2017/18 Bushfire Operations Plan Environment, Planning and Sustainable Development Directorate Bushfire Operations Plan Page 1

Upload: vutruc

Post on 19-Mar-2018

217 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

2017/18 Bushfire Operations Plan

Environment, Planning and Sustainable Development Directorate

Bushfire Operations Plan Page 1

Page 2: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ContentsIntroduction........................................................................................................................................................................................................................... 2

Summary of Proposed Works and Activities...........................................................................................................................................................................2

Approval................................................................................................................................................................................................................................. 2

Fire Business Operating Costs 2017/18..................................................................................................................................................................................2

Seasonal Program 2017/18.................................................................................................................................................................................................... 2

Prevention - Fuel Management 2017/18...............................................................................................................................................................................2

Prescribed Burns................................................................................................................................................................................................................ 2

Cultural Burns..................................................................................................................................................................................................................... 2

Ecological Burns.................................................................................................................................................................................................................. 2

Chemical............................................................................................................................................................................................................................. 2

Grazing............................................................................................................................................................................................................................... 2

Physical Removal................................................................................................................................................................................................................ 2

Slashing.............................................................................................................................................................................................................................. 2

Prevention - RFS Volunteer Burns 2017/18............................................................................................................................................................................2

Prevention - Access Management 2017/18............................................................................................................................................................................2

Maintenance...................................................................................................................................................................................................................... 2

Upgrade.............................................................................................................................................................................................................................. 2

Construction....................................................................................................................................................................................................................... 2

Vegetation Control............................................................................................................................................................................................................. 2

Prevention - Infrastructure 2017/18......................................................................................................................................................................................2

Preparedness - Equipment 2017/18.......................................................................................................................................................................................2

Preparedness - Training 2017/18...........................................................................................................................................................................................2

Audit & Monitoring 2017/18.................................................................................................................................................................................................. 2

Planning & Research 2017/18................................................................................................................................................................................................2

Education 2017/18................................................................................................................................................................................................................. 2

Standby, Response & Recovery 2017/18................................................................................................................................................................................2

Unforeseen Fire Management 2017/18.................................................................................................................................................................................2

Bushfire Operations Plan Page 2

Page 3: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

IntroductionThis document details the bushfire management works and activities the Environment and Planning Directorate (EPSDD) plans to implement on land under its management during the 2017-18 financial year in compliance with the Strategic Bushfire Management Plan Version 3 (SBMP). The document constitutes a Bushfire Operations Plan (BOP) as stipulated under Section 78 of the Emergencies Act 2004.

Summary of Proposed Works and ActivitiesThe following table provides a summary of the bushfire management works and activities EPSDD plans to implement during the 2017-18 financial year under this BOP. Please note that measures of areas and lengths are derived from GIS and may differ slightly from actual areas

    No. Of Activities Ha KmFire Business Operating Costs 7 - -Seasonal Program 3 - -

Prevention - Fuel Management

Chemical 33 372 184Grazing 73 6041 -Physical Removal (All) 34 312 -RFS Prescribed Burns* 7 55 -Prescribed Burns 30 8006Cultural Burn 3 29Ecological Burn 12 224 -Slashing 246 4705 -Total 437 19,774 184

Prevention - Access Management

Construction 1 - 1Upgrade 5 - 35Maintenance 85 - 206Vegetation Control 24 - 273Total 115 - 515

Prevention - Infrastructure 15 - -Equipment Purchase 8 - -

Training

Capacity Building & Succession Training 14 - -Conference 6 - -Essential Competency Attainment 13 - -Essential Competency Maintenance 5 - -External Extension 2 - -National Co-ordination Meeting 14 - -Other Training 2 - -Pre-Season Preparedness 8 - -

Auditing and Monitoring 23 - -Planning and Research 59 - 1Education 7 - -Standby Response and Recovery 1 - -Unforeseen Fire Management 2 - - 742 19,774 700

* These burns are planned to be undertaken by the Rural Fire Service and are not subject to audit.

Bushfire Operations Plan Page 3

Page 4: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ApprovalThe Emergencies Act 2004 requires the EPSDD BOP to be approved by the Commissioner of the Emergency Services Agency (ESA). The letter below is formal notification of approval of the BOP from the ESA Commissioner as required under the Emergencies Act 2004.

Bushfire Operations Plan Page 4

Page 5: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Fire Business Operating Costs 2017/18The following table lists the business operating costs for the Fire Management Section of EPSDD and includes salaries, vehicles and buildings. These costs are not reportable or subject to approval by the Commissioner of the Emergency Services Agency.

ID Item

B01Salaries (OT and Penalties) for Fire Management Section Management Staff (excludes roading and forestry officers).

B02 Salaries (OT and Penalties) for Fire Management Unit Permanent BOP Crew

BO4 Vehicles

BO5 Vehicles Fuel

BO7 Stromlo Office and Hume Weighbridge

BO8 Recruitment and staff management (Includes Fitness tests & Medicals for new staff)

BO9 Salaries for Fire Management Unit Capital Works position

  TOTAL

Seasonal Program 2017/18

Seasonal Crews

ID Item

SP1 Rapid response Grader hire 1840hrs

SP2 Rapid response Dozer hire 1840hrs

SP3a Seasonal crew salaries

  TOTAL

Bushfire Operations Plan Page 5

Page 6: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Prevention - Fuel Management 2017/18

Prescribed Burns

Map ID Map Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Dozer Hrs

Grader Hrs Priority

Hazard Pre-

TreatmentEcological Advice

FB000cVarious Various Various 0

FB000c - As required, assist NSW NPWS with undertaking prescribed burns in NSW which are of benefit to the ACT.

31/07/2017 30/06/2018 BOP Crew 30 20 0 0 2

FB000d Various Various Various 0 FB000d - As required, assist RFS with undertaking prescribed burns on rural leases that are of benefit to PCS managed land. 31/07/2017 30/06/2018 BOP Crew 0 5 0 0 2

FB000e Various Various Various 0 FB000e - Hazard reduction burn reconnaissance and burn planning for the large rural burns 31/07/2017 30/06/2018 Contractor

(other) 0 5 0 0 1

FB000f Various Various Various 0 FB000f - Hazard reduction burn rehabilitation of dormant fire trails and spot overs 31/07/2017 30/06/2018 Various 0 5 0 0 1

FB003 8Urban

Reserves - South

Strategic Fire Fighting Advantage

ZoneOakey Hill 6.47

FB003 - Undertake fuel hazard reduction burn in Oakey Hill to break up a fire run from the Curtin Horse Paddocks to Mt Taylor and protect the suburb of Lyons

31/07/2017 30/06/2018 Various 10 3 0 0 2 Very High Apply guideline 1 & 2 & 3

FB014 7Urban

Reserves - North

Outer Asset Protection Zone Black Mountain 18 FB014 - Undertake hazard reduction burn to reduce the intensity of

fires burning on Black Mt close to the urban edge 31/07/2017 30/06/2018 Various 30 10 0 0 1 High Apply guideline 1 & 2 & 3 & 34

FB016 6Urban

Reserves - North

Inner Asset Protection Zone Black Mountain 4 FB016 - Undertake hazard reduction burn to protect Black Mt Tower 31/07/2017 30/06/2018 Various 15 10 0 0 1 High Apply guideline 1 & 2 & 3 &

34

FB019a 6Urban

Reserves - North

Inner Asset Protection Zone Aranda 2614 1 FB019a - Undertake fuel hazard reduction burn on Aranda Spine to

help protect the suburb of Aranda 31/07/2017 30/06/2018 Various 15 10 0 0 1 High Apply guideline 1 & 2 & 3 & 34

FB019b 6Urban

Reserves - North

Inner Asset Protection Zone Aranda 2614 1 FB019b - Undertake fuel hazard reduction burn on Aranda Spine to

help protect the suburb of Aranda 31/07/2017 30/06/2018 Various 15 10 0 0 1 High Apply guideline 1 & 2 & 3 & 34

FB039 10Urban

Reserves - South

Strategic Fire Fighting Advantage

ZoneMount Taylor 65 FB039 - Undertake hazard reduction on Mount Taylor to help protect

the suburb of Torrens 31/07/2017 30/06/2018 Various 30 10 0 0 1 High Apply guideline 1 & 2 & 3 & 21

FB043 8Urban

Reserves - South

Outer Asset Protection Zone Chapman 2611 13 FB043 - Undertake fuel hazard reduction burn on Cooleman Ridge to

help protect the suburb of Chapman 31/07/2017 30/06/2018 Various 30 10 40 20 1 High Apply guideline 1 & 2 & 3 & 21

FB072 17

National Parks and

Catchments – Namadgi

Landscape Fire Management Zone NNP-Corin 3358

FB072 - Reduce fuels in an area of very high likelihood of fire ignition and spread within the asset of the Corin dam catchment. Also assists in preventing fires from spreading from North to South within the upper cotter catchment.

31/07/2017 30/06/2018 Various 60 35 30 0 2 Very High Apply guideline 1 & 2 & 3 & 4 & 5 & 6 & 29 & 36 & 37 & 36

Bushfire Operations Plan Page 6

Page 7: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Dozer Hrs

Grader Hrs Priority

Hazard Pre-

TreatmentEcological Advice

FB095 21

National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage

ZoneNNP 679 FB095 - To protect the asset of the area unburnt in 2003. 31/07/2017 30/06/2018 Various 60 25 20 0 1 Very High Apply guideline 1 & 2 & 3 & 5

& 36

FB115 14

National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage

ZoneNNP-Bendora 165

FB115 - To strengthen Brindabella Rd as fire control advantage to assist in preventing the North - South spread of fire. Wet forest unlikely to be burnt. Uses wet forest as control line.

31/07/2017 30/06/2018 Various 60 10 10 0 1 Very High Apply guideline 1 & 2 & 3 & 6

FB128 12Urban

Reserves - South

Outer Asset Protection Zone Bonython 2905 9 FB128 - Undertake hazard reduction burn to help protect the suburb of

Bonython 31/07/2017 30/06/2018 Various 30 10 0 0 1 High Apply guideline 1 & 2 & 3

FB165 7Urban

Reserves - North

Strategic Fire Fighting Advantage

Zone

Mount Ainslie-Majura 29 FB165 - Strategic area to contain fires ignited along Mt Ainslie Drive 31/07/2017 30/06/2018 Various 30 10 0 0 1 Very High Apply guideline 1 & 2 & 3 &

16.1

FB187 4 City Services

Strategic Fire Fighting Advantage

ZoneMt Rogers 10 FB187 - Strategic area for containing fires on Mt Rodgers 31/07/2017 30/06/2018 Various 30 10 0 0 1 Very High Apply guideline 1 & 2 & 3 & 20

FB292 15

National Parks and

Catchments – Tidbinbilla

Strategic Fire Fighting Advantage

Zone

Tidbinbilla Nature Reserve 310

FB292 - Maintain low fuels in area of high likelihood of ignition and spread. Also an area where fires burning on the West of the Tidbinbilla Range are likely to spot/spread to.

31/07/2017 30/06/2018 Various 45 10 20 0 1 Very High Apply guideline 1 & 2 & 3 & 36

FB352 7 City Services

Inner Asset Protection Zone O’Connor 2602 2

FB352 - Undertake a fuel hazard reduction burn to help protect the suburb of O'Connor. The burn is located north of Fairfax Street, east of Dryandra Street, and is adjacent to both Bauhinia & Yapunyah St.

31/07/2017 30/06/2018 Various 15 10 0 0 1 High Apply guideline 1 & 2 & 3 & 36

FB365 6Urban

Reserves - North

Outer Asset Protection Zone Gossan Hill 2 FB365 - Undertake hazard reduction burn to help protect Radford 31/07/2017 30/06/2018 Various 15 10 0 0 1 High Apply guideline 1 & 2 & 3 & 36

FB370 6Urban

Reserves - North

Strategic Fire Fighting Advantage

Zone

The Pinnacle Reserve 17 FB370 - Strategic area for containing wildfires ignited along urban

edge before they burn into adjacent bushland. 31/07/2017 30/06/2018 Various 30 10 0 0 2 High Apply guideline 1 & 2 & 3 & 16 & 36

FB444 5Urban

Reserves - North

Strategic Fire Fighting Advantage

ZoneGoorooyarroo 29 FB444 - Strategic area for containing fires before they cross the

Federal Hwy. 31/07/2017 30/06/2018 Various 30 10 0 0 1 Very High Apply guideline 1 & 2 & 3 & 21 & 36

FB601 7Urban

Reserves - North

Strategic Fire Fighting Advantage

ZoneBlack Mountain 16 FB601 - Strategic area for containing wildfires ignited along Belconnen

Way before they burn onto Black Mt. 31/07/2017 30/06/2018 Various 30 10 0 0 2 High Apply guideline 1 & 2 & 3 & 21 & 34 & 36

FB605b 6Urban

Reserves - North

Strategic Fire Fighting Advantage

ZoneCook 2614 3 FB605b - To prevent fires spreading from Mt Painter to Aranda

Bushland. 31/07/2017 30/06/2018 Various 15 10 0 0 2 High Apply guideline 1 & 2 & 3 & 21 & 36

FB628 15

National Parks and

Catchments – Tidbinbilla

Strategic Fire Fighting Advantage

Zone

Tidbinbilla Nature Reserve 582

FB628 - FB628, FB293, FB105 - Undertake strategic fuel reduction burn in Tidbinbilla NR north of Tango's Track, South of Spur 2 Trail, and east of Camelback Fire Trail

31/07/2017 30/06/2018 Various 45 10 20 0 2 Very High Apply guideline 1 & 2 & 3 & 21 & 36

FB671 16Urban

Reserves - South

Strategic Fire Fighting Advantage

Zone

Rob Roy Nature Reserve 124 FB671 - Undertake hazard reduction burn to reduce overall fuel hazard

to < High 31/07/2017 30/06/2018 Various 45 10 20 0 1 Very High Apply guideline 1 & 2 & 3 & 36

Bushfire Operations Plan Page 7

Page 8: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Dozer Hrs

Grader Hrs Priority

Hazard Pre-

TreatmentEcological Advice

FB675 17

National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage

Zone

NNP-Honeysuckle 2230

FB675 - Undertake prescribed burn in Namadgi National Park. The burn is located north of Orroral Ridge Road and Australian Alps Walking Track, east of Smokers Trail and south of Corin Road

31/07/2017 30/06/2018 Various 60 25 40 0 1 Very High Apply guideline 1 & 2 & 3 & 36

FB734 14

National Parks and

Catchments – MRC

Landscape Fire Management Zone Uriarra Forest 114 FB734 - Undertake prescribed burn in the Blue Range area to reduce

the OFH 31/07/2017 30/06/2018 Various 60 10 20 0 1 Very High Apply guideline 1 & 2 & 3 & 16 & 29 & 36

FB757 13

National Parks and

Catchments – Kowen

Strategic Fire Fighting Advantage

ZoneKowen 207 FB757 - reduce the pine slash within the plantation. 31/07/2017 30/06/2018 BOP Crew 30 15 0 0 2 Very High Apply guideline 1 & 2 & 3 & 5

& 39

FB759 14

National Parks and

Catchments – MRC

Landscape Fire Management Zone Uriarra Forest 12 FB759 - Undertake burn to remove pine piles from mechanical removal

works 31/07/2017 30/06/2018 Various 30 15 0 0 1 Very High

Cultural Burns

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description

Scheduled Start

Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

PriorityHazard

Pre- Treatment

Ecological Advice

FB73215

National Parks and Catchments – Tidbinbilla

Strategic Fire Fighting Advantage Zone

Tidbinbilla Nature Reserve

13FB732 - Murumbung Rangers to conduct a burn at Wallaby Rocks

Aboriginal art site with the aim of protecting the site from fire31/07/2017 30/06/2018

Murumbung Rangers

5 5 3 Moderate

FB733 15 National Parks and Catchments – MRC

Landscape Fire Management Zone Pierces Crk 9 FB733 - Murumbung Rangers to conduct a burn at Pierce's Creek grass

tree site 31/07/2017 30/06/2018 Murumbung Rangers 5 5 2 Moderate

FB760 22 National Parks and Catchments – Googong

Strategic Fire Fighting Advantage Zone

Googong Foreshores 7 FB760 - Murumbung Rangers to conduct a cultural burn at London

Bridge to protect the various cultural sites. 31/07/2017 30/06/2018 Murumbung Rangers 5 5 2 High

Ecological Burns

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description

Scheduled Start

Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

PriorityHazard

Pre- Treatment

Ecological Advice

FB0334 Urban Reserves - North

Outer Asset Protection Zone

Dunlop 2615 9FB033 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 2 Moderate Apply guideline 1 & 2 & 3

FB035 4 Urban Reserves - NorthInner Asset Protection

ZoneDunlop 2615 8

FB035 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 1 Very High Apply guideline 1 & 2 & 3 & 21

Bushfire Operations Plan Page 8

Page 9: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description

Scheduled Start

Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

PriorityHazard

Pre- Treatment

Ecological Advice

FB389 6 Urban Reserves - NorthStrategic Fire Fighting

Advantage ZoneKama Nature

Reserve20

FB389 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 1 Very High

Apply guideline 1 & 2 & 3 & 21 & 36

FB704 9 Urban Reserves - South VariousJerrabomberra

Wetland Reserve

9FB704 - Ecological burn to manipulate vegetation in favour of natives and to provide structural diversity to provide mosaic of habitats for a

variety of resident and migratory species31/07/2017 30/06/2018 PCS Staff 0 5 2 High Apply guideline 1 & 2 & 3

FB739 6 Urban Reserves - SouthStrategic Fire Fighting

Advantage ZoneMolonglo 16

FB739 - Ecological Burn. Aim to reduce exotic species cover and promote native species cover. Values: PTWL and NTG

31/07/2017 30/06/2018 PCS Staff 0 5 2 ModerateApply guideline 1 & 2 & 3 & 16

& 29 & 36

FB743 5 Urban Reserves - NorthStrategic Fire Fighting

Advantage Zone

Mulanggari Grassland Reserve

20FB743 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 1 Moderate

Apply guideline 1 & 2 & 3 & 17 & 21 & 22

FB744 4 Urban Reserves - NorthStrategic Fire Fighting

Advantage Zone

Dunlop Grassland Reserve

15FB744 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 2 Moderate

Apply guideline 1 & 2 & 3 & 17 & 22

FB745 5 Urban Reserves - NorthStrategic Fire Fighting

Advantage Zone

Gungaderra Grassland Reserve

20FB745 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 1 Moderate Apply guideline 1 & 2 & 3 & 21

FB746 5 Urban Reserves - NorthStrategic Fire Fighting

Advantage ZoneCrace Grassland

Reserve30

FB746 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Striped

Legless Lizard and Golden Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 2 Moderate

Apply guideline 1 & 2 & 3 & 17 & 21 & 22

FB747 11 Urban Reserves - SouthStrategic Fire Fighting

Advantage Zone

Jerrabomberra Grasslands

Reserve60

FB747 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 1 Moderate

Apply guideline 1 & 2 & 3 & 17 & 21 & 22

FB749 7 Urban Reserves - NorthOuter Asset Protection

ZoneMount Pleasant 10

FB749 - Ecological Burn. Aim to reduce exotic species cover, with a focus on vinca major, and promote native species cover. Values:

declining woodland bird habitat31/07/2017 30/06/2018 PCS Staff 0 5 2 Moderate Apply guideline 1 & 2 & 3

FB758 9 Urban Reserves - SouthStrategic Fire Fighting

Advantage ZoneSymonston 2609 7

FB758 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity

31/07/2017 30/06/2018 PCS Staff 0 5 1 ModerateApply guideline 1 & 2 & 3 & 16

& 20

FB0334 Urban Reserves - North

Outer Asset Protection Zone

Dunlop 2615 9FB033 - Ecological Burn. To increase ecological condition and habitat values of NTG & increase habitat heterogeneity specifically for Golden

Sun Moth.31/07/2017 30/06/2018 PCS Staff 0 5 2 Moderate Apply guideline 1 & 2 & 3

Chemical

Map ID Map Agency/ District Fuel Management

Zone Location Ha Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FC010a10

National Parks and Catchments – MRC

Inner Asset Protection Zone

Murrumbidgee River Corridor

41 0FC010a - Spray around built facilities (buildings, signs, picnic tables etc.) in the Murrumbidgee River Corridor including at Uriarra, Cotter, Pine Island, Kambah

Pool, Point Hut and Tharwa.31/07/2017 30/06/2018 PCS Staff 0 5 1 Moderate Apply guideline 9

Bushfire Operations Plan Page 9

Page 10: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management

Zone Location Ha Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FC011 15National Parks and

Catchments – NamadgiInner Asset Protection

ZoneNNP-Various 3 0

FC011 - Spray around built facilities (buildings, signs etc.) in Namadgi camping and BBQ areas including Mt Clear, Orroral, Glendale, Honeysuckle, Bulls Head,

Bulls Head repeater, Bendora.31/07/2017 30/06/2018 PCS Staff 0 4 1 Moderate Apply guideline 9

FC012 19National Parks and

Catchments – NamadgiInner Asset Protection

ZoneNNP-Various 9 0

FC012 - Spray around built facilities (buildings, signs etc.) at Namadgi huts including Pearsons, Brandy Flat, Brayshaws, Franks.

31/07/2017 30/06/2018 PCS Staff 0 5 1 Moderate Apply guideline 9

FC013 17National Parks and

Catchments – NamadgiInner Asset Protection

ZoneNNP-Various 3 0

FC013 - Spray around built facilities (buildings, signs etc.) at Namadgi homesteads including Gudgenby, Tennant and Orroral.

31/07/2017 30/06/2018 PCS Staff 0 4 1 Moderate Apply guideline 9

FC017 17National Parks and

Catchments – NamadgiStrategic Fire Fighting

Advantage ZoneNNP-Honeysuckle 0 45

FC017 - Undertake herbicide control of re-growth on fire trails treated by the tritter machines at the Blue Gum burn (FB675, AV145)

31/07/2017 30/06/2018Contractor

(fire)0 3 1 High Apply guideline 9

FC021 15National Parks and

Catchments – TidbinbillaStrategic Fire Fighting

Advantage ZoneTidbinbilla Nature

Reserve0 12

FC021 - Undertake herbicide control of re-growth on fire trails treated by the tritter machines at the Tango's Track burn (FB628, FB293, FB105, AV149)

31/07/2017 30/06/2018Contractor

(fire)0 3 2 High Apply guideline 9

FC051 16National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Miowera Pines 8 0FC051 - Undertake herbicide control of re-growth on external boundary of Miowera

treated by mechanical removal (FP1031)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC058 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 1FC058 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV166)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC059 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

NNP-Bendora 0 2FC059 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV165)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC060 14National Parks and Catchments – MRC

Various Uriarra Forest 0 5FC060 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV164)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC062 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 7FC062 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV162)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC063 14National Parks and Catchments – MRC

Various Uriarra Forest 0 3FC063 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV161)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC064 14National Parks and Catchments – MRC

Various Uriarra Forest 0 7FC064 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV160)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC070 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

NNP-Bendora 0 20FC070 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (FB092, AV178)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC071 15National Parks and

Catchments – NamadgiStrategic Fire Fighting

Advantage ZoneNNP-Corin 0 5

FC071 - Undertake herbicide control of re-growth on fire trails treated by mechanical removal (FB100, AV179)

31/07/2017 30/06/2018Contractor

(fire)0 3 2 High Apply guideline 9

Bushfire Operations Plan Page 10

Page 11: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management

Zone Location Ha Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FC072 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Pierces Crk 0 8FC072 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (FB124, AV180)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC075 14National Parks and Catchments – MRC

Various Uriarra Forest 0 4FC075 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV183)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC076 14National Parks and Catchments – MRC

Various Pierces Crk 0 6FC076 - Undertake herbicide control of re-growth on fire trails treated by

mechanical removal (AV184)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC078 20National Parks and

Catchments – NamadgiVarious NNP 0 5

FC078 - Undertake herbicide control of regrowth along the roadside of Brandy Flat Fire Trail (South) as mapped (AV)

31/07/2017 30/06/2018Contractor

(fire)0 3 2 High Apply guideline 9

FC079 13National Parks and

Catchments – GoogongLandscape Fire

Management ZoneKowen 158 0

FC079 - Undertake herbicide control of regrowth along the roadside of strategic fire breaks in Kowen Forest as mapped (AV123)

31/07/2017 30/06/2018Contractor

(fire)0 3 1 High Apply guideline 9

FC080 5 Urban Reserves - NorthLandscape Fire

Management ZoneMount Ainslie-

Majura0 3

FC080 - Undertake herbicide control of regrowth along the roadside of Mt Majura Road as mapped (AV157)

31/07/2017 30/06/2018Contractor

(fire)0 3 1 High Apply guideline 9

FC082 15National Parks and

Catchments – TidbinbillaStrategic Fire Fighting

Advantage ZoneTidbinbilla Nature

Reserve0 6

FC082 - Undertake herbicide control of re-growth on fire trails treated by mechanical removal (FB292, AV186)

31/07/2017 30/06/2018Contractor

(fire)0 3 2 High Apply guideline 9

FC083 15National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Pierces Crk 0 10FC083 - Undertake herbicide control of regrowth along the roadside of Paddy’s

River Rd between the Cotter Avenue and Tanners Flat as mapped (AV188)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC085 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Uriarra Forest 0 4FC085 - Undertake herbicide control of regrowth along the roadside of Brindabella

Rd between East West Rd and Blue Range Rd as mapped (AV190)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC089 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Uriarra Forest 0 3FC089 - Undertake herbicide control of regrowth along the roadside of Wombat

Road as mapped (AV195)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC090 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Uriarra Forest 0 1FC090 - Undertake herbicide control of regrowth along the roadside of the upper

section of Marshall's Break as mapped (AV196)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC091 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 10FC091 - Undertake herbicide control of regrowth along the roadside of Warks

Road as mapped (AV197)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC092 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 2FC092 - Undertake herbicide control of regrowth along the roadside of Pago Break

Road as mapped (AV198)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC093 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 3FC093 - Undertake herbicide control of regrowth along the roadside of Camages

Road as mapped (AV199)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

Bushfire Operations Plan Page 11

Page 12: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management

Zone Location Ha Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FC094 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 5FC094 - Undertake herbicide control of regrowth along the roadside of East West

Road as mapped (AV200)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC095 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Uriarra Forest 0 4FC095 - Undertake herbicide control of regrowth along the roadside of Bullock

Paddock Road as mapped (AV201)31/07/2017 30/06/2018

Contractor (fire)

0 3 1 High Apply guideline 9

FC099 14National Parks and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 0 3FC099 - Undertake herbicide control of regrowth along the roadside of Nursery

Pump Road as mapped (AV205)31/07/2017 30/06/2018

Contractor (fire)

0 3 2 High Apply guideline 9

FC100 0 Various Various Various 150 0FC100 - Undertake herbicide control of regrowth on physical removal jobs from

2016/1731/07/2017 30/06/2018

Contractor (fire)

180 3 1 High Apply guideline 9

Grazing

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG000Various Various Various 0 FG000 - Water cartage and urea blocks for fuel management grazing as required 31/07/2017 30/06/2018 Contractor (fire) 0 1 1

FG043 2Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneMulligans Flat Reserve 89

FG043 - Graze Blocks 1 and 2 Gungahlin to maintain grass fire hazard < 50. Note: grazing is only to be undertaken if grass fuel hazard approaches 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG045 2Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneGungahlin Eucalypt

Plantation298 FG045 - Graze Gungahlin Eucalypt Plantation to maintain grass fire hazard < 50 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG049 1Urban Reserves

- NorthOuter Asset Protection

ZoneHarcourt Hill 26

FG049 - Graze Harcourt Hill to maintain grass height <200mm within 30m of back fences (or slash if not achievable by grazing) and grass fire hazard < 35 elsewhere on

Harcourt Hill as mapped.30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG050 5Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZonePercival Hill Reserve 34 FG050 - Graze Percival Hill Reserve to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG051 4Urban Reserves

- NorthVarious

Dunlop Grassland Reserve

50 FG051 - Graze Dunlop Grassland Reserve to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG054 6National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Lower Molonglo River Corridor

321 FG054 - Graze Lower Molonglo River Corridor to maintain grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

Bushfire Operations Plan Page 12

Page 13: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG055 6Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneKama Nature Reserve 121 FG055 - Graze Kama to maintain grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG056 5Urban Reserves

- NorthVarious

Crace Grassland Reserve

22 FG056 - Graze Bellenden St blocks to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG057 5Urban Reserves

- NorthVarious Watson 2602 17

FG057 - Graze North Watson Blocks to maintain grass height <200mm within 30m of buildings (or slash if not achievable by grazing) and grass fire hazard < 35 elsewhere

within blocks.30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG058 9Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneFyshwick 2609 38

FG058 - Graze Tennant St Block to maintain grass height <200mm within 30m of buildings (or slash if not achievable by grazing) and grass fire hazard < 35 elsewhere

within block.30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG062 16National Parks

and Catchments – MRC

Outer Asset Protection Zone

Murrumbidgee River Corridor

19FG062 - Graze Tharwa blocks to maintain grass height < 200m within 30m of buildings

(or slash if not achievable by grazing) and grass fire hazard < 35 elsewhere.30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG063 12National Parks

and Catchments – MRC

Outer Asset Protection Zone

Murrumbidgee River Corridor

72FG063 - Graze Stranger Hill to maintain grass height <200mm within 30m of back

fences (or slash if not achievable by grazing) and grass fire hazard < 35 elsewhere.30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG064 10National Parks

and Catchments – MRC

VariousMurrumbidgee River

Corridor97 FG064 - Graze Greenway 2900 Paddocks to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG066 10Urban Reserves

- SouthOuter Asset Protection

ZoneUrambi Hills 24

FG066 - Graze strategic areas along Urambi urban interface to maintain grass fire hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG072a 18National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Ingledene 574FG072a - Graze identified compartments within Ingledene West to maintain grass fire

hazard < 50.30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG072b 18National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Ingledene 165FG072b - Graze identified compartments within Ingledene East to maintain grass fire

hazard < 50.30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG073 6Urban Reserves

- NorthVarious Stromlo 171 FG073 - Graze Greenhills West to maintain grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG073a 6Urban Reserves

- SouthOuter Asset Protection

ZoneStromlo 42

FG073a - Graze block immediately to the west of the Arboretum to maintain grass fuel hazard < 35

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG074 8Horse

PaddocksVarious

Arawang - Neighbour Horse Paddocks

52FG074 - Undertake grazing in Arawang - Neighbour Horse Paddocks to achieve Grass

Fuel Hazard < 35 in Arawang 3, 4 and Neighbour 1, 3, 4.30/09/2017 31/03/2018

Contractor(horse Paddocks)

0 1 1 High Apply guideline 8

FG075 6Horse

PaddocksStrategic Fire Fighting

Advantage ZoneCook Horse Paddocks 24

FG075 - Undertake grazing in Cook Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 1, 2, 4.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 2 High Apply guideline 8

Bushfire Operations Plan Page 13

Page 14: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG076 13Horse

PaddocksStrategic Fire Fighting

Advantage ZoneOaks Estate Horse

Paddocks12

FG076 - Undertake grazing in Oaks Estate Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 1, 2, 6.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG077 8Horse

PaddocksStrategic Fire Fighting

Advantage ZoneYarralumla Horse

Paddocks25

FG077 - Undertake grazing in Yarralumla Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 4, 5, 6 and Grass Fuel Hazard < 50 in paddocks 1, 2.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG078 10Horse

PaddocksStrategic Fire Fighting

Advantage ZoneTaylor Horse Paddocks 13

FG078 - Undertake grazing in Taylor Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 3, 4.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 2 High Apply guideline 8

FG079 1Horse

PaddocksStrategic Fire Fighting

Advantage ZoneHall Horse Paddocks 25

FG079 - Undertake grazing in Hall Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 1, 4.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG081 8Horse

PaddocksStrategic Fire Fighting

Advantage ZoneIlloura Horse Paddocks 43

FG081 - Undertake grazing in Illoura Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 4,5,6,7 and Grass Fuel Hazard < 50 in paddock 1.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG082 5Horse

PaddocksStrategic Fire Fighting

Advantage ZoneKaleen Horse Paddocks 11

FG082 - Undertake grazing in Kaleen Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 1, 2.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 2 High Apply guideline 8

FG083 3Horse

PaddocksStrategic Fire Fighting

Advantage ZoneParkwood Horse

Paddocks41

FG083 - Undertake grazing in Parkwood Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddocks 2, 6, 7, 8 and Parkwood JC and Grass Fuel Hazard < 50 in

paddock 3.30/09/2017 31/03/2018

Contractor(horse Paddocks)

0 1 1 High Apply guideline 8

FG084 11Horse

PaddocksStrategic Fire Fighting

Advantage ZoneGilmore Horse

Paddocks10

FG084 - Undertake grazing in Gilmore Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddock 1 and Gilmore 2905 Pony Club.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG085 11Horse

PaddocksStrategic Fire Fighting

Advantage Zone

Rose Cottage - MacArthur Horse

Paddocks45

FG085 - Undertake grazing in Rose Cottage - MacArthur Horse Paddocks to achieve Grass Fuel Hazard < 35 in Rose Cottage 6, 7 and MacArthur Park 1, 2, 3.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 1 High Apply guideline 8

FG086 5Horse

PaddocksOuter Asset Protection

ZoneHackett Horse Paddocks 10

FG086 - Undertake grazing in Hackett Horse Paddocks to achieve Grass Fuel Hazard < 35 in paddock 3.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 2 High Apply guideline 8

FG088 8Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneCooleman Ridge 7

FG088 - Undertake grazing along Cooleman Ridge Bicentennial National Trail and grazing trial area that links Cooleman Ridge Bicentennial National Trail with Nature

Trail Track to maintain grass fuel hazard < 50.30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG089 8Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneStromlo 45 FG089 - Graze Eastern side of Narrabundah Hill to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 2 1 High Apply guideline 8

FG090 1Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneHall 2618 11 FG090 - Graze paddock East side of Hall 2618 to maintain grass fire hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG093 5Urban Reserves

- NorthOuter Asset Protection

ZoneLyneham Ridge 39

FG093 - Graze to maintain overall fuel hazard < moderate in plantation area. Note grazing is excluded from northern most paddock.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

Bushfire Operations Plan Page 14

Page 15: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG094 8 City ServicesStrategic Fire Fighting

Advantage ZoneFisher Parkland 40 FG094 - Graze Fisher Parkland to maintain grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG095 9 City ServicesStrategic Fire Fighting

Advantage ZoneFyshwick 2609 15

FG095 - Graze block between the Monaro Hwy, Canberra Av, Jerrabomberra Crk and railway line to achieve overall grass fuel hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG096 14Territory

Venues and Events

Strategic Fire Fighting Advantage Zone

Stromlo Forest Park 466 FG096 - Graze the are northwest Mt Stromlo to achieve grass fuel hazard < 50 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG099 6 VariousStrategic Fire Fighting

Advantage ZoneCoppins Crossing 175 FG099 - Graze blocks to maintain grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 2 3 High Apply guideline 8

FG100 12National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

25 FG100 - Graze Stranger Paddock to maintain grass fuel hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG101 12National Parks

and Catchments – MRC

Outer Asset Protection Zone

Murrumbidgee River Corridor

10 FG101 - Graze Pine Island Hardwood Plantation to maintain grass fuel hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG102 10Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneUrambi Hills 13

FG102 - Graze strategic areas along Urambi urban interface to maintain grass fire hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 Very High Apply guideline 8

FG103 12Urban Reserves

- SouthOuter Asset Protection

ZoneRob Roy Nature

Reserve13 FG103 - Undertake grazing south of Banks to achieve grass fuel hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG104 13National Parks

and Catchments – Kowen

Strategic Fire Fighting Advantage Zone

Kowen 388FG104 - Undertake grazing in central Kowen area as mapped to achieve grass fuel

hazard < 50 in grassland areas and OFH < Very high in forested areas.30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG105 5Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneGungaderra Grassland

Reserve37

FG105 - Undertake grazing in areas as mapped in Gungaderra Grasslands to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG106 5Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneCrace Grassland

Reserve10

FG106 - Undertake grazing in areas as mapped in Crace Grasslands to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG107 3National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

11FG107 - Undertake grazing in areas as mapped along Stockdill Drive to achieve grass

fuel hazard < 50.30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG109 13National Parks

and Catchments – Kowen

Strategic Fire Fighting Advantage Zone

Kowen 78FG109 - Undertake grazing in mapped area along the Molonglo River adjacent to

Queanbeyan to achieve a grass fuel hazard < 35.30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG110 13National Parks

and Catchments – Kowen

Strategic Fire Fighting Advantage Zone

Kowen 730FG110 - Undertake grazing in East Kowen area both sides of the Kings Highway as

mapped to achieve grass fuel hazard < 50 in grassland areas and OFH < very high in forested areas.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

Bushfire Operations Plan Page 15

Page 16: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG111 16National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Bullen Range Nature Reserve

325FG111 - Undertake grazing Southern end of the Bullen Range Nature Reserve and in Mioweria Pine Plantation as mapped to achieve grass fuel hazard < 50 in grassland

areas and OFH < very high in forested areas.30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG112 8 City ServicesOuter Asset Protection

ZoneWeston Creek 2611 2

FG112 - Undertake grazing in Cotter Road paddock as mapped to achieve grass fuel hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG113 4Urban Reserves

- NorthVarious Dunlop 2615 140

FG113 - Undertake grazing in paddocks to west of Dunlop and McGregor to achieve grass fuel hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG114 9Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneAbattoir Holding

Paddocks165

FG114 - Undertake grazing in identified Abattoir holding paddocks as mapped to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG118 8Horse

PaddocksStrategic Fire Fighting

Advantage ZoneCurtin Horse Paddocks 15

FG118 - Undertake grazing in Curtin Horse Paddocks to achieve Grass Fuel Hazard < 50 in paddocks 1, 4, 5.

30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG121 7Horse

PaddocksStrategic Fire Fighting

Advantage ZoneDuntroon Horse

Paddocks18

FG121 - Undertake grazing in Duntroon Horse Paddocks to achieve Grass Fuel Hazard < 50 in paddocks 3, 4.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG122 11Horse

PaddocksStrategic Fire Fighting

Advantage ZoneHume Horse Paddocks 29

FG122 - Undertake grazing in Hume Horse Paddocks to achieve Grass Fuel Hazard < 50 in paddock 2.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG125 7Urban Reserves

- NorthLandscape Fire

Management ZoneFairbairn 2600 63

FG125 - Graze identified blocks between Woolshed Creek and Majura Road to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG128 12Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneMonaro Hwy 142

FG128 - Graze identified blocks east of the Monaro Highway south of Melrose Pines to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG130 10National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

0FG130 - Graze paddocks west of Kambah Pool Road (excluding gully area) to achieve

grass fuel hazard < 50.30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG132 9Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneFyshwick 2609 24

FG132 - Graze between Canberra Avenue and railway line to achieve grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG135 9Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneFyshwick 2609 25 FG135 - Graze AMTEC site south of Fyshwick 2609 to achieve grass fuel hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG136 5Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneGungahlin 2912 1

FG136 - Graze area to north and west of gas facility off Horse Park Drive to achieve grass fire hazard < 35.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG137 5Urban Reserves

- NorthStrategic Fire Fighting

Advantage ZoneFederal Hwy 10 FG137 - Graze area west of Federal Highway to achieve grass fire hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

Bushfire Operations Plan Page 16

Page 17: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map

Agency/ District

Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FG151 5Urban Reserves

- NorthOuter Asset Protection

ZoneMulanggari Grassland

Reserve26 FG151 - Undertake grazing in area as mapped to maintain grass fuel hazard < 35. 30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG152 5Horse

PaddocksStrategic Fire Fighting

Advantage ZoneKaleen Horse Paddocks 9

FG152 - Undertake grazing in South Kaleen Horse Paddocks to achieve Grass Fuel Hazard < 50 in paddock 3.

30/09/2017 31/03/2018Contractor(horse

Paddocks)0 1 2 High Apply guideline 8

FG154 7Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneJerrabomberra Wetland

Reserve102

FG154 - Undertake grazing in Jerrabomberra Wetlands as mapped to maintain grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG155 6Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneCoppins Crossing 20

FG155 - Graze block West side of Coppins Crossing Rd to maintain grass fire hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG156 6Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneCoppins Crossing 7

FG156 - Graze block East side of Coppins Crossing Rd to maintain grass fire hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 2 High Apply guideline 8

FG157 6Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneCoppins Crossing 150

FG157 - Graze block East side of Coppins Crossing Rd to maintain grass fire hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG158 6Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneCoppins Crossing 50

FG158 - Graze block West side of Coppins Crossing Rd to maintain grass fire hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG160 14National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

12 FG160 - Graze Jews Corner to maintain grass fuel hazard < 50. 30/09/2017 31/03/2018 Licence Holder 0 1 3 High Apply guideline 8

FG161 8Urban Reserves

- SouthStrategic Fire Fighting

Advantage ZoneStromlo 55

FG161 - Undertake grazing at the intersection of Cotter Rd and Eucumbene Drive to maintain grass fuel hazard < 50.

