MET-420, Semester I 2015-16

JPAN Tubular Components Pvt Ltd.

Sumit Soni2012ME10731

1

MET-420, Semester I 2015-16

Introduction

➔ Manufactures Tubing Components

➔ Started in 1998 with 400sqft of space and today having More than 80000sqft .

➔ ISO 9000::2008

➔ Sales in 2014 :13.44 milion$

2

MET-420, Semester I 2015-16

Project: Plant Equipment Layout

3

MET-420, Semester I 2015-16

Three line to be transfered to New Plant

4

MET-420, Semester I 2015-16

Plant area and its structure

5

MET-420, Semester I 2015-16

Line Equipment Planning

6

MET-420, Semester I 2015-16 7

SchematicDiagram

Line Equipment Planning

MET-420, Semester I 2015-16 8

Line Equipment Planning

MET-420, Semester I 2015-16

Machine Planning

9

MET-420, Semester I 2015-16

Machine Set up as per planning and line output

10

Line 1

Line 2

MET-420, Semester I 2015-16 11

Line 3

Machine Set up as per planning and line output

MET-420, Semester I 2015-16

Conveyor Length optimization:

➢ No of process and its space

➢ No of persons required to do the process

➢ Space to prevent piling of products and messing of

products into each other12

MET-420, Semester I 2015-16 13

Conveyor Length optimization:

MET-420, Semester I 2015-16

Conveyor length after optimisation

14

MET-420, Semester I 2015-16

Trolley Arrangement Plan

15

MET-420, Semester I 2015-16 16

Final Layout

MET-420, Semester I 2015-16 17

Final Layout

MET-420, Semester I 2015-16

Final Layout

18

MET-420, Semester I 2015-16

Takt Time

19

MET-420, Semester I 2015-16

Project: Thermal Insulator Design

20

Old Design

MET-420, Semester I 2015-16

New Design

21

Project: Thermal Insulator Design

MET-420, Semester I 2015-16

Workplace Organisation Method

22

MET-420, Semester I 2015-16 23