Settlement Construction Settlement Construction is 2 times higher then in is 2 times higher then in Israel Israel proper proper Settlement Watch Report August 2011 www.peacenow.org.il

Upload: hagitofran

Post on 17-Jul-2015

2.009 views

Category:

News & Politics


0 download

TRANSCRIPT

Page 1: ConstructionReport2011

Settlement Construction Settlement Construction is 2 times higher then in is 2 times higher then in

IsraelIsrael properproperSettlement Watch Report

August 2011 www.peacenow.org.il

Page 2: ConstructionReport2011

Since the end of the settlement freeze (Oct 2010 – July 2011)

Construction rate in Israel proper – 1 housing unit per 235 residentsConstruction rate in the settlements – 1 housing unit per 123 residents

Construction rate is almost 2 times higher in settlements then in Israel proper

New Neighborhood in Kedumim 6/7/11

Page 3: ConstructionReport2011

Since the end of the settlement freeze (Oct 2010-July 2011) : * 2,598 housing units have begun to be constructed in settlements

* Ground works has been started to a further 317 housing units

* Around 100 mobile homes have been added to various settlements and outposts

* The construction of 2,149 new housing units was completed.

* At least 3,700 units were under construction during the period from October 2010 till July 2011

= The freeze effects have been reversed completely

New Neighborhood in Tkoa 8/6/11

Page 4: ConstructionReport2011

2/3 of the Construction is East of the Built-Up Barrier

Only 33% of the construction (869 units) is west of the Separation Barrier

35% of the construction (903 units) are in the “finger” areas – were the barrier is planned yet not built

32% of the construction (826 units) is in isolated settlements, east of the planned barrier

Page 5: ConstructionReport2011

Ofra – Construction of a new neighborhood East of the Barrier, Ramallah area – 21/6/11

Page 6: ConstructionReport2011

Carmei Tzur – Settlement east of the Barrier, Hebron area – 14/10/10

Page 7: ConstructionReport2011

Carmei Tzur – Construction of new neighbourhood (56 units)East the Barrier, Hebron area – 22/5/11

Page 8: ConstructionReport2011

Construction in the “finger” areas

אזור מעלה אדומים

212

קרני שומרון-קדומים

114

גוש עציון329

אצבע אריאל 245

903 units being constructed in the finger areas – where the barrier is planned yet not built.

Ariel Finger245

Gush Etzion329

Maale AdumimArea212

Karnei Shomron-Kedumim

114

Page 9: ConstructionReport2011

Revava – Settlement in the “finger areas” – 12/10/10

Page 10: ConstructionReport2011

Revava – Construction 66 news unit – 8/7/11

Page 11: ConstructionReport2011

Pedu’el (Settlement in the “Ariel Finger” area) Construction of new neighbourhood – 22/6/11

Page 12: ConstructionReport2011

Further ground housing construction Cottages + Villas

New Neighborhood of Villas (48 Units) for a religious group in Alei Zahav 14/7/11

63% of the construction in the settlements (1,642) are detached or Semi-detached housing – mainly for the religious public

Page 13: ConstructionReport2011

Nerya – Settlement east of the Barrier – Ramallah area – 16/10/10

Page 14: ConstructionReport2011

Nerya – Settlement east of the Barrier, Ramallah area – 21/6/11

Page 15: ConstructionReport2011

Elkana – Construction of new neighbourhood of cottages – 22/6/11

Page 16: ConstructionReport2011

Widespread illegal construction in theSettlements and Outposts

Around 383 units currently being built illegally According to the planning and construction laws. 157 of these units are in illegal outposts

Illegal construction in Bet El

9/12/10 21/6/11

Page 17: ConstructionReport2011

Mitzpe Kramim Outpost – Ramallah Area 16/10/10

Page 18: ConstructionReport2011

Mitzpe Kramim Outpost – Ramallah area – 21/6/11

Page 19: ConstructionReport2011

For Further Information: