46094-001: neighborhood upgrading and shelter project ... - nusp2 resettlement plan - kapuas... ·...
TRANSCRIPT
Resettlement Plan
May 2018
Indonesia: Neighborhood Upgrading and Shelter
Project – Phase 2
Prepared by the Regency of Kapuas and Directorate General of Human Settlements, Ministry of Public Works and Housing for the Asian Development Bank.
CURRENCY EQUIVALENTS (as of 15 May 2018)
Currency unit – rupiah (Rp)
Rp1.00 = $0.0000725 $1.00 = Rp13,793.00
ABBREVIATIONS
ADB – Asian Development Bank APBD – Anggaran Pendapatan and Belanja Daerah (Regional
Budget Income and Expenditure) DGHS – Directorate of Human Settlements
NOTE
(i) The fiscal year (FY) of the Government of Indonesia and its agencies ends on 31 December. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2011 ends on 31 December 2011.
(ii) In this report, "$" refers to US dollars. This resettlement plan is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.
1 | P a g e
2 | P a g e
TABLE OF CONTENTS
LIST OF FIGURE .......................................................................................................... 4
LIST OF TABLES .......................................................................................................... 5
LIST OF APPENDIXS ................................................................................................... 6
ABBREVIATIONS ......................................................................................................... 7
CHAPTER I ................................................................................................................... 8
PROJECT DESCRIPTION ............................................................................................ 8
A. PROJECT OVERVIEW ........................................................................................ 8
B. PROJECT DESCRIPTION AT KAPUAS DISTRICT ............................................ 8
C. PROJECT IMPACT .............................................................................................. 9
D. RELOCATION OF AFFECTED PEOPLE ......................................................... 10
CHAPTER II ................................................................................................................ 12
RESETTLEMENT SCOPE .......................................................................................... 12
A. RESETTLEMENT .............................................................................................. 12
B. ACTIVITY IMPACT DESCRIPTION ................................................................... 12
CHAPTER III ............................................................................................................... 14
SOCIOECONOMIC INFORMATION AND PROFILE .................................................. 14
A. THE AFFECTED PEOPLE ................................................................................ 14
B. JOB AND REVENUES ....................................................................................... 15
C. SOCIAL INFORMATION .................................................................................... 15
D. GENDER ISSUE ................................................................................................ 15
E. VULNERABLE HOUSEHOLDS ......................................................................... 16
CHAPTER IV ............................................................................................................... 17
DISCLOSURE OF INFORMATION, CONSULTATION AND PARTICIPATION .......... 17
A. DISSEMINATION............................................................................................... 17
B. ADVANCED COORDINATION .......................................................................... 18
C. DISCLOSURE ................................................................................................... 19
CHAPTER V ................................................................................................................ 20
POLICY FRAMEWORK FOR RESETTLEMENT RESIDENTS ................................... 20
A. OBJECTIVE ....................................................................................................... 20
B. LEGAL BASIC POLICY ..................................................................................... 20
C. PROJECT BASIC PRINCIPLE .......................................................................... 21
D. MATRIC OF AFFECTED PEOPLE RIGHT ........................................................ 22
CHAPTER VI ............................................................................................................... 24
3 | P a g e
IMPACT AND COMPENSATION ................................................................................ 24
A. REASONABLE REIMBURSEMENT VALUE ..................................................... 24
B. COMPENSATION .............................................................................................. 27
C. GAP ................................................................................................................... 27
CHAPTER VII .............................................................................................................. 29
RECOVERY OF REVENUES AND LIVELIHOODS .................................................... 29
A. OBJECTIVE ....................................................................................................... 29
B. RECOVERY AND REHABILITATION PROGRAM ............................................ 29
CHAPTER VIII ............................................................................................................. 32
INSTITUTIONAL ARRANGEMENTS .......................................................................... 32
A. GENERAL SETTINGS ....................................................................................... 32
B. THE DIVISION OF ROLES ................................................................................ 32
C. BUDGETING ..................................................................................................... 33
CHAPTER IX ............................................................................................................... 34
MONITORING AND EVALUATION ............................................................................. 34
A. OBJECTIVE ....................................................................................................... 34
B. MONITORING AND EVALUATION RESULT .................................................... 34
C. RECOMENDATION ........................................................................................... 35
APPENDIX .................................................................................................................. 37
4 | P a g e
LIST OF FIGURE
Figure 1. Sei Bagong Bridge condition in Kelurahan Selat ....................................................... 9
Figure 2. Sei Bagong Bridge condition in Kelurahan Selat ..................................................... 10
Figure 3. Map of Affected Location ........................................................................................... 11
Figure 4. The condition of Mrs. Mahmudah's place of business ............................................. 34
Figure 5. Condition of the house and place of business Mr. Sardianor ................................... 35
Figure 6. The condition of the porch of the house and place of business Mrs. Lamsiah ......... 35
5 | P a g e
LIST OF TABLES
Table 1. List Name of The Affected People ............................................................................... 13
Table 2. Affected Public Facility and Utility ............................................................................. 13
Table 3. Female Head of Family Profile .................................................................................... 14
Table 4. Affected People Profile ............................................................................................... 14
Table 5. Affected People Occupation........................................................................................ 15
Table 6. Data Of Vulnerable Households .................................................................................. 16
Table 7. Entitlement Matrix ...................................................................................................... 22
Table 8. Reasonable Reimbursement Value of Building House and AP Utilities..................... 24
Table 9. Reasonable Reimbursement Value of Public Facility ................................................ 25
Table 10. Reasonable Reimbursement Value of Loss of Business Income ............................ 25
Table 11. Solatium Criteria ..................................................................................................... 26
Table 12. Calculation of Solatium Against Building Residential & RRV .................................. 26
Table 13. Total Reasonable Reimbursement Value ............................................................... 27
Table 14. GAP Value or Difference ........................................................................................ 28
Table 15. Income Restoration Program .................................................................................. 30
Table 16. Program Type and Implementation of APs Recovery ............................................. 31
Table 17. Name of affected peoples who are beneficiaries of the Recovery Program ............ 31
Table 18. Implementation Schedule ....................................................................................... 33
6 | P a g e
LIST OF APPENDIXS
Appendix 1. Distribution of Slum Settlement District of Kapuas ................................................... 38
Appendix 2. Vulnerable Household ........................................................................................ 39
Appendix 3. RRV for Utility ..................................................................................................... 40
Appendix 4. Resetlement Fee ................................................................................................ 41
Appendix 5. Unit Rate / m2 ..................................................................................................... 42
Appendix 6. Structure Organization .......................................................................................... 43
Appendix 7. Existing house conditions ..................................................................................... 44
Appendix 8. Leaflet ................................................................................................................. 47
7 | P a g e
ABBREVIATIONS
ADB : Asian Development Bank
AP : Affected People APBD : Anggaran Pendapatan dan Belanja Daerah (Local Gevernment
Budget) BSPS : Bantuan Stimulan Perumahan Swadaya (Self-help Housing
Stimulants) BKM : Badan Keswadayaan Masyarakat (CIO) BLK : Balai Latihan Kerja (Job Training Center)
CIO : Community Implementing Organization
DDR : Due Diligence Report
DED : Detail Engineering Design
DGHP : Directorate General of Housing Provision
DGHS : Directorate General of Human Settlements
HHs : Households
KIP : Kartu Indonesia Pintar (Indonesia Smart Card)
KIS : Kartu Indonesia Sehat (Indonesia Health Card)
KUK : Kredit Usaha Kecil (Credit for Small Business)
LCO : Local Coordinating Office
NMC : National Management Consultant
NPW : Nilai Perhitungan Wajar (Reasonable Reimbursement Value)
NUAP : Neighborhood Upgrading Action Plan
NUSP : Neighborhood Upgrading Shelter Project
PIU : Project Implementation Unit
PDAM : Local Government-owned Water Supply Company
PMU : Project Management Unit
RMC : Regional Management Consultant
RTLH : Rumah Tidak Layak Huni (Inadequate/Poor House)
SATKER : Satuan Kerja (Local Project Implementing Unit/PIU) SATKER PKPBM : Satuan Kerja Peningkatan Kualitas Permukiman Berbasis
Masyarakat (National PIU of Community Based Settlement Quality Improvement)
SIAP : Slum Improvement Action Plan
SPS : Safeguard Policy Statement
8 | P a g e
CHAPTER I
PROJECT DESCRIPTION
A. PROJECT OVERVIEW
1. New Upgrading And Shelter Project (NUSP-2) is a program initiated by the Government of
Indonesia through the Ministry of Public Works and Housing to support the achievement of the Cities
without Slums Program by 2020 and the provision of housing and settlements in a sustainable
manner in accordance with the mandate of Law No. 1 of 2011 about Housing and Settlement Area
2. NUSP-2 will be implemented in 20 districts/cities to improve the quality of slum areas with
facilitation of activities grouped in three main components, namely: 1) Improving the institutional
capacity of local governments; 2) Improving the quality of slum infrastructure; 3) Provision of new
settlements for low-income communities. One of target districts/cities of NUSP-2 are Kapuas District.
3. Improvement the quality of slum infrastructure (component 2) is carried out in two
approaches: infrastucture construction activities implemented by Community Implementing
Organization (Badan Keswadayaan Masyarakat), which called “community contract” at the
community level, and those implemented by professional contractor for complex civil works at the
regional level.
4. NUSP-2 was started in 2015, starting with the implementation of community contract
activities in 73 kelurahans spread across 20 cities/districts. The implementation of complex civil
works began in 2016, including those in Kapuas District.
5. This Due Diligence Report (DDR) is a safeguard social document for the Complex Civil
Work Package in Kapuas District, implementing the construction of the Sei Selat Bridge in
Kelurahan Selat Hulu and Sei Bagong Bridge in Kelurahan Selat Tengah. This DDR contains
policies, guidelines, resettlement processes and profiles of affected people, compensation and local
government assistance programs.
B. PROJECT DESCRIPTION AT KAPUAS DISTRICT
6. Based on the slums profile, the majority of bridges were in poor condition, especially the
wooden stakes which had becoming to decay. Approximately 70% of existing bridges in Kelurahan
Selat Hulu and Selat Tengah were weakened. The conditions of most of wooden poles were
deteriorated that could not safely support 4-wheeled vehicles passing the bridge. Consequently, the
community had difficulties in mobilizing stuffs and limited access to services of health, waste-
collection, fire-fighter and other business activities.
7. NUSP-2 in Kapuas District was carried out in 10 slum kelurahans and had been set through
Decree of Bupati No.772/PU/2014 concerning First Amendment of Decision No.134/PU/2011 on
Stipulation of the Location of Housing and Slum Resettlement Environment, and Decree of Head of
Bappeda of Kapuas No.02/BAPP/B-III/065/1/2016 regarding Location of Structuring and Improving
the Environment Quality of Slum in Kapuas District. List of slum locations and target locations of
NUSP-2 Kapuas District can be seen in Appendix 1.
9 | P a g e
8. In 2016, the local government of Kapuas District implemented infrastructure constructions by
community contracts in 10 kelurahans and 2 infrastructure packages of complex civil works, namely
the bridges of Sei Selat in Selat Hulu and Sei Bagong in Selat Tengah. The construction of the two
bridges was planned as one of the Kapuas slum reduction schemes of the prioritized category,
which included in the SIAP document. The need for the bridge improvement was proposed in a
community proposal, and also proposed through the Sub District Musrenbang (consultation on
development plan), and during community meetings at the time of NUAP preparation in 2015.
9. DED for this complex civil work was prepared by a consultant recruited by the Government
of Kapuas District by APBD financing. The construction plan was disseminated to several
community leaders in early 2016, and widely disseminated to all community level surrounding the
location on 12 July 2016 in Kelurahan Selat Hulu, and on 13 July 2016 in Kelurahan Selat Tengah.
The dissemination events were attended by BKM, LPM (a sort of village council), the Head of RW
(Rukun Warga, hamlet or sub-neighbourhood) and community leaders, as well as officials of sub-
district and district government. They also agreed on the implementation schedule to be done in
August 2016.
10. The construction of Sei Selat bridge in Selat Hulu was projected to be 26 meters long and 6
meters wide, whereas the construction of the Sei Bagong bridge in Selat Tengah to be 24 meters
long and 6 meters wide, and built for one lane over the village street. These bridges are made of
wood covered with concrete and asphalt. The status of land for the construction of the Sei Selat
bridge is owned by the Kapuas district government.
C. PROJECT IMPACT
11. The construction of Sei Selat and Sei Bagong bridges will bring big impact on improving the
social and economic accessibility. The Sei Selat Bridge will connect the Selat Hulu area with the
Selat Tengah and Selat Dalam, and the Sei Bagong Bridge will connect the Selat Tengah with the
Selat Hilir and Selat Hulu.
Figure 1. Sei Bagong Bridge condition in Kelurahan Selat
10 | P a g e
Figure 2. Sei Bagong Bridge condition in Kelurahan Selat
12. Because of the worsening condition of the old bridges, the economic development of the
community in kelurahan Selat Hulu and kelurahan Selat Tengah has been declining, as these
bridges were vital access for their businesses and daily activities. Therefore, the community of
kelurahan Selat Hulu and kelurahan Selat Tengah strongly support the plan of Sei Selat and Sei
Bagong Bridges construction, since these bridges are expected to provide easy and safe access
among many kelurahans of Selat Sub-District and Kapuas City.
13. However, there are six households will be affected by the construction of the bridges, of
which four households in kelurahan Selat Hulu, and two in kelurahan Selat Tengah. Of the four
affected households in kelurahan Selat Hulu, there is one house of semi-permanent building which
needs to be relocated, as this house is situated on disadvantaged site on the river bank at one end
of the bridge. Pictures of initial conditions of affected residents' houses can be seen in Appendix 7.
D. RELOCATION OF AFFECTED PEOPLE
14. The construction and widening of the Sei Selat Bridge unavoidably will relocate a house
used as home and small business (bamboo handicraft shop), which was situated on the river bank
at one end of the bridge. This house belongs to Mrs. Mahmudah, and will be relocated not far from
the original site, about 50 meters away from the bridge.
11 | P a g e
Figure 3. Map of Affected Location
12 | P a g e
CHAPTER II
RESETTLEMENT SCOPE
A. RESETTLEMENT
15. The construction of the Sei Selat Bridge in Kelurahan Selat Hulu and of the Sei Bagong
Bridge in Kelurahan Selat Tengah has affected six households of 25 individuals, consisting of 56%
male and 44% female. The list of their names is in Table 1.
16. Two of six households are woman-headed and classified as vulnerable households,
whereas 4 other households are headed by male.
17. The plan for the construction of the Sei Selat and Sei Bagong bridges and the plan of
relocation of one household have been agreed upon by the affected peoples and the rest of
communities of Selat Hulu and Selat Tengah through a consultation forum. Based on the
deliberations, affected peoples have agreed on the amount of compensation that is between Rp.
4.000.000,- - Rp. 11.000.000,-.
18. The Local Coordinating Office (LCO), the Kapuas District Working Unit (Satker), and the
related consultants have identified the affected objects, calculated the loss assets of the residents
and arranged the assistance facilitation plan to ensure that the affected people will not experience a
decrease in their quality of life or living standards.
B. ACTIVITY IMPACT DESCRIPTION
19. Loss of business. There are six houses would be affected, of which one building serves as
a home/small shop, and the other 3 buildings (house porch) serves as a place of business. After the
resettlement, the affected people are expected to be able keeping their business in a new place.
However, the affected people will experience a decline in their income in a given period of time, thus
they need to be given livelihood assistance during that period (one affected household would be
relocated, five households partly affected, three out of these five used the porch for business. See
details in Table 1.
