amana contracting and steel buildings prequalification ... · oil/power/water 53 retail 60 project...
TRANSCRIPT
-
Pre
qu
alific
atio
n
Contents
Section 1: Introduction
Who We Are 5
Vision, Mission and Values 6
What We Do 7
Section 2: Project Profiles
Agricultural/Equestrian 9
Automotive 11
Aviation 17
Food Processing 22
Institutional 28
Logistics 34
Manufacturing 47
Medical 51
Oil/Power/Water 53
Retail 60
Project List 62
Section 3: Capabilities
Amana Personnel 75
Equipment Capabilities 76
Financial Information 77
Policies and Procedures 78
Health, Safety and Environment 80
Competitive Advantage 81
Sustainable Construction 81
Section 4: Corporate Overview
Amana Contracting and Steel Buildings 83
Corporate Office 84
Abu Dhabi 84
Dubai 84
Northern Emirates 85
Doha 85
Kuwait 86
Jeddah 86
Khobar 86
Riyadh 87
Sohar 87
Colombo 87
DuBox 88
3
-
Se
ctio
n 1
Introduction
-
Who We Are
A M A N A
I t s i n t h e n a m e
Amana Contracting Group
Amana Contracting Group is a leading group of companies with a long
standing and established reputation for servicing the industrial and
commercial construction sectors across the Middle East through the
integrated operations of its subsidiary companies:
Amana Contracting and Steel Buildings
(www.amanabuildings.com)
Amana Pipeline Construction (www.amanapipelines.com)
Amana Industries
(www.amanaindustries.com)
The Amana companies have been providing solutions to these sectors in
the region for over 20 years. Today, the synergy provided within the Group
allows the company to service these important sectors in a seamless
manner in more than one way. Amanas commitment to total client
satisfaction begins with its vision of becoming the preeminent leader of fast
-track construction in the Gulf industrial and commercial markets,
delivering total solutions to its clients. The ability of the company to
achieve its vision is dependent on satisfying and retaining its clients who
understand and value the element of time saving.
Amana Contracting and Steel Buildings
Founded in Abu Dhabi on September 12, 1993, Amana Contracting and
Steel Buildings is today the regional leader in the design-build construction
of industrial and commercial facilities across the Gulf. Structured in a
decentralized manner, the company is able to respond to its clients needs
in a very quick and efficient manner. The company has built its reputation
on the ability to provide design-build solutions for extremely fast-track
projects .
Today, Amana Contracting and Steel Buildings has offices in the United
Arab Emirates, Qatar, Kuwait, Saudi Arabia, Oman, Egypt and Sri Lanka.
Each of these offices is independently run with capabilities to market,
tender, design, procure and construct projects on a full design-build basis.
Amana Pipeline Construction
Amana Pipeline Construction is a specialized civil-mechanical contractor
focused on mechanical process requirements of the oil/gas and chemical
industries with presence across the UAE. With over 500 employees, the
company is able to provide piping tanks, and process-related works on a
complete design-build basis.
Amana Industries
Amana Industries is the structural steel fabrication arm of the Amana
Group. With over 600 employees, the company is able to estimate, design,
fabricate and erect specialized steelworks solutions across the Middle East.
5
-
Vision Our Vision is to become the regional leader in designing, construction and
commissioning of commercial and industrial buildings in the Middle East,
Africa, and South East Asia
Mission Our Mission is to provide our clients with the highest service quality, on time
and budget delivery. We shall achieve this by creating a partnership
between our employees, managers, and shareholders focused on
executing our projects on Time, under Budget, and within the Quality
requirements.
We will perform this in the most efficient and productive manner such as to
generate a reasonable return for our shareholders and ourselves.
Values Our Values, basic and fundamental shall remain the guiding light in our
dealings, internal and external. There will be the uncompromising
foundations upon which we build our Mission.
Integrity: the courage to maintain the right from the wrong without
compromise
Reliability: the ability to deliver on what we promise, without exception
Accountability: the strength to be responsible for our own actions and
decisions
Competitive Advantage
One Company
One Vis ion
One Future
Our advantages come from being committed to exceeding our clients
expectations, recruiting only the best talent, and in adapting a
decentralized modus operandi that is connected via our information-
sharing platform, AmanaTech.
6
-
What We Do
Amana is a Special Grade general contractor focused on the industrial
and commercial construction markets across the Middle East. The
company has in-house capabilities to develop a project from conception
through construction to completion.
Our services include:
Design-Build Turnkey Solutions
Based on the clients requirements and specifications, Amana leverages its
internal competencies and experiences to streamline the project costs
and provides the client with value engineered design. This would cover the
full civil, architectural, structural steel, mechanical, electrical and external
services scopes. Amana also obtains approval from authorities and
proceeds to complete the turnkey construction of the project.
Turnkey Construction Amana undertakes a project based on the requirements of the client as
per pre-approved designs completed by a third party engineering/design
office.
Structural Steel Only
The company designs fully the structural steel and undertakes the task of
supplying and erecting the steel structures. This is typically done for large
steel projects such as power plant and oilfield applications.
7
-
Se
ctio
n 2
Project Profiles
-
9
Equestrian Facility for Emaar Properties at
Arabian Ranches
Client: Emaar Properties
Consultant: RMJM
Location: Dubai
Completion Date: September 2003
Duration: 9 months
Built-up Area: 12,500 square meters
Scope: Turnkey
This equestrian facility is located in the Arabian Ranches gated community
amidst residential villas and other facilities.
The project consisted of 8 typical stables, two accommodation facilities, a
store, a service block and an electrical substation. The sub- and super-
structures are designed in concrete, with a steel structure roofing system.
The external appearance provides a local heritage-look complete with
custom-made wooden doors and ironmongery. The facility is fitted with
rubber flooring, feeding areas and other equestrian accessories.
A special ventilation/exhaust system was provided for temperate control.
The project was completed with paddock areas, water supply, and
drainage systems.
Agricultural/Equestrian
-
Agricultural/Equestrian
World Cup Quarantine Stables Extension for the
MeydanHorse Racing City at Nad Al Sheba
Client: Meydan LLC
Consultant: Teo. A. Khing Design Consultants
Location: Dubai
Completion Date: January 2008
Duration: 3 months
Built-up Area: 5,000 square meters
Scope: Design-Build
The MeydanHorse Racing City is a US$600 million facility offering horse
racing, training tracks, stables, a museum, hotels, restaurants,
entertainment clubs, plazas, towers and a boathouse.
The 5 quarantine stables were constructed on a fast-track basis for use at
the Dubai World Cup in March 2008. With a built-up area of 5,000 square
meters, the facility also includes horse paths and specialized equestrian
equipment. Due to the fast-track nature of the job, internal and external
precast walls were used which allowed for the completion of the entire job
in 3 months.
10
-
11
Automotive
Komatsu Warehouse and Office for Abdul Latif
Jameel Heavy Equipment in Jeddah
Client: Abdul Latif Jameel Co.
Consultant: Talal Kurdi
Location: Jeddah
Completion Date: January 2016
Duration: 14 months
Built-up Area: 9,800 square meters
Scope: Turnkey
This project was awarded to Amana on a complete turnkey basis. The
facility is to be used by Komatsu to display machines for sale and rent. It
also incorporates a workshop area for maintenance, a warehouse for
spare parts, washing area, training bay and administration building with an
distinctive architectural facade.
-
Automotive
12
Motor World Development (Phase 1) for Aldar
Properties at Sweihan
Client: Aldar Properties
Consultant: RMJM / AECOM
Location: Abu Dhabi
Completion Date: May 2011
Duration: 12 months
Built-up Area: 40,000 square meters
Scope: Turnkey
Aldar Properties is developing a new automotive development which will
be dedicated to buying, selling and servicing both new and pre-owned
cars.
The development will comprise of both residential and mixed-use
components, including a 3-star hotel with a business center and a variety
of food outlets.
Motor World is designed to be a one-stop shop for customers, providing all
related services under one roof, including finance, insurance and
registration services.
Amana was awarded phase one of the project which involved the
construction of 118 showrooms and associated facilities.
-
Automotive
General Motors Logistics Facility for Danzas at
Jebel Ali Free Zone
Client: Danzas
Consultant: Edara
Location: Dubai
Completion Date: May 2003
Duration: 6 months
Built-up Area: 14,000 square meters
Scope: Design-Build
Located Abu Dhabi bound on Sh. Zayed Road, this distribution center is
used to store and transport spare parts for General Motors across the
region.
Having a total built-up area of 14,000 square meters on a plot area of
43,000 square meters, this project was awarded and constructed on a fast-
track basis. With a large clear span, this pre-engineered design-build
facility was designed for the full utilization of the storage space and
racking requirements for the rapid movement of goods.
This facility has internal administration offices, a utilities building and a small
security house.
In July 2006, Amana completed a 13,000 square-meter warehouse and
office expansion for the General Motors facility.
13
-
Automotive
Logistics Center for United Motors at Jebel Ali
Free Zone
Client: United Motors
Consultant: Al Waha Engineering
Location: Dubai
Completion Date: September 2003
Duration: 9 months
Built-up Area: 12,000 square meters
Scope: Turnkey
A landmark project located in Jebel Ali Free Zone along the Sh. Zayed
Road, this distinguished facility reaches a height of 18.2 meters with a total
built-up area of 12,000 square meters, on a plot of 15,000 square meters.