30/09/2017 31/03/2018 Licence Holder 0 1 1 High Apply guideline 8

FG163 6 ArboretumOuter Asset Protection

ZoneVarious 47

FG163 - Graze patch Arboretum paddock GG and neighbouring paddocks in late spring with the aim of achieving a GFH <35

30/09/2017 31/03/2018 Arboretum 0 1 1 High Apply guideline 8

Physical Removal

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FP1006 13 City ServicesInner Asset Protection

ZoneBeard 2620 4

FP1006 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Norse Rd Beard

31/07/2017 30/06/2018 BOP Crew 30 1 2 High Apply guideline 10

Bushfire Operations Plan Page 17

Page 18: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FP1011 12 City Services VariousIsabella Plains

29054

FP1011 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Johnson Dr Isabella Plains

31/07/2017 30/06/2018 BOP Crew 150 1 2 High Apply guideline 10

FP1015 8 City Services Various Duffy 2611 50 FP1015 - Remove Pine wildlings, thin & lift to improve slashing area 31/07/2017 30/06/2018 BOP Crew 150 1 2 High Apply guideline 10

FP1018 4 City ServicesInner Asset Protection

ZoneGiralang 2617 6

FP1018 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Giralang Pines

31/07/2017 30/06/2018 BOP Crew 30 1 2 High Apply guideline 10

FP1023 12 City ServicesInner Asset Protection

ZoneBonython 2905 4

FP1023 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Drakeford Dr Bonython

31/07/2017 30/06/2018 BOP Crew 30 1 2 High Apply guideline 10

FP1024 12 City ServicesInner Asset Protection

ZoneCalwell 2905 10

FP1024 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Johnson Dr Calwell

31/07/2017 30/06/2018 BOP Crew 30 1 2 High Apply guideline 10

FP1031 16National Parks

and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Mioweria 8 FP1031 - External firebreak, boom spraying and some dozer work 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1042 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 19 FP1042 - Removal of pine regrowth as specified in the Blue Range rehab plan 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1043 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 20 FP1043 - Removal of pine regrowth as specified in the Blue Range rehab plan 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1044 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 11 FP1044 - Removal of pine regrowth as specified in the Blue Range rehab plan 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1045 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 23 FP1045 - Removal of pine regrowth as specified in the Blue Range rehab plan 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1046 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 16 FP1046 - Removal of pine regrowth as specified in the Blue Range rehab plan 31/07/2017 30/06/2018 Contractor (fire) 0 1 1 Very High Apply guideline 10

FP1047 15National Parks

and Catchments – Tidbinbilla

Strategic Fire Fighting Advantage Zone

Tidbinbilla Nature Reserve

55FP1047 - Remove the lower limbs and ground debris, remove small shrubs to improve APZ

mowing area in Tidbinbilla as mapped. includes mechanical removal31/07/2017 30/06/2018 BOP Crew 600 1 1 Very High Apply guideline 10

FP1048 15National Parks

and Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

NNP-Bendora 1FP1048 - Remove the lower limbs and ground debris, remove small shrubs & trees to

improve APZ around Bulls Head Repeater31/07/2017 30/06/2018 BOP Crew 30 1 1 Very High Apply guideline 10

FP1049 18National Parks

and Catchments – Namadgi

Landscape Fire Management Zone

NNP-Tennent 1FP1049 - Remove the lower limbs and ground debris, remove small shrubs & trees to

improve APZ around Tennant Fire Tower31/07/2017 30/06/2018 BOP Crew 30 1 1 Very High Apply guideline 10

Bushfire Operations Plan Page 18

Page 19: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FP1050 5Urban Reserves

- NorthLandscape Fire

Management ZoneMount Ainslie-

Majura1

FP1050 - Remove the lower limbs and ground debris, remove small shrubs & trees to improve APZ around Air Services Facility.

31/07/2017 30/06/2018 BOP Crew 30 1 1 High Apply guideline 10

FP1051 6Urban Reserves

- NorthInner Asset Protection

ZoneBruce Ridge 3

FP1051 - Remove the lower limbs and ground debris, remove small shrubs to improve APZ around Calvary Hospital.

31/07/2017 30/06/2018 BOP Crew 500 1 1 High Apply guideline 10

FP1052 14National Parks

and Catchments – MRC

Landscape Fire Management Zone

Uriarra Forest 21FP1052 - Edge prune first two rows of commercial pine blocks along One Stick Road as part

of strategic fuel break31/07/2017 30/06/2018 BOP Crew 120 1 1 Very High Apply guideline 10

FP1053 6Urban Reserves

- NorthInner Asset Protection

ZoneMount Painter

Reserve6

FP1053 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Mt Painter Reserve

31/07/2017 30/06/2018 BOP Crew 60 1 2 Moderate Apply guideline 10

FP1054 8Urban Reserves

- SouthInner Asset Protection

ZoneOakey Hill Reserve

8FP1054 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ

mowing area in Oakey Hill Reserve31/07/2017 30/06/2018 BOP Crew 60 1 2 Moderate Apply guideline 10

FP1055 11Urban Reserves

- SouthInner Asset Protection

ZoneWanniassa Hills 8

FP1055 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Wanniassa Hill Reserve

31/07/2017 30/06/2018 BOP Crew 90 1 2 Moderate Apply guideline 10

FP1056 10Urban Reserves

- SouthInner Asset Protection

ZoneUrambi Hills 8

FP1056 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Urambi Hill Reserve

31/07/2017 30/06/2018 BOP Crew 60 1 2 Moderate Apply guideline 10

FP1057 12 City ServicesInner Asset Protection

ZoneCalwell Hill 2

FP1057 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Calwell Hill

31/07/2017 30/06/2018 BOP Crew 90 1 2 Moderate Apply guideline 10

FP1058 4 City ServicesStrategic Fire Fighting

Advantage ZoneNicholls 2913 1

FP1058 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Nicholls Viner Place

31/07/2017 30/06/2018 BOP Crew 90 1 2 High Apply guideline 10

FP1059 4 City ServicesOuter Asset Protection

ZoneLatham 2615 1

FP1059 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Latham Wrenfordsley Place

31/07/2017 30/06/2018 BOP Crew 60 1 2 High Apply guideline 10

FP1060 13 City ServicesInner Asset Protection

ZoneHarman 2600 2

FP1060 - Mechanical removal of elevated blackberry to improve IAPZ mowing area in Harman Woods Lane

31/07/2017 30/06/2018 Contractor (fire) 10 1 2 Moderate Apply guideline 10

FP1061 8 City ServicesInner Asset Protection

ZoneWeston 2611 2

FP1061 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Weston Unwin Place

31/07/2017 30/06/2018 BOP Crew 30 1 1 Moderate Apply guideline 10

FP1062 17National Parks

and Catchments – Namadgi

Outer Asset Protection Zone

Corin Road 2FP1062 - Remove the lower limbs and ground debris, remove small shrubs to improve APZ

around Corin Ranger House31/07/2017 30/06/2018 BOP Crew 60 1 1 High Apply guideline 10

FP1063 4 City ServicesInner Asset Protection

ZoneDunlop 2615 2

FP1063 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Dunlop Cashion Court

31/07/2017 30/06/2018 BOP Crew 60 1 2 Very High Apply guideline 10

Bushfire Operations Plan Page 19

Page 20: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Fuel Management Zone Location Ha Works Description Scheduled

Start MonthScheduled

Finish Month

WhoEst. Fire

Crew Days

Est. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FP1064 5 City ServicesInner Asset Protection

ZoneLyneham 2602 2

FP1064 - Remove the lower limbs and ground debris, remove small shrubs to improve APZ mowing area in Lyneham Randwick Road. includes mechanical removal

31/07/2017 30/06/2018 Contractor (fire) 60 1 2 High Apply guideline 10

FP1065 1 City ServicesInner Asset Protection

ZoneHall 2618 1

FP1065 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Hall Victoria Street

31/07/2017 30/06/2018 BOP Crew 30 1 2 High Apply guideline 10

FP1066 6 City ServicesInner Asset Protection

ZoneBruce 2617 2

FP1066 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area in Bruce Jaeger Circuit

31/07/2017 30/06/2018 BOP Crew 60 1 2 High Apply guideline 10

FP1067 11 City ServicesInner Asset Protection

ZoneBonython 2905 2

FP1067 - Remove the lower limbs and ground debris, remove small shrubs to improve IAPZ mowing area along

31/07/2017 30/06/2018 BOP Crew 60 1 2 High Apply guideline 10

FP953 11 City Services Various Hume 2620 6 FP953 - Follow up vegetation removal in IAPZ - Hume 31/07/2017 30/06/2018 BOP Crew 60 1 2 High Apply guideline 10

SlashingMap ID Map Agency/ District Fuel Management

Zone Location Ha Works Description Scheduled Start Month

Scheduled Finish Month

WhoEst. Staff Days

Priority Hazard Pre- Treatment

Ecological Advice

FS001 1Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneDunlop Grassland

Reserve15

FS001 - Where possible and where not grazed, slash along management trails to maintain grass fuel hazard < 35 6m wide. Also, where not grazed, slash 6m wide Bicentennial National Trail from Dunlop

Grassland Reserve to Gooromon Pond.30/09/2017 30/04/2018 PCS Staff 2 1 Very High Apply guideline 7

FS002 5Urban Reserves -

NorthInner Asset Protection

ZonePercival Hill Reserve 5

FS002 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide plus adjacent area as mapped (2 x job lot contract cost)

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS004 1Urban Reserves -

NorthInner Asset Protection

ZoneHarcourt Hill 2

FS004 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost)

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS006 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZonePercival Hill Reserve 1 FS006 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 2 2 Very High Apply guideline 7

FS007 2Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMulligans Flat

Reserve36

FS007 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide and 30m wide along gas pipeline.

30/09/2017 30/04/2018 PCS Staff 19 2 Very High Apply guideline 7

FS009 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneGungaderra

Grassland Reserve6 FS009 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

FS011 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMulanggari

Grassland Reserve7 FS011 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 4 2 Very High Apply guideline 7

FS012 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneCrace Grassland

Reserve7 FS012 - Where possible, slash to maintain grass fuel hazard < 50 6m wide along management trails. 30/09/2017 30/04/2018 PCS Staff 4 2 Very High Apply guideline 7

FS013 2Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneGoorooyarroo 82

FS013 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide and 30m wide along gas pipeline.

30/09/2017 30/04/2018 PCS Staff 7 2 Very High Apply guideline 7

FS014 7Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneBlack Mountain 8 FS014 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

FS015 7 Urban Reserves - Inner Asset Protection Black Mountain 0 FS015 - Where possible, slash around ACTEW substation to maintain grass height <200mm 30m 30/09/2017 30/04/2018 PCS Staff 2 1 Very High Apply guideline 7

Bushfire Operations Plan Page 20

Page 21: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

North Zone wide.

FS016 7Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneO'Connor Ridge 4 FS016 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS017 7Urban Reserves -

NorthInner Asset Protection

ZoneO'Connor Ridge 6

FS017 - Where possible, slash around motor village, YHA and house to maintain grass height < 200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS018 6Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneAranda Bushland 4 FS018 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS019 6Urban Reserves -

NorthInner Asset Protection

ZoneAranda Bushland 3

FS019 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS020 6Urban Reserves -

NorthInner Asset Protection

ZoneThe Pinnacle

Reserve6

FS020 - Where possible, slash along the urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS021 6Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneThe Pinnacle

Reserve6

FS021 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide.

30/09/2017 30/04/2018 PCS Staff 4 2 Very High Apply guideline 7

FS022 6Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMount Painter

Reserve3 FS022 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 2 2 Very High Apply guideline 7

FS023 6Urban Reserves -

NorthInner Asset Protection

ZoneMount Painter

Reserve5

FS023 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS024 6Urban Reserves -

NorthInner Asset Protection

ZoneGossan Hill 8

FS024 - Where possible, slash along urban interface to maintain grass height <200mm 20m wide along secondary interface and 30m wide along primary interface (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS025 7Urban Reserves -

NorthInner Asset Protection

ZoneMount Pleasant 5

FS025 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide adjacent to lee interface and 20m wide adjacent to secondary interface (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS026 7Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMount Pleasant 2 FS026 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 2 2 Very High Apply guideline 7

FS027 7Urban Reserves -

NorthInner Asset Protection

ZoneMount Ainslie-

Majura22

FS027 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide adjacent to lee interface, 20m wide adjacent to secondary interface and 30m wide adjacent to

primary interface (includes around pistol club, ACTEW substation)30/09/2017 30/04/2018

Contractor (fire)

1 1 Very High Apply guideline 7

FS028 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMount Ainslie-

Majura14

FS028 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide, including Bicentennial National Trail along the federal hwy and underneath powerlines.

30/09/2017 30/04/2018 PCS Staff 11 2 Very High Apply guideline 7

FS029 9Urban Reserves -

SouthInner Asset Protection

ZoneIsaacs Ridge - Mugga Mugga

5FS029 - Where possible, slash around Quamby, Domestic Animal Services and other buildings to

maintain grass height <200mm 30m wide (2 x job lot contract cost).30/09/2017 30/04/2018

Contractor (fire)

1 1 Very High Apply guideline 7

FS031 9Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneRed Hill 4 FS031 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS032 9Urban Reserves -

SouthInner Asset Protection

ZoneRed Hill 24

FS032 - Where possible, slash along urban interface to maintain grass height <200mm 20m wide along secondary interface and 30m wide along primary interface (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS033 9Urban Reserves -

SouthInner Asset Protection

ZoneJerrabomberra

Wetland Reserve9

FS033 - Where possible, slash around buildings and visitor facilities to maintain grass height <200mm 30m wide.

30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS035 8Urban Reserves -

SouthInner Asset Protection

ZoneOakey Hill Reserve 7

FS035 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS036 8Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneOakey Hill Reserve 3 FS036 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS037 8 Urban Reserves - South

Strategic Fire Fighting Advantage Zone

Mount Taylor 10 FS037 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

Bushfire Operations Plan Page 21

Page 22: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS038 7Urban Reserves -

SouthInner Asset Protection

ZoneMount Taylor 19 FS038 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide. 30/09/2017 30/04/2018 PCS Staff 5 1 Very High Apply guideline 7

FS039 10Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneMcQuoids Hill 5 FS039 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS040 8Urban Reserves -

SouthInner Asset Protection

ZoneCooleman Ridge 15

FS040 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS041 8Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneCooleman Ridge 10

FS041 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide and at least 15m wide along Dam Track, ACTEW Trail and Bicentennial National Trail linking to

sealed road.30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

FS042 8National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

23FS042 - Where possible, slash along Cotter to Kambah Pool Trails to maintain grass fuel hazard <

50 6m wide.30/09/2017 30/04/2018 PCS Staff 7 2 Very High Apply guideline 7

FS044 10Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneFarrer Ridge 4 FS044 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 2 2 Very High Apply guideline 7

FS045 10Urban Reserves -

SouthInner Asset Protection

ZoneFarrer Ridge 6

FS045 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide adjacent to lee interface, 20m wide adjacent to secondary interface and 30m wide adjacent to

primary interface.30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS046 11Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneWanniassa Hills 3 FS046 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS047 11Urban Reserves -

SouthInner Asset Protection

ZoneWanniassa Hills 17

FS047 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide adjacent to lee interface, 20m wide adjacent to secondary interface and 30m wide adjacent to

primary interface (2 x job lot contract cost).30/09/2017 30/04/2018

Contractor (fire)

1 1 Very High Apply guideline 7

FS048 12Urban Reserves -

SouthInner Asset Protection

ZoneTuggeranong Hill 27

FS048 - Where possible, slash along urban interface to maintain grass height <200mm 10m wide adjacent to lee interface, 20m wide adjacent to secondary interface and 30m wide adjacent to

primary interface (2 x job lot contract cost).30/09/2017 30/04/2018

Contractor (fire)

1 1 Very High Apply guideline 7

FS049 10Urban Reserves -

SouthInner Asset Protection

ZoneUrambi Hills 8

FS049 - Where possible, slash along urban interface to maintain grass height <200mm 20m wide adjacent to secondary interface and 30m wide adjacent to primary interface (2 x job lot contract

cost).30/09/2017 30/04/2018

Contractor (fire)

1 1 Very High Apply guideline 7

FS050 10Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneUrambi Hills 8 FS050 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

FS051 10National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

10FS051 - Where possible, slash along management trails near Greenway 2900 to maintain grass fuel

hazard < 50 6m wide.30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

FS052 10National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

33FS052 - Where possible, slash Freshford break, west side of Murrumbidgee River, to maintain grass

fuel hazard < 50 6m wide.30/09/2017 30/04/2018 PCS Staff 3 2 Very High Apply guideline 7

FS053 10National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

11FS053 - Where possible, slash along management trails and adjacent areas between Pine island

and Point Hut to maintain grass fuel hazard < 35 6m wide (except along pipeline road which is to be slashed fence to fence).

30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS054 12National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

6FS054 - Where possible, slash along trail between Point Hut and Lanyon to maintain grass fuel

hazard < 50 3-6m wide.30/09/2017 30/04/2018 PCS Staff 4 2 Very High Apply guideline 7

FS055 10National Parks and Catchments – MRC

Inner Asset Protection Zone

Murrumbidgee River Corridor

40FS055 - Where possible, slash Murrumbidgee Recreation Reserves including Uriarra, Cotter, Pine

Island, Kambah Pool, Point Hut and Tharwa to maintain grass height <200mm .30/09/2017 30/04/2018 PCS Staff 16 1 Very High Apply guideline 7

FS056 15National Parks and

Catchments – Tidbinbilla

Strategic Fire Fighting Advantage Zone

Tidbinbilla Nature Reserve

19FS056 - Where possible, as mapped, slash management trails, roads (including ring road) and

sanctuary fence to maintain grass fuel hazard < 50 3m wide.30/09/2017 30/04/2018 PCS Staff 5 2 Very High Apply guideline 7

Bushfire Operations Plan Page 22

Page 23: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS057 15National Parks and

Catchments – Tidbinbilla

Inner Asset Protection Zone

Tidbinbilla Nature Reserve

8FS057 - Where possible, slash around TNR management facilities including Depot, bore, rock

wallaby enclosures, cross fostering pens, wetlands enclosure fence and VIC to maintain grass height <200mm 30m wide.

30/09/2017 30/04/2018 PCS Staff 5 1 Very High Apply guideline 7

FS058 15National Parks and

Catchments – Tidbinbilla

Inner Asset Protection Zone

Tidbinbilla Nature Reserve

1FS058 - Where possible, slash around Nils, Rock Valley, Dalsetta Garage, Cinerea to maintain grass

height <200mm 30m wide.30/09/2017 30/04/2018 PCS Staff 2 1 Very High Apply guideline 7

FS059 15National Parks and

Catchments – Tidbinbilla

Strategic Fire Fighting Advantage Zone

Tidbinbilla Nature Reserve

20FS059 - Where possible, slash along National Parks and Catchments - Tidbinbilla Station boundary

to maintain grass fuel hazard <35 9m wide.30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS061 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Murrumbidgee River Corridor

6FS061 - Where possible, slash along trails between Uriarra and Cotter within Stoney Creek NR to

maintain grass fuel hazard < 50 6m wide.30/09/2017 30/04/2018 PCS Staff 4 2 Very High Apply guideline 7

FS063 15National Parks and

Catchments – Namadgi

Inner Asset Protection Zone

NNP-Various 6FS063 - Where possible, slash Namadgi camping and BBQ areas including Mt Clear, Orroral,

Glendale, Honeysuckle, Bulls Head, Bulls Head repeater, Bendora to maintain grass height <200mm.