20. Demolition of the house and porch. There is one house of semi-permanent building that is
used as a home and also for business (small handicraft shop), located on the river bank at one end
of the bridge that unavoidably must be dismantled. Because of the widening and improvement of the
Sei Selat Bridge, this house need to be demolished and relocated. This house is owned by Mrs.
Mahmuda, who is making bamboo handicrafts for her living. The relocation will affect the income of
Mrs Mahmuda in a certain period of time, thus she needs to be given income restoration and some
compensation for her loss. The affected asset as the consequence of the demolition of the house is
valued as follows:
Building of houses and porch, which is calculated based on the type of construction used and
assessed on the basis of Reasonable Reimbursement Value (RRV) or NPW (Nilai
Perhitungan Wajar).
Utilities, such as the cost of a new installation of electricity and water.
13 | P a g e
The land is not considered as part of the affected assets, as the land belongs to the Kapuas
District Government.
21. Impact on public facilities and utilities. There are four affected public facilities, consist of two
units of electricity pole, PDAM (water utility) pipeline network, Telkom (telephone) pole, and fire-
fighter storage/facility (See Table 2.)
Table 1. List Name of The Affected People
No. Name of Affected
People
Building
Area
Affected
Area
Building
Function
Affected
Object
Sei Selat Bridge in Kelurahan Selat Hulu
01. Mahmudah 13 m2 13 m2 Residency and
Business Place
total demolition
02. Sardianor 188 m2 12 m2 House and
Business Place
Front porch
03. Lamsiah 180 m2 9 m2 Residency and
Business Place
Front porch
04. Rudy Hartono 48 m2 18 m2 Residency Front porch
Sei Bagong Bridge in Kelurahan Selat Tengah
01. Setya Darma 300 m2 6 m2 Residency Front porch
02. Abdul Sani 40 m2 8 m2 Residency and
Business Place
Front porch
Table 2. Affected Public Facility and Utility
No. Asset Ownership Affected Object Volume
Sei Selat Bridge in Kelurahan Selat Hulu
01. PLN Electric Pole 1 Unit
02. PDAM Pipeline 1 unit
03. Telkom Telecom Pole 1 Unit
Sei Bagong Bridge in Kelurahan Selat Tengah
01. PLN Electric Pole 1 Unit
02. PDAM Pipeline 1 unit
03. Telkom Telecom Pole 1 Unit
04. Fire Safety Storage Post 1 Unit
14 | P a g e
CHAPTER III
SOCIOECONOMIC INFORMATION AND PROFILE
A. THE AFFECTED PEOPLE
22. There are six households that directly affected by construction of Sei Selat and Sei Bagong
bridges. Four of the affected house buildings are used as home (residence) and business, and two
houses merely for living (home).
23. The number of family members of the six affected households is 4-6 individuals. This
indicates that most households have relatively moderate and large family load. Out of six
affected households, there are 2 families (33%) whose heads are female. The profile of
affected female head of household is as follows:
Table 3. Female Head of Family Profile
No. Name Age Family
Member Occupation
Income (per
day)
01. Hj. Lamsiah 68 1 Trader Rp. 50.000,-
02. Mahmudah 42 4 Trader Rp. 50.000,-
Source: Primary Data, already processed, November 2017
24. The total number of affected people for 6 households are 25 individuals, consisting of 56%
male and 44% female. Of the affected peoples, 52% (13 persons) were of productive age, 48%
were of less productive age. (See Table 4.)
Table 4. Affected People Profile
No. Age group Male Female Total
01. 0 - 4 1 0 1
02. 5 - 14 6 3 8
03. 15 – 55 7 6 13
04. >55 1 1 2
TOTAL 15 10 25
Source: Primary Data, already processed, November 2017
15 | P a g e
B. JOB AND REVENUES
25. Job. The occupations of six 6 affected households (AHHs) are trader (4 persons), laborer (1
person) and private sector (1 person).
Table 5. Affected People Occupation
No. Occupation Total %
01. Trader 4 66%
02. Laborer 1 17%
03. Private employee 1 17%
Source: Primary Data, already processed, November 2017
26. Monthly Income. The range of income of affected peoples per month is between Rp.
1.500.000,- - Rp.30.000.000,-. Most of them are still under the Minimum Wage of Kapuas District,
which is Rp. 2,352,859,- .
C. SOCIAL INFORMATION
27. Most of the community of Kelurahan Selat Hulu and Kelurahan Selat Tengah Subdistrict
Selat strongly support the construction plan of Sei Selat and Sei Bagong Bridges, since the bridges
are vital access for their social, culture and economy, which connecting their kelurahans with the rest
of society. After some events of socialization and consultations, all affected peoples provide support
and contribution in the implementation of the construction of the bridges by giving up some or whole
parts of their houses and/or porchs affected by widening the bridge project. The affected peoples
have high expectation that their livelihood and economy will improve after the bridge construction.
28. The affected people have close kinship relationships with the surrounding communities,
since most of them are from the same region and have many close relatives live nearby. Affected
people also have active social and cultural relationships in mutual cooperation. These are showed
by the many community gatherings that have been done regularly, such as arisan (a form of
community rotating savings), reciting Koran, community service, etc.
29. Affected people are eager to have easy access to health, education and market centers.
They also hope to get the convenience of water services, sanitation and garbage/waste-collection.
D. GENDER ISSUE
30. The difficulties of access due to the deteriorating old bridges were experienced by the whole
community of Kelurahan Selat Hulu and Kelurahan Selat Tengah including the affected people and
female group. Women participated in socialization and deliberations meetings to raise their
concerns, including special deliberations of affected vulnerable groups. However, even though many
locals are working in the bridge construction project, women are not involved in physical works, as
these works are too heavy for them.
16 | P a g e
E. VULNERABLE HOUSEHOLDS
31. Vulnerable groups are distinct groups of people who might suffer disproportionately or face
the risk of being marginalized by the effects of resettlement and specifically include: (i) households
headed by women, elderly, or disabled, (ii) households falling under the generally accepted indicator
for poverty, (iii) landless households, and (iv) ethnic minorities. In this case, all households are
landless, two households are headed by women and three households are classified as poor,
therefore all affected households are vulnerable. Details are provided in Table 6.
Table 6. Data Of Vulnerable Households
No NameVulner
able
Female
HouseHold
Occupation
Type
Income/
day (IDR)
No
Land
Poor
HouseVulnerable
01. MAHMUDAH 42 Trader 100.000 02. SARDIANOR 50 Trader 150.000 03. LAMSIAH 68 Trader 80.000 04. RUDY HARTONO 45 Worker 25.000 05. SETYA DARMA 58 Private Employees 500.000 06. ABDUL SANI 61 Trader 50.000
17 | P a g e
CHAPTER IV
DISCLOSURE OF INFORMATION, CONSULTATION AND PARTICIPATION
A. DISSEMINATION
32. The initial dissemination of NUSP-2 in Kelurahan Selat Hulu was conducted on July 12,
2016, and in Kelurahan Selat Tengah was held on July 13, 2016. The dissemination was attended
by representatives from the Public Works Office, representatives from Sub District, Head of
Kelurahan, BKM, community leaders and local residents. In this event, besides aiming to provide
understanding related to slum handling through NUSP-2, participants also discussed the plan to
build the Sei Selat and Sei Bagong Bridges which impacted on some residents' houses due to the
bridge widening project. It was identified that there were six (6) households affected by the
construction of the bridges, which five households were affected partially (only the house porchs)
and one household was affected the whole house. The conclusion of this dissemiation/public
consultation is that all community members, including affected households, strongly supported the
implementation of construction of the Sei Selat and Sei Bagong bridges.
