ADDENDUM NUMBER ONE
To the Drawings and Project Manual
Dated: 3/19/18
Entitled:
GRADY HEALTH
MARCUS STROKE & NEUROSCIENCE
ANGIO SUITE 2
Atlanta, Georgia
Prepared By:
BSA LIFESTRUCTURES
3348 Peachtree Road NE, Suite 1460
Atlanta, GA 30326
__________________________________
William Alexander
Registration No. 003590
Addendum Dated:4/13/2018
Project Number: 17220008
GRADY HEALTH SYSTEM ADDENDUM NUMBER ONE
Atlanta, Georgia
Marcus Stroke and Neuroscience - Angio Suite 2
BSA LifeStructures #17220008 Page 1
CHANGES TO THE PROJECT MANUAL
1. N/A
CHANGES TO THE DRAWINGS
1. DRAWING A118 :
a. Angio 2 8A008 Elevation has been changed to reflect the addition of overhead
cabinets.
2. DRAWING A128
a. The reflected ceiling plan has changed to show the addition of a laminate bulkhead
above the overhead cabinets.
3. DRAWING E118
a. The electrical power drawing has been changed to show the addition of a data outlet
in the alcove of corridor 8A102.
END OF ADDENDUM NUMBER ONE
Attachments: A118, A128, E118
SOILEDUTIL.
8A014
CLEANSUPPLY
8A051
MEDS
8A047
CONSULT
8A45
CONF. /LOUNGE
8A038
ELEC
8A018
COMM
8A016
STAFFSTATION
8A052
ANGIOBI-PLANE
8A097
CORRIDOR
8A102
CORRIDOR
8A101
LIGHT WELL
ELEV.ELEV.
ELEV.
A118
A118
STAFFSTATION
8A036
3
4
ANGIO 2
8A008
SCRUB
8A007
ANGIO 2EQUIPMENT
8A013
ANGIO 2CONTROL
8A009
8A01
3
8A00
8
8A00
7-1
A3
11 1/2" 10"
10' -
8 1
/4"
6 3/
4"
14' -
0"
6 3/
4"
AU
TO
1' - 1 1/2" 3' - 10"
1' -
1 1
/2"
1' -
1 1
/2"
3' - 0" 3' - 5 7/8"
8A00
9
A3
F2
A3
1
1
1
1
1
1
8A00
7-2
1
1
1
02
03
05
01
04
A118
5
06
07
08
2 2
3
3
3
3
4
4
4
1
5
5
5
52
3
3
2
11
5
5
PP
PP
6
6
1' -
3 1
/8"
A2 B6
1' - 6"
F2
B6A6
A2
A27
3' -
6"
8
8
8
8
2' -
10"
FILLER 1' - 3" 2' - 6" 2' - 6" 2' - 6" 2' - 6"
1
2
3 4
23
2' -
0"
2' -
6"
2' -
6"
EQ EQ EQ EQ EQ EQ EQF EQ EQ F
7
2' -
6"
4"
4' -
2"
EQ EQ EQ EQ
8A009
1
5
66
1 2
22
2
2
3
3 3
3
3
3
3
3
3
4
4
15
5
4
6
7 8 8
1
4
4
9
10
10
10
10
10
11
11
11
11
11
11
12
12
12
9
9
9
13
14
15
16
XX
ARCHITECTURAL SYMBOLS LEGEND
NEW COLUMN LINE
SECTION INDICATOR
GENERAL ARCHITECTURAL NOTES
1
A101
SIM
A. REFER TO SITE SPECIFIC DRAWINGS FOR EQUIPMENT INFORMATION. COORDINATE BLOCKING AND MEP CONNECTIONS AS REQUIRED.
B. PROVIDE 18" MINIMUM ADA REQUIRED CLEARANCE ADJACENT TO STRIKE OF DOOR.
C. PAINTING CONTRACTOR SHALL LABEL, ABOVE CEILING, ALL FIRE RATED WALL CONSTRUCTION AND SMOKE BARRIER WALL CONSTRUCTION IN ACCORDANCE WITH SPECIFICATION.
