c plcipl c ings

8
PL C 17th Volume - October 2021 CIPL INGS ? Season's Greetings to everyone!! Season's Greetings to everyone!! I hope all of you and your loved ones are doing I hope all of you and your loved ones are doing well in these tough times. well in these tough times. Season's Greetings to everyone!! I hope all of you and your loved ones are doing well in these tough times. From Director's Desk CIPL celebrated Independence Day with zeal and enthusiasm. now than ever before. This calls for us to innovate, now than ever before. This calls for us to innovate, work harder and smarter in order to achieve our work harder and smarter in order to achieve our targets. The need of the hour is to diversify and CIPL targets. The need of the hour is to diversify and CIPL has acted upon this and is currently working in various has acted upon this and is currently working in various sectors – ranging from Electrical/Water Utility sectors – ranging from Electrical/Water Utility Shifting, Highway Lighting, Bus shelters, Solar Shifting, Highway Lighting, Bus shelters, Solar Energy to Toll Plaza building construction across 11 Energy to Toll Plaza building construction across 11 states in India. states in India. In addition to this, we have recently laid renewed In addition to this, we have recently laid renewed emphasis on diversifying our client portfolio as well. I emphasis on diversifying our client portfolio as well. I am excited to announce that we have bagged new am excited to announce that we have bagged new projects with two new clients – with Ravi Infraprojects projects with two new clients – with Ravi Infraprojects Private Limited (RIPL) & PNC Infratech. Private Limited (RIPL) & PNC Infratech. I sign off by wishing everyone good health and a I sign off by wishing everyone good health and a successful third quarter of FY 21-22. successful third quarter of FY 21-22. now than ever before. This calls for us to innovate, work harder and smarter in order to achieve our targets. The need of the hour is to diversify and CIPL has acted upon this and is currently working in various sectors – ranging from Electrical/Water Utility Shifting, Highway Lighting, Bus shelters, Solar Energy to Toll Plaza building construction across 11 states in India. In addition to this, we have recently laid renewed emphasis on diversifying our client portfolio as well. I am excited to announce that we have bagged new projects with two new clients – with Ravi Infraprojects Private Limited (RIPL) & PNC Infratech. I sign off by wishing everyone good health and a successful third quarter of FY 21-22. Yours, Satyavrat Singh Director The past 18 months have been The past 18 months have been one the toughest periods one the toughest periods throughout the world throughout the world irrespective of the field. We at irrespective of the field. We at CIPL have also faced our own CIPL have also faced our own set of challenges but I am set of challenges but I am extremely proud of the way we extremely proud of the way we The past 18 months have been one the toughest periods throughout the world irrespective of the field. We at CIPL have also faced our own set of challenges but I am extremely proud of the way we have gelled as a unit have gelled as a unit and seen this phase and seen this phase through. through. I believe that our I believe that our field of business is field of business is more competitive more competitive have gelled as a unit and seen this phase through. I believe that our field of business is more competitive PL C

Upload: others

Post on 27-Feb-2022

7 views

Category:

Documents


0 download

TRANSCRIPT

PLC17th Volume - October 2021

CIPL INGS

?

Season's Greetings to everyone!!Season's Greetings to everyone!!

I hope all of you and your loved ones are doing I hope all of you and your loved ones are doing well in these tough times. well in these tough times.

Season's Greetings to everyone!!

I hope all of you and your loved ones are doing well in these tough times.

From Director's Desk

CIPL celebrated Independence Day with zeal and enthusiasm.

now than ever before. This calls for us to innovate, now than ever before. This calls for us to innovate, work harder and smarter in order to achieve our work harder and smarter in order to achieve our targets. The need of the hour is to diversify and CIPL targets. The need of the hour is to diversify and CIPL has acted upon this and is currently working in various has acted upon this and is currently working in various sectors – ranging from Electrical/Water Utility sectors – ranging from Electrical/Water Utility Shifting, Highway Lighting, Bus shelters, Solar Shifting, Highway Lighting, Bus shelters, Solar Energy to Toll Plaza building construction across 11 Energy to Toll Plaza building construction across 11 states in India.states in India.

