    Contents

    Section 1: Introduction

    Who We Are 5

    Vision, Mission and Values 6

    What We Do 7

    Section 2: Project Profiles

    Agricultural/Equestrian 9

    Automotive 11

    Aviation 17

    Food Processing 22

    Institutional 28

    Logistics 34

    Manufacturing 47

    Medical 51

    Oil/Power/Water 53

    Retail 60

    Project List 62

    Section 3: Capabilities

    Amana Personnel 75

    Equipment Capabilities 76

    Financial Information 77

    Policies and Procedures 78

    Health, Safety and Environment 80

    Competitive Advantage 81

    Sustainable Construction 81

    Section 4: Corporate Overview

    Amana Contracting and Steel Buildings 83

    Corporate Office 84

    Abu Dhabi 84

    Dubai 84

    Northern Emirates 85

    Doha 85

    Kuwait 86

    Jeddah 86

    Khobar 86

    Riyadh 87

    Sohar 87

    Colombo 87

    DuBox 88

    3

  • Se

    ctio

    n 1

    Introduction

  • Who We Are

    A M A N A

    I t s i n t h e n a m e

    Amana Contracting Group

    Amana Contracting Group is a leading group of companies with a long

    standing and established reputation for servicing the industrial and

    commercial construction sectors across the Middle East through the

    integrated operations of its subsidiary companies:

    Amana Contracting and Steel Buildings

    (www.amanabuildings.com)

    Amana Pipeline Construction (www.amanapipelines.com)

    Amana Industries

    (www.amanaindustries.com)

    The Amana companies have been providing solutions to these sectors in

    the region for over 20 years. Today, the synergy provided within the Group

    allows the company to service these important sectors in a seamless

    manner in more than one way. Amanas commitment to total client

    satisfaction begins with its vision of becoming the preeminent leader of fast

    -track construction in the Gulf industrial and commercial markets,

    delivering total solutions to its clients. The ability of the company to

    achieve its vision is dependent on satisfying and retaining its clients who

    understand and value the element of time saving.

    Amana Contracting and Steel Buildings

    Founded in Abu Dhabi on September 12, 1993, Amana Contracting and

    Steel Buildings is today the regional leader in the design-build construction

    of industrial and commercial facilities across the Gulf. Structured in a

    decentralized manner, the company is able to respond to its clients needs

    in a very quick and efficient manner. The company has built its reputation

    on the ability to provide design-build solutions for extremely fast-track

    projects .

    Today, Amana Contracting and Steel Buildings has offices in the United

    Arab Emirates, Qatar, Kuwait, Saudi Arabia, Oman, Egypt and Sri Lanka.

    Each of these offices is independently run with capabilities to market,

    tender, design, procure and construct projects on a full design-build basis.

    Amana Pipeline Construction

    Amana Pipeline Construction is a specialized civil-mechanical contractor

    focused on mechanical process requirements of the oil/gas and chemical

    industries with presence across the UAE. With over 500 employees, the

    company is able to provide piping tanks, and process-related works on a

    complete design-build basis.

    Amana Industries

    Amana Industries is the structural steel fabrication arm of the Amana

    Group. With over 600 employees, the company is able to estimate, design,

    fabricate and erect specialized steelworks solutions across the Middle East.

    5

  • Vision Our Vision is to become the regional leader in designing, construction and

    commissioning of commercial and industrial buildings in the Middle East,

    Africa, and South East Asia

    Mission Our Mission is to provide our clients with the highest service quality, on time

    and budget delivery. We shall achieve this by creating a partnership

    between our employees, managers, and shareholders focused on

    executing our projects on Time, under Budget, and within the Quality

    requirements.

    We will perform this in the most efficient and productive manner such as to

    generate a reasonable return for our shareholders and ourselves.

    Values Our Values, basic and fundamental shall remain the guiding light in our

    dealings, internal and external. There will be the uncompromising

    foundations upon which we build our Mission.

    Integrity: the courage to maintain the right from the wrong without

    compromise

    Reliability: the ability to deliver on what we promise, without exception

    Accountability: the strength to be responsible for our own actions and

    decisions

    Competitive Advantage

    One Company

    One Vis ion

    One Future

    Our advantages come from being committed to exceeding our clients

    expectations, recruiting only the best talent, and in adapting a

    decentralized modus operandi that is connected via our information-

    sharing platform, AmanaTech.

    6

  • What We Do

    Amana is a Special Grade general contractor focused on the industrial

    and commercial construction markets across the Middle East. The

    company has in-house capabilities to develop a project from conception

    through construction to completion.

    Our services include:

    Design-Build Turnkey Solutions

    Based on the clients requirements and specifications, Amana leverages its

    internal competencies and experiences to streamline the project costs

    and provides the client with value engineered design. This would cover the

    full civil, architectural, structural steel, mechanical, electrical and external

    services scopes. Amana also obtains approval from authorities and

    proceeds to complete the turnkey construction of the project.

    Turnkey Construction Amana undertakes a project based on the requirements of the client as

    per pre-approved designs completed by a third party engineering/design

    office.

    Structural Steel Only

    The company designs fully the structural steel and undertakes the task of

    supplying and erecting the steel structures. This is typically done for large

    steel projects such as power plant and oilfield applications.

    7

  • Se

    ctio

    n 2

    Project Profiles

  • 9

    Equestrian Facility for Emaar Properties at

    Arabian Ranches

    Client: Emaar Properties

    Consultant: RMJM

    Location: Dubai

    Completion Date: September 2003

    Duration: 9 months

    Built-up Area: 12,500 square meters

    Scope: Turnkey

    This equestrian facility is located in the Arabian Ranches gated community

    amidst residential villas and other facilities.

    The project consisted of 8 typical stables, two accommodation facilities, a

    store, a service block and an electrical substation. The sub- and super-

    structures are designed in concrete, with a steel structure roofing system.

    The external appearance provides a local heritage-look complete with

    custom-made wooden doors and ironmongery. The facility is fitted with

    rubber flooring, feeding areas and other equestrian accessories.

    A special ventilation/exhaust system was provided for temperate control.

    The project was completed with paddock areas, water supply, and

    drainage systems.

    Agricultural/Equestrian

  • Agricultural/Equestrian

    World Cup Quarantine Stables Extension for the

    MeydanHorse Racing City at Nad Al Sheba

    Client: Meydan LLC

    Consultant: Teo. A. Khing Design Consultants

    Location: Dubai

    Completion Date: January 2008

    Duration: 3 months

    Built-up Area: 5,000 square meters

    Scope: Design-Build

    The MeydanHorse Racing City is a US$600 million facility offering horse

    racing, training tracks, stables, a museum, hotels, restaurants,

    entertainment clubs, plazas, towers and a boathouse.

    The 5 quarantine stables were constructed on a fast-track basis for use at

    the Dubai World Cup in March 2008. With a built-up area of 5,000 square

    meters, the facility also includes horse paths and specialized equestrian

    equipment. Due to the fast-track nature of the job, internal and external

    precast walls were used which allowed for the completion of the entire job

    in 3 months.

    10

  • 11

    Automotive

    Komatsu Warehouse and Office for Abdul Latif

    Jameel Heavy Equipment in Jeddah

    Client: Abdul Latif Jameel Co.

    Consultant: Talal Kurdi

    Location: Jeddah

    Completion Date: January 2016

    Duration: 14 months

    Built-up Area: 9,800 square meters

    Scope: Turnkey

    This project was awarded to Amana on a complete turnkey basis. The

    facility is to be used by Komatsu to display machines for sale and rent. It

    also incorporates a workshop area for maintenance, a warehouse for

    spare parts, washing area, training bay and administration building with an

    distinctive architectural facade.

  • Automotive

    12

    Motor World Development (Phase 1) for Aldar

    Properties at Sweihan

    Client: Aldar Properties

    Consultant: RMJM / AECOM

    Location: Abu Dhabi

    Completion Date: May 2011

    Duration: 12 months

    Built-up Area: 40,000 square meters

    Scope: Turnkey

    Aldar Properties is developing a new automotive development which will

    be dedicated to buying, selling and servicing both new and pre-owned

    cars.

    The development will comprise of both residential and mixed-use

    components, including a 3-star hotel with a business center and a variety

    of food outlets.

    Motor World is designed to be a one-stop shop for customers, providing all

    related services under one roof, including finance, insurance and

    registration services.

    Amana was awarded phase one of the project which involved the

    construction of 118 showrooms and associated facilities.

  • Automotive

    General Motors Logistics Facility for Danzas at

    Jebel Ali Free Zone

    Client: Danzas

    Consultant: Edara

    Location: Dubai

    Completion Date: May 2003

    Duration: 6 months

    Built-up Area: 14,000 square meters

    Scope: Design-Build

    Located Abu Dhabi bound on Sh. Zayed Road, this distribution center is

    used to store and transport spare parts for General Motors across the

    region.

    Having a total built-up area of 14,000 square meters on a plot area of

    43,000 square meters, this project was awarded and constructed on a fast-

    track basis. With a large clear span, this pre-engineered design-build

    facility was designed for the full utilization of the storage space and

    racking requirements for the rapid movement of goods.

    This facility has internal administration offices, a utilities building and a small

    security house.

    In July 2006, Amana completed a 13,000 square-meter warehouse and

    office expansion for the General Motors facility.

    13

  • Automotive

    Logistics Center for United Motors at Jebel Ali

    Free Zone

    Client: United Motors

    Consultant: Al Waha Engineering

    Location: Dubai

    Completion Date: September 2003

    Duration: 9 months

    Built-up Area: 12,000 square meters

    Scope: Turnkey

    A landmark project located in Jebel Ali Free Zone along the Sh. Zayed

    Road, this distinguished facility reaches a height of 18.2 meters with a total

    built-up area of 12,000 square meters, on a plot of 15,000 square meters.

    As the central distribution hub for heavy equipment and spare parts, this

    design-build facility was specifically developed by Amana to maximize the

    storage space by using a combination of multiple mezzanines and a

    central crane.