As the central distribution hub for heavy equipment and spare parts, this
design-build facility was specifically developed by Amana to maximize the
storage space by using a combination of multiple mezzanines and a
central crane.
The external construction of the building is enhanced by a simplistic
approach, using a combination of glazing, composite aluminum cladding
and pre-cast panels.
14
-
Showroom for Liberty Automobiles at Sharjah
Industrial Area
Client: Liberty Automobiles
Consultant: Horizon International Consulting Engineers
Location: Sharjah
Completion Date: January 2004
Duration: 9 months
Built-up Area: 14,000 square meters
Scope: Turnkey
The Liberty Automobiles Showroom, located in the busy area of Al Wahda
Street in Sharjah, is the one of the worlds largest showrooms for General
Motors. Constructed for H.H. Sheikh Khaled bin Abdul-Aziz Al Qasimi, the
showroom is 140 meters in length and has a two-in-one elevation.
This automotive facility consists of the showroom, a service center , an
office complex and a pre-approved car sales area.
15
Automotive
-
Automotive
Parts Distribution Center for Al Futtaim Motors at
Dubai Investment Park
Client: Al Futtaim Real Estate
Consultant: Kling Consult
Location: Dubai
Completion Date: January 2007
Duration: 12 months
Built-up Area: 54,000 square meters
Scope: Design-Build
The landmark project, located on the Jebel AliLahbab Road within the
Dubai Investment Park, consists of a 38,650 square-meter central
warehouse, an 11,650 square-meter tire storage area, 1,650 square meters
of ancillary buildings and 2,100 square meters of office space.
The structures space frame works are designed to provide large storage
space.
The office area is elevated above the other structures and is finished with
glazing, composite aluminum cladding and honeycomb panels with
specially designed landscaping to enhance the elevation.
16
-
Aviation
17
Spares and Repair Center for Airbus at Dubai
Airport Free Zone
Client: Airbus Middle East
Consultant: Al Hashemi
Location: Dubai
Completion Date: April 2007
Duration: 10 months
Built-up Area: 5,000 square meters
Scope: Turnkey
The Airbus Spares and Repair Center is designed to stock a large inventory
of parts manufactured by the aerospace giant, in addition to equipment
from the companys various suppliers around the world.
The facility is designed with stringent European specifications and consists
of high quality finishes and external faade materials imported from
Slovenia.
In the past, regional airlines would send their electronic cabin systems to
Germany for repair services. However, with the Dubai facility now
operational, repairs can be done in the Middle East. The center also
benefits from direct access to the apron at Dubai International Airport in
order to maximize the speed and efficiency of transporting goods.
-
Aviation
18
Airport Staff Access and Control Facility
(ASACF) for Hamad International Airport
Client: NDIA Steering Committee
Consultant: MACE International
Location: Qatar
Completion Date: May 2013
Duration: 15 months
Built-up Area: 13,336 square meters
Scope: Turnkey
The New Doha International Airport (NDIA) Steering Committee required
the construction of a dedicated Airport Staff Access Control Facility
(ASACF) to supplement other staff control points located at the new
airport. The primary function of ASACF is to provide a dedicated building
to manage the high volume of staff movement and to efficiently screen
staff entering or leaving the airports Security Restricted Area.
The project also included supporting administration and corresponding
amenities and serve as an employment hub for bus drivers.
-
Aviation
19
Second Hangar for Presidential Flight at Abu
Dhabi Airport
Client: Presidential Flight
Consultant: Technip TPS
Location: Abu Dhabi
Completion Date: September 2016
Duration: 18 months
Built-up Area: 19,580 square meters
Scope: Turnkey
The project involves the construction of an additional hangar for
Presidential Flight at Abu Dhabi International Airport.
Measuring in at 190 meters by 90 meters, the hangar can accommodate
the largest wide-body aircrafts such as Boeing 747s, Boeing 777s, and,
Airbus A380s.
The hangars have been designed to accommodate either:
Two Airbus A380s in Nose-in Position, or
Two Boeing 747-800Fs in Nose-in or Tail-in Positions, or
Two Boeing 787-8s or -9s in Nose-in or Tail-in position, and, one
Airbus A320
-
Aviation
20
Cargo Building for Emirates SkyCargo at Dubai
South Al Maktoum International Airport
Client: Emirates Airlines
Consultant: -
Location: Dubai
Completion Date: October 2013
Duration: 11 months
Built-up Area: 75,065 square meters
Scope: Turnkey
Emirates SkyCargo s new state-of-the-art cargo terminal is their primary
facility at Al Maktoum International Airport and, from 2014, the new
headquarters of operations having shifted their premise from Dubai
International Airport.
The terminal has an initial capacity to manage 700 000 tons of cargo per
year with the ability to expand to meet future growth. It also provides
Emirates SkyCargo with the space to have a larger perishables handling
area, with a dedicated pharmaceutical storage area, enabling it to
expand its cool chain products and services.
-
Aviation
21
Aircraft Maintenance, Repair & Overhaul (MRO)
Facility for Goodrich at Jebel Ali Free Zone
Client: Goodrich Corporation
Consultant: Scott Wilson Kirkpatrick & Co. Ltd.
Location: Dubai
Completion Date: June 2007
Duration: 7 months
Built-up Area: 11,750 square meters
Scope: Turnkey
Located within Jebel Ali Free Zone, the Goodrich aircraft facility consists of
a 10,000 square-meter maintenance and repair center with an attached
two-level 1,000 square meter concrete office building.
The facility offers a full range of maintenance, repair and overhaul services
for components and systems for both commercial and military aerospace
customers from Europe, the Middle East and Africa. The repair services
offered will encompass components and systems from aircraft nacelle
systems, cargo systems, de-icing systems, hoists and winches, senor systems
and aircraft evacuation systems.
-
Food Processing
22
Cold Store for Shahini Cold Store at Second
Industrial City Riyadh
Client: Shahini Holding Group Co. Ltd.
Consultant: Miebach Consulting
Location: Riyadh
Completion Date: February 2015
Duration: 12 months
Built-up Area: 29,195 square meters
Scope: Turnkey
This facility was built as part of Shahini Holding Group expansion plans to
serve the central region of Saudi Arabia. Amanas scope was building of
the cold store facility including all civil, structural, architectural and
domestic MEP works and the below key items:
Super flat slab
Industrial doors
Elevators
Asphalt works
Finishes
-
Cold Room Stores for Emirates Flight Catering at
Al Rowaiyah Third
Client: Emirates Airlines
Consultant: ARTEC Architectural & Engineering
Location: Dubai
Completion Date: October 2014
Duration: 12 months
Built-up Area: 10,510 square meters
Scope: Turnkey
The cold rooms stores for Emirates Flight Catering are located Al Rowaiyah Third in
Dubai and consists of the mentioned cold stores, freezers as well as offices and other
amenities.
The cold stores maintain an internal temperature of 2C to 18C whereas the
freezers are chilled to a 20C. The cold stores and freezers account for about 90%
of the total built-up area with the remaining area dedicated to offices, canteens
and service blocks.
Food Processing
23
-
24
Food Processing Plant for Brasil Foods (BRF) at
Khalifa Industrial Zone Abu Dhabi (KIZAD)
Client: Brasil Foods (BRF)
Consultant: Derby Design Consultant LLC
Location: Abu Dhabi
Completion Date: November 2014
Duration: 16 months
Built-up Area: 39,718 square meters
Scope: Turnkey
Project Consists of a Food Processing Facility including 5 Production Lines,
Inbound cold and dry food storage, outbound cold storage, Dry Storage,
Offices, Mosque, MEP Plant and support Facilities (Industrial Building
(Including Mezzanine), Service Building, Dry Raw Material Store,
Maintenance Boiler Room, Refrigeration Equipment Building, Packing
Material Store Building, Fire & Water Pumps, Waste Water Treatment Plant,
Access Control, Mosque, Workers Waiting Room).
This state of the art facility has a production capacity of approximately 80
thousand tons of frozen food products including hamburgers, pizzas, frozen
pies, breaded items and specialty meats and marinated processed foods.
The facility is also the largest for the South American company outside its
home continent and the first tenant to setup within the food
manufacturing cluster in KIZAD.
Food Processing
-
Food Processing
Factory and Offices for Del Monte Foods in
Dubai and Jeddah
Client: Del Monte Foods
Consultant: Orion Engineering + SAK Engineering
Location: Dubai + Jeddah
Completion Date: October 2006 + September 2009
Duration: 10 months + 18 months
Built-up Area: 15,500 square meters + 51,200 square meters
Scope: Multiple
The fresh-cut factory for fruit juices is a state-of-the-art facility and the first
factory of its kind to be constructed at the fruit and vegetable market in Al
Aweer. The facilities were constructed on a fast-track basis in order to
meet the growing requirements of the industry.
The factory is constructed on an area of 29,000 square meters and was
completed within 10 months using 360 tons of steel. The facility also has
approximately 1,700 square meters of built-up office space. The factory
has been designed as a pre-engineered steel structure and the office
facilitates have been designed as reinforced concrete cement structures
with hollow core slabs.
Amana was also awarded a turnkey contract for the Del Monte factory at
Khorma, Saudi Arabia. The project consists of 4 main buildings: the cold
store, administration building, labor accommodation, and workshop. Most
of the external areas are concrete flooring and the rest is asphalt. The cold
store contains 33 loading/unloading entries to store and distribute all types
of fruit. It also consists of 46 refrigerators and 19 banana repining
equipment. The factory is constructed on an area of 86,500 square meters
and was completed within 18 months using 2,000 tons of steel.
