borang frgs2 (khairil hizar) 2

30
(Diisi oleh RMC) One (1) copy of this form must be submitted to the Institution of Higher Education Excellence Planning Division, Department of Higher Education, Level 7, No. 2, Tower 2, Street P5/6, Precinct 5, 62200 Putrajaya. [Incomplete Form will be rejected] A TITLE OF PROPOSED RESEARCH: Tajuk penyelidikan yang dicadangkan : A NEW KNOWLEDGE MANAGEMENT FRAMEWORK FOR PUBLIC ORGANISATIONS MANAGING CONSTRUCTION INFRASTRUCTURE PROJECTS B DETAILS OF RESEARCHER / MAKLUMAT PENYELIDIK B(i) Name of Project Leader: IC / Passport Number: Nama Ketua Projek: No. Kad Pengenalan/ Pasport: Assoc. Prof. Sr. Dr. Padzil @ Fadzil bin Hassan 600524-01- 5203 B(ii ) Position (Please tick ( ) ): Jawatan (Sila tanda ( ) ): Professor Assoc. Prof. / Sen. Lect. Lecturer Profesor Prof. Madya / P. Kanan Pensyarah B(ii i) Faculty/School/Centre/Unit (Please provide full address): Fakulti/Jabatan /Pusat/Unit (Sila nyatakan alamat penuh): Fakulti of Architecture, Planning and Surveying Universiti Teknologi MARA 40450 Shah Alam, Selangor BORANG FRGS – A1 (R) SINGLE DISCIPLINARY PROJECT APPLICATION FORM FUNDAMENTAL RESEARCH GRANT SCHEME (FRGS) Skim Geran Penyelidikan Fundamental (Pindaan 1/2012) JABATAN PENGAJIAN TINGGI Kod Rujukan:

Upload: fadzil-hassan

Post on 03-Dec-2014

2.259 views

Category:

Education


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Borang frgs2  (khairil hizar) 2

(Diisi oleh RMC)

One (1) copy of this form must be submitted to the Institution of Higher Education Excellence Planning Division, Department of Higher Education, Level 7, No. 2, Tower 2, Street P5/6, Precinct 5, 62200 Putrajaya.

[Incomplete Form will be rejected]

A TITLE OF PROPOSED RESEARCH:Tajuk penyelidikan yang dicadangkan :

A NEW KNOWLEDGE MANAGEMENT FRAMEWORK FOR PUBLIC ORGANISATIONS MANAGING CONSTRUCTION INFRASTRUCTURE PROJECTS

B DETAILS OF RESEARCHER / MAKLUMAT PENYELIDIK

B(i) Name of Project Leader: IC / Passport Number:Nama Ketua Projek: No. Kad Pengenalan/ Pasport:Assoc. Prof. Sr. Dr. Padzil @ Fadzil bin Hassan 600524-01-5203

B(ii) Position (Please tick ( √ )):Jawatan (Sila tanda ( √ )): Professor Assoc. Prof. / Sen. Lect. Lecturer Profesor Prof. Madya / P. Kanan Pensyarah

B(iii) Faculty/School/Centre/Unit (Please provide full address):Fakulti/Jabatan /Pusat/Unit (Sila nyatakan alamat penuh):Fakulti of Architecture, Planning and SurveyingUniversiti Teknologi MARA40450 Shah Alam, Selangor

B(iv) Office Telephone No.: 03 - 55211670 Handphone No.: 017 - 3708483No. Telefon Pejabat: No. Telefon Bimbit:

B(v)

E-mail Address: [email protected] e-mel:

BORANG FRGS – A1 (R)

SINGLE DISCIPLINARY PROJECT

APPLICATION FORMFUNDAMENTAL RESEARCH GRANT SCHEME (FRGS)

Skim Geran Penyelidikan Fundamental(Pindaan 1/2012)

JABATAN PENGAJIAN TINGGIKEMENTERIAN PENGAJIAN TINGGI

Kod Rujukan:

Page 2: Borang frgs2  (khairil hizar) 2

B(vi) Date of first appointment with this University: 1.6.1989Tarikh mula berkhidmat dengan Universiti ini:

B(vii) Type of Service (Please tick ( √ )):Jenis Perkhidmatan (Sila tanda ( √ )):

Permanent Contract (State contract expiry date): Tetap Kontrak (Nyatakan tarikh tamat kontrak): ____________________

C RESEARCH INFORMATION / MAKLUMAT PENYELIDIKAN

C(i) Research Area (Please tick ( √ )):Bidang Penyelidikan (Sila tanda ( √ )):

A. Pure Science (Sains Tulen)

Chemistry Physic Biology (Kimia) (Fizik) (Biologi)

Biochemistry Materials Science Mathematics and Statistics (Biokimia) (Sains Bahan) (Matematik dan Statistik)

B. Applied Science (Sains Gunaan) Chemistry Physic Biology

(Kimia) (Fizik) (Biologi)

Mathematics and Statistics Computer Science Biotechnology (Matematik dan Statistik) (Sains Komputer) (Bioteknologi)

Materials Science (Sains Bahan)

C. Technology and Engineering (Teknologi dan Kejuruteraan)

Mechanical & Manufacturing Electrical and Electronic Civil (Mekanikal dan Pembuatan) (Elektrikal dan Elektronik) (Awam) Material and Polymer Chemical Engineering Information and Communication (Bahan dan Polimer) (Kejuruteraan Kimia) Technology (Teknologi Komunikasi dan

Informasi) Energy Transportation (Tenaga) (Pengangkutan)

Page 3: Borang frgs2  (khairil hizar) 2

D. Clinical and Health Sciences (Sains Kesihatan dan Klinikal) Basic Medical Sciences Pharmacy Pharmacology (Sains Perubatan Asas) (Farmasi) (Farmakologi)

Medical Microbiology Parasitology Pathology (Mikrobiologi Perubatan) (Parasitologi) (Pathologi)

Community Medical Prevention Clinical Surgical Clinical Medical (Perubatan Pencegahan (Klinikal Surgikal) (Klinikal Medikal) Masyarakat) Associate Health Science Dental Nursing Science (Sains Kesihatan Bersekutu) (Pergigian) (Sains Kejururawatan)

E. Social Sciences (Sains Sosial)

Anthropology Psychology Sociology (Antropologi) (Psikologi) (Sosiologi) Political Science Business and Management Geography (Sains Politik) (Pengurusan dan Perniagaan) (Geografi) Economic Human Ecology Communication (Ekonomi) (Ekologi Manusia) (Komunikasi)

F. Arts and Applied Arts (Sastera dan Sastera Ikhtisas) Language and Linguistic Literature Religion (Bahasa dan Linguistik) (Kesusasteraan) (Agama)

Philosophy Civilization History (Falsafah) (Tamadun) (Sejarah)

Art Culture Education (Seni) (Budaya) (Pendidikan)

Principle and Law Built Environment Environment (Dasar dan Undang-undang) (Alam Bina- (Alam Sekitar- Aspek Kemanusiaan) Aspek Kemanusiaan)

G. Natural Sciences and National Heritage (Sains Tabii dan Warisan Negara) Environment Forestry Agriculture (Alam Sekitar) (Perhutanan) (Pertanian)

Marine Archaeology Geology (Marin) (Arkeologi) (Geologi) Ethnography Built Environment Culture (Etnografi) (Heritage Aspect) (Budaya) Alam Bina (Aspek Warisan) Biodiversity (Kepelbagaian Biologi)

Page 4: Borang frgs2  (khairil hizar) 2

C(ii) Location of Research:Tempat penyelidikan dijalankan:

(Contoh / Example ) : Animal Experimental Unit, Animal Laboratory Center, Faculty of Medicine, University Malaya, 50603 Lembah Pantai, Kuala Lumpur

1. Centre for Construction Project and Infrastructure ManagementFaculty of Architecture, Planning and SurveyingUniversiti Teknologi MARA40450 Shah Alam, Selangor

2. Enterprise Content and Knowledge Management UnitCawangan Projek KompleksIbu Pejabat Jabatan Kerja Raya MalaysiaJalan Sultan Salahuddin50582 Wilayah Persekutuan Kuala Lumpur

C(iii) Duration of this research (Maximum 36 months): Tempoh masa penyelidikan ini (Maksimum 36 bulan):

Duration: 24 bulan Tempoh : From : 1 Ogos 2013 Dari :

To : 31 Julai 2015 Hingga :

C(iv) Other Researchers:Ahli-ahli penyelidik yang lain:(Please include maximum 5 pages of curriculum vitae for each researcher)

Bil NameNama

IC / Passport Number:

No. Kad Pengenalan/ Pasport:

Faculty/ School/ Centre/ Unit

Fakulti/P.Pengajian/Pusat/Unit

Academic Qualification/Designation

Tahap Kelayakan Akademik/Jawatan

Signature Tandatangan

1 Dr Zulhabri Ismail 760923-03-5327

Faculty of Architecture, Planning and Surveying/Research Management Institute

PhD in Built Environment/ Lecturer DM52

2

Page 5: Borang frgs2  (khairil hizar) 2

C(v) Research projects that have been completed or ongoing by project leader for the last three years. Please provide title of research, grant’s name, position, duration, year commence and year ending. Sila sediakan maklumat termasuk termasuk tajuk, nama geran, peranan, tempoh, tahun mula dan tahun tamat bagi penyelidikan yang sedang/telah dijalankan oleh ketua penyelidik dalam tempoh tiga tahun terakhir.

Title of ResearchTajuk penyelidikan

Grant’s NameNama Geran

Position / RoleJawatan / Peranan

DurationTempoh

Start Date Tarikh mula

End DateTarikh tamat

Preliminary Cost Estimate & Cost Planning

JKR Principal Investigator 12 months August 2012 August 2013

Construction industry Development Board (CIDB)-University technology MARA (UiTM)-Salford University collaborative research to support the Construction Industry Master Plan (CIMP)

CIDB Head of Project 60 monthsNovember

2009November

2014

A Study on the Malaysiaa Legal Framework and Risk Management: Design Professionals

FRGS Principal Investigator 12 months April 2009 April 2010

The Critical Assessment of SMM2 in Preparation for SMM3

The Institution of Surveyors Malaysia

Co-Investigator 12 months March 2010 March 2011

Construction Disputes and Build Projects in Malaysia

UiTM RMI Excellent Grant

Principal Investigator 12 months June 2009 June 2010

Entry participant of Licensed Construction Professionals in Continuing Professional Development Activities

FRGS Principal Investigator 12 months June 2008 June 2009

C(vi) Please provide information on academic publications that has been published by the project leader for the last five (5) years. (Example: Journals, Books, Chapters in books, etc)Sila kemukakan maklumat berkaitan penerbitan akademik yang telah diterbitkan oleh ketua penyelidik dalam tempoh lima (5) tahun terakhir. (Contoh: Jurnal, buku, bab dalam buku, dll)

Title of publicationTajuk penerbitan

Name of journals/booksNama jurnal/buku

Year publishedTahun diterbitkan

Re-learning design and build implementation process in Malaysia: Findings from a workshop

CHUSER 2012 - 2012 IEEE Colloquium on Humanities, Science and Engineering Research, pp. 314-318

2012

Soft Skills Implementation in Construction Management Program: A survey of Malaysian Public Universities.

IEEE Symposium on Humanities, Science and Engineering Research, pp. 1533-1538

2012

Page 6: Borang frgs2  (khairil hizar) 2

The Criticality of Quality Management in Building Corporate Resilience in a Post Recession Period

European Journal of Social Sciences, ISSN: 1450-2267. Vol. 18, No 3

2011

Is Corporate Social Responsibility (CSR) Agenda Losing Momentum with Recession?

International Bulletin Of Business Administration, Issue 10 ISSN: 1451-243x

2011

Bloom's Taxonomy in the Provision of Quantity Surveying Degree Programme

Business, Symposium on Engineering and Industrial Applications (ISBEIA), pp.431 - 436

2011

An evaluation of the Competencies, Skills and Knowledge of Quantity Surveying Graduates in Consultant Quantity Surveying firms in Malaysia

IEEE Colloquium on  Humanities, Science and Engineering (CHUSER), pp. 228-232 2011

A Critical Assessment of the Challenges of Developing the Malaysian Construction Workforce through Training

IEEE Colloquium on  Humanities, Science and Engineering (CHUSER), pp. 223-227 2011

Tracking architectural defects in the Malaysian hospital projects IEEE Symposium on Business, Engineering and

Industrial Applications (ISBEIA), pp. 298-3022011

Fundamental elements of sustainable private financing initiative contracts

IEEE Symposium on  Business, Engineering and Industrial Applications, pp. 334-339

2011

Sustainable Private Financing Initiative Contracts

IEEE Symposium on Business, Engineering and Industrial Applications (ISBEIA), pp. 452-457

2011

Green Campus Initiative Framework at UCSI University and Proposed Framework

Business & Management Quarterly Review Vol. 1, No. 3, pp. 14-27.

2010

Academic Enterpreneurship and Innovation in Higher Education: An Integrated Framework for Malaysian Universities

6th World Scientific and Engineering Academy and Society (WSEAS) International Conference on Educational Technologies (EDUTE’ 10), pp. 30-35

2010

An Exploratory Study on Peer Learning Experiences in the Architectural Design Studio

6th World Scientific and Engineering Academy and Society (WSEAS) International Conference on Educational Technologies (EDUTE’ 10), pp. 36-42

2010

Enhancing Employability of Graduates through Educational Collaboration with professional Institutions: The Experience of the Faculty of Built Environment, University of Malaya

6th World Scientific and Engineering Academy and Society (WSEAS) International Conference on Educational Technologies (EDUTE’ 10), pp. 42-47

2010

Page 7: Borang frgs2  (khairil hizar) 2

Technology transfer (TT) and technology exchange (TE) in Malaysia International Conference on  Education and

Management Technology (ICEMT), pp. 6-122010

Meanings and Interchangeability of Continuing Professional Development (CPD), Training and Education, and their Connection, and their Influence on Learning and Development in Built Environment

Asean Journal of Teaching and Learning in the Higher Education (AJTLHE), Vol. 1, No.1, pp.1-7,

2010

Enhancing Employability of Graduates through Educational Collaboration with professional Institutions: The Experience of the Faculty of Built Environment, University of Malaya”,

6th WSEAS/IASME International Conference on Educational Technologies

2010

Best Practice Framework for Construction Workforce Training

3rd WSEAS International Conference on Energy Planning, Energy Saving, Environmental Education (EPESE’09), pp. 191-195

2009

A Framework for Designing Training for Site Managers

3rd WSEAS International Conference on Energy Planning, Energy Saving, Environmental Education (EPESE’09), pp. 196-200

2009

Research Design and Data Collection Techniques for Investigating People-environment Behavior

3rd WSEAS International Conference on Energy Planning, Energy Saving, Environmental Education (EPESE’09), pp. 212-218

2009

Intangibles in the Built Environment: The Emerging Challenge Facing the Surveying Profession.

