27
Area Completion Project Update Area Completion Project Update A Presentation to the SRS Citizens Advisory Board May 20, 2008 Presentation By Wade Whitaker, ACP Federal Project Director Office of the Assistant Manager for Closure Project Department of Energy Savannah River Operations Office

Upload: others

Post on 13-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

Area Completion Project Update

Area Completion Project Update

A Presentation to the

SRS Citizens Advisory Board

May 20, 2008

Presentation By

Wade Whitaker, ACP Federal Project Director

Office of the Assistant Manager for Closure Project

Department of Energy Savannah River Operations Office

Page 2: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

2

AgendaAgenda

• Project Performance

• Project Status

• Remedial Technology Utilization

• FFA Appendix E

Page 3: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

3

AcronymsAcronyms

CMP Chemicals, Metals, and Pesticides PitsCY Current YearD&D Deactivation and DecommissioningDNAPL Dense Non Aqueous Phase LiquidsDOE Department of EnergyEPA Environmental Protection AgencyERH Electrical Resistance HeatingFFA Federal Facility AgreementFt2 Square FeetFY Fiscal YearM&O Management and OperationsMWMF Mixed Waste Management FacilityPCBs Polychlorinated BiphenylsRA Remedial ActionRI/FS Remedial Investigation / Feasibility StudyROD Record of DecisionSCDHEC South Carolina Department of Health and Environmental ControlSGP Soils and Groundwater ProgramSRS Savannah River SiteTCE/PCE Trichloroethylene / TetrachloroethyleneVOCs Volatile Organic Compounds

Page 4: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

4

Project Performance

Page 5: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

5

Project PerformanceProject Performance

• Consistently met all 2,025 FFA milestones since 1993

– 59 in FY 08

• Maintaining a strong relationship with regulators

• Have completed 360 of 515 waste units (70%)

– 22 in FY 08

• Have dispositioned 246 of 985 Performance Metric facilities (25%)

– 229 industrial, 10 nuclear, 7 radioactive

– 1 industrial facility in FY 08

Page 6: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

6

Project PerformanceProject Performance

• Area Completion Strategy started FY 05 significantly reducing project

cost and schedule

• 14 Groundwater Plumes

– 12 active remediation systems

• Developing and utilizing efficient, cost-effective technologies

– Edible Oils for Microbes

– Electrical Resistance Heating

– Phytoremediation

– Silver Injection

– Hydraulic Fracturing

Page 7: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

7

Area Completion StrategyArea Completion Strategy

• A systematic approach to completing cleanup work integrating D&D and SGP scope

• Historical process:– Did not focus on any single area– Evaluated each waste unit individually with much paperwork and

higher costs– Did not address D&D facilities

• Today’s process:– Addresses large groupings of waste units and facilities in a

geographic area– Integrates D&D / SGP cleanup– Area End States can be determined– Economies of scale in sampling, remediation, and documentation

Page 8: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

8

S a v a n n a h

R i v e r

Par Pond

L LakeSt

eel

Cre

ek

Bran

ch

Pen

Bra

nch

Four

mile

UpperThree

Runs

Tim

’sBr

anch

Tinker

Creek

LowerThree

Run

sC

reek

T AreaT AreaCompleted Completed

20062006

A Area2014

D AreaD Area

M Area

F Area2016

H Area2022

R AreaR Area

N Area2014

C Area2010

L Area2022

K Area2021

H Tank Farm2025

F Area Tank Farm2024

P AreaP Area

S a v a n n a h

R i v e r

Par Pond

L LakeSt

eel

Cre

ek

Bran

ch

Pen

Bra

nch

Four

mile

UpperThree

Runs

Tim

’sBr

anch

Tinker

Creek

LowerThree

Run

sC

reek

T AreaCompleted

2006

A Area2014

D AreaD Area

M Area

F Area2016

H Area2022

R AreaR Area

N Area2022

C Area2010

L Area2022

K Area2021

H Tank Farm2025

F Area Tank Farm2024

Completed

UnderwayPending

CompletedCompleted

UnderwayUnderwayPendingPending(start date)

P AreaP Area

Area Completions

8

Page 9: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

9

E Area

S a v a n n a hR i v e r

Par Pond

L LakeSt

eel

Cre

ek

Bran

ch

Pen

Bra

nch

Four

mile

Upper Three

Runs

Tim

’sBr

anch

TinkerCreek

Lower Three

Run

sC

reek

A Area

Groundwater Plumes

D Area

M Area

H Area

R Area

P Area

N AreaN Area

C Area

L AreaL Area

B Area

K AreaK Area

Groundwater Contamination Plumes (13)