25
-
26
Food Processing
Production, Logistics Facility, and Offices for
Nestle Dubai at Techno Park
Client: Nestle Dubai Manufacturing LLC
Location: Dubai
Completion Date: June 2010
Duration: 13 months
Built-up Area: 18,500 square meters
Scope: Turnkey
The project is located at Techno Park; it is an extension of the existing
Nestle facility and consists of:
An office building
Utility and production area
Packaging area
A warehouse
The complete building is precast except for the warehouse which Amana
changed from precast to steel in order to provide schedule benefits to the
client. The project comprises of very high standards and stringent quality
requirements, being a food processing plant. The completion of the
project involved 4 milestones for each of the areas described above, in
order to accomplish the installation of the process equipment.
For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green
-
Infant Nutritional Products Manufacturing Plant &
Accommodations for Almarai at Al Kharj
Client: Almarai Company Limited
Consultant: Almarai Company Limited
Location: Riyadh
Completion Date: November 2011 + February 2012
Duration: 25 months + 14 months
Built-up Area: 47,000 square meters + 9,000 square meters
Scope: Design-Build
The project involves the construction of infant nutritional manufacturing
facility consisting of the main process building as well as other facilities
such as administration building, laboratory, EMS, transformers, substations,
a central utility building, piping bridge, underground water storage tanks
and pump houses.
The main process building has a total floor area of 40,000 square meters
and is composed mainly of insulated precast cladding and precast
structural elements as well as a CIP dryer tower.
The accommodation buildings will house staff that will be employed at the
new plant. The 2 four-storey buildings are concrete structures and include
standard external insulated concrete block wall cladding. Amenities within
the accommodation include basketball, volleyball and tennis courts, a
football field, swimming pool, and, laundry and gym facilities.
Amana is also constructing a number of facilities for Almarai including an
inbound warehouse (41, 000 square meters), poultry processing plant with
staff accommodations (55,000 square meters), and a large-scale bakery
(39,000 square meters).
27
Food Processing
-
Institutional
28
Ancillary Building, Car Park & Podium (1A/1B)
for Masdar Institute of Science & Technology
Client: Abu Dhabi Future Energy Company (Masdar)
Consultant: WSP Group
Location: Abu Dhabi
Completion Date: November 2010
Duration: 23 months
Built-up Area: 131,000square meters
Scope: Turnkey
Phase A of the project included extensive excavation and earth retention
for utility tunnels and for huge underground tanks. The project required
very detailed planning to deal with extreme temperatures to manage cast
-in-place concrete activities and over 2,500 laborers on two shifts. The
facility consists of underground tanks, two levels of parking garage to
accommodate 2,200 cars, a high-end Personal Rapid Transportation (PRT)
station to transport people, Freight Rapid Transportation (FRT) marshalling
area, media wall, a water feature wall and landscape, MEP systems, and,
glass reinforced concrete perimeter wall system.
Phase B required an expedited schedule so Amana worked with MASDAR
to utilize a highly sustainable precast with 65% ground granulated blast
furnace slag (GGBS) as a cement replacement in the concrete mix design.
New techniques were also introduced to reduce the use of water and
natural resources to reduce carbon footprint; 99% of the waste generated
from construction activities was recycled.
For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green
-
Institutional
International Doha Convention Center for Barwa
Real Estate at West Bay
Client: Barwa Real Estate Company
Consultant: WS Atkins & Partners Overseas WLL
Location: Qatar
Completion Date: November 2007
Duration: 7 months
Built-up Area: 30,000 square meters
Scope: Turnkey
The facility, constructed on 70,000 square meters of land in the Dafna Area
in West Bay, Doha, has a total built-up area of almost 30,000 square meters
and is designed with international specifications requiring over 2,000 tons
of steel.
This project was awarded to Amana on a fast-track, turnkey basis. Due to
this short time duration, the design and construction of the facility were
performed simultaneously.
29
-
Institutional
Office Buildings (Balance Works) for Tecom at
Dubai Design District (D3)
Client: Tecom Investments
Consultant:
Location: Dubai
Completion Date: August 2014
Duration: 10 months
Built-up Area: 289,775 square meters
Scope: Turnkey
The project consists of completing the three main office buildings (North,
South and Core Buildings) that had been previously abandoned by
another contractor. Office space starts at 800 square feet and include
either Courtyard View, Standard View or Burj View.
30
-
Institutional
31
Sound Stages (Phases A & B) for Dubai
Properties at Dubai Studio City
Client: Dubai Properties / Dubai Studio City
Consultant: Cansult Maunsell
Location: Dubai
Completion Date: June 2009
Duration: 12 months
Built-up Area: 14,250 square meters
Scope: Turnkey
The contract, awarded by TECOM Investment, involved the construction of
a world-class Sound Stages Complex. The Sound Stages Complex is a
concrete framed structure covered with sound-proof glass. The building
boasts a unique architectural design with the roof specially designed to
suspend a mobile facility for movie shooting. Since a vast majority of the
lead items for the facility were imported from the US, the time-frame for the
project was very sensitive.
-
Institutional
32
Technical & Customer Care Building for
Ooredoo at Mesaimeer
Client: Ooredoo
Consultant: Architectural Consulting Group
Location: Doha
Completion Date: May 2013
Duration: 18 months
Built-up Area: 58,500 square meters
Scope: Turnkey
The 58,500 square meter cast in-situ concrete structure houses Qtels
technical and customer care facilities consisting of a basement level, a
ground floor with two additional floors and a penthouse. Amana
completed work on the project in 18 months.
-
Institutional
33
Three Schools for the Abu Dhabi Future School
Program for Abu Dhabi General Services
Client: Abu Dhabi General Services PJSC (Musanada)
Consultant: Dewan Architects and Engineers
Location: Abu Dhabi
Completion Date: September 2011
Duration: 8 months
Built-up Area: 15,000 square meters
Scope: Turnkey
The project comprises of the construction of three (3) Kindergartens
Schools of similar designs in the following areas in Abu Dhabi:
Abu Dhabi Island Kindergarten
Al Shawamekh Kindergarten
Al Rahba Kindergarten
All Kindergartens are only ground floor and accommodate approximately
360 students within 18 class rooms. The Kindergartens are supported by
offices, library, special education, physical education, break out spaces,
and a small cafeteria. In addition to these, there is a nursery space, as well
as an outdoor learning spaces, parking, drop offs and other external
areas.
The GFA of each of these kindergartens is approximately 5,000 square
meters and each is required to be handed-over within a fast-track period
of 8 months prior to the start of the new academic year.
The buildings are intended to achieve Two (2) Pearls Estidama Rating and
will also include CCTV security systems, PA/Music systems and the BMS
System. The buildings will also include all the MEP Services requirements
including fire alarm/fire fighting, etc. as required by the prevailing
government codes.
For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green
-
Logistics
34
Distribution Center for IKEA at Dubai South
Client: GRDI
Consultant:
Location: Dubai
Completion Date: July 2015
Duration: 12 months
Built-up Area: 104,578 square meters
Scope: Design-Build
The IKEA Dubai project was quite a unique accomplishment for a number
of reasons. First, the building standards and specifications set by IKEA far
exceed the typical standards found in this part of the world. Secondly, IKEA
operates a rigorous system called IWAY that monitors, controls and
protects the health, safety and welfare of construction workers on its
projects requiring Amana and its entire supply chain to fully comply with
global best practices. Thirdly, IKEAs approval process during the entire
construction requires the smallest details to be approved by multiple
stakeholders thus potentially leading to significant delays.
Nevertheless, Amana was up to the challenge and based on GRDIs
feedback, Amana excelled at the work performed.
-
Logistics
35
Warehouse Extension for LOGIX at Jebel Ali Free
Zone
Client: M.H. Alshaya Co.
Project Management: Mace International
Location: Dubai
Completion Date: February 2012
Duration: 10 months
Built-up Area: 26,600 square meters
Scope: Design-Build
The facility, located in the south sector of Jebel Ali Free Zone, consists of a
built-up area of 26,600 square meters on a plot of 74,000 square meter. The
structure, visible from Sheikh Zayed Road, is designed and constructed to
the highest standards needed to serve the warehousing and logistic needs
of the client.
The warehouse will provide logistical support for major retail brands as BHS,
Debenhams, Mothercare and Starbucks.
The original warehouse was also constructed by Amana and was
completed in October 2005 with a total built-up area of 25,000 square
meters. Once the extension has been completed, Alshaya would have
more than doubled its warehousing capacity.
-
Container Terminal Maintenance Building for
PCFC at Jebel Ali Industrial Area
Client: Ports, Customs, & Free Zone Corporation
Consultant: Arenco Architectural and Engineering
Location: Dubai
Completion Date: February 2005
Duration: 10 months
Built-up Area: 27,750 square meters
Scope: Turnkey
The Ports, Customs and Free Zone Corporation required the turnkey
construction of a purpose-built facility designed to maintain the
transportation containers being hauled by trailers. This facility has a total
built-up area that exceeds 25,000 square meters with a height of 18
meters.
This facility encompasses heavy steel sections and thick concrete floor
slabs to accommodate different types of heavy live loads, huge roll-up
doors and deep trenches. The facility is complete with various mechanical,
electrical, and plumbing services including a fully air conditioned
workshop, compressed air systems, and special electrical requirements.
The building also houses various administration units and offices
36
Logistics
-
Logistics
Light Industrial Units for Dubai Ports Authority at
Jebel Ali Free Zone
Client: Dubai Ports Authority
Consultant: Al Wasl Al Jadeed Consultants
Location: Dubai
Completion Date: December 2005 + January 2007 + August 2007
Duration: 10 months
Built-up Area: 63,800 square meters + 27,500 square meters +
34,000 square meters
The Light Industrial Units (Phases 8, 9 and 12) were awarded to Amana on a
fast-track basis. These developments are composed of various rental units
used for light industries and general warehousing for companies in the free
zone.
Phase 8 consists of 21 independent buildings with a total built-up area of
63,800 square meters on a plot of 159,000 square meters. Phase 9 consist of
40 warehouses with a total built-up area of 27,500 square meters. Phase 12
consists of 8 warehouse blocks totaling 64 units with a total built-up area of
34,000 square meters.
These high quality, thermally insulated purpose-built units are fitted with
offices and tow cargo entry/exit points, a ramp for forklifts and a loading
dock for containers and trucks, located at the rear of each unit.
37
-
Logistics Centre for Panalpina Gulf
at Dubai South
Client: Hi Flow Logistics 2 DWC
End-User: Panalpina Gulf
Location: Dubai
Completion Date: September 2016
Duration: 12 months
Built-up Area: 42,000 square meters
Scope: Design-Build
The Distribution Centre for Panalpina on Plot FB-140 at Dubai Logistics City is
designed as a strategic hub, specifically located to take advantage of the
increase in air cargo with the ongoing expansion of Al Maktoum
International Airport.
The gross internal areas (GIAs) of the three warehouses measure in at
16,900 square meters for Warehouse A, 10,200 square meters for
Warehouse B, and, 10,200 square meters for Warehouse C. With 2,900
square meters of office space, the total GIA measures in at 42,000 square
meters.
38
Logistics
-
Logistics Center, Workshops and Offices for
Ocean Fair International Group at Technopark
Client: Ocean Fair International Group
Consultant: -
Location: Dubai
Completion Date: February 2016
Duration: 12 months
Built-up Area: 34,960 square meters
Scope: Design-Build
The logistics center for Ocean Fair International Group consists of a
regional office with two storage facilities, a temperature controlled
warehouse, and a unique cold store as it is a single box and not a box
within a box - a first for the region.
The cold store is divided into several chambers and has temperatures
ranging from -22 degrees Celsius to 22 degrees Celsius. The cold store
ground floor measures in at 16,120 square meters with a 3,040 square
meter mezzanine level. The temperature controlled warehouse covers
11,080 square meters whereas the G+2 office measures in at 3,900 square
meters.
Logistics
39
-
Cold Store Complex for Gulf Warehousing
Company at Doha Industrial Area
Client: Gulf Warehousing Company (GWC)
Consultant: Gulf Engineering & Industrial Consultancy
Location: Qatar
Completion Date: February 2006
Duration: 12 months
Built-up Area: 32,500 square meters
Scope: Turnkey
Situated on 47,300 square meters of land, this 32,500 square-meter
distribution facility is designed to contain over 43,000 pallet positions. The
complex is a high-bay facility with an internal very narrow aisle (VNA)
racking system and state-of-the-art material handling equipment with a
useable height of up to 13.5 meters. The entire facility was designed and
constructed in less than 210 days.
The facility offers a number of storage environments including:
4,200 pallets of frozen storage (30C to 20C)
4,200 pallets of chill storage (0C to 12C)
12,604 pallets of A/C storage (12C to 18C)
22,776 pallets of ambient storage
The complex is also equipped with a positive power air system to
significantly reduce dust contamination and humidity levels, as well as a
state-of-the-art security system consisting of full CCTV coverage and card-
swipe access gates.
40
Logistics
-
Logistics Facilities for Agility Logistics in Dubai
and Kuwait
Client: Agility Logistics
Consultant: - - + Orion Engineering
Location: Kuwait + Dubai
Completion Date: November 2006 + August 2008
Duration: 6 months + 14 months
Built-up Area: 51,200 square meters + 79,000 square meters
Scope: Multiple
This state-of-the-art high density storage facility is the single largest
warehouse construction within the Jebel Ali Free Zone. The facility consists
of the warehouse itself, a regional office building, a canteen block as well
as other service amenities.
The project required over 3,500 tons of structural steel, 100,000 square
meters of cladding and 20,000 cubic meters of concrete. The warehouse
facility is equipped with a sophisticated fire fighting system with a sprinkler
grid, involving 120km of piping equal to the distance between Jebel Ali
and Abu Dhabi.
Storage within the warehouse is based on a Very Narrow Aisle (VNA)
racking system stretching up to a height of over 14 meters. Given the
weight of the goods and the time-sensitivity of the project, Amana
implemented Laser Screed technology during the construction. Laser
Screed is an innovative concrete slab technology which is comparatively
quicker, high-strength, ultra-durable and safer than conventional
reinforcement.
Amana was also awarded numerous contracts from Agility for the
construction of logistic facilities in Jeddah and Kuwait, a retail distribution
center in Dubai, and a cold store facility in Doha.
Logistics
41
-
Logistics
Workshops, Warehouses, Shops & Showrooms
for Dubai Maritime City at Port Rashid
Client: Dubai Maritime City (DMC)
Consultant: Turner Construction International LLC
Location: Dubai
Completion Date: August 2007
Duration: 12 months
Built-up Area: 85,000 square meters
Scope: Design-Build
The buildings were constructed on 377,700 square meters of reclaimed
land at Port Rashid and required over 5,000 tons of steel. The facilities were
constructed on a fast-track basis in order to meet DMCs scheduled
launch date.
The 11 buildings have a total built-up area of 85,000 square meters and
were built using special architectural and structural elements to create the
required curve roofs for each structure.
Amana was also awarded a contract to construct additional industrial
workshops totaling 22,000 square meters and is tailored towards small
enterprises servicing the maritime industry.
42 For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green
-
Logistics
Industrial Warehouse for Ajman Free Zone
Authority at Ajman New Industrial Complex
Client: Ajman Free Zone Authority
Consultant: Cansult Engineers & Project Managers
Location: Ajman
Completion Date: December 2007
Duration: 12 months
Built-up Area: 95,000 square meters
Scope: Turnkey
The 95,000 square-meter facility consists of 15 warehouses that were
constructed on 200,000 square meters of land requiring over 2,300 tons of
steel and 12 months to complete. Amana modified the original design to
allow for increased operational flexibility and to maximize free space
availability.
The first warehouse was ready in 210 days from the start of construction
with a completion of an additional warehouse every 10 days thereafter.
Amana was also awarded the contract for the second phase of the
Ajman New Industrial Complex in Al Jurf. The second phase consists of
labor accommodations, an administration building, a mosque and a
security station. This project complements phase one of the Ajman New
Industrial Complex. Both phases were completed within 300 days.
43
-
Logistics
Logistics Village Qatar (H1A & H2A Warehouses)
for Gulf Warehousing Company at Al Wukair
Client: Gulf Warehousing Company (GWC)
Consultant: Gulf Engineering & Industrial Consultancy
Location: Qatar
Completion Date: March 2013
Duration: 12 months
Built-up Area: 58,782 square meters
Scope: Turnkey
The project involved the construction of two buildings (H1A & H2A) using
super flat flooring system. Building H1A has a built-up area of 27,282 square
meters while H2A has a built-up area of 31,500 square meters. Both
buildings were constructed simultaneously within 12 months.
Logistics Village Qatar is the countrys largest and most modern integrated
and self-contained full-service logistics center.
44
-
Logistics
45
Qatofin Logistics Terminal for Alfred Talke
Logistic Services at Mesaieed Industrial City
Client: Qatofin
Operator: Alfred Talke Logistic Services
Location: Qatar
Completion Date: October 2008
Duration: 20 months
Built-up Area: 57,000 square meters
Scope: Design-Build
The terminal complex comprises of 4 buildings featuring a 56,000 square-
meter covered warehouse, 14,500 square-meter silo storage, two fully
automatic and mobile packaging lines, 20 loading docks, and, container
storage and transshipment with a capacity of 1,000teu.
The complex sits on an area of approximately 100,000 square meters and
was constructed on a design-build basis in 20 months.
-
Logistics
Distribution Center for Landmark Group at Dubai
South
Client: Landmark Group
Consultant: Al Wasl Al Jadeed Consultants
Location: Dubai
Completion Date: February 2016
Duration: 12 months
Built-up Area: 86,641 square meters
Scope: Turnkey
The project involved the construction of 3 warehouses providing Landmark
Group with over 66,000 square meters of storage space (23,000 square
meters in Warehouse 1 and 21,500 square meters each in Warehouse 2
and 3). The height of the buildings at their ridge is 17 meters and includes
over 45km of firefighting piping.
Warehouse 1 will be used for storing products destined for Babyshop stores,
Warehouse 2 will provide storage for Lifestyle and Beauty Bay products,
and Warehouse 3 will store Home Box and Shoemart products.
In addition to the warehouses, offices & maintenance, service and other
miscellaneous buildings were also constructed.
The project required 4260 tons of steel to construct and was completed in
14 months.
46
-
Manufacturing
47
Pre-Cast Factory for Mammut Industries at
Dubai Techno Park
Client: Mammut Industries
Consultant: Image Consultant
Location: Dubai
Completion Date: May 2005
Duration: 9 months
Built-up Area: 35,500 square meters
Scope: Turnkey
One of the worlds largest automated pre-cast factories, this development
covers a total built-up area exceeding 35,000 square meters on a plot in
excess of 100,000 square meters.