D. ALL INTERIOR GYPSUM WALLS SHALL BE TYPE B3 UNLESS NOTED OTHERWISE.
E. ALL GYPSUM COLUMN SURROUNDS SHALL BE TYPE F1 UNLESS NOTED OTHERWISE.
F. ALL DIMENSIONS ARE TO FACE OF GYPSUM BOARD, FACE OF BLOCK OR CONCRETE, OR TO FACE OF EXISTING WALL FINISH.
G. REFER TO DETAIL 01/A001 FOR TYPICAL LOCATION OF INTERIOR DOOR OPENINGS.
H. ALL LEAD-LINING TO BE TO 7'-0" A.F.F. UNLESS NOTED OTHERWISE. REFER TO PLAN NOTES FOR LEAD THICKNESS AS REQUIRED BY PHYSICIST REPORT.
I. PROVIDE FIREPROOFING ON ALL STRUCTURAL SUPPORT BEAMS ABOVE CEILINGOR IN CEILING SPACE OF FLOOR BELOW. FIREPROOFING TO BE EITHER CEMENTITIOUS FIREPROOFING (078116) OR INTUMESCENT MASTIC FIREPROOFING (078123) AT CONTRACTOR'S OPTION.
1
A000 2
3
4
DETAIL INDICATORAREA
OFDETAIL DETAIL NUMBER
SHEET NUMBER
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION
PLAN NOTE DESIGNATION
EQUIPMENT DESIGNATION. REFERTO EQUIPMENT SCHEDULE.
ELEVATION TAG
TOILET ACCESSORY
FIRE EXTINGUISHER AND CABINETF.E.C.
A101
1 SIM SIMILAR
000
ROOM
000
00
00
AU
TO
DOOR NUMBER DESIGNATION
WALL TYPE
WALL TYPE SUFFIX
DOOR WITH AUTOMATIC DOOR OPERATOR
NEW DOOR
NEW WALL
PUSH PLATE ACTUATOR
XX.#
PP
101
XX
GENERAL DEMOLITION NOTES
DEMOLITION SYMBOLS LEGEND
EXISTING COLUMN LINE
DEMOLITION NOTE DESIGNATION
EXISTING WALL TO REMAIN
EXISTING WALL TO BE REMOVED
EXISTING DOOR AND FRAME TO REMAIN
EXISTING DOOR AND FRAME TO BE REMOVED
EXISTING WINDOW AND FRAME TO REMAIN
EXISTING WINDOW AND FRAME TO BE REMOVED
00
A. THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY PARTITIONS AND TEMPORARY DOORS AS DEEMED NECESSARY BY THE ARCHITECT, ENGINEER AND OWNER. THEY SHALL BE WELL MAINTAINED AND ANY DAMAGE REPAIRED IMMEDIATELY TO AVOID MIGRATION OF DUST INTO ADJOINING AREAS.
B. TEMPORARY PARTITIONS IN CORRIDORS ARE TO BE CONFIGURED SO THAT OTHER SPACES ARE ACCESSIBLE AT ALL TIMES, INCLUDING BY BED TRAFFIC IF NEEDED. CONFIRM WITH OWNER PRIOR TO INSTALLATION.
C. THE CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK IN OCCUPIED SPACES AND SHALL NOTIFY THE OWNER TWO WEEKS PRIOR TO COMMENCING WORK. SUCH SPACES ARE TO REMAIN OCCUPIED DURING DEMOLITION AND ALL WORK SHALL BE PERFORMED IN SUCH A MANNER TO MINIMIZE DISRUPTIONS TO OCCUPANTS. PROTECT EXISTING FLOOR FINISHES FROM CONSTRUCTION TRAFFIC THROUGH OCCUPIED AREAS. EXISTING WALL, FLOOR AND CEILINGS FINISHES TO REMAIN SHALL BE PROTECTED AND ANY DAMAGE RESULTING FROM DEMOLITION WORK SHALL BE REPAIRED.
D. WHEN DEMOLITION CAUSES DAMAGE TO FLOOR, WALL OR CEILING SURFACES THAT WILL REMAIN EXPOSED IN THE FINISHED WORK, SUCH DAMAGE SHALL BE REPAIRED AS REQUIRED TO RECEIVE NEW FINISHES.
E. THE CONTRACTOR SHALL COVER AND PROTECT OWNER'S EQUIPMENT WHICH CANNOT BE REMOVED FROM THE PROJECT AREA.
F. THE CONTRACTOR SHALL CONFIRM WITH OWNER WHETHER ANY EQUIPMENT OR ITEMS IN AREAS SHOWN TO BE DEMOLISHED ARE TO BE KEPT OR SALVAGED BY OWNER.
