A120 Bypass (Little Hadham)
Gateway & Business Case Presentation
![Page 2: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/2.jpg)
www.hertsdirect.org
Overview of ProblemHighway issues:•Signal controlled staggered crossroads in village causes congestion (A120 is one-way through the signals).•Proximity of adjacent historic buildings limit online options.•Instances of vehicles hitting buildings within the village.
Other associated issue:•Flooding within the centre of the village (most recent in Feb 2014).
Signalised Cross Roads in Little Hadham
Little Hadham
Bishop’s Stortford
StanstedAirport
![Page 3: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/3.jpg)
www.hertsdirect.org
Overview of FloodingAssociated issue:•Flooding within the centre of the village (most recent in Feb 2014).
![Page 4: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/4.jpg)
www.hertsdirect.org
Overview of Scheme• 3.9km Single Carriageway Bypass• 3 Flood Attenuation/Storage Areas (delivered as part of the scheme
in collaboration with the Environment Agency)
Flood Storage Area
Roundabout Roundabout
Albury Road Overbridge
Agricultural Bridges
![Page 5: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/5.jpg)
www.hertsdirect.org
Governance Framework
![Page 6: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/6.jpg)
www.hertsdirect.org
HCC Project Stages and GatewaysStage Gateway
Stage 1 - InitiationGateway 1 - Inception
Stage 2 – Option TestingGateway 2 - Feasibility
Stage 3 – Preferred Option Business case
Gateway to be passed Gateway 3 – Programme EntryStage 4 -Design
Gateway 4 – Conditional ApprovalStage 5 -Procurement
Gateway 5 – Final ApprovalStage 6 – Delivery
Gateway 6 - CompletionStage 7 - Maintain & Operate
![Page 7: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/7.jpg)
www.hertsdirect.org
Gateway 3 RequirementsThe project promoter will be required to provide evidence that the following criteria have been met within its request to pass through Gateway 3:
– Business Case approved following independent review– Updated Budget, Funding and Cashflow Requirements Identified for
Stage 4– Indicative Budget, Funding and Cashflow Requirements Identified for
Stages 5, 6 & 7– Approvals to Seek Statutory Powers Secured– All Legal Agreements Identified– Consultation and Communication Strategy for Stage 4 Identified– Post Completion Monitoring Regime Identified– Governance Framework Completed Quantitatively for Stage 4 and
Qualitatively for Stages 5, 6 &7
![Page 8: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/8.jpg)
www.hertsdirect.org
Business CaseGateway 3 Requirement - Business Case approved following independent review
A120 Business Case structure:–Background–Strategic Case –Economic Case–Financial Case–Commercial Case–Management
![Page 9: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/9.jpg)
www.hertsdirect.org
Business Case - ObjectivesObjectives:1. To decrease the journey time along the A120 between Bishop’s Stortford and the A10 by providing a local bypass at Little Hadham in scale with the other sections of the route by 2019.2. To reduce the risk of fluvial flooding in Little Hadham and communities to the south by working with the Environment Agency to deliver integral flood attenuation areas as part of the delivery of the bypass.3. To reduce severance in the centre of Little Hadham by removal of the majority of the through traffic congestion and, as a result,improving the overall well-being of residents in Little Hadham.
![Page 10: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/10.jpg)
www.hertsdirect.org
Business Case – Key Outcomes
• Benefit to Cost Ratio– 9.1 (early schemes BCR 7.86)– Does not include Wider Economic Benefits or those
associated with the flood storage.• Total funding required for bypass scheme is £29.86m
including inflation.• Categorised as a Local Major Transport Scheme.• Contract strategy to be agreed, but likely to be a D&B.
![Page 11: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/11.jpg)
www.hertsdirect.org
Key Issues and Risks• LEP funding not secured
– In SLGF Bid as high priority• Poor collaboration with Environment Agency
– MOU almost signed off– Collaboration Agreement being negotiated
• Required land not secured– Offer to acquire land - negotiations on-going
• Programme Risks due to unknown Issuese.g. Archaeology, Protected Species
– Robust assessment planned for 2014/15– Programme includes some capacity for delay
• Competition for Competent Contractors (Dam)– Begin engagement with Contractors once funding secured
![Page 12: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/12.jpg)
www.hertsdirect.org
Key Scrutiny Outcomes• Stakeholder, Partners and Inter-dependencies Risk to Delivery
– MOU with EA developed, other stakeholder workshops and engagement planned.
• Reliance on previous Optioneering Work subject to challenge– Workshop already held to review previous work, further consideration will be
undertaken as required.
• Modelling Benefits and Journey Time Information deviation from process– Updated traffic modelling work planned and commissioned to be complete by
mid 2014.
• Scheme Costs and Affordability Risk– Funding routes identified and approval of funding by LTB, LEP and EA being
sought.
