

or

prob

lem

s. P

oten

tial d

ead-

end

corr

idor

is p

ropo

sed

to b

e re

solv

ed a

s pa

rt o

f upc

omin

g re

nova

tion.

Cod

e re

view

indi

cate

s th

at d

ead-

end

corr

idor

can

be

reso

lved

by

repl

acin

g ex

it si

gn a

bove

doo

r to

allo

w e

xitin

g th

roug

h au

to s

hop

- thi

s re

quire

s th

at th

e do

or b

e a

3 ho

ur r

ated

do

or.

Alte

rnat

e so

lutio

n w

ould

be

to e

limin

ate

corr

idor

by

capt

urin

g th

e sp

ace

with

in th

e au

to c

lass

room

. Thi

s w

ill r

equi

re th

e do

or o

nly

be a

1-1

/2 h

our

rate

d do

or.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)10

55

80

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 147

Page 222: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

8,70

0 sf

Flo

ors

:1

Use

Typ

es:

%

3%40

,314

$

2005

:

2008

:

2010

:

2016

:N

o ch

ange

s re

porte

d.

No

repo

rted

pro

blem

s

No

repo

rted

cha

nges

or

prob

lem

s.

No

repo

rted

cha

nges

or

prob

lem

s.

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

1510

75

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

rM

ain

Cam

pus

Aut

o R

epai

r an

d Fa

cilit

ies

Mai

nten

ance

Offi

ces

Yea

r B

uilt:

200

570

% V

oc-T

ech

30%

Adm

inis

trat

ion

AMM 2016 Campus Facilities Master Plan Section 8 - 148

Page 223: 2017 Facilities Masterplan West Shore Community College

%

$1,3

43,8

00$1

04,8

16

$80,

628

130,

349

$

63,1

59.0

$

9.

7%26

,876

$

FA

IR

Sum

mar

y -

Bui

ldin

g N

o: 0

6 -

Aut

o R

epai

r an

d M

aint

enan

ce C

ente

r

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te

CR

V T

ota

ls

1,34

3,80

0$

25,5

32$

-

$

1.90

%G

OO

D

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I$/

YR

MA

INTA

INR

ATI

NG

$25,

532

$1,1

32,8

24

1-5

yrs

6-10

yrs

11+

yrs

AMM 2016 Campus Facilities Master Plan Section 8 - 149

Page 224: 2017 Facilities Masterplan West Shore Community College

Summaryof

AllSystems/

Compo

nents

Build

ingNo.

07:Scho

enhe

rrCa

mpu

sCen

ter

CRV:

9,49

1,90

0$

Immed

.Va

lue

15

Value

610

Value

11+

Value

System

%$

%$

%$

%$

%$

Structure

0.17

1,61

3,62

3$

0.00

$0.00

$0.05

80,681

$0.95

1,53

2,94

2$

Roof

0.06

569,51

4$

0.00

$0.00

$0.10

56,951

$0.90

512,56

3$

Glazing

0.07

664,43

3$

0.00

$0.00

$0.05

33,222

$0.95

631,21

1$

Clad

ding

0.05

474,59

5$

0.00

$0.00

$0.05

23,730

$0.95

450,86

5$

HVAC

0.19

1,80

3,46

1$

0.00

$0.05

90,173

$0.05

90,173

$0.90

1,62

3,11

5$

Plum

bing

0.07

664,43

3$

0.00

$0.00

$0.05

33,222

$0.95

631,21

1$

Prim

ary/Second

ary

0.04

379,67

6$

0.00

$0.00

$0.05

18,984

$0.95

360,69

2$

Distrib

ution

0.05

474,59

5$

0.00

$0.00

$0.05

23,730

$0.95

450,86

5$

Lightin

g0.05

474,59

5$

0.00

$0.02

9,49

2$

0.05

23,730

$0.93

441,37

3$

Voice/Da

ta0.02

189,83

8$

0.00

$0.00

$0.05

9,49

2$

0.95

180,34

6$

Ceilings

0.03

284,75

7$

0.00

$0.00

$0.05

14,238

$0.95

270,51

9$

Walls

0.07

664,43

3$

0.00

$0.00

$0.05

33,222

$0.95

631,21

1$

Doors

0.03

284,75

7$

0.00

$0.00

$0.05

14,238

$0.95

270,51

9$

Floo

rs0.05

474,59

5$

0.00

$0.00

$0.05

23,730

$0.95

450,86

5$

Code

(fire,A

DA,etc.)

0.03

284,75

7$

0.00

$0.00

$0.05

14,238

$0.95

270,51

9$

Immed

.Site

0.02

189,83

8$

0.00

$0.00

$0.05

9,49

2$

0.95

180,34

6$

CRV

9,49

1,90

0$

DMB

$99

,665

$50

3,07

1$

8,88

9,16

4$

FCI

0.0%

DMB

99,665

$FCI

1.1%

AMM 2016 Campus Facilities Master Plan Section 8 - 150

Page 225: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

17%

1,61

3,62

3$

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

r

Yea

r B

uilt:

200

7

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

15%

Kitc

hen/

Food

Ser

vice

40%

Stu

dent

Cen

ter/

Boo

ksto

re

45%

Lib

rary

Mai

n C

ampu

s

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Str

uctu

re0

05

95

Ste

el fr

ame,

sla

b on

gra

de. R

aise

d flo

or s

yste

m a

t lib

rary

No

repo

rted

prob

lem

s

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 151

Page 226: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%6%

569,

514

$

2008

:

2010

2013

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

CR

V o

f S

yste

m

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

% o

f sy

stem

to

bud

get

fo

r re

pai

r/re

pla

cem

ent

$Im

med

iate

1-5

yrs

6-10

yrs

11+

yrs

Roo

f0

010

90

Whi

te r

einf

orce

d P

VC

roo

f. In

tern

ally

dra

ined

at 2

sto

ry p

ortio

n, s

cupp

ers/

dow

nspo

uts

at 1

sto

ry p

ortio

n. S

ome

icin

g pr

oble

ms

occu

rrin

g w

here

dow

nspo

uts

drai

n.

No

repo

rted

prob

lem

s

Roo

f ins

pect

ed a

nnua

lly, n

o pr

oble

ms

repo

rted.

No

repo

rted

prob

lem

s.

AMM 2016 Campus Facilities Master Plan Section 8 - 152

Page 227: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

7%66

4,43

3$

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Sys

tem

/ C

om

po

nent

No

tes

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Gla

zing

00

595

Insu

late

d gl

ass

in a

lum

inum

fram

ing,

no

repo

rted

pro

blem

s

No

repo

rted

prob

lem

s

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 153

Page 228: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

19%

1,80

3,46

1$

2008

:

2010

:

2013

:

2016

:Li

brar

y w

as c

arpe

ted

to s

eal f

loor

sys

tem

join

ts.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

CR

V o

f S

yste

m

HV

AC

Pun

ch li

st it

ems

have

bee

n re

solv

ed, b

ut p

robl

ems

with

HVA

C s

yste

m b

alan

cing

con

tinue

.

No

chan

ges

repo

rted.

Sys

tem

stil

l lea

ks e

xces

sive

air

thro

ugh

floor

join

ts.

Pro

posa

l is

to c

ompl

etel

y ca

rpet

the

libra

ry, u

sing

car

pet t

o se

al fl

oor s

yste

m jo

ints

.

$

905

50

11+

yrs

6-10

yrs

1-5

yrs

Imm

edia

te%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t

Roo

ftop

mou

nted

chi

ller

(ser

ves

all u

nits

).E

ast:

2 bo

ilers

; Car

rier

VFD

AH

U in

mec

hani

cal r

oom

.C

ente

r (a

triu

m):

roo

ftop

Car

rier

VFD

AH

U.

Wes

t: C

arrie

r V

FD A

HU

in m

echa

nica

l roo

m.

Libr

ary

- mix

of c

eilin

g V

AV

, in-

floor

forc

ed a

ir sy

stem

(on

rai

sed

floor

sys

tem

), r

adia

nt c

eilin

g pa

nels

in m

eetin

g ro

oms.