    The external construction of the building is enhanced by a simplistic

    approach, using a combination of glazing, composite aluminum cladding

    and pre-cast panels.

    14

  • Showroom for Liberty Automobiles at Sharjah

    Industrial Area

    Client: Liberty Automobiles

    Consultant: Horizon International Consulting Engineers

    Location: Sharjah

    Completion Date: January 2004

    Duration: 9 months

    Built-up Area: 14,000 square meters

    Scope: Turnkey

    The Liberty Automobiles Showroom, located in the busy area of Al Wahda

    Street in Sharjah, is the one of the worlds largest showrooms for General

    Motors. Constructed for H.H. Sheikh Khaled bin Abdul-Aziz Al Qasimi, the

    showroom is 140 meters in length and has a two-in-one elevation.

    This automotive facility consists of the showroom, a service center , an

    office complex and a pre-approved car sales area.

    15

    Automotive

  • Automotive

    Parts Distribution Center for Al Futtaim Motors at

    Dubai Investment Park

    Client: Al Futtaim Real Estate

    Consultant: Kling Consult

    Location: Dubai

    Completion Date: January 2007

    Duration: 12 months

    Built-up Area: 54,000 square meters

    Scope: Design-Build

    The landmark project, located on the Jebel AliLahbab Road within the

    Dubai Investment Park, consists of a 38,650 square-meter central

    warehouse, an 11,650 square-meter tire storage area, 1,650 square meters

    of ancillary buildings and 2,100 square meters of office space.

    The structures space frame works are designed to provide large storage

    space.

    The office area is elevated above the other structures and is finished with

    glazing, composite aluminum cladding and honeycomb panels with

    specially designed landscaping to enhance the elevation.

    16

  • Aviation

    17

    Spares and Repair Center for Airbus at Dubai

    Airport Free Zone

    Client: Airbus Middle East

    Consultant: Al Hashemi

    Location: Dubai

    Completion Date: April 2007

    Duration: 10 months

    Built-up Area: 5,000 square meters

    Scope: Turnkey

    The Airbus Spares and Repair Center is designed to stock a large inventory

    of parts manufactured by the aerospace giant, in addition to equipment

    from the companys various suppliers around the world.

    The facility is designed with stringent European specifications and consists

    of high quality finishes and external faade materials imported from

    Slovenia.

    In the past, regional airlines would send their electronic cabin systems to

    Germany for repair services. However, with the Dubai facility now

    operational, repairs can be done in the Middle East. The center also

    benefits from direct access to the apron at Dubai International Airport in

    order to maximize the speed and efficiency of transporting goods.

  • Aviation

    18

    Airport Staff Access and Control Facility

    (ASACF) for Hamad International Airport

    Client: NDIA Steering Committee

    Consultant: MACE International

    Location: Qatar

    Completion Date: May 2013

    Duration: 15 months

    Built-up Area: 13,336 square meters

    Scope: Turnkey

    The New Doha International Airport (NDIA) Steering Committee required

    the construction of a dedicated Airport Staff Access Control Facility

    (ASACF) to supplement other staff control points located at the new

    airport. The primary function of ASACF is to provide a dedicated building

    to manage the high volume of staff movement and to efficiently screen

    staff entering or leaving the airports Security Restricted Area.

    The project also included supporting administration and corresponding

    amenities and serve as an employment hub for bus drivers.

  • Aviation

    19

    Second Hangar for Presidential Flight at Abu

    Dhabi Airport

    Client: Presidential Flight

    Consultant: Technip TPS

    Location: Abu Dhabi

    Completion Date: September 2016

    Duration: 18 months

    Built-up Area: 19,580 square meters

    Scope: Turnkey

    The project involves the construction of an additional hangar for

    Presidential Flight at Abu Dhabi International Airport.

    Measuring in at 190 meters by 90 meters, the hangar can accommodate

    the largest wide-body aircrafts such as Boeing 747s, Boeing 777s, and,

    Airbus A380s.

    The hangars have been designed to accommodate either:

    Two Airbus A380s in Nose-in Position, or

    Two Boeing 747-800Fs in Nose-in or Tail-in Positions, or

    Two Boeing 787-8s or -9s in Nose-in or Tail-in position, and, one

    Airbus A320

  • Aviation

    20

    Cargo Building for Emirates SkyCargo at Dubai

    South Al Maktoum International Airport

    Client: Emirates Airlines

    Consultant: -

    Location: Dubai

    Completion Date: October 2013

    Duration: 11 months

    Built-up Area: 75,065 square meters

    Scope: Turnkey

    Emirates SkyCargo s new state-of-the-art cargo terminal is their primary

    facility at Al Maktoum International Airport and, from 2014, the new

    headquarters of operations having shifted their premise from Dubai

    International Airport.

    The terminal has an initial capacity to manage 700 000 tons of cargo per

    year with the ability to expand to meet future growth. It also provides

    Emirates SkyCargo with the space to have a larger perishables handling

    area, with a dedicated pharmaceutical storage area, enabling it to

    expand its cool chain products and services.

  • Aviation

    21

    Aircraft Maintenance, Repair & Overhaul (MRO)

    Facility for Goodrich at Jebel Ali Free Zone

    Client: Goodrich Corporation

    Consultant: Scott Wilson Kirkpatrick & Co. Ltd.

    Location: Dubai

    Completion Date: June 2007

    Duration: 7 months

    Built-up Area: 11,750 square meters

    Scope: Turnkey

    Located within Jebel Ali Free Zone, the Goodrich aircraft facility consists of

    a 10,000 square-meter maintenance and repair center with an attached

    two-level 1,000 square meter concrete office building.

    The facility offers a full range of maintenance, repair and overhaul services

    for components and systems for both commercial and military aerospace

    customers from Europe, the Middle East and Africa. The repair services

    offered will encompass components and systems from aircraft nacelle

    systems, cargo systems, de-icing systems, hoists and winches, senor systems

    and aircraft evacuation systems.

  • Food Processing

    22

    Cold Store for Shahini Cold Store at Second

    Industrial City Riyadh

    Client: Shahini Holding Group Co. Ltd.

    Consultant: Miebach Consulting

    Location: Riyadh

    Completion Date: February 2015

    Duration: 12 months

    Built-up Area: 29,195 square meters

    Scope: Turnkey

    This facility was built as part of Shahini Holding Group expansion plans to

    serve the central region of Saudi Arabia. Amanas scope was building of

    the cold store facility including all civil, structural, architectural and

    domestic MEP works and the below key items:

    Super flat slab

    Industrial doors

    Elevators

    Asphalt works

    Finishes

  • Cold Room Stores for Emirates Flight Catering at

    Al Rowaiyah Third

    Client: Emirates Airlines

    Consultant: ARTEC Architectural & Engineering

    Location: Dubai

    Completion Date: October 2014

    Duration: 12 months

    Built-up Area: 10,510 square meters

    Scope: Turnkey

    The cold rooms stores for Emirates Flight Catering are located Al Rowaiyah Third in

    Dubai and consists of the mentioned cold stores, freezers as well as offices and other

    amenities.

    The cold stores maintain an internal temperature of 2C to 18C whereas the

    freezers are chilled to a 20C. The cold stores and freezers account for about 90%

    of the total built-up area with the remaining area dedicated to offices, canteens

    and service blocks.

    Food Processing

    23

  • 24

    Food Processing Plant for Brasil Foods (BRF) at

    Khalifa Industrial Zone Abu Dhabi (KIZAD)

    Client: Brasil Foods (BRF)

    Consultant: Derby Design Consultant LLC

    Location: Abu Dhabi

    Completion Date: November 2014

    Duration: 16 months

    Built-up Area: 39,718 square meters

    Scope: Turnkey

    Project Consists of a Food Processing Facility including 5 Production Lines,

    Inbound cold and dry food storage, outbound cold storage, Dry Storage,

    Offices, Mosque, MEP Plant and support Facilities (Industrial Building

    (Including Mezzanine), Service Building, Dry Raw Material Store,

    Maintenance Boiler Room, Refrigeration Equipment Building, Packing

    Material Store Building, Fire & Water Pumps, Waste Water Treatment Plant,

    Access Control, Mosque, Workers Waiting Room).

    This state of the art facility has a production capacity of approximately 80

    thousand tons of frozen food products including hamburgers, pizzas, frozen

    pies, breaded items and specialty meats and marinated processed foods.

    The facility is also the largest for the South American company outside its

    home continent and the first tenant to setup within the food

    manufacturing cluster in KIZAD.

    Food Processing

  • Food Processing

    Factory and Offices for Del Monte Foods in

    Dubai and Jeddah

    Client: Del Monte Foods

    Consultant: Orion Engineering + SAK Engineering

    Location: Dubai + Jeddah

    Completion Date: October 2006 + September 2009

    Duration: 10 months + 18 months

    Built-up Area: 15,500 square meters + 51,200 square meters

    Scope: Multiple

    The fresh-cut factory for fruit juices is a state-of-the-art facility and the first

    factory of its kind to be constructed at the fruit and vegetable market in Al

    Aweer. The facilities were constructed on a fast-track basis in order to

    meet the growing requirements of the industry.

    The factory is constructed on an area of 29,000 square meters and was

    completed within 10 months using 360 tons of steel. The facility also has

    approximately 1,700 square meters of built-up office space. The factory

    has been designed as a pre-engineered steel structure and the office

    facilitates have been designed as reinforced concrete cement structures

    with hollow core slabs.

    Amana was also awarded a turnkey contract for the Del Monte factory at

    Khorma, Saudi Arabia. The project consists of 4 main buildings: the cold

    store, administration building, labor accommodation, and workshop. Most

    of the external areas are concrete flooring and the rest is asphalt. The cold

    store contains 33 loading/unloading entries to store and distribute all types

    of fruit. It also consists of 46 refrigerators and 19 banana repining

    equipment. The factory is constructed on an area of 86,500 square meters

    and was completed within 18 months using 2,000 tons of steel.

