cefpi logo and conference baner · new primary school on greenfield site stage 1 completed 2010...

1
Email [email protected] Phone 07 3257 3622 Fax 07 3257 3677 Mother Teresa Catholic Primary School New primary school on greenfield site Stage 1 completed 2010 Stage 2 completed 2012 Area of site: 3.35Ha (after Council required dedications) Area of buildings: Stage 1: 1,660m 2 ; Stage 2: 1,560m 2 Budget: Stage 1: $6,000,000—$1,745/m 2 Stage 2: $3,655,000—$1,610/ m 2 Cefpi logo and conference baner This 3 stream Catholic Primary School was Masterplanned with Stage 1 & 2 procured through traditional delivery. In its founda- tion year the school commenced with Prep to Year 3, with Stage 1 comprising Admin Building, Classroom Facilities for years P-3, Multipurpose Building, Tuckshop and Undercover Areas. Stage 2 adds a Resource Centre, extension to Admin, additional Class- rooms and a further Multipurpose Building. Planning has been carefully considered to allow for flexibility to meet the require- ments of a dynamic and adaptable environment, responsive to social and technological changes. The sub-tropical environment allowed outdoor Learning Areas to become a central feature of the school with passive design elements including building orien- tation, use of natural ventilation and daylight being exploited. Mother Teresa Catholic Primary School was delivered for the prevailing BGA rates without sacrificing building quality.

Upload: others

Post on 18-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cefpi logo and conference baner · New primary school on greenfield site Stage 1 completed 2010 Stage 2 completed 2012 Area of site: 3.35Ha (after Council required dedications) Area

Email [email protected] Phone 07 3257 3622 Fax 07 3257 3677 Mother Teresa Catholic Primary School New primary school on greenfield site Stage 1 completed 2010 Stage 2 completed 2012 Area of site: 3.35Ha (after Council required dedications) Area of buildings: Stage 1: 1,660m2; Stage 2: 1,560m2 Budget: Stage 1: $6,000,000—$1,745/m2 Stage 2: $3,655,000—$1,610/ m2

Cefpi logo and conference baner

This 3 stream Catholic Primary School was Masterplanned with Stage 1 & 2 procured through traditional delivery. In its founda-tion year the school commenced with Prep to Year 3, with Stage 1 comprising Admin Building, Classroom Facilities for years P-3, Multipurpose Building, Tuckshop and Undercover Areas. Stage 2 adds a Resource Centre, extension to Admin, additional Class-rooms and a further Multipurpose Building. Planning has been carefully considered to allow for flexibility to meet the require-ments of a dynamic and adaptable environment, responsive to social and technological changes. The sub-tropical environment allowed outdoor Learning Areas to become a central feature of the school with passive design elements including building orien-tation, use of natural ventilation and daylight being exploited. Mother Teresa Catholic Primary School was delivered for the prevailing BGA rates without sacrificing building quality.