In addition to this, we have recently laid renewed In addition to this, we have recently laid renewed emphasis on diversifying our client portfolio as well. I emphasis on diversifying our client portfolio as well. I am excited to announce that we have bagged new am excited to announce that we have bagged new projects with two new clients – with Ravi Infraprojects projects with two new clients – with Ravi Infraprojects Private Limited (RIPL) & PNC Infratech.Private Limited (RIPL) & PNC Infratech.

I sign off by wishing everyone good health and a I sign off by wishing everyone good health and a successful third quarter of FY 21-22.successful third quarter of FY 21-22.

now than ever before. This calls for us to innovate, work harder and smarter in order to achieve our targets. The need of the hour is to diversify and CIPL has acted upon this and is currently working in various sectors – ranging from Electrical/Water Utility Shifting, Highway Lighting, Bus shelters, Solar Energy to Toll Plaza building construction across 11 states in India.

In addition to this, we have recently laid renewed emphasis on diversifying our client portfolio as well. I am excited to announce that we have bagged new projects with two new clients – with Ravi Infraprojects Private Limited (RIPL) & PNC Infratech.

I sign off by wishing everyone good health and a successful third quarter of FY 21-22.

Yours,

Satyavrat Singh

Director

The past 18 months have been The past 18 months have been one the toughest periods one the toughest periods t h r o u g h o u t t h e w o r l d t h r o u g h o u t t h e w o r l d irrespective of the field. We at irrespective of the field. We at CIPL have also faced our own CIPL have also faced our own set of challenges but I am set of challenges but I am extremely proud of the way we extremely proud of the way we

The past 18 months have been one the toughest periods t h r o u g h o u t t h e w o r l d irrespective of the field. We at CIPL have also faced our own set of challenges but I am extremely proud of the way we

have gelled as a unit have gelled as a unit and seen this phase and seen this phase through.through.

I believe that our I believe that our field of business is field of business is more competitive more competitive

have gelled as a unit and seen this phase through.

I believe that our field of business is more competitive

PLC

PLPATH LIGHTERS TO THE NATION

C SHARE & CARE 2

Ganpati Bappa Morya!!

“The greatness of a culture can be found in its festivities”

Ganesh Chaturthi was celebrated with gusto at CIPL on 10th September, 2021. We prayed to Lord Ganesha to bestow us with wisdom, fortune, and good luck. Mr.

Manesh Pareek, Purchase Head, helped us through the puja proceedings.

The idol of Lord The idol of Lord Ganesh at CIPL HOGanesh at CIPL HO

The idol of Lord Ganesh at CIPL HO

Director Mr. Devvrath Singh Director Mr. Devvrath Singh offering his prayers to the deity.offering his prayers to the deity.

Director Mr. Devvrath Singh offering his prayers to the deity.

HO members offering prayers HO members offering prayers to Lord Ganesh. to Lord Ganesh.

HO members offering prayers to Lord Ganesh.

Independence Day Celebration India celebrated its 75th Independence Day on the 15th of August, 2021. Since, 15th August was a Sunday–HO members celebrated the day on 13th August. Everyone came dressed in ethnic attire – in the colors of the ag. Respect was paid to our heroes who

fought for our Independence. Sweets were distributed amongst all. The HO was beautifully decorated by Ms. Bhumika Jeithiwal, Ms. Neelam Mishra with help from Mr. Biplab Mahato, Mr. Sanjoy Mahato and team.

Director Mr. Devvrath SinghDirector Mr. Devvrath Singhalong with Mr. Prithvi Singh along with Mr. Prithvi Singh

and Mr. Dashrath Singhand Mr. Dashrath Singh

Director Mr. Devvrath Singhalong with Mr. Prithvi Singh

and Mr. Dashrath Singh

The “girl gang” in their The “girl gang” in their traditional attires.traditional attires.

The “girl gang” in their traditional attires.

Mr. Mohd Ayub celebrated the Mr. Mohd Ayub celebrated the day on site with ag hoisting.day on site with ag hoisting.

