Calculating the Short Circuit Current when there is a Transformer in the circuit. Every transformer has “ %” impedance value stamped on the nameplate. Why is it stamped? It is stamped because it is a tested value after the transformer has been manufactured. The test is as follows: A voltmeter is connected to the primary of the transformer and the secondary 3-Phase windings are bolted together with an ampere meter to read the value of current flowing in the 3-Phase bolted fault on the secondary. The voltage is brought up in steps until the secondary full load current is reached on the ampere meter connected on the transformer secondary So what does this mean for a 1000KVA 13.8KV – 480Y/277V. First you will need to know the transformer Full Load Amps Full Load Ampere = KVA / 1.73 x L-L KV FLA = 1000 / 1.732 x 0.48 FLA = 1,202.85 The 1000KVA 480V secondary full load ampere is 1,202A. When the secondary ampere meter reads 1,202A and the primary Voltage Meter reads 793.5V. The percent of impedance value is 793.5 / 13800 = 0.0575. Therefore; % Z = 0.0575 x 100 = 5.75% This shows that if there was a 3-Phase Bolted fault on the secondary of the transformer then the maximum fault current that could flow through the transformer would be the ratio of 100 / 5.75 times the FLA of the transformer, or 17.39 x the FLA = 20,903A Based on the infinite source method at the primary of the transformer. A quick calculation for the Maximum Fault Current at the transformer secondary terminals is FC = FLA / %PU Z FC = 1202 / 0.0575 = 20,904A This quick calculation can help you determine the fault current on the secondary of a transformer for the purpose of selecting the correct overcurrent protective devices that can interrupt the available fault current. The main breaker that is to be installed in the circuit on the secondary of the transformer has to have a KA Interrupting Rating greater then 21,000A. Be aware that feeder breakers should include the estimated motor contribution too. If the actual connected motors are not known, then assume the contribution to be 4 x FLA of the transformer. Therefore, in this case the feeders would be sized at 20.904 + (4 x 1202 = 25,712 Amps GENERATOR FAULT CURRENT Generator fault current differs from a Transformer. Below, we will walk through a 1000KVA example. 800KW 0.8% PF 1000KVA 480V 1,202FLA KVA = KW / PF KVA = 800 / .8 KVA = 1000 FLA = KVA / 1.732 x L-L Volts FLA = 1000 / 1.732 x 0.48 FLA = 1,202 (As listed in the table for generator subtransient X” values is 0.16) FC = FLA / X” FC = 1202 / 0.16 FC = 7,513A

Upload: shivvaram

Post on 22-Dec-2015

60 views

Category:

Documents


1 download

DESCRIPTION

clculations

TRANSCRIPT

Page 1: Calculating The

Calculating the Short Circuit Current when there is a Transformer in the circuit. Every transformer has “ %” impedance value stamped on the nameplate. Why is it stamped? It is stamped because it is a tested value after the transformer has been manufactured. The test is as follows: A voltmeter is connected to the primary of the transformer and the secondary 3-Phase windings are bolted together with an ampere meter to read the value of current flowing in the 3-Phase bolted fault on the secondary. The voltage is brought up in steps until the secondary full load current is reached on the ampere meter connected on the transformer secondary So what does this mean for a 1000KVA 13.8KV – 480Y/277V. First you will need to know the transformer Full Load AmpsFull Load Ampere = KVA / 1.73 x L-L KVFLA = 1000 / 1.732 x 0.48FLA = 1,202.85The 1000KVA 480V secondary full load ampere is 1,202A.When the secondary ampere meter reads 1,202A and the primary Voltage Meter reads 793.5V. The percent of impedance value is 793.5 / 13800 = 0.0575. Therefore; % Z = 0.0575 x 100 = 5.75% This shows that if there was a 3-Phase Bolted fault on the secondary of the transformer then the maximum fault current that could flow through the transformer would be the ratio of 100 / 5.75 times the FLA of the transformer, or 17.39 x the FLA = 20,903A Based on the infinite source method at the primary of the transformer. A quick calculation for the Maximum Fault Current at the transformer secondary terminals is FC = FLA / %PU Z FC = 1202 / 0.0575 = 20,904A This quick calculation can help you determine the fault current on the secondary of a transformer for the purpose of selecting the correct overcurrent protective devices that can interrupt the available fault current. The main breaker that is to be installed in the circuit on the secondary of the transformer has to have a KA Interrupting Rating greater then 21,000A. Be aware that feeder breakers should include the estimated motor contribution too. If the actual connected motors are not known, then assume the contribution to be 4 x FLA of the transformer. Therefore, in this case the feeders would be sized at 20.904 + (4 x 1202 = 25,712 Amps GENERATOR FAULT CURRENTGenerator fault current differs from a Transformer. Below, we will walk through a 1000KVA example.800KW 0.8% PF 1000KVA 480V 1,202FLAKVA = KW / PFKVA = 800 / .8KVA = 1000 FLA = KVA / 1.732 x L-L VoltsFLA = 1000 / 1.732 x 0.48FLA = 1,202(As listed in the table for generator subtransient X” values is 0.16)FC = FLA / X”FC = 1202 / 0.16FC = 7,513ASo, the fault current of a 1000KVA Generator is a lot less then a 1000KVA transformer. The reason is the impedance value at the transformer and Generator reactance values are very different. Transformer 5.75% vs. a Generator 16% Reference: geindustrial.com