    25

  • 26

    Food Processing

    Production, Logistics Facility, and Offices for

    Nestle Dubai at Techno Park

    Client: Nestle Dubai Manufacturing LLC

    Location: Dubai

    Completion Date: June 2010

    Duration: 13 months

    Built-up Area: 18,500 square meters

    Scope: Turnkey

    The project is located at Techno Park; it is an extension of the existing

    Nestle facility and consists of:

    An office building

    Utility and production area

    Packaging area

    A warehouse

    The complete building is precast except for the warehouse which Amana

    changed from precast to steel in order to provide schedule benefits to the

    client. The project comprises of very high standards and stringent quality

    requirements, being a food processing plant. The completion of the

    project involved 4 milestones for each of the areas described above, in

    order to accomplish the installation of the process equipment.

    For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green

  • Infant Nutritional Products Manufacturing Plant &

    Accommodations for Almarai at Al Kharj

    Client: Almarai Company Limited

    Consultant: Almarai Company Limited

    Location: Riyadh

    Completion Date: November 2011 + February 2012

    Duration: 25 months + 14 months

    Built-up Area: 47,000 square meters + 9,000 square meters

    Scope: Design-Build

    The project involves the construction of infant nutritional manufacturing

    facility consisting of the main process building as well as other facilities

    such as administration building, laboratory, EMS, transformers, substations,

    a central utility building, piping bridge, underground water storage tanks

    and pump houses.

    The main process building has a total floor area of 40,000 square meters

    and is composed mainly of insulated precast cladding and precast

    structural elements as well as a CIP dryer tower.

    The accommodation buildings will house staff that will be employed at the

    new plant. The 2 four-storey buildings are concrete structures and include

    standard external insulated concrete block wall cladding. Amenities within

    the accommodation include basketball, volleyball and tennis courts, a

    football field, swimming pool, and, laundry and gym facilities.

    Amana is also constructing a number of facilities for Almarai including an

    inbound warehouse (41, 000 square meters), poultry processing plant with

    staff accommodations (55,000 square meters), and a large-scale bakery

    (39,000 square meters).

    27

    Food Processing

  • Institutional

    28

    Ancillary Building, Car Park & Podium (1A/1B)

    for Masdar Institute of Science & Technology

    Client: Abu Dhabi Future Energy Company (Masdar)

    Consultant: WSP Group

    Location: Abu Dhabi

    Completion Date: November 2010

    Duration: 23 months

    Built-up Area: 131,000square meters

    Scope: Turnkey

    Phase A of the project included extensive excavation and earth retention

    for utility tunnels and for huge underground tanks. The project required

    very detailed planning to deal with extreme temperatures to manage cast

    -in-place concrete activities and over 2,500 laborers on two shifts. The

    facility consists of underground tanks, two levels of parking garage to

    accommodate 2,200 cars, a high-end Personal Rapid Transportation (PRT)

    station to transport people, Freight Rapid Transportation (FRT) marshalling

    area, media wall, a water feature wall and landscape, MEP systems, and,

    glass reinforced concrete perimeter wall system.

    Phase B required an expedited schedule so Amana worked with MASDAR

    to utilize a highly sustainable precast with 65% ground granulated blast

    furnace slag (GGBS) as a cement replacement in the concrete mix design.

    New techniques were also introduced to reduce the use of water and

    natural resources to reduce carbon footprint; 99% of the waste generated

    from construction activities was recycled.

    For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green

  • Institutional

    International Doha Convention Center for Barwa

    Real Estate at West Bay

    Client: Barwa Real Estate Company

    Consultant: WS Atkins & Partners Overseas WLL

    Location: Qatar

    Completion Date: November 2007

    Duration: 7 months

    Built-up Area: 30,000 square meters

    Scope: Turnkey

    The facility, constructed on 70,000 square meters of land in the Dafna Area

    in West Bay, Doha, has a total built-up area of almost 30,000 square meters

    and is designed with international specifications requiring over 2,000 tons

    of steel.

    This project was awarded to Amana on a fast-track, turnkey basis. Due to

    this short time duration, the design and construction of the facility were

    performed simultaneously.

    29

  • Institutional

    Office Buildings (Balance Works) for Tecom at

    Dubai Design District (D3)

    Client: Tecom Investments

    Consultant:

    Location: Dubai

    Completion Date: August 2014

    Duration: 10 months

    Built-up Area: 289,775 square meters

    Scope: Turnkey

    The project consists of completing the three main office buildings (North,

    South and Core Buildings) that had been previously abandoned by

    another contractor. Office space starts at 800 square feet and include

    either Courtyard View, Standard View or Burj View.

    30

  • Institutional

    31

    Sound Stages (Phases A & B) for Dubai

    Properties at Dubai Studio City

    Client: Dubai Properties / Dubai Studio City

    Consultant: Cansult Maunsell

    Location: Dubai

    Completion Date: June 2009

    Duration: 12 months

    Built-up Area: 14,250 square meters

    Scope: Turnkey

    The contract, awarded by TECOM Investment, involved the construction of

    a world-class Sound Stages Complex. The Sound Stages Complex is a

    concrete framed structure covered with sound-proof glass. The building

    boasts a unique architectural design with the roof specially designed to

    suspend a mobile facility for movie shooting. Since a vast majority of the

    lead items for the facility were imported from the US, the time-frame for the

    project was very sensitive.

  • Institutional

    32

    Technical & Customer Care Building for

    Ooredoo at Mesaimeer

    Client: Ooredoo

    Consultant: Architectural Consulting Group

    Location: Doha

    Completion Date: May 2013

    Duration: 18 months

    Built-up Area: 58,500 square meters

    Scope: Turnkey

    The 58,500 square meter cast in-situ concrete structure houses Qtels

    technical and customer care facilities consisting of a basement level, a

    ground floor with two additional floors and a penthouse. Amana

    completed work on the project in 18 months.

  • Institutional

    33

    Three Schools for the Abu Dhabi Future School

    Program for Abu Dhabi General Services

    Client: Abu Dhabi General Services PJSC (Musanada)

    Consultant: Dewan Architects and Engineers

    Location: Abu Dhabi

    Completion Date: September 2011

    Duration: 8 months

    Built-up Area: 15,000 square meters

    Scope: Turnkey

    The project comprises of the construction of three (3) Kindergartens

    Schools of similar designs in the following areas in Abu Dhabi:

    Abu Dhabi Island Kindergarten

    Al Shawamekh Kindergarten

    Al Rahba Kindergarten

    All Kindergartens are only ground floor and accommodate approximately

    360 students within 18 class rooms. The Kindergartens are supported by

    offices, library, special education, physical education, break out spaces,

    and a small cafeteria. In addition to these, there is a nursery space, as well

    as an outdoor learning spaces, parking, drop offs and other external

    areas.

    The GFA of each of these kindergartens is approximately 5,000 square

    meters and each is required to be handed-over within a fast-track period

    of 8 months prior to the start of the new academic year.

    The buildings are intended to achieve Two (2) Pearls Estidama Rating and

    will also include CCTV security systems, PA/Music systems and the BMS

    System. The buildings will also include all the MEP Services requirements

    including fire alarm/fire fighting, etc. as required by the prevailing

    government codes.

    For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green

  • Logistics

    34

    Distribution Center for IKEA at Dubai South

    Client: GRDI

    Consultant:

    Location: Dubai

    Completion Date: July 2015

    Duration: 12 months

    Built-up Area: 104,578 square meters

    Scope: Design-Build

    The IKEA Dubai project was quite a unique accomplishment for a number

    of reasons. First, the building standards and specifications set by IKEA far

    exceed the typical standards found in this part of the world. Secondly, IKEA

    operates a rigorous system called IWAY that monitors, controls and

    protects the health, safety and welfare of construction workers on its

    projects requiring Amana and its entire supply chain to fully comply with

    global best practices. Thirdly, IKEAs approval process during the entire

    construction requires the smallest details to be approved by multiple

    stakeholders thus potentially leading to significant delays.

    Nevertheless, Amana was up to the challenge and based on GRDIs

    feedback, Amana excelled at the work performed.

  • Logistics

    35

    Warehouse Extension for LOGIX at Jebel Ali Free

    Zone

    Client: M.H. Alshaya Co.

    Project Management: Mace International

    Location: Dubai

    Completion Date: February 2012

    Duration: 10 months

    Built-up Area: 26,600 square meters

    Scope: Design-Build

    The facility, located in the south sector of Jebel Ali Free Zone, consists of a

    built-up area of 26,600 square meters on a plot of 74,000 square meter. The

    structure, visible from Sheikh Zayed Road, is designed and constructed to

    the highest standards needed to serve the warehousing and logistic needs

    of the client.

    The warehouse will provide logistical support for major retail brands as BHS,

    Debenhams, Mothercare and Starbucks.

    The original warehouse was also constructed by Amana and was

    completed in October 2005 with a total built-up area of 25,000 square

    meters. Once the extension has been completed, Alshaya would have

    more than doubled its warehousing capacity.

  • Container Terminal Maintenance Building for

    PCFC at Jebel Ali Industrial Area

    Client: Ports, Customs, & Free Zone Corporation

    Consultant: Arenco Architectural and Engineering

    Location: Dubai

    Completion Date: February 2005

    Duration: 10 months

    Built-up Area: 27,750 square meters

    Scope: Turnkey

    The Ports, Customs and Free Zone Corporation required the turnkey

    construction of a purpose-built facility designed to maintain the

    transportation containers being hauled by trailers. This facility has a total

    built-up area that exceeds 25,000 square meters with a height of 18

    meters.

    This facility encompasses heavy steel sections and thick concrete floor

    slabs to accommodate different types of heavy live loads, huge roll-up

    doors and deep trenches. The facility is complete with various mechanical,

    electrical, and plumbing services including a fully air conditioned

    workshop, compressed air systems, and special electrical requirements.