G. CONTRACTOR SHALL COORDINATE ALL DEMOLITION WITH ANY PHASING REQUIRED TO COMPLETE THE WORK.
H. WHERE EXTERIOR WALLS, DOORS AND/OR WINDOWS ARE TO BE REMOVED OR MODIFIED, THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THAT THE EXISTING BUILDING REMAINS SECURE, WEATHER-TIGHT, AND WITHOUT DRAFTS.
I. MAKE ALL DEMOLITION CLEAN AND COMPLETE AND IN A MANNER SUITABLE TO ACCEPT NEW FINISHES AND/OR SURFACES.
J. REMOVE ALL EXISTING WALL MOUNTED ITEMS WITHIN THE PROJECT LIMIT AREA WHICH ARE NOT NOTED TO REMAIN. THE CONTRACTOR SHALL DISPOSE OF THESE ITEMS AFTER INSPECTION BY THE OWNER FOR FUTURE USE. IF ITEMS ARE REMOVED FROM WALLS THAT ARE TO REMAIN, THE CONTRACTOR SHALL PATCH WALLS AS REQUIRED TO RECEIVE NEW FINISHES AND/OR SURFACES.
K. DEMOLITION FOR BUILDING SERVICES AND UTILITIES SHALL BE PERFORMED BY THE TRADE RESPONSIBLE FOR THAT UTILITY. FOR EXAMPLE, PLUMBING FIXTURES SHALL BE DEMOLISHED BY THE MECHANICAL CONTRACTOR. OPENINGS FOR DEMOLISHED UTILITIES SHALL BE INFILLED BY TRADE RESPONSIBLE FOR PIPING, DUCT OR CONDUIT DEMOLITION. OPENINGS THROUGH FIRE-RATED CONSTRUCTION SHALL BE PATCHED TO MATCH EXISTING CONSTRUCTION OR BE FIRESTOPPED.
L. REMOVE EXISTING FLOOR AND BASE MATERIALS IN ALL AREAS SCHEDULED TO RECEIVE NEW FLOOR AND BASE. REFER TO FINISH DRAWINGS OR SCHEDULES. REMOVE FLOOR AND BASE ADHESIVES AND PREPARE SURFACES AS REQUIRED TO RECEIVE NEW FINISHES. MAKE DEMOLITION CLEAN AND COMPLETE IN A MANNER SUITABLE TO ACCEPT NEW FINISHES AND/OR SURFACES.
M. REMOVE EXISTING WALL FINISHES ON ALL WALLS SCHEDULED TO RECEIVE NEW FINISHES. REFER TO FINISH DRAWINGS FOR LOCATIONS OF NEW FINISHES. REMOVE EXISTING WALL COVERINGS AND ADHESIVES. PREPARE WALL SURFACES AS DETAILED IN SPECIFICATIONS.
N. THE FLOOR IN THE ANGIO ROOM IS TO BE PREPPED SUCH THAT IT COMPLIES WITH THE PHILIPS REQUIREMENTS IN THE PHILIPS SITE SPECIFIC DRAWINGS FOR FLOOR FLATNESS AND FLOOR LEVELING.
ELEVATION SYMBOL LEGEND
GENERAL ELEVATION NOTES
A. REFER TO SITE SPECIFIC DRAWINGS FOR EQUIPMENT INFORMATION. REFER TO M/E/P DRAWINGS TO COORDINATE CONNECTIONS.
B. ALL DIMENSIONS ARE TAKEN TO THE FACE OF FINISHED MATERIAL.C. INSTALL WOOD BLOCKING TO STUDS TO SUPPORT ALL WALL-
MOUNTED CABINETRY AND EQUIPMENT AS REQUIRED.D. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS PRIOR TO
CONSTRUCTING CABINETRY.E. ALL BASE CABINETS SHALL BE 2'-0" DEEP UNLESS NOTED
OTHERWISE.F. ALL CASEWORK SHALL BE FINISHED IN PLASTIC LAMINATE UNLESS
NOTED OTHERWISE.G. PROVIDE FILLER PANELS AT ALL LOCATIONS WHERE CABINETRY
ABUTS A WALL.H. PROVIDE A 4" HIGH INTEGRAL BACK SPLASH ON ALL COUNTERS WITH
RECESSED SINKS. INSTALL SIDE SPLASHES WHERE THESE COUNTERS ABUT A WALL.
I. PROVIDE ADJUSTABLE SHELVING WITHIN ALL WALL AND BASE CABINETRY AS SHOWN BY DASHED LINE.
J. PROVIDE 12" CLEAR INTERIOR DIMENSION ON ALL UPPER WALL CABINETS UNLESS NOTED OTHERWISE.
K. CONSTRUCT GYPSUM DRYWALL BULKHEADS ABOVE UPPER CABINETRY TO BE 1" DEEPER AND LONGER THAN CABINETRY BELOW UNLESS INDICATED OTHERWISE.
L. COORDINATE BULKHEAD HEIGHTS INDICATED HERE WITH THAT SHOWN ON THE REFLECTED CEILING PLAN. CONFIRM ANY DISCREPANCIES WITH THE ARCHITECT PRIOR TO CONSTRUCTION.
M. COORDINATE ALL WALL OUTLETS TO AVOID CONFLICT WITH CASEWORK.
SECTION INDICATOR
ELEVATION NOTE DESIGNATION
1
A101
SIM
00
DRYWALL MOLDING END CLOSURE LIKE FRY-REGLET DMEC, FULLY TAPED AND COVERED WITH JOINT COMPOUND.
REFER TO DIMENSION PLANS FOR SCHEDULED WALL TYPES. PULL TIGHT TO FACE OF MULLION.
ALUMINUM CURTAINWALL / STOREFRONT SYSTEM
WALL CONSTRUCTIONBELOW SILL/ABOVE HEAD OF WINDOW
(2) CONTINUOUS SEALANT BEADS
NOTE:CENTER WALL ON MULLION, UNLESS DIMENSIONED OTHERWISE.
1 3/
16"
7 3/4"
1/4"
HOLLOW METAL DOOR FRAME
WOOD DOOR
LINE OF WALL BEYOND
NEW FLOOR COVERING
FLOOR LEVELING MATERIAL
EXISTING FLOORING TO REMAIN
SOLID SURFACE SILL SS2.
EXISTING CONCRETE FLOOR
18
1/2"
STAINLESS STEEL SCHLUTER RENO-T TRANSITION STRIP
1 1/
2"
Structural Engineers
Suite 300
1175 Grimes Bridge Road
Roswell, GA 30075
Newcomb&Boyd
www.bsalifestructures.com
3348 Peachtree Road NE, Suite 1460Atlanta, GA 30326
ph 404.814.1001 fx 317.819.7288
C
B A
D
J
K
L
DE
SIN
GE
D
DR
AW
N
AP
PR
OV
ED
BSALS PROJECT NO.
KEYPLANPLAN NORTH
DATE
Copyright © 2013Consulting Engineering GroupSuite 525303 Peachtree Center Avenue, NEAtlanta, Georgia 30303-1277T 404 730-8400F 404 730-8401
D:\
Use
rs\jb
oye
r\D
ocu
men
ts\1
7220
008-
AR
CH
_BS
AL
S_C
EN
TR
AL
_v20
17_J
Bo
yer.
rvt
4/13
/201
8 9:
46:5
6 A
M 17220008
Ap
pro
ver
Au
tho
r
Des
ign
er
A118
DEMO. PLAN, ARCH.PLAN, AND INT.ELEVATIONS
MARCUS STROKE &NUEROSCIENCEANGIO SUITE 2
ANGIO SUITE
2
RELEASED FORCONSTRUCTION
MAR 19, 2018
CLIENT PROJECT NO. - 1722008
1/4" = 1'-0"1
PARTIAL EIGHTH FLOOR DIMENSION AND ARCHITECTURAL PLAN
1/4" = 1'-0"3
ANGIO 2 8A008 ELEVATION 1/4" = 1'-0"
4ANGIO 2 CONTROL 8A009 ELEVATION
1/8" = 1'-0"2
PARTIAL EIGHTH FLOOR DEMOLITION PLAN
DEMOLITION PLAN NOTES1 REMOVE EXISTING WALL COMPLETELY.
2 REMOVE EXISTING DOOR AND FRAME COMPLETELY.
3 REMOVE EXISTING PLUMBING FIXTURE COMPLETELY.
4 REMOVE EXISTING CASEWORK COMPLETELY.
5 REMOVE EXISTING HEADWALL COMPLETELY.
6 REMOVE EXISTING PORTION OF WALL.
7 RELOCATE EXISTING THERMOSTAT. REFER TO MECHANICAL DRAWINGS.
8 RELOCATE EXISTING ZONE VALVE BOX. REFER TO PLUMBINGDRAWINGS.
9 EXISTING BUILDING EXPANSION JOINT COVER TO REMAIN.
10 REMOVE EXISTING FLOORING COMPLETELY AND PREPARE FOR FLOORLEVELING COMPOUND.
11 REMOVE EXISTING CEILING COMPLETELY.
12 REMOVE EXISTING BUILDING EXPANSION JOINT COVER.
13 CONTRACTOR TO DEMOLISH SMALL SECTION OF WALL UNDER WINDOWSILL TO SEE IF THIS WALL SECTION CAN BE REMOVED TO RECESS THESCRUBEX. MODIFY EXISTING SOLID SURFACE SILL AS REQUIRED.
14 REMOVE PORTION OF EXSTING CRASH RAILS. PREP EXPOSED EDGES TORECIEVE NEW END CAPS.
15 REMOVE EXISTING WOOD CRASH RAIL/HAND RAIL
16 REMOVE EXSTING CERAMIC TILE AND PREPARE SURFACE TO RECIEVENEW FINISH.
ARCHITECTURAL PLAN NOTES1 REFER TO PHILIPS SITE SPECIFIC DRAWINGS FOR EQUIPMENT
INFORMATION.
2 NEW SOLID SURFACE THRESHOLD AT DOOR. REFER TO DETAIL 06/A118.
3 USE FLOOR LEVELING MATERIAL TO RAISE FLOOR 1 3/16" FOR ANGIOEQUIPMENT MOUNTING PLATE. REFER TO DETAIL 06/A118. FLATNESSAND LEVELNESS OF FLOOR TO CONFORM TO PHILIPS EQUIPMENTDRAWINGS.
4 NEW EXPANSION JOINT COVER. CONFIRM JOINT SIZE IN FIELD.
5 DASHED LINE DENOTES WALL WITH LEAD LINING. REFER TO PHYSICISTREPORT FOR LEAD THICKNESS.
6 WALL EXPANSION JOINT AND COVER.
7 EXTEND LEAD LINING BEHIND DUCTWORK. REFER TO MECHANICALDRAWINGS.
8 EXISTING BUILDING EXPANSION JOINT COVER TO REMAIN.
INTERIOR ELEVATION NOTES1 WALL BASE. REFER TO INTERIOR DRAWINGS.
2 25" DEEP SOLID SURFACE COUNTERTOP WITH BACKSPLASH ANDSIDESPLASHES AS SHOWN.
3 24" DEEP PLASTIC LAMINATE BASE CABINET WITH DRAWER AND DOOR(S)AS SHOWN.
4 24" DEEP PLASTIC LAMINATE ADA ACCESSIBLE SINK ENCLOSURE.
5 32" DEEP SOLID SURFACE COUNTERTOP WITH BACKSPLASH ANDSIDESPLASHES AS SHOWN.
6 METAL COUTERTOP WALL BRACKET.
7 LAMINATE BULKHEAD. TO BE FLUSH WITH THE FACE OF THE CABINET.CEILING AND GRID TO REMAIN CONTINUOUS. LAMINATE TO MATCH THEVERTICAL FACE OF CABINETS.
EQUIPMENT SCHEDULE
# NAME REMARKS01 MEDICAL STORAGE CART
02 ANESTHESIA CART
03 LINEN CART
04 MEDICATION DISPENSER
05 SCRUBEX
06 LEAD APRON RACK
07 MONITOR
08 PATIENT TRACKING BOARD
1 1/2" = 1'-0"5
ENDWALL CENTERED WITH MULLION TRANSITION 3" = 1'-0"
6DOOR/ FLOORING THRESHOLD DETAIL
TOILET ACCESSORIES
# NAME INSTALL1 COAT HOOK
2 PAPER TOWEL DISPENSER
3 SOAP DISPENSER
MARK DATE DESCRIPTION1 4-13-2018 Addendum 1
1
R16
00
R930
R1450
8A008
8A009
8A007
8A013
8A014
2' -
2 1
/8"
2' -
2 1
/4"
2' -
2 1
/4"
2' -
2 1
/4"
2' -
2 1
/4"
2' -
2 1
/4"
2' -
2 1
/4"
2' -
2 1
/4"
3' -
5 1
/2"
2
1
1
1
3
3
3
3
3
4
4
7' -
10
3/4"
10' - 9 1/4" 6' - 8"
5
+7' - 10"