33. The dissemination event was also undertaken to provide information about the grievance
redress mechanism related to the resettlement of one household and five households partially
affected by the dismantling of the house porch. Complaints may be submitted either directly or in
writing to the chief of hamlet or neighbourhood group (RT/RW, Rukun Tetangga/Rukun Warga), or if
necessary to the Kelurahan level or even to the municipal level. The District Satker will act as
Grievance Redress Mechanism Officer. The grievance redress mechanism (GRM), objection or
proposal is implemented through the following stages:
The Kelurahan official will conduct mediation of the complaints to be drilled to completion, if
the complaints are not satisfied, the complaints will be brought to the District level.
The Sub-District official will conduct mediation of the complaints until they are settled; if these
are not settled they will be brought to the District / Public Works level.
The District GRM official will conduct a complaint research.
The result of the research or investigation will be informed to the Affected People (APs) no
later than 12 days to be discussed with a decision that holds the principle of win-win solution.
The results of problem solving or handling of complaints, disseminated through the public
space available such as bulletin boards in offices, government offices, and the District Office
and the Kelurahan Office.
34. Coordination meetings with Affected Peoples (APs) are conducted to approach the affected
people in formulating and agreeing compensation for damages to their homes or assets.
Coordination meetings are conducted in each location, i.e.:
The coordination related to the construction of the Sei Selat Bridge was carried out by the
Asset Identification Team on July 12, 2016 at Mr. Sardianor's house as the head of RT in
Kelurahan Selat Hulu Subdistrict Selat by inviting Affected Peoples (APs), local community
leaders and sub district staff. The result of the consultation was that the residents agreed to
support the implementation of the bridge construction, the amount of compensation for the
affected part of the house and agreed that the residents would be involved in the
implementation of the construction of the bridge.
18 | P a g e
Coordination of the planned construction of the Sei Bagong Bridge was carried out by the
Asset Identification Team on July 13, 2016 at the home of Mr. H. Setya Dharma in
Kelurahan Selat Tengah Subdistrict Selat by inviting Affected Peoples (APs), local
community leaders and sub-district staff. The conclusion of the consultation was that the
residents agreed to support the implementation of the bridge construction, the amount of
compensation for the partly affected of the house and agreed that the residents would be
involved in the implementation of the construction of the bridge.
35. Advanced coordination meeting was also held during the monitoring of the
implementation activities of construction of the bridge by the Monitoring and Reporting Team.
This team will directly monitor the construction activities of bridge widening and the
dismantling and reconstruction of affected people houses. The meeting discussed about
complaint handling mechanism, objection or proposal is implemented through the following stages:
If the affected people (AP) feel disturbed by the development process, complaint can be
delivered in writing or oral to the chief of RT (hamlet), until it is considered settled if not, it will
be taken to the Kelurahan level.
The Kelurahan conduct mediation of complaint material to be discussed until it was settled if
not, it will be brought to the Sub-District level.
The Sub-district will facilitate the resolution of complaint until settled, otherwise will be
brought to the District/PU.
The District’s GRM officials (the mediation team) will conduct a complaint study, including
complaints that directly received by the district team.
The results of such research or investigation will be informed to the Affected People (APs)
no later than 12 days to be deliberated.
Problem solving or handling of complaints, objections and suggestions will be documented
and disclosed for public especially for the APs. Disclosure will be made through available
public spaces such as bulletin boards at the Project office, the District Government office,
and the Sub-district office and the Kelurahan office.
36. During the construction works of the bridge widening project, the implementation will
be monitored by the LCO, the Local Government Unit Work (Satker) and other relevant
agencies, including on-site consultations with affected people, communities around the
activities and the CIO.
B. ADVANCED COORDINATION
37. Meeting coordination and monitoring in order to evaluate the post population transfer
was held on 12-13 October 2017 at the Public Works Kapuas Office. The meeting was
attended by Central Unit Work, National Management Consultants, LCO, Unit Work of Kapuas
District, City Coordinator and BKM/CIO. The result of this meeting had some conclusions that
need to be followed up:
a. Further survey to identify the socio-economic data of the 6-affected households;
b. Identify local government programs that can be provided as a form of recovery
effort or income restoration for affected people;
c. Accelerate the preparation of DDR reports.
19 | P a g e
As for the recovery efforts, here are some programs that have been agreed:
BPJS (Health Insurance), which will be implemented on FY 2018 Quarter 1 to 4,
Financed by the local government’s budget.
Customers of Garbage Bank, which will be implemented on FY 2018 Quarter 1 to
4, financed by the local government’s budget.
38. The LCO and Kapuas District Work Unit will conduct consultations and continuous
coordination with the affected peoples and the concerned various parties. This consultation
aims to determine how far the objectives of the Resettlement have been achieved, and
conduct evaluation to ensure the social and economic conditions of affected people are not
decreased. The implementation of planned assistance programs should be monitored then.
This monitoring and evaluation is expected to provide input to the government in formulating
future policies and programs.
C. DISCLOSURE
39. For the disclosure of public information, this Due Diligence Report (DDR) will be uploaded on
the ADB and the PWH Ministry website, as well as on the Kapuas District Work Unit’s (local
Satker’s) website. Further, the information about DDR will be summarized in the form of leaflet and
distributed for easier access to affected people.
20 | P a g e
CHAPTER V
POLICY FRAMEWORK FOR RESETTLEMENT RESIDENTS
A. OBJECTIVE
40. The objective of resettlement and compensation is to ensure that the project provides
opportunities for affected people to gain benefit so it will not be a worse condition during and after the
implementation.
B. LEGAL BASIC POLICY
41. Policy Framework. This DDR has been prepared in compliance with ADBs Involuntary
Resettlement Safeguards (SPS, 2009) and Operation Manual Section F1/BP, March 2010, and the
Indonesian Government’s law and regulations related to land acquisition that include i) Law No. 2/2012 on Land Acquisition for Development in Public Interests; ii) Presidential Regulation no. 71/2012 on
Implementation of Land Acquisition for the Development in Public Interest; iii) Regulation of BPN Head
No. 5/2012 on the implementation guideline for Presidetail Regulation No. 71/2012. In addition, the
Ministry of Finance Regulation No. 13/PMK 02/2013 and Ministry of Home Affair Regulation No.
72/2012 on the guidelines for Law 2/2012 implementation.
1. ADB’s Sosial Safeguard Policy Requirements
42. The ADB SPS, 2009 consolidated three safeguard policies, i.e. (i) involuntary
resettlement (IR), (ii) indigenous peoples (IP), and (iii) environment. Requirements of ADB’s 2009 SPS indicates the following principles: (i) involuntary resettlements must be avoided
where feasible; (ii) minimize involuntary resettlements by exploring project and design
alternatives; (iii) enhance the livelihoods of all displaced persons in real terms relative to pre-
project levels; and (iv) improve the standards of living of the displaced poor or other vulnerable
groups. The scope of the safeguards include physical replacement (relocation, loss of
residential land, or loss of shelter) and economic displacement (loss of land, assets, access to
assets, income sources, or means of livelihood as a result of (a) involuntary acquisition of
land, or (b) involuntary restrictions on land use or on access to legally designated parks and
protected areas. It also stipulates whether the losses and involuntary restrictions are full or
partial, permanent or temporary. Annex 1 lists the 12 policy principles required to meet the
resettlement objectives of ADB’s SPS. The project has been categorized as C for IP (no impact on IP), as no IP have been identified residing in the project locations. The policy on
environment is discussed in a separate document.
2. Other ADB’s Crosscutting Policy Themes
43. ADB’s other crosscutting policy themes includes: (i) the Gender and Development (1998), which adopts gender mainstreaming as a key strategy to promote gender equity and
to ensure that men and women participate and that their needs are addressed in all stages
including in the decision-making process of development activities; (ii) Public Communication
Policy (2011) that encourages active participation of affected people and other stakeholders
during project preparation and implementation; (iii) Accountability Mechanism (2012). It is part
of ADB‟ s continued efforts to enhance its capacity in responding to and/or resolving the problems associated with the implementation of its policies in all programs or projects it
assists. Prescriptions from these crosscutting ADB’s policy themes shall be incorporated and defined in the appropriate sections of the LARPs.