    The building also houses various administration units and offices

    36

    Logistics

  • Logistics

    Light Industrial Units for Dubai Ports Authority at

    Jebel Ali Free Zone

    Client: Dubai Ports Authority

    Consultant: Al Wasl Al Jadeed Consultants

    Location: Dubai

    Completion Date: December 2005 + January 2007 + August 2007

    Duration: 10 months

    Built-up Area: 63,800 square meters + 27,500 square meters +

    34,000 square meters

    The Light Industrial Units (Phases 8, 9 and 12) were awarded to Amana on a

    fast-track basis. These developments are composed of various rental units

    used for light industries and general warehousing for companies in the free

    zone.

    Phase 8 consists of 21 independent buildings with a total built-up area of

    63,800 square meters on a plot of 159,000 square meters. Phase 9 consist of

    40 warehouses with a total built-up area of 27,500 square meters. Phase 12

    consists of 8 warehouse blocks totaling 64 units with a total built-up area of

    34,000 square meters.

    These high quality, thermally insulated purpose-built units are fitted with

    offices and tow cargo entry/exit points, a ramp for forklifts and a loading

    dock for containers and trucks, located at the rear of each unit.

    37

  • Logistics Centre for Panalpina Gulf

    at Dubai South

    Client: Hi Flow Logistics 2 DWC

    End-User: Panalpina Gulf

    Location: Dubai

    Completion Date: September 2016

    Duration: 12 months

    Built-up Area: 42,000 square meters

    Scope: Design-Build

    The Distribution Centre for Panalpina on Plot FB-140 at Dubai Logistics City is

    designed as a strategic hub, specifically located to take advantage of the

    increase in air cargo with the ongoing expansion of Al Maktoum

    International Airport.

    The gross internal areas (GIAs) of the three warehouses measure in at

    16,900 square meters for Warehouse A, 10,200 square meters for

    Warehouse B, and, 10,200 square meters for Warehouse C. With 2,900

    square meters of office space, the total GIA measures in at 42,000 square

    meters.

    38

    Logistics

  • Logistics Center, Workshops and Offices for

    Ocean Fair International Group at Technopark

    Client: Ocean Fair International Group

    Consultant: -

    Location: Dubai

    Completion Date: February 2016

    Duration: 12 months

    Built-up Area: 34,960 square meters

    Scope: Design-Build

    The logistics center for Ocean Fair International Group consists of a

    regional office with two storage facilities, a temperature controlled

    warehouse, and a unique cold store as it is a single box and not a box

    within a box - a first for the region.

    The cold store is divided into several chambers and has temperatures

    ranging from -22 degrees Celsius to 22 degrees Celsius. The cold store

    ground floor measures in at 16,120 square meters with a 3,040 square

    meter mezzanine level. The temperature controlled warehouse covers

    11,080 square meters whereas the G+2 office measures in at 3,900 square

    meters.

    Logistics

    39

  • Cold Store Complex for Gulf Warehousing

    Company at Doha Industrial Area

    Client: Gulf Warehousing Company (GWC)

    Consultant: Gulf Engineering & Industrial Consultancy

    Location: Qatar

    Completion Date: February 2006

    Duration: 12 months

    Built-up Area: 32,500 square meters

    Scope: Turnkey

    Situated on 47,300 square meters of land, this 32,500 square-meter

    distribution facility is designed to contain over 43,000 pallet positions. The

    complex is a high-bay facility with an internal very narrow aisle (VNA)

    racking system and state-of-the-art material handling equipment with a

    useable height of up to 13.5 meters. The entire facility was designed and

    constructed in less than 210 days.

    The facility offers a number of storage environments including:

    4,200 pallets of frozen storage (30C to 20C)

    4,200 pallets of chill storage (0C to 12C)

    12,604 pallets of A/C storage (12C to 18C)

    22,776 pallets of ambient storage

    The complex is also equipped with a positive power air system to

    significantly reduce dust contamination and humidity levels, as well as a

    state-of-the-art security system consisting of full CCTV coverage and card-

    swipe access gates.

    40

    Logistics

  • Logistics Facilities for Agility Logistics in Dubai

    and Kuwait

    Client: Agility Logistics

    Consultant: - - + Orion Engineering

    Location: Kuwait + Dubai

    Completion Date: November 2006 + August 2008

    Duration: 6 months + 14 months

    Built-up Area: 51,200 square meters + 79,000 square meters

    Scope: Multiple

    This state-of-the-art high density storage facility is the single largest

    warehouse construction within the Jebel Ali Free Zone. The facility consists

    of the warehouse itself, a regional office building, a canteen block as well

    as other service amenities.

    The project required over 3,500 tons of structural steel, 100,000 square

    meters of cladding and 20,000 cubic meters of concrete. The warehouse

    facility is equipped with a sophisticated fire fighting system with a sprinkler

    grid, involving 120km of piping equal to the distance between Jebel Ali

    and Abu Dhabi.

    Storage within the warehouse is based on a Very Narrow Aisle (VNA)

    racking system stretching up to a height of over 14 meters. Given the

    weight of the goods and the time-sensitivity of the project, Amana

    implemented Laser Screed technology during the construction. Laser

    Screed is an innovative concrete slab technology which is comparatively

    quicker, high-strength, ultra-durable and safer than conventional

    reinforcement.

    Amana was also awarded numerous contracts from Agility for the

    construction of logistic facilities in Jeddah and Kuwait, a retail distribution

    center in Dubai, and a cold store facility in Doha.

    Logistics

    41

  • Logistics

    Workshops, Warehouses, Shops & Showrooms

    for Dubai Maritime City at Port Rashid

    Client: Dubai Maritime City (DMC)

    Consultant: Turner Construction International LLC

    Location: Dubai

    Completion Date: August 2007

    Duration: 12 months

    Built-up Area: 85,000 square meters

    Scope: Design-Build

    The buildings were constructed on 377,700 square meters of reclaimed

    land at Port Rashid and required over 5,000 tons of steel. The facilities were

    constructed on a fast-track basis in order to meet DMCs scheduled

    launch date.

    The 11 buildings have a total built-up area of 85,000 square meters and

    were built using special architectural and structural elements to create the

    required curve roofs for each structure.

    Amana was also awarded a contract to construct additional industrial

    workshops totaling 22,000 square meters and is tailored towards small

    enterprises servicing the maritime industry.

    42 For more information on Amanas sustainable construction capabilities, visit www.amanabuildings.com/green

  • Logistics

    Industrial Warehouse for Ajman Free Zone

    Authority at Ajman New Industrial Complex

    Client: Ajman Free Zone Authority

    Consultant: Cansult Engineers & Project Managers

    Location: Ajman

    Completion Date: December 2007

    Duration: 12 months

    Built-up Area: 95,000 square meters

    Scope: Turnkey

    The 95,000 square-meter facility consists of 15 warehouses that were

    constructed on 200,000 square meters of land requiring over 2,300 tons of

    steel and 12 months to complete. Amana modified the original design to

    allow for increased operational flexibility and to maximize free space

    availability.

    The first warehouse was ready in 210 days from the start of construction

    with a completion of an additional warehouse every 10 days thereafter.

    Amana was also awarded the contract for the second phase of the

    Ajman New Industrial Complex in Al Jurf. The second phase consists of

    labor accommodations, an administration building, a mosque and a

    security station. This project complements phase one of the Ajman New

    Industrial Complex. Both phases were completed within 300 days.

    43

  • Logistics

    Logistics Village Qatar (H1A & H2A Warehouses)

    for Gulf Warehousing Company at Al Wukair

    Client: Gulf Warehousing Company (GWC)

    Consultant: Gulf Engineering & Industrial Consultancy

    Location: Qatar

    Completion Date: March 2013

    Duration: 12 months

    Built-up Area: 58,782 square meters

    Scope: Turnkey

    The project involved the construction of two buildings (H1A & H2A) using

    super flat flooring system. Building H1A has a built-up area of 27,282 square

    meters while H2A has a built-up area of 31,500 square meters. Both

    buildings were constructed simultaneously within 12 months.

    Logistics Village Qatar is the countrys largest and most modern integrated

    and self-contained full-service logistics center.

    44

  • Logistics

    45

    Qatofin Logistics Terminal for Alfred Talke

    Logistic Services at Mesaieed Industrial City

    Client: Qatofin

    Operator: Alfred Talke Logistic Services

    Location: Qatar

    Completion Date: October 2008

    Duration: 20 months

    Built-up Area: 57,000 square meters

    Scope: Design-Build

    The terminal complex comprises of 4 buildings featuring a 56,000 square-

    meter covered warehouse, 14,500 square-meter silo storage, two fully

    automatic and mobile packaging lines, 20 loading docks, and, container

    storage and transshipment with a capacity of 1,000teu.

    The complex sits on an area of approximately 100,000 square meters and

    was constructed on a design-build basis in 20 months.

  • Logistics

    Distribution Center for Landmark Group at Dubai

    South

    Client: Landmark Group

    Consultant: Al Wasl Al Jadeed Consultants

    Location: Dubai

    Completion Date: February 2016

    Duration: 12 months

    Built-up Area: 86,641 square meters

    Scope: Turnkey

    The project involved the construction of 3 warehouses providing Landmark

    Group with over 66,000 square meters of storage space (23,000 square

    meters in Warehouse 1 and 21,500 square meters each in Warehouse 2

    and 3). The height of the buildings at their ridge is 17 meters and includes

    over 45km of firefighting piping.

    Warehouse 1 will be used for storing products destined for Babyshop stores,

    Warehouse 2 will provide storage for Lifestyle and Beauty Bay products,

    and Warehouse 3 will store Home Box and Shoemart products.

    In addition to the warehouses, offices & maintenance, service and other

    miscellaneous buildings were also constructed.

    The project required 4260 tons of steel to construct and was completed in

    14 months.

    46

  • Manufacturing

    47

    Pre-Cast Factory for Mammut Industries at

    Dubai Techno Park

    Client: Mammut Industries

    Consultant: Image Consultant

    Location: Dubai

    Completion Date: May 2005

    Duration: 9 months

    Built-up Area: 35,500 square meters

    Scope: Turnkey

    One of the worlds largest automated pre-cast factories, this development

    covers a total built-up area exceeding 35,000 square meters on a plot in

    excess of 100,000 square meters.

    The facility encompasses a high level of design complexity as it includes:

    extensive machine foundations, networks of underground trenches,

    batching plants, multilevel conveyor systems and stand-alone ovens for

    fast curing, among other features.

    The factory is fully automated with a network of conveyor systems,

    requiring a complex ground floor slab inclusive of various inserts and

    precise floor casting tolerances suitable to support the robotized

    processes.

    The level of mechanical, electrical, and plumbing works is extensive and

    includes multiple uses of bus bars, and specialty electrical and

    compressed air services for manufacturing process.

  • Manufacturing

    48

    Advanced Technology Facility for ABB Electrical

    Industries at Dammam 2nd Industrial City

    Client: ABB Electrical Industries Co Ltd.

    Consultant: PMG

    Location: Dammam

    Completion Date: March 2015

    Duration: 15 months

    Built-up Area: 18,010 square meters

    Scope: Design-Build

    This landmark project for ABB, built on a 67,599 square meter plot, consists

    of a main building divided into 4 main areas:

    Offices area (Ground + Mz.): 4,544 square meter Plant Rooms: 1,104 square meter PPHV Area: 9,500 square meter Drivers and Motors Area: 2,025 square meter It also has some service facilities around the main building such as the

    guardhouses and the MV/LV rooms and the main entrance canopy.

    PPHV Area (the main component in the project) is the manufacturing area

    for GIS Switchgear, and this is considered the first of its kind production

    area in KSA. The design criteria governing the project are very stringent

    and require an air-tight envelop, and require to maintain positive pressure

    inside the building as the biggest enemy in the manufacturing of GIS

    Switchgear is dust, and hence to have a dust controlled environment in a

    dusty environment is the main challenge in the project, and the whole

    PPHV Area was designed and constructed to act in a similar manner as a

    large air-lock.

    The slab on grade in the project was also constructed with very stringent

    guidelines maintaining a tolerance of + 3mm across the whole facility.

  • Manufacturing

    Cotton Yarn Manufacturing Plant for United

    Textiles at Fujairah Free Zone

    Client: United Textiles FZE

    Consultant: Concept Consulting Engineers

    Location: Fujairah

    Completion Date: March 2007

    Duration: 10 months

    Built-up Area: 24,000 square meters

    Scope: Turnkey

    The 24,000 square meter facility is uniquely designed with the distance

    between the columns measuring 24 meters which is equal to the distance

    between the frames, joined together with jack beams. The air conditioning

    ducts have also been designed to flow up from tunnels underneath the

    ground floor slab.

    At full operations, the factory is capable of producing 10,000 tons of high

    quality ring-spun yarn per year. The facility has also been designed to allow

    for future expansion and growth.

    49

  • Plasterboard Factory for Saint-Gobain Gyproc

    Emirates Industries at Industrial City Abu Dhabi

    Client: Saint-Gobain Gyproc Emirates Industries Ltd.

    Consultant: GIBB Ltd.

    Location: Abu Dhabi

    Completion Date: June 2009

    Duration: 15 months

    Built-up Area: 22,000 square meters

    Scope: Turnkey

    The 22,000 square meter facility, located at Industrial City 1 in Abu Dhabi,

    was constructed on a turnkey basis and was completed within 15 months.

    The mandate of the contract included all civil, MEP, structural steel and

    sheet cladding works in addition to the installation of process equipment

    and the erection of a 27-metre high gypsum rock silo platform. The project

    required nearly 1650 tons of hot rolled structural steel.

    The factory constitutes a first phase of the project and will produce 30

    million square meters of plasterboard annually. Engineering studies for the

    second phase of the project, which will be a ready-mix joint filler factory, is

    currently under way.

    Manufacturing

    50

  • 51

    Medical

    51

    Client: Schlumberger Technical Services Inc.

    Consultant: Morgan Consulting Engineers

    Location: Abu Dhabi

    Completion Date: March 2006 + January 2008 + August 2009

    Duration: Multiple

    Built-up Area: 25,000 square meters (combined)

    Scope: Turnkey

    The 43,500 square meter hospital includes 50 beds, and provides general

    medicine, obstetrics and gynecology services. It includes an intensive care

    unit for infants.

    The project involved construction of additional buildings, including:

    accommodations for visitors, mens quarters, womens quarters, and family

    quarters; a mosque; electrical substation and generator/transformer

    building; mechanical plant and pump room building; and a mortuary. The

    grounds also include two tennis courts and a medium-size soccer field.

    Ghayathi Community Hospital for Health

    Authority Abu Dhabi (SEHA) at Ghayathi

  • 52

    Medical

    Oral Solid Dosage (OSD) Production Facility for

    Pfizer at King Abdullah Economic City

    Client: Pfizer Inc.

    Consultant: EGEC & Foster Wheeler

    Location: Jeddah

    Completion Date: January 2016

    Duration: 21 months

    Built-up Area: 11,579 square meters

    Scope: Turnkey

    This oral solid dose manufacturing facility will produce a wide range of

    Pfizers medicines currently supplied to the Kingdom. The facility has direct

    access to King Abdullah Port on the Red Sea for logistical ease and

    transportation. The state of the art facility consists of:

    An administration building

    A production building, and,

    Warehouse and utility buildings

    The hygienic areas in the production building use High-Efficiency Particle

    Arrestance (HEPA) filtration that remove 99.97% of particles from the air

    that passes into and out of the building. An Environmental Management

    System is also used to maintain pressure within the labs. All mechanical and

    electrical systems are monitored and controlled by a building

    management system. Due to the complex nature of such a project MEP

    works were performed in-house by Amana.

  • Oil/Power/Water

    53

    High Schools for Abu Dhabi National Oil

    Company at Sas Al Nakhl

    Client: Abu Dhabi National Oil Company (ADNOC)

    Consultant: Engineering Consultants Group (ECG)

    Location: Abu Dhabi

    Completion Date: December 2008

    Duration: 16 months

    Built-up Area: 30,000 square meters

    Scope: Turnkey

    Located in Sas Al Nakhl, the male and female high school consists of two

    separate buildings, 2 floors each, and can accommodate a total of 800

    students. Each of the school buildings also includes sport facilities (for

    basketball, football and tennis), in addition to related structures such as

    roads, walkways, prayer areas, playgrounds, soft and hard landscaping,

    external shaded swimming pool and a car and bus park.

    Having been awarded the project in July 2007, Amana was successfully

    able to complete construction of the 30,000-square meter facility in 66

    weeks; in time for the new academic year. The design of the school was

    done to the highest world class standards with special attention given

    towards the sports facilities and science labs, in accordance with

    ADNOCs strategy to contribute to the social development of Abu Dhabi.

  • Oil/Power/Water

    Female Educational Facilities for Abu Dhabi

    National Oil Company at Sas Al Nakhl

    Client: Abu Dhabi National Oil Company (ADNOC)

    Consultant: Engineering Consultants Group

    Location: Abu Dhabi

    Completion Date: February 2007

    Duration: 8 months + 12 months

    Built-up Area: 19,000 square meters

    Scope: Design-Build

    The facility covers an area of approximately 24,000 square meters, and

    was constructed over a period of 68 weeks in two phases. Phase 1, totaling

    12,000 square meters, was completed within 32 weeks, with work on Phase

    2 commencing immediately after. The completion of Phase 1 allowed

    ADNOC to access the facility by June 2006 so that students were able to

    attend scheduled training in August 2006.

    The facility is comprised of three interconnected buildings. The central

    building is composed of ground plus two floors while the other two

    buildings flanking it are composed of ground plus one floor. The external of

    the buildings will have stone cladding. These prestigious facilities have

    been custom designed to suit the requirements of ADNOC.

    54

  • Oil/Power/Water

    55

    Learning Center for Schlumberger Technical

    Services at Al Shamkha

    Client: Schlumberger Technical Services Inc.

    Consultant: Morgan Consulting Engineers

    Location: Abu Dhabi

    Completion Date: March 2006 + January 2008 + August 2009

    Duration: Multiple

    Built-up Area: 25,000 square meters (combined)

    Scope: Turnkey

    This training center, the largest center being constructed for Schlumberger

    in the region, is designed for the training of employees stationed within the

    Middle East and Africa regions. The training center is constructed on an

    area over 90,000 square meters with the first phase completed in 10

    months (the substructure was completed in 58 days). External facilities such

    as the concrete pads for rigging equipment were completed in 165 days

    and the main building workshops were handed over 225 days from the

    start of the project.

    Phase 2 of the project, added an additional 1,900 square meters of built-

    up area while Phase 3 added 5,000 square meters of built-up area.

  • District Cooling Plant for Barwa District Cooling

    at Barwa City

    Client: Barwa Real Estate

    EPC Contractor: TAS Qatar

    Location: Qatar

    Completion Date: February 2010

    Duration: 10 months

    Built-up Area: 15,400 square meters

    Scope: Civil, Finishes and Steel Structure

    The built-up area of the facility is approximately 15,400 square meters and

    required 350 tons of steel and 14,000 cubic meters of concrete to

    construct. Constructed on a fast-track basis over 300 days with the testing

    and commissioning of the chillers and pumps commencing on day 254.

    The integrated efforts of all companies involved was essential to achieve

    the necessary milestones.

    Oil/Power/Water

    56

  • Learning Center Accommodations for

    Schlumberger at Al Shawamekh

    Client: Schlumberger Middle East

    Consultant: Parsons International

    Location: Abu Dhabi

    Completion Date: February 2010

    Duration: 16 months

    Built-up Area: 29,800 square meters (combined)

    Scope: Multiple

    The design of the Staff Accommodation was developed with a built-up

    area of about 29,800m square meters adjacent to the Schlumberger

    Learning Center and was constructed in accordance to the highest world

    class standards to serve the Schlumberger Learning Center in the Middle

    East Region and its neighbors.

    The concrete based complex which consists of 6 identical blocks (G+2) will

    serve as accommodation for around 492 Schlumberger trainees from

    different parts of the world. A central amenities block is also designed to

    facilitate entertainment & dining facilities to the trainees. A 2,000 square

    meter indoor multipurpose court has been designed using pre-engineered

    steel and is located a couple meters away from the accommodation

    complex.

    The awarding of this project follows on the successful completion of

    Schlumberger's Middle East Learning Center in August 2006.

    Oil/Power/Water

    57

  • Non-Process Buildings for EMAL Smelter

    Complex at Taweelah

    Client: Emirates Aluminum Company Limited (EMAL)

    Consultant: SNC Lavalin / Worley Parsons

    Location: Abu Dhabi

    Completion Date: May 2010

    Duration: Multiple

    Built-up Area: 270,000 square meters (combined)

    Scope: Multiple

    The entire EMAL project consisted of around 85,000 tons of complex steel

    structures out of which Amana erected 65% (approximately 55,000 tons). In

    total, the contracts involved the construction of 49 buildings distributed

    between the following packages:

    1. Steel erection of main potline buildings, carbon building and the

    installation of the onshore and offshore conveyor system. The

    installation includes 4km of conveyors, with intermediate steel

    structure transfer towers with a height of 50m, including the

    installation of the structure itself, the conveyor belts, pulleys,

    compressor pipes and firefighting works.

    2. Turnkey construction of over 30 non-process buildings, as well as cast

    house offices and service buildings.

    3. Steel fabrication of various steel structures for the green carbon

    plant and other scopes such as the rod shop conveyor and packing

    coke recovery system.

    Oil/Power/Water

    58

  • Oil/Power/Water

    59

    Thermal Energy Solar Power 100 MW CCP Plant

    (Shams 1) for Shams Power Company

    Client: UTE Abener Teyma Emirates I

    Consultant: URG Group

    Location: Abu Dhabi

    Completion Date: September 2010 + June 2011 + November 2011

    Duration: 8 months + 8 months + 11 months

    Built-up Area: 6,000 square meters + 9,800 square meters + 9,800

    square meters

    Amana was awarded three contracts for the construction of a wind barrier and

    plant buildings and facilities for the UAEs first Thermal Energy Solar Power located

    near Madinat Zayed in Abu Dhabi.

    Amanas scope of work included the design and construction of:

    Wind barrier

    HTF storage

    Diesel oil storage tanks

    Steam turbine building foundation works as well as the supply and erection of the building structure

    HTF and booster heater foundations

    Technical and non-technical buildings

    Water treatment plant

    Administration building

    Laboratory

    Workshops

    CCM solar field building

    Additionally, our associate company, Amana Pipeline Construction was awarded

    four subcontracts on the project:

    Complete assembly of 9,216 solar module reflectors.

    Solar Field erection of the assembled solar module reflectors including the intermediate and central supports.

    Engineering, Design, Procurement of Materials, Fabrication, Transport, Erection and Commissioning of the Water and Fuel Oil Storage Tanks.

    Mechanical Erection of the Solar Field Piping.

  • Retail

    60

    IKEA Doha Store for Bawabat Al Shamal Real

    Estate at Festival City

    Client: Bababet Al Shamal Real Estate Co. (BASREC)

    Consultant: AED / BSBG / MACE

    Location: Qatar

    Completion Date: February 2012

    Duration: 12 months

    Built-up Area: 76,000 square meters

    Scope: Turnkey

    Amana, in a joint venture with QACC, constructed the first phase of the

    Doha Festival City Project, the IKEA Doha store. This was a typical pre-cast /

    structural steel / in-situ concrete structure comprising of a:

    Basement level car park

    Ground level car park

    First and Second floor

    Warehouse

    Showrooms

    Restaurants

    Kitchens

    Offices

    The project was fast tracked with the tenant obtaining access to certain

    areas of the project while construction was progressing in others. Safety,

    health and environmental considerations were paramount as parts of the

    project were handed over to the client; nevertheless, the project was one

    of the first in Qatar to be monitored by the Ministry of Environment with

    respect to Construction Environmental Management Plan (CEMP)

    regulations. Stringent Qatar Civil Defense demands were met and the store

    opened ahead of schedule.

  • Retail

    Lulu Hypermarkets for EMKE in the UAE

    and Oman

    Client: EMKE Group

    Consultant: Design Concepts Consulting Architects

    Location: Ajman + Fujairah + Oman

    Completion Date: August 2004+September 2009+November 2009

    Duration: 9 months + 12 months + 10 months

    Built-up Area: 24,000 square meters + 17,100 square meters +

    13,500 square meters

    Amana has completed a number of facilities for the client including the

    Lulu Hypermarket at Al Bustan (Ajman) as well as the Lulu Mall and

    Hypermarket Expansion in Fujairah, the Lulu Hypermarket in Dibba and the

    Lulu Hypermarket at Khasab (Oman).

    Lulu Hypermarket (Dibba) is spread across 17,000 square meters and over

    20,000 square meters of land. The building has a concrete faade

    complete with authentic Islamic architecture including wind towers.

    The 24,000 square-meter Lulu Hypermarket (Ajman) was undertaken with

    First Gulf Bank and consists of a bank building, a hypermarket, and ground

    floor parking. The building is reinforced concrete cement structure made

    with precast columns.

    61

  • 62

    Agricultural/Equestrian

    Automotive

    Project Name Office Built-Up

    Area (m2)

    Completion

    Date

    (dd/mm/yyyy)

    Client

    Port Silos for Dammam Agricultural Services at

    Dammam Port

    Khobar 36,600 04/07/2013 Arabian Agricultural Services Co.

    (ARASCO)

    Equestrian Facility for Emaar Properties at

    Arabian Ranches

    Abu Dhabi 12,671 27/09/2003 Emaar Properties

    Abdali Agricultural Area Service Center for the

    Public Authority of Agriculture at Jahra

    Kuwait 12,500 24/12/2010 Public Authority of Agriculture

    Affairs & Fish Resources

    Flour Mill (600 tons per day) for Grain Silos & Flour

    Mill Organization at Al Ahsa

    Khobar 10,200 16/06/2014 Grain Silos & Flour Mill

    Organization

    Poultry Farm for Arabian Farms in Dubai Dubai 8,954 09/07/2000 Arabian Farms Ltd.

    Animal Feed Plant for National Fodder at

    Mussafah Industrial City

    Abu Dhabi 8,608 17/10/2001 Emirates Link Maltauro L.L.C.

    Accommodation & Open Shed for National

    Fodder Plant at Mussafah Industrial City

    Abu Dhabi 8,400 30/10/2004 Emirates International Invest Co.

    Additional Storage Facility for National Fodder

    Plant at Mussafah Industrial City

    Abu Dhabi 6,000 19/03/2004 Emirates International Invest Co.

    Storage Facility for Emirates Flour & Animal Feed

    Factory at Mina Zayed

    Abu Dhabi 5,657 28/12/2002 General Industry Corporation

    (Senaat)

    Feed Mill for Dammam Agricultural Services at

    Dammam

    Khobar 5,000 05/04/2013 Arabian Agricultural Services Co.

    (ARASCO)

    Extension of World Cup Quarantine Stables for

    Meydan at Ned Al Sheba

    Northern

    Emirates

    4,925 04/01/2008 Meydan LLC

    Falcon Sanctuary for Sh. Sultan Bin Zayed Al

    Nahyan at Warsan Farm

    Abu Dhabi 4,000 11/09/2002 Public Works Department

    Onion Storage Facility for Abu Dhabi Agriculture

    Department in Western Region

    Abu Dhabi 3,485 20/05/2001 Abu Dhabi Municipality

    Horse Stables for H.H. Sh. Mohammed Al Thani at

    Umm Qarn

    Doha 2,775 25/09/2002 H.H. Shk. Mohammed Al Thani

    Stables for the Office of His Highness the President

    at Al Wathba

    Abu Dhabi 2,731 10/07/1999 Private Dept. of H.H. Sheikh

    Zayed

    Feed Mill for Van Aarsen International Northern

    Emirates

    2,546 13/07/2002 Van Aarsen International

    Flat Storage Facility for ARASCO at Al Kharj Jeddah 2,338 13/12/2014 Arabian Agricultural Services Co.

    (ARASCO)

    Agricultural Advisory Institute for Abu Dhabi

    Municipality at Al Liwa

    Abu Dhabi 1,490 27/05/2002 Family Construction Est.

    Stables for H.H. Sh. Tahnoon Bin Zayed at Al

    Wathba

    Abu Dhabi 1,016 31/07/2001 Private Dept. of H.H. Sheikh

    Zayed

    Cold Storage Facility for Mr. Mohammed Bin

    Masaood

    Abu Dhabi 600 07/10/2000 Advanced Horticulture Co. WLL

    Stables for H.H. Shk. Tahnoon Bin Zayed Al

    Nahyan at Al Wathba

    Abu Dhabi 480 21/03/1998 H.H. Shk. Tahnoon Bin Zayed Al

    Nahyan

    Market Facility for Abu Dhabi Agriculture

    Department at Baniyas

    Abu Dhabi 432 02/04/2003 Al Ryum Contracting & General

    Transportation Est.

    Project Name Office Built-Up

    Area (m2)

    Completion

    Date

    (dd/mm/yyyy)

    Client

    Parts Distribution Center for Al Futtaim Motors at

    Dubai Investments Park

    Dubai 54,154 27/01/2007 Al Futtaim Real Estate

    Motor World Development (Phase 1) for Aldar

    Properties at Sweihan

    Abu Dhabi 40,000 15/05/2011 Aldar Properties PJSC

  • For an up-to-date listing, visit www.amanabuildings.com/industries

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Office, Training Center and Warehouse for Isuzu

    Motors at Jebel Ali Free Zone

    Dubai 22,900 25/05/2017 Jebal Ali Free Zone Authority

    Logistics Facility for Diesel Technic at Jebel Ali

    Free Zone

    Dubai 16,392 28/06/2013 Diesel Technic (M.E) FZE

    MEP Work for Arabian Vehicle & Trucks Industry's

    Green Field at King Abdullah Economic City

    Jeddah 11,835 29/03/2015 Arabian Vehicle & Trucks Industry

    Co. Ltd.

    Volvo Truck Production Facility for Arabian

    Vehicle & Trucks Industry at King Abdullah

    Economic City

    Jeddah 11,835 12/05/2015 Arabian Vehicle & Trucks Industry

    Co. Ltd.

    Car Showroom & Workshop for Al Tayer Motors at

    Haleefath

    Northern

    Emirates

    10,473 10/01/2011 Al Tayer Motors LLC

    Warehouse and Office for Abdul Latif Jameel

    Heavy Equipments in Jeddah

    Jeddah 8,535 31/12/2015 Abdul Latif Jameel Heavy

    Equipments

    Caterpillar Workshop Extension for Mohamed

    Abdul Rahman Al Bahar at Sharjah Industrial Area

    Northern

    Emirates

    8,448 13/06/2010 Mr. Mohamed Abdul Rahman Al

    Bahar

    Steel Structures for Toyota at Doha Industrial Area Doha 7,260 23/06/2016 Andullah Abdul Ghani & Partners

    Rubber Factory for Al Dobowi Group at Al Hamra Northern

    Emirates

    7,015 13/06/2008 Al Dobowi Group LLC

    Chrysler, Jeep and Dodge Showroom and

    Bodyshop for Al Futtaim Motors at Sharjah

    Industrial Area

    Northern

    Emirates

    6,295 16/07/2011 Al Futtaim Real Estate

    Showroom for United Motors Agency at Al Hassa Khobar 5,756 12/07/2008 United Motors Agency (UMA)

    Warehouse Extension for Diesel Technic at Jebel

    Ali Free Zone

    Dubai 3,267 25/06/2008 Diesel Technic (M.E) FZE

    Erection of Aramco Bus Service Facility for

    Earadat Transport Company at Dammam

    Khobar 3,063 20/03/2012 Zamil Steel Industries

    Automobile Facility for United Motors Agency at

    Jubail Industrial City

    Khobar 2,800 01/03/2010 United Motors Agency (UMA)

    Car Showroom & Offices for Al Massar Leasing at

    Shuwaikh

    Kuwait 1,000 20/08/2007 Al Massar Leasing and

    Investment Co.

    Infiniti Showroom for Al Babtain Group at Al Rai Kuwait 850 09/09/2007 Al Babtain Group

    Automotive

    Aviation Project Name Office

    Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Cargo Building for Emirates SkyCargo at Dubai

    South Al Maktoum International Airport

    Dubai 75,065 08/10/2013 Emirates Airline

    MEP Work for Presidential Flight Second Hangar

    at Abu Dhabi Airport

    Dubai 19,580 05/02/2016 Presidential Flight

    Second Hangar for Presidential Flight at Abu

    Dhabi Airport

    Dubai 19,580 04/02/2016 Presidential Flight

    Airport Staff Access and Control Facility (ASACF)

    for Hamad International Airport

    Doha 13,366 29/05/2013 New Doha International Airport

    (NDIA) Steering Committee

    Goodrich Aircraft MRO Facility for Dubai Ports

    Authority at Jebel Ali Free Zone

    Abu Dhabi 11,750 07/06/2007 Dubai Ports Authority

    Office Building for Oman Air at Seeb Sohar 5,698 29/01/2010 Oman Air

    Spares Center for Airbus at Dubai Airport Free

    Zone

    Northern

    Emirates

    4,806 08/04/2007 Airbus

    Cold Room Stores for Emirates Flight Catering at

    Al Rowaiyah Third

    Dubai 10,510 11/10/2014 Emirates Flight Catering

    Extension Towards Gate 13 for Emirates Flight

    Catering at Dubai International Airport

    Dubai 3,805 15/12/2014 Emirates Flight Catering

  • 64

    Aviation

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Fuel Farm Buildings for the Department of Civil

    Aviation at Al Maktoum International Airport

    Dubai 4,547 04/07/2008 Dubai Department of Civil

    Aviation

    MEP Work for the Extension Towards Gate 13 for

    Emirates Flight Catering at Dubai International

    Airport

    Dubai 3,804 14/02/2015 Emirates Flight Catering

    Helicopter Maintenance Workshop for Motor Sich

    at Sharjah Airport International Free Zone

    Northern

    Emirates

    2,260 24/02/2012 Motor Sich

    Terminal Building and Hangar Extension for

    Maldivian Air Taxi at Ibrahim Nasir International

    Airport (aka Male International Airport)

    Colombo 2,258 31/01/2007 Maldivian Air Taxi (Pte) Ltd.

    Workshop & Offices for Motor Sich at Sharjah

    Airport International Free Zone

    Northern

    Emirates

    265 31/07/2007 Motor Sich

    Food Processing

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Infant Nutritional Products Manufacturing Plant

    for Almarai at Al Kharj

    Jeddah 91,361 31/08/2011 Almarai Company

    Hadco Process Plant for Almarai at Hail Jeddah 54,443 16/02/2013 Almarai Company

    Juice Factory for Gulf Union Foods at Riyadh Riyadh 52,603 22/02/2013 Gulf Union Foods Company

    Fruit Cold Store for Del Monte Saudi Arabia at Al

    Khomra

    Jeddah 51,200 01/11/2009 Del Monte Saudi Arabia

    Inbound Warehouse for Almarai at Al Kharj Jeddah 41,493 14/10/2010 Almarai Company

    Food Processing Plant for Brasil Foods (BRF) at

    Khalifa Industrial Zone Abu Dhabi (KIZAD)

    Dubai 39,718 15/07/2013 Brasil Foods (BRF)

    Bakery Production Facility for Almarai at Al Kharj Jeddah 38,649 14/06/2010 Almarai Company

    Bakery for Western Bakeries at Hail Jeddah 34,452 30/11/2015 Almarai Company

    Manufacturing Facility for MARS Saudi Arabia at

    King Abdullah Economic City

    Jeddah 28,864 31/12/2013 MARS Saudi Arabia

    Hadco Accommodations for Almarai at Al Kharj Jeddah 26,586 01/11/2012 Almarai Company

    Dairy Production Facility for National Dairy in Al

    Ain

    Abu Dhabi 21,431 10/08/2015 National Dairy Company

    Cheese Plant Expansion for Almarai's Central

    Processing Plant (CPP) 2 at Kharj

    Jeddah 20,209 14/12/2016 Almarai Company

    Production & Logistics Facility, Offices and

    Warehouse for Nestle Dubai at Techno Park

    Dubai 18,580 15/06/2010 Nestle Dubai Manufacturing LLC

    MEP Work for Al Dahra Kohinoor's Rice Mill at

    Khalifa Industrial Zone Abu Dhabi (KIZAD)

    Abu Dhabi 17,000 29/02/2016 Al Dahra Kohinoor LLC

    Rice Mill for Al Dahra Kohinoor at Khalifa Industrial

    Zone Abu Dhabi (KIZAD)

    Abu Dhabi 17,000 29/02/2016 Al Dahra Kohinoor LLC

    Office & Logistic Facility for Almarai at Dubai

    Industrial City

    Dubai 14,336 14/10/2012 Almarai Company

    Depot Complex for Almarai at Abha Riyadh 13,967 12/03/2014 Almarai Company

    Food Processing Sheds for Al Nafees International

    Manufacturing at Dubai Industrial City

    Dubai 11,475 30/03/2016 Al Nafees International

    Manufacturing LLC

    3PL Facility for Areej Vegetable Oil & Derivatives

    in Muscat

    Sohar 9,300 17/03/2014 Areej Vegetable Oils &

    Derivatives SAOG

    Accommodation Expansion (Phase 8) for Almarai

    at Sadiyat Island

    Abu Dhabi 9,218 27/08/2014 Saudi Amana Contracting Co. -

    Riyadh

    MEP Work on the Food Factory, Warehouse and

    Office for MAM Food Company at Dubai

    Industrial City

    Dubai 8,720 17/05/2015 MAM Food Company LLC

    Food Factory, Warehouse and Office for MAM

    Food Company at Dubai Industrial City

    Dubai 8,720 17/05/2015 MAM Food Company LLC

    Food Production Facility for Al Islami at Dubai

    Investments Park

    Dubai 7,871 04/03/2015 Dubai Co-operative Society (Al

    Islami Foods Co.)

  • 65

    For an up-to-date listing, visit www.amanabuildings.com/industries

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Sport Facilities for Almarai Hadco at Hail Jeddah 6,600 12/07/2013 Almarai Company

    Cold Store for DIP Offices at Dubai Investments

    Park

    Northern

    Emirates

    6,397 18/04/2007 Dubai Investment Park

    Project Falcon for Nabisco Arabia at Dammam

    First Industrial

    Khobar 6,044 28/11/2011 Nabisco Arabia Co. Ltd.

    Electrical Work on Project Falcon for Nabisco at

    Dammam 1st Industrial City

    Khobar 6,044 31/12/2011 Nabisco Arabia Co. Ltd.

    Accommodations for Almarai at Al Kharj Jeddah 5,822 31/08/2010 Almarai Company

    Depot for Almarai in Ras Al Khaimah Dubai 4,683 09/08/2015 Almarai Emirates LLC

    Cold Store Building for Suma Fruits at Ardiyah Kuwait 4,498 29/01/2009 Suma Fruits International Co.

