consultant’s profile · page 3 of 23 consultant’s profile sap project experiences customer...

23
Consultant’s Profile FIRAT KAYIRAN Principal Consultant Oil&Gas Logistic Solutions SAP Turkey Profile Fırat KAYIRAN was a freelance materials management consultant,business intelligence consultant, warehouse management and supplier relationship management consultant for over 10 years before he started to work for SAP Turkey.He has finished various MM,WM projects at various industry sectors on version SAP ECC 6.0, SAP HANA S/4 and BI projects on version 3.5 and 7.0, Business Objects projects on XI 3.1, XI 4.0 and SRM version 7.0 and SRM version 5.0 . Now he’s working for SAP Turkey as Principal Consultant in Oil&Gas area. SAP Experiments – Summary Materials Management He has finished 10 full-cycle, 1 media purchasing, 3 roll-out, 1 Business Consulting materials management,2 business blueprint, 1 company code replacement, 1 split valuation, 2 custom vendor evaluation, 1 availability check, 1 high level modeling and 7 custom MM projects.He has also 1 ongoing MM project . He has an advanced knowledge about ABAP programming (coding the user- exits,BadIs,reports), He has deep knowledge regarding Hana S/4 infrastructure and processes, He has knowledge about design of SAP Business Workflow, He has knowledge about integration of material management with other SAP R/3 modules , He educates project team about SAP material management, He has an advanced knowledge about MM-related portable terminal applications, He has experienced about LIS(Logistics Information System), He has experienced about availability check, He has experienced about abap query design, He developed several applications regarding import process in Turkey, He has experienced about integration of SAP-Non SAP systems He has experienced regarding IS DIMP, IS Fashion Management, IS Oil industry solutions , commodity management solution and health industry processes.

Upload: others

Post on 01-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Consultant’s Profile

FIRAT KAYIRAN

Principal Consultant – Oil&Gas Logistic Solutions

SAP Turkey

Profile

Fırat KAYIRAN was a freelance materials management consultant,business intelligence consultant, warehouse management and supplier relationship management consultant for over 10 years before he started to work for SAP Turkey.He has finished various MM,WM projects at various industry sectors on version SAP ECC 6.0, SAP HANA S/4 and BI projects on version 3.5 and 7.0, Business Objects projects on XI 3.1, XI 4.0 and SRM version 7.0 and SRM version 5.0 . Now he’s working for SAP Turkey as Principal Consultant in Oil&Gas area.

SAP Experiments – Summary

Materials Management

− He has finished 10 full-cycle, 1 media purchasing, 3 roll-out, 1 Business Consulting materials

management,2 business blueprint, 1 company code replacement, 1 split valuation, 2 custom

vendor evaluation, 1 availability check, 1 high level modeling and 7 custom MM projects.He

has also 1 ongoing MM project .

− He has an advanced knowledge about ABAP programming (coding the user-

exits,BadIs,reports),

− He has deep knowledge regarding Hana S/4 infrastructure and processes,

− He has knowledge about design of SAP Business Workflow,

− He has knowledge about integration of material management with other SAP R/3 modules ,

− He educates project team about SAP material management,

− He has an advanced knowledge about MM-related portable terminal applications,

− He has experienced about LIS(Logistics Information System),

− He has experienced about availability check,

− He has experienced about abap query design,

− He developed several applications regarding import process in Turkey,

− He has experienced about integration of SAP-Non SAP systems

− He has experienced regarding IS DIMP, IS Fashion Management, IS Oil industry solutions ,

commodity management solution and health industry processes.

Page 2: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 2 of 23

Consultant’s Profile

Business Intelligence

− He has finished 7 BW projects.(administration-performance),

− He educates project team about Netweaver BW.

− He has experienced about integration of SAP and Non-SAP systems(via PI)

Warehouse Management

− He has done 8 WM full-cycle project, 2 WM high level modeling Project and 1 documentation

WM project

− He has knowledge about integration of warehouse management with other SAP R/3 modules,

− He educates project team about SAP warehouse management,

− He has deep knowledge about designing handheld terminals.