30/09/2017 30/04/2018 PCS Staff 4 1 Very High Apply guideline 7

FS064 19National Parks and

Catchments – Namadgi

Inner Asset Protection Zone

NNP-Various 9FS064 - Where possible, slash around Namadgi huts including Pearsons, Brandy Flat, Brayshaws,

Franks, etc. to maintain grass height <200mm 30m wide around huts.30/09/2017 30/04/2018 PCS Staff 5 1 Very High Apply guideline 7

FS065 17National Parks and

Catchments – Namadgi

Inner Asset Protection Zone

NNP-Various 3FS065 - Where possible, slash around Namadgi homesteads including Gudgenby, Tennant and

Orroral to maintain grass height <200mm 30m wide around homesteads.30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS066 15National Parks and

Catchments – Namadgi

Inner Asset Protection Zone

NNP-Various 3FS066 - Where possible, slash around Namadgi management facilities including VIC , Cotter Hut,

Glendale Depot, Bendora Boat Shed and Corin House and Boat Shed to maintain grass height <200mm 30m wide around facilities..

30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS070 15National Parks and

Catchments – Tidbinbilla

Inner Asset Protection Zone

Tidbinbilla Nature Reserve

0FS070 - Where possible, slash around TNR BBQ and picnic facilities to maintain grass height <

200mm 30m wide.30/09/2017 30/04/2018 PCS Staff 5 1 Very High Apply guideline 7

FS072 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

3FS072 - Where possible, slash around visitor centre and workshop to maintain grass height <

200mm > 30m wide.30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS073 22National Parks and

Catchments – Googong

Strategic Fire Fighting Advantage Zone

Googong Foreshores

80FS073 - Where possible, slash along trails on west side of Googong to maintain grass fuel hazard

<50 6-12m wide.30/09/2017 30/04/2018 PCS Staff 11 2 Very High Apply guideline 7

FS074 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

2FS074 - Where possible, slash around London Bridge Woolshed and Shearer's Quarters to maintain

grass height < 200mm >30m wide.30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS098 6 ArboretumStrategic Fire Fighting

Advantage ZoneWeston Creek 2611 76

FS098 - Slash identified trails and other areas within Stromlo Forest and Weston Creek to maintain grass fuel hazard <50 >6m wide.

30/09/2017 30/04/2018 Arboretum 2 1 Very High Apply guideline 7

FS102 12Urban Reserves -

SouthInner Asset Protection

ZoneRob Roy Nature

Reserve5

FS102 - Where possible, slash along urban interface to maintain grass height <200mm 30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS103 6Territory Venues and

EventsStrategic Fire Fighting

Advantage ZoneStromlo Forest Park 72

FS103 - Slash along identified trails and around bushfire memorial within Stromlo Forest Park to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Territory

Venues and Events

1 1 Very High Apply guideline 7

FS104 8 Horse Paddocks VariousArawang -

Neighbour Horse Paddocks

13FS104 - Undertake slashing in Arawang - Neighbour Horse Paddocks to maintain grass height

<200mm 20m wide south side of Arawang 3 and 4, east side of Neighbour 4 and part of Neighbour 2, and south side of Arawang 3, 10m wide east side of Arawang 3,4, north side o

30/09/2017 30/04/2018Contractor(h

orse Paddocks)

1 1 Very High Apply guideline 7

Bushfire Operations Plan Page 23

Page 24: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS106 6 Horse Paddocks VariousCook Horse Paddocks

4FS106 - Undertake slashing in Cook Horse Paddocks to maintain grass <200mm 10m wide north side of paddock 4, south east side of paddock 2, south side paddocks 2,3, 6m wide east side of

paddocks 1,2 and full width of identified lanes and yards.30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 Very High Apply guideline 7

FS108 8 Horse Paddocks VariousCurtin Horse

Paddocks3

FS108 - Undertake slashing in Curtin Horse Paddocks to maintain grass height <200mm 10m wide south side of paddocks 1,2,3,4,5, east side of paddocks 3,4, 6m wide north and west side of

paddocks 1,2, north side of paddock 3 and full width of identified lanes and y30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 Very High Apply guideline 7

FS110 7 Horse Paddocks VariousDuntroon Horse

Paddocks7

FS110 - Undertake slashing in Duntroon Horse Paddocks to maintain grass height <200mm 30m wide south east side of paddock 3, 10m wide north east and north side of paddock 3, 6m wide south

west side of paddocks 3, 4, and full width of identified lanes, yards and b30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS112 13 Horse Paddocks VariousOaks Estate Horse

Paddocks5

FS112 - Undertake slashing in Oaks Estate Horse Paddocks to maintain grass <200mm in all of paddock 7, 30m wide south side paddock 1,5, 10m wide south and east side of paddock 2, south

side of paddock 3, east side of paddock 6 and full width of identified lanes a30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS114 8 Horse Paddocks VariousYarralumla Horse

Paddocks7

FS114 - Undertake slashing in Yarralumla Horse Paddocks to maintain grass height <200mm 30m wide west side of paddock 8, 10m wide north, south, east side of paddock 7, north side of paddock 8,

south side of paddocks 1,2, east side of paddocks 4,5,6 and full width30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS116 10 Horse Paddocks VariousTaylor Horse

Paddocks5

FS116 - Undertake slashing in Taylor Horse Paddocks to maintain grass height < 200mm 10m wide south side of paddocks 2,3,4, east side of paddocks 1,2, north side of paddocks 1,3,4 and full width

of identified yards and lanes.30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS117 1 Horse Paddocks VariousHall Horse Paddocks

4FS117 - Undertake slashing in Hall Horse Paddocks to maintain grass height <200mm 20m wide

east side of paddocks 1,4 south side of paddocks 2,4, west side of paddock 3, 10m wide south side of paddock 3 and full width of identified lanes and yards.

30/09/2017 30/04/2018Contractor(h

orse Paddocks)

1 1 High Apply guideline 7

FS121 8 Horse Paddocks VariousIlloura Horse

Paddocks10

FS121 - Undertake slashing in Illoura Horse Paddocks to maintain grass height <200mm 20m wide east side of paddocks 6,7, 10m wide north, south and east side of paddock 4 and south side of

paddocks 7, wetland, 2(part), 1 and full width of identified lanes, yards a30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS123 5 Horse Paddocks VariousKaleen Horse

Paddocks2

FS123 - Undertake slashing in Kaleen Horse Paddocks to maintain grass height <200mm 10m wide west side of paddocks 1, 2.

30/09/2017 30/04/2018Contractor(h

orse Paddocks)

1 1 High Apply guideline 7

FS125 3 Horse Paddocks VariousParkwood Horse

Paddocks10

FS125 - Undertake slashing in Parkwood Horse Paddocks to maintain grass height <200mm 30m wide east side of paddocks 7, 6, 20m wide south side of paddocks 7, 2 and Parkwood J.C, 20m wide

south and part of west side of paddock 8, 10m wide north side of paddocks 4,30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS127 11 Horse Paddocks VariousGilmore Horse

Paddocks6

FS127 - Undertake slashing in Gilmore Horse Paddocks to maintain grass height <200mm 30m wide north east side of paddock 1, 10m wide south side of pony club and full width of identified lanes and

yards.30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS129 11 Horse Paddocks VariousRose Cottage -

MacArthur Horse Paddocks

19FS129 - Undertake slashing in Rose Cottage - MacArthur Horse Paddocks to maintain grass height <200mm 30m wide adjacent to Rose Cottage Buildings, 10m wide west side of MacArthur Park 1,5,

Rose Cottage 5, south side of Rose Cottage 1,2, east side of Rose Cottage30/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS131 5 Horse Paddocks VariousHackett Horse

Paddocks6

FS131 - Undertake slashing in Hacket Horse Paddocks to maintain grass height <200mm 30m wide part of south side of paddock 2 part of west side of paddock 5, 10m wide south west part of paddock

3, 10m wide east side of paddocks 1,2, 6m wide east side of paddocks 130/09/2017 30/04/2018

Contractor(horse

Paddocks)1 1 High Apply guideline 7

FS137 5 Urban Reserves - Inner Asset Protection Mulanggari 1 FS137 - Slash along edge of road to maintain grass close to houses <200mm 30m wide. 30/09/2017 30/04/2018 PCS Staff 1 1 High Apply guideline 7

Bushfire Operations Plan Page 24

Page 25: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

North Zone Grassland Reserve

FS187 3 No WasteStrategic Fire Fighting

Advantage ZoneFormer Parkwood

Landfill81 FS187 - Undertake slashing Parkwood Landfill site to maintain grass fuel hazard < 50. 30/09/2017 30/04/2018 No Waste 1 1 High Apply guideline 7

FS188 5 CemeteriesStrategic Fire Fighting

Advantage ZoneMitchell Cemetery 28 FS188 - Undertake slashing Mitchell Cemetery to maintain grass fuel hazard < 50. 30/09/2017 30/04/2018 1 1 High Apply guideline 7

FS216 7Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneMonaro Hwy 77

FS216 - Where possible, undertake rural road slashing along Monaro Hwy as mapped to maintain grass height <200mm.

30/09/2017 30/04/2018Contractor (Districts)

1 1 High Apply guideline 7

FS224 12National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Point Hut Road 14FS224 - Where possible, undertake rural road slashing along Point Hut Road as mapped to maintain

grass height < 200mm.30/09/2017 30/04/2018

Contractor (Districts)

1 1 High Apply guideline 7

FS226 3Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneStockdill Dr 20

FS226 - Where possible, undertake rural road slashing along Stockdill Dr as mapped to maintain grass height < 200mm.

30/09/2017 30/04/2018Contractor (Districts)

1 1 High Apply guideline 7

FS232 18National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Apollo Road 12FS232 - Where possible, undertake rural roadside slashing along Apollo Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS233 18National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Boboyan Road 25FS233 - Where possible, undertake rural roadside slashing along Boboyan Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS234 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Brindabella Road 32FS234 - Where possible, undertake rural roadside slashing along Brindabella Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS236 15National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Corin Road 24FS236 - Where possible, undertake rural roadside slashing along Corin Road as mapped to maintain

grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS239 3National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Fairlight Road 4FS239 - Where possible, undertake rural roadside slashing along Fairlight Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS242 13National Parks and

Catchments – KowenStrategic Fire Fighting

Advantage ZoneKings Highway 30

FS242 - Where possible, undertake rural roadside slashing along Kings Highway as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

2 1 High Apply guideline 7

FS243 13National Parks and

Catchments – KowenStrategic Fire Fighting

Advantage ZoneKowen Road 2

FS243 - Where possible, undertake rural roadside slashing along Kowen Road as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

2 1 High Apply guideline 7

FS247 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Mountain Creek Road

6FS247 - Where possible, undertake rural roadside slashing along Mountain Creek Road as mapped

to maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS248 18National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Naas Road 29FS248 - Where possible, undertake rural roadside slashing along Naas Road as mapped to maintain

grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS250 20National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Orroral Road 8FS250 - Where possible, undertake rural roadside slashing along Orroral Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS251 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Paddys River Road 34FS251 - Where possible, undertake rural roadside slashing along Paddys River Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

Bushfire Operations Plan Page 25

Page 26: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS254 13National Parks and

Catchments – KowenStrategic Fire Fighting

Advantage ZoneSutton Road 17

FS254 - Where possible, undertake rural roadside slashing along Sutton Road as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

2 1 High Apply guideline 7

FS255 16National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Tidbinbilla Rd 57FS255 - Where possible, undertake rural roadside slashing along Tidbinbilla Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS256 15National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Tidbinbilla Tracking Station Rd

6FS256 - Where possible, undertake rural roadside slashing along Tidbinbilla Tracking Station Rd as

mapped to maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS257 18National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Top Naas Road 5FS257 - Where possible, undertake rural roadside slashing along Top Naas Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS258 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Uriarra Rd 55FS258 - Where possible, undertake rural roadside slashing along Uriarra Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

2 1 High Apply guideline 7

FS259 1Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneWallaroo Road 3

FS259 - Where possible, undertake rural roadside slashing along Wallaroo Road as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

2 1 High Apply guideline 7

FS260 9Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneWoods Lane 4

FS260 - Where possible, undertake rural roadside slashing along Woods Lane as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

2 1 High Apply guideline 7

FS261 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

2FS261 - Where possible, slash 6m around facilities, including picnic tables and toilets, within

downstream picnic area to maintain grass <200mm and also remove excess leaf litter and dead shrubs 6m around facilities.

30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS262 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

3FS262 - Where possible, slash 6m around facilities, including picnic tables and toilets, within

Foreshores Carpark recreation area to maintain grass <200mm and also remove excess leaf litter and dead shrubs 6m around facilities.

30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS263 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

3 FS263 - Where possible, slash 30m around residences to maintain grass <200mm. 30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS264 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

2FS264 - Where possible, slash 30m around Tin Hut and associated facilities to maintain grass

<200mm.30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS265 22National Parks and

Catchments – Googong

Inner Asset Protection Zone

Googong Foreshores

1FS265 - Where possible, slash 30m around London Bridge Homestead and associated structures to

maintain grass <200mm.30/09/2017 30/04/2018 PCS Staff 2 1 High Apply guideline 7

FS268 12 City ServicesInner Asset Protection

ZoneCalwell Hill 1

FS268 - Where possible, slope mow adjacent to houses on Calwell Hill to maintain grass < 200mm 10m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS270 10 City ServicesInner Asset Protection

ZoneSulwood Dr 9

FS270 - Where possible slash bank along south side of Sulwood Dr to maintain grass < 200mm (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Very High Apply guideline 7

FS271 15National Parks and

Catchments – Tidbinbilla

Inner Asset Protection Zone

Birragai 3FS271 - Where possible, and if not achieved by macropod grazing, slash 30m around buildings at

Birragai to maintain grass < 200mm.30/09/2017 30/04/2018 PCS Staff 5 1 Very High Apply guideline 7

FS272 5Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneLyneham Ridge 19

FS272 - Where possible, slash along internal trails and boundaries to maintain grass fuel hazard < 35 6m wide.

30/09/2017 30/04/2018 PCS Staff 3 1 Very High Apply guideline 7

FS276 1Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneHall 2618 2

FS276 - Where possible, slash along internal trails and boundaries to maintain grass fuel hazard < 50 6m wide and along urban interface to maintain grass height < 200mm 30m wide.

30/09/2017 30/04/2018 PCS Staff 2 1 Very High Apply guideline 7

Bushfire Operations Plan Page 26

Page 27: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS277 9 City ServicesInner Asset Protection

ZoneSymonston 2609 4

FS277 - Slash 30m around buildings at Symonston to maintain grass at less than 200mm (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS286 2Urban Reserves -

NorthInner Asset Protection

ZoneMulligans Flat

Reserve5

FS286 - Where possible, and if not achieved by macropod grazing, slash 30m wide along urban interface of Forde to maintain grass < 200mm.

30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS296 9Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneIsaacs Ridge - Mugga Mugga

26 FS296 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 5 1 High Apply guideline 7

FS297 11Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneJerrabomberra

Grasslands Reserve8 FS297 - Where possible, slash along management trails to maintain grass fuel hazard < 50 6m wide. 30/09/2017 30/04/2018 PCS Staff 4 1 Moderate Apply guideline 7

FS298 17National Parks and

Catchments – Namadgi

Inner Asset Protection Zone

NNP-Bimberi 1 FS298 - Where possible, slash around air navigation facility on Mt Ginini to maintain grass <200mm. 30/09/2017 30/04/2018 PCS Staff 2 1 Moderate Apply guideline 7

FS304 12Urban Reserves -

SouthInner Asset Protection

ZoneAmber Ridge 7

FS304 - Where possible, slash along urban interface of Amber Ridge to maintain grass <200mm >30m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 Moderate Apply guideline 7

FS312 9Urban Reserves -

SouthInner Asset Protection

ZoneIsaacs Ridge -

Mugga11

FS312 - Undertake slashing to maintain grass height < 200mm for 20m out from the urban interface of Isaacs and O'Malley (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS313 11 City ServicesInner Asset Protection

ZoneGilmore 2905 2

FS313 - Undertake slashing to maintain grass height < 200mm for 30m out from the urban interface on Gilmore Hill (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS321 2Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMulligans Flat

Reserve26

FS321 - Undertake slashing 3m either side of Mulligans Flat fence to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018 PCS Staff 5 1 High Apply guideline 7

FS322 3 PropertyInner Asset Protection

ZoneParkwood 3 FS322 - Undertake slashing to maintain grass height < 200mm 30m out from Parkwood. 30/09/2017 30/04/2018 Property 2 1 High Apply guideline 7

FS343 6National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Lower Molonglo River Corridor

45FS343 - Where possible, undertake slashing along Pipeline Rd as mapped to maintain grass hazard

< 50.30/09/2017 30/04/2018 PCS Staff 5 1 High Apply guideline 7

FS354 6 City ServicesInner Asset Protection

ZoneAranda 2614 2

FS354 - Undertake slashing to maintain grass height < 200mm as mapped from the urban edge in Aranda Spine (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS356 6 ArboretumGeneral Fire

Management Zone GFMZ

International Arboretum

152FS356 - Slash within and between tree plantings within the International Arboretum to maintain grass

fuel hazard < 50.30/09/2017 30/04/2018 Arboretum 1 2 High Apply guideline 7

FS361 4Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneBicentennial National Trail

29FS361 - Undertake slashing fence to fence along Bicentennial National Trail from Gooromon Ponds

south to Stockdil Dr to maintain grass < 200mm.30/09/2017 30/04/2018 PCS Staff 5 1 High Apply guideline 7

FS362 5 Horse Paddocks VariousKaleen Horse

Paddocks4

FS362 - Undertake slashing in South Kaleen Horse Paddocks to maintain grass height <200mm 10m wide north west side of paddock 1 and full width of identified yards and lanes.

30/09/2017 30/04/2018Contractor(h

orse Paddocks)

2 1 High Apply guideline 7

FS363 11 Horse Paddocks VariousHume Horse

Paddocks2

FS363 - Undertake slashing in Hume Horse Paddocks to maintain grass <200mm 10m wide east side of paddock 2.

30/09/2017 30/04/2018Contractor(h

orse Paddocks)

2 1 High Apply guideline 7

FS364 6National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Lower Molonglo River Corridor

9 FS364 - Undertake slashing along ACTEW easement 6m wide to maintain grass height <200mm. 30/09/2017 30/04/2018Contractor

(fire)1 2 High Apply guideline 7

FS373 7Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneMount Ainslie-

Majura4

FS373 - Slash along northern, eastern and southern boundary of Block 688 Majura to maintain grass fuel hazard <50 10m wide (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS375 4 City ServicesInner Asset Protection

ZoneNicholls 2913 1

FS375 - Undertake slashing 10m out from urban interface of Cecins Pl, Nicholls to maintain grass < 200mm (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS378 6Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneKama Nature

Reserve8 FS378 - Undertake slashing 6m wide as mapped within Kama to maintain grass fuel hazard < 50. 30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS379 9Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneRed Hill 1

FS379 - Undertake slashing 6m wide along the entry road to the Federal Golf Club as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

Bushfire Operations Plan Page 27

Page 28: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS382 9 City ServicesInner Asset Protection

ZoneBeard 2620 1

FS382 - Undertake slashing 30m wide around the northern and western sides of Tannery and wreckers as mapped to maintain grass < 200mm.