21 | P a g e
3. Indonesia Government Regulation
44. In 2012, the Government issued Law no. 2 about land acquisition for development for
the Public Interest. The purpose of land acquisition is to provide land for the implementation of
development in order to improve the welfare and prosperity of the nation, state and society
while maintaining the legal interests of the Eligible Party. Some of the things regulated in this
rule are:
The availability of land for the construction of public interest is guaranteed by the state;
Land acquisition is conduct by the government;
Land acquisition must be done in accordance with spatial planning and other related
development plans;
Implementation of land acquisition for the public interest pay attention to the balance
between the interests of development and the interests of society;
Land Acquisition in the public interest carried out by administering proper and fair
compensation;
Disposal of the right holder shall only be made after payment of compensation is
completed based on a court decision;
The land acquisition process should involve all stakeholders.
4. Gap Analysis and Basic Project Principles
45. A gap was found between ADB's Social Safeguard Policy and Indonesian Government
regulations on land acquisition, such as:
The law regulate that have to be balance between the interests of development and
the interests of the people, but has not yet specifically defined the alignments of the
community (including indigenous peoples, vulnerable groups), and the socio-economic
evaluation of affected communities.
The law has not clearly set about resettlement, relocation of affected people and illegal
government land use arrangements.
C. PROJECT BASIC PRINCIPLE
46. Basic Principles The principles to be applied for the project are as follows:
a. Acquisition of land and other assets shall be avoided and minimized as much as
possible by exploring project and design alternatives and appropriate sosial,
economic, operational, and engineering solutions that have the least impact on
populations in the project area.
b. All affected persons included in the cut-off date are eligible for compensation and
rehabilitation assistance, irrespective of tenure status, sosial or economic
standing, and any such factors that may discriminate against achieving the
objectives outlined above. Neither lack of legal rights to the assets lost, or tenure
status or sosial or economic status will not be a bar for the APs from entitlements
to such compensation and rehabilitation measures.
22 | P a g e
c. APs who have no recognizable rights or claims to the land that they are occupying,
(e.g. informal dwellers/squatters), are entitled to compensation for loss of non-land
assets and various options of resettlement assistance.
d. APs shall be fully consulted and informed on the project, their entitlement and
resettlement options. As well as the assistance measures. Ensure the APs
participation in planning, implementation, and monitoring and evaluation of
resettlements programs. Particular attention will be provided to the vulnerable
groups and ensure their participation in consultations.
e. The project will not cause physical displacement of APs from housing and/or lose
10% or more of total land owned or productive income. If the proposed
infrastructure indicates the need to relocate people, the proposed infrastructure
will be dropped from project financing.
f. The living standards of the affected people are not expected to be reduced due to
the small scale of the land acquisition. This will be ensured in the LARP.
g. There shall be an effective grievance redress mechanisms to receive and facilitate
resolution of the affected persons’ concern during the preparation and implementation of LARPs.
h. Details of the LARPs, including documentation of the consultation process shall be
disclosed to APs and any interested groups through public meetings and in the
form of summary LARPs or information booklets and leaflets in a language that
can be understood by the APs and in an accessible places (such as neighborhood
notice board, project and commune offices).
i. Appropriate monitoring shall be carried out to assess land acquisition objectives
and their impacts on the standard of living of the APs. The M& E, mechanisms
shall be identified and set in place as part of the land acquisition management
system. Monitoring reports should be disclosed.
j. Civil works will not be commenced until (a) payment has been fully provided to the
APs and rehabilitation measures if any, are in place; (b) already-compensated APs
have cleared the area in a timely manner; and (c) the area is free from any
encumbrances.
D. MATRIC OF AFFECTED PEOPLE RIGHT
47. The rights of affected people matrix in the table below summarizes the rights and
assistance received by affected peoples.
48.
Table 7. Entitlement Matrix
Impact Type Aplication Qualified Person Project Entitlement and/or Assistance
Permanent Impact
Loss of entire
building (1 house as
Impacted
buildings as a
Mrs Mahmudah Compensation will be provided in
cash to affected people in
23 | P a g e
Impact Type Aplication Qualified Person Project Entitlement and/or Assistance
place of business
relocated)
whole
Area of 1
(one) building
is 13 m2
accordance with the reasonable
reimbursement value for the
building (resettlement)
Affected people are entitled to
compensation for relocation.
The affected peoples are entitled to
new installation assistance for
electricity and clean water;
Affected people are entitled to a
livelihood recovery program and
the opportunity to work.
LCO and the Kapuas District Unit
Work facilitate demolition and
transportation
LCO and Unit Work provide
opportunities for the affected
peoples if they want to become a
manpower on the project.
The District Government of
KAPUAS will provide facilitation for
life recovery program for affected
people.
Loss some of house
porchs
Residents
house
5 Affected HH Citizens get compensation to
restore back the porch of his house
in accordance with the RRV.
LCO and the Kapuas District Unit
Work facilitate demolition and
transportation
The LCO and Unit Work provide
opportunities for affected people to
become involved in the workforce
Lossing Business Affected people are entitled to RRV
for loss of income for 2 months after
resettlement;
Affected people are entitled to
moving expenses and the cost of
transition.
Loss of building
structure
Post for
storage of fire
equipment
The rebuilding of the storage of fire
post
LCO and Unit Work provide RRV
for rebuilding.
Rights for Vulnerable
Households
6 Affected Peoples Vulnerable groups will get an
economic improvement program
Economic recovery program will
be sustainable.
24 | P a g e
CHAPTER VI
IMPACT AND COMPENSATION
A. REASONABLE REIMBURSEMENT VALUE
49. Reasonable Reimbursement Value is the value of ownership based on equity with
Market Value of a Property, with exceptional attention of extraordinary elements of non-
physical loss cause by the acquisition of rights to the Property (SPI 102 - 3.10). Reasonable
Reimbursement Value (RRV or NPW, Nilai Perhitungan Wajar) is defined the same as the
value of compensation as stipulated in Law No. 2 Year 2012. RRV can be generated from a
combination of physical losses and non-physical losses on an assessment object. This
combination can be described as the sum of Market Value indications for physical losses plus
an indication of the value of non-physical losses.
50. Land. The land occupied by affected people belongs to the Kapuas District
Government, so there is no calculation of Reasonable Reimbursement Value (NPW) to the
land for affected people.
51. Residential Buildings and Porch. Houses affected only one house, with an area of
13 square meters, whereas five (5) houses affected partly (only the house porch) with a total
area of 66 square meters. All house structures are semi-permanent. The age of the building
varies between 16 - 23 Years.
52. Utilities (PLN and PDAM). New installations of PLN (Power Utility) and PDAM (Water
and Pipeline Utility) will be allocated to one AP. The RRV is provided based on the new tariff
of PLN and PDAM in 2017 applicable in Kapuas District.
53. The Reasonable Reimbursement Value of the affected physical losses (buildings and
utilities) is calculated as follows:
RRV of house building is calculated by using the latest unit price of building
materials set by the Regent. Calculation of unit price per square meter for semi-
permanent building is Rp.939.800,-. Details of unit price can be seen in the
appendix 6.
RRV for utilities for new installations of PLN based on the price of 2017 is Rp.
1.400.000,-/house; and for installation of new Water Installation for Low Income
Community (MBR, Masyarakat Berpenghasilan Rendah) is Rp. 120.000,-/
household.
Table 8. Reasonable Reimbursement Value of Building House and AP Utilities
No. Item Unit Price (IDR) Volume Total (IDR)
01. Building 939.800 66 m2 62.026.800
02. Utilities
- Electric Instalation 1.400.00 1 HH 1.400.000
- Water Instalation 120.000 1 HH 120.000
Total Reasonable Reimbursement Value 63.546.800
Source: Primary Data, processed already, November 2017
The total RRV for buildings of 6 affected people including utilities and electricity and drinking
water costs is Rp. 63.546.800, -. Details of NPW for utility can be seen in the appendix 4.