4
DIM
EN
SIO
NS
TO
CE
NT
ER
LIN
E O
F U
NIS
TR
UT
UNISTRUT
4
4
6
7
8
9
GENERAL REFLECTED CEILING NOTES
A. ALL LAY-IN ACOUSTICAL CEILINGS SHALL BE INSTALLED AT 8'-0" ABOVE FINISH FLOOR, UNLESS NOTED OTHERWISE.
B. ALL LAY-IN ACOUSTICAL CEILINGS SHALL BE TYPE ACT1 (SCRUBBABLE), UNLESS NOTED OTHERWISE.
C. REMOVE AND REPLACE EXISTING CEILING TILES AND GRID ON FLOOR BELOW (SEVENTH FLOOR) AS REQUIRED FOR INSTALLATION OF FLOOR SUPPORT MEMBERS. REFER TO STRUCTURAL DRAWINGS FOR EXTENT OF WORK REQUIRED.
REFLECTED CEILING SYMBOLS
SUSPENDED LAY-IN CEILING SYSTEM
ACT - 1
+9' - 0"
ROOM NUMBER
ACOUSTICAL CEILING TILE - TYPE
CEILING HEIGHT ABOVE FINISH FLOOR
RECESSED "CAN" LIGHT FIXTURE OR PENDANT
CEILING MOUNTED EXIT LIGHT
CUBICLE CURTAIN TRACK AND CURTAIN
2'x4' LIGHTING FIXTURE
2'x2' LIGHTING FIXTURE
1'x4' LIGHTING FIXTURE
RETURN AIR GRILLE
EXHAUST AIR GRILLE
SUPPLY AIR GRILLE
CJGYPSUM CONTROL JOINT
ACCESS PANEL
DRYWALL BULKHEAD/CEILING
000
CONCEALED SPRINKLER HEAD
Structural Engineers
Suite 300
1175 Grimes Bridge Road
Roswell, GA 30075
Newcomb&Boyd
www.bsalifestructures.com
3348 Peachtree Road NE, Suite 1460Atlanta, GA 30326
ph 404.814.1001 fx 317.819.7288
C
B A
D
J
K
L
DE
SIN
GE
D
DR
AW
N
AP
PR
OV
ED
BSALS PROJECT NO.
KEYPLANPLAN NORTH
DATE
Copyright © 2013Consulting Engineering GroupSuite 525303 Peachtree Center Avenue, NEAtlanta, Georgia 30303-1277T 404 730-8400F 404 730-8401
D:\
Use
rs\jb
oye
r\D
ocu
men
ts\1
7220
008-
AR
CH
_BS
AL
S_C
EN
TR
AL
_v20
17_J
Bo
yer.
rvt
4/13
/201
8 9:
47:0
1 A
M 17220008
Ap
pro
ver
Au
tho
r
Des
ign
er
A128
REFLECTED CEILINGPLAN
MARCUS STROKE &NUEROSCIENCEANGIO SUITE 2
ANGIO SUITE
2
RELEASED FORCONSTRUCTION
MAR 19, 2018
CLIENT PROJECT NO. - 1722008
1/4" = 1'-0"1
PARTIAL EIGHTH FLOOR REFLECTED CEILING PLAN
REF. CEILING PLAN NOTES1 REFER TO PHILIPS SITE SPECIFIC DRAWINGS FOR EQUIPMENT
INFORMATION.
2 NEW GYPSUM BOARD BULKHEAD. CONFIRM CEILING HEIGHT INCORRIDOR IS HIGHER THAN FINISHED BOTTOM OF BULKHEAD.
3 UNISTRUT SUPPORTS FROM STRUCTURE ABOVE. BOTTOM OF UNISTRUTTO BE 1/4" BELOW FINISHED CEILING.
4 CEILING EXPANSION JOINT.
5 ANESTHESIA BOOM AND SURGICAL LIGHT BOOM LOCATION. REFER TOSTRUCTURAL DRAWINGS FOR SUPPORT INFORMATION.
6 EXISTING LIGHT IN NEW GRID. REINSTALL EXISTING LIGHT FIXTURE INTHIS ROOM IN NEW CEILING GRID.
7 REFER TO PHILIPS SITE SPECIFIC DRAWINGS FOR CEILING HEIGHTREQUIREMENTS FOR THIS ROOM. ENSURE THAT CEILING HEIGHTCONFORMS TO REQUIREMENTS FOR CEILING-HUNG EQUIPMENT.