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS387 2Urban Reserves -

NorthOuter Asset Protection

ZoneBonner 2914 37

FS387 - Slash Outer Asset Protection Zone around Bonner as mapped to maintain grass fuel hazard < 35

30/09/2017 30/04/2018 PCS Staff 5 1 High Apply guideline 7

FS388 8Urban Reserves -

SouthOuter Asset Protection

ZoneCoombs 2611 29

FS388 - Slash Outer Asset Protection Zone around Coombs as mapped to maintain grass fuel hazard < 35

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS389 11 Horse PaddocksOuter Asset Protection

ZoneMacarthur 2904 2

FS389 - Slash Outer Asset Protection Zone that is not within the horse paddocks to maintain grass fuel hazard < 35

30/09/2017 30/04/2018Contractor(H

orse Paddocks)

2 1 High Apply guideline 7

FS390 5Urban Reserves -

NorthOuter Asset Protection

ZoneCrace Grassland

Reserve6

FS390 - Slash Outer Asset Protection Zone along Flemington Rd opposite racecourse 100m wide to maintain grass fuel hazard < 35

30/09/2017 30/04/2018 PCS Staff 2 1 High Apply guideline 7

FS391 7 City Services Various Acton 2601 20FS391 - Undertake slashing relevant to fire management in the suburb of Acton as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS392 7 City Services Various Ainslie 2602 8FS392 - Undertake slashing relevant to fire management in the suburb of Ainslie as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS393 2 City Services Various Amaroo 2914 42FS393 - Undertake slashing relevant to fire management in the suburb of Amaroo as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS394 6 City Services Various Aranda 2614 16FS394 - Undertake slashing relevant to fire management in the suburb of Aranda as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS395 12 City Services Various Banks 2906 16FS395 - Undertake slashing relevant to fire management in the suburb of Banks as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS396 9 City Services Various Barton 2600 12FS396 - Undertake slashing relevant to fire management in the suburb of Barton as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 Very High Apply guideline 7

FS397 4 City Services Various Belconnen 2617 48FS397 - Undertake slashing relevant to fire management in the suburb of Belconnen as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS399 12 City Services Various Bonython 2905 28FS399 - Undertake slashing relevant to fire management in the suburb of Bonython as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS401 6 City Services Various Bruce 2617 40FS401 - Undertake slashing relevant to fire management in the suburb of Bruce as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS402 12 City Services Various Calwell 2905 71FS402 - Undertake slashing relevant to fire management in the suburb of Calwell as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS403 7 City Services Various Campbell 2612 42FS403 - Undertake slashing relevant to fire management in the suburb of Campbell as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS405 1 City Services Various Casey 2913 22FS405 - Undertake slashing relevant to fire management in the suburb of Casey as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 28

Page 29: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS407 8 City Services Various Chapman 2611 14FS407 - Undertake slashing relevant to fire management in the suburb of Chapman as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS408 4 City Services Various Charnwood 2615 4FS408 - Undertake slashing relevant to fire management in the suburb of Charnwood as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS409 8 City Services Various Chifley 2606 14FS409 - Undertake slashing relevant to fire management in the suburb of Chifley as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS410 11 City Services Various Chisholm 2905 23FS410 - Undertake slashing relevant to fire management in the suburb of Chisholm as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS412 12 City Services Various Conder 2906 12FS412 - Undertake slashing relevant to fire management in the suburb of Conder as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS413 6 City Services Various Cook 2614 32FS413 - Undertake slashing relevant to fire management in the suburb of Cook as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS414 8 City Services Various Curtin 2605 94FS414 - Undertake slashing relevant to fire management in the suburb of Curtin as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS415 9 City Services Various Deakin 2600 36FS415 - Undertake slashing relevant to fire management in the suburb of Deakin as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS417 5 City Services Various Downer 2602 5FS417 - Undertake slashing relevant to fire management in the suburb of Downer as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS418 8 City Services Various Duffy 2611 50FS418 - Undertake slashing relevant to fire management in the suburb of Duffy as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS419 4 City Services Various Dunlop 2615 45FS419 - Undertake slashing relevant to fire management in the suburb of Dunlop as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS421 4 City Services Various Evatt 2617 23FS421 - Undertake slashing relevant to fire management in the suburb of Evatt as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS422 11 City Services Various Fadden 2904 34FS422 - Undertake slashing relevant to fire management in the suburb of Fadden as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS423 10 City Services Various Farrer 2607 7FS423 - Undertake slashing relevant to fire management in the suburb of Farrer as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS424 8 City Services Various Fisher 2611 11FS424 - Undertake slashing relevant to fire management in the suburb of Fisher as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS425 4 City Services Various Florey 2615 20FS425 - Undertake slashing relevant to fire management in the suburb of Florey as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 29

Page 30: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS426 4 City Services Various Flynn 2615 15FS426 - Undertake slashing relevant to fire management in the suburb of Flynn as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS427 2 City Services Various Forde 2914 27FS427 - Undertake slashing relevant to fire management in the suburb of Forde as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS429 5 City Services Various Franklin 2913 23FS429 - Undertake slashing relevant to fire management in the suburb of Franklin as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS430 4 City Services Various Fraser 2615 49FS430 - Undertake slashing relevant to fire management in the suburb of Fraser as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS431 9 City Services Various Fyshwick 2609 30FS431 - Undertake slashing relevant to fire management in the suburb of Fyshwick as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS432 9 City Services Various Garran 2605 9FS432 - Undertake slashing relevant to fire management in the suburb of Garran as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS433 11 City Services Various Gilmore 2905 15FS433 - Undertake slashing relevant to fire management in the suburb of Gilmore as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS435 4 City Services Various Giralang 2617 48FS435 - Undertake slashing relevant to fire management in the suburb of Giralang as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS436 12 City Services Various Gordon 2906 38FS436 - Undertake slashing relevant to fire management in the suburb of Gordon as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS437 11 City Services Various Gowrie 2904 23FS437 - Undertake slashing relevant to fire management in the suburb of Gowrie as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS438 10 City Services Various Greenway 2900 57FS438 - Undertake slashing relevant to fire management in the suburb of Greenway as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS440 5 City Services Various Gungahlin 2912 37FS440 - Undertake slashing relevant to fire management in the suburb of Gungahlin as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS441 7 City Services Various Hackett 2602 6FS441 - Undertake slashing relevant to fire management in the suburb of Hackett as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS442 1 City Services Various Hall 2618 23FS442 - Undertake slashing relevant to fire management in the suburb of Hall as mapped to maintain

grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS444 5 City Services Various Harrison 2914 38FS444 - Undertake slashing relevant to fire management in the suburb of Harrison as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS445 6 City Services Various Hawker 2614 6FS445 - Undertake slashing relevant to fire management in the suburb of Hawker as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 30

Page 31: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS446 4 City Services Various Higgins 2615 15FS446 - Undertake slashing relevant to fire management in the suburb of Higgins as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS448 8 City Services Various Holder 2611 27FS448 - Undertake slashing relevant to fire management in the suburb of Holder as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS449 4 City Services Various Holt 2615 4FS449 - Undertake slashing relevant to fire management in the suburb of Holt as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS450 8 City Services Various Hughes 2605 24FS450 - Undertake slashing relevant to fire management in the suburb of Hughes as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS451 11 City Services Various Hume 2620 36FS451 - Undertake slashing relevant to fire management in the suburb of Hume as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS452 11 City Services Various Isaacs 2607 10FS452 - Undertake slashing relevant to fire management in the suburb of Isaacs as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS453 10 City Services Various Isabella Plains 2905 52FS453 - Undertake slashing relevant to fire management in the suburb of Isabella Plains as mapped

to maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS455 5 City Services Various Kaleen 2617 83FS455 - Undertake slashing relevant to fire management in the suburb of Kaleen as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS456 10 City Services Various Kambah 2902 103FS456 - Undertake slashing relevant to fire management in the suburb of Kambah as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS457 9 City Services Various Kingston 2604 3FS457 - Undertake slashing relevant to fire management in the suburb of Kingston as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS458 4 City Services Various Latham 2615 44FS458 - Undertake slashing relevant to fire management in the suburb of Latham as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS459 4 City Services Various Lawson 2617 13FS459 - Undertake slashing relevant to fire management in the suburb of Lawson as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS460 7 City Services Various Lyneham 2602 15FS460 - Undertake slashing relevant to fire management in the suburb of Lyneham as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS461 8 City Services Various Lyons 2606 20FS461 - Undertake slashing relevant to fire management in the suburb of Lyons as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS462 11 City Services Various Macarthur 2904 15FS462 - Undertake slashing relevant to fire management in the suburb of Macarthur as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS463 4 City Services Various Macgregor 2615 92FS463 - Undertake slashing relevant to fire management in the suburb of Macgregor as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 31

Page 32: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS467 10 City Services Various Mawson 2607 11FS467 - Undertake slashing relevant to fire management in the suburb of Mawson as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS468 4 City Services Various Mckellar 2617 13FS468 - Undertake slashing relevant to fire management in the suburb of Mckellar as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS469 4 City Services Various Melba 2615 25FS469 - Undertake slashing relevant to fire management in the suburb of Melba as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS470 5 City Services Various Mitchell 2911 25FS470 - Undertake slashing relevant to fire management in the suburb of Mitchell as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS471 10 City Services Various Monash 2904 52FS471 - Undertake slashing relevant to fire management in the suburb of Monash as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS473 9 City Services Various Narrabundah 2604 27FS473 - Undertake slashing relevant to fire management in the suburb of Narrabundah as mapped

to maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS474 2 City Services Various Ngunnawal 2913 43FS474 - Undertake slashing relevant to fire management in the suburb of Ngunnawal as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS475 1 City Services Various Nicholls 2913 86FS475 - Undertake slashing relevant to fire management in the suburb of Nicholls as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS476 13 City Services Various Oaks Estate 2620 11FS476 - Undertake slashing relevant to fire management in the suburb of Oaks Estate as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS477 7 City Services Various O'Connor 2602 8FS477 - Undertake slashing relevant to fire management in the suburb of O'Connor as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS478 9 City Services Various O'Malley 2606 15FS478 - Undertake slashing relevant to fire management in the suburb of O'Malley as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS479 10 City Services Various Oxley 2903 10FS479 - Undertake slashing relevant to fire management in the suburb of Oxley as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS481 5 City Services Various Palmerston 2913 12FS481 - Undertake slashing relevant to fire management in the suburb of Palmerston as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS483 8 City Services Various Pearce 2607 5FS483 - Undertake slashing relevant to fire management in the suburb of Pearce as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS484 8 City Services Various Phillip 2606 10FS484 - Undertake slashing relevant to fire management in the suburb of Phillip as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS485 9 City Services Various Pialligo 2609 7FS485 - Undertake slashing relevant to fire management in the suburb of Pialligo as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 32

Page 33: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS486 9 City Services Various Red Hill 2603 4FS486 - Undertake slashing relevant to fire management in the suburb of Red Hill as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS488 12 City Services Various Richardson 2905 38FS488 - Undertake slashing relevant to fire management in the suburb of Richardson as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS492 4 City Services Various Spence 2615 17FS492 - Undertake slashing relevant to fire management in the suburb of Spence as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS495 9 City Services Various Symonston 2609 52FS495 - Undertake slashing relevant to fire management in the suburb of Symonston as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS496 16 City Services Various Tharwa 2620 2FS496 - Undertake slashing relevant to fire management in the suburb of Tharwa as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS497 10 City Services Various Theodore 2905 11FS497 - Undertake slashing relevant to fire management in the suburb of Theodore as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS498 8 City Services Various Torrens 2607 9FS498 - Undertake slashing relevant to fire management in the suburb of Torrens as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS502 10 City Services Various Wanniassa 2903 56FS502 - Undertake slashing relevant to fire management in the suburb of Wanniassa as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS503 8 City Services Various Waramanga 2611 4FS503 - Undertake slashing relevant to fire management in the suburb of Waramanga as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS504 5 City Services Various Watson 2602 35FS504 - Undertake slashing relevant to fire management in the suburb of Watson as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS506 8 City Services Various Weston 2611 30FS506 - Undertake slashing relevant to fire management in the suburb of Weston as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS510 7 City Services Various Yarralumla 2600 116FS510 - Undertake slashing relevant to fire management in the suburb of Yarralumla as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS513 13 City Services Various Beard 2620 26FS513 - Undertake slashing relevant to fire management in the suburb of Beard as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS514 2 City Services Various Bonner 2914 16FS514 - Undertake slashing relevant to fire management in the suburb of Bonner as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS515 5 City Services Various Gungahlin Region 5FS515 - Undertake slashing relevant to fire management in the suburb of Crace as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS516 2 City Services Various Gungahlin Region 5FS516 - Undertake slashing relevant to fire management in the suburb of Jacka as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

Bushfire Operations Plan Page 33

Page 34: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

FS517 2 City Services Various Gungahlin Region 16FS517 - Undertake slashing relevant to fire management in the suburb of Moncrieff as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS518 8 City Services Various Molonglo 42FS518 - Undertake slashing relevant to fire management in the Molonglo Region as mapped to

maintain grass < 200mm.30/09/2017 30/04/2018

Contractor (City

Services)1 1 High Apply guideline 7

FS907 4 City ServicesOuter Asset Protection

ZoneMt Rogers 5

FS907 - Undertake slashing/brush cutting in mapped areas of Mt Rogers as mapped to maintain grass hazard < 35.

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS908 12Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneTuggeranong Hill 7

FS908 - Where possible, slash along internal management trails on Tuggeranong Hill as mapped to maintain grass fuel hazard < 50 3-6m wide.

30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS909 8Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneDuffy 2611 16

FS909 - Where possible, slash along internal management trails on Narrabundah Hill as mapped to maintain grass fuel hazard < 50 3-6m wide.

30/09/2017 30/04/2018 PCS Staff 3 1 High Apply guideline 7

FS913 13 City ServicesInner Asset Protection

ZoneOaks Estate 2620 1

FS913 - Where possible undertake slashing to maintain grass height < 200mm for 30m out from the urban interface of River Street Oaks Estate as mapped (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS914 13 City ServicesInner Asset Protection

ZoneOaks Estate 2620 1

FS914 - Where possible undertake slashing to maintain grass height < 200mm for 30m out from the urban interface of Hill Street Oaks Estate as mapped (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS915 9Urban Reserves -

SouthInner Asset Protection

ZoneJerrabomberra

Wetland Reserve2

FS915 - Undertake slashing to maintain grass height < 200mm for 30m out from the DAS Fleet facility on Dairy Rd as mapped. (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS916 4 City ServicesInner Asset Protection

ZoneNicholls 2913 1

FS916 - Undertake slashing 10m out from urban interface of Stedman Pl, Nicholls to maintain grass < 200mm (2 x job lot contract cost).

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS917 7 City ServicesInner Asset Protection

ZoneO'Connor 2602 1

FS917 - Where possible slash Inner Asset Protection Zone to maintain grass height <200mm As mapped along Fairfax St (2 x job lot contract cost)

30/09/2017 30/04/2018Contractor

(fire)1 1 High Apply guideline 7

FS918 14National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone

Cotter Rd 25FS918 - Where possible, undertake rural roadside slashing along Cotter Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

1 1 High Apply guideline 7

FS919 13National Parks and

Catchments – Googong

Strategic Fire Fighting Advantage Zone

Kowen 1FS919 - Where possible, undertake rural roadside slashing along Hibernan Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

1 1 High Apply guideline 7

FS921 4Urban Reserves -

NorthStrategic Fire Fighting

Advantage ZoneBelconnen Region 1

FS921 - Where possible, undertake rural roadside slashing along Jerramlea Road as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

1 1 High Apply guideline 7

FS922 18National Parks and

Catchments – Namadgi

Strategic Fire Fighting Advantage Zone

Gigerline Nature Reserve

2FS922 - Where possible, undertake rural roadside slashing along Smiths Road & Sandwash Road as

mapped to maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

1 1 High Apply guideline 7

FS923 13National Parks and

Catchments – Googong

Strategic Fire Fighting Advantage Zone

Kowen 5FS923 - Where possible, undertake rural roadside slashing along Sparrow Road as mapped to

maintain grass fuel hazard < 50.30/09/2017 30/04/2018

Contractor (Districts)

1 1 High Apply guideline 7

FS925 16Urban Reserves -

SouthStrategic Fire Fighting

Advantage ZoneTuggeranong

Region10

FS925 - Where possible, undertake rural roadside slashing along Tharwa Drive as mapped to maintain grass fuel hazard < 50.

30/09/2017 30/04/2018Contractor (Districts)

1 1 High Apply guideline 7

Bushfire Operations Plan Page 34

Page 35: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Prevention - RFS Volunteer Burns 2017/18The following table lists the volunteer burns EPSDD plans to allocate to the ACT Rural Fire Service for 2017/18. These burns will not form part of the audit of the implementation of the EPSDD Bushfire Operations Plan.

Map ID Map Agency/ District Fuel Management Zone Location Ha Type of Work Works Description Priority Ecological Advice

FB230a 5 City Services Inner Asset Protection Zone Hughes 2605 2RFS Volunteer Prescribed Burn

FB230a - Undertake Prescribed burn in the Hughes/Garran Woodland as mapped to achieve OFH < Moderate 1 Apply guideline 1, 2, 3

FB230b 11 City Services Inner Asset Protection Zone Hughes 2605 2RFS Volunteer Prescribed Burn

FB230b - Undertake Prescribed burn in the Hughes/Garran Woodland as mapped to achieve OFH < Moderate 1 Apply guideline 1, 2, 3

FB650 6 City Services Outer Asset Protection Zone Tharwa 2620 6RFS Volunteer Prescribed Burn

FB650 - Undertake prescribed burn within Tharwa north of Cuppacumbalong as mapped to achieve OFH < Moderate 3 Apply guideline 1, 2, 3,

5, 38

FB702 7 City Services Inner Asset Protection Zone Hume 2620 2RFS Volunteer Prescribed Burn

FB702 - Undertake prescribed burn in woodland between industrial properties off Alderson Pl Hume as mapped to achieve OFH < moderate. 1 Apply guideline 1, 2, 3

FB706 1 Urban Reserves - South Strategic Fire Fighting Advantage Zone Oaks Estate 2620 7

RFS Volunteer Prescribed Burn

FB706 - Burn willow piles at Oaks Estate as mapped. 2 Apply guideline 1, 2, 3, 36

FB716 5 National Parks and Catchments – MRC Various Murrumbidgee River

Corridor 8RFS Volunteer Prescribed Burn

FB716 - Undertake prescribed burn in Point Hut Dog Exercise Area to achieve grass fuel hazard < 50. 2 Apply guideline 1, 2, 3,

21

FB727 4 National Parks and Catchments – MRC

Strategic Fire Fighting Advantage Zone Stromlo Forest Park 28

RFS Volunteer Prescribed Burn

FB727 - Undertake prescribed burn in Stromlo Forest Park as mapped to achieve OFH < moderate. 2 Apply guideline 1, 2, 3,

16, 29

Bushfire Operations Plan Page 35

Page 36: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Prevention - Access Management 2017/18

Maintenance

Map ID Map Agency/ District Location Road Name Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

HrsPriority Ecological Advice

AM11515

National Parks and Catchments –

Tidbinbilla

Tidbinbilla Nature Reserve

Camel Back Fire Trail

2 AM115 - Gravel 2km of Camel Back Fire Trail from Mountain Creek Road carpark 31/07/2017 30/06/2018Seasonal

Plant3 0 0 40 2 Apply guideline 12 & 13

AM378 5Urban Reserves -

NorthGoorooyarroo Gooroo Fire Trail 2

AM378 - Repair drainage structures and running surface along the Rocks Car Park Fire Trail as mapped.

