Page 1: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Carbon management plan

WM Energy Managers' Forum, Friday 7th December 2012

Balbir BassiRugby Borough [email protected]

Page 2: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Introduction

• In the past years Rugby Borough Council has taken measures in cutting down on wasted energy.

• Meter readings were taken manually and given to the energy supplier. This contributed to bill validation and eliminated estimated billing.

• False billing has been eliminated by identifying redundant and non existent meters.

• New supplier contracts have been set up for suppliers to provide actual readings rather than estimated readings.

• Significant reduction in billing is seen in slides to follow

Page 3: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Corporate Energy Costs

Page 4: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Achievements & Progress to dateProjects already implemented

•Town hall voltage optimisation

•Closure of Redundant buildings

•Heating schedule checks (BEMS set points)

•Energy Management (Monitoring, Recording & Reporting)•Installation of LED lighting to John Barford car park

Page 5: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Case studyThe secret :

•To show success with an initial project that demonstrates a strong financial return.

•Implement a project with a positive Environmental Impact.

That’s;

Replacement of T8 5ft fluorescent tubes and fitting with Lylux- 5ft LED and fittings with sensors

Page 6: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Case Study

John Barford Multi-Storey Car Park

LED lighting to a Multi-storey Car Park

•Complete Lamp/Luminaires & Lighting controls(sensors) ,supply and fit to 389 fittings.

•Project Cost £49 950 including installation

Page 7: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

John Barford before installation of LED lighting

Page 8: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

John Barford after installation of LED lighting

Page 9: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

The link for before and after installation for a panoramas view of the car park. 

• Location 1, before the installation:

http://www.ecolight-ltd.com/index.php/markets/our-customers/rugby-council-car-park/before-installation-1• Location 1, after the installation:

http://www.ecolight-ltd.com/index.php/markets/our-customers/rugby-council-car-park/after-installation-1

Page 10: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Predicted ChangeJohn Barford Car Park

lightingPredicted Savings for the car park only

Page 11: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Actual Evidence of ChangeJohn Barford Car Park lighting

Pay back less than 5 years: 4.8 years

From £5,274

down to £1,305

Page 12: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Evidence of ChangeJohn Barford Car Park

lighting• Impact• Reduced electric energy consumption:75% saving In

one quarter .• Reduced annual running costs from £13,232 to £2,742• Improved Energy efficiency to the car Park• Improved Lighting Control• Improved Lighting levels hence Customer satisfaction.• Positive Environmental impact

Page 13: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Challenges• To Believe in LED (new technology),as the

most cost effective solution for the car Park.

• To design for sensors and timers to maximise energy savings while providing adequate lighting where necessary.

• To manage the project during Christmas period and ensure minimum disruptions to the daily use of the car park.

Page 14: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk

Summary

• LED with controls is the way forward. It cuts down on energy usage while producing a positive effect on budgets

• Final Thought…….Energy reduction

saves money

Page 15: Carbon management plan WM Energy Managers' Forum, Friday 7th December 2012 Balbir Bassi Rugby Borough Council Balbir.Bassi@rugby.gov.uk