The Professional Journal of The Institution of Surveyors, Vol. 44. No 3, pp.18-22 2009

Continuing Professional Development, Training and Education As Part of Technology For Learning Process in Built Environment”,

7th WSEAS International Conference on Education and Educational Technology (EDU’08), pp. 157-162 2008

“An Empirical Study on the Training Needs of Construction Site Managers”

Association of Researchers in Construction Management, ARCOM 2005 - Proceedings of the 21st Annual Conference 1 , pp. 95-104 2005

C(vii) Executive Summary of Research Proposal (maximum 300 words) (Please include the background of research, literature reviews, objectives, research methodology and expected outcomes from the research project)

Ringkasan Cadangan Eksekutif Penyelidikan (maksimum 300 patah perkataan)(Meliputi latar belakang penyelidikan, kajian literatur, kaedah penyelidikan, objektif dan jangkaan hasil penyelidikan)

The practice of knowledge management, driven by change to adopt of new technology and procurement systems in public organisations managing inforastucture projects has been recognised as one of the key enablers for achieving operational effectiveness. This has led to the consequent increase in the numbers of research in this area over the last two decades. The driving challenge has been to establish new knowledge management concepts which can be applied to public project management organisations. Various results have been recorded from the application of these concepts in practice. Some have found the concepts very successful whereas some have failed badly. Numerous follow up studies have been carried out to understand the shortcomings of the application of these concepts, and various strategies for moving forward have come to

Page 8: Borang frgs2  (khairil hizar) 2

the fore.

The application of knowledge management in public project management organisations is relatively new and is evolving dynamically. Many suggestions have been proposed. These can be exemplified amongst others from concepts that link the knowledge management to strategic management (Davenport and Prusak, 2000; Wong and Aspinwall, 2005), knowledge management to communities of practice (Schenkel and Teigland, 2008; Wenger and Snyder, 2000), knowledge manahgement fo organizational learning (Argyris and Schön,1978; Yang, 2007) and knowledge management to innovation (Egbu, 2004; Nonaka and Takeuchi,1995). While there has been much support for application of these concepts, equally there has been much critic that argues their limitations and in their effective application in the project management for public organisations. Central to most of the critics are that these concepts are too theoretical, too rigid and are not holistic enough to be applicable to organisations in variable project settings. Preliminary studies undertaken by this proposal suggest that the development of a knowledgement framework which is able to incorporate the eco-systems and variables within and surrounding the public project management organisation is possible. To date there has been a dearth of research that specifically study these integration and linkages, and the impact of the variable elements of the public project organisations within their eco-systems.

It is the aim of this research to bridge this knowledge gap by developing a new knowledge management framework that integrates all the key elements that impact knowledge management in public project management organisations. It is envisages that with this framework, it is envisaged that the framework will be able to offer a more holistic conception of the internal and external factors which impact the design and implementation of knowledge management within these organisations.

C(viii) Detailed proposal of research project:Cadangan maklumat penyelidikan secara terperinci:

(a) Research background including Hypothesis /Research Questions and Literature Reviews. Keterangan latar belakang penyelidikan termasuk kenyataan hipotesis / persoalan penyelidikan dan kajian literatur.

Background to the research

The conceptual framework drawn to structure the research theoretical framework and the establishment of the research problem statement is shown in Figure 1.

The Theoretical Framework

Knowledge management

Why knowledge mangement?The emergence of knowledge management as one of the latest strategic management approaches in recent years have evolved from the need for a better and systematic way of managing organisational knowledge in order to propel organisations toward superior business growth and competitive advantage, achievable by leveraging their knowledge assets. Prior to the introduction of knowledge management, organisations have been managing knowledge arbitrarily and in an unstructured manner, often with the absence of any proper strategy as guidance. However, due to the pressure of global competition and changes in market condition, this approach is deemed no longer relevant to ensure effective adaptation to the changing landscape.

Fig. 1

Page 9: Borang frgs2  (khairil hizar) 2

The survival of organisations in today’s uncertain economic times is very much dependent upon their ability to adapt and acclimate successfully to the changing climate (Chan and Scott-Ladd, 2004; Loermans, 2002). Failure to act in a timely manner will only lead these organisations to a greater risk of becoming irrelevant. Thus, the necessity for organisations to continuously adapt and innovate in order to remain competitive and viable in the new environment is of highly significant. Over the last two decades, knowledge has been regarded as among the most critical strategic resources of an organisation for sustained competitive advantage and innovation. This necessitates knowledge in organisations to be effectively and systematically managed before wealth generation, sustainable growth and competitive advantage can be achieved (Durst and Edvardsson, 2012).

Approaches to knowledge managementGenerally, there are two commonly adopted approaches to knowledge management; the codification and the personalization (Jasimuddin, 2008). The former focuses on making knowledge more explicit, by viewing knowledge as an object which can be manipulated, transferred and stored (Alavi & Leidner, 2001). In this approach, technology especially ICT plays an important role in capturing and disseminating the knowledge. Technology is used extensively to expedite the diffusion of knowledge through intranet, groupware and email. In fact, many acknowledged that the explosion of knowledge management was attributed to the advent of technology. Hence, it would unthinkable nowadays to carry out proper knowledge management activities without having in place the appropriate technology. However, it must be noted that technology is not knowledge management; instead it should be considered to be one of the key enablers in the implementation (Loermans, 2002; Secton and Senaratne, 2008). On the other hand, the personalization approach is more concerned with connecting people, taking the more traditional route of sharing individual and organisational knowledge between individuals. This approach focuses on extracting and exploiting tacit knowledge, the type of knowledge that is highly contextual and is obtained through experience, observation and reflection that resides largely in human minds (Davenport & Prusak, 2000; Quintas, 2005). Techniques such as Communities of Practice (Lave & Wenger, 1991), After Action Review and Knowledge Networks (Alavi & Leidner, 2001) provide appropriate means of humanized approaches toward individuals with a common interest and shared understanding to interact with each others in the most appropriate and conducive environment for sharing knowledge (O'Dell & Hubert, 2011).

It must be noted that in knowledge management, it would be premature to focus on just one approach while neglecting the other as it would jeopardize the overall effectiveness of the knowledge management process. For instance, too much emphasis on the use of technology in capturing and managing explicit knowledge may lead to the loss of opportunity for organisations to unearth the valuable tacit knowledge that resides in the minds of employees. In contrary, by putting too much effort and time on capturing tacit knowledge, the advantage offered by technology in terms of expediting communications and effective knowledge transfer would come to waste.

Challenge of integrating variables in knowledge management Thus, it would require a concerted effort by the organisation to continuously finding suitable ways to take full advantage of both approaches in an integrated manner (Tan et al., 2012). A study by Oluikpe (2012) which explores the development of knowledge management strategy in a financial instruction fittingly demonstrates the benefit gained by the organisation in striking a balance between the utilization of technology and people approach through communities of practice and a functional portal which together successfully drove the implementation and managed to increase the knowledge flows across the organisation.

Public project management organisations

Knowledge management and the Construction Industry Master Plan (CIMP)The importance of knowledge management to project management organisations has been highlighted in the Construction Industry Master Plan (CIMP), a 10-year strategic transformation plan (2006 – 2015) to reform the construction industry. This can be exemplified from the CIMP Strategic Thrust No 6: To leverage on Information Communication Technology (ICT) in the construction industry. Underpinning thie structegic thrust is the need for the industry to adopt knowledge sharing through nurturing continuous improvement practices by sharing information such as standards and regulations, best practices and job opportunities (CIDB, 2006).

Page 10: Borang frgs2  (khairil hizar) 2

However, despite all the initiatives and promotions there has be little to show that the initiatives have been successful (Hassan, 2011). Due to the inherent characteristic of the construction industry that is extremely fragmented and transient in nature, this creates an environment that inhibits knowledge sharing and continous learning activities to take place (Bishop, Bouchlaghem, Glass, & Matsumoto, 2008).