Atr

ium

- m

ix o

f VA

V a

nd h

ot w

ater

rad

iant

floo

r.U

pper

leve

l - in

-floo

r fo

rced

air

syst

em (

on r

aise

d flo

or s

yste

m)

DD

C c

ontr

ols.

No

repo

rted

pro

blem

s.

Sys

tem

/ C

om

po

nent

No

tes

Air

leak

s in

rais

ed fl

oor s

yste

m m

ake

bala

ncin

g di

fficu

lt.

AMM 2016 Campus Facilities Master Plan Section 8 - 154

Page 229: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

5%47

4,59

5$

2008

:

2010

:

2013

:

2016

:N

o ch

ange

s re

porte

d.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cla

ddin

g0

05

95

Bric

k on

blo

ck b

acku

p; e

xter

ior

grad

e gy

psum

boa

rd s

offit

s. L

arge

gap

s in

sof

fit a

llow

ing

in b

irds

and

bugs

No

repo

rted

prob

lem

s

Sof

fit g

ap p

robl

em re

solv

ed.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 155

Page 230: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

7%66

4,43

3$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Plu

mbi

ng0

05

95

Cop

per

supp

ly li

nes.

No

repo

rted

prob

lem

s.

No

chan

ges

repo

rted

No

repo

rted

chan

ges

or p

robl

ems.

AMM 2016 Campus Facilities Master Plan Section 8 - 156

Page 231: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

4%37

9,67

6$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Prim

ary

/ Sec

onda

ry0

05

95

3 ph

ase

480/

277

Sie

men

s sy

stem

on

cam

pus

elec

tric

al lo

op, s

uffic

ient

cap

acity

No

repo

rted

prob

lem

s.

No

repo

rted

prob

lem

s.

Tran

sfor

mer

s te

sted

in 2

012,

upd

ated

and

repa

ired

as re

quire

d. N

o re

porte

d pr

oble

ms.

AMM 2016 Campus Facilities Master Plan Section 8 - 157

Page 232: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

5%47

4,59

5$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Dis

trib

utio

n0

05

95

Sie

men

s pa

nels

and

bre

aker

s, n

o re

port

ed p

robl

ems.

No

repo

rted

prob

lem

s.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 158

Page 233: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

5%47

4,59

5$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Ligh

ting

02

593

No

repo

rted

prob

lem

s

No

repo

rted

chan

ges

or p

robl

ems.

Lib

rary

was

repl

ampe

d in

201

0.

Rep

orte

d as

hav

ing

27 d

iffer

ent l

amp

type

s in

bui

ldin

g, in

clud

ing

mul

tiple

type

s of

T8,

T5,

indu

ctio

n, c

ompa

ct fl

uore

scen

t, ha

loge

n, a

nd m

etal

hal

ide.

Sto

ckin

g la

mps

exp

ecte

d to

be

diff

icul

t.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 159

Page 234: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

2%18

9,83

8$

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Voi

ce/D

ata

00

595

Wi-F

i add

ed to

all

build

ings

.

No

repo

rted

chan

ges

or p

robl

ems.

VO

IP s

yste

m

AMM 2016 Campus Facilities Master Plan Section 8 - 160

Page 235: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

3%28

4,75

7$

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cei

lings

00

595

2x2

lay-

in ty

pica

l, op

en to

dec

k in

atr

ium

, som

e gy

psum

boa

rd c

eilin

gs in

lim

ited

area

s.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 161

Page 236: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

7%66

4,43

3$

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Wal

ls0

05

95

Gyp

sum

boa

rd o

n m

etal

stu

d ty

pica

l. W

alls

rep

aint

ed o

n re

gula

r sc

hedu

le.

Her

man

Mill

er d

emou

ntab

le p

artit

ion

syst

em in

offi

ce a

reas

.E

xten

sive

cas

ewor

k in

kitc

hen/

serv

ery

area

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 162

Page 237: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

3%28

4,75

7$

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Doo

rs0

05

95

Ext

erio

r: A

lum

inum

fram

e do

ors

typi

cal.