Supplier Relationship Management

− He has experienced with SRM 5.0 and SRM 7.0,

− He has finished 1 roll-out SRM project in Spain and 1 full-cycle SRM 7.02 project

Business Objects

– He has experienced with XI 3.1 and XI 4.0 web intelligence and universe designer and finished 2

projects

Professional Experiments & Certificates – Summary

− He has SAP Enterprise Central Component(ECC) 6.0 material management solution

consultant certificate. (Certificate ID: 0004363876)

− He has SAP Supplier Relationship Management 5.0 solution consultant certificate.

(Certificate ID: 0004363876)

− He has BCP 3.0 Bulk Calculations Petroleum – QuantityWare GmbH

Page 3: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 3 of 23

Consultant’s Profile

SAP Project Experiences

Customer Besler-Oil Production Company of Ulker Group

Duration 11 Months(02.2007-01.2008)

Industry Food-Production(SAP IS-DIMP Solution)

Project Description ECC 6.0Regional Implementation Project

Role Materials Management Consultant

Responsibilities/

Deliverables

– Regional SAP ECC 6.0 material management (MM)

implementation project of the plants of Beslerinİstanbul and

Adana.Total of 337 employees are working at two plants and

total oil production capasity is 388.500 tons per year. This

production capasity is the biggest in Turkey.

– Design of business processes

– Design of business scenarios,

– Integration of other non-SAP systems,

– Technical spesification documentation of ABAP development

programs,

– Making stock movements in storage locations with handheld

terminals. Designing, developing and giving support about

handheld terminals,

– Training of project team,

– Preparing periodic meeting and project status reports,

– Documentation,

– Query design,

– LIS(Logistic Information System)reportdesign,

– Giving support of Arete Importing Module,

– Giving support after going-live.

Customer Sales&Marketing Companies Of Ulker Group

Duration 17 Months(02.2007 – 07.2008)

Industry Food-Sales&Marketing(SAP IS-DIMP Solution)

Project Description ECC 6.0Regional Implementation Project

Role Material Management Consultant

Responsibilities/

Deliverables

– Regional SAP ECC 6.0 material management (MM)

implementation project of Ulker Group sales&marketing

companies (Atlas Food Marketing, Atlantik Food Marketing,

İstanbul Food Marketing (Import-Export), Pasifik Food Marketing,

Kellog-Med Food Marketing, Esas Food Marketing, Eksper Food

Marketing, Rekor Food Marketing, Seher Food Marketing, Tek-

Ozel Food Marketing, Birleşik Food Marketing),

– Design of business process,

– Design of business scenarios,

– Integration designing of warehouse management partner

company-Netlog Exen warehouse management system and SAP

system which includes:

- Sending transport orders to Exen system,

- Receiving goods issue confirmations form Exen system,

Page 4: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 4 of 23

Consultant’s Profile

- Receiving inventory difference quantities from Exen system,

- Receiving goods receipt data from Exen system,

- Receiving cancellation data of these orders that is sent to

Exen system

– Technical spesification documentation of ABAP development

programs,

– Preparing periodic meeting and project status reports,

– Development of programs that automates manual processes in

SAP ,

– Query design,

– LIS(Logistic Information System) report design,

– Giving support for 3 months after going-live.

Customer Media Purchasing Project of Ulker Group (Oncu A.S.)

