case study for camden academy

2
Consultant BAM Client BAM M&E Sector Education Products Dinak Flue System Equipment Clyde Modulex 290 & 900 Application High Efficiency Condensing 0844 809 2509 | airtherm.co.uk | [email protected] Project Profile UCL Academy, Adelaid Road, Camden Front Entrance Aerial View of site Camden gets all fired up…. Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded, 4 hour fire rated, gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load. Airtherm Engineering Limited liaised with both the consultant and the contractor at all times, attending site meetings, providing comprehensive technical submission, including calculations and drawings for approval prior to manufacture of the equipment. The system installed comprised of a 12m horizontal run and a 26m vertical, complete with draft stabilisers and the necessary drains incorporated to allow any unwanted condense to evacuate to the system. The flue system was installed back in April 2012, however the design and liaising with the contractor begin some months earlier. Working closely with BAM Construction the installation was certainly a success. Clyde Modulex Boiler

Upload: andy-brown

Post on 24-Jun-2015

28 views

Category:

Documents


3 download

DESCRIPTION

Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load. The system installed comprised of a 10m horizontal run and a 26m vertical, complete with the necessary drains incorporated to allow any unwanted condense to evacuate to the system. The system was installed back in April 2012. Working closely with BAM Construction the installation was certainly a success. The UCL Academy will be housed in brand-new, purpose-built accommodation on Adelaide Road in Swiss Cottage, North London. The new building is specifically designed to support the curriculum and pastoral structures that the school will offer. The Academy’s facilities include: • State-of-the-art science laboratories, and a science demonstration theatre for interactive lectures, experiments and talks by visiting academics from UCL; • An engineering science suite, which will include workshops and technology and science labs (for electronics and for engineering physics) designed to give students the experience of ‘being engineers’; • Suites of rooms for art, music and drama, including highly-equipped performance spaces; • ‘House’ spaces, providing comfortable, welcoming places for students to eat together, and to use for informal study during breaks and before and after school.

TRANSCRIPT

Page 1: Case study for camden academy

Consultant

■ BAM

Client

■ BAM M&E

Sector

■ Education

Products

■ Dinak Flue System

Equipment

■ Clyde Modulex 290 & 900

Application

■ High Efficiency Condensing

0844 809 2509 | airtherm.co.uk | [email protected]

Project Profile

UCL Academy, Adelaid Road, Camden

Front Entrance

Aerial View of site

Camden gets all fired up…. Airtherm Engineering Limited have designed, supplied and installed a 500mm diameter stainless steel, twin wall, fully welded, 4 hour fire rated, gas and water tight Dinak DWhp flue system serving three high efficiency Clyde condensing boilers, with a total 2.2MW output load. Airtherm Engineering Limited liaised with both the consultant and the contractor at all times, attending site meetings, providing comprehensive technical submission, including calculations and drawings for approval prior to manufacture of the equipment. The system installed comprised of a 12m horizontal run and a 26m vertical, complete with draft stabilisers and the necessary drains incorporated to allow any unwanted condense to evacuate to the system. The flue system was installed back in April 2012, however the design and liaising with the contractor begin some months earlier. Working closely with BAM Construction the installation was certainly a success. Clyde Modulex Boiler

Page 2: Case study for camden academy

• Boilers: Clyde

• Model: Modulex 1 x 290kw & 2 x 900kw

• Application: Chimney / Flue system

• Operating mode: Dry / Wet

• Pressure: Negative / positive pressure

• Working pressure: 200 Pa (product will operate 1000pa max)

• Inner wall: 316L1.4404/1.457 thickness ≤ Ø250 0,4 mm, ≥ Ø300 0,5 mm

• Outer wall: AISI 304/ 1.4301 thickness 0,5 / 0,6 mm

• Insulation: 25mm thick Rockwool insulation

• Sealant : tri-lip 'o' type silicone ring

• Fuel type: Gas/Oil/Coal/Wood

• Other Application Dinak Flues can be used:

• Condensing boilers

• Atmospheric gas-fired boilers

• Gas blown boilers

• Industrial ovens, large-scale establishments

• Wood-fired stoves

0844 809 2509 | airtherm.co.uk | [email protected]

Product Solution

Airtherm Masterflue

Contact Details:

Airtherm Engineering Ltd

Ventilation House

Pedmore

Stoubridge

West Midlands

DY9 0DS

Tel: 0844 8092509

Fax: 01562 887312

MasterFlue