Skip to search Skip to primary navigation menu

Skip to secondary navigation menu Skip to main body of content

Skip to footer Back to top

Page 2: Calculating The

Home Contact Us Press Room Questions?

A Copper Alliance Member

 

Applications Architecture

o Design Handbook o Copper in Architecture Awards o Featured Projects o FAQs o Finishes o Educational Programs o Architecural Manufacturers & Distributors o Consultants and Contractors

Automotiveo Electric Vehicles o Copper-Nickel Brake Tube o Radiators and Heat Exchangers

Electricalo Building Wire o Power Quality o Busbar

Tube, Pipe & Fittingso Copper Tube Handbook o Overview o Key Copper Benefits o HVAC/R o DX Geothermal Heat Pumps o Tech Corner o Applications

Fuel GasIndustrial

o Casting Alloys o Bronze Sleeve Bearings o Selecting Bronze Bearing Materials o Electronic Connector Design Guide o Copper Alloy Molds o Mold Design Guidelines

Marineo Copper Nickel

Machined Productso Free-Cutting Brass o Copper and Brass Forgings o Bronze Sleeve Bearings o Forging Guide Glossary

TelecommunicationsAntimicrobial

Page 3: Calculating The

Do It Proper With Copper Video Series Resources

Find Suppliers of Coppero Copper Alloy Supplier Database o Architectural Installation Contractors Database o Architecural Manufacturers & Distributors

Copper Technical Reference LibraryPublications ListSeminars, Workshops & TrainingMarket DataStandards & Specifications

o UNS Standard Designation for Wrought and Cast Copper o ASTM Standard Designation for Wrought and Cast Copper and Copper Alloys o International Alloy Systems for Copper o Comparison of National Standards o Cross Specification Index o European Numbering System for Non-Ferrous Metals o Inactive Alloys o Registering A New Copper Alloy

Alloy Properties & Useso Copper Alloys Search - Basic o Copper Alloys Search - Advanced o Properties of Copper o Low Temperature Properties of Copper o Cryogenic Properties of Copper o Copper Compounds o Microstructures of Copper Alloys o Corrosion Protection & Resistance o Powder Metallurgy o Metallurgy of Copper-Base Alloys

Questions? Consumers

Copper in the Artso 2015 Archive o 2014 Archive o 2013 Archive o 2012 Archive o 2011 Archive o 2010 Archive o 2009 Archive o 2008 Archive o 2007 Archive

Copper in Your Homeo Archtecture, Lighting & Decor o Cookware & Decorations o Do It Yourself o Electrical & Communications Wiring o Environment & Health o Home Planning o Plumbing, Heating & Cooling o Innovations & Technology o Copper Links o FAQs o Copper News

Copper & Human Health Education

Copper Is...Copper ProductionCopper Facts

Page 4: Calculating The

History of Coppero 60 Centuries of Copper o Copper in the USA

The Statue of Libertyo Concept o Construction & Installation o Facts & Figures o Repair Concerns o Repair Details o Reclothed Lady

Copper and Kidso Fingerprint Disinfection Test o Copper Experiment o Seek a Word o Connect the Dots o Private Whys? o Where Does Copper Come From? o Copper Production

