Bridge Design Innovations
Jeff Triezenberg: Bridge Support Engineer Specialist (MDOT)Brad Wagner: Bridge Design Supervising Engineer (MDOT)Jeremy Hedden, (Bergmann & Associates)Dave Juntunen, Bridge Development Engineer, (MDOT)
MDOT ACEC/Michigan Partnering WorkshopFebruary 4, 2016
![Page 2: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/2.jpg)
Four Innovations Presented
Guidelines for Bridge Plan Preparation Jeff Triezenberg, MDOT
MDOT Bridge Design QA/QCBridge Design Reinvention Brad Wagner, MDOT
CFRP - M-102 OVER PLUM CREEK BRIDGE Jeremy Hedden, (Bergmann & Associates)
Update MDOT use of CFRP Prestressed Beams Dave Juntunen, MDOT
![Page 3: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/3.jpg)
Reason for Update
Update plans for current practices Current sample plans > 10 years old Still have metric units
![Page 4: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/4.jpg)
Comments from all stakeholders have not been incorporated. Sample plans presented here are not final.
![Page 5: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/5.jpg)
Example Followed
![Page 6: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/6.jpg)
Major Changes
Hagy, Jessica. Card 1456 www.thisisindexed.com
![Page 7: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/7.jpg)
General Guides
![Page 8: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/8.jpg)
Stamping Guidelines
Addressed in Road Design Manual 1.02.01E Addressed in Road Sample Plans Similar instructions added to Bridge Sample
Plans. Prime stamps Title sheet Subs to consultants add logo to sheets Subs to MDOT stamp the first sheet
![Page 9: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/9.jpg)
Site Sheet Changes
Alignment with road sheets
![Page 10: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/10.jpg)
Site Sheet Changes
![Page 11: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/11.jpg)
Site Sheet Changes
![Page 12: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/12.jpg)
Site Sheet Changes
![Page 13: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/13.jpg)
Soil Borings
![Page 14: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/14.jpg)
Reinforcement Sheet
![Page 15: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/15.jpg)
Proposed Location
Keep current plans as an archive
![Page 16: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/16.jpg)
MDOT BRIDGE DESIGN QA/QCBridge Design Innovations
![Page 17: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/17.jpg)
Background
Bridge Design QA/QC
![Page 18: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/18.jpg)
Background 2007 – I-35W Collapse & Investigation 2011 – FHWA Guidance on QC/QA in Bridge
Design 2012 – FHWA Review of MDOT’s Practices 2014/2015 – Development of MDOT Guidance
Bridge Design QA/QC
![Page 19: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/19.jpg)
Background 2012 FHWA Findings – MDOT Owned Bridges“MDOT in-house designs generally follow the guidance on QC……”
“(For consultant designs)…..MDOT doesn’t routinely verify the Consultant QC/QA plan is actually implemented.”
MDOT’s QC/QA processes for both in-house and consultant designs are not well documented.
Bridge Design QA/QC
![Page 20: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/20.jpg)
MDOT Guidance for BridgeDesign Quality Assurance& Quality Control
Bridge Design QA/QC
![Page 21: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/21.jpg)
Bridge Design QA/QC Guidance Document
Purpose“… to document (MDOT) Bridge Design QC/QA procedures for design and plan preparation of trunk line highway bridge projects. “
Objective“To ensure bridges are designed correctly, with no errors once the design calculations, drawings, and specifications are finalized…”
Bridge Design QA/QC
![Page 22: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/22.jpg)
Bridge Design QA/QC Guidance Document What it does: Establishes definitions of QA/QC for Bridge Provides framework for individual QA/QC Plans
What it doesn’t do: Does not replace consultant QA/QC Plans Does not set requirements for methods of
performing QA/QC.