8 ACT TYPE 2. REFER TP SPECIFICATIONS.
9 LAMINATE BULKHEAD REFER TO INTERIOR ELEVATIONS
MARK DATE DESCRIPTION1 4-13-2018 Addendum 1
1
J
E
E
EE
SSS
SS
E
E
E
E
E
N S
NS
E
EEE EE
E
UPS
.CB2
.CB MA
6ADPAEXISTING
480V/277V
SOILEDUTIL.
8A014
CLEANSUPPLY
8A051
MEDS8A047
CONSULT8A45
CONF. /LOUNGE
8A038
ELEC8A018
COMM8A016
STAFFSTATION
8A052
ANGIOBI-PLANE
8A097
CORRIDOR
8A102
CORRIDOR
8A101
LIGHTWELL
8A103
ELEV.8A104
ELEV.8A105
ELEV.8A106
STAFFSTATION
8A036
ANGIO 2
8A008
SCRUB8A007
ANGIO 2EQUIPMENT
8A013
ANGIO 2CONTROL
8A009
2
3
6ADPA 4
RSAP
UPS
CB
CB2
CB2
MA
CB
VR65-0819
PAC-8-4
EPO
CB2/UPS
ANESTHESIA
BOOM
PHYSIOLOGICAL
MONITOR
SURGICAL
LIGHT
5
MOTORIZED
SHADE
MOTORIZED
SHADE
MOTORIZED
SHADE
3 DATA
CONDENSATE
PUMP
WAP
6
8ACBA
8ANBC
UPS
C:3
C:1
C:5
C:28
C:26
C:26
AUTO
SLIDING
DOOR
N:3
7
C:1
C:1
C:30 C:30 C:30
C:30
C:32
C:32
C:32
C:32
N:9
N:9
N:9
N:9
N:9
?10
8
C:33C:27
C:29
C:31N:11
N:13
9
(APPROX. 140' TO ROOM 8E002)
10
C:32
APPROX. LOCATION OF
PANELBOARD 6ADPA ON
LEVEL 6A INTERSTITIAL
MECH. ROOM.
APPROX. LOCATION OF
EXISTING CONDUIT CHASE
N:9
MED GAS ALARM PANEL
AT NURSE STATION
.
8BEBA:56,58
30/2/NF
10
10
1
1
13
350X 150X
150X
150X
LEVEL 6A
8TH FLOOR
7TH FLOOR
350X
150X
ONE-LINE SYMBOL LEGEND
INDIVIDUALLY MOUNTED CIRCUIT BREAKER
3 #2/0 AND 1 #2/0 GROUND, 2" CONDUIT
3 - 400 kcmil AND 1- 400 kcmil GROUND, 3" CONDUIT
EXISTING CONDUIT CHASE Newcomb&Boyd
CONSULTANTS AND ENGINEERS
www.bsalifestructures.com
3348 Peachtree Road NE, Suite 1460Atlanta, GA 30326
ph 404.814.1001 fx 317.819.7288
C
B A
D
J
K
L
DE
SIN
GE
D
DR
AW
N
AP
PR
OV
ED
BSALS PROJECT NO.
KEYPLANPLAN NORTH
DATE
Copyright © 2017Consulting Engineering GroupSuite 525303 Peachtree Center Avenue, NEAtlanta, Georgia 30303-1277T 404 730-8400Contact: Kidane AbebeN&B PROJECT:17N250
C:\
Rev
it P
roje
cts\
ME
P_G
MH
Mar
cus
Str
oke
Cen
ter
R17
_KH
A.r
vt
4/13
/201
8 6:
30:0
5 A
M
17220008
VFL
VFL
VFL
E118
ELECTRICAL POWERDEMOLITION & NEWCONSTRUCTION
MARCUS STROKE &NUEROSCIENCEANGIO SUITE 2
ANGIO SUITE 2
RELEASED FORCONSTRUCTION
MAR 19, 2018
CLIENT PROJECT NO. - 1722008
1/4" = 1'-0"1
ELECTRICAL POWER EIGHTH FLOOR 1/4" = 1'-0"
2ELECTRICAL POWER EIGHTH FLOOR DEMOLITION
GENERAL NOTES: (THIS PLAN ONLY)1. REFER TO ANGIO EQUIPMENT INSTALLATION DRAWINGS
FOR ADDITIONAL REQUIREMENTS. PROVIDE ELECTRICAL EQUIPMENT, WIRING, RACEWAYS, DEVICES AND OTHER ELECTRICAL APPARATUS AS REQUIRED PER ANGIO EQUIPMENT MANUFACTURER'S INSTALLATION REQUIREMENTS.
