Inc. Enterprises, JDR Inc. Enterprises, JDR 292 south main street, suite 200, alpharetta, georgia 30004-1950 http://www.j-drain.com PROJECT: CITY HALL LOCATION: ATLANTA, GA DATE OF COMPLETION: 2003 CASE STUDY: GREEN ROOF 770 442-1461 800 843 7569 FAX 770 664 7951 Green Roof Drainage System J-DRain GRS J-DRain GRS Green Roof Drainage System R ATLANTA CITY HALL Greenroof is the first municipal project of its kind in the south. The project, sponsored by City of Atlanta, Department of Watershed Management, offers aesthetic and functional benefits for City Hall and Atlanta. Completed December 2003, it is located in the heart of downtown Atlanta, Georgia. The project: a 3000 square-foot garden on the buildings fourth floor roof is accessed from the fifth-floor cafeteria. The greenroof not only contri- butes to storm water management, reduced heating and cooling costs, water quality improvement and heat reduction, but also serves as an out- door patio amenity for employees and visitors. Installation of (high strength dimple core and two layers of geosynthetic fabric attached top and bottom), took one day and covers the entire roof. Concrete pedestal pavers, soil, stepping-stones, and 3000 plants (35 different varieties) were then installed directly on top of the J-DRain GRS J-DRain GRS drain layer.

Upload: others

Post on 18-Oct-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CITY HALL CASE STUDY - J-Drain · JJDDRR EEnntteerrpprriisseess,, IInncc.. 292 south main street, suite 200, alpharetta, georgia 30004-1950 PROJECT: CITY HALL LOCATION: ATLANTA

Inc.Enterprises, JDR Inc.Enterprises, JDR 292 south main street, suite 200, alpharetta, georgia 30004-1950

http://www.j-drain.com

PROJECT: CITY HALLLOCATION: ATLANTA, GADATE OF COMPLETION: 2003

CASE STUDY: GREEN ROOF

770 442-1461 800 843 7569 FAX 770 664 7951

Green Roof Drainage System

J-DRain GRSJ-DRain GRSGreen Roof Drainage System

RR

ATLANTA CITY HALL Greenroof is the first municipal project of its kind in the south. The project, sponsored by City of Atlanta, Department of Watershed Management, offers aesthetic and functional benefits for City Hall and Atlanta. Completed December 2003, it is located in the heart of downtown Atlanta, Georgia.The project: a 3000 square-foot garden on the buildings fourth floor roof is accessed from the fifth-floor cafeteria. The greenroof not only contri-butes to storm water management, reduced heating and cooling costs, water quality improvement and heat reduction, but also serves as an out-door patio amenity for employees and visitors.Installation of (high strength dimple core and two layers of geosynthetic fabric attached top and bottom), took one day and covers the entire roof. Concrete pedestal pavers, soil, stepping-stones, and 3000 plants (35 different varieties) were then installed directly on top of the