In Malaysia there are many public organisations that are tasked with the responsibility to manage infrastructure projects. This includes the including Public Works Department (PWD), Department of Irrigation and Drainage (DID), Highway Authority, city and municipality councils, and in-house project management departments of ministries and semi-government agencies. As the nation’s leading public project implementation organizations, these organisations play important roles in the growth of country’s construction industry and the overall economy as a whole and are committed in their mission to meet stakeholders’ expectation by providing the best possible services through successful project delivery undertaken by them completed within the stipulated quality, timeframe and cost parameters (JKR, 2010b). As one of the key players in the construction industry, these public project management organisations relies heavily on information and knowledge to ensure the effective and efficient planning, construction and delivery of infrastructure projects. Therefore, the need to manage project tacit and explicit knowledge is seen as highly critical and crucial. Only by having proper knowledge management techniques in place, construction organisations will be able to leverage on intellectual capital, which resulted in avoiding repetiting costly mistakes and minimising time wastage by reinventing the wheels (Hassan, 2011).

Knowledge Management in the Public Project Management Organisations

Drivers As calls for better and improved public service delivery continue to be demanded by the public in recent years, this has left the public organisations including public project management organisations with no other options but to move forward in finding innovative ways to meet the ever growing expectations (Luen & Al-Hawamdeh, 2001). Moreover, continual public pressure for the public sector to demonstrate greater accountability and transparency in delivering public policy at the expense of fewer resources requires the public sector to conduct a critical evaluation of their current procedures and policies (Riege & Lindsay, 2006). Taken this into consideration, one of the approaches that have been taken under public sector transformation programs is to harness the organisational collective intelligence along with external knowledge resources which underline the need to institutionalize knowledge management in the public sector.

According to the Wiig (2002), a successful implementation of a comprehensive knowledge management can deliver broad and significant benefits to the public sector and the nation as a whole as it helps to develop competent and effective public services to ensure that public interests and agendas are pursued appropriately, prepare the public to become effective policy partners who participate in public decision making, build and leverage public and private intellectual capital which will then lead to pursuing priority initiatives that improve performance and competitiveness and developing capable knowledge workers that are able to perform skilled and knowledge-intensive tasks. In the same vein, Riege & Lindsay (2006) highlight the critical role plays by knowledge management especially the knowledge sharing process in facilitating two way transfers of scientific and socially-based knowledge between the public sector and the stakeholders towards the development of better public policy. Similar to Wiig (2002), the authors highlight four main reasons why knowledge management is getting increased attention from the public sector as follows:

i. To drive efficiencies across all public services by connecting silos of informationii. To develop new or consolidating outdated systems to improve overall performanceiii. To improve accountability and mitigating risk by making informed decisions and resole issued

fasteriv. To deliver better and more cost-effective constituent services such as enhancing partnerships with,

and responsiveness to, the public

Vexing issues of knowledge management implementationNonetheless, despites many realizing the benefits offered by the knowledge management, studies found that the uptake among public organisations in implementing knowledge management is still low as compared to the private organisations (Butler and Murphy, 2007; Cong & Pandya, 2003; Sandhu, Jain, and Ahmad, 2011; Yang 2007). Among the research that has been done to examine the practice of knowledge management in public organisations includes studies in accounting (Chong, Salleh, Ahmad and Syed-Ikhsan, 2011), agriculture (Talisayon, 2013) and police work (Biygautane & Al-Yahya, 2011; Luen & Al-Hawamdeh, 2001; Seba & Rowley, 2010). Tol date, there has not been any study addressing knowledge management

Page 11: Borang frgs2  (khairil hizar) 2

implementation in public project management organisations. The main reason for the slow adoption of knowledge management among public organisations can be attributed primarily to the underlying differences in visions, missions, procedures and culture between the two sectors (Chawla & Joshi, 2010; Cong, Li-Hua, & Stonehouse, 2007; Cong & Pandya, 2003).

Whilst the public sector is mostly driven by a set policy and politics, which place strong emphasis on providing quality public service delivery to the stakeholders, the profit oriented private sector is predominantly driven by its strategy, structure and culture to serve its shareholders (Abdullah & Date, 2009; Chong, Salleh, Ahmad, & Sharifuddin, 2011). As the private sector is constantly exploring new and innovative approaches to remain relevant and competitive, the lack of competitive edge in the public sector has led to the lack of interest and slow adoption of knowledge management within the sector (Cong & Pandya, 2003; Sandhu, Jain, & Ahmad, 2011; Yao, Kam, & Chan, 2007). MAMPU (2010) in its study of knowledge management implementation in Malaysia reveals that out of 94 government agencies being reviewed in 2010; only 12% of them have a knowledge management strategy. This worrying trend is causing lots of concern to the stakeholders on whether the civil servants are fully equipped with the right knowledge and competence in facilitating them in making informed decisions and formulating public policies for the betterment of all.

Realizing this predicament and the loss of opportunities to better enhance public service delivery, various efforts have been taken by the governments in promoting and encouraging the adoption of knowledge management in the public sector including organizing awareness programs such seminars, trainings and workshops on the discipline (Biygautane & Al-Yahya, 2011). However, due to its inherent characteristics that are traditionally rigid, hierarchical and bureaucratic along with other broad range of issues and challenges unique to the public sector, the process can be much more challenging as compared to the private sector (Chong et al., 2011). Unless these issues and challenges are addressed accordingly in a timely manner, they will adversely impact the effectiveness of knowledge management implementation in the public sector.

The challenge to contextualise knowledge management knowledge management in public project management organisationsThe implementation of knowledge management in public project management public organisations is not a straightforward task. There can be no one-size-fits-all knowledge management solution that can simply be adopted. Knowledge management itself is highly contextual and unique for every organisation. Public project management organisations are inevitably confronted with a range issues that will have adverse impact on the knowledge management initiative and it is agreat challenge is to contend with the spectrum of elements which are inherent to the project organisation. The variables can range from the organisational strategic management system, the organisational structure, knowledge gaps, operational procedures to people issues. These are exacerbated further by the differing project size, location, procurement systems and contractual settings which these organisations undertake. Some of the issues are salient and can only be presented by a list of vaguely and briefly defined factors. Often, these leads to a lot of confusion and misunderstanding, especially in the endeavour design and operate to a knowledge management system that works.

Inability to contend with this issues often leads to unwanted failure. (Chua & Lam, 2005; Conley and Wei, 2009). In their studies, Akhavan, Jafari, & Fathian (2005) found that the failure rate knowledge management projects in organisations are between 50% and 70%. There is no assurance of knowledge management success, regardless of the amount of investment being made. A key pre-requisite to potentially successful knowledge management initiative is the ability to address these variable issues (Riege, 2005). In the effort to circumvent these issues, various knowledge management concepts have emerged from research to propose the way forward for the implementation of knowledge management in organisations, public and private alike. While there has been much support for these concepts, equally there has been much critic that argues their practical applicability in the actual implementation. The central theme to most of the critiques are that the frameworks are too theoretical, high-level and are not flexible enough to be applicable to organisations in organisational settings.

Preliminary studies undertaken by this research proposal suggest that this variability are influenced by the contextual uniqueness of the organisation itself and the ecosystem within which it evolves. However, there has been a paucity of research that have been successful in integrating all these elements together. The main findings emerging from the preliminary study of these concepts are the significance of the critical elements which needs to integrated. This includes the organisational strategy and governance, the element of community, organisational learning, innovation, the impact of information technology and the embodiment of common shared values and accordingly the interrelationships between all these elements to knowledge management. This proposal posits that an integrated framework which can link all the existing variable

Page 12: Borang frgs2  (khairil hizar) 2

elements of the frameworks can possibly be developed to offer a holistic conception of the adoption of knowledge management in public project management organisations.

