Blossom Park Condominium Update
Code Enforcement Division
October 14, 2014
Blossom Park Condominiums
PurposeBackgroundMajor Issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Blossom Park Condominiums
PurposeBackgroundMajor Issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Purpose
Condominium project with significant issuesMake BCC aware of scope and magnitude of
concerns and potential range of actionsNo action requested today
Blossom Park Condominiums
PurposeBackgroundMajor Issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Background
W. Landstreet Rd.
Sand Lake Rd.
SOBT
Beachline Expressway
Florida Turnpike
Florida Mall
Blossom Park Condo’s
Background
C
Landstreet Road
Massey Cadillac
Sout
h O
rang
e Bl
osso
m T
rail
Beach
line Ex
pressw
ay
Shell
Waffle House
A
BD
EFG
Entrance
C
Background
Originally Days Inn MotelBuildings constructed in 1973– Concrete block main buildings– Wood structure walkways
Hotel converted to condominiums in 2003
6 buildings– 3 stories– 345 units
Background
Occupancy– About 175 occupied units (50%)– Approximately 250 residents
Owner Make-up
– 119 units (35%) owned by people who own multiple units
Owner Location Number of Units PercentBlossom Park 69 20%Rest of Orange County 82 24%Rest of Florida 56 16%Other 49 States 48 14%Puerto Rico 73 21%Foreign 17 5%
Background
Single water and electric meters for entire complex– Electric – Duke Energy– Water - OUC– Waste-water - OCU
Several times water shutoff imminent, bill paid
Background
Receiver appointed in 2010Similar responsibilities in court order for Tymber
SkanHas not complied with notices from Building
Safety or Code EnforcementSerious code violations such as failing exterior
walkways not being addressed
Background
Zoned I-1/I-5–Condo plat recorded by State–Reflected as condo-hotel by
OCPAPermits previously issued
as hotel useHas not maintained license
with DBPR as hotel since April 2006
Future Land Use
Zoning
Background
Review of Condo Declarations–No homestead allowed–No timeshare–No prohibition on children
Zoning (hotel use) would allow short-term stays only, less than 179 days
Based on lease agreements and license status, it does not appear to be managed as a hotel property
Blossom Park Condominiums
PurposeBackgroundMajor Issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Major Issues - Code Enf.
Code violations / Property Maintenance– Stairs, landings and walkways– Electrical and lighting
Deteriorating stair systems (Bldg. A, B, C, D)
Structural flooring andlanding issues(Bldg. E, F G)
A
B
D
EFG
C
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Conditions Stairs, Landings & Walkways
Major Issues - Code Enf.
Exterior Structural Violations–Non-functioning elevators– Hallway lighting– Gutters/downspouts– Failing walkways due to water damage–Unsafe stairways, handrails, guardrails– Graffiti
Interior violations (14 units inspected)–No smoke alarms– Ceilings have water damage– Broken windows
Major Issues - Code Enf.
Process cases to November 3, 2014 Special Magistrate–Compliance period–Reinspections–Possible fines/liens
Conditions may require units on multiple floors to be vacated
Major Issues - Building Safety
September 2013 complaint of unsafe conditions Issued notice of violation for Building C and G:– A structural engineering
evaluation of the egress paths– Temporary shoring plans
for Building G– Permits for all remedial
repairs
November 2013 receivedengineering evaluation A
B
D
EFG
C
Major Issues - Building Safety
June 2014 complaint from OFM regarding unsafe conditions for Buildings E and F Issued notice of violation:–A structural engineering
report–Certification of the
electrical circuits in the corridor
No response received to date. A
B
D
EFG
C
Major Issues - Building Safety
County contracting for evaluation confirming unsafe condition determination by Code Enforcement
All stairs, landings, and walkwaysEstimated to be completed in 6-8 weeks
Fire Rescue Incidents
2012 2013 20140
20
40
60
80
100
120
140
160
144124
92
31
Fire Rescue Incident History
ProjectedActual
123 Projected Incidents
Major Issues - Fire Rescue
Fire and Life Safety SystemsStructural integrity of emergency egress−Stairwells−Walkways
Maintenance of exiting fire protection features−Hydrants−Standpipes−Fire alarm−Automatic Sprinkler System
Major Issues - Law Enforcement
Crime Homicide (3) Aggravated Battery and
Assault Burglary Stolen vehicles Sale or delivery (cocaine, heroin, cannabis) Unlawful possession
Over 250 arrests YTD Mandatory patrols
Major Issues - Law Enforcement
2012 2013 20140
200
400
600
800
1000
1200
1400
1600
1800
977731
1,194
Calls for Service History, 0.5 mile radiusActual
Calls for 9 months
Major Issues - Law Enforcement
CrimeNAB heard case on October 9, 2014Required compliance agreement
– No Trespass and No Loitering signs– Install / maintain security cameras– Criminal background checks on employees and tenants in
Association controlled units– Evaluate security gate– Repair and maintain perimeter fence– Off-duty deputies for security– Other administrative requirements
Blossom Park Condominiums
PurposeBackgroundMajor Issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Summary
Hotel-condo conversion in 2003345 units, half occupiedMajor issues–Code Enforcement–Building Safety Division–Fire Marshal’s Office–Law Enforcement
Summary
Hearings scheduled–NAB held on October 9, 2014–Special Magistrate scheduled for November 3, 2014
Contracting for Engineering Assessment Compliance schedule and actions subject to
findings of hearings and assessmentStrong concerns from Building Official and Fire
Marshal