Duration 2 Months(01.2008 – 03.2008)

Industry Media Purchasing(SAP IS-DIMP Solution)

Project Description ECC 6.0Regional Implementation Project

Role ECC 6.0 Material Management Consultant

Responsibilities/

Deliverables

- Regional SAP ECC 6.0 material management (MM)

implementation project of Oncu İletisim A.S. that purchases media

for Ulker Group companies,

– Design of business process,

– Design of business scenarios,

– Making easy of entering incoming invoice with integration of SAP-

Incoming invoice processing department

– Technical spesification documentation of ABAP development

programs,

– Distribution of central contract to several ECC system,

– Integration of other modules of SAP,

- Development of report that lists commission of media purchasing

to other companies of Ulker group

Customer İdeal Bisküvi - Fresh Kek Roll-Out Project

Duration 4 Months (08.2008 – 01.2009)

Industry Food-Production(SAP IS-DIMP Solution)

Project Description ECC 6.0RegionalRoll-Out Project

Role R/3 Material Management Consultant

Responsibilities/

Deliverables

- Regional SAP ECC 6.0 material management (MM) roll-out project

of Ideal Bisküvi A.S. and Fresh Kek A.S.

– Design of additional business process,

– Design of additional business scenarios,

– Technical spesification documentation of ABAP development

programs,

– Preparing periodic meeting and project status reports,

– Query design,

– Integration of other modules of SAP,

Page 5: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 5 of 23

Consultant’s Profile

- Giving support of Arete Importing Module,

Customer Elastogran

Duration 1 Month (02.2009-03.2009)

Industry Chemical

Project Description R/3 4.7 Business Consulting

Role R/3 Materials Management Consultant- Business Consultant

Responsibilities/

Deliverables

- Analysis, development and reporting to managers of business

process of Elastogran about R/3 material management

Customer Efes Pilsen

Duration 2 Months (04.2009-05.2009)

Industry Bewerage-Production

Project Description Business Information Warehouse – BW Project

Role SAP Netweaver-BW Consultant

Responsibilities/

Deliverables

- Purchasing business information warehouse consulting of EFPA –that is marketing company of bewerage- and Anadolu Efes-bewerage production company- - Design of purchasing infocube, - Loading budget data from excel file to infocube, - Loading actual data from SAP, - Designing and building hierarchy structure, - Preparing 70 business explorer reports.

Customer Sunjut

Duration 1 Month (05.2009-06.2009)

Industry Textile

Project Description Business Information Warehouse – BW Project

Role SAP Netweaver-BW Consultant

Responsibilities/

Deliverables

-Profit analysis business information warehouse consulting. - Design of PA infocube, - Loading data from customer table of SAP to infocube,

Customer Unilever

Duration 17 Months ( 12.2008 - 07.2010 )

Industry FMCG

Project Description Unilever U2K2 Multinational APO Business Information Warehouse – BW- Project

Role SAP Netweaver-BW Consultant

Responsibilities/

Deliverables

- Unilever’s Indonesia, Thailand, Japan,Malaysia,

Singapore,Turkey,Saudi Arabia,Israel,Australia,New

Zaeland,China,Taiwan,Hong Kong APO project-named U2K2-

- Designing infocubes and datastore objects that is used by demand

planning, supply network planning module of APO,

- Extracting data from external systems using SAP PI(Process

Interface),

Page 6: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 6 of 23

Consultant’s Profile

- Designing open hubs, infocubes, datastore objects, virtual

providers and multiproviders that is used by APO reportings,

- Tracing and improving system performance,

- Creating BW queries,

- Creating test cases and following up open issues,

- Making periodic calls with CPL and other project members,

- Giving BW support for live projects

Customer Betek Chemical and Painting

Duration 3 Months (03.2009-06.2009)

Industry Chemical and Painting

Project Description Business Information Warehouse – BW Project

Role BW Consultant

Responsibilities/

Deliverables

- Creation of data extraction structure from SQL, Oracle DB’s and

ECC system

- Installing , creating BW HR and Sales and Distribution

infoproviders and BW queries thatHuman resources and

marketing department requires

- Creating reports from Oracle-extracted data to analyze sales-

promotion activities.