The facility encompasses a high level of design complexity as it includes:
extensive machine foundations, networks of underground trenches,
batching plants, multilevel conveyor systems and stand-alone ovens for
fast curing, among other features.
The factory is fully automated with a network of conveyor systems,
requiring a complex ground floor slab inclusive of various inserts and
precise floor casting tolerances suitable to support the robotized
processes.
The level of mechanical, electrical, and plumbing works is extensive and
includes multiple uses of bus bars, and specialty electrical and
compressed air services for manufacturing process.
-
Manufacturing
48
Advanced Technology Facility for ABB Electrical
Industries at Dammam 2nd Industrial City
Client: ABB Electrical Industries Co Ltd.
Consultant: PMG
Location: Dammam
Completion Date: March 2015
Duration: 15 months
Built-up Area: 18,010 square meters
Scope: Design-Build
This landmark project for ABB, built on a 67,599 square meter plot, consists
of a main building divided into 4 main areas:
Offices area (Ground + Mz.): 4,544 square meter Plant Rooms: 1,104 square meter PPHV Area: 9,500 square meter Drivers and Motors Area: 2,025 square meter It also has some service facilities around the main building such as the
guardhouses and the MV/LV rooms and the main entrance canopy.
PPHV Area (the main component in the project) is the manufacturing area
for GIS Switchgear, and this is considered the first of its kind production
area in KSA. The design criteria governing the project are very stringent
and require an air-tight envelop, and require to maintain positive pressure
inside the building as the biggest enemy in the manufacturing of GIS
Switchgear is dust, and hence to have a dust controlled environment in a
dusty environment is the main challenge in the project, and the whole
PPHV Area was designed and constructed to act in a similar manner as a
large air-lock.
The slab on grade in the project was also constructed with very stringent
guidelines maintaining a tolerance of + 3mm across the whole facility.
-
Manufacturing
Cotton Yarn Manufacturing Plant for United
Textiles at Fujairah Free Zone
Client: United Textiles FZE
Consultant: Concept Consulting Engineers
Location: Fujairah
Completion Date: March 2007
Duration: 10 months
Built-up Area: 24,000 square meters
Scope: Turnkey
The 24,000 square meter facility is uniquely designed with the distance
between the columns measuring 24 meters which is equal to the distance
between the frames, joined together with jack beams. The air conditioning
ducts have also been designed to flow up from tunnels underneath the
ground floor slab.
At full operations, the factory is capable of producing 10,000 tons of high
quality ring-spun yarn per year. The facility has also been designed to allow
for future expansion and growth.
49
-
Plasterboard Factory for Saint-Gobain Gyproc
Emirates Industries at Industrial City Abu Dhabi
Client: Saint-Gobain Gyproc Emirates Industries Ltd.
Consultant: GIBB Ltd.
Location: Abu Dhabi
Completion Date: June 2009
Duration: 15 months
Built-up Area: 22,000 square meters
Scope: Turnkey
The 22,000 square meter facility, located at Industrial City 1 in Abu Dhabi,
was constructed on a turnkey basis and was completed within 15 months.
The mandate of the contract included all civil, MEP, structural steel and
sheet cladding works in addition to the installation of process equipment
and the erection of a 27-metre high gypsum rock silo platform. The project
required nearly 1650 tons of hot rolled structural steel.
The factory constitutes a first phase of the project and will produce 30
million square meters of plasterboard annually. Engineering studies for the
second phase of the project, which will be a ready-mix joint filler factory, is
currently under way.
Manufacturing
50
-
51
Medical
51
Client: Schlumberger Technical Services Inc.
Consultant: Morgan Consulting Engineers
Location: Abu Dhabi
Completion Date: March 2006 + January 2008 + August 2009
Duration: Multiple
Built-up Area: 25,000 square meters (combined)
Scope: Turnkey
The 43,500 square meter hospital includes 50 beds, and provides general
medicine, obstetrics and gynecology services. It includes an intensive care
unit for infants.
The project involved construction of additional buildings, including:
accommodations for visitors, mens quarters, womens quarters, and family
quarters; a mosque; electrical substation and generator/transformer
building; mechanical plant and pump room building; and a mortuary. The
grounds also include two tennis courts and a medium-size soccer field.
Ghayathi Community Hospital for Health
Authority Abu Dhabi (SEHA) at Ghayathi
-
52
Medical
Oral Solid Dosage (OSD) Production Facility for
Pfizer at King Abdullah Economic City
Client: Pfizer Inc.
Consultant: EGEC & Foster Wheeler
Location: Jeddah
Completion Date: January 2016
Duration: 21 months
Built-up Area: 11,579 square meters
Scope: Turnkey
This oral solid dose manufacturing facility will produce a wide range of
Pfizers medicines currently supplied to the Kingdom. The facility has direct
access to King Abdullah Port on the Red Sea for logistical ease and
transportation. The state of the art facility consists of:
An administration building
A production building, and,
Warehouse and utility buildings
The hygienic areas in the production building use High-Efficiency Particle
Arrestance (HEPA) filtration that remove 99.97% of particles from the air
that passes into and out of the building. An Environmental Management
System is also used to maintain pressure within the labs. All mechanical and
electrical systems are monitored and controlled by a building
management system. Due to the complex nature of such a project MEP
works were performed in-house by Amana.
-
Oil/Power/Water
53
High Schools for Abu Dhabi National Oil
Company at Sas Al Nakhl
Client: Abu Dhabi National Oil Company (ADNOC)
Consultant: Engineering Consultants Group (ECG)
Location: Abu Dhabi
Completion Date: December 2008
Duration: 16 months
Built-up Area: 30,000 square meters
Scope: Turnkey
Located in Sas Al Nakhl, the male and female high school consists of two
separate buildings, 2 floors each, and can accommodate a total of 800
students. Each of the school buildings also includes sport facilities (for
basketball, football and tennis), in addition to related structures such as
roads, walkways, prayer areas, playgrounds, soft and hard landscaping,
external shaded swimming pool and a car and bus park.
Having been awarded the project in July 2007, Amana was successfully
able to complete construction of the 30,000-square meter facility in 66
weeks; in time for the new academic year. The design of the school was
done to the highest world class standards with special attention given
towards the sports facilities and science labs, in accordance with
ADNOCs strategy to contribute to the social development of Abu Dhabi.
-
Oil/Power/Water
Female Educational Facilities for Abu Dhabi
National Oil Company at Sas Al Nakhl
Client: Abu Dhabi National Oil Company (ADNOC)
Consultant: Engineering Consultants Group
Location: Abu Dhabi
Completion Date: February 2007
Duration: 8 months + 12 months
Built-up Area: 19,000 square meters
Scope: Design-Build
The facility covers an area of approximately 24,000 square meters, and
was constructed over a period of 68 weeks in two phases. Phase 1, totaling
12,000 square meters, was completed within 32 weeks, with work on Phase
2 commencing immediately after. The completion of Phase 1 allowed
ADNOC to access the facility by June 2006 so that students were able to
attend scheduled training in August 2006.
The facility is comprised of three interconnected buildings. The central
building is composed of ground plus two floors while the other two
buildings flanking it are composed of ground plus one floor. The external of
the buildings will have stone cladding. These prestigious facilities have
been custom designed to suit the requirements of ADNOC.
54
-
Oil/Power/Water
55
Learning Center for Schlumberger Technical
Services at Al Shamkha
Client: Schlumberger Technical Services Inc.
Consultant: Morgan Consulting Engineers
Location: Abu Dhabi
Completion Date: March 2006 + January 2008 + August 2009
Duration: Multiple
Built-up Area: 25,000 square meters (combined)
Scope: Turnkey
This training center, the largest center being constructed for Schlumberger
in the region, is designed for the training of employees stationed within the
Middle East and Africa regions. The training center is constructed on an
area over 90,000 square meters with the first phase completed in 10
months (the substructure was completed in 58 days). External facilities such
as the concrete pads for rigging equipment were completed in 165 days
and the main building workshops were handed over 225 days from the
start of the project.
Phase 2 of the project, added an additional 1,900 square meters of built-
up area while Phase 3 added 5,000 square meters of built-up area.
-
District Cooling Plant for Barwa District Cooling
at Barwa City
Client: Barwa Real Estate
EPC Contractor: TAS Qatar
Location: Qatar
Completion Date: February 2010
Duration: 10 months
Built-up Area: 15,400 square meters
Scope: Civil, Finishes and Steel Structure
The built-up area of the facility is approximately 15,400 square meters and
required 350 tons of steel and 14,000 cubic meters of concrete to
construct. Constructed on a fast-track basis over 300 days with the testing
and commissioning of the chillers and pumps commencing on day 254.
The integrated efforts of all companies involved was essential to achieve
the necessary milestones.
Oil/Power/Water
56
-
Learning Center Accommodations for
Schlumberger at Al Shawamekh
Client: Schlumberger Middle East
Consultant: Parsons International
Location: Abu Dhabi
Completion Date: February 2010
Duration: 16 months
Built-up Area: 29,800 square meters (combined)
Scope: Multiple
The design of the Staff Accommodation was developed with a built-up
area of about 29,800m square meters adjacent to the Schlumberger
Learning Center and was constructed in accordance to the highest world
class standards to serve the Schlumberger Learning Center in the Middle
East Region and its neighbors.