25 | P a g e
54. Public Facility. The affected public facilities are the demolition and removal of 2 units
of electricity poles, Telkom poles and fire safety post located around the bridge construction
path. It is assumed that the transfer and rebuilding cost of the above mentioned public
facilities is Rp. 12,050,000,-.
Table 9. Reasonable Reimbursement Value of Public Facility
No. Item Unit Price (IDR) Volume Total
(IDR)
01. Electric Instalation 1.400.000 2 Unit 2.800.000
02. Water Instalation 750.000 1 Unit 750.000
03. Telkom Instalation 5.000.000 1 Unit 5.000.000
04. Safety Fire Post 3.500.000 1 Unit 3.500.000
Total Reasonable Reimbursement Value 12.050.000
Source: Primary Data, processed already, November 2017
55. Loss of business income. The displacement of citizens will have an impact on their
income, especially for those who have jobs as traders (shops and stalls). Out of six (6) people
affected, there are 4 residents who are living as traders and their income will be affected. As
for the people who work as laborers and private employee, their income will not likely be
affected. The RRV for loss of income (temporarily) is calculated by assuming that for 2 months
the AP will not be able to run their business properly. Thus, the monthly income amount of the
AP becomes the unit price of loss of operating income. Details of RRV Loss of income is as
follows:
Table 10. Reasonable Reimbursement Value of Loss of Business Income
Source: Primary Data, processed already, November 2017
56. Solatium. It is an intangible emotional loss associated with the acquisition of land
used as a dwelling place of the owner. The solatium assessment object is only for residential
buildings. The criteria for solatium calculation are done by considering the period of stay that
is between less than 3 years to more than 30. For more details, the criteria to calculate the
solatium can be seen in Table 11 as follows:
01. MAHMUDAH 42 P Trader 100.000 6.000.000 12.217.400 244.348 6.244.348
02. SARDIANOR 50 L Trader 150.000 9.000.000 11.277.600 225.552 9.225.552
03. LAMSIAH 68 P Trader 80.000 4.800.000 8.458.200 169.164 4.969.164
04. ABDUL SANI 61 L Trader 50.000 3.000.000 7.518.400 150.368 3.150.368
23.589.432
No Name Age Gender Occupation
T O T A L
R R V of
Building
Moving Cost
Assumption
2%
Income Per
Day (IDR)
Total
(IDR)
R R V
(IDR)
26 | P a g e
Table 11. Solatium Criteria No. Solatium Criteria RT – 1A RT – 2A RT – 1B RT – 2B
01. Length of Stay < 3 year 5% of
physical loss
value
5% of physical
loss value
5% of
physical loss
value
5% of physical
loss value
02. Length of Stay 4 – 9 year 10% 10% 10% 10%
03. Length of Stay 10 – 19 year 15% 15% 15% 15%
04. Length of Stay 20 – 29 year 20% 20% 20% 20%
05. Length of Stay > 30 year 30% 30% 30% 30%
Source : KPSPI ~ MAPPI
57. Solatium Calculation of Residential Building. The calculation of solatium on
residential building was conducted on six APs based on the length of stay and/or occupying
the house. The calculation of solatium can be seen in the Table 12 below.
Table 12. Calculation of Solatium Against Building Residential & RRV
Source: Primary Data, processed already, November 2017
58. Total Reasonable Reimbursement Value. The total RRV for the assets of six
affected peoples is the sum of RRV for buildings, utilities, public facilities, and the cost of loss
of income, which is as follows:
Length
of Stay
(Year)
Area
(M2)
Unit
Rate/
M2 (IDR)
Building
Asset Value
(IDR)
01. MAHMUDAH SHOP 23 13 939.800 12.217.400 2.443.480 183.261 14.844.141
02. SARDIANOR HOUSE & SHOP 21 12 939.800 11.277.600 2.255.520 169.164 13.702.284
03. LAMSIAH HOUSE & SHOP 21 9 939.800 8.458.200 1.691.640 126.873 10.276.713
04. RUDY HARTONO HOUSE 21 18 939.800 16.916.400 3.383.280 253.746 20.553.426
05. SETYA DARMA HOUSE 17 6 939.800 5.638.800 845.820 84.582 6.569.202
06. ABDUL SANI HOUSE & SHOP 16 8 939.800 7.518.400 1.127.760 112.776 8.758.936
74.704.702
Transaction
1,5 %
R R V
(IDR)Solatium
TOTAL
Type Of
Building
Building
NamaNo
27 | P a g e
Table 13. Total Reasonable Reimbursement Value NO. ASSET VALUE (IDR)
01. Building 74.704.702
02. Utilities 1.520.000
03. Loss Income 23.589.432
TOTAL AFFECTED ASSET VALUE 99.814.134
Source: Primary Data, processed already, November 2017
B. COMPENSATION
59. Act. No. 2 of 2012 declares that compensation shall be appropriate and fair and
equitable compensation shall be granted to the rightful parties in return for the liberated land.
The 10 principle of justice emphasizes that land procurement guarantees the right benefits
and compensation for the entitled parties in order for them to get a chance to live a better life.
60. The transfer for one affected household is done, for the implementation of the bridge
construction project is done voluntarily. Deliberation and consultation was conducted before
the construction of the bridge has begun. All affected communities strongly support the
implementation of the project as it will open access for transportation.
61. The LCO and the Kapuas District Satker provide guarantees to affected people and
other affected objects for assistance and compensation, so as to ensure that ressttlement
does not adversely affect the community.
62. Although the six affected people to build unlicensed buildings on government land
(along the river banks), yet the local government have prepared a compensation fund which
amount has been agreed upon by the affected peoples. Three discussion meetings were held
to determine the amount of compensation fund which was varied, and the amount of agreed
compensation was between Rp. 4.000.000,- to Rp. 11.000.000,-.
63. The total compensation cost provided by the Kapuas District Government is Rp.
34.500.000,-, wherein each affected peoples get between Rp. 4.000.000,- s/d Rp. 11,000,000,
- for unloading and moving costs.
C. GAP
64. GAP; GAP is a method of measurement to determine the value of gaps that occur
during the implementation of RRV. There is a relatively high gap when compared between the
compensation value provided and the fair reimbursement value of six APs. The gap value can
be seen in the following description:
Reasonable Reimbursement Value = 99.814.134,-
Paid Compensation = 34.500.000,-
Gap 65.314.134,-
28 | P a g e
Table 14. GAP Value or Difference
Source: Primary Data, processed already, November 2017
65. To complete the GAP value of Rp.65.314.134,- Kapuas District Government will
provide assistance in the form of development programs, social, health and other assistance.
The program will be implemented in 2018 Quarter 1 - 4. The budget to be used for the
implementation of the program comes from the local government’s budget (APBD) funds.
Building
(IDR)
Utilitas
(IDR)
Loss Income
(IDR)
01. MAHMUDAH 42 P SHOP 23 13 Pedagang 14.844.141 1.520.000 6.244.348 22.608.489 11.000.000 (11.608.489)
02. SARDIANOR 50 L HOUSE & SHOP 21 12 Pedagang 13.702.284 - 9.225.552 22.927.836 5.000.000 (17.927.836)
03. LAMSIAH 68 P HOUSE & SHOP 21 9 Pedagang 10.276.713 - 4.969.164 15.245.877 4.500.000 (10.745.877)
04. RUDY HARTONO 45 L HOUSE 21 18 Buruh 20.553.426 - - 20.553.426 5.000.000 (15.553.426)
05. SETYA DARMA 58 L HOUSE 17 6 Swasta 6.569.202 - - 6.569.202 5.000.000 (1.569.202)
06. ABDUL SANI 61 L HOUSE & SHOP 16 8 Pedagang 8.758.936 - 3.150.368 11.909.304 4.000.000 (7.909.304)
(65.314.134)
And Solatiom
T O T A L
Given
Compensation
Differences
(IDR)No Name Age Gender
Type Of
Building
Length
of Stay
(Year)
Area
(M2)
Reasonable Reimbursement Value
OccupationTotal
(IDR)
29 | P a g e
CHAPTER VII
RECOVERY OF REVENUES AND LIVELIHOODS
A. OBJECTIVE
66. The LCO and the Kapuas District Unit Work provide assurance that the affected
peoples will not experience a decrease in income by providing facilitation of income recovery
and rehabilitation programs in accordance with the needs of the evaluation results.
