1

40% Construction Community Meeting

Welcome! This meeting will begin shortly.

August 12, 2020

1

High School Site 80-H-SW-4

High School Site 80-H-SW-4Meeting AgendaAugust 12, 2020, 5:00 PM

• Welcome – School Board Member: Linda Kobert

• Introductions – Lauren Roth/ Facilities Communications

• School Naming: Principal Guy Swenson

• Project Update – David Torbert, AIA, NCARBFreddy Torres, PM

• Questions and Answers

• Adjournment3

Welcome Message from District 3 Board Member

Linda Kobert

Site 80-H-SW-4 4

Introductions by Senior manager, Facilities Communications

Lauren Roth

5Site 80-H-SW-4

Rezoning ProcessSchool Board Policy JC

Step 1 - Superintendent commences rezoningStep 2 - Calendar (Timeline) developedStep 3 - Calendar shared Step 4 - Research, data collection and meetings with internal stakeholders Step 5 - Community Meeting(s) September 2020Step 6 - Rule Development Workshop September 2020Step 7 - Public Hearing October 2020Step 8 - Storage of materials6

6 6Site 80-H-SW-4

School NamingPrincipal Guy Swenson

• Introduction

• Site 80-H-SW-4 web site: https://tinyurl.com/Site80HS

• School naming survey: https://forms.gle/tFbKABCxjoxyXAGx8

• Mascot,Colors

7Site 80-H-SW-4

Site Location 80-H-SW-4

8

Parkside

Sand Lake

Dr. Phillips Community Park

Villas of Grand

Cypress

S. A

POPK

A VI

NEL

AND

ROAD

Lake Ruby

Lake Willis

Hilton Grand

Vacations

Jewish Community

Center

New Connector

Road (By County)

north

SEAWORLD

ORANGE COUNTY CONVENTION

CENTER

DR. PHILLIPS HS

FREEDOM HS

SITE 80NEW HIGH

SCHOOL

BEACHLINE

S. JO

HN Y

OU

NG

PAR

KWAY

STAT

E RO

AD 4

41

WIN

TER

GAR

DEN

VIN

ELAN

D RO

AD

Site Aerial 80-H-SW-4

9

Dr. Phillips Community

Park

Park Soleil

Lake Ruby

New Connector Road

(By County)

FENTON ROAD

High School Site 80-H-W-4

(+/-50 Acres)

north

Jewish Community

Center

Lake Willis

Sand Lake

S. A

POPK

A VI

NEL

AND

ROAD

Site Plan 80-H-SW-4

10

Bus Loop &Staff Parking

north0’ 200’

StudentParking

Stadium Track

& Field

Courtyard

Practice Field

Baseball

Softball Practice Field

Tennis Basketball

Future Expansion

Retention

FRONT DOOR

Full Median Opening

Parent DropVisitorParking

Bus D

rop

Student Stations = 2,776

Parking = 777 spacesCar Stacking = up to 300 cars

On-site Bus Stacking = 60 buses

Bike Racks

ServiceFencing

Retention

Cafeteria3-Story Academics

Auditorium MusicAdmin.

Media Gym

Shadehouse & Greenhouse

Daryl Carter Parkway

Field House

Project Basis – OCPS Prototype High School 80-H-SW-4

11

OCPS PROTOTYPE HIGH SCHOOLSWindermere High SchoolOak Ridge High SchoolEvans High SchoolApopka High SchoolWest Orange High SchoolWekiva High SchoolOcoee High SchoolLake Nona High SchoolEast River High SchoolFreedom High SchoolTimber Creek High SchoolOlympia High School

Oak Ridge High School

Project Basis – OCPS Prototype High School 80-H-SW-4

12

UPGRADES INCLUDED PROTOTYPEEducational• 21st Century Collaborative Learning Hubs

Technology• Interactive Touchscreen Smart TV’s• WiFi access points throughout

Energy Efficiency• LED lighting campus wide (interior, exterior,

site and athletic fields)• High efficiency chillers and variable

pumping scheme• Low flow plumbing fixtures• Commissioning of MEP systems• ASHRAE 90.1 compliance for lighting and

power metering

Security• Full security access control and cameras for

the school• 2-way emergency radio system• Voice evacuation fire alarm system• Permanent generator and life safety lighting

Windermere High School

Renderings 80-H-SW-4

13

north

Renderings 80-H-SW-4

14

north

Renderings 80-H-SW-4

15

north

Renderings 80-H-SW-4

16

north

Campus Plan 80-H-SW-4

17

north

GYM

CLASSROOMS & LABS3-STORIES

SECURE COURTYARD

CAFETERIA

MEDIA

ADMIN

MUSICAUDITORIUM

LOCKER ROOMS

PARENT DROP OFF

BU

SD

RO

P O

FF

Building Program

18

Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

CAFETERIA

MEDIA CENTER

Building Program

19

Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

SCIENCE LAB

COMPUTER LAB

20

GYMNASIUM

AUDITORIUM

Building Program

Campus ProgramAdministrationMedia CenterCafeteriaClassroom Buildings

• Classrooms• Science Labs• Computer Labs• CTE Labs

Auditorium & Music Spaces• Band• Vocal• Orchestra• Piano Lab

Gymnasium • Locker Rooms • Weight Room• Gymnastics/Dance• Wrestling

80-H-SW-4Students: 2,776Buildings: +/-350,000 Square Feet

Site Program

21

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

STADIUM/TRACK & FIELD

GREENHOUSE

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Site Program

22

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

SOFTBALL

BASEBALL

Site Program

23

Site AmenitiesGreenhouse and Shade houseAthletics

• Field House at Stadium/Track•Locker Rooms•Weight Room•Concessions

• Practice Fields• Baseball Field• Softball Field• Baseball & Softball Concessions• Tennis Courts• Outdoor Basketball Courts

Cars and BusesStudent and Faculty parking

(+/-777 Spaces)Parent Drop off / pick upBus Loop (up to 60 buses)

80-H-SW-4Site: +/-50 Acres

OUTDOOR BASKETBALL

TENNIS

Additional Features 80-H-SW-4

24

Safety & Security• Secure Courtyard Design• Single Secure Entry Point• Security System & Cameras• Card Reader Entrance Controls

Educational Technology• 70” Touch Screen “Smart” Monitors• Audio Enhancement• WiFi Connectivity

CLASSROOM TECHNOLOGY

SECURE ENTRY POINT

Audio Enhancement

System

70” Touchscreen

Wireless Access Point

Sustainability 80-H-SW-4

25

Building• 10% more energy efficient than ASHRAE

90.1 standard• High Efficiency Chillers (15% energy

reduction)• Light colored roof to reduce heat gain and

improves energy performance• Energy Efficient LED Lighting• Energy Star rated equipment• Water saving toilets, faucets, and fixtures• All classrooms have daylighting• Over 75% of ALL spaces have daylighting• Thermal efficient windows/glazing

Site• Native/low water plants – reduce water

consumption• Low Impact Design (LID) stormwater design

What to Expect

Work Hours*Monday – Saturday 6:00am –6:00pm* Early morning concrete pours will be necessary and will be in strict accordance with the Orange County noise ordinance

DeliveriesMonday – Friday 6:00am – 6:00pmAll construction deliveries to enter the jobsite from Fenton Rd.

• Import of over 350,000 CY of Fill = 22,000 trucks

• Concurrent Construction of Daryl Carter Parkway Extension

• No impact to the surrounding community

• Work alongside local law enforcement to ensure the safe driving along Apopka Vineland.

26

Site Logistic Plan

26

Planned Schedule

Main Campus ConstructionStructural

June 2021

April2019

September2019

Move-In

August2021

Design, Permitting,and Bidding

EarlySitePackage

January2020

28

August2020

Main Campus ConstructionFinishes

Construction Update and Milestones

28

Notice to Proceed (NTP) – Site was September 17, 2019.

Site clearing, import of fill was completed in December.

Tilt wall panels were completed in May.

Structural Steel Erection completed in July.

Roofing work is 95% complete.

Installation of deep storm drainage is ongoing.

Fireproofing of structural steel is ongoing.

Interior framing and finishes are ongoing.

Project remains on schedule for Substantial Completion in Summer 2021.

Orange County Public Schools Site 80-H-SW-4 High School

29

Orange County Public Schools Site 80-H-SW-4 High School

30

Orange County Public Schools Site 80-H-SW-4 High School

31

Orange County Public Schools Site 80-H-SW-4 High School

32

Orange County Public Schools Site 80-H-SW-4 High School

33

Orange County Public Schools Site 80-H-SW-4 High School

34

Forming of Slab on Grade

Pouring of Tilt Panels with a Boom Pump

Orange County Public Schools Site 80-H-SW-4 High School

35

Erection of Tilt Panels with 300 Ton Crawler Crane

Erection of Tilt Panels and Structural Steel

Orange County Public Schools Site 80-SW-4 High School

36

Preparation of Tilt Panels for Structural Steel Installation

Structural Steel for Second Floor Deck

Orange County Public Schools Site 80-H-SW-4 High School

37

Installation of Deep Storm Drainage Pipe and Structures

Roof Joist and Deck Installation

Orange County Public Schools Site 80-H-SW-4 High School

38

Pouring of Second Floor Slab

Installation of Roof Insulation and LWIC

Orange County Public Schools Site 80-H-SW-4 High School

39

Framing, MEP Hangers and Rough-in Ongoing

Exterior finishes ongoing

Orange County Public Schools Site 80-H-SW-4 High School