7/21/2019 PDMS Agenda.docx http://slidepdf.com/reader/full/pdms-agendadocx 1/1 Agenda: Feed water area, CCW module and Steam line interface with HRSG. LP Steam line interface from bottom. Drain concept from HRSG to be reviewed. ! per HRSG the drain from LP will "o to conden!er #a!h bo$ which i! not acceptable. %&pa!! !tation to be updated to 't a! per (D) of b&pa!! valve!.  *hic+ne!! of S* foundation from SD re-uired. Pre!entl& the main !team line! are cla!h with S* internal pipin". Plan % i! to move the S* and S* top level platform b& P /0/.1 m. %low down tan+ module. cce!! wa&! and e!cape route are modeled in PD(S. Fuel oil and Fuel "a! module. 2 Propo!al a! per Fred& 3%SCH3R. Fuel 4il 54$ i! cla!hin" with Plant area. 2 G* to be done. 5eed (D) for e-uipment to "enerate module!. PD for Samplin", (CW, CCW and Fuel oil are not available from proce!!. ! per toda&! PD !tatu! Pipin" are in PD(S model e$cept for the followin" 6 o 77 5o of drain! per %D* to be routed. Space re!ervation i! available. o Where interface! are not clear i! mar+ed in PD. o FW line! interface! are not clear with HRSG. o For HP and HRH 3$it DSH !hould be placed in the !cope of HRSG. o Concept for Container pipin" need! to be done.

Upload: prashant-agrawal

Post on 04-Mar-2016

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PDMS Agenda.docx

7/21/2019 PDMS Agenda.docx

http://slidepdf.com/reader/full/pdms-agendadocx 1/1

Agenda:

• Feed water area, CCW module and Steam line interface with HRSG.

• LP Steam line interface from bottom. Drain concept from HRSG to be

reviewed. ! per HRSG the drain from LP will "o to conden!er #a!h bo$ which

i! not acceptable.• %&pa!! !tation to be updated to 't a! per (D) of b&pa!! valve!.

•  *hic+ne!! of S* foundation from SD re-uired. Pre!entl& the main !team

line! are cla!h with S* internal pipin". Plan % i! to move the S* and S* top

level platform b& P /0/.1 m.

• %low down tan+ module.

• cce!! wa&! and e!cape route are modeled in PD(S.

• Fuel oil and Fuel "a! module. 2 Propo!al a! per Fred& 3%SCH3R.

• Fuel 4il 54$ i! cla!hin" with Plant area. 2 G* to be done.

• 5eed (D) for e-uipment to "enerate module!.

• PD for Samplin", (CW, CCW and Fuel oil are not available from proce!!.

• ! per toda&! PD !tatu! Pipin" are in PD(S model e$cept for the followin" 6o 77 5o of drain! per %D* to be routed. Space re!ervation i! available.

o Where interface! are not clear i! mar+ed in PD.

o FW line! interface! are not clear with HRSG.

o For HP and HRH 3$it DSH !hould be placed in the !cope of HRSG.