The Copper Learning Center Environment

Sustainable Energyo Electric Motors o Energy Efficiency o Energy Storage o Renewables o Transformers o Latest in SE o SE at a Glance

Mining & Recyclingo Trends In Copper Alloy Scrap In The U.S. o Copper - The World's Most Reusable Resource o Recycling of Copper

Green Properties of CopperCopper in Drinking Water

o Corrosion Symposium Report o Lead-free Solders for Drinking Water Plumbing Systems

Copper in the Natural Environmento Case Studies o Copper Roof Stormwater Runoff o Copper in Brake Pads Publications

Newsletterso Building & Architecture News o Discover Copper Online o Innovations

Publications List About CDA

CDA MissionCDA StaffPress RoomMembership

o Associate Membership o Association By-Laws o CDA Membership Application

Member LoginTradeshows

o Upcoming Tradeshows o 2015

Page 5: Calculating The

o 2014 DisclaimerContact UsLink to UsSite HelpSubscribe to Copper.org

Share on facebook Share on twitter Share on linkedin Share on email More Sharing Services

Home Environment   Sustainable Energy   Transformers   Transformer Life Cycle Cost

Environment

High-Efficiency Copper-Wound Transformers Save Energy and Dollars Proper Transformer Sizing & Copper Windings Temperature Rise and Transformer Efficiency Transformer Life Cycle Cost Introduction to Transformer Losses High-Efficiency Utility Transformers Mean Lowest Total Owning Cost

Transformer Life-Cycle Cost (Total Owning Cost)This article is excerpted from "Premium-Efficiency Motors and Transformers", a CD-ROM available from CDA by calling 888-480-4276.

Introduction

Transformers typically can be expected to operate 20-30 years or more, so buying a unit based only on its initial cost is uneconomical and foolish. Transformer life-cycle cost (also called "total owning cost") takes into account not only the initial transformer cost but also the cost to operate and maintain the transformer over its life. This requires that the total owning cost (TOC) be calculated over the life span of the transformer. With this method, it is now possible to calculate the real economic choice between competing models. (This same method can be used to calculate the most economical total owning cost of any long-lived device and to compare competing models on the same basis.) The TOC method not only includes the value of purchase price and future losses but also allows the user to adjust for tax rates, cost of borrowing money, different energy rates, etc.

A basic version of the TOC formula would look like this:

Page 6: Calculating The

TOC = Initial Cost of Transformer + Cost of the No-load Losses + Cost of the Load Losses

Since the formula includes the cost of losses, which will occur in the future, it is necessary to discount these future costs to equate them to present-day dollars (your company comptroller may be of assistance here). The transformer manufacturer supplies the bid price. If the A and B values are known, then the manufacturers should base the bid prices on the same A and B factors in all cases.

The cost of no-load and load losses are calculated using the following formulas:

Cost of No-load Losses = A x (No-load Losses)Cost of Load Losses = B x (Load Losses)

How to Calculate Transformer Life-Cycle Cost

The A and B factors as described in an article titled, "Introduction to Transformer Losses," (elsewhere on this CD-ROM) have been determined on the basis of equivalent first cost and need no further manipulation. This has the benefit of allowing the manufacturer to design the transformer to meet the A and B factors specified by the customer. No-load losses are constant for each transformer design, being dependent on the core steel characteristics and design. Load losses, on the other hand, are variable and directly proportional to the load on the transformer, typically being stated at the full-rated nameplate loading.

If the A and B values are not known, as is typical of smaller users, merely use the load loss and no-load loss in watts, multiplying each by the relevant hours and cost per kWh. (The case history of Herman Miller Company uses this method.)

Benefits of Using Transformer Life-Cycle Cost (Total Owning Cost)

Life-cycle cost (or total owning cost) analysis is a method that encompasses not only the initial purchase price but also the comparative operating costs of competing models, equalized to present-day dollars. Since the operating cost of a transformer over its life may be many times its initial price, the only fair comparison with competing models must take operating costs into account.