Bridge Design QA/QC
![Page 23: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/23.jpg)
Document Overview Definitions Qualifications of key personnel Minimum areas to be checked Quality Control Procedures Quality Assurance Procedures In House/Consultant requirements Corrective Actions
Bridge Design QA/QC
![Page 24: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/24.jpg)
What to expect Receipt of QA/QC documentation. Load Rating completed prior to turn-in MDOT Bridge Field services reviews Project Level QA (PLQA) Peer reviews
Bridge Design QA/QC
![Page 25: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/25.jpg)
MDOT BRIDGE DESIGN REINVENTION
Bridge Design Innovations
![Page 26: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/26.jpg)
Process Improvement Process Recommended by management in early 2015 Bridge Design ‘As is” mapping session in July Very successful – many ideas proposed Decided to proceed with process improvement
Bridge Design Reinvention
![Page 27: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/27.jpg)
Many Stakeholders
Bridge Design Reinvention
Road DesignerBridge Designer Hydraulics
Geotechnical
Region
MunicipalityAestheticsLoad Rating
Signing/SignalsConstructionReal Estate
RailroadStructural Fab/materials
MDNR/MDEQ/USACE
Traffic & Safety
![Page 28: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/28.jpg)
Process Takeaways Need to start projects at the right time, but how? Need to bring project deliverables together
between Plan Preview and OEC Fiscal year constraints can leave few options if
something happens during design
Bridge Design Reinvention
![Page 29: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/29.jpg)
Bridge Design Reinvention
![Page 30: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/30.jpg)
www.bergmannpc.com
our people and our passion in every project
CARBON FIBER REINFORCED POLYMERLESSONS LEARNED IN THE USE OF CARBON FIBER COMPOSITE
CABLE (CFCC) ON THE M-102 OVER PLUM CREEK BRIDGE
IN COORDINATION WITH:
![Page 31: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/31.jpg)
www.bergmannpc.com
our people and our passion in every project
BRIEF HISTORY OF CFCC IN MICHIGAN
• DR. GRACE AND MDOT HAVE PARTNERED TO PROMOTE THE USE OF THIS MATERIAL
• EXTERNAL POST TENSIONING COMBINED WITH INTERNAL ON A DOUBLE “T” BEAM IN SOUTHFIELD (THE BRIDGE STREET BRIDGE)
• POST TENSIONING FOR SBS BOX BEAMS
• LONGITUDINAL PRESTRESSING IN CONCRETE BEAMS
• “MILD” REINFORCEMENT IN BEAMS, DECK AND BARRIER
![Page 32: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/32.jpg)
www.bergmannpc.com
our people and our passion in every project
PROJECT OVERVIEW
M-102 overPlum Creek
![Page 33: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/33.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
WB M-102
EB M-102
N
Eight Mile Drain
SITE
![Page 34: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/34.jpg)
www.bergmannpc.com
our people and our passion in every project
• TWIN 75’ LONG BRIDGES
• EIGHT (8) 33” DEEP BY 48” BOX BEAMS
• COMPOSITE CONCRETE DECK
• STANDARD IN EVERYWAY, EXCEPT…
PROJECT OVERVIEW
![Page 35: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/35.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
BRIDGE DETAILS
• CARBON FIBER COMPOSITE CABLE USED IN ALL SUPERSTRUCTURE ELEMENTS
• BOX BEAMS• P/S STRANDS• SHEAR STIRFFUPS• SLAB TIES• “MILD” REINFORCEMENT IN TOP FLANGE
• DECK SLAB• TRANSVERSE AND LONGITUDINAL
REINFORCEMENT
• BARRIER• LONGITUDINAL TEMP & SHIRNKAGE
REINF• GRADE 60 STEEL BAR USED TO