Mr. Mohd Ayub celebrated the day on site with ag hoisting.

CIPL organised a training & developmental session for its employees at Head Ofce in the month of August. The topic for the session was “How to full your dreams in life”. The session was taken by motivational speaker Mr. Yogendra Nigam.

He focused on topics like how to identify the barriers in one's life that stops one from achieving their goals. He also talked about how we must focus on tasks which are important and manage time properly.

PLPATH LIGHTERS TO THE NATION

C Learning & Development 3“Tell me and I forget, teach me and I may remember, involve me and I learn.”

Mr. Yogendra Nigam was welcomed by ourMr. Yogendra Nigam was welcomed by ourChairperson Mrs. Sujata Gangwar.Chairperson Mrs. Sujata Gangwar.

Mr. Yogendra Nigam was welcomed by ourChairperson Mrs. Sujata Gangwar.

Mr. Yogendra Nigam while Mr. Yogendra Nigam while taking the session.taking the session.

Mr. Yogendra Nigam while taking the session.

Induction Training – August

An Induction training was held for the

new recruits. The training sessions were headed

by Mr. Asit Gupta supported by Mrs. Sneha

Singh and team. The new CIPLions were taught

about the company policies and importance of

QUALITY.

CIPL Clothes Donation Drive A small gesture by us can be a boon for the poverty stricken, deprived people to stay happy during the cruel summer / winter season. CIPL decided to help the less fortunate and show generosity by donating clothes to keep the deprived ones comfortable in harsh

summers and winters. The CIPL Clothes Donation Drive was held in the month of September and it was met with an overwhelming response! The clothes were donated to an NGO called “Indra Kusth Ashram” that helps people with leprosy.

PLPATH LIGHTERS TO THE NATION

C Work Status 4

RAJASTHANCompleted :

1. Water Utility Shifting work at Jodhpur [VRC]:

● Water Utility Shifting Works at Jodhpur has been executed by CIPL.

● Project Value: Rs. 4 Cr

● Team Members: Mr. Shailendra Garg, Mr. Chetan Dadhich, Mr. Pawan Jangid, Mr. Mohd. Ayub

2. Reliance Trends, Jaipur (RIL):

● CIPL was awarded the Interior Works for Reliance Trends in Murlipura by RIL.

● Project Value: Rs. 1.5 Cr

● Team Members: Mr. Dinesh Mathur, Mr. Lokesh Gautam.

Ongoing :

1. Electrical Utility Shifting (RAPU) [GRIL]:

● Construction / up-gradation of two lanes with paved shoulder of NH from Raisinghnagar –Poogal section under phase-1 of BharatmalaPariyojana on EPC Mode.

● Project Value: Rs. 7 Cr

● Team Members: Mr Shailendra Garg, Mr Nitant Gupta, Mr Mukesh Kumar.

● Work Status: 98% completed.

2. EHV Work at Jodhpur [VRC]:

● Extra High Voltage (EHV) Work at Jodhpur is being executed by CIPL.

● Project Value: Rs. 12 Cr

● Team Members: Mr. Shailendra Garg, Mr. Chetan Dadhich, Mr. Pawan Jangid, Mr. Mohd. Ayub

● Work Status:5% completed.

3. Construction of Eight Lane Carriageway [DMIA]:

● Construction of Eight Lane Carriageway under new client DMIA

● Project Value: Rs. 10 Cr

● Team Members: Mr. Shailendra Garg, Mr. Nitant Gupta, Mr. Akash Rawlani.

● Work Status: 20% completed.

4. Construction of Eight Lane Access-Controlled Expressway under BharatmalaPariyojana [L&T]:

● Construction of Eight Lane Access-Controlled Expressway under client L&T

● Project Value: Rs. 4.5 Cr

● Team Members: Mr. Shailendra Garg, Mr. Nitant Gupta, Mr. Yogesh Kumar.

● Work Status:30% completed.

5. KUSUM Solar Project (JVVNL):

· SITC of Solar Plants under KUSUM Scheme of JVVNL – Lot – 9 was awarded to CIPL by JVVNL.