B. RECOVERY AND REHABILITATION PROGRAM
67. Economic Recovery. There are four houses functioned as places of business
affected by the construction of the bridge. One unit of the house was completely demolished
and moved to a location not far from the old location, while three houses have lost part of their
house porch. The resulting impact has no significant impact on his business. The income
recovery program for affected people will provide an opportunity to become a workforce or
partner in the procurement of materials required by the contractor. In addition to the recovery
program, the affected people will be provided with other existing social and economic
supporting programs by the local government of Kapuas.
68. The local government facilitates supports to seriously affected people. It includes
support to ease the process of small business permit, business certificate and domicile
statement, which facilitated by Kelurahan Selat Hulu and Kelurahan Selat Tengah. In addition,
several following programs to recover living quality and income of the affected people were
provided:
BPJS (Health Insurance) Program by the Department of Health, which will be
implemented on FY. 2018 during Quarter 1 to 4. The program will be financed by local
budget (APBD financing).
Garbage Bank Customer Program by Department of Public Works and the
Environment, which will be implemented in FY 2018 during Quarter 1 to 4. The
program will be financed by local budget (APBD financing).
Various Skill Training Programs based on the interest of the affected people by
Department of Labor which will be implemented in FY 2018 during Quarter 1 to 4. The
program will be financed by local budget (APBD financing).
In details, the income restoration program provided by the government of Kapuas
District is presented in Table 15.
30 | P a g e
Table 15. Income Restoration Program
No
Affected People
Income
Restoration
Program
received
Value (IDR)
Provider Financing
Schedule of implemen
tation
1. Mahmudah 1. Sewing Training 5.000.000,00 Skill Training Center (BLK) of Kapuas District
APBD March - May 2018
2. Rattan Handicraft Training Course
2.000.000,00 Department of Industry, Trading & Cooperative of Kapuas District
APBD May - August 2018
2. Sardianor 1. Carpentry Training
5.000.000,00 Subdepartmen of Construction Service (Jasa Konstruksi/Jakon) of Kapuas District
APBD August - December 2018
2. Credit for Small Business (KUK)
70.000.000,00 Bank Rakyat Indonesia (BRI)
APBD 2018
3. Lamsiah 1. Credit for Small Business (KUK)
70.000.000,00 Bank Rakyat Indonesia (BRI)
APBD 2018
4. Rudi Hartono 1. Automotive Training Course
5.000.000,00 Skill Training Center (BLK) of Kapuas District
APBD September - November 2018
2. Welding Training Course
5.000.000,00 Skill Training Center (BLK) of Kapuas District
APBD October - November 2018
3. Carpentry Training Course
5.000.000,00 Subdepartmen of Construction Service (Jasa Konstruksi/Jakon) of Kapuas District
APBD August - December 2018
5. Setya Darma 1. Credit for Small Business (KUK)
70.000.000,00 Bank Rakyat Indonesia (BRI)
APBD 2018
2. Skill Certification Course 5.000.000,00 Subdepartmen of
Construction Service (Jasa Konstruksi/Jakon) of Kapuas District
APBD October - December 2018
6. Abdul Sani 1. Automotive Training Course
5.000.000,00 Skill Training Center (BLK) of Kapuas District
APBD September - November 2018
2. Welding Training Course
5.000.000,00 Skill Training Center (BLK) of Kapuas District
APBD October - November 2018
3. Carpentry Training Course
5.000.000,00 Subdepartmen of Construction Service (Jasa Konstruksi/Jakon) of Kapuas District
APBD August - December 2018
Total 257.000.000,00
69. Rehabilitation. Rehabilitation of affected houses and utilities has already been done.
With the construction of bridges, local government would be able to improve services for
garbage-collection or waste management by building waste storage facility and providing
improved access to other services.
31 | P a g e
70. Conclusion. The economic recovery or income restoration program for six APs will be
implemented by Kapuas local government to comply with the lack of compensation that has been
given, based on the calculation of Reasonable Reimbursement Fair Value that has been done. The
Recovery Program Value to be provided to cover the Gap will be explained below;
Recovery Program Value = 66.000.000,-
Gap = 65.314.134,-
Difference (Excess Compensation) 685.866,-
Table 16. Program Type and Implementation of APs Recovery
Source: Primary Data, processed already, Januari 2018
Table 17. Name of affected peoples who are beneficiaries of the Recovery Program
Source: Primary Data, processed already, November 2017
Q1 Q2 Q3 Q4
01.Indonesia Health
Card6 HH 100.000/Month 50.400.000
DINAS
KESEHATANAPBD
02. Tranning 3 HH 1.875.000/Person 6.000.000 BLK APBD
03.Integrated Service
Pos for Elderly2 HH 100.000/Month 9.600.000
DINAS
KESEHATANAPBD
66.000.000
2018 to 2021
Total Cost
NO. Type of programeNumber of
BeneficiariesUnit
Compensation
ValueTOTAL Value P I C Budgeting
Implementation Schedule
Rattan
HandicraftCarpentry
01. MAHMUDAH 12.000.000 12.000.000 -11.608.489 391.511 2018-2020 4 anggota keluarga
02. SARDIANOR 18.000.000 18.000.000 -17.927.836 72.164 2018-2021 4 anggota keluarga
03. LAMSIAH 6.000.000 4.800.000 10.800.000 -10.745.877 54.123 2018-2021 1 anggota keluarga
04. RUDY HARTONO 1.500.000 4.500.000 9.600.000 15.600.000 -15.553.426 46.574 2018-2020 4 anggota keluarga
05. SETYA DARMA 1.600.000 1.600.000 -1.569.202 30.798 2018 2 anggota keluarga
06. ABDUL SANI 3.600.000 4.400.000 8.000.000 -7.909.304 90.696 2018-2019 2 anggota keluarga
66.000.000 -65.314.134 685.866TOTAL (IDR)
BPJSNO. Name R R V IDR G A P SurplusImplementation
YearRemark
Intgerated
Service Post
for Elderly
Training
32 | P a g e
CHAPTER VIII
INSTITUTIONAL ARRANGEMENTS
A. GENERAL SETTINGS
71. In supporting the implementation of NUSP-2, the organization of project management
involves government, community and consultants, at the central level, district/municipal level, to the
Kelurahan and the community. The organizational structure of the project can be seen in Appendix
6
72. The Directorate General of Human Settlements is the Executing Agency of NUSP-2, at the
central level of EA assisted by the Project Management Unit (PMU) and the Satker PKPBM as the
Project Implementation Unit (PIU) at the central level. Whereas at the city level, there is a Local
Coordinating Office (LCO) Kapuas District and Kapuas District Satker as the Project Implementation
Unit at the district level. Each unit is assisted by a national management consultant (NMC) and a
Regional Management Consultant (RMC). The Directorate General of Human Settlements is
responsible for the management of LARP compiled by the LCO and Satker assisted by Safeguard
Specialist at the Regional Management Consultant (RMC). These consultants will work together with
the District PIU to monitor and update the LARP document.
B. THE DIVISION OF ROLES
73. PMU and Unit Work, representing DGHS to perform the tasks are: 1). Establish program
planning and implementation policies; 2). Coordinate all activities to all relevant agencies; 3).