CONNECT DECK TO BARRIER (CRASH WORTHY)
![Page 36: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/36.jpg)
www.bergmannpc.com
our people and our passion in every project
• SCHEDULE / LEAD TIME
• DESIGN CODE AND LACK OF STANDARDS
• MATERIAL LIMITATIONS
• SKEW
DESIGN CHALLENGES
• ADVANCED PROCUREMENT CONTRACT
• ESTIMATING QUANTITY NEEDS INCLUDING WASTE
• COORDINATING FABRICATOR AND CONTRACTOR EFFORTS BY SPECIFICATION
![Page 37: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/37.jpg)
www.bergmannpc.com
our people and our passion in every project
• SCHEDULE / LEAD TIME
• DESIGN CODE AND LACK OF STANDARDS
• MATERIAL LIMITATIONS
• SKEW
DESIGN CHALLENGES
• ACI 440
• DR. GRACE AND LTU RESEARCH
• SPECIAL PROVISIONS
![Page 38: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/38.jpg)
www.bergmannpc.com
our people and our passion in every project
• SCHEDULE / LEAD TIME
• DESIGN CODE AND LACK OF STANDARDS
• MATERIAL LIMITATIONS
• SKEW
DESIGN CHALLENGES
• STRONG IN TENSION / WEAK IN SHEAR (ELIMINATE CRACKING)
• STRENGTH REDUCTIONS (BAR BENDS AND CREEP RUPTURE)
• PULLING ON THE CFCC STRANDS
• SHEAR CAPACITY OF BEAM VS. DEMANDS
4.5” Thick WebAt 1/4 point
12” Thick WebAt End Block
Beam Web(flanges not shown)
![Page 39: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/39.jpg)
www.bergmannpc.com
our people and our passion in every project
DESIGN CHALLENGES
• TENSION IN TOP OF BEAMS IN OBTUSE CORNERS DUE TO SKEW / BACKWALLS
• INTERMEDIATE DIAPHRAGM LOCATION AND DIFFERENTIAL BEAM DEFLECTION
• END DIAPHRAM DIFFERENTIAL DEFLECTION
• SCHEDULE / LEAD TIME
• DESIGN CODE AND LACK OF STANDARDS
• MATERIAL LIMITATIONS
• SKEW
![Page 40: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/40.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
CONSTRUCTION CHALLENGES
• MATERIAL HANDLING
• STRESSING OPERATIONS
• DECK REINFORCEMENT
• NO SMOKING!
• KEEP AWAY FROM ABRASIONS
• STORAGE AND PROTECTION
![Page 41: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/41.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
CONSTRUCTION CHALLENGES
• MATERIAL HANDLING
• STRESSING OPERATIONS
• DECK REINFORCEMENT
• ONE OF THE FIRST USES OF MDOT’S DEBONDING SLEEVE SPEC (NO SPLIT SLEEVES)
• DIFFERENTIAL TEMPERATURES DURING PRESTRESSING OPERATION
• TYPICAL BEAM CONSTRUCTION METHODS…MOSTLY
• ARRANGEMENT OF PRESTRESSING COUPLERS
![Page 42: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/42.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
CONSTRUCTION CHALLENGES
• MATERIAL HANDLING
• STRESSING OPERATIONS
• DECK REINFORCEMENT
• CABLE KEEPS IT CURVE WITHOUT TENSION
• WORKER ACCESS DURING DECK PLACEMENT AND VIBRO COMPACTION
• TIEING BARS
![Page 43: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/43.jpg)
www.bergmannpc.com
our people and our passion in every project
SUMMARY• PROMISING MATERIAL
• CONTINUE TO RESEARCH AND IMPROVE
• USE AS “MILD” REINFORCEMENT NOT PRACTICAL
• POTENTIAL PRODUCTION PLANT PLANNED FOR THE U.S.
• CFCC AND CONCRETE ARE NOT DUCTILE, MUST DESIGN ACCORDINGLY
CFCC Steel
Material Cost per Foot $5/ft $0.67/ft
Material Cost per SFT $115 $15
Total Bridge $/sft $510 $415
![Page 44: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/44.jpg)
www.bergmannpc.com
our people and our passion in every projectour people and our passion in every project
ACKNOWLEDGEMENTS
OWNER
DESIGN RESEARCH / TECHNICAL ADVICE
FABRICATOR / CONTRACTOR
![Page 45: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/45.jpg)
www.bergmannpc.com
our people and our passion in every project
QUESTIONS?