● Project Value: Rs. 18 Cr

● Team Members: Mr. Shailendra Garg, Mr. Nitant Gupta, Mr. Yogesh Kumar, Mr. Sunny Garg, Mr. Mahendra Sain

● Work Status: 5% completed.

6. Electrical Audit & Design at Various Government

“A dream doesn't become reality through magic;it takes sweat, determination & hard work.”

Hospital In 8 Zones of Rajasthan Under Medical & Health Department:

● CIPL was awarded the work of electrical audit & design of various govt. hospitals under the Medical & Health Dept. of Rajasthan.

● Project Value: Rs. 105 Lacs

● Team Members: Mr. Vishnu Kumar Kumhar, Mr. Mohd. Ayub, Mr. Naresh Gurjar, Mr. Vipin Kumar, Mr. Abhishek Sharma, Mr. Yogesh Kumar, Mr. Sourabh Sen.

● Work Status: 70% completed.

7. Highway Lighting & Toll Plaza Lighting with Solar Power Plant on EPC Mode under Bharatmala Pariyojana:

● CIPL was awarded the work for highway lighting & toll plaza lighting with solar plant at Eight Lane Carriageway starting at Haryana-Rajasthan border and ends at Junction with SH44 (Km 78+800 to Km 115+700) section of Delhi – Vadodara Greenfield Alignment (NH-148N).

● Project Value: Rs. 2.78 Cr.

● Team Members: Mr. Devvrath Singh, Mr. Hariram, Mr. Bablu Verma.

● Work Status: 50% completed.

GUJARATCompleted :

1. Porbandar-Dwarka (PODK) Project [GRIL]:

● Electrical utility shifting at Porbandar - Dwarka Road Project.

● Project Value: Rs. 14 Cr

● Team Members: Mr Shailendra Garg, Mr Abhinav Manek, Mr Sheeshram, Mr Bhanwar Lal, Mr Prabhati Lal .

Ongoing :

1. Dwarka-Khambaliya-Dwarka (DKD) Project [GRIL]:

● Electrical utility shifting at Dwarka-Khambaliya-Dwarka Road Project.

● Project Value: Rs. 17 Cr

● Team Members: Mr Shailendra Garg, Mr Abhinav Manek, Mr Sheeshram, Mr Bhanwar Lal, Mr Prabhati Lal.

● Work Status: 50% completed.

2. Highway Lighting and PGR Works under NHAI PIU Rajkot:

● Providing Lighting Facility and safety grill on ROB cum Fly-over near NarsangTekri at Porbandar

● Project Value: Rs. 150 Lacs

● Team Members: Mr Shailendra Garg, Mr Abhinav Manek.

● Work Status: 50% completed.

3. Vanana Toll Plaza (ABL):

● CIPL has been awarded the work for building the toll plaza in Gujarat.

PLPATH LIGHTERS TO THE NATION

C Work Status 5"Every mountain top is within reach if you just keep climbing."

MAHARASHTRAOn-going :

1. Electrical Utility Shifting Work at PKG 134 & 135 in Gondia Dist., Maharashtra (Shivalaya Construction Company Pvt. Ltd. - SCC):

● CIPL has associated with a new client, Shivalaya Construction Company Pvt. Ltd. (SCC) and is executing electrical utility shifting work at PKG 134 & 135 in Gondia Dist. Of Maharashtra.

● Project Value: Rs. 24 Cr

● Team Members: Mr Shailendra Garg, Mr Narendra Singh, Mr Vikash Singh, Mr. Prashant T. Pustode.

● Work Status: 90% completed

2. Water Utility Shifting Work (Shivalaya Construction Company Pvt. Ltd.):

● CIPL is also working on the water utility shifting work under PKG: 134A, B, C & PKG - 135

● Project Value: Rs. 5.5 Cr

● Team Members: Mr Shailendra Garg, Mr. Narendra Kumar Singh, Mr Lokesh Kumawat.

● Work Status: 80% completed.