![Page 13: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/13.jpg)
www.hertsdirect.org
Programme
2014 2015 2016 2017 2018 2019 2020
Gateway 3 – Programme Entry
Stage 4 – Preliminary Design & Planning ApplicationGateway 4 – Conditional Approval
Stage 5 – Procurement
Gateway 5 – Final Approval
Stage 6 – Delivery (D&B)
Gateway 6 – Completion
Stage 7 – Maintain and Operate
![Page 14: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/14.jpg)
www.hertsdirect.org
Budget, Funding and Cashflow
2014/15 2015/16 2016/17 2017/18 2018/19
Stage 4 – Preliminary Design & Planning Application
£0.65m £1.13m
Stage 5 – Procurement £0.76m
Stage 6 – Delivery (D&B) £10.93m £16.26m
Stage 7 – Maintain and Operate
Programme of costs 2015-19
![Page 15: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/15.jpg)
www.hertsdirect.org
Funding SourcesFunding Source Amount (£m)
Project Sponsor (HCC) £1.55m
Growth Fund (LTB) £18.5m
Environmental Agency sources
£1.0m
Stansted Airport Ltd/S106 £0.33m
Growth Fund (LEP) £8.48m
Total £29.86m
![Page 16: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/16.jpg)
www.hertsdirect.org
Cost Profile (including inflation)Financial
Year2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 Total
HCC £0.12m £0.65m £0.68m £0.10m £0 £0 £1.55m
LTB £0 £0 £0.45m £0.66m £10.93m £6.45m £18.50m
LEP £0 £0 £0 £0 £0 £9.81m £9.81m
Total £0.12m £0.65m £1.13m £0.76m £10.93m £16.26m £29.86m
![Page 17: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/17.jpg)
www.hertsdirect.org
Statutory ProcessCompleted:• Preferred Route identification process undertaken in 2008. • “Authorisation to proceed with Statutory Processes including applying for Planning Permission, Side Roads Orders and Compulsory Purchase Orders to enable delivery of the A120 LittleHadham Bypass” obtained via
– H&WM Panel endorsement (18 March 2014) and
– Cabinet authorisation (24 March 2014).
![Page 18: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/18.jpg)
www.hertsdirect.org
Statutory ProcessTo be completed:•Side Road Orders / TROs•Rights of Way diversions•Compulsory Purchase Orders (if required)•Joint Planning Permission Application to HCC for bypass and for flood storage area•SUDS Approval (following consultation in early stages to be completed formally by D&B Contractor)
![Page 19: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/19.jpg)
www.hertsdirect.org
Legal Agreements• Memorandum of Understanding in place with
Environment Agency• Collaboration Agreement with EA (to set out detail under
MoU) to be developed during Stage 4• Any associated agreements following potential land
purchase will be developed as appropriate.
![Page 20: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/20.jpg)
www.hertsdirect.org
Stakeholder Engagement Strategy (Stage 4)• Public Consultation Events undertaken as part of previous schemes• Business Case Identifies:
– Public and stakeholder engagement will be a key part of the delivery of the project.
– Statutory Consultees and other key stakeholders will be engaged throughout the scheme assessment and delivery process.
– We will hold Environmental Liaison Group Meetings (ELG) throughout the environmental assessment process.
– Public information events and one-to-one meetings with potentially directly affected landowners and other interested parties
• Stakeholder Mapping Exercise undertaken i/c EA• Stakeholder Engagement Activity Plan to be produced in Q1 14/15• Letters have already been sent to landowners and Councillors
about environmental surveys and project website set up with FAQ.
![Page 21: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/21.jpg)
www.hertsdirect.org
Post Completion Monitoring RegimeStrategy developed in accordance with DfT guidance in order to measure the effectiveness of the intervention in meeting the scheme objectives. Strategy based upon two elements:•Assessment of data that is already collected by the county council on a before and after basis; and•Collection and assessment of data collected specifically for the purpose of developing and appraising the scheme.The results will be reported in a Before and After Study to be produced one year after full scheme opening. Evaluation of the scheme based upon the monitored impacts and outcomes will be reported in the study.
Further specific monitoring arrangements for each objective detailed within the Business Case.
![Page 22: A120 Bypass (Little Hadham) - Hertfordshire · 2018-08-22 · The project promoter will be required to provide evidence that the ... (ELG) throughout the environmental assessment](https://reader034.vdocument.in/reader034/viewer/2022050305/5f6e2bf5e08e7206c2212f6b/html5/thumbnails/22.jpg)
www.hertsdirect.org
Stage 4 Programme/Milestones2014 2015
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Gateway 3 – Programme Entry
Flood Modelling Work (EA)
Traffic Model Update
Preliminary Scheme Design
Environmental Surveys
Environmental Assessments
Preparation of Planning Application
Submission of Planning Application
Planning Process
Public Inquiry (if required)
Gateway 4 – Conditional Approval