The concrete based complex which consists of 6 identical blocks (G+2) will
serve as accommodation for around 492 Schlumberger trainees from
different parts of the world. A central amenities block is also designed to
facilitate entertainment & dining facilities to the trainees. A 2,000 square
meter indoor multipurpose court has been designed using pre-engineered
steel and is located a couple meters away from the accommodation
complex.
The awarding of this project follows on the successful completion of
Schlumberger's Middle East Learning Center in August 2006.
Oil/Power/Water
57
-
Non-Process Buildings for EMAL Smelter
Complex at Taweelah
Client: Emirates Aluminum Company Limited (EMAL)
Consultant: SNC Lavalin / Worley Parsons
Location: Abu Dhabi
Completion Date: May 2010
Duration: Multiple
Built-up Area: 270,000 square meters (combined)
Scope: Multiple
The entire EMAL project consisted of around 85,000 tons of complex steel
structures out of which Amana erected 65% (approximately 55,000 tons). In
total, the contracts involved the construction of 49 buildings distributed
between the following packages:
1. Steel erection of main potline buildings, carbon building and the
installation of the onshore and offshore conveyor system. The
installation includes 4km of conveyors, with intermediate steel
structure transfer towers with a height of 50m, including the
installation of the structure itself, the conveyor belts, pulleys,
compressor pipes and firefighting works.
2. Turnkey construction of over 30 non-process buildings, as well as cast
house offices and service buildings.
3. Steel fabrication of various steel structures for the green carbon
plant and other scopes such as the rod shop conveyor and packing
coke recovery system.
Oil/Power/Water
58
-
Oil/Power/Water
59
Thermal Energy Solar Power 100 MW CCP Plant
(Shams 1) for Shams Power Company
Client: UTE Abener Teyma Emirates I
Consultant: URG Group
Location: Abu Dhabi
Completion Date: September 2010 + June 2011 + November 2011
Duration: 8 months + 8 months + 11 months
Built-up Area: 6,000 square meters + 9,800 square meters + 9,800
square meters
Amana was awarded three contracts for the construction of a wind barrier and
plant buildings and facilities for the UAEs first Thermal Energy Solar Power located
near Madinat Zayed in Abu Dhabi.
Amanas scope of work included the design and construction of:
Wind barrier
HTF storage
Diesel oil storage tanks
Steam turbine building foundation works as well as the supply and erection of the building structure
HTF and booster heater foundations
Technical and non-technical buildings
Water treatment plant
Administration building
Laboratory
Workshops
CCM solar field building
Additionally, our associate company, Amana Pipeline Construction was awarded
four subcontracts on the project:
Complete assembly of 9,216 solar module reflectors.
Solar Field erection of the assembled solar module reflectors including the intermediate and central supports.
Engineering, Design, Procurement of Materials, Fabrication, Transport, Erection and Commissioning of the Water and Fuel Oil Storage Tanks.
Mechanical Erection of the Solar Field Piping.
-
Retail
60
IKEA Doha Store for Bawabat Al Shamal Real
Estate at Festival City
Client: Bababet Al Shamal Real Estate Co. (BASREC)
Consultant: AED / BSBG / MACE
Location: Qatar
Completion Date: February 2012
Duration: 12 months
Built-up Area: 76,000 square meters
Scope: Turnkey
Amana, in a joint venture with QACC, constructed the first phase of the
Doha Festival City Project, the IKEA Doha store. This was a typical pre-cast /
structural steel / in-situ concrete structure comprising of a:
Basement level car park
Ground level car park
First and Second floor
Warehouse
Showrooms
Restaurants
Kitchens
Offices
The project was fast tracked with the tenant obtaining access to certain
areas of the project while construction was progressing in others. Safety,
health and environmental considerations were paramount as parts of the
project were handed over to the client; nevertheless, the project was one
of the first in Qatar to be monitored by the Ministry of Environment with
respect to Construction Environmental Management Plan (CEMP)
regulations. Stringent Qatar Civil Defense demands were met and the store
opened ahead of schedule.
-
Retail
Lulu Hypermarkets for EMKE in the UAE
and Oman
Client: EMKE Group
Consultant: Design Concepts Consulting Architects
Location: Ajman + Fujairah + Oman
Completion Date: August 2004+September 2009+November 2009
Duration: 9 months + 12 months + 10 months
Built-up Area: 24,000 square meters + 17,100 square meters +
13,500 square meters
Amana has completed a number of facilities for the client including the
Lulu Hypermarket at Al Bustan (Ajman) as well as the Lulu Mall and
Hypermarket Expansion in Fujairah, the Lulu Hypermarket in Dibba and the
Lulu Hypermarket at Khasab (Oman).
Lulu Hypermarket (Dibba) is spread across 17,000 square meters and over
20,000 square meters of land. The building has a concrete faade
complete with authentic Islamic architecture including wind towers.
The 24,000 square-meter Lulu Hypermarket (Ajman) was undertaken with
First Gulf Bank and consists of a bank building, a hypermarket, and ground
floor parking. The building is reinforced concrete cement structure made
with precast columns.
61
-
62
Agricultural/Equestrian
Automotive
Project Name Office Built-Up
Area (m2)
Completion
Date
(dd/mm/yyyy)
Client
Port Silos for Dammam Agricultural Services at
Dammam Port
Khobar 36,600 04/07/2013 Arabian Agricultural Services Co.
(ARASCO)
Equestrian Facility for Emaar Properties at
Arabian Ranches
Abu Dhabi 12,671 27/09/2003 Emaar Properties
Abdali Agricultural Area Service Center for the
Public Authority of Agriculture at Jahra
Kuwait 12,500 24/12/2010 Public Authority of Agriculture
Affairs & Fish Resources
Flour Mill (600 tons per day) for Grain Silos & Flour
Mill Organization at Al Ahsa
Khobar 10,200 16/06/2014 Grain Silos & Flour Mill
Organization
Poultry Farm for Arabian Farms in Dubai Dubai 8,954 09/07/2000 Arabian Farms Ltd.
Animal Feed Plant for National Fodder at
Mussafah Industrial City
Abu Dhabi 8,608 17/10/2001 Emirates Link Maltauro L.L.C.
Accommodation & Open Shed for National
Fodder Plant at Mussafah Industrial City
Abu Dhabi 8,400 30/10/2004 Emirates International Invest Co.
Additional Storage Facility for National Fodder
Plant at Mussafah Industrial City
Abu Dhabi 6,000 19/03/2004 Emirates International Invest Co.
Storage Facility for Emirates Flour & Animal Feed
Factory at Mina Zayed
Abu Dhabi 5,657 28/12/2002 General Industry Corporation
(Senaat)
Feed Mill for Dammam Agricultural Services at
Dammam
Khobar 5,000 05/04/2013 Arabian Agricultural Services Co.
(ARASCO)
Extension of World Cup Quarantine Stables for
Meydan at Ned Al Sheba
Northern
Emirates
4,925 04/01/2008 Meydan LLC
Falcon Sanctuary for Sh. Sultan Bin Zayed Al
Nahyan at Warsan Farm
Abu Dhabi 4,000 11/09/2002 Public Works Department
Onion Storage Facility for Abu Dhabi Agriculture
Department in Western Region
Abu Dhabi 3,485 20/05/2001 Abu Dhabi Municipality
Horse Stables for H.H. Sh. Mohammed Al Thani at
Umm Qarn
Doha 2,775 25/09/2002 H.H. Shk. Mohammed Al Thani
Stables for the Office of His Highness the President
at Al Wathba
Abu Dhabi 2,731 10/07/1999 Private Dept. of H.H. Sheikh
Zayed
Feed Mill for Van Aarsen International Northern
Emirates
2,546 13/07/2002 Van Aarsen International
Flat Storage Facility for ARASCO at Al Kharj Jeddah 2,338 13/12/2014 Arabian Agricultural Services Co.
(ARASCO)
Agricultural Advisory Institute for Abu Dhabi
Municipality at Al Liwa
Abu Dhabi 1,490 27/05/2002 Family Construction Est.
Stables for H.H. Sh. Tahnoon Bin Zayed at Al
Wathba
Abu Dhabi 1,016 31/07/2001 Private Dept. of H.H. Sheikh
Zayed
Cold Storage Facility for Mr. Mohammed Bin
Masaood
Abu Dhabi 600 07/10/2000 Advanced Horticulture Co. WLL
Stables for H.H. Shk. Tahnoon Bin Zayed Al
Nahyan at Al Wathba
Abu Dhabi 480 21/03/1998 H.H. Shk. Tahnoon Bin Zayed Al
Nahyan
Market Facility for Abu Dhabi Agriculture
Department at Baniyas
Abu Dhabi 432 02/04/2003 Al Ryum Contracting & General
Transportation Est.
Project Name Office Built-Up
Area (m2)
Completion
Date
(dd/mm/yyyy)
Client
Parts Distribution Center for Al Futtaim Motors at
Dubai Investments Park
Dubai 54,154 27/01/2007 Al Futtaim Real Estate
Motor World Development (Phase 1) for Aldar
Properties at Sweihan
Abu Dhabi 40,000 15/05/2011 Aldar Properties PJSC
-
For an up-to-date listing, visit www.amanabuildings.com/industries
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Office, Training Center and Warehouse for Isuzu
Motors at Jebel Ali Free Zone
Dubai 22,900 25/05/2017 Jebal Ali Free Zone Authority
Logistics Facility for Diesel Technic at Jebel Ali
Free Zone
Dubai 16,392 28/06/2013 Diesel Technic (M.E) FZE
MEP Work for Arabian Vehicle & Trucks Industry's
Green Field at King Abdullah Economic City
Jeddah 11,835 29/03/2015 Arabian Vehicle & Trucks Industry
Co. Ltd.