3. Highway Lighting at Khetia-Kolde Section of SH-4 & SH-5 (PKG-7) [HGIEL]:

● SITC of electrical poles, high masts, toll plaza lighting and other electrical items with all accessories (PKG-07)

● Project Value: Rs. 3 Cr

● Team Members: Mr Devvrath Singh,Mr Abhishek Prasad, Mr. Aman Sountiyal

● Work Status: 60% completed

4. Highway Lighting at Pimpalgaon-Nashik-Gonde section of NH-3 (Dineshchandra R Agrawal InfraconPvt. Ltd.):

● CIPL is currently working on the SITC of Highway Lighting at Six Laning of Pimpalgaon-Nashik-Gonde section of NH-3 from 380.00 km to 440.00 km for DRA.

● Project Value: Rs. 2.33 Cr.

● Team Members: Mr Devvrath Singh,Mr Amresh Yadav

● Work Status: 95% completed

UTTAR PRADESH

JHARKHANDOn-going:

1. Highway Lighting at Hazaribagh-Ranchi Project (HARA) [NHAI]:

● CIPL is doing the highway lighting work of 4-Laning the Hazaribagh-Ranchi Section of NH 33 Project.

● Project Value: Rs. 1.41 Cr.

● Team Members: Mr Chetan Dadhich, Mr. Shambhu Kumar.

● Work Status: 95% completed.

Completed:1. Dasna-Meerut Highway Solar Works [GRIL] :● Supply, Installation, Testing & Commissioning of 1.6

MW of Solar Power Plant along with associated electrical works at Dasna-Meerut Highway (NE-3)

● Project Value : Rs. 15 Cr.● Team Members : Mr. Devvrath Singh, Mr. Shambhu

Kumar, Mr. Badal Utrelia, Mr. Dashrath SinghOn-going:1. HA_VA Water Pipeline Shifting Project [GRIL]:● Work for replacement of pipeline due to widening of NH

in 6 Lane from Handia to Raja Talab● Project Value: Rs. 10 Cr● Team Members: Mr Chetan Dadhich, Mr AjitSingh

Yadav, Mr Rahul Sharma & Mr Ankush Sharma.● Work Status: 75% complete.2. Electrical & Water Utility Shifting Work for road

project at PA-SA [GRIL]:● Electrical & Water Utility Shifting Work for road project

at Panipat-Shamli.● Project Value: Rs. 6.83 Cr● Team Members: Mr. Chetan Dadhich, Mr. Ajit Singh

Yadav, Mr. Yashwant Kumar● Work Status: 90% Completed.3. Electrical Utility Shifting Work (SA-MU) [GRIL]:● Electr ical Uti l i ty Shif t ing Work at Shamli-

Muzzafarnagar.● Project Value: Rs. 17.70 Cr● Team Members: Mr. Chetan Dadhich, Mr. Sitaram

Singh Shekhawat, Mr. Prakash Chand Kharra.● Work Status: 35% completed.3. Electrical & Water Utility Shifting for Road Project

(NAMI):● Electrical Utility Shifting Work at Naviganj-Mitrasen

Chowk● Project Value: Rs. 25 Cr.● Team Members: Mr. Chetan Dadhich, Mr. Rahul Sharma, Mr. Ajit Singh Yadav, Mr. Ankush Kumar.● Work Status: 85% completed.

● Project Value: Rs. 80 Lacs

● Team Members: Mr Shailendra Garg, Mr. Asit Gupta, Mr Abhinav Manek, Mr. Jitendra Sharma.

● Work Status: 15% completed.

HARYANAOn-going:

1. Highway Lighting Work for Eight-Laning of section

of NH 1 from MukerbaChowk to Panipat (MCP_RP)

[Welspun Enterprises Ltd.]:

● CIPL is doing Highway Lighting Work for Eight-Laning

of section of NH-1 from Mukerba Chowk to Panipat

(MCP_RP)

● Project Value: Rs. 8 Cr.

