assignment-ii_hu801b_b.tech (che).doc
TRANSCRIPT
-
7/21/2019 Assignment-II_HU801B_B.Tech (CHE).doc
1/2
ASSIGNMENT-II(For the students who will not appear for the 2ndInternal Examination on the account of
joining in the job)
B. Tech (Chemical Engineering)
Semester: 8th
Subect: !r"ect Management
!a#er C"$e: %&8'B
Anser the *"ll"ing +uesti"ns:
.)Following are the details of two new machines:
!articulars Machine A Machine B
Cost of the Machine Rs. 100000 Rs. 150000
Installation costs Rs. 20000 Rs. 25000
Salvage value Rs. 10000 Rs. 15000
!ife of the machine 5 "ears 5 "ears
Machine hours #er "ear 2000 hrs. 2000 hrs.
$ut#ut #er hour 10 units 15 units
Selling #rice #er unit Rs. 10 Rs. 10
Material cost #er unit Rs. % Rs. %
&ages #er machine hour Rs. %0 Rs. %0
'ower charges #er machine hour Rs. 2 Rs. 2
Re#airs ( Maintenance #er "ear Rs. 10000 Rs. 12000
Su#ervision charges #er "ear Rs. 12000 Rs. 20000
$ther e)#enses Rs. 20000 Rs. *0000
&or+ing ca#ital Rs. 25000 Rs. %0000
Rate of ta) , 50- , 50-
Calculate the verage Rate of Return of two machines ta+ing average investment as /ase and
using the following methods:i nnual average income after ta) and de#reciation.
ii nnual average income after ta) #lus de#reciation and
dvice the management the #rofita/le machine.
,.)he following ta/le shows the activities their immediate #redecessors and time estimates ofthe #ro3ect.
ctivit" 4 C 6 F 7 8 I
Immediate'redecessor
9 9 4 C 6 C 6 F 7
$#timistic ime toda"s
* 2 1 2 12 10 1
Most !i+el" ime tm
da"s*.5 ; 2 2.5 ; 1 < 12 1.5
'essimistic ime t#
da"s 1= * 20 20 15 1 2
1
-
7/21/2019 Assignment-II_HU801B_B.Tech (CHE).doc
2/2
i Calculate the e)#ected time and variance of each activit" of the #ro3ect.ii raw the networ+ diagram find the critical #ath and calculate the e)#ected duration of
the #ro3ect.
iii ssuming that the #ro3ect com#letion time follows normal distri/ution. calculate the#ro/a/ilit" of com#leting the #ro3ect in a 50 da"s and / *2 da"s
7iven the ta/le value of >
> 0.