Another benefit to owning a transformer with low life-cycle cost, results from the fact that it runs cooler. Loss in the form of heat reduces the life of a transformer by causing damage to the insulation over time. It can also cause transformers to fail. Consequently, a transformer with lower life-cycle cost wouild be expected to have a longer life and lower failure rate, as well as lower losses. A transformer with lower losses (both core and coil) reduces the amount of power generation needed to accommodate the losses. This in turn reduces the emission of greenhouse gases, i.e. carbon dioxide (CO2), produced by fossil fuel generators.

Why Is a Premium-Efficiency Transformer Worth the Cost?

Page 7: Calculating The

A premium-efficiency transformer costs more initially, but saves sufficient money over time to more than pay back the extra purchase cost. Pay a little more up front for a premium transformer and save money over the life of the unit, or save a few dollars on a low-first-cost standard-efficiency transformer and continue to spend more money on wasted electric power for 20-30 years.

Premium-efficiency transformers have cores made of low-loss silicon steel with copper windings or amorphous steel with copper windings. Copper windings have lower resistance per cross-sectional area than aluminum windings. Thus, copper windings require smaller cores that produce lower no-load losses and offer greater reliability.

The transformer manufacturers have reduced the no-load losses of silicon steel transformers by over 60 percent in the last 30 years. They have accomplished this reduction in four ways: (1) they have improved the construction of the silicon steel, itself; (2) they have improved the cutting of the laminations; (3) they have improved the stacking or assembling of the laminations in the core of the transformer; (4) and finally, by using improved computer models of the no-load losses, they can better design the core to reduce no-load losses.

Premium-efficiency transformers with cores made of amorphous steel with copper windings have even lower no-load losses than silicon steel transformers. Transformers with amorphous steel in their cores lose 70-80 percent less energy in their core than silicon-core transformers.

Manufacturers also reduce core losses by using thinner laminations in the core and by using step-lapped joints. Rather than butting the laminations joints, they interleave laminations and increase the amount of steel that bridges the joint gap. This reduces the resistance between the laminations and thus reduces eddy current losses.

Example 1: Life-Cycle Cost Comparison of Two 75-kVA Transformers Using A and B Values

An example of the TOC of a more efficient (copper-wound) 75 kVA transformer to less efficient (aluminum wound) 75 kVA at 100% loading provided by Olsun Electrics illustrates the lower TOC of the more-efficient copper-wound transformer: In this example, the A value is assumed to be $1.50 per watt, and the B value is $0.35 per kWh.

TOC = Initial cost of transformer + Cost of the No-load Losses + Cost of the Load Losses

TOC of more efficient = $2,064 + ($1.50/watt)(320 watts) + ($0.35)(1670 watts)= $3,128.50

TOC of less efficient= $1,979 + ($1.50/watt)(350 watts) + ($0.35)(1874)= $3,159.90

Page 8: Calculating The

In this example, the more efficient transformer costs $85 more initially, but has 30 watts less core loss, and 204 watts lower coil loss, so the total owning cost of the more efficient unit is less than the cheaper first-cost unit.

Example 2: Total Owning Cost of a 750 kVA Transformer Using No-load and Load Losses and Present Value of Money

If you do not have, or do not use A and B factors in your business (they are typically used at utilities, but frequently not at many commercial businesses), you should ask for the no-load and load losses in watts from the manufacturer. Having that data, two other types of economic calculation can be performed, total owning cost both with and without the present value of money factored in.

Let's consider a simplified comparison of two alternative transformers assuming we have the no-load and load loss. We will assume that electricity costs are $0.075 per kWh, and are steady for 15 years of estimated life, with no variation for time of day. The "discount" factor for relating future costs to present day dollars is assumed to be 10 per cent (consult your comptroller or accountant for the correct factor for you). By present value, we mean that in order to pay for $1 in losses one year from now, we need to have $0.91 today, which can be invested (after taxes) at 10% return. Our transformer will be loaded to 75% of nameplate rating for 6,000 hours per year, and zero load for 2,760 hours per year. Salvage value, rate changes, inflation and maintenance costs are omitted for simplification.

For one year, the present worth of a sum at 10% discount factor is:

PW= 1(1 + i)n

where: i = discount factor, n = number of years (in this case n= 1)

for one year, PW = 1 / (1 + 0.1)1

PW = 1 / (1.1) = 0.909

For a series of equal payments (costs) over time, the present worth formula becomes:

PW =

(1 + i)n - 1

i(1 + i)n

Let's plug in some typical values for a 750 kVA transformer.