31/07/2017 30/06/2018Seasonal

Plant3 0 0 30 1

AM389 14National Parks and Catchments – MRC

Uriarra ForestBullock Paddock

Rd0

AM389 - Repair Padavan's Crossing on Bullock Paddock Road to allow passage of articulated floats

31/07/2017 30/06/2018Contracto

r (fire)3 0 0 0 1 Apply guideline 12 & 13

AM446 10Urban Reserves -

SouthCooleman Ridge

Dry Dam Fire Trail

1AM446 - Maintain drainage structures & running surfaces of Dry Dam Fire Trail in

Cooleman Ridge31/07/2017 30/06/2018

Seasonal Plant

3 0 0 30 3 Apply guideline 12 & 13

AM478 15National Parks and Catchments – MRC

NNP-Bendora Parrot Road 9 AM478 - Maintain drainage structures & running surfaces of Parrot Road 31/07/2017 30/06/2018Seasonal

Plant3 0 0 100 2 Apply guideline 12 & 13

AM485 7Urban Reserves -

NorthMount Pleasant Various 5

AM485 - Maintain drainage structures & running surfaces of trails in Mount Pleasant as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 60 2 Apply guideline 12 & 13

AM505 7Urban Reserves -

NorthBlack Mountain

Kids Lookout Trail

1 AM505 - Maintain drainage structures & running surfaces of Kids Lookout Track 31/07/2017 30/06/2018Seasonal

Plant3 0 0 30 3 Apply guideline 12 & 13

AM510 20National Parks and

Catchments – Namadgi

NNP-NaasThe Forest Fire

Trail5 AM510 - Maintain drainage structures & running surfaces of The Forest Fire Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 50 40 1 Apply guideline 12 & 13

AM513 17National Parks and

Catchments – Namadgi

NNP-OrroralOrroral Water Tank Track

1AM513 - Maintain drainage structures & running surfaces of Orroral Water Tank

Track31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 1 Apply guideline 12 & 13

AM515 15National Parks and

Catchments – Tidbinbilla

Tidbinbilla Nature Reserve

Various 6AM515 - Repair road surface and drainage structures on roads to be used as

containment lines for FB29231/07/2017 30/06/2018

Seasonal Plant

3 0 60 0 1 Apply guideline 12 & 13

AM516 14National Parks and Catchments – MRC

NNP-Bendora Two Sticks Road 17 AM516 - Repair road surface and drainage structures on Two Sticks Rd - Uriarra 31/07/2017 30/06/2018Seasonal

Plant3 0 0 80 1 Apply guideline 12 & 13

AM517 13National Parks and

Catchments – Namadgi

Kowen Kowen Road 6 AM517 - Repair road surface and drainage structures on Kowen Rd 31/07/2017 30/06/2018Seasonal

Plant3 0 0 60 1 Apply guideline 12 & 13

AM518 13National Parks and

Catchments – Namadgi

Kowen Seven Mile Road 6 AM518 - Repair road surface and drainage structures on Seven Mile Rd - Kowen 31/07/2017 30/06/2018Seasonal

Plant3 0 0 50 1 Apply guideline 12 & 13

AM519 13National Parks and

Catchments – Namadgi

Kowen Fearnside Way 7 AM519 - Repair road surface and drainage structures on Fearnside Way 31/07/2017 30/06/2018Seasonal

Plant3 0 0 60 1 Apply guideline 12 & 13

AM520 14National Parks and Catchments – MRC

Kowen Archery Road 2 AM520 - Repair road surface and drainage structures on Archery Rd Pierces Ck 31/07/2017 30/06/2018Seasonal

Plant3 0 0 40 1

Apply guideline 12 & 13 & 36

Bushfire Operations Plan Page 36

Page 37: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

HrsPriority Ecological Advice

AM521 13National Parks and

Catchments – Namadgi

Kowen Western Break 15AM521 - Repair road surface and drainage structures on Western Boundary Kowen

Escarpment31/07/2017 30/06/2018

Seasonal Plant

3 0 0 70 1 Apply guideline 12 & 13

AM522 12Urban Reserves -

SouthTuggeranong Melrose Pines 5

AM522 - Repair road surface and drainage structures on Melrose (Tuggeranong) Pines

31/07/2017 30/06/2018Seasonal

Plant3 0 20 50 1

Apply guideline 12 & 13 & 36

AM523 16National Parks and Catchments – MRC

Bullen Range Nature Reserve

Tracking Station Fire Trail

2AM523 - Repair road surface and drainage structures on the Tracking Station Fire

Trail31/07/2017 30/06/2018

Seasonal Plant

3 0 40 0 1 Apply guideline 12 & 13

AM524 21National Parks and

Catchments – Namadgi

NNPMount Clear Fire

Trail10 AM524 - Repair road surface and drainage structures on the Mt Clear Fire Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 80 0 1 Apply guideline 12 & 13

AM525 14National Parks and

Catchments – Namadgi

NNP Mineshaft Road 5AM525 - Repair road surface and drainage structures of Mineshaft Rd, replace

catchments31/07/2017 30/06/2018

Seasonal Plant

3 0 0 40 1 Apply guideline 12 & 13

AM526 21National Parks and

Catchments – Namadgi

NNPBurnt Hill Fire

Trail6

AM526 - Repair road surface and drainage structures on roads to be used as containment lines for FB095

31/07/2017 30/06/2018Seasonal

Plant3 0 80 0 1 Apply guideline 12 & 13

AM527 8Territory Venues

and EventsStromlo Forest Park

Stromlo Forest Park

8AM527 - Repair road surface and drainage structures on the Eastern side of Stromlo

Forest park31/07/2017 30/06/2018

Contractor (fire)

3 0 0 0 1Apply guideline 12 & 13

& 36

AM528 14Territory Venues

and EventsStromlo Forest Park

Stromlo Forest Park

4AM528 - Repair road surface and drainage structures on the Western side of

Stromlo Forest park31/07/2017 30/06/2018

Contractor (fire)

3 0 0 0 1 Apply guideline 12 & 13

AM529 11Urban Reserves -

SouthIsaacs Ridge - Mugga Mugga

Isaacs horse trail 1 AM529 - Repair road surface and drainage structures on Isaacs Horse Trail 31/07/2017 30/06/2018Seasonal

Plant3 0 70 0 1

Apply guideline 12 & 13 & 36

AM530 11Urban Reserves -

SouthIsaacs Ridge - Mugga Mugga

Various 1AM530 - Repair road surface and drainage structures to allow all weather access as

mapped31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 1 Apply guideline 12 & 13

AM531 18Urban Reserves -

SouthRob Roy Nature

ReserveCharcoal

Paddock Track2

AM531 - 2016 storm damage/ vehicle damage some ruts are up to 500-600mm deep. There are little areas of erosion appearing along the tracks entire length,

although the most damage is at the Southern/Northers most points.31/07/2017 30/06/2018

Seasonal Plant

3 0 40 0 1 Apply guideline 12 & 13

AM532 15National Parks and

Catchments – Tidbinbilla

Pierces Crk Various 0 AM532 - Repair road surface and drainage structures on Boundary Road 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 1 Apply guideline 12 & 13

AM533 14National Parks and Catchments – MRC

Murrumbidgee River Corridor

Various 0 AM533 - river washing out maintenance track 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 1 Apply guideline 12 & 13

AM534 14National Parks and Catchments – MRC

Bullen Range Nature Reserve

Various 0 AM534 - Repair road surface and drainage structures on Cottermouth River Track 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 1

Apply guideline 12 & 13 & 36

AM535 14National Parks and Catchments – MRC

Bullen Range Nature Reserve

Bullen Range Fire trail

0AM535 - Rough and rocky washed out steep section. We only just managed to get

up it in Parks 2031/07/2017 30/06/2018

Seasonal Plant

3 0 20 0 1Apply guideline 12 & 13

& 36

AM536 14National Parks and Catchments – MRC

Paddys River Road Various 1 AM536 - Close & stabilise in line with trails dormant status. 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 1 Apply guideline 12 & 13

AM537 14National Parks and Catchments – MRC

Uriarra ForestCooby's Loop

Fire Trail1 AM537 - Reshape surface, create cross fall, regrade rollovers and compact 31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 1 Apply guideline 12 & 13

AM538 14National Parks and Catchments – MRC

Uriarra Forest Concrete Road 3AM538 - Reshape surface and reform rollovers where existing, install new rollovers

along entirety of trail and compact.31/07/2017 30/06/2018

Seasonal Plant

3 0 60 0 1 Apply guideline 12 & 13

Bushfire Operations Plan Page 37

Page 38: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

HrsPriority Ecological Advice

AM539 20National Parks and

Catchments – Namadgi

NNP-Naas Various 6AM539 - Naas valley FT some areas are heavily degraded, mainly towards forest

trail. Heavy ruts from drainage issues.31/07/2017 30/06/2018

Seasonal Plant

3 0 200 0 1 Apply guideline 12 & 13

AM540 22National Parks and

Catchments – Googong

Googong Foreshores

Western Foreshore FT

0 AM540 - FT around Wells Inlet starting to erode heavily 31/07/2017 30/06/2018Seasonal

Plant3 0 0 40 1 Apply guideline 12 & 13

AM541 22National Parks and

Catchments – Googong

Googong Foreshores

Various 0AM541 - Flynns Xing entry/exit starting to erode heavily and will potentially become

impassable in the near future31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 1 Apply guideline 12 & 13

AM542 14National Parks and Catchments – MRC

Uriarra Forest Sinclair Circuit 5 AM542 - Repair road surface and drainage structures on Sinclair Circuit 31/07/2017 30/06/2018Seasonal

Plant3 0 100 0 1 Apply guideline 12 & 13

AM544 22National Parks and

Catchments – Googong

Googong Foreshores

Western foreshores FT

1AM544 - Repair road surface and drainage structures on western foreshores walk.

Sheet sections of road as required.31/07/2017 30/06/2018

Seasonal Plant

3 0 10 20 1 Apply guideline 12 & 13

AM545 22National Parks and

Catchments – Googong

Googong Foreshores

Western Foreshore FT

4AM545 - Repair road surface and drainage structures on western foreshores walk.

spring has opened up in the middle of FT. heavily eroding either side of inlet31/07/2017 30/06/2018

Seasonal Plant

3 0 0 20 1Apply guideline 12 & 13

& 36

AM546 8Urban Reserves -

SouthDuffy 2611 Various 2 AM546 - Repair road surface and drainage structures on Narrabundah Hill 31/07/2017 30/06/2018

Seasonal Plant

3 0 50 0 1 Apply guideline 12 & 13

AM547 10National Parks and Catchments – MRC

Bullen Range Nature Reserve

Red Rocks Firetrail

4AM547 - Repair road surface and drainage structures, reinforce crossing with rock

on the Red Rocks Fire Trail31/07/2017 30/06/2018

Seasonal Plant

3 0 50 50 1 Apply guideline 12 & 13

AM548 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 5

AM548 - Repair road surface and drainage structures of Main Mulligans Track as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 1 Apply guideline 12 & 13

AM549 16Urban Reserves -

SouthRob Roy Nature

ReserveVarious 9

AM549 - Repair road surface and drainage structures on roads to be used as containment lines for FB671

31/07/2017 30/06/2018Seasonal

Plant3 0 150 0 1 Apply guideline 12 & 13

AM550 8National Parks and Catchments – MRC

Cooleman RidgeCut-off drain trail above Darrel Pl

0AM550 - Upgrade drainage and repair road surface. Deep rutting, sediment running

to suburb.31/07/2017 30/06/2018

Contractor (fire)

3 5 0 0 1 Apply guideline 12 & 13

AM551 14National Parks and Catchments – MRC

Uriarra Forest Blackberry Road 1AM551 - Maintenance of drainage structures and the surface of Blackberry Road as

mapped31/07/2017 30/06/2018

Seasonal Plant

3 0 0 20 1 Apply guideline 12 & 13

AM552 17National Parks and

Catchments – Namadgi

NNP-Gudgenby Smokers Trail 0AM552 - Repair Orroral River Crossing which is washing away and almost down to

bare pipes.31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 1 Apply guideline 12 & 13

AM553 14National Parks and Catchments – MRC

Paddys River Road BFG Rd 1AM553 - The Western end potentially needs more cross fall or crown. There is an

old culvert exposed that needs removing ideally too31/07/2017 30/06/2018

Contractor (fire)

3 0 0 0 1Apply guideline 12 & 13

& 36

AM554 14National Parks and

Catchments – Tidbinbilla

Tidbinbilla Nature Reserve

Unknown 0AM554 - Repair drainage on Murrays Creek Road. Corner in this section the road is

being undercut.31/07/2017 30/06/2018

Contractor (fire)

3 0 0 0 1 Apply guideline 12 & 13

AM556 14National Parks and

Catchments – Namadgi

Pierces Crk Detour Road 1 AM556 - Repair road surface and drainage structures of Detour Rd 31/07/2017 30/06/2018Contracto

r (fire)3 0 0 0 1 Apply guideline 12 & 13

AM557 9Urban Reserves -

SouthRed Hill Gandalf track 1 AM557 - Repair road surface and drainage structures on Gandalf Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 30 2 Apply guideline 12 & 13

AM558 11Urban Reserves -

SouthIsaacs Ridge - Mugga Mugga

Various 0 AM558 - Repair road surface and drainage structures as mapped 31/07/2017 30/06/2018Seasonal

Plant3 0 30 0 2 Apply guideline 12 & 13

Bushfire Operations Plan Page 38

Page 39: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

HrsPriority Ecological Advice

AM559 18Urban Reserves -

SouthRob Roy Nature

ReserveSouth Rob Roy

Track0 AM559 - Repair road surface and drainage structures on South Rob Roy Track 31/07/2017 30/06/2018

Seasonal Plant

3 0 30 0 2 Apply guideline 12 & 13

AM560 10Urban Reserves -

SouthCooleman Ridge

Arawang Saddle Fire Trail

0 AM560 - Repair road surface and drainage structures on Arawang Saddle Fire Trail 31/07/2017 30/06/2018Seasonal

Plant3 0 30 0 2 Apply guideline 12 & 13

AM562 14National Parks and Catchments – MRC

Bullen Range Nature Reserve

Jews Corner River access

0 AM562 - Repair road surface and drainage structures on Fairvale River Road 31/07/2017 30/06/2018Seasonal

Plant3 1 20 0 2 Apply guideline 12 & 13

AM565 14National Parks and Catchments – MRC

Pierces Crk Unknown 1AM565 - general maintenance and draining. Southern stretch potentially requires

dozer and roadside veg control31/07/2017 30/06/2018

Seasonal Plant

3 0 20 0 2 Apply guideline 12 & 13

AM566 14National Parks and Catchments – MRC

Pierces Crk Unknown 1 AM566 - Close & stabilise in line with trails dormant status. 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 2 Apply guideline 12 & 13

AM567 14National Parks and Catchments – MRC

Pierces Crk Unknown 1 AM567 - Close & stabilise in line with trails dormant status. 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 2 Apply guideline 12 & 13

AM568 14National Parks and Catchments – MRC

Pierces Crk Unknown 1 AM568 - Close & stabilise in line with trails dormant status. 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 2 Apply guideline 12 & 13

AM569 6Urban Reserves -

NorthThe Pinnacle

ReserveSpringvale Trail 0 AM569 - Repair road surface and drainage structures on Springvale Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 25 2 Apply guideline 12 & 13

AM570 6Urban Reserves -

NorthGossan Hill Urban FT 0 AM570 - Repair road surface and drainage structures on Urban Fire Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 25 2 Apply guideline 12 & 13

AM571 6Urban Reserves -

NorthGossan Hill

Gossan Three FT

1 AM571 - Repair road surface and drainage structures on Gossan Three Fire Trail 31/07/2017 30/06/2018Seasonal

Plant3 0 15 25 2

Apply guideline 12 & 13 & 36

AM572 6Urban Reserves -

NorthGossan Hill Urban FT 0 AM572 - Repair road surface and drainage structures on Urban Fire Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 25 2Apply guideline 12 & 13

& 36

AM573 6Urban Reserves -

NorthBruce Ridge

Bruce Ridge 2 FT

1 AM573 - Repair road surface and drainage structures on Bruce Ridge as mapped 31/07/2017 30/06/2018Seasonal

Plant3 0 0 25 2 Apply guideline 12 & 13

AM574 6Urban Reserves -

NorthBruce Ridge Various 0 AM574 - Repair road surface and drainage structures on Bruce Ridge as mapped 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 25 2 Apply guideline 12 & 13

AM575 7Urban Reserves -

NorthBruce Ridge Bruce Four FT 0 AM575 - Repair road surface and drainage structures on Bruce Ridge as mapped 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 30 2 Apply guideline 12 & 13

AM576 11Urban Reserves -

SouthIsaacs Ridge - Mugga Mugga

Various 0 AM576 - Repair road surface and drainage structures - deep ruts developing. 31/07/2017 30/06/2018Seasonal

Plant3 0 10 0 2 Apply guideline 12 & 13

AM577 11Urban Reserves -

SouthIsaacs Ridge - Mugga Mugga

Various 0 AM577 - Repair surface and associated drainage structures deep rut 31/07/2017 30/06/2018Seasonal

Plant3 0 10 0 2 Apply guideline 12 & 13

AM578 22National Parks and

Catchments – Googong

Googong Foreshores

Western foreshore FT

1 AM578 - Repair road surface and drainage structures in Googong as mapped 31/07/2017 30/06/2018Seasonal

Plant3 0 0 20 2 Apply guideline 12 & 13

AM580 10National Parks and Catchments – MRC

Kambah Pool Road Various 0AM580 - Repair drainage, out falling and sheeting in sections. 8 loads of sheeting

rock.31/07/2017 30/06/2018

Seasonal Plant

3 0 0 40 2 Apply guideline 12 & 13

AM581 6Urban Reserves -

NorthThe Pinnacle

ReserveTully Boundary

Trail2 AM581 - Repair road surface and drainage structures on Tully Boundary Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 40 2 Apply guideline 12 & 13

AM582 6Urban Reserves -

NorthAranda Bushland Powerline Trail 1 AM582 - Repair road surface and drainage structures in Aranda NR as mapped 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 40 2 Apply guideline 12 & 13

Bushfire Operations Plan Page 39

Page 40: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works DescriptionScheduled

Start Month

Scheduled Finish Month

WhoEst. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

HrsPriority Ecological Advice

AM583 22National Parks and

Catchments – Googong

Googong Foreshores

Various 0AM583 - upgrade entries of crossing to improve traction, entry / exit very slippery in

wet conditions31/07/2017 30/06/2018

Seasonal Plant

3 0 0 30 2 Apply guideline 12 & 13

AM586 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 5

AM586 - Repair road surface and drainage structures of Sanctuary North Trail as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 2 Apply guideline 12 & 13

AM587 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 5

AM587 - Repair road surface and drainage structures of Sanctuary South Trail as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 2 Apply guideline 12 & 13

AM588 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 1

AM588 - Repair road surface and drainage structures of Sanctuary South Trail as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 2 Apply guideline 12 & 13

AM589 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 1 AM589 - Repair road surface and drainage structures of Bog Track as mapped 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 15 2 Apply guideline 12 & 13

AM590 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 0

AM590 - Repair road surface and drainage structures of Gas Pipeline Track as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 2 Apply guideline 12 & 13

AM593 14National Parks and Catchments – MRC

Uriarra Forest Blue Range Rd 2AM593 - Repair road surface and drainage structures on Blue Range Road as

mapped31/07/2017 30/06/2018

Seasonal Plant

3 0 0 60 2 Apply guideline 12 & 13

AM595 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 0

AM595 - Repair road surface and drainage structures of Sanctuary North Trail as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 15 2

Apply guideline 12 & 13 & 36

AM596 2Urban Reserves -

NorthMulligans Flat

ReserveVarious 2

AM596 - Repair road surface and drainage structures of Sanctuary South Trail as mapped

31/07/2017 30/06/2018Seasonal

Plant3 0 0 30 2

Apply guideline 12 & 13 & 36

AM603 6Urban Reserves -

NorthMount Painter

ReserveMt Painter Horse

Trail1 AM603 - Repair road surface and drainage structures on Mt Painter Horse Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 40 3Apply guideline 12 & 13

& 36

AM604 7Urban Reserves -

NorthO'Connor Ridge

O'Connor One FT

0 AM604 - Repair road surface and drainage structures on Stadium Fire Trail 31/07/2017 30/06/2018Seasonal

Plant3 0 20 0 3

Apply guideline 12 & 13 & 36

AM607 7Urban Reserves -

NorthO'Connor Ridge No name 0 AM607 - Repair road surface and drainage structures on Tip Fire Trail 31/07/2017 30/06/2018

Seasonal Plant

3 0 10 0 3Apply guideline 12 & 13

& 36

AM613 5Urban Reserves -

NorthGoorooyarroo Various 4 AM613 - Repair road surface and drainage structures as mapped 31/07/2017 30/06/2018

Seasonal Plant

3 0 0 60 2Apply guideline 12 & 13

& 36

AM614 9Urban Reserves -

SouthRed Hill 2603 Red Hill Fire Trail 1

AM614 - Repair road surface including sheeting and drainage structures on Red Hill Fire Trail

31/07/2017 30/06/2018Seasonal

Plant3 0 0 40 2

Apply guideline 12 & 13 & 36

Upgrade

Map ID Map Agency/ District Location Road Name Km Works Description

Scheduled Start

Month

Scheduled Finish Month Who

Est. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

Hrs Priority Ecological Advice

AU00320

National Parks and Catchments –

NamadgiNNP-Naas Naas Fire Trail 1

AU003 - Repair Naas River Crossing at Caloola Farm to allow safe passage of rigid floats

31/07/2017 30/06/2018Contracto

r (fire)10 0 0 0 1 Apply guideline 12 & 13

AU008 20National Parks and

Catchments – Namadgi

NNP-Naas Naas Fire Trail 10 AU008 - Upgrade Naas Fire Trail to allow safe passage of Rigid Float between Boboyan Rd and Horse Gully Rd. 31/07/2017 30/06/2018 Contracto

r (fire) 10 0 0 0 2 Apply guideline 12 & 13

AU015 21 National Parks and Catchments –

NNP-Gudgenby Old Boboyan 15 AU015 - Capital – Upgrade Old Boboyan Road to Rigid Float Standard 31/07/2017 30/06/2018 Contractor (fire)