Issues and challenges in implementing Knowledge Management in public project management organisations

While there have been many literatures which highlight the issues and challenges faced by the private sector in implementing knowledge management, unfortunately there is a paucity of research conducted in addressing the factors that inhibit knowledge management within the public project management organisations. Based on a preliminary critical review conducted on the literature pertaining to the problems faced by public organisations in implementing knowledge management, the proposal found the list of barriers which confront the application of knowledge management which can be adapted to public project management organisations as follows:

A. Individual Lack of awareness and understanding

Several researches suggest that employees’ lack of awareness and understanding of knowledge management as one of the main reasons that is causing the organisation within the public sector to continue to struggle in implementing the initiative (Biygautane & Al-Yahya, 2011; Cong et al., 2007; Cong & Pandya, 2003; Yuen, 2007). As a relatively new discipline especially in the public sector, the majority of the civil servants is still not aware of the concept of knowledge management, the activities involved in the processes and the benefits it brings to individual and organisation (Cong et al., 2007). The inadequacy of information leads to a widespread confusion and misunderstanding among employees especially those from the lower levels with regards to their expected roles and responsibilities. As a result, many are reluctant to take part actively in the knowledge-based activities organized by the organisations as they perceive the activities to be secondary and trivial in nature which are of no real value to them in particular.

Lack of values for knowledge sharingKnowledge sharing is considered as the cornerstone of knowledge management, without which, the success of the initiative is far from. Unfortunately, the lack of knowledge sharing is pretty much prevalent in the public sector (Cong et al., 2007; Salleh & Ahmad, 2009; Syed-Ikhsan & Rowland, 2004a; Talisayon, 2013). This predicament can be attributed to a number of reasons. For instance, employees, generally, view the knowledge they possess as a source of power. Therefore they are unwilling to share their knowledge other out of fear that by doing so, it may risk their value to the organisations and jeopardize any career advancement opportunities as well as endangered their job security (Al-Athari & Zairi, 2001).

Poor communication and interpersonal skillsThe success of knowledge management is very much dependent on the employees’ abilities and skills to communicate and interact effectively with others. Employees who possess these traits would have the ability to connect with others in social settings such as knowledge sharing sessions without many difficulties. On the other hand, for those who are lacking in such skills would find themselves unable to contribute or gain any significant benefits from the knowledge related activities and may eventually lead to poor performance. Sandhu et al. (2011) in their study of assessing the public sector employees perception towards the knowledge management in Malaysia posit poor of verbal and interpersonal skills as one of the main individual barriers apart from lack of time and lack of interaction that resulted in their low engagement in knowledge sharing activities.

B. Organisation Rigid and hierarchical organisation structure

Public sector in general is well renowned for its traditional rigid and hierarchical organisation structure which is regulated by a set of rules and procedures. This type of mechanistic structure is useful for large organisations such as public organisations as it helps to ensure smooth operations with a clearly defined job scope and responsibilities, a strong chain of commands and a rapid decision making process. Nevertheless, with such inflexibility, it would have resulted in units and groups to operate in isolation, invisible and unreachable of each other. This segmented structure

Page 13: Borang frgs2  (khairil hizar) 2

will inevitably lead to the development of knowledge silos which are commonly responsible for unnecessary duplication of knowledge, reinventing the wheel or repeating similar mistakes in organisations (Cong et al., 2007; Conley & Wei, 2009).

Lack of a clear and concise knowledge management strategyIt is an acknowledged fact that the success of any initiatives in organisations is very much dependent on the types of strategies being adopted and knowledge management is likewise. The strategy will determine the overall approach and directions taken by the organisations in which goals and objectives will be met. Therefore due to the absence of a comprehensive knowledge management strategy, which consists of policies, procedures and activities for managing organisational knowledge assets, the implementation is at risk. Yet, while many recognized the importance of having a well-defined strategy to provide the basis to move forward (Oluikpe, 2012), surprisingly, findings from a number of empirical studies reveal that there are still organisations out there that do not have a knowledge management strategy in place (MAMPU, 2010).

Misalignment between knowledge management strategy and business strategyEstablishing an alignment between knowledge management and business strategy is essential to ensure successful implementation of the initiative. This is critical to ensure the initiative will be able to contribute effectively towards organisations growth and performance by taking into consideration the organisation’s goals, objectives and others strategic related matters during the development and deployment of knowledge management initiative. In the absence of a clear association between both elements, which has been widely ignored in practice, the impact of knowledge management in demonstrating the strategic importance will be minimal and this will eventually affect employees’ perception and their further commitment in the initiative (Abdullah & Date, 2009).

Dysfunctional organisational cultureOrganisational culture, considered as the glue that binds the organisation together greatly influences the process and outcomes of knowledge management within organisations. Thus, dysfunctional organisational culture including over reliance on individual performance than team efforts, minimum tolerance towards mistakes where mistakes are viewed negatively, a prevailing blame culture and lack of innovation mindset are more likely to cause more harm than good and serve as a major barrier to the organisation's continuous efforts in fostering an environment of openness and cooperation for knowledge management to truly thrive (Sandhu et al., 2011; Yuen, 2007).

Lack of top management support and commitmentOne of the key elements for long-term success in any new initiatives would be a visible and continuous support and sponsorship by the top management and knowledge management in no different (Bartczak, Rainer, Boulton, Oswald, & Malley, 2010). Nevertheless, due to some concern purported by some critics that knowledge management as just another management fad and other concurrently pressing organisational matters that require the immediate attention of the top management, these issues will at times affect their commitment to the initiative. Without the much needed support, it would be almost impossible to sustain further growth of the initiative, especially in getting the resources such as budget and manpower to carry out the related activities and convincing the employees on the importance of knowledge management discourse (Chong et al., 2011).

Lack of rewards and recognition systemCreating a successful knowledge management requires active and continuous commitment from the employees in terms of the amount of energy and time spent in participating in knowledge related activities. Yet, even though many acknowledged the benefits knowledge management offers, either at individual level or collectively as whole, employees as emotional beings would strive more persistently in those activities when they are motivated. By simply depending on employees' willingness to contribute their time and energy in the initiative would be somehow premature and unrealistic (Al-Alawi, Al-Marzooqi, & Mohammed, 2007; Syed-Ikhsan & Rowland, 2004a).

Lack of performance measurementAs most of the public organisations are still in the early stages of setting up or implementing their

Page 14: Borang frgs2  (khairil hizar) 2

knowledge management programs, there is at present little emphasis given to assessing and evaluating their effectiveness by using appropriate performance measurement methods. Whilst many acknowledged the difficulties involved in performing such tasks due to the complexities in understanding the intangible nature of knowledge and the fact that the impact of knowledge management initiative may not be immediately visible, the lack of performance measurement can be a cause for concern especially in demonstrating knowledge management practical value to organisations (Al-Athari & Zairi, 2001; Bartczak et al., 2010).

C. Technolog Inadequate IT systems and processes

It would unthinkable nowadays to implement knowledge management without having a proper technology to support the initiative. In fact, it is widely reported in literature that the popularity gained by knowledge management in recent years is partly due to the critical role played by technology especially IT with regards its speed and efficiency in acquiring, capturing, disseminating and managing knowledge. Having an effective knowledge management system in place is therefore essential in providing the much needed support for knowledge management activities (Hüttenegger, 2003).

Lack of trainingAnother potential barrier is lack of training on knowledge management tools and techniques (Cong et al., 2007; Salleh & Ahmad, 2009). More often than not, the lack of training can be caused by financial and time constraints faced by organisations in organizing the training programs. Nonetheless, the importance of training must not be taken lightly. For instance, with regards to the deployment of knowledge management systems, due to the lack or absence of appropriate training program, employees are unable to utilize all the features available in the systems to their full potential. Consequently, inefficiencies will creep in. This will eventually lead to frustration and low employee morale.