Page 9: Calculating The

Standard Transformer High-Efficiency Transformer

Purchase price - $10,194No-load losses - 1647 WLoad losses at 100% - 9507 WLoad loss at 75% - 5348 W

$10,8451018 W6769 W3808 W

Total Owning Cost of Transformer #1 (standard efficiency):

TOC = purchase price + present value of future no load losses + present value of future load losses

Purchase price = $10,194No load losses per year = 1.647 kW x 8760 h/y x $0.075/kWh = $1,082.08

Present Value (P.V.) of no load losses for 15 yrs= $1082.08 x ((1+0.1)15 -1) / (0.1) x (1+ 0.1)15= $1,082.08 x ( 4.1772 -1) / 0.41772= $8,229.74

Load losses per year = 5.348 kW x 6000 h/y x $0.075/kWh = $2,406.60P.V. of load losses for 15 yrs. = $2,406.60 x (4.1772 - 1) / 0.41772=$18,304.72

Total Owning Cost of Standard-Efficiency = $10,194.00 + $8,229.74 + $18,304.72 = $36,728.46

Total Owning Cost of transformer #2 (high efficiency):

TOC = purchase price + present value of future no load losses + present value of future load losses

Purchase price = $10,845No load losses per year = 1.018 kW x 8760 h/y x $0.075/kWh = $668.83

P.V. of no load losses for 15 yrs = $668.83 x ((1+0.1)15 -1) / (0.1)(1+ 0.1)15

= 668.83 x (4.1772 -1) / 0.41772= $5,087.16

Load losses per year = 3.808 kW x 6000 h/y x $0,075/kWh = $1,713.60

P.V. of load losses for 15 yrs.

= $1,713.60 x (4.1772 - 1) / (.41772)= $13,033.73

Total Owning Cost of Premium-Efficiency = $10,845.00 + $5,087.16 + $13,033.73) =$28,965.89

Page 10: Calculating The

Present Value of Savings with Energy Efficient transformer = $36,728.46 - $28,965.89 =$7,762.57

Example 3: Simplified Total Owning Cost (without time value of money)

A third, and simpler method of calculating savings is to omit the present value of money entirely, and simply calculate the annual owning cost. Many purchasers use this method as a quick alternative to more complex methods, producing different numerical answers but the sameconclusions. We will use the same purchase price and loss figures as Example 2, above.

Here are the purchase and loss values again:

Standard Transformer High Efficiency Transformer

Purchase price - $10,194No-load losses - 1647 WLoad losses at 100% - 9507 WLoad loss at 75% - 5348 W

$10,8451018 W6769 W3808 W

Cost of Standard Transformer (over 15 years) = purchase price+ [(value of load loss) + (value of no load loss)] x 15

Purchase price = $10,194Annual cost of load losses = 5.348 kW x 6000 h/y x $0.075/kWh = $2,406.60Annual cost of no load losses = 1.647 kW x 8760 h/y x $0.075/kWh = $1,082.08Annual cost of load losses and no load losses = $3,488.68

TOC of Standard transformer = $10,194 + ($2,406.60 x 15) + ($1,082.08 x 15) = $62,524.20

Cost of Energy Efficient transformer (over 15 years):

Purchase price = $10,845Annual cost of load losses = 3.808 kW x 6000 h/y x $0.075 = $1,713.60Annual cost of no load losses = 1.018 kW x 8760 h/y x $0.075 = $668.83Annual cost of load losses and no load losses = $2,382.43, i.e. saves $1,106.25 every year

TOC of Efficient transformer = $10,845 + (1713.60 x 15) + (668.83 x 15) = $46,581.4515-year savings with energy-efficient transformer = $62,524.20 - $46,581.45 = $15,942.75

Page 11: Calculating The

The energy efficient transformer will SAVE almost ONE AND ONE-HALF TIMES its initial purchase price over the 15-year assumed ownership, compared to the less efficient model.

Whichever method you choose, the conclusion is the same. Even though the more- efficient transformer costs more initially, its lower operating cost saves money over its life.