2. CIRCUIT NUMBERS PREFACED WITH "C:" - CIRCUIT NUMBERS REFERENCE PANELBOARD "8ACBA", UON.
3. CIRCUIT NUMBERS PREFACED WITH "N:" - CIRCUIT NUMBERS REFERENCE PANELBOARD "8ANBC", UON.
# KEY NOTES: (THIS PLAN ONLY)1. HATCHED REGION DENOTES AREA OF DEMOLITION. REMOVE EXISTING ELECTRICAL DEVICES, WIRING, RACEWAYS, AND
LUMINAIRES. REMOVE WIRING AND RACEWAY BACK TO SERVING PANELBOARD.2. CIRCUIT BREAKER "CB2" - UPS INPUT CIRCUIT BREAKER. 480V, 150A/3P, 14 KAIC, WITH SHUNT TRIP. CIRCUIT BREAKER
MANUFACTURER SHALL BE SCHNEIDER ELECTRIC, SQUARE D.3. CIRCUIT BREAKER "CB" - ANGIO EQUIPMENT MAINS "MA" INPUT CIRCUIT BREAKER. 480V, 125A/3P 14 KAIC. CIRCUIT BREAKER
MANUFACTURER SHALL BE SCHNEIDER ELECTRIC, SQUARE D. TYPE PER ANGIO EQUIPMENT MANUFACTURER REQUIREMENTS. 4. HOMERUN TO EXISTING PANELBOARD "6ADPA" LOCATED ON LEVEL 6A IN INTERSTITIAL MECHANICAL ROOM, PROVIDE NEW
150A/3P CIRCUIT BREAKER IN PANELBOARD. MANUFACTURER SHALL BE SCHNEIDER ELECTRIC, SQUARE D, MINIMUM 35KAIC. 5. MOTORIZED SHADE CONTROL STATIONS BY OTHER DIVISIONS, INFRASTRUCTURE AND FINAL CONNECTIONS BY DIVISION 26. 6. WIRELESS ACCESS POINT. EXACT LOCTION TO BE DETERMINED BY GRADY IT.7. CIRCUIT TO EXISTING 120V, 20A BRANCH CIRCUIT SERVING CORRIDOR.8. EXTEND 120V CIRCUIT FROM NEAREST TERMINAL UNIT IN CORRIDOR FOR TERMINAL UNIT CONTROL POWER.9. PROVIDE NEW BREAKER AS SCHEDULED IN EXISTING PANELBOARD 8BEBA IN ROOM 8E002 TO SERVE PAC. PROVIDE
DISCONNECT, MOUNT ADJACENT TO EQUIPMENT.10. PROVIDE NEW BREAKER AS SCHEDULED IN EXISTING EQUIPMENT BRANCH PANELBOARD 8BEBA IN ROOM 8E002 TO SERVE
PAC CONDENSATE PUMP AND AUTO DOOR.11. PROVIDE CONNECTION TO MED GAS ALARM PANEL AT NURSE STATION 8B030, EXTEND NEAREST 120V LIFE SAFETY BRANCH
CIRCUIT WITH CAPACITY IN AREA. COORDINATE EXACT LOCATION AND CONNECTION WITH EQUIPMENT.12. PROVIDE GROUND BARS AND ASSOCIATED EQUIPMENT GROUND CONNECTIONS PER ANGIO EQUIPMENT DRAWINGS. PROVIDE
1 #1 G IN 0.75" CONDUIT FROM GROUND BAR TO PANELBOARD 6ADPA. CONNECT GROUND BARS TOGETHER WITH #2/0 BARE COPPER WIRE.
13. DEMOLISH TELECOMMUNICATIONS OUTLETS IN THE SPACES BEING RENOVATED. DECOMMISSIONED CABLING SHALL BE PULLED BACK TO ORIGIN AND DISPOSED OF. CONTRACTOR SHALL PROTECT AND RESUPPORT ACTIVE CABLING PASSING THROUGH THE SPACE TO SERVE OTHER AREAS. NURSE CALL WORK TO BE PERFORMED BY NURSE CALL VENDOR. CAREFULLY REMOVE NURSE CALL DEVICES OFF DEMOLISHED PARTITIONS AND CEILINGS AND TURN OVER TO THE OWNER.
NO SCALE3
PARTIAL ONE-LINE
2 3
4
MARK DATE DESCRIPTION1 4/13/2018 Addendum 1