● Team Members: Mr Chetan Dadhich, Mr Umesh

Krishniya, Mr. Mohd. Junaid, Mr. Mohd. Irshad,

Mr. Mohd. Hassan Raza, Mr. Mohd. Sadre Alam.

● Work Status: 55% completed.

PLPATH LIGHTERS TO THE NATION

C Work Status 6“Although I like to relax & have fun, my PASSION is my WORK.”

OUR NEW PROJECTS

ANDHRA PRADESHOn-going:1. Structural Fabrication works and Solar Plant on

Toll Plaza Canopy for the project highway from Gundugolanu - Devarapalli, GULI (Solar + Bus Shelters + Toll Plaza Canopy):

● SITC Work of Bus Shelters & Grid-Tied Solar Plant on Toll Plaza Canopy

● Project Value: Rs. 1.74 Cr.● Team Members: Mr Chetan Dadhich, Mr Shambhu

Kumar, Mr. Praveen Sharma, Mr. Santosh Kumar Pal.● Work Status: 85% completed.

MADHYA PRADESHOn-going:1. Utility Shifting at PKG-18 & 21 [GRIL]:● GRIL has allotted CIPL with the task of Utility Shifting

at PKG-18 & 21● Project Value: 14 Cr● Team Members: Mr Shailendra Garg, Mr Vinod Kumar

Kataria, Mr Nitant Gupta, Mr Nawal Kumar Sharma.● Work Status: 98% completed.2. Highway Lighting & Toll Plaza Lighting and Solar

Power Plant for 5 Nos Packages of MP Bharat Mala Project (P18, P21, P23, P24, P25):

● GRIL has allotted CIPL with the task of highway lighting & toll plaza lighting and Solar power plant installation.

● Project Value: 29.30 Cr

● Team Members: Mr Devvrath Singh, Mr. Nawal Sharma, Mr.Bablu Verma, Mr. Abhay Singh

● Work Status: 10% completed.

Sl. No Name of Project Value Location Client Team HoD

1.Highway Lighting and Solarworks at Nagaur-Bikaner(NH 89) Road Project

Rs. 5.04 Cr Rajasthan RIPLMr. Prakash

Chand Kharra

Mr.Devvrath

Singh

2.Interior Works at warehouseof Reliance Retail Ltd. -Chomu

Rs. 100 Lacs Rajasthan RILMr. Pawan

Kaushik, Mr.Gulab Nabi

Mr. DineshMathur

3.Renovation Works at RelianceRetail Store at Sanganer,Jaipur

Rs. 10 Lacs Rajasthan RILMr. Gulab

NabiMr. Dinesh

Mathur

4.SITC of 25MHigh Mast atTOT P-9 Porbandar – JetpurRoad Project

Rs. 15 lacs Gujarat NHAI

Mr. AbhinavManek,

Mr. RajeshChoudhary

Mr. ChetanDadhich

5.SITC of 30MHigh Mast atRewa Boarder Check Post ofMPBCDCL

Rs. 17 lacsMadhyaPradesh

ElsamexMaintenance

ServicesLimited

Mr. UmeshKrishniya,Mr. Sunny

Garg

Mr. ChetanDadhich

Sometimes all you need is a little bit of Cake…!

Birthday celebration of Birthday celebration of Ms.Bhumika Ms.Bhumika

Jeithiwal at HOJeithiwal at HO

Birthday celebration of Ms.Bhumika

Jeithiwal at HO

Birthday celebration of Birthday celebration of Mr. Umesh Krishniya & Mr. Umesh Krishniya & Mr. Nitant Gupta at HOMr. Nitant Gupta at HO

Birthday celebration of Mr. Umesh Krishniya & Mr. Nitant Gupta at HO

Mr. Dashrath Singh, Mr. Mr. Dashrath Singh, Mr. Pawan Jangid & Mr. Shivraj Pawan Jangid & Mr. Shivraj

Singh Rajawat at HOSingh Rajawat at HO

Mr. Dashrath Singh, Mr. Pawan Jangid & Mr. Shivraj

Singh Rajawat at HO

MrVirendra Singh Nirwan, MrVirendra Singh Nirwan, Mr. Vaibhav Vyas & Mr. Vaibhav Vyas &