Example 4: Total Owning Cost of a 75 kVA Transformer

Olsun Electrics Corporation, a manufacturer of dry-type transformers, switch gear and reactors, provided a comparison of the no-load and load losses of 75-kVA dry-type transformers. In this example, the low-efficiency aluminum-wound transformer cost $1,336 and had no-load losses of 375 watts and full-load losses of 2,829 watts. The high-efficiency copper-wound unit cost $3,214 and had no-load losses of 190 watts and full-load losses of 993 watts (see table). It was assumed that the transformer would operate continuously throughout the year.

Here are the numbers:

Transformer rating: 75 kVA

Number of shifts loaded 1 (8760 h/y)

Energy cost: $0.070/kWh

The Total 15-Year Operating Cost is calculated:

Operating Cost (in $) = [(NLL x 8760 x 0.070) + (FLL x 8760 x 0.070)] x 15

Where:NLL = No load losses (kW)FLL = Full load losses (kW)Estimated full load hours per year = 8760Total hours per year = 8760

NOTE: The simplified table below does not account for taxes, depreciation or the time value of money

Inserting the bidders' cost and operating data and the estimated duty cycle numbers into an total owning cost (TOC) analysis, the following table shows the TOC calculations for the low and high efficiency units based on the following formula:

Page 12: Calculating The

TOC = price + cost of the no-load losses + cost of the load losses

OptionPurchase

PriceNo-Load

Losses, wattsFull-Load

Losses, wattsOne-Year,

Operating Cost15-Year

Operating CostTotal 15-Year Owning Cost

LowEfficiency

$1,336 375 2,829 $1,965 $29,475 $30,811

High Efficiency

$3,214 190 993 $725 $10,875 $14,084

Life-Cycle Cost Analysis

The savings associated with the high-efficiency copper-wound transformer, not taking into account depreciation, inflation or the time value of money, is $16,727 over a 15-year study period.

If the time value of money is taking into consideration, the TOC = price + A x (no-load losses) + B x (full load losses). Where,

A =

(System Capacity Cost) + (Energy Cost) x (8760) x 0.001

(Carrying Charge Rate)B = (System Capacity Cost) + (Energy Cost) x (No. hrs operate in a yr.) x 0.001

(Carrying Charge Rate)

Using the above formula and assuming there is no system capacity cost, that the carrying charge rate is 11 percent, and the transformer operates continuously throughout the year, the A and B factors equal $5.57/watt. This results in a TOC of $19,182 for the low-efficiency unit and $9,803 for the high-efficiency copper-wound unit, and a TOC savings of $9,379 for the high-efficiency copper-wound transformer.

Conclusions

The lesson learned in this example is that the purchase of a higher-cost higher-efficiency, copper-wound unit instead of a lower-cost, low-efficiency aluminum-wound unit will result in significant savings over the life of the transformer. As for the environmental benefits, the high-efficiency copper-wound transformer will contribute to reducing greenhouse gas emissions by reducing the consumption of fossil fuel necessary to accommodate excessive transformer losses.

Home

Page 13: Calculating The

 

Disclaimer

 

Link to Us

 

Membership

 

Sitemap

AAACopyright © 2015 Copper Development Association Inc. All Rights Reserved.

….

 

Home

About Us

Inside

Events Calendar

Advertisement

Subscription

Contact Us

Page 14: Calculating The

 Cover Story

Smart grid, smart electricity, smart India

 

Smar

t grid

is the

key

to

boost

powe

r

effici

ency

in

futur

e

In.....

 

Thermal power is rest with hope

 

New

gover

nmen

t,

sever

al

new

polici

es

and

prom

ising

priva

te

i.....

 

Elect 

 

Low Losses in Transformers - at what cost? [21 Dec 2012] 

  Low Losses 

in Transformers - at what cost?

 

As the awareness of reducing greenhouse gases and emissions is

increasing and the fear of global warming is no longer a theoretical

prophecy, globally efforts are being made to attack these problems. In the

electrical field also, efforts are being made to increase the efficiency of

generation, transmission and distribution of energy. One of the components

in the chain is the transformer and this article is an attempt to critically look

at the practices and the suggested remedies.

Procurement Policy

Transformers are highly efficient equipment with efficiency well over 98 per cent

and often over 99 per cent. But the quest of transformer users, manufacturers,

specification makers for low losses has led to various technical and commercial

methods adopted in the procurement process. This article looks at some of these

methods and explores an alternate viewpoint especially suited for Indian

conditions.