Conduct recruitment of consultants; 4). Coordinate project financial management;5). Coordinate the
procurement process of goods and services; 6). Coordinate intensively with the lender; 7).
Consolidate comprehensive physical and financial reports; 8). Supporting the tasks of LCO and City
Work Unit in carrying out their duties, including in implementing and updating LARP; 9). Conduct
control, monitoring and evaluation of all project implementation.
74. LCO and Unit Work representing the City Government to carry out the tasks are: 1).
Preparing SIAP; 2). Coordinate all activities to all relevant agencies in the region; 3). Coordinating
actors at the community level; 4). Coordinate NUAP drafting and civil work planning; 5). Conducting
regional auctions and coordinating procurement of goods at the community level; 6). Coordinate
intensively with PMU and Satker at the central level; 7). Consolidate physical and financial reports at
city level; 8). Arranging safeguard reports including implementing and updating LARP; 9).
Controlling, monitoring and evaluation of all project implementation at city level; 10). Deliver physical
and financial reports to the PMU and the Central Satker on a regular basis.
75. Management Consultant has the duty of assisting PMU, LCO and Unit Work in; 1).
Technical assistance, management and control of all phases of the project; 2). Developing concepts,
strategies, and training modules covering aspects of gender equality in project activities; 3).
Technical assistance and assistance of Community and Community Group Assistance; 4). Monitor
and evaluate projects; 5). Build awareness and understanding of the community; 6). Facilitate the
community in identifying the problems and needs of infrastructure development, evaluating the
capacity of community institutions; 7). developt participatory planning and decision-making
mechanisms at the community level;8). conduct monitoring and evaluation activities of training
activities through field visits, interviews and data collection; 9). Ensure the fulfillment of gender
equality indicator targets; 10). Monitor the social, environmental and economic impacts of project
implementation, including provision of data and information on environmental preliminary conditions,
33 | P a g e
and reporting on initial project impact assessments; 11). Controll, monitor and evaluate of all project
implementation at city level; 12). Deliver physical and financial reports to PMU, LCO and Unit Work
on a regular basis.
Table 18. Implementation Schedule
1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 4 5 6
1 Initial Coordination for Planning LCO, Satker
2 Identifying Aps Surveyor Team
3 Developing DED Consultant
4 Dissemination LCO, Satker
5 Village Meeting LCO, Satker
6 Coordination Meeting for Compensation LCO, Satker
7 Follow-up meeting LCO, Satker
8 Dissemination of Relocation Plan LCO, Satker
9 Relocation Process LCO, Satker
10 Project Site Preparation Contractor
11 Physical Construction Contractor
12 Aps Monitoring Monev Team
13 Post-Construction Coordination Meeting LCO, Satker
14 Recovery Program Local Government
15 Updating DDR LCO, Satker and Monev Team
No. Activity PIC2016 2017
C. BUDGETING
76. The allocation of asset replacement cost for six affected households, with a total area
of 66 square meters, is derived from the Kapuas District Government Budget. All houses are
semi-permanent structure. House buildings used various type of roof (tiles and asbestos), and
bricks and board type of wall. The age of the buildings is estimated between 16 to 23 years
old. The asset of six affected houses valued by RRV is Rp. 99.814.134,- with estimated asset
value of each house between Rp. 6.569.202,- to Rp. 22.927.836,-
34 | P a g e
CHAPTER IX
MONITORING AND EVALUATION
A. OBJECTIVE
77. Monitoring and evaluation activities are conducted to monitor the implementation of
resettlement of the affected people to be carried out in accordance with the plan and to benefit all
parties involved. Monitoring was conducted by the LCO and the local PIU of Kapuas District in
collaboration with the monitoring and evaluation team.
78. The monitoring and evaluation team has following tasks; 1). Supervision of action plan
implementation starting from dissemination, consultation, land acquisition and relocation, physical
construction, community involvement; 2) Coordination with relevant stakeholders in local
government and affected peoples; 3). Preparation and updating of progress reports on the
implementation including LARP.
B. MONITORING AND EVALUATION RESULT
79. Relocation one Affected Household. One house that serves as a place of business
(kiosk) on behalf of Mrs. Mahmudah moved to a new site not far from the original location.
Mrs. Mahmudah built her business place in the front yard of her original home. The current
condition of business premises is getting better, bigger and more relative merchandise. Ibu
Mahmudah benefited greatly from the bridge, as the distribution and sale of her merchandise
were much smoother. Based on interviews conducted, Mrs. Mahmudah has revenue increase
of about 25% compared to the previous place.
Figure 4. The condition of Mrs. Mahmudah's place of business
80. Losing part of the house porch of the affected peoples. . 5 households that part of
their porch house affected by construction had been repaired. There are 3 houses also used
as a place of business has also been repaired. Affected people whose houses also serve as
a place of business, after the construction of the bridge, most of the revenue increased. For
example, Mr. Sardianor who has a business of buying and selling wood. Previously all the
wood is stored on the porch of the house with a small capacity and minimal buyer
35 | P a g e
opportunities. Currently, after receiving compensation, Mr. Sardianor has dared to open a
wider place next to his home and is now progressing significantly.
Figure 5. Condition of the house and place of business Mr. Sardianor
Figure 6. The condition of the porch of the house and place of business Mrs. Lamsiah
The results of monitoring and evaluation found that the positive impact posed post bridge
development is the economic trend of the community will increase. This is indicated by the
growth of new business opportunities and the development of community businesses that
increase due to easier transportation modes (transportation can be up to business location).
C. RECOMENDATION
81. Recommendations formulated based on monitoring and evaluation results:
36 | P a g e
The government is obliged to ensure the impact of physical, social, and economic
resettlement processes.
Enhancing the dissemination method and scope to community for not building
houses or other assets on government owned land.
Improving the control and licensing mechanism for building development.
Facilitating credit access for affected people running small businesses.
Improving the socialization of a good and healthy lifestyle and generating agent of
change who can promote this lifestyle to various community groups.
Progress of recovery program or corrective action and resettlement impacts to the
livelihood of APs will be monitored and included in the project social safeguard
monitoring report to be submitted to ADB for acceptance and disclosure on it’s website.
37 | P a g e
APPENDIX
38 | P a g e
Appendix 1. Distribution of Slum Settlement District of Kapuas
No Sub District Kelurahan Wide area (ha)
01. Selat Selat Barat 35,8
02. Selat Selat Dalam 15,30
03. Selat Selat Hilir 60,15
04. Selat Selat Hulu 68,7
05. Selat Selat Tengah 60,17
06. Selat Selat Utara 18,96
07. Selat Murung Keramat 23,5
08. Selat Panamas 21
09. Selat Desa Pulau Telo 19,71
10. Selat Desa Pulau Telo Baru 8,38
39 | P a g e
Appendix 2. Vulnerable Household
40 | P a g e
Appendix 3. RRV for Utility
01. MAHMUDAH SHOP 13 1.400.000 120.000 1.520.00002. SARDIANOR HOUSE & SHOP 12 - - -03. LAMSIAH HOUSE & SHOP 9 - - -04. RUDY HARTONO HOUSE 18 - - -05. SETYA DARMA HOUSE 6 - - -06. ABDUL SANI HOUSE & SHOP 8 - -
1.520.000T O T A L
TotalNo NameType of
Building
Area
(M2)PLN PDAM
41 | P a g e
Appendix 4. Resetlement Fee
42 | P a g e
Appendix 5. Unit Rate / m2
43 | P a g e
Appendix 6. Structure Organization
44 | P a g e
Appendix 7. Existing house conditions
The affected peoples had relocated due to the construction of Kapuas Bridge
Initial condition of affected location
Initial condition of affected location
45 | P a g e
Initial condition of Ibu Mahmudah’s house
New house for Ibu Mahmudah built nearby
46 | P a g e
Initial condition of affected location
Initial condition of house porch of Bp
Sardianor used for business place
47 | P a g e
Appendix 8. Leaflet
48 | P a g e