10 0 0 0 1 Apply guideline 12 & 13

Bushfire Operations Plan Page 40

Page 41: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works Description

Scheduled Start

Month

Scheduled Finish Month Who

Est. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

Hrs Priority Ecological AdviceNamadgi

AU016 14 National Parks and Catchments – MRC Pierces Crk Lees Creek 0 AU016 - Repair the crossing at the corner of Vanity's and Cliff Roads to allow

passage of articulated float vehicles 31/07/2017 30/06/2018 Contractor (fire) 10 0 0 0 1 Apply guideline 12 & 13

Construction

Map ID Map Agency/ District Location Road Name Km Works Description

Scheduled Start

Month

Scheduled Finish Month Who

Est. Staff Day

s

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

Hrs Priority Ecological Advice

AC004 8 Urban Reserves - North Stromlo Unnamed Fire

Trail 1 AC004 - Construct tanker standard trail along boundary between cpt 72 Stromlo pines and Tuggeranong Pwy fence line 31/07/2017 30/06/2018 Seasonal

Plant 3  0 20 40 1 Apply guideline 12

Vegetation Control

Map ID Map Agency/ District Location Road Name Km Works Description

Scheduled Start

Month

Scheduled Finish Month Who

Est. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

Hrs Priority Ecological Advice

AV12313

National Parks and Catchments – Kowen

Kowen Kowen Roads 37AV123 - Mulch shoulders and batters of strategic fire breaks in Kowen Forest as

mapped31/07/2017 30/06/2018

Contractor (fire)

3 0 0 0 1 Apply guideline 12 & 14

AV138 15 National Parks and Catchments – MRC NNP-Bendora Mount Franklin

Road 48 AV138 - Mulch the shoulders and batters of Mount Franklin Road using the tritterer machines 31/07/2017 30/06/2018 Contracto

r (fire) 3 60 0 0 1 Apply guideline 12 & 14

AV156 7 Urban Reserves - North

Mount Ainslie-Majura Various 29 AV156 - BOP crew to prune low limbs & encroaching vegetation in Mt Ainslie

Nature Reserve as mapped 31/07/2017 30/06/2018 BOP Crew 3 30 0 0 2 Apply guideline 12 & 14

AV158 2 Urban Reserves - North

Mulligans Flat Reserve Various 5 AV158 - BOP crew to prune low limbs & encroaching vegetation in Mulligans Flat as

mapped 31/07/2017 30/06/2018 BOP Crew 3 30 0 0 2 Apply guideline 12 & 14

AV182 7 Urban Reserves - North Black Mountain Little Black

Mountain Track 20 AV182 - BOP crew to prune low limbs & encroaching vegetation in Black Mountain Nature Reserve as mapped 31/07/2017 30/06/2018 BOP

Crew 3 180 0 0 2 Apply guideline 12 & 14

AV183 14 National Parks and Catchments – MRC Uriarra Forest Crusher Road 4 AV183 - Mulch shoulders and batters of Crusher Road and spray re-growth 31/07/2017 30/06/2018 Contracto

r (fire) 3 6 0 0 2 Apply guideline 12 & 14

AV186 15National Parks and

Catchments – Tidbinbilla

Tidbinbilla Nature Reserve Various 6 AV186 - Mulch shoulders and batters of trails to be used for containment of FB292

as mapped (FB292) 31/07/2017 30/06/2018 Contractor (fire) 3 9 0 0 1 Apply guideline 12 & 14

AV187 7 Urban Reserves - North

Mount Ainslie-Majura Various 27 AV187 - BOP crew to prune low limbs & encroaching vegetation in Mt Majura Nature

Reserve as mapped 31/07/2017 30/06/2018 BOP Crew 3 180 0 0 2 Apply guideline 12 & 14

AV188 14 National Parks and Catchments – MRC Pierces Crk Paddys River

Road 10 AV188 - Mulch shoulders and batters of Paddy’s River Rd between the Cotter Avenue and Tanners Flat. 31/07/2017 30/06/2018 Contracto

r (fire) 3 0 0 0 1 Apply guideline 12 & 14

AV189 14 National Parks and Catchments – MRC Uriarra Forest Pabral Road 7 AV189 - Mulch shoulders and batters of Pabral Rd as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 11 0 0 1 Apply guideline 12 & 14

AV190 14National Parks and

Catchments – Namadgi

Uriarra Forest Brindabella Road 4 AV190 - Mulch shoulders and batters of Brindabella Rd between East West Rd and

Blue range Rd as mapped 31/07/2017 30/06/2018 Contractor (fire) 3 0 0 0 2 Apply guideline 12 & 14

AV191 14 National Parks and Catchments – MRC NNP-Bendora Coree Summit

Road 3 AV191 - Mulch shoulders and batters of Coree Summit trail as mapped 31/07/2017 30/06/2018 Contractor (fire) 3 5 0 0 1 Apply guideline 12 & 14

AV192 7 Urban Reserves - North Bruce Ridge Various 18 AV192 - BOP crew to prune low limbs & encroaching vegetation in Bruce/O'Connor

Ridge as mapped 31/07/2017 30/06/2018 BOP Crew 3 60 0 0 2 Apply guideline 12 & 14

AV193 14National Parks and

Catchments – Namadgi

NNP-Bendora Two Sticks Road 18 AV193 - Mulch shoulders and batters of Two Sticks Rd as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 27 0 0 1 Apply guideline 12 & 14

AV195 14 National Parks and Catchments – MRC Uriarra Forest Wombat Road 3 AV195 - Mulch shoulders and batters of Wombat Road as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 5 0 0 1 Apply guideline 12 & 14

AV196 14 National Parks and Catchments – MRC Uriarra Forest Blundells Link /

Marshall's Break 1 AV196 - Mulch shoulders and batters of the upper section of Marshall's Break as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 2 0 0 1 Apply guideline 12 & 14

Bushfire Operations Plan Page 41

Page 42: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Map ID Map Agency/ District Location Road Name Km Works Description

Scheduled Start

Month

Scheduled Finish Month Who

Est. Staff Days

Est. Fire

Crew Days

Seasonal Dozer Hrs

Seasonal Grader

Hrs Priority Ecological Advice

AV197 14 National Parks and Catchments – MRC Uriarra Forest Warks Road 10 AV197 - Mulch shoulders and batters of Warks Road as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 15 0 0 1 Apply guideline 12 & 14

AV198 14 National Parks and Catchments – MRC Uriarra Forest Pago Break Link 2 AV198 - Mulch shoulders and batters of Pago Break as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 3 0 0 1 Apply guideline 12 & 14

AV199 14 National Parks and Catchments – MRC Uriarra Forest Camages Road 3 AV199 - Mulch shoulders and batters of Camages Road as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 4 0 0 1 Apply guideline 12 & 14

AV200 14 National Parks and Catchments – MRC Uriarra Forest East West Road 5 AV200 - Mulch shoulders and batters of East West Road as mapped 31/07/2017 30/06/2018 Contracto

r (fire) 3 7 0 0 1 Apply guideline 12 & 14

AV201 14 National Parks and Catchments – MRC Uriarra Forest Bullock Paddock

Road 4 AV201 - Mulch shoulders and batters of Bullock Paddock Road as mapped 31/07/2017 30/06/2018 Contractor (fire) 3 6 0 0 1 Apply guideline 12 & 14

AV205 14 National Parks and Catchments – MRC Uriarra Forest Nursery Pump

Road 3 AV205 - Mulch shoulders and batters of Nursery Pump Road 31/07/2017 30/06/2018 Contractor (fire) 3 4 0 0 2 Apply guideline 12 & 14

AV206 21National Parks and

Catchments – Namadgi

NNP Burnt Hill Fire Trail 6 AV206 - Mulch shoulders and batters of trails to be used for containment of FB095

as mapped (FB095, AM526) 31/07/2017 30/06/2018 Contractor (fire) 3 9 0 0 1 Apply guideline 12 & 14

AV207 8 Territory Venues and Events Stromlo Forest Park Various 0 AV207 - Mulch shoulders and batters of various trails in Stromlo Forest Park as

mapped. 31/07/2017 30/06/2018 Contractor (fire) 10 0 0 0 1 Apply guideline 12 & 14

Bushfire Operations Plan Page 42

Page 43: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Prevention - Infrastructure 2017/18

ID Agency/District Location Works DescriptionScheduled

Start Month

Scheduled Finish Month

Who Estimated Staff Days

Estimated Fire Crew

DaysPriority

I042 Various VariousI042 - Pre-season maintenance check and clearance of fuel around PCS owned radio repeaters at Booth, Pierces Trig & Googong.

31/07/2017 30/06/2018 Various 11 10 1

I043 Various Various I043 - Assist RFS to implement TRN system upgrades and code plug changes as required 31/07/2017 30/06/2018 PCS Staff 6 5 1

I056 Various VariousI056 - If required, use tankers to top up water tanks at Honeysuckle, Blue Range, Rob Roy, clear range, camel back & Mt Franklin and repair water tanks if required

31/07/2017 30/06/2018 Various 11 10 1

I069 Various Various I069 - Repairs to fuel management grazing infrastructure including gates and fencing 31/07/2017 30/06/2018 Contractor (fire) 1 0 1

I089National Parks and

Catchments – NamadgiVarious I089 - Maintenance of helipads throughout Namadgi National Park. 31/07/2017 30/06/2018 Various 61 60 1

I117National Parks and

Catchments – NamadgiVarious I117 - Replacement water tanks for ones vandalised. 31/07/2017 30/06/2018 Contractor (fire) 1 0 1

I125 Urban Reserves - North Outer Asset Protection Zone I125 - Remove internal tree protection fencing 31/07/2017 30/06/2018Contractor (Districts)

32 30 2

I129 Urban Reserves - NorthStrategic Fire Fighting

Advantage ZoneI129 - Repair boundary fence along Barton Highway 31/07/2017 30/06/2018

Contractor (Districts)

2 0 2

I133 Urban Reserves - North Various I133 - FG105 repair boundary fence 31/07/2017 30/06/2018Contractor (Districts)

2 0 2

I134National Parks and Catchments – MRC

Various I134 - Quarry Rock blasting 31/07/2017 30/06/2018 Contractor (fire) 1 0 1

I135National Parks and Catchments – MRC

Various I135 - Quarry and Stockpile works (carting loading etc.) 31/07/2017 30/06/2018 Contractor (fire) 2 0 2

I136National Parks and

Catchments – NamadgiVarious I136 - Assess water levels in bendalls basin & webbs dam and refill if required. 31/07/2017 30/06/2018 PCS Staff 12 10 2

I137 Urban Reserves - North VariousI137 - Install new water meter, Remove & Install new trough for BOP Grazing paddock FG056

31/07/2017 30/06/2018Contractor (Districts)

2 0 2

I138 Urban Reserves - North VariousI138 - Supply & install new trough in Gungaderra south, repair trough in Gungaderra north - BOP Grazing paddock FG105

31/07/2017 30/06/2018Contractor (Districts)

2 0 2

I139 Urban Reserves - North Various I139 - Repair burst water lines in Dunlop BOP grazing paddock 31/07/2017 30/06/2018Contractor (Districts)

2 0 2

Bushfire Operations Plan Page 43

Page 44: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Preparedness - Equipment 2017/18

ID Item

Scheduled Start

Month

Scheduled Finish Month

Estimated Staff Days

E007 Fire PPE replacement/maintenance/upgrade Jul-17 Jun-18 30

E012General fire management consumables (including fusees, batteries, flagging tape etc.), changeover of lights/radios and operational equipment for implementation of BOP activities, ration packs, herbicide etc. Jul-17 Jun-18 45

E072 Ongoing software maintenance for Mobile Data Terminals Jul-17 Jun-18 2E076 Data (SIM card) costs for MDT Jul-17 Jun-18 1E089 FME Software maintenance Jul-17 Jun-18 1E090 Avenza Maps licensing Jul-17 Jun-18 1E091 ENVI & IDL Software Maintenance. Jul-17 Jun-18 1E093 Capital Upgrade of TRN radios. Jul-17 Jun-18 20

Bushfire Operations Plan Page 44

Page 45: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Preparedness - Training 2017/18

ID Accreditation/Skill Level Type of Training

Estimated No. of Staff scheduled For

Training/ Refresher

Scheduled Start

Month

Scheduled Finish Month

Estimated Staff Days

Estimated Fire Crews

Days Priority

TA001

TA001 - Bushfire Fighter (BF) to increase number of firefighting staff, new recruits, seasonal crews and seasonal plant operators

Essential Competency Attainment 25 31/07/2017 30/06/2018 60 92 1

TA002 TA002 - Advanced Fire-fighter (AF) for all qualified Bushfire FightersEssential Competency

Attainment 14 31/07/2017 30/06/2018 68 64 1

TA003TA003 - Crew Leader (CL) for all identified Crew Leaders, Sector Leaders and Level 1 Incident Controllers.

Essential Competency Attainment 5 31/07/2017 30/06/2018 25 10 1

TA004

TA004 - Divisional Commander for all identified staff who perform the role of Incident Controller, Divisional Commander, Task Force Leader at Level 2 or 3 incidents or perform the Fire Duty Officer role

Essential Competency Attainment 4 31/07/2017 30/06/2018 23 5 1

TA005TA005 - 4WD including winch recovery operations for new recruits, untrained staff and seasonal crews

Essential Competency Attainment 14 31/07/2017 30/06/2018 37 54 1

TA006 TA006 - Chainsaw Intermediate/Advanced Falling including refresherEssential Competency

Attainment 14 31/07/2017 30/06/2018 8 5 1

TA007 TA007 - ChemCert for seasonal crewsEssential Competency

Attainment 2 31/07/2017 30/06/2018 0 15 1

TA0010 TA0010 - First Aid initial training to ensure all fire fighters have current first aid qualificationsEssential Competency

Attainment 25 31/07/2017 30/06/2018 0 0 1

TA018TA018 - Fire Awareness Training for other ACTGOV staff, plant operators, BNHCRC researchers working in the ACT and Indigenous community members

Essential Competency Attainment 5 31/07/2017 30/06/2018 2 0 1

TA019 TA019 - Values Officer familiarisation with Conservation Research and MonitoringEssential Competency

Attainment 5 31/07/2017 30/06/2018 3 0 2

TA020TA020 - Fire Behaviour Analyst training including support for mentoring prior to achievement of competence

Essential Competency Attainment 1 31/07/2017 30/06/2018 10 0 1

TA024TA024 - Consideration be given to a dedicated Media spokesman within the IMT and media training should be given to identified staff.

Essential Competency Attainment 2 31/07/2017 30/06/2018 2 0 1

TA026 TA026 - Tri Agency fire training campEssential Competency

Attainment 15 31/07/2017 30/06/2018 2 0 2

TC001 TC001 - Attendance at Annual AFAC & BNHCRC Conference. Conference 20 31/07/2017 30/06/2018 16 0 1

TC002 TC002 - Attendance at FEDOG Annual Meeting Conference 25 31/07/2017 30/06/2018 3 0 2

TC003 TC003 - Attend GIS Technology Conference Conference 1 31/07/2017 30/06/2018 3 0 2

Bushfire Operations Plan Page 45

Page 46: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ID Accreditation/Skill Level Type of Training

Estimated No. of Staff scheduled For

Training/ Refresher

Scheduled Start

Month

Scheduled Finish Month

Estimated Staff Days

Estimated Fire Crews

Days PriorityTC004 TC004 - Attend grassland curing and management workshop with CFA Conference 0 31/07/2017 30/06/2018 3 0 2

TC005 TC005 - Attend BNHCRC Research Driving Change Showcase Conference 0 31/07/2017 30/06/2018 3 0 2

TC006 TC006 - Attend Women in Fire conference next due in 2018 Conference 0 31/07/2017 30/06/2018 9 0 1TE004 TE004 - Assist ACT & NSW RFS & ACT F&R with training up to 20 staff days/year if required External Extension 7 31/07/2017 30/06/2018 15 5 2

TE005 TE005 - Train volunteer brigades on role of PCS in fire management External Extension 2 31/07/2017 30/06/2018 5 0 1

TM001 TM001 - RAFT, including Hover Entry/Exit, Winching and Work Safely Around AircraftEssential Competency

Maintenance 120 31/07/2017 30/06/2018 35 45 1

TM003 TM003 - Chainsaw Intermediate Falling refresherEssential Competency

Maintenance 2 31/07/2017 30/06/2018 5 0 1

TM004 TM004 - Chainsaw Advanced Falling refresherEssential Competency

Maintenance 1 31/07/2017 30/06/2018 4 0 1

TM005 TM005 - Undertake CASA 20:11 Safety Training for all relevant fire-fightersEssential Competency

Maintenance 1 31/07/2017 30/06/2018 30 25 1

TM006 TM006 - Fire Behaviour Analyst skills maintenance & roster. including travel if requiredEssential Competency

Maintenance 1 31/07/2017 30/06/2018 10 0 2

TN001 TN001 - Attendance at AFAC PPE Group, 6-monthly meetings National Co-ordination Meeting 1 31/07/2017 30/06/2018 4 0 2

TN003 TN003 - Attendance at BNHCRC stakeholder and Lead End User & research priority meetings National Co-ordination Meeting 2 31/07/2017 30/06/2018 4 0 2

TN004 TN004 - Attendance at AFAC Rural Land Management meetings National Co-ordination Meeting 1 31/07/2017 30/06/2018 4 0 2

TN005 TN005 - Attend 2 x DELWP BRAAT team briefings National Co-ordination Meeting 1 31/07/2017 30/06/2018 10 0 2

TN007 TN007 - Attend Bureau of Meteorology pre-fire season weather briefing National Co-ordination Meeting 1 31/07/2017 30/06/2018 5 0 1

TN008 TN008 - AFAC Council Meetings National Co-ordination Meeting 1 31/07/2017 30/06/2018 2 0 1

TN0012 TN0012 - AFAC Learning and Development Meetings National Co-ordination Meeting 1 31/07/2017 30/06/2018 0 0 2

TN0017TN0017 - Attendance at National Burning Project workshops including cost benefit analysis & review of prescribed burning National Co-ordination Meeting 1 31/07/2017 30/06/2018 5 0 1

TN018 TN018 - Attendance at Forest Fire Management Group (FFMG) meetings National Co-ordination Meeting 0 31/07/2017 30/06/2018 4 0 1

TN019 TN019 - Attend Bushfire and Natural Hazards CRC Research Advisory Forums (RAF) National Co-ordination Meeting 0 31/07/2017 30/06/2018 4 0 1

TN020 TN020 - AFAC Board meetings National Co-ordination Meeting 0 31/07/2017 30/06/2018 10 0 2

TN021 TN021 - Attend EMSINA meetings National Co-ordination Meeting 0 31/07/2017 30/06/2018 15 0 2

TN022 TN022 - Attend AFAC Predictive Services Group (PSG) meetings National Co-ordination Meeting 0 31/07/2017 30/06/2018 10 0 2

Bushfire Operations Plan Page 46

Page 47: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ID Accreditation/Skill Level Type of Training

Estimated No. of Staff scheduled For

Training/ Refresher

Scheduled Start

Month

Scheduled Finish Month

Estimated Staff Days

Estimated Fire Crews

Days PriorityTN023 TN023 - Attend PSG Systems Group meetings National Co-ordination Meeting 0 31/07/2017 30/06/2018 6 0 2

TO001 TO001 - Venue hire, catering and materials for training courses Other Training 120 31/07/2017 30/06/2018 5 0 1

TO003 TO003 - Ensure training data entered into training database is accurate and up to date Other Training 0 31/07/2017 30/06/2018 10 0 1

TP001 TP001 - Fire Preparedness Workshop for all bushfire fighters Pre-Season Preparedness 1 31/07/2017 30/06/2018 160 40 1

TP002 TP002 - Fitness Assessment Pre-Season Preparedness 1 31/07/2017 30/06/2018 84 20 1

TP003TP003 - RAFT crew field exercises including navigation and team work and practicing pre-determined RAFT strategies for identified areas Pre-Season Preparedness 5 31/07/2017 30/06/2018 12 20 1

TP004 TP004 - Pre-season pre-formed IMT familiarisation Pre-Season Preparedness 14 31/07/2017 30/06/2018 4 0 1

TP005 TP005 - Pre-season meeting with Lake George Zone NSW RFS Pre-Season Preparedness 2 31/07/2017 30/06/2018 3 0 1

TP006 TP006 - Pre-season meeting with Cooma - Monaro Zone NSW RFS Pre-Season Preparedness 35 31/07/2017 30/06/2018 3 0 1