![Page 46: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/46.jpg)
Update: MDOT use of CFRP Prestressed Beams 2011: Pembroke Ave over M-39 2012: M-50 / US-127 BR ov RR 2013-14: EB & WB M-102 over
Plum Creek 2014-15: I-94 over Lapeer
Road. EB & WB 2015: M-66 over West Branch 2015: M-100 over Sharp Drain 2016: M-86 over Prairie Creek 2017: Several Projects being
considered. I-75 over Godard and
Sexton Kilfoil I-94 Projects
![Page 47: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/47.jpg)
CFRP Research – Latest Completed
RC-1620 - Evaluation and Analysis of Decked Bulb T Beam Bridges Polled fund Research project
MICHIGAN, IOWA, MINNESOTA, WISCONSON, OREGON
![Page 48: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/48.jpg)
CFRP Research - Ongoing
Research EVALUATING LONG TERM CAPACITY &
DUCTILITY OF CFRP PRESTRESSING AND POST TENSIONING STRANDS
![Page 49: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/49.jpg)
COLLEGE OF ENGINEERING
49
Experimental Investigation
Evaluate anchorage
Creep
Relaxation
Bond fatigue
Conc. creep, Shrinkage.
Splice length
Freeze-Thaw
Fire
Two sets tested @ 0 & 42 days
Four @ 1 yr.(lab. vs. outdoor)
Four @ 2 yrs.(lab vs. outdoor)
One beam tested @ 28 days
Two @ 2 yrs.(lab. vs. outdoor)
Overall performance
Explicit Performance
Two @ 1 yr.(lab. vs. outdoor)
Five pre-tensioned decked bulb T beams
Un-bonded strands (10 sets)
![Page 50: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/50.jpg)
Development of Design Guides
NCHRP 12-97: Guide Specification for the Design of Concrete Bridge Beams Prestressed with CFRP Systems
MDOT Research: Develop Design Guide Specifications
![Page 51: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/51.jpg)
COLLEGE OF ENGINEERING
51
Long term monitoring of five test specimens
Test Temperature 68 °F ± 4 °F
Test start date 01/14/2014
Average ultimate strength 68.2 kip
Prestressing level 54.8 kip/strand
Test Duration to date 11 months
Prestressing ratio 80%
![Page 52: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/52.jpg)
COLLEGE OF ENGINEERING
52
LVDT for strain measurement
MTS loading actuator
LMT for deflection measurement
4-ft load spreader
Strain gages
![Page 53: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/53.jpg)
COLLEGE OF ENGINEERING
53
Establish bond strength of CFRP
Perform fatigue test on bond test specimens
ACI440.3R-12-B.3 Test method for bond strength of FRP bars by pullout testing
ACI440.3R-12-B.7 Test method for tensile fatigue of FRP bars (performed on bond strength specimens)
![Page 54: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/54.jpg)
COLLEGE OF ENGINEERING
54
CFCC prestressed decked bulb T beam under fire/loading event (ASTM E119)
15'-0"
Applied service load
Initial Prestressing force (kip)
Service load (kip)
72 14100 20132 25
![Page 55: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/55.jpg)
COLLEGE OF ENGINEERING
55
After 25 minutes from the start of testAfter 35 minutes from the start of testAfter 52 minutes from the start of test
![Page 56: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/56.jpg)
![Page 57: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/57.jpg)
Post Fire Test
![Page 58: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/58.jpg)
What we’ve learned
Effective Cross Sectional Area Steel = .217
inch^2 CFCC = .179
inch^2
![Page 59: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/59.jpg)
What we’ve learned
Looking for the “Killer App” Longitudinal pre-tensioning
Need to go from .6 inch diameter strand to .7 inch diameter strand .6 inch diameter strand 1.6 – 1.8 factor for
increase of number of strands if using CFRP vs Steel
.7 inch diameter strand 1.2 factor for increase of number of strands if using CFRP vs Steel
![Page 60: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/60.jpg)
We are not alone
Virginia DOT Bridge Beams with
Carbon Fiber Reinforced Polymer Strands
Piles with Carbon Fiber Reinforced Polymer Strands
![Page 61: Bridge Design Innovations](https://reader033.vdocument.in/reader033/viewer/2022051405/589d823a1a28ab954a8ba453/html5/thumbnails/61.jpg)
Next Steps
Continue to do projects and research Looking for candidate for Decked Bulb-T beam.
Research to confirm .7 inch diameter CFCC strands can be used.
Working through AAASHTO SCOBS (Bridge Committee) Technical Committee T-6 Fiber Reinforced Polymer Composites