Mr. Satyavrat Singh at HOMr. Satyavrat Singh at HO

MrVirendra Singh Nirwan, Mr. Vaibhav Vyas &

Mr. Satyavrat Singh at HO

Birthday celebration of Birthday celebration of Mr.Ravi Kaushik Mr.Ravi Kaushik

at HOat HO

Birthday celebration of Mr.Ravi Kaushik

at HO

PLPATH LIGHTERS TO THE NATION

C Work Status 7"With hard work and effort, you can achieve anything"

Name of Work : Fabrication of Toll Plaza Canopy, Bus Shelter and Rooftop Solar Plant.Location: GULI Toll Plaza at Gundugolam – Devarapalli (Andhra Pradesh)Value: Rs. 2 Cr.

Client: G R Infraprojects Limited. Date of Completion: September, 2021.

Water Utility Shifting and related works at DR-GV 1.Location: Jodhpur, Rajasthan.

Value: Rs. 2.5 Cr.Client: VRC Constructions India (P) Ltd.

Date of Completion: September, 2021 Let's get ready for GSG!!

PLPATH LIGHTERS TO THE NATION

C Moving Forward 8“Tough times don't last, tough people do”

CURRENT INFRAPROJECTS (P) LIMITEDA-27, BASANT VIHAR, VAISHALI MARG (WEST), PANCHYAWALA, JAIPUR, RAJASTHAN, INDIA.PIN- 302034

E-mail: [email protected], Website: www.currentinfra.com

Editorial BoardChief Editor : Mrs. Sujata Gangwar | Editor : Mrs. Sneha Singh

Felicitations…Mr. Rahul SharmaAssistant Manager - ProjectsMr Sharma has been awarded 'Employee of the Month' for the month of JULY 2021. He has working hard on NAMI Site.

“WELCOME Aboard!! You have joined our jolly crew, though we can't promise calm seas or smooth sailing, we can promise to deep six all the nautical clichés.”

Mr. Narendra Singh ShekhawatSenior Manager – Accounts & FinanceMr Shekhawat has been awarded 'Employee of the Month for the month of JULY 2021. Mr. Shekhawat has been handling Accounts & Finance with expertise.

Mr. Shambhu KumarManager - ProjectsMr. Kumar has been awarded 'Employee of the Month – On-Site' for the month of SEPTEMBER 2021. He has put in a lot of effort in the GULI Project.He has worked hard under tough timelines and completed the project on time.

Mr. Pawan KaushikAssistant Manager – ERP/ITMr. Kaushik has been awarded 'Employee of the Month – Head Ofce' for the month of SEPTEMBER 2021. He has managed both on-site and HO this month with prowess.

WELCOME NEW SAILORS!!

Vishnu Kr. KumharSenior Manager - DesignSite: Head Office, JaipurEdcn: Diploma (CIVIL)

Yogesh KumarGET

Site: HO, JaipurEdcn: B.Tech

Neelam MishraReceptionist

Site: HO, JaipurEdcn: BA

Ankit MishraDET

Site: Head Office, JaipurEdcn: Diploma (electrical)

Gulab NabiManager - Projects

Site: RIL ProjectEdcn: B.Tech (Civil)

Bhumika JeithiwalHR Executive

Site: Head Office, JaipurEdcn: MBA - HR

Aman SountiyalSite EngineerSite: PunjabEdcn: B.Tech

Vandana SharmaTrainee –Accounts

Site: Head Office, JaipurEdcn: B.Com

Ravi ParkashAssist. Manager-Legal

Site: Head Office, JaipurEdcn: LLB

Narendra JakharDriver

Site: Head Office, Jaipur

Anita PakhariaManager - Technical

Site: H. O., JaipurEdcn: M. Tech

Happy ChaurasiaJr. Proj. Coordinator

Site: H. O., JaipurEdcn: B.Tech

“Alone we can do so Little; Together we can do

so much”A new Flyer was launched for MEC Test House in September