Lack of securityIn connection to technology, there is a genuine concern raised by employees over the issue of security and confidentiality of information being posted and transmitted via the knowledge management systems such as websites and online forums (Salleh & Ahmad, 2009). This is not a baseless assertion as there have been many instances in the past where a string of high profile websites and portals were susceptible to hacking and malware attacks due to loose security measures (Grossman, 2013). And due to the exponential advancement of technology, these vulnerabilities can be difficult to monitor and manage considering their rapidly evolving rate of change.

Problem Statement

Page 15: Borang frgs2  (khairil hizar) 2

The constructs culminated from the literature review converge to proposition the problem statement as shown in Figure 2:

(b) Objective(s) of the Research

Individual

Organisation

Technology

Lack of awareness & understanding

PROBLEM STATEMENT:(Proposition for the proposed

research)Poor knowledge

management in public project management

organisations

Lack of values for knowledge sharing

Poor communication & interpersonal skills

Rigid & hierarchical organization structure

Lack of clear & concise knowledge management

strategy

Misalignment between the knowledge

management & the organisation’s strategy

Dysfunctional organisational culture

Lack of top management support

and commitment

Lack of rewards and recognition system

Lack of performance

measurement

Inadequate IT systems and processes

Lack of training

Lack of security

Fig. 2

Page 16: Borang frgs2  (khairil hizar) 2

Objektif Penyelidikan

(Drawing from the problem statement highlighted in Figure 2)

This study embarks on the following objective:

1) To critically investigate the current concepts, theories and frameworks of knowledge management which are applicable for public project management organisations

2) To investigate the issues and challenges confronting public project management organisations in developing and implementing knowledge management

3) To establish a conceptual knowledge management framework for public project management organisations

4) To validate the conceptual knowledge management framework developed for public project management organisations

(c) Methodology Kaedah penyelidikan

Please state in the form / Sila nyatakan di borang ini

1. Description of MethodologyThe study will be carried out using the mixed method approach, comprising of quantitative and qualitative methods:

Research ObjectiveResearch Methodology

Method Data Collection Analysis

1. To critically investigate the current concepts, theories and frameworks of knowledge management which are applicable for public project management organisations

Document Analysis

Questionnaires

Semi structured interview

Books, Journals, Reports

Chief Knowledge Officers/Knowledge Managers in Public Project Management Organisations

Critical Analysis

SPSS/Rasch

Atlas.TI

2. To investigate the issues and challenges confronting public project management organisations in developing and implementing knowledge management (based on the themes of the six constructs)

Document Analysis

Questionnaires

Semi structured interview

Books, Journals, Reports

Chief Knowledge Officers/Knowledge Managers in Public Project Management Organisations

Critical Analysis

SPSS/Rasch

Atlas.TI

3. To establish a conceptual knowledge management framework for public project management organisations

\

Development of Research Hypothesis

Expert panels Atlas.TI

4. To validate the conceptual knowledge management

Testing of Research Hypothesis

Expert panels Atlas.TI

Page 17: Borang frgs2  (khairil hizar) 2

framework developed for public project management organisations

2. Flow Chart of Research Activities (Please refer to Appendix)

3. Gantt Chart of Research Activities (Please refer to Appendix)

4. Milestones and Dates (Please refer to Appendix)

(d) Expected Results/Benefit Jangkaan Hasil Penyelidikan

1. Novel theories/New findings/Knowledge

To date there has been no study that emprically assessed the issue of slow adoption of knowledge management implementation in the public project management organisations. This research aims to bridge this knowledge gap. The novelty of the research is the establishment of a new conceptual of knowledge management developed into an operational framework to aid the strategic development and monitoring of knowledge management initiatives in public project management organisations.

2. Research PublicationsThree (3) ISI/SCOPUS/IEEE journals

a) Title : Academy of Management Learning & Education ISSN : 1537-260XPublisher : ACAD MANAGEMENTIF : 2.533

b) Title : Public Management Review ISSN : 1471-9037Publisher : ROUTLEDGE JOURNALS, TAYLOR & FRANCIS LTDIF : 1.295

c) Title : Knowledge Management Research & Practice ISSN : 1477-8238Publisher : PALGRAVE MACMILLAN LTDIF : 0.855

3. Specific or Potential ApplicationsThe findings of this research can be used as a term of reference and guidelines for the implementation of knowledge management in public project management organisations as part of an effort to enhance service quality and better delivery of projects to customers.

4. Number of PhD and Masters (by research) Students1 potential PhD candidate

Page 18: Borang frgs2  (khairil hizar) 2

a) Name : Khairil Hizar Md KhuzaimahResearch Title : Developing Knowledge Management Framework for Public project

management organisations

References:

1. Abdullah, & Date, H. (2009). Public Sector Knowledge Management: A Generic Framework. Public Sector ICT Management Review, 3(1), 1–14.

2. Ajmal, M., Helo, P., & Kekäle, T. (2010). Critical factors for knowledge management in project business. Journal of Knowledge Management, 14, 156–168. Retrieved from http://www.emeraldinsight.com.ezaccess.library.uitm.edu.my/journals.htm?issn=1367-3270&volume=14&issue=1&articleid=1840416&show=html

3. Al-Alawi, A. I., Al-Marzooqi, N. Y., & Mohammed, Y. F. (2007). Organizational culture and knowledge sharing: Critical success factors. Journal of Knowledge Management, 11(2). Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-34547483630&partnerID=40&md5=36555fecd04521d0702efd51d6925b18

4. Al-Athari, A., & Zairi, M. (2001). Building benchmarking competence through knowledge management capability. An International Journal, 8(1).

5. Alavi, M., & Leidner, D. E. (2001). Review: Knowledge management and knowledge management systems: Conceptual foundations and research issues. MIS Quarterly: Management Information Systems, 25(1), 107–136. Retrieved from http://www.scopus.com/inward/record.url?eid=2-s2.0-9744248703&partnerID=40&md5=2629ddd19957862f7d9e62cbf65eac82

6. Archer, N. (2006). A Classification of Communities of Practice. In Encyclopedia of Communities of Practice in Information and Knowledge Management.

7. Bartczak, S. E., Rainer, R. K., Boulton, W. R., Oswald, S. L., & Malley, K. O. (2010). Investigating Barriers to Knowledge Management Implementation in the U.S. Military: A Focus on Managerial Influences. In Proceedings of the Southern Association for Information Systems Conference (pp. 23–28).

8. Bishop, J., Bouchlaghem, D., Glass, J., & Matsumoto, I. (2008). Ensuring the effectiveness of a knowledge management initiative. Journal of Knowledge Management, 12(4), 16–29. Retrieved from http://www.emeraldinsight.com/journals.htm?issn=1367-3270&volume=12&issue=4&articleid=1733095&show=abstract

9. Biygautane, M., & Al-Yahya, K. (2011). Knowledge Management in the UAE ’ s Public Sector : (pp. 1–34).

10. Bresnen, M., Edelman, L., Newell, S., Scarbrough, H., & Swan, J. (2003). Social practices and the management of knowledge in project environments. International Journal of Project Management, 21(3), 157–166. doi:10.1016/S0263-7863(02)00090-X

11. Chan, C. C. A., & Scott-Ladd, B. (2004). Organisational learning: Some considerations for human resource practitioners. Asia Pacific Journal of Human Resources, 42(3), 336–347. Retrieved from http://apj.sagepub.com/content/42/3/336.abstract

12. Chawla, D., & Joshi, H. (2010). Knowledge management initiatives in Indian public and private sector organizations. Journal of Knowledge Management, 14, 811–827.