Volvo Truck Production Facility for Arabian
Vehicle & Trucks Industry at King Abdullah
Economic City
Jeddah 11,835 12/05/2015 Arabian Vehicle & Trucks Industry
Co. Ltd.
Car Showroom & Workshop for Al Tayer Motors at
Haleefath
Northern
Emirates
10,473 10/01/2011 Al Tayer Motors LLC
Warehouse and Office for Abdul Latif Jameel
Heavy Equipments in Jeddah
Jeddah 8,535 31/12/2015 Abdul Latif Jameel Heavy
Equipments
Caterpillar Workshop Extension for Mohamed
Abdul Rahman Al Bahar at Sharjah Industrial Area
Northern
Emirates
8,448 13/06/2010 Mr. Mohamed Abdul Rahman Al
Bahar
Steel Structures for Toyota at Doha Industrial Area Doha 7,260 23/06/2016 Andullah Abdul Ghani & Partners
Rubber Factory for Al Dobowi Group at Al Hamra Northern
Emirates
7,015 13/06/2008 Al Dobowi Group LLC
Chrysler, Jeep and Dodge Showroom and
Bodyshop for Al Futtaim Motors at Sharjah
Industrial Area
Northern
Emirates
6,295 16/07/2011 Al Futtaim Real Estate
Showroom for United Motors Agency at Al Hassa Khobar 5,756 12/07/2008 United Motors Agency (UMA)
Warehouse Extension for Diesel Technic at Jebel
Ali Free Zone
Dubai 3,267 25/06/2008 Diesel Technic (M.E) FZE
Erection of Aramco Bus Service Facility for
Earadat Transport Company at Dammam
Khobar 3,063 20/03/2012 Zamil Steel Industries
Automobile Facility for United Motors Agency at
Jubail Industrial City
Khobar 2,800 01/03/2010 United Motors Agency (UMA)
Car Showroom & Offices for Al Massar Leasing at
Shuwaikh
Kuwait 1,000 20/08/2007 Al Massar Leasing and
Investment Co.
Infiniti Showroom for Al Babtain Group at Al Rai Kuwait 850 09/09/2007 Al Babtain Group
Automotive
Aviation Project Name Office
Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Cargo Building for Emirates SkyCargo at Dubai
South Al Maktoum International Airport
Dubai 75,065 08/10/2013 Emirates Airline
MEP Work for Presidential Flight Second Hangar
at Abu Dhabi Airport
Dubai 19,580 05/02/2016 Presidential Flight
Second Hangar for Presidential Flight at Abu
Dhabi Airport
Dubai 19,580 04/02/2016 Presidential Flight
Airport Staff Access and Control Facility (ASACF)
for Hamad International Airport
Doha 13,366 29/05/2013 New Doha International Airport
(NDIA) Steering Committee
Goodrich Aircraft MRO Facility for Dubai Ports
Authority at Jebel Ali Free Zone
Abu Dhabi 11,750 07/06/2007 Dubai Ports Authority
Office Building for Oman Air at Seeb Sohar 5,698 29/01/2010 Oman Air
Spares Center for Airbus at Dubai Airport Free
Zone
Northern
Emirates
4,806 08/04/2007 Airbus
Cold Room Stores for Emirates Flight Catering at
Al Rowaiyah Third
Dubai 10,510 11/10/2014 Emirates Flight Catering
Extension Towards Gate 13 for Emirates Flight
Catering at Dubai International Airport
Dubai 3,805 15/12/2014 Emirates Flight Catering
-
64
Aviation
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Fuel Farm Buildings for the Department of Civil
Aviation at Al Maktoum International Airport
Dubai 4,547 04/07/2008 Dubai Department of Civil
Aviation
MEP Work for the Extension Towards Gate 13 for
Emirates Flight Catering at Dubai International
Airport
Dubai 3,804 14/02/2015 Emirates Flight Catering
Helicopter Maintenance Workshop for Motor Sich
at Sharjah Airport International Free Zone
Northern
Emirates
2,260 24/02/2012 Motor Sich
Terminal Building and Hangar Extension for
Maldivian Air Taxi at Ibrahim Nasir International
Airport (aka Male International Airport)
Colombo 2,258 31/01/2007 Maldivian Air Taxi (Pte) Ltd.
Workshop & Offices for Motor Sich at Sharjah
Airport International Free Zone
Northern
Emirates
265 31/07/2007 Motor Sich
Food Processing
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Infant Nutritional Products Manufacturing Plant
for Almarai at Al Kharj
Jeddah 91,361 31/08/2011 Almarai Company
Hadco Process Plant for Almarai at Hail Jeddah 54,443 16/02/2013 Almarai Company
Juice Factory for Gulf Union Foods at Riyadh Riyadh 52,603 22/02/2013 Gulf Union Foods Company
Fruit Cold Store for Del Monte Saudi Arabia at Al
Khomra
Jeddah 51,200 01/11/2009 Del Monte Saudi Arabia
Inbound Warehouse for Almarai at Al Kharj Jeddah 41,493 14/10/2010 Almarai Company
Food Processing Plant for Brasil Foods (BRF) at
Khalifa Industrial Zone Abu Dhabi (KIZAD)
Dubai 39,718 15/07/2013 Brasil Foods (BRF)
Bakery Production Facility for Almarai at Al Kharj Jeddah 38,649 14/06/2010 Almarai Company
Bakery for Western Bakeries at Hail Jeddah 34,452 30/11/2015 Almarai Company
Manufacturing Facility for MARS Saudi Arabia at
King Abdullah Economic City
Jeddah 28,864 31/12/2013 MARS Saudi Arabia
Hadco Accommodations for Almarai at Al Kharj Jeddah 26,586 01/11/2012 Almarai Company
Dairy Production Facility for National Dairy in Al
Ain
Abu Dhabi 21,431 10/08/2015 National Dairy Company
Cheese Plant Expansion for Almarai's Central
Processing Plant (CPP) 2 at Kharj
Jeddah 20,209 14/12/2016 Almarai Company
Production & Logistics Facility, Offices and
Warehouse for Nestle Dubai at Techno Park
Dubai 18,580 15/06/2010 Nestle Dubai Manufacturing LLC
MEP Work for Al Dahra Kohinoor's Rice Mill at
Khalifa Industrial Zone Abu Dhabi (KIZAD)
Abu Dhabi 17,000 29/02/2016 Al Dahra Kohinoor LLC
Rice Mill for Al Dahra Kohinoor at Khalifa Industrial
Zone Abu Dhabi (KIZAD)
Abu Dhabi 17,000 29/02/2016 Al Dahra Kohinoor LLC
Office & Logistic Facility for Almarai at Dubai
Industrial City
Dubai 14,336 14/10/2012 Almarai Company
Depot Complex for Almarai at Abha Riyadh 13,967 12/03/2014 Almarai Company
Food Processing Sheds for Al Nafees International
Manufacturing at Dubai Industrial City
Dubai 11,475 30/03/2016 Al Nafees International
Manufacturing LLC
3PL Facility for Areej Vegetable Oil & Derivatives
in Muscat
Sohar 9,300 17/03/2014 Areej Vegetable Oils &
Derivatives SAOG
Accommodation Expansion (Phase 8) for Almarai
at Sadiyat Island
Abu Dhabi 9,218 27/08/2014 Saudi Amana Contracting Co. -
Riyadh
MEP Work on the Food Factory, Warehouse and
Office for MAM Food Company at Dubai
Industrial City
Dubai 8,720 17/05/2015 MAM Food Company LLC
Food Factory, Warehouse and Office for MAM
Food Company at Dubai Industrial City
Dubai 8,720 17/05/2015 MAM Food Company LLC
Food Production Facility for Al Islami at Dubai
Investments Park
Dubai 7,871 04/03/2015 Dubai Co-operative Society (Al
Islami Foods Co.)
-
65
For an up-to-date listing, visit www.amanabuildings.com/industries
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Sport Facilities for Almarai Hadco at Hail Jeddah 6,600 12/07/2013 Almarai Company
Cold Store for DIP Offices at Dubai Investments
Park
Northern
Emirates
6,397 18/04/2007 Dubai Investment Park
Project Falcon for Nabisco Arabia at Dammam
First Industrial
Khobar 6,044 28/11/2011 Nabisco Arabia Co. Ltd.
Electrical Work on Project Falcon for Nabisco at
Dammam 1st Industrial City
Khobar 6,044 31/12/2011 Nabisco Arabia Co. Ltd.
Accommodations for Almarai at Al Kharj Jeddah 5,822 31/08/2010 Almarai Company
Depot for Almarai in Ras Al Khaimah Dubai 4,683 09/08/2015 Almarai Emirates LLC
Cold Store Building for Suma Fruits at Ardiyah Kuwait 4,498 29/01/2009 Suma Fruits International Co.