Customer Erdemir&Isdemir Iron And Steel Company

Duration 12 Months(10.2009 - 10.2010)

Industry Iron&Steel Heavy Industries(SAP IS-DIMP Solution)

Project Description ECC 6.0 and BI 7.0 Business Information Warehouse Project

Role BW Consultant & MM Consultant & WM Consultant

Responsibilities/

Deliverables

Business Information Warehouse

- Activating and Designing FI-GL, FI-AA, FI-TR, CO-PC, CO-

PCA, CO-PA, CO-CCA, MM-PUR, MM-IM, QM Business

content &other custom developed queries

- Creating related process chains

- Activating bi statistics and tracing performance

Materials Management

– Design of business processes

– Design of business scenarios,

– Integration of other non-SAP systems,

– Technical specification documentation of ABAP development

programs,

- Supporting materials management design&development in

spesific issues:

Arete Import Module

Page 7: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 7 of 23

Consultant’s Profile

Arete Bidding&Evaluation Development

Warehouse Management

- Implementation of warehouse management for 25 spare parts

warehouses

- Designing&developing scenarios,forms,programs etc.

- Integration with IM

Customer Trakya Glass A.Ş.

Duration 6Months (10.2010-04.2011)

Industry Flat Glass Manufacturing Plant(SAP IS-DIMP Solution)

Project Description ECC 6.0Regional Implementation Project

Role ECC 6.0 Material Management Consultant

Responsibilities/

Deliverables

- Implementation of ECC 6.0 Material Management module of

Trakya Glass Turkey, Yenisehir Glass plants of Şişecam

Group ,

– Design of Turkey-spesific scenarios,

– Customizing of Bulgaria spesific INTRASTAT reporting,

– Setting up custom product allocation scenario built on standart

availability check,

– Desing of Custom glass-cutting scenario(with subcontracting),

– Desing of MM spesific shipping scenarios,

– Design of general scenarios,

– Design of integration scenario of :

- Receiving material master data from Oracle system

-Preparing periodic “Where are we” reports to project managers,

– Documentation of ABAP development technical specs,

- Integration with the other modules,

– Installing of Arete importing pack,

– Installing of Arete quotation evaluation pack,

– Design of handheld terminals,

– Project team trainings,

– Documentation,

– Query design.

Customer Trakya Glass Bulgaria

Duration 4 Months (04.2011 – 08.2011)

Industry Flat Glass Manufacturing Plant(SAP IS-DIMP Solution)

Project Description ECC 6.0Regional Roll-Out Implementation Project

Role ECC 6.0 Material Management Consultant

Responsibilities/

Deliverables

- Roll-out project of ECC 6.0 Material Management module of

Trakya Glass Bulgaria plants of Şişecam Group ,

- Transition of Paşabahçe-BG SAP System according to

Bulgaria Laws, accounts,logistic processes

– Design of Bulgaria spesific scenarios,

Page 8: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 8 of 23

Consultant’s Profile

– Customizing of Bulgaria spesific INTRASTAT reporting,

– Desing of MM spesific shipping scenarios,

– Design of general scenarios,

-Preparing periodic “Where are we” reports to project managers,

– Documentation of ABAP development technical specs,

- Integration with the other modules,

– Design of handheld terminalsand barcode print-outs of operating

materials storage location,

– Project team trainings,

– Documentation,

Customer Almarai Food

Duration 6 Months (08.2011 - 02.2012)

Industry Food&Beverage

Project Description XI 3.1 Business Object Implementation Project

Role Business Object Consultant

Responsibilities/

Deliverables

- Business object(Web intelligence) project of poultry part of

Almarai Food.

- Design of business information warehouse data structure

- Design of web intelligence universe

- Design of 44 poultry reports using web intelligence

Customer Sertrans Logistics

Duration 1 Month

Industry Logistics

Project Description BI 7.02 Business Information Warehouse Project

Role BW Consultant

Responsibilities/

Deliverables

- Creation of the accounts payable, account receivable and general

ledger reports’ data warehousing structure ,

- Creation of reports using query designer

Customer Paşabahçe Glass Industry

Duration (08.2011-11.2011)

Industry Glass Tableware Manufacturer

Project Description Company Code Replacement Project

Role Materials Management Consutant

Responsibilities/

Deliverables

- Changