pdms agenda.docx
Post on 04-Mar-2016
216 Views
Preview:
TRANSCRIPT
7/21/2019 PDMS Agenda.docx
http://slidepdf.com/reader/full/pdms-agendadocx 1/1
Agenda:
• Feed water area, CCW module and Steam line interface with HRSG.
• LP Steam line interface from bottom. Drain concept from HRSG to be
reviewed. ! per HRSG the drain from LP will "o to conden!er #a!h bo$ which
i! not acceptable.• %&pa!! !tation to be updated to 't a! per (D) of b&pa!! valve!.
• *hic+ne!! of S* foundation from SD re-uired. Pre!entl& the main !team
line! are cla!h with S* internal pipin". Plan % i! to move the S* and S* top
level platform b& P /0/.1 m.
• %low down tan+ module.
• cce!! wa&! and e!cape route are modeled in PD(S.
• Fuel oil and Fuel "a! module. 2 Propo!al a! per Fred& 3%SCH3R.
• Fuel 4il 54$ i! cla!hin" with Plant area. 2 G* to be done.
• 5eed (D) for e-uipment to "enerate module!.
• PD for Samplin", (CW, CCW and Fuel oil are not available from proce!!.
• ! per toda&! PD !tatu! Pipin" are in PD(S model e$cept for the followin" 6o 77 5o of drain! per %D* to be routed. Space re!ervation i! available.
o Where interface! are not clear i! mar+ed in PD.
o FW line! interface! are not clear with HRSG.
o For HP and HRH 3$it DSH !hould be placed in the !cope of HRSG.
o Concept for Container pipin" need! to be done.
top related