13. Chong, S. C., Salleh, K., Ahmad, S. N. S., & Sharifuddin, S.-I. S. O. (2011). KM implementation in a public sector accounting organization: an empirical investigation. Journal of Knowledge Management, 15(3), 497–512. doi:10.1108/13673271111137457

14. Chua, A., & Lam, W. (2005). Why KM projects fail: a multi-case analysis. Journal of Knowledge

Page 19: Borang frgs2  (khairil hizar) 2

Management, 9(3), 6–17. doi:10.1108/13673270510602737

15. Coakes, E., Amar, A. D., & Granados, M. L. (2010). Knowledge management, strategy, and technology: a global snapshot. Journal of Enterprise Information Management, 23(3), 282–304. doi:10.1108/17410391011036076

16. Coetzee, J. C., Beek, W. S. B. Van, & Buys, A. (2012). A practical knowledge management framework within the pyrometallurgical industry. The Journal of The Southern African Institute of Mining and Metallurgy, 112(July), 621–630.

17. Cong, X., Li-Hua, R., & Stonehouse, G. (2007). Knowledge management in the Chinese public sector: empirical investigation. Journal of Technology Management in China, 2(3), 250–263. doi:10.1108/17468770710825188

18. Cong, X., & Pandya, K. V. (2003). Issues of Knowledge Management in the Public Sector. Electronic Journal of Knowledge Management.

19. Conley, C. A., & Wei, Z. (2009). Factors Critical to Knowledge Management Success. Advances in Developing Human Resources, 11(3), 334–348. Retrieved from http://adh.sagepub.com/content/11/3/334.abstract

20. Droege, S. B. ., & Hoobler, J. M. (2003). Employee turnover and tacit knowledge diffusion: a network perspective. Journal of Managerial Issues, 15(1), 50–64. Retrieved from www.jstor.org/stable/40604414?

21. Durst, S., & Edvardsson, I. R. (2012). Knowledge management in SMEs : a literature review. Journal of Knowledge Management, 16(6), 879–9903. doi:10.1108/13673271211276173

22. Egbu, C. O. (2004). Managing knowledge and intellectual capital for improved organizational innovations in the construction industry: an examination of critical success factors. Engineering, Construction and Architectural Management, 11(5), 301–315. doi:10.1108/09699980410558494

23. Esterhuizen, D., Schutte, C., & Du Toit, A. (2012). A knowledge management framework to grow innovation capability maturity. SA Journal of Information Management, 14(1), 1–10. doi:10.4102/sajim.v14i1.495

24. Garavan, T. N., Carbery, R., & Murphy, E. (2007). Managing intentionally created communities of practice for knowledge sourcing across organisational boundaries: Insights on the role of the CoP manager. The Learning Organization, 14(1), 34–49. doi:10.1108/09696470710718339

25. Goh, A. L. S. (2005). Harnessing knowledge for innovation: an integrated management framework. Journal of Knowledge Management, 9(4), 6–18. doi:10.1108/13673270510610297

26. Grossman, J. (2013). The Web Won’t Be Safe or Secure until We Break It. Communications of the ACM, 56(1), 10. doi:10.1145/2390756.2390758

27. Hassan, P.F. (2011) “The achievements of CIMP, Personal interview 12 June 2011, Kuala Lumpur

28. Holsapple, C. W., & Joshi, K. D. (2000). An investigation of factors that influence the management of knowledge in organizations. Journal of Strategic Information Systems, 9, 235–261.

29. Hüttenegger, G. (2003). Knowledge Management System Building Blocks. Electronic Journal on Knowledge Management, 1(2), 65–76.

30. Jarrar, Y. F. (2002). Knowledge management: learning for organisational experience. Managerial Auditing Journal, 17(6), 322–328. doi:10.1108/02686900210434104

31. Jasimuddin, S. M. (2008). A holistic view of knowledge management strategy. Journal of Knowledge Management, 12(2), 57–66.

32. Kang, S.-W., & Kim, S.-W. (2010). Integrative framework on knowledge management and new product

Page 20: Borang frgs2  (khairil hizar) 2

development. Asian Journal on Quality, 11(2), 157–164. doi:10.1108/15982681011075961

33. Karadsheh, L., Mansour, E., Alhawari, S., Azar, G., & El-Bathy, N. (2009). A Theoretical Framework for Knowledge Management Process : Towards Improving Knowledge Performance. Communications of the IBIMA, 7.

34. Lai, H. (2000). Knowledge Management : A Review of Theoretical Frameworks and Industrial Cases. In 33rd Hawaii International Conference on System Sciences (Vol. 00, pp. 1–10).

35. Lin, H.-F. (2007). Knowledge sharing and firm innovation capability: an empirical study. International Journal of Manpower, 28(3/4), 315–332. doi:10.1108/01437720710755272

36. Luen, T. W., & Al-Hawamdeh, S. (2001). Knowledge management in the public sector: principles and practices in police work. Journal of Information Science, 27(5), 311–318. doi:10.1177/016555150102700502

37. MAMPU. (2010). Knowledge Management Blueprint.

38. Mansour, E., & Alhawari, S. (2011). Development of Conceptual Framework for Knowledge Management Process *. Journal of Modern Accounting and Auditing, 7(8), 864–877.

39. McDermott, R., & O’Dell, C. (2001). Overcoming cultural barriers to sharing knowledge. Journal of Knowledge Management, 5, 76–85.

40. Oluikpe, P. (2012). Developing a corporate knowledge management strategy. Journal of Knowledge Management, 16(6). doi:10.1108/13673271211276164

41. Plessis, M. du. (2007). Knowledge management: what makes complex implementations successful? Journal of Knowledge Management, 11, 91–101. Retrieved from http://www.emeraldinsight.com.ezaccess.library.uitm.edu.my/journals.htm?issn=1367-3270&volume=11&issue=2&articleid=1599332

42. Riege, A. (2005). Three-dozen knowledge-sharing barriers managers must consider. Journal of Knowledge Management, 9(3), 18–35. doi:10.1108/13673270510602746

43. Riege, A., & Lindsay, N. (2006). Knowledge management in the public sector : stakeholder partnerships in the public policy development. Journal of Knowledge Management, 10(3), 24–39. doi:10.1108/13673270610670830

44. Robinson, H. S., Carrillo, P. M., Anumba, C. J., & Al-Ghassani, A. M. (2005). Knowledge management practices in large construction organisations. (C. J. Anumba & P. Carrillo, Eds.)Engineering, Construction and Architectural Management, 12(5), 431–445. doi:10.1108/09699980510627135

45. Salleh, K., & Ahmad, S. N. S. (2009). Knowledge Management in Electronic Government The Organisational Readiness of Local Authorities in Malaysia.pdf . Public Sector ICT Management , 3(1).

46. Sandhu, M. S., Jain, K. K., & Ahmad, I. U. K. B. (2011). Knowledge sharing among public sector employees: Evidence from Malaysia. International Journal of Public Sector Management, 24(3), 206–226. doi:10.1108/09513551111121347

47. Seba, I., & Rowley, J. (2010). Knowledge management in UK police forces. Journal of Knowledge Management, 14, 611–626. Retrieved from http://www.emeraldinsight.com.ezaccess.library.uitm.edu.my/journals.htm?issn=1367-3270&volume=14&issue=4&articleid=1871164&show=html

48. Skyrme, D., & Amidon, D. (1997). The Knowledge Agenda. Journal of Knowledge Management, 1(1), 27–37. Retrieved from http://www.emeraldinsight.com/journals.htm?issn=1367-3270&volume=1&issue=1&articleid=883616&show=abstract

49. Sung Jun, J., & Joo, B.-K. (2011). Knowledge Sharing: The Influences of Learning Organization Culture, Organizational Commitment, and Organizational Citizenship Behaviors. Journal of Leadership

Page 21: Borang frgs2  (khairil hizar) 2

& Organizational Studies, 18(3), 353–364. Retrieved from http://jlo.sagepub.com/content/18/3/353.abstract

50. Syed-Ikhsan, S. O. S. Bin, & Rowland, F. (2004a). Benchmarking knowledge management in a public organisation in Malaysia. Benchmarking: An International Journal, 11(3), 238–266. doi:10.1108/14635770410538745

51. Syed-Ikhsan, S. O. S., & Rowland, F. (2004b). Knowledge management in a public organization: a study on the relationship between organizational elements and the performance of knowledge transfer. Journal of Knowledge Management, 8(2), 95–111. doi:10.1108/13673270410529145

52. Talisayon, S. (2013). Knowledge Management for the Public Sector (pp. 1 – 94). Capstone.

53. Wiig, K. M. (2002). Knowledge management in public administration. Journal of Knowledge Management, 6(3), 224–239. doi:10.1108/13673270210434331

54. Wong, K. Y. (2005). Critical success factors for implementing knowledge management in small and medium enterprises. Industrial Management & Data Systems, 105(3), 261–279. Retrieved from http://www.emeraldinsight.com/journals.htm?articleid=1463424&show=html

55. Yao, L. J., Kam, T. H. Y., & Chan, S. H. (2007). Knowledge sharing in Asian public administration sector: the case of Hong Kong. Journal of Enterprise Information Management, 20(1), 51–69. doi:10.1108/17410390710717138

56. Yuen, Y. H. (2007). Overview of Knowledge Management in the Public Sector (pp. 1–16).

DACCESS TO EQUIPMENT AND MATERIAL / KEMUDAHAN SEDIA ADA UNTUK KEGUNAAN BAGI PENYELIDIKAN INI

Equipment Peralatan

LocationTempat

Example / Contoh:

HRTEMXRD

UiTMUKM

Page 22: Borang frgs2  (khairil hizar) 2

E BUDGET /BELANJAWAN

Please indicate your estimated budget for this research and details of expenditure according to the guidelines attached.Sila nyatakan anggaran bajet bagi cadangan penyelidikan ini dan berikan butir – butir perbelanjaan lengkap dengan berpandukan kepada garis panduan yang dilampirkan.

Budget detailsButiran belanjawan

Amount requested by applicant Jumlah yang dipohon

oleh pemohon

Amount approved by VC/Dep.VC (R&D)/Director of RMC

Jumlah yang diluluskan oleh Naib Canselor/ TNC (P&I)/Pengarah

RMCYear 1

Tahun 1 (RM)

Year 2Tahun 2

(RM)

Year 3Tahun 3

(RM)

TotalJumlah (RM)

E(i) Vote 11000 - Salary and wagesUpah dan Elaun

Untuk Pembantu Penyelidik Siswazah (GRA)

Please specifySila nyatakan secara lengkap dengan pecahannya sekali.

Salary for one (1) GRA @ RM2,000/month for 24 months

24,000 24,000 48,000

Please Indicate the overall Budget

Sila nyatakan bajet secara keseluruhan

Page 23: Borang frgs2  (khairil hizar) 2

Assisting in conducting: Case studies,

document analysis, interview and transcribing data

Questionaire survey and analysing data

E(ii) Vote 21000 - Travelling and Transportation/Perjalanan dan Pengangkutan.Please specifySila nyatakan secara lengkap dengan pecahannya sekali.

1. Local Conferencesi. International

Conference on Human Capital and Knowledge Management 2013 at Kuala Lumpur, Malaysia (3 - 4 December 2013)

2. International Conferences

i. ICIKM 2014 : International Conference on Information and Knowledge Management at Barcelona, Spain (27 – 28 February 2014)

3. Travelling expenses for case studies in Malaysia

2,000

6,000

5,000 5,000

2,000

6,000

10,000

Page 24: Borang frgs2  (khairil hizar) 2

4. Food and Lodging 3,500 3,500 7,000

Budget detailsButiran belanjawan

Amount requested by applicant Jumlah yang dipohon

oleh pemohon

Amount approved by VC/Dep.VC (R&D)/Director of RMC

Jumlah yang diluluskan oleh Naib Canselor/ TNC (P&I)/Pengarah

RMCYear 1

Tahun 1 (RM)

Year 2Tahun 2

(RM)

Year 3Tahun 3

(RM)

TotalJumlah (RM)

E(iii) Vote 24000 - RentalSewaan

Please specifySila nyatakan secara lengkap dengan pecahannya sekali. NIL NIL

Please Indicate the overall Budget

Sila nyatakan bajet secara keseluruhan

E(iv) Vote 27000 - Research Materials & Supplies Bekalan dan Bahan Penyelidikan

Please specifySila nyatakan secara lengkap dengan pecahannya sekali.

1. Stationaries

2. Printing and Binding

3,000

3,000

3,000

3,000

6,000

6,000

Page 25: Borang frgs2  (khairil hizar) 2

3. Reference Books

4. Distribution of questionaires and related expenses

3,000

6,000

3,000

6,000

6,000

12,000

E(v) Vote 28000 - Maintenance and Minor Repair ServicesBaik pulih kecil dan ubahsuai

Please specifySila nyatakan secara lengkap dengan pecahannya sekali. NIL NIL

E(vi) Vote 29000 - Professional Services Perkhidmatan Ikhtisas

Please specifySila nyatakan secara lengkap dengan pecahannya sekali.

1. Professional services

i. Statistician and Copy Editor

2. Honorarium

3. ATLAS.ti course

2,000

2,000

4,000

2,000

4,000

4,000

2,000

Please Indicate the overall Budget

Sila nyatakan bajet secara keseluruhan

E(vii) Vote 35000 - Accessories and EquipmentAksesori dan Peralatan

Page 26: Borang frgs2  (khairil hizar) 2

Please specifySila nyatakan secara lengkap dengan pecahannya sekali. NIL NIL

TOTAL AMOUNTJUMLAH BESAR

113,000

F Declaration by applicant / Akuan Pemohon(Please tick ( √ )): / (Sila tanda ( √ )):

I hereby declare that:Saya dengan ini mengaku bahawa:

1. All information stated here are accurate, KPT and IPT has right to reject or to cancel the offer without prior notice if there is any inaccurate information given. Semua maklumat yang diisi adalah benar, KPT dan IPT berhak menolak permohonan atau membatalkan tawaran pada bila-bila masa sekiranya keterangan yang dikemukakan adalah tidak benar.

2. Application of this fundamental research is presented for the Fundemental Research Grant

Scheme (FRGS).Permohonan projek penyelidikan ini dikemukakan untuk memohon peruntukan di bawah Geran Penyelidikan Fundamental IPT.

3. Application of this fundamental research is also presented for the other reasearch grant/s (grant’s name and total amount)Permohonan projek penyelidikan ini juga dikemukakan untuk memohon peruntukan geran penyelidikan dari (nama geran dan jumlah dana)____________________________________

Date : Applicant’s Signature :Tarikh : Tandatangan Pemohon : ___________________________

Page 27: Borang frgs2  (khairil hizar) 2

G Recommended by Vice Chancellor/Deputy Vice Chancellor (Research and Innovation)/Director of Research Management CenterPerakuan Naib Canselor/Timbalan Naib Canselor(P & I)/Pengarah Pusat Pengurusan Penyelidikan

Page 28: Borang frgs2  (khairil hizar) 2

Please tick ( √ ) Sila tandakan ( √ )

Recommended:Diperakukan:

A. Highly Recommended Sangat Disokong

B. Recommended Disokong

C. Not Recommended (Please specify reason) Tidak Disokong (Sila Nyatakan Sebab)

Comments:Ulasan:

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------

Name: Signature:Nama: Tandatangan:

Date:Tarikh:

Note: APPLICATIONS SUBMITTED WILL BE TREATED IN FULL CONFIDENCE. THE DECISION OF THE FUNDAMENTAL RESEARCH GRANT SCHEME MAIN COMMITTEE MOHE IS FINAL. Semua permohonan dianggap sulit. Keputusan Jawatankuasa Induk Skim Geran Penyelidikan Fundamental KPT adalah MUKTAMAD.