Total Owning Cost (TOC)

The most widely used method for the evaluation of transformers is the Total

Owning Cost (TOC) method. The TOC method proposes that in purchasing any

item of plant or equipment the following two costs have to be considered:

Initial capital cost

Operating cost.

The latter cost for a transformer is the cost of supplying the no-load loss and the

load loss, so:

Advertisers

Visit us at

Page 15: Calculating The

….

sign in or up

HOME

ARTICLES  

BLOG  

FORUM  

GROUPS  

JOBS  

COURSES  

ALBUMS  

LIKES FOLLOW   MORE

<="" div="" style="outline: none; padding: 0px; margin: 15px 0px 0px; border: 0px solid rgb(242, 240, 240); font-family: OpenSansRegular; color: rgb(112, 112, 112); text-align: left; font-size: 13px !important; float: right !important; display: block;">

Articles 

Page 16: Calculating The

Articles Home

 

Browse Articles

Owner

Hameedullah Ekhlasupdated April 4131 articles

Most Liked Articles

o This Week

o This Month

o Overall

o

CREEP EFFECT ...1 like

o

PV System1 like

o

What are Bear...1 like

General

Page 17: Calculating The

Electrical Engineering

Electrical Problem & SolutionPower SystemsTransformerMotorProtectionWiring Design

Renewable EnergyCivil EngineeringMechanical Engineering

Electrical Calc...33 likes6,435 views

Civil Engineering9 likes13,932 views

Metal1 like55 views

Wind Energy11 likes410 views

Electrical Engi...83 likes70,279 views

Motor

Page 18: Calculating The

17 likes586 views

Protection Scheme for Power System Components

Posted by Hameedullah Ekhlas April 4 - 118 views - Filed in Protection

 (78) Out-of-Step Relay for Generator:  Relay tracks the impedance by detecting the variations of the voltage/current. The variations is small during normal conditions however it changes nearly stepwise in the case of fault conditions. This means that the impedance is changed abruptly (87) Differential Relay for Trasformer:  Protects the transformer from internal faults by taking the current inputs from both primary and secondary side of the transformer. The sum of these currents (taking into consideration transformer turns ratio) is zero under normal conditions or external faults but not equal to zero in case of fault conditions (21) Distance Protection for Transmision Lines:  A fault in a transmission line will result in the decrease of line impedance which is compared with a pre-defined threshold value. The trip signal will be sent to the breaker if the measured impedance is smaller than the threshold. (50/51) Over-current Protection Transmision Lines: 

Page 19: Calculating The

A fault in a transmission line will result in the increase of current passing through the line which is compared with a pre-defined threshold value. The trip signal will be sent to the breaker if the measured current exceeds the threshold (27/59) Under/Over Voltage Protection for Loads:  A fault at the load bus will vary the terminal voltage. The measured voltage is compared with pre-defined threshold value. The trip signal will be sent to the breaker if it is lower/ greater compare to the threshold.  Reference: 

1. J. L. Blackburn, Protective Relaying: Principles and Applications, M. O. Thurston and W. Middendorf, Eds. Marcel Dekker, Inc., 1987.

2. P. Andersson, Power System Protection. Wiley-IEEE Press, 1998.

Article Tags: #transformer #Transmission line #FAULT #breaker #Protection Scheme for Power System Components 

Share     Report     Print Article COMMENTS

  PHOTOS (1)

0 comments

Copyright ©2015  -  Privacy  -  Terms of Service  -  Contact  -  Power Systems  -  Transformers  -  Motors  -  Wiring Design  -  Solar Energy  -  Soil Testing  -  Concrete  -  Structure  -  Seismic  -  Civil Courses  -  Mech.Courses  -  Electrical Jobs  -  Civil Jobs  -  Mech.Jobs  -  Electrical Courses  -  Civil Books  -  HVAC  -  Moment & Shearwall  -   Power Distribution  -  Power system guides  -  Power protection guides  -  Electrical Books  -  ExcelSheet Calculators  -  Wind Energy  -  Substation  -  Transformers guides  -  Solar guides  -  Wind guides  -  Motor guides  -  Transmission Lines  -  Hydro