Remediation Systems Operatingn

Remediation Systems in Shutdown

F Area

T Area

14 Groundwater Contamination PlumesA/M, B, C, D, E, F, G, H, K, L, N, P, R, T Areas

12 Active Remediation Systems 2 Airstrippers, 2 Recirculation, Dynamic Underground Stripping, 4 Soil Vapor Extraction Units (A/M Areas)Base Injection (F&H Waste Management Facility)Electrical Resistance Heating (Chemical, Metals, & Pesticides Pits)Phytoremediation (Mixed Waste Management Facility)

8 Enhanced SystemsBaroballs (A/M, Miscellaneous Chemical Basin, P Burning Rubble Pit)Microblowers (A and C Burning Rubble Pits)Barrier walls (F&H Waste Management Facility)T Area Edible Oil Treatment

6 Passive Systems Monitored Natural Attenuation (Chemical, Metals, & Pesticides Pits; D Oil Seepage Basin; R Reactor Seepage Basin; K and L Burning Rubble Pits, Sanitary Landfill)

3 Systems In ShutdownBiosparge (Sanitary Landfill) Groundwater Waste Treatment Units (F&H)

11 Systems Pending

Page 10: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

A Area35 facilities

F Area48 facilities

E Area3 facilities

T Area27 facilities

D Area23 facilities

C Area11 facilities

H Area3 facilities

M Area24 facilities

R Area8 facilities

N Area9 facilities

P Area21 facilities

L Area11 facilities

K Area11 facilities

Dispositioned 246 Performance Metric Facilities thru March 2008

Dispositioned 246 Performance Metric Facilities thru March 2008

G Area (General)5 facilities

S Area2 facilities

10

B Area4 facilities

U Area1 facility

Page 11: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

11

Project Status

Page 12: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

12

F Canyon Outside Facilities Dispositioning

F Canyon Outside Facilities Dispositioning

• Started 2004; Scheduled for 2008 completion

• Outside facilities: Chemical Storage Area; Water Handling Area; Acid Recovery Unit; Recycle Sump; General Purpose Evaporator; GP Tank Storage Area; 800-series Underground Tank Storage Cells; Segregated Solvent Area; 360 linear feet of Over Head Pipe Bridge with associated piping

• During deactivation the following was accomplished:

– More than five miles of process piping removed

– 50 large chemical and waste tanks removed / disposed

– Hazardous, Low Level, Mixed, and Transuranic Wastes removed

– Concrete caps being placed over rad contaminated tanks

Page 13: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

13

Allendale Barricade Dispositioning

Allendale Barricade Dispositioning

• Removal of safety concern on public Highway 125

• Started January 2007; Completed October 2007

Page 14: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

14

M Area CompletionM Area Completion

2nd Area Completion• Started 2003; Scheduled for 2011

completion

• D&D completed in 2006– Removed 24 M-Area Performance Metric

facilities

• Early cleanup actions implemented to remove radioactive and VOC contamination in soil by 2008

• Proposed Plan will be available for public comment in May 2008

ThenThen

NowNow

Page 15: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

15

3rd Area completion (1st Reactor to be Dispositioned)• Started 2005; scheduled for 2014 completion• 21 of 25 Performance Metric facilities decommissioned• D&D activities to support Area Completion:

– Installed temporary power, lighting and communications

– Established Electrical and Mechanical Cold and Dark

– Implemented Habitability Plan– Characterized reactor vessel and facility– Removed moderator from the process

water system and prepared reactor decommissioning alternatives study

– Performing deactivation activities (removal of asbestos, lead, PCBs, mold)

P Area CompletionP Area Completion

Page 16: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

16

• End State Proposal / Early Actions– In situ decommissioning of P Reactor which

means that a significant portion of the reactor building will remain in place

– In May / June 2008, the Early Action Proposed Plan will be issued for a 45-day public review and comment

– Issue Early Action ROD FY 09

• Public Involvement Activities in response to CAB recommendation #248:

• October 16th, 2007 - Aiken, SC

• February 28th, 2008 - Aiken, SC

• May 19th, 2008 - Savannah, GA

P Area CompletionP Area Completion

ThenThen

NowNow

Page 17: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

17

4th Area completion (2nd Reactor to be Dispositioned)

• Started 2007; Scheduled for 2015 Completion

• 8 of 12 Performance Metric facilities decommissioned

• D&D activities to support Area Completion:

• Removed water from disassembly basin• Installing Temporary Power, lighting, and

communications• Establishing Mechanical Cold and Dark• Characterized Reactor Vessel and Reactor

facility

• Work Plan being revised to include reactor building and reactor vessel

R Area CompletionR Area Completion

Page 18: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

18

Remediation Technology Utilization

Page 19: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

19

Background• T Area has a small persistent TCE/PCE

plume which is managed with Pump and Treat (airstripper) since 1996

– Approximately $1M/year M&O costs– At a point of diminishing returns

New Strategy• Use Edible Oil injection techniques to

sequester and biologically destroy the VOCs– Inject Neat Edible Oil to sequester VOCs

(vadose zone source)– Inject Edible Oil emulsion (food source) to

promote microbial activity and reducing conditions in groundwater (reductive dechlorination)

– Anticipate results in less than six months– Discontinue use of airstripper

Edible Oils for MicrobesEdible Oils for Microbes

DC

AB

neat oil deployment zone (water table barrier and smear zone cuts off future source to

groundwater)

A = neat (pure) vegetable oilB = injection, metering and flow monitoring systemC = deep vadose / water table oil injection wellD = residual vadose source

groundwater plume (treated with emulsified oil)

Neat Oil

D

C

AB

E

emulsified oil deployment zone

A = concentrated emulsified food grade vegetable oil, nutrients and buffer/baseB = metering and flow monitoring systemC = emulsified oil injection wellD = extraction well to control oil zone geometryE = air stripper – VOC water treatment system (equipped with tank/pump for recirculation)

Oil Emulsion

Page 20: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

20

Chemicals, Metals, & Pesticides (CMP) PitsElectrical Resistance Heating

Chemicals, Metals, & Pesticides (CMP) PitsElectrical Resistance Heating

• ERH is a soil treatment technology used to remediate solvent contamination in subsurface soils

• CMP is second deployment of ERH technology at SRS

• Electrodes inserted into the subsurface heat the soil to transform liquid solvents into gas phase

• The contaminants are subsequently removed using soil vapor extraction

• Full-scale ERH operations began March 2008– Estimate removal to be approximately

5,000 pounds– Redeployed mobile equipment utilized in

2007 at C Reactor

CMP Pits Aerial ViewCMP Pits Aerial View

Page 21: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

21

MWMF PhytoremediationUpgrades

MWMF PhytoremediationUpgrades

• MWMF Phytoremediation –captures tritium contaminated groundwater in 2.7 million gallon pond and irrigates on 22 acres of pine trees for transpiration

• About 70% annual tritium reduction (from 1,500 - 2,000 curies to 450 curies) to Fourmile Branch

• SRS has expanded and upgraded system– Added 22 acres of pine trees (need

50 more acres)– Increased capacity of irrigation

supply and distribution system by two times

MWMF - New Supply Pumps

MWMF - Inside Control Room

Page 22: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

22

Silver InjectionSilver Injection

• F / H Seeplines– RCRA Permit

– Iodine 129 concentration elevated

– Bench scale testing using silver injection with positive results; pilot scale testing underway; well network being installed

– Regulators approved 5-year milestone extension to 2012 to allow pilot scale testing

– Could greatly reduce cost from $85M (barrier wall and cap) to $1M operating cost per year

Page 23: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

23

Hydraulic Fracturing to Help DNAPL Treatment

Hydraulic Fracturing to Help DNAPL Treatment

• DNAPL in silts and clays provide long-term source of groundwater contamination

• Hydraulic fracturing opens up these tight soil to allow treatment

• At A-014 Outfall, high vacuum soil vapor extraction is removing 100 pounds per week of PCE and TCE from shallow subsurface

7/1/07 8/1/07 9/1/07 10/1/07 11/1/07 12/1/07

0

500

1000

1500

2000

2500

PCE

Mas

s R

emov

ed, l

bs

0

10

20

30

40

50

TCE

Mas

s R

emov

ed, l

bsPCETCE

Page 24: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

24

FFA Appendix E

Page 25: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

25

FFA Appendix EFFA Appendix E

• Provides a lifecycle list of waste unit outyear cleanup milestones

– First two outyears are enforceable milestones (comprehensive list)

– Rest of outyear milestones include Field Starts, RODs, RA Starts

• Updated annually in November and regulator approval required

• SCDHEC and EPA approved FY 08 Appendix E on February 21, 2008

Page 26: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

26

SummarySummary

• Continue to work with regulators to evolve

processes and fieldwork

• Continue deployment of effective, cost-efficient

technologies

Page 27: Area Completion Project Update - SRS CAB · 7 Area Completion Strategy • A systematic approach to completing cleanup work integrating D&D and SGP scope • Historical process: –

27

Questions and AnswersQuestions and Answers

?? ?? ??

??