2 pa

irs o

f aut

omat

ic s

lidin

g do

ors.

Mai

n en

try

door

s st

icki

ng, p

oten

tially

from

sla

b he

avin

g.In

terio

r: S

olid

Cor

e w

ood

typi

cal.

Stic

king

mai

n en

try s

lidin

g do

ors

have

bee

n re

paire

d an

d ar

e on

mai

nten

ance

cont

ract

.

No

chan

ges

repo

rted

AMM 2016 Campus Facilities Master Plan Section 8 - 163

Page 238: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

5%47

4,59

5$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Floo

rs0

05

95

Rai

sed

floor

sys

tem

in li

brar

y an

d on

sec

ond

leve

l.S

tain

ed c

oncr

ete

floor

in a

triu

mC

arpe

t in

offic

es a

reas

No

repo

rted

prob

lem

s.

No

repo

rted

chan

ges

or p

robl

ems.

Libr

ary

is s

ched

uled

to b

e co

mpl

etel

y ca

rpet

ed to

sea

l air

leak

s in

rais

ed fl

oor s

yste

m.

AMM 2016 Campus Facilities Master Plan Section 8 - 164

Page 239: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

3%28

4,75

7$

2008

:

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Cod

e (f

ire,A

DA

, etc

.)0

05

95

Fully

spr

inkl

ed.

Hyd

raul

ic e

leva

tor

No

repo

rted

prob

lem

s.

No

repo

rted

chan

ges

or p

robl

ems.

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 165

Page 240: 2017 Facilities Masterplan West Shore Community College

Cam

pus

:N

ote

s:A

rea:

38,0

00sf

Flo

ors

:2

Use

Typ

es:

%

2%18

9,83

8$

2010

:

2013

:

2016

:

No

chan

ges

repo

rted.

Bui

ldin

g N

o: 0

7 -

Sch

oen

her

r C

amp

us C

ente

rM

ain

Cam

pus

Caf

é, L

ibra

ry, B

ooks

tore

, and

Stu

dent

Ser

vice

s

Yea

r B

uilt:

200

715

% K

itche

n/Fo

od S

ervi

ce40

% S

tude

nt C

ente

r/B

ooks

tore

45%

Lib

rary

Sys

tem

/ C

om

po

nent

No

tes

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

Imm

ed. S

ite/E

xt L

tg0

05

95

Con

cret

e w

alks

with

hot

wat

er s

now

mel

t sys

tem

. Sec

tions

of c

oncr

ete

dete

riora

ting,

pos

sibl

y du

e to

ove

rwor

king

or

bad

mix

. Bei

ng r

epai

red

unde

r w

arra

nty.

Con

cret

e w

alks

repl

aced

with

new

und

er w

arra

nty

(incl

udin

g si

dew

alk

heat

sys

tem

).

No

chan

ges

repo

rted.

AMM 2016 Campus Facilities Master Plan Section 8 - 166

Page 241: 2017 Facilities Masterplan West Shore Community College

%

9,49

1,90

0$

$0

$99,

665

$503

,071

$8

,889

,164

$/Y

R M

AIN

TAIN

RA

TIN

G$9

9,66

5$0

1.1%

$189

,838

GO

OD

Sum

mar

y -

Bui

ldin

g N

o:0

7 -

Sch

oen

her

r C

amp

us C

ente

r

Pri

ori

ty Is

sues

Dat

aC

RV

DM

BE

XC

ES

SFC

IR

ATI

NG

Sys

tem

CR

V o

f S

yste

m%

of

syst

em t

o b

udg

et f

or

rep

air/

rep

lace

men

t$

Imm

edia

te1-

5 yr

s6-

10 y

rs11

+ y

rs

CR

V T

ota

ls

$9,4

91,9

00$0

$00.

00%

GO

OD

0-5

Yea

r C

umul

ativ

e D

ata

DM

BE

XC

ES

SFC

I

AMM 2016 Campus Facilities Master Plan Section 8 - 167