Warehouse for Seville Products at Al Quoz Dubai 4,342 14/06/2017 Seville Products Ltd. (LLC)
Cold Store Facility for Almarai at Nizwa Sohar 2,500 14/01/2013 Almarai Company
Blow Moulding Department Dry Store for Almarai
at Al Karj
Jeddah 2,338 31/05/2016 Almarai Company
MEP Work for Almarai's Hadco Accommodations
(Type L6) at Hail
Jeddah 2,336 29/05/2016 Almarai Company
Hadco Accommodations (Type L6) for Almarai at
Hail
Jeddah 2,336 02/05/2015 Almarai Company
MEP Work for Cold Store Extension for Del Monte
at Al Aweer
Dubai 2,201 06/01/2016 Del Monte Foods
Cold Store Extension for Del Monte at Al Aweer Dubai 2,201 06/01/2016 Del Monte Foods
Dunkin' Donuts Bakery Production Facility for Al
Zahra Real Estate at Sharjah Industrial Area
Northern
Emirates
2,061 06/05/2007 Al Zahra Real Estate
VIP Resthouse for Almarai at Hail Jeddah 1,984 01/03/2013 Almarai Company
Ingredients Storage for Almarai's Plant 6 al Al
Kharj
Jeddah 1,615 30/12/2016 Almarai Company
Manufacturing Facility for MARS GCC at Jebel Ali Dubai 1,600 11/09/2016 MARS GCC
HVAC & Earthing Works for Non Process Building
on the Dora Dora Project at Al Kharj
Jeddah 907 07/06/2015 MEFSCO (Cargill / ARASCO JV)
Plant Grind Expansion for MEFSCO on the Dora
Dora Project at Al Kharj
Jeddah 907 07/06/2015 MEFSCO (Cargill / ARASCO JV)
Chemical Store for Almarai Hadco at Hail Jeddah 890 01/01/2015 Almarai Company
Factory Expansion for MARS at Jebel Ali Free
Zone
Dubai 707 12/04/2014 MARS LLC
Workshop and Storage for Almarai
Accommodations at Hadco
Jeddah 500 30/11/2013 Almarai Company
Bakery Main Entrance for Almarai at Al Kharj Jeddah 346 15/03/2011 Almarai Company
Cold Store for Gulf Union Foods in Riyadh Riyadh 289 07/09/2012 Gulf Union Foods Company
MV Network for Almarai at Hail Jeddah 250 14/04/2015 Almarai Company
Food Processing
Institutional
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Office Buildings (Balance Works) for Tecom at
Dubai Design District (D3)
Northern
Emirates
289,775 25/08/2014 Tecom Investments
External Works on the School of Business and
Plaza for Qatar University at Al Tarfa
Doha 84,743 01/10/2011 Qatar University
Civil Works Construction of Schools at Jaber Al
Ahmed City (N2 Neighborhood)
Kuwait 78,500 21/12/2013 Public Authority for Housing
Welfare
-
Institutional
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Ancillary Building, Car Park & Podium Phase 1B for
Masdar Institute of Science and Technology
(MIST) at Masdar City
Abu Dhabi 73,500 14/08/2010 Abu Dhabi Future Energy
Company (Masdar)
Six Warehouses and a Mosque for Abu Dhabi
Business Hub at Mussafah
Abu Dhabi 70,394 28/02/2018 Abu Dhabi Business Hub LLC
Schools (Phase 3 - Package 1) of the Abu Dhabi
Future School Program for Abu Dhabi General
Services (Musanada) across Abu Dhabi
Abu Dhabi 60,915 09/06/2013 Abu Dhabi General Services
(Musanada)
Technical & Customer Care Building for Ooredoo
at Mesaimeer
Doha 58,489 01/05/2013 Ooredoo
Ancillary Building, Car Park & Podium Phase 1A
for Masdar Institute of Science and Technology
(MIST) at Masdar City
Abu Dhabi 57,800 12/11/2009 Abu Dhabi Future Energy
Company (Masdar)
Regiment for the Directorate of Military Works at
Mafraq Camp
Abu Dhabi 50,000 06/10/2011 Directorate of Military Works
4 Schools (Package 2 - Stage 9) for Ashghal in
and around Doha
Doha 42,075 17/07/2016 Public Works Authority (Ashghal)
Newspaper Production Facility for Gulf News at
Dubai Investments Park
Dubai 42,000 15/09/2010 Al Nisr Publishing LLC
4 Schools (Package 4 - Stage 9) for Ashghal in
and around Doha
Doha 41,740 17/07/2016 Public Works Authority (Ashghal)
Housing for the Public Authority for Housing
Welfare at Sabah Al Ahmed City
Kuwait 37,070 08/02/2014 Public Authority for Housing
Welfare
Multi-Purpose Industrial Complex for Ajman
Municipality at Industrial Zone B
Northern
Emirates
29,765 25/10/2009 Ajman Municipality
International Doha Convention Center for Barwa
Real Estate at West Bay
Doha 29,650 27/02/2007 Barwa Real Estate
School of Business for Qatar University at Al Tarfa Doha 27,800 01/09/2011 Qatar University
Public Housing Project for Qatar Development
Bank at Duhail
Doha 22,337 17/12/2011 Qatar Development Bank
Warehouses & Workshops for Dubai Properties at
Dubai Studio City
Northern
Emirates
21,649 06/09/2009 Dubai Properties
Feed Mill for the Department of Presidential
Affairs at Al Ain
Northern
Emirates
21,250 02/01/2011 Department of Presidential Affairs
Boys Secondary School for Public Authority for
Housing Welfare at Doha
Kuwait 20,040 10/04/2013 China First Metallurgical Group
South Staff Accommodation Food Court for
Dubai Ports Authority at Jebel Ali Free Zone
Dubai 18,291 03/06/2009 Dubai Ports Authority
Three Schools (Phase 2 - Package 1) of the Abu
Dhabi Future School Program for Abu Dhabi
General Services (Musanada) near Abu Dhabi
Abu Dhabi 14,861 18/09/2011 Abu Dhabi General Services
(Musanada)
Sound Stages (Phases A & B) for Dubai Properties
at Dubai Studio City
Northern
Emirates
14,243 16/09/2009 Dubai Properties
Bilingual School for Al Kalema Al Tayeba at
Mahbola
Kuwait 13,318 23/10/2008 Al Kalema Al Tayeba Co.
New American School for Esol in Dubai DuBox 13,000 14/04/2018 Esol Education FZ LLC
Bank Branch for First Gulf Bank at Jebel Ali Free
Zone
Northern
Emirates
12,702 11/11/2010 First Gulf Bank
Commercial Office Building for HE Jumaa Ahmad
Juma Albawandi
Abu Dhabi 11,500 22/10/2009 Abu Dhabi Commercial
Properties LLC
Labor Accommodation for DIP Offices at Dubai
Investments Park
Northern
Emirates
11,169 03/05/2007 Dubai Investment Park
Central Kitchen & Office Building for Kuwait Hotels
Company at Al Farwaniyah
Kuwait 9,700 11/11/2008 Kuwait Hotels Co. (Safir
International Hotel Management)
Warehouse and Office Building for Expolanks
Holdings at Wellampitiya
Colombo 9,643 31/01/2013 Expolanka Holdings Plc.
Deira International School Extension for Al Futtaim
Group Real Estate at Dubai Festival City
CEC 9,612 13/01/2017 Al Futtaim Group Real Estate
Workshop and Showrooms for Kanoo Group at
Esnaad Phase 3 in Mussafah Industrial City
Abu Dhabi 8,813 11/11/2010 Kanoo Group
Villa Development for Al Futtaim Real Estate
Company at Al Dhiyafa
DuBox 8,346 28/02/2017 Eastern International LLC
66
-
67
For an up-to-date listing, visit www.amanabuildings.com/industries
Project Name Office Built-Up
Area (m2)
Completion Date
(dd/mm/yyyy) Client
Office Buildings (Balance Works) for Tecom at
Dubai Design District (D3)
United Arab
Emirates
289,775 25/08/2014 Tecom Investments
External Works on the School of Business and
Plaza for Qatar University at Al Tarfa
Qatar 84,743 01/10/2011 Qatar University
Civil Works Construction of Schools at Jaber Al
Ahmed City (N2 Neighborhood)
Kuwait 78,500 21/12/2013 Public Authority for Housing
Welfare
Ancillary Building, Car Park & Podium Phase 1B for
Masdar Institute of Science and Technology
(MIST) at Masdar City
United Arab
Emirates
73,500 14/08/2010 Abu Dhabi Future Energy
Company (Masdar)
Schools (Phase 3 - Package 1) of the Abu Dhabi
Future School Program for Abu Dhabi General
Services (Musanada) across Abu Dhabi
United Arab
Emirates
60,915 09/06/2013 Abu Dhabi General Services
(Musanada)
Technical & Customer Care Building for Ooredoo
at Mesaimeer
Qatar 58,489 01/05/2013 Ooredoo
Ancillary Building, Car Park & Podium Phase 1A
for Masdar Institute of Science and Technology
(MIST) at Masdar City
United Arab
Emirates
57,800 12/11/2009 Abu Dhabi Future Energy
Company (Masdar)
Regiment for the Directorate of Military Works at
Mafraq Camp
United Arab
Emirates
50,000 06/10/2011 Directorate of Military Works
4 Schools (Package 2 - Stage 9) for Ashghal in
and around Doha
Qatar 42,075 17/07/2016 Public Works Authority (Ashghal)
Newspaper Production Facility for Gulf News at
Dubai Investments Park
United Arab
Emirates
42,000 15/09/2010 Al Nisr Publishing LLC
4 Schools (Package 4 - Stage 9) f