    Warehouse for Seville Products at Al Quoz Dubai 4,342 14/06/2017 Seville Products Ltd. (LLC)

    Cold Store Facility for Almarai at Nizwa Sohar 2,500 14/01/2013 Almarai Company

    Blow Moulding Department Dry Store for Almarai

    at Al Karj

    Jeddah 2,338 31/05/2016 Almarai Company

    MEP Work for Almarai's Hadco Accommodations

    (Type L6) at Hail

    Jeddah 2,336 29/05/2016 Almarai Company

    Hadco Accommodations (Type L6) for Almarai at

    Hail

    Jeddah 2,336 02/05/2015 Almarai Company

    MEP Work for Cold Store Extension for Del Monte

    at Al Aweer

    Dubai 2,201 06/01/2016 Del Monte Foods

    Cold Store Extension for Del Monte at Al Aweer Dubai 2,201 06/01/2016 Del Monte Foods

    Dunkin' Donuts Bakery Production Facility for Al

    Zahra Real Estate at Sharjah Industrial Area

    Northern

    Emirates

    2,061 06/05/2007 Al Zahra Real Estate

    VIP Resthouse for Almarai at Hail Jeddah 1,984 01/03/2013 Almarai Company

    Ingredients Storage for Almarai's Plant 6 al Al

    Kharj

    Jeddah 1,615 30/12/2016 Almarai Company

    Manufacturing Facility for MARS GCC at Jebel Ali Dubai 1,600 11/09/2016 MARS GCC

    HVAC & Earthing Works for Non Process Building

    on the Dora Dora Project at Al Kharj

    Jeddah 907 07/06/2015 MEFSCO (Cargill / ARASCO JV)

    Plant Grind Expansion for MEFSCO on the Dora

    Dora Project at Al Kharj

    Jeddah 907 07/06/2015 MEFSCO (Cargill / ARASCO JV)

    Chemical Store for Almarai Hadco at Hail Jeddah 890 01/01/2015 Almarai Company

    Factory Expansion for MARS at Jebel Ali Free

    Zone

    Dubai 707 12/04/2014 MARS LLC

    Workshop and Storage for Almarai

    Accommodations at Hadco

    Jeddah 500 30/11/2013 Almarai Company

    Bakery Main Entrance for Almarai at Al Kharj Jeddah 346 15/03/2011 Almarai Company

    Cold Store for Gulf Union Foods in Riyadh Riyadh 289 07/09/2012 Gulf Union Foods Company

    MV Network for Almarai at Hail Jeddah 250 14/04/2015 Almarai Company

    Food Processing

    Institutional

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Office Buildings (Balance Works) for Tecom at

    Dubai Design District (D3)

    Northern

    Emirates

    289,775 25/08/2014 Tecom Investments

    External Works on the School of Business and

    Plaza for Qatar University at Al Tarfa

    Doha 84,743 01/10/2011 Qatar University

    Civil Works Construction of Schools at Jaber Al

    Ahmed City (N2 Neighborhood)

    Kuwait 78,500 21/12/2013 Public Authority for Housing

    Welfare

  • Institutional

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Ancillary Building, Car Park & Podium Phase 1B for

    Masdar Institute of Science and Technology

    (MIST) at Masdar City

    Abu Dhabi 73,500 14/08/2010 Abu Dhabi Future Energy

    Company (Masdar)

    Six Warehouses and a Mosque for Abu Dhabi

    Business Hub at Mussafah

    Abu Dhabi 70,394 28/02/2018 Abu Dhabi Business Hub LLC

    Schools (Phase 3 - Package 1) of the Abu Dhabi

    Future School Program for Abu Dhabi General

    Services (Musanada) across Abu Dhabi

    Abu Dhabi 60,915 09/06/2013 Abu Dhabi General Services

    (Musanada)

    Technical & Customer Care Building for Ooredoo

    at Mesaimeer

    Doha 58,489 01/05/2013 Ooredoo

    Ancillary Building, Car Park & Podium Phase 1A

    for Masdar Institute of Science and Technology

    (MIST) at Masdar City

    Abu Dhabi 57,800 12/11/2009 Abu Dhabi Future Energy

    Company (Masdar)

    Regiment for the Directorate of Military Works at

    Mafraq Camp

    Abu Dhabi 50,000 06/10/2011 Directorate of Military Works

    4 Schools (Package 2 - Stage 9) for Ashghal in

    and around Doha

    Doha 42,075 17/07/2016 Public Works Authority (Ashghal)

    Newspaper Production Facility for Gulf News at

    Dubai Investments Park

    Dubai 42,000 15/09/2010 Al Nisr Publishing LLC

    4 Schools (Package 4 - Stage 9) for Ashghal in

    and around Doha

    Doha 41,740 17/07/2016 Public Works Authority (Ashghal)

    Housing for the Public Authority for Housing

    Welfare at Sabah Al Ahmed City

    Kuwait 37,070 08/02/2014 Public Authority for Housing

    Welfare

    Multi-Purpose Industrial Complex for Ajman

    Municipality at Industrial Zone B

    Northern

    Emirates

    29,765 25/10/2009 Ajman Municipality

    International Doha Convention Center for Barwa

    Real Estate at West Bay

    Doha 29,650 27/02/2007 Barwa Real Estate

    School of Business for Qatar University at Al Tarfa Doha 27,800 01/09/2011 Qatar University

    Public Housing Project for Qatar Development

    Bank at Duhail

    Doha 22,337 17/12/2011 Qatar Development Bank

    Warehouses & Workshops for Dubai Properties at

    Dubai Studio City

    Northern

    Emirates

    21,649 06/09/2009 Dubai Properties

    Feed Mill for the Department of Presidential

    Affairs at Al Ain

    Northern

    Emirates

    21,250 02/01/2011 Department of Presidential Affairs

    Boys Secondary School for Public Authority for

    Housing Welfare at Doha

    Kuwait 20,040 10/04/2013 China First Metallurgical Group

    South Staff Accommodation Food Court for

    Dubai Ports Authority at Jebel Ali Free Zone

    Dubai 18,291 03/06/2009 Dubai Ports Authority

    Three Schools (Phase 2 - Package 1) of the Abu

    Dhabi Future School Program for Abu Dhabi

    General Services (Musanada) near Abu Dhabi

    Abu Dhabi 14,861 18/09/2011 Abu Dhabi General Services

    (Musanada)

    Sound Stages (Phases A & B) for Dubai Properties

    at Dubai Studio City

    Northern

    Emirates

    14,243 16/09/2009 Dubai Properties

    Bilingual School for Al Kalema Al Tayeba at

    Mahbola

    Kuwait 13,318 23/10/2008 Al Kalema Al Tayeba Co.

    New American School for Esol in Dubai DuBox 13,000 14/04/2018 Esol Education FZ LLC

    Bank Branch for First Gulf Bank at Jebel Ali Free

    Zone

    Northern

    Emirates

    12,702 11/11/2010 First Gulf Bank

    Commercial Office Building for HE Jumaa Ahmad

    Juma Albawandi

    Abu Dhabi 11,500 22/10/2009 Abu Dhabi Commercial

    Properties LLC

    Labor Accommodation for DIP Offices at Dubai

    Investments Park

    Northern

    Emirates

    11,169 03/05/2007 Dubai Investment Park

    Central Kitchen & Office Building for Kuwait Hotels

    Company at Al Farwaniyah

    Kuwait 9,700 11/11/2008 Kuwait Hotels Co. (Safir

    International Hotel Management)

    Warehouse and Office Building for Expolanks

    Holdings at Wellampitiya

    Colombo 9,643 31/01/2013 Expolanka Holdings Plc.

    Deira International School Extension for Al Futtaim

    Group Real Estate at Dubai Festival City

    CEC 9,612 13/01/2017 Al Futtaim Group Real Estate

    Workshop and Showrooms for Kanoo Group at

    Esnaad Phase 3 in Mussafah Industrial City

    Abu Dhabi 8,813 11/11/2010 Kanoo Group

    Villa Development for Al Futtaim Real Estate

    Company at Al Dhiyafa

    DuBox 8,346 28/02/2017 Eastern International LLC

    66

  • 67

    For an up-to-date listing, visit www.amanabuildings.com/industries

    Project Name Office Built-Up

    Area (m2)

    Completion Date

    (dd/mm/yyyy) Client

    Office Buildings (Balance Works) for Tecom at

    Dubai Design District (D3)

    United Arab

    Emirates

    289,775 25/08/2014 Tecom Investments

    External Works on the School of Business and

    Plaza for Qatar University at Al Tarfa

    Qatar 84,743 01/10/2011 Qatar University

    Civil Works Construction of Schools at Jaber Al

    Ahmed City (N2 Neighborhood)

    Kuwait 78,500 21/12/2013 Public Authority for Housing

    Welfare

    Ancillary Building, Car Park & Podium Phase 1B for

    Masdar Institute of Science and Technology

    (MIST) at Masdar City

    United Arab

    Emirates

    73,500 14/08/2010 Abu Dhabi Future Energy

    Company (Masdar)

    Schools (Phase 3 - Package 1) of the Abu Dhabi

    Future School Program for Abu Dhabi General

    Services (Musanada) across Abu Dhabi

    United Arab

    Emirates

    60,915 09/06/2013 Abu Dhabi General Services

    (Musanada)

    Technical & Customer Care Building for Ooredoo

    at Mesaimeer

    Qatar 58,489 01/05/2013 Ooredoo

    Ancillary Building, Car Park & Podium Phase 1A

    for Masdar Institute of Science and Technology

    (MIST) at Masdar City

    United Arab

    Emirates

    57,800 12/11/2009 Abu Dhabi Future Energy

    Company (Masdar)

    Regiment for the Directorate of Military Works at

    Mafraq Camp

    United Arab

    Emirates

    50,000 06/10/2011 Directorate of Military Works

    4 Schools (Package 2 - Stage 9) for Ashghal in

    and around Doha

    Qatar 42,075 17/07/2016 Public Works Authority (Ashghal)

    Newspaper Production Facility for Gulf News at

    Dubai Investments Park

    United Arab

    Emirates

    42,000 15/09/2010 Al Nisr Publishing LLC

    4 Schools (Package 4 - Stage 9) f