TP007 TP007 - PCS Fire Duty Officer refresher Pre-Season Preparedness 0 31/07/2017 30/06/2018 6 0 1

TP009 TP009 - Pre-season meeting with Region South NSW RFS Pre-Season Preparedness 0 31/07/2017 30/06/2018 3 0 1

TS001 TS001 - Lighting Patterns CourseCapacity Building & Succession

Training 2 31/07/2017 30/06/2018 15 30 2

TS004 TS004 - PCS Tanker Driver AssessmentsCapacity Building & Succession

Training 7 31/07/2017 30/06/2018 30 10 2

TS006 TS006 - Skills maintenance training for fire management staff, PCS fire crews and seasonal fire crewsCapacity Building & Succession

Training 1 31/07/2017 30/06/2018 30 140 2

TS012 TS012 - Development training for fire crewsCapacity Building & Succession

Training 5 31/07/2017 30/06/2018 10 20 1

TS013 TS013 - Training for new BAAT membersCapacity Building & Succession

Training 5 31/07/2017 30/06/2018 30 0 2

TS014 TS014 - Training in the TM1 BOP database for fire section staffCapacity Building & Succession

Training 25 31/07/2017 30/06/2018 15 0 1

TS015 TS015 - Fire simulation workshopCapacity Building & Succession

Training 2 31/07/2017 30/06/2018 5 0 1

TS016 TS016 - Fireline Leadership TrainingCapacity Building & Succession

Training 1 31/07/2017 30/06/2018 16 0 2

TS017 TS017 - Level 2/3 IC, OPS, Plan, LOGS, Situations Officer TrainingCapacity Building & Succession

Training 1 31/07/2017 30/06/2018 34 0 2

TS018 TS018 - Assist other states with hazard reduction burns/fire suppression operations to increase experience of PCS staff

Capacity Building & Succession Training

1 31/07/2017 30/06/2018 140 100 1

Bushfire Operations Plan Page 47

Page 48: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ID Accreditation/Skill Level Type of Training

Estimated No. of Staff scheduled For

Training/ Refresher

Scheduled Start

Month

Scheduled Finish Month

Estimated Staff Days

Estimated Fire Crews

Days Priority

TS020 TS020 - Advanced fire weather trainingCapacity Building & Succession

Training 5 31/07/2017 30/06/2018 16 10 2

TS025TS025 - Cultural heritage procedural awareness training for Bushfire-designated staff (in accordance with Indigenous Fire Framework); session at the Fire Preparedness Workshops (TP001)

Capacity Building & Succession Training 0 31/07/2017 30/06/2018 1 0 1

TS026

TS026 - Murumbung Rangers field trip to Boodoree National Park and/or Victorian Indigenous Protected Areas for information exchange with other Indigenous Ranger groups and Murumbung Rangers with specific focus on fire management

Capacity Building & Succession Training 0 31/07/2017 30/06/2018 6 9 1

TS027TS027 - Murumbung Rangers to attend the Indigenous fire conference in Cairns, next due in August 2018;

Capacity Building & Succession Training 0 31/07/2017 30/06/2018 3 0 1

Bushfire Operations Plan Page 48

Page 49: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Audit & Monitoring 2017/18

ID Item

Scheduled Start

Month

Scheduled Finish Month Who

Est Staff Days

Est Fire Crew Days Priority

AMP001AMP001 - Assess fuel hazard across the ACT, including helicopter hire to undertake fuel hazard assessments in areas remote from vehicle access 30/09/2017 31/03/2018 BOP Crew 11 180 1

AMP002 AMP002 - Assess fuel hazard and access standards after implementation of physical removal and slashing works for audit purposes. 31/07/2017 30/06/2018 FMU Office Staff 15 15 1

AMP003 AMP003 - Undertake audit of grazed areas to determine need for additional, unplanned, fuel management treatments 31/10/2017 31/03/2018 FMU Office Staff 15 15 1

AMP010 AMP010 - Annual fire equipment and appliance audit 01/08/2017 30/11/2017 FMU Office Staff 10 20 1

AMP016 AMP016 - Annual key audit of fire vehicles, command vehicles, officers and IMT staff 01/08/2017 30/11/2017 FMU Office Staff 4 0 1

AMP049 AMP049 - Undertake fire severity mapping following significant prescribed burns via remote sensing 31/07/2017 30/06/2018 FMU Office Staff 20 35 1

AMP077 AMP077 - Undertake annual audit and maintenance checks on TRN and VHF radios 31/08/2017 30/11/2017 FMU Office Staff 5 5 1

AMP082 AMP082 - Continue to employ PO2 to assess environmental actions in BOP and undertake monitoring of bushfire activities. 31/07/2017 30/06/2018 FMU Office Staff 1 0 1

AMP114 AMP114 - Participate in the group monitoring the implementation of actions in Version 3 of the SBMP. 31/07/2017 30/06/2018 FMU Office Staff 8 0 1

AMP115 AMP115 - Undertake environmental monitoring of identified BOP activities in accordance with existing BOP Environmental Monitoring Plan 31/07/2017 30/06/2018 FMU Office Staff 60 0 1

AMP118AMP118 - Undertake annual risk assessment of Stockyard Spur Walking Track and rectify any issues identified including issues identified in final signoff for previous year's audit. 31/07/2017 30/06/2018 FMU Office Staff 2 30 1

AMP120 AMP120 - Undertake water quality monitoring for the Blue Range Rehabilitation. Part of Blue Range Fire/Rehab plan. 31/07/2017 30/06/2018 Contractor (fire) 5 60 1

AMP121 AMP121 - BOP reporting to meet the requirements of the Auditor-General's recommendations 31/10/2017 31/03/2018 FMU Office Staff 400 0 1

AMP122 AMP122 - Murumbung Rangers to conduct fuel hazard assessments at identified cultural sites in the ACT 31/07/2017 30/06/2018 Murumbung Rangers 30 30 1

AMP123 AMP123 - Murumbung Rangers to assess as required, unexpected Indigenous cultural discoveries on fire grounds 31/07/2017 30/06/2018 Murumbung Rangers 12 0 3

AMP124 AMP124 - Murumbung Rangers to assess selected fire grounds pre-burning for natural and cultural heritage values 31/07/2017 30/06/2018 Murumbung Rangers 14 0 2

AMP125 AMP125 - Murumbung Rangers to conduct as required, cultural heritage assessment of emergency bushfire containment lines prior to rehabilitation 31/07/2017 30/06/2018 Murumbung Rangers 14 0 1

AMP126 AMP126 - Continue to monitor the rehabilitation of the containment lines around the Ginini Fire of 2012-2013 and the Cotter River HR burn & Brandy Flat HR 31/07/2017 30/06/2018 Non FMU Staff 9 30 1

AMP127 AMP127 - Undertake desktop erosion risk assessment following significant prescribed burns using outputs of AMP049 31/07/2017 30/06/2018 FMU Office Staff 10 0 1

AMP131 AMP131 - Implement smoke management program and smoke modelling on larger rural burns 31/07/2017 30/06/2018 FMU Office Staff 10 0 2

AMP132 AMP132 - Audit previously treated roadsides for weed regrowth & respray as required 31/07/2017 30/06/2018 FMU Office Staff 5 60 2

AMP133 AMP133 - Murumbung Rangers to assess selected fire grounds post-burning for natural and cultural heritage values 31/07/2017 30/06/2018 Murumbung Rangers 14 0 2

AMP134 AMP134 - Audit trails and gate access in Forestry estate and clear as required. 31/07/2017 30/06/2018 BOP Crew 0 60 2

Bushfire Operations Plan Page 49

Page 50: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Planning & Research 2017/18

ID Item

Scheduled Start

Month

Scheduled Finish Month Who

Est Fire

Crew Days

Est Staff Days Priority

P&R081 P&R081 - Print 2017/18 EPSDD BOP 31/07/2017 30/06/2018 Contractor (fire) 0 3 1P&R082 P&R082 - Prepare Draft 2018/19 BOP 31/07/2017 30/06/2018 FMU Office Staff 0 64 1P&R086 P&R086 - Update and print hard copy pre-suppression plans 31/07/2017 30/06/2018 Various 0 30 1P&R087 P&R087 - Update electronic version of pre-suppression plans for use on mobile devices. 31/07/2017 30/06/2018 FMU Office Staff 0 15 2P&R088 P&R088 - Maintain and upgrade mobile systems for field data collection for OFHA, slashing, grazing, road condition and other audits 31/07/2017 30/06/2018 Various 0 30 2P&R099 P&R099 - Update fuel hazard assessment plots to reflect new developments 31/07/2017 30/06/2018 FMU Office Staff 0 10 2P&R113 P&R113 - Provide input into development applications, master plans and other similar planning documents 31/07/2017 30/06/2018 PCS Staff 0 60 1P&R120 P&R120 - Annual access charge for NAFC aircraft tracking system. 31/07/2017 30/06/2018 Contractor (fire) 0 1 1

P&R145P&R145 - Review and provide input into applications for developments on nature strips to ensure developments are compatible with Inner Asset Protection Zone standards 31/07/2017 30/06/2018 PCS Staff 0 10 1

P&R149 P&R149 - Prepare concept plans and costings for bushfire management for new suburbs as required 31/07/2017 30/06/2018 PCS Staff 0 10 1P&R150 P&R150 - Provide advice on applications for tree plantings and other land management activities on TCCS managed land as required 31/07/2017 30/06/2018 PCS Staff 0 10 1P&R174 P&R174 - In combination with EDD and EPSDD develop a more streamlined development approval process for fire management activities. 31/07/2017 30/06/2018 FMU Office Staff 0 35 1P&R175a P&R175a - Fire Management Unit planning day 31/07/2017 30/06/2018 Contractor (fire) 6 20 2P&R176 P&R176 - Maintain & Upgrade TM1 31/07/2017 30/06/2018 Contractor (fire) 0 50 1P&R187 P&R187 - Procurement fees and insurance for capital works construction and planning and approval projects 31/07/2017 30/06/2018 Contractor (fire) 0 2 1P&R196 P&R196 - Continue development of works plan for upgrading Yaouk Fire Trail to Rigid Float standard (AMP101 in RFMP). 31/07/2017 30/06/2018 PCS Staff 0 22 2

P&R207P&R207 - Develop a computerised fire behaviour simulation capability for use in wildfires and prescribed fires (e.g.: Phoenix, Prometheus, SPARK, SABRE, AURORA or similar). 31/07/2017 30/06/2018 FMU Office Staff 0 50 2

P&R209 P&R209 - Develop a standby system such that there is a sliding scale of resource availability that matches the level of risk. 31/07/2017 30/06/2018 PCS Staff 0 10 1P&R210 P&R210 - Develop a plan for maximising the use of radios for PCS and minimising the need for more than a single radio to be carried. 31/07/2017 30/06/2018 PCS Staff 0 5 2P&R211 P&R211 - Continue development of a PCS Fire Management Manual 31/07/2017 30/06/2018 PCS Staff 0 30 1P&R212 P&R212 - Continue development of text notification system for use by the Fire Duty Officer and for organising resources 31/07/2017 30/06/2018 PCS Staff 0 10 1P&R214 P&R214 - Review/update BOP ecological guidelines 31/07/2017 30/06/2018 PCS Staff 0 22 2P&R217 P&R217 - Prepare temporary traffic management plans for prescribed burns (including volunteer burns). 31/07/2017 30/06/2018 Contractor (fire) 0 2 1

P&R218P&R218 - Implementation of contract traffic management for volunteer burns (for PCS burns the cost of contract traffic management is allocated against each individual burn). 31/07/2017 30/06/2018 Contractor (fire) 0 2 1

P&R220 P&R220 - If required, assist with implementing high priority prescribed burns on rural leases in the ACT. 31/07/2017 30/06/2018 PCS Staff 30 14 1P&R221 P&R221 - Catering for prescribed burns 31/07/2017 30/06/2018 PCS Staff 0 10 1P&R227 P&R227 - Annual update of Regional Fire Management Plan in conjunction with ESA and publication of shapefiles on ACTMapi. 31/07/2017 30/06/2018 FMU Office Staff 0 5 1P&R228 P&R228 - Upload the 2017-18 BOP access and fuel management shapefiles to ACTMapi. 31/07/2017 30/06/2018 FMU Office Staff 0 5 1P&R230 P&R230 - Maintain interactive road maintenance database including return interval for maintenance 31/07/2017 30/06/2018 FMU Office Staff 0 15 1

P&R231P&R231 - Continue development of national guidelines for erosion and sedimentation management in bushfire prone areas in conjunction with AFAC and University of Melbourne (partly funded by AFAC) 31/07/2017 30/06/2018 FMU Office Staff 0 20 1

P&R233P&R233 - Continue development fire equipment database for tracking the location of and replacement schedule for major pieces of fire equipment and consumables such as turn-out gear. 31/07/2017 30/06/2018 FMU Office Staff 0 10 2

P&R234 P&R234 - Continue planning and approval process for upgrading the Clear Range Fire Trail north of Forest Fire Trail to Rigid Float Standard 31/07/2017 30/06/2018 FMU Office Staff 0 20 1P&R235 P&R235 - Contribution to national grass curing assessment development project hosted by CFA 31/07/2017 30/06/2018 FMU Office Staff 0 36 1P&R237 P&R237 - Develop software to auto-populate the IAP template from the burn tracker application and other data 31/07/2017 30/06/2018 Contractor (other) 0 5 2P&R240 P&R240 - Develop TRN frequency guide book 31/07/2017 30/06/2018 FMU Office Staff 0 5 2P&R241 P&R241 - Contribute to the cost of the acquisition of aerial imagery of the ACT 31/07/2017 30/06/2018 Various 0 1 2P&R244 P&R244 - Annual membership fee of the International Association of Wildland Fire (IAWF) 31/07/2017 30/06/2018 FMU Office Staff 0 1 2P&R246 P&R246 - Implement fuel moisture collection system for prescribed burns (includes in-kind contribution to the BNHCRC) 31/07/2017 30/06/2018 FMU Office Staff 90 15 2

P&R251P&R251 - Murumbung Rangers to draft a research/discussion paper on the preparation and implementation of an ACT Indigenous Fire Management Framework 31/07/2017 30/06/2018 Murumbung Rangers 0 10 1

P&R253 P&R253 - Murumbung Rangers to conduct Indigenous fire management planning workshop 31/07/2017 30/06/2018 Murumbung Rangers 0 10 2P&R254 P&R254 - Murumbung Rangers to conduct Indigenous community fire management skills and capabilities audit and develop database 31/07/2017 30/06/2018 Murumbung Rangers 0 10 3

Bushfire Operations Plan Page 50

Page 51: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

ID Item

Scheduled Start

Month

Scheduled Finish Month Who

Est Fire

Crew Days

Est Staff Days Priority

P&R255 P&R255 - Murumbung Rangers to check the ACT cultural heritage database for assets on proposed fire grounds (in BOP and RFMPs) 31/07/2017 30/06/2018 Murumbung Rangers 0 10 1

P&R256P&R256 - Murumbung Rangers to develop a management plan for the Pierce's Creek grass tree site with a long-term strategy and details for a burn plan or other activities 31/07/2017 30/06/2018 Murumbung Rangers 0 10 1

P&R257P&R257 - Murumbung Rangers to develop a management plan for a cultural site in the Ginninderra catchment with a long-term strategy and details for a burn plan and other management objectives 31/07/2017 30/06/2018 Murumbung Rangers 0 10 2

P&R258 P&R258 - Murumbung Rangers to develop a traditional Aboriginal seasons calendar-map for the ACT and surrounding areas, including burning season(s) 31/07/2017 30/06/2018 Murumbung Rangers 0 10 3P&R265 P&R265 - Continue development and improvement of the PBDST – including automated upload of the gridded weather. 31/07/2017 30/06/2018 FMU Office Staff 0 5 2P&R266 P&R266 - Continue and enhance where possible the role of the contract meteorologist to add value in the decision making process. 31/07/2017 30/06/2018 FMU Office Staff 0 5 2

P&R268P&R268 - Advocate the need for another dedicated AWS website in the Act and enlist support from ESA (investigate Mt Clear at the first priority dedicated site as well as possibly one in North Canberra). 31/07/2017 30/06/2018 FMU Office Staff 0 5 3

P&R269 P&R269 - Continue the development and improvements of the Availability Calendar and Access database whilst investigating a similar system. 31/07/2017 30/06/2018 FMU Office Staff 0 5 1

P&R270P&R270 - Decide on the agency wide application of the Availability Calendar and the definition of ‘Available’ and the issues associated prior to next season, including who pays for the system. 31/07/2017 30/06/2018 FMU Office Staff 0 1 1

P&R271 P&R271 - EPD to develop concise descriptor guidelines for incorporation into the IAP’s. 31/07/2017 30/06/2018 FMU Office Staff 0 5 1P&R272 P&R272 - Investigate getting the advice of a professional dietician to assist with decision on day-pack contents for both field crews and the IMT. 31/07/2017 30/06/2018 FMU Office Staff 0 1 2P&R273 P&R273 - From a working group to agree on standard fatigue guidelines prior to the bushfire season. 31/07/2017 30/06/2018 FMU Office Staff 30 25 1P&R275 P&R275 - Continue planning of prescribed burn identified in the RFMP 2017-19 31/07/2017 30/06/2018 FMU Office Staff 0 30 2P&R276 P&R276 - Draft update to the Code of sustainable land management and associated manuals 31/07/2017 30/06/2018 FMU Office Staff 0 100 1P&R277 P&R277 - Booth Range trail planning. 31/07/2017 30/06/2018 FMU Office Staff 10 20 1P&R278 P&R278 - East west Trail planning 31/07/2017 30/06/2018 FMU Office Staff 10 20 2P&R280 P&R280 - Bullen river crossing 31/07/2017 30/06/2018 FMU Office Staff 0 20 2P&R281 P&R281 - Start development of the 2019-2029 RFMP 31/07/2017 30/06/2018 FMU Office Staff 0 50 1

Education 2017/18

ID Item

Scheduled Start

Month

Scheduled Finish Month Who

Estimated Staff Days Priority

ED002 Fire management display at Floriade or RFS Field Day. Jul-17 Oct-17 PCS Staff 5 2ED004 Publish the BOP on the ACT GOV website. Aug-17 Oct-17 PCS Staff 5 1ED006 Present BOP to community stakeholders such as Park Care, NPA and NCC. Oct-17 Jun-18 FMU Office Staff 5 1ED007 Advertising for public information and awareness of the burning program Nov-17 May-18 Contractor (other) 5 1ED008

Develop and maintain a PCS bushfire website including creation of content such as videos and photos Dec-17 Jun-18 Contractor (other) 10 2

ED009

Promote positions with Fire Management Unit to the Aboriginal and Torres Strait Islander community, particularly on seasonal fire crews. Jan-18 Jun-18 Non FMU Staff 2 1

ED010 Upgrade the PCS intranet bushfire pages Feb-18 Jun-18 FMU Office Staff 4 2

Bushfire Operations Plan Page 51

Page 52: Bushfire Operations Plan 2017-18 -   Web view2017/18 Bushfire Operations Plan. Environment, Planning and Sustainable Development Directorate

Standby, Response & Recovery 2017/18

ID Item

Scheduled Start

MonthScheduled

Finish Month

Estimated Staff Days

Estimated Fire Crew

Days

Seasonal GraderHours

Seasonal DozerHours

SRR001SRR001 - Fire Standby and Suppression Overtime & Allowances to meet MoU requirements Jul-17 Jun-18 250 300 50 100

Unforeseen Fire Management 2017/18 These resources will be used to cover unforeseen fuel, access; training and other fire management activities as directed by the Emergency Services Authority and as recommended by the Chief Ministers Department internal audit into the 2005/06 BOP. If the accrued unforeseen fire management resources exceed the amount allocated below, then other fire management works and activities listed in this BOP, to the value of the unforeseen fire management resource overrun, will be rolled over to the following financial year.

ID Item

Scheduled Start

MonthScheduled

Finish Month

Estimated Staff Days

Estimated Fire Crew Days

Seasonal GraderHours

Seasonal DozerHours

UFM001 UFM001 - Contingency For Capital Projects Jul-17 Jun-18 2 0 0 0UFM002 UFM002 - Unforeseen Fire Management activities Jul-17 Jun-18 100 200 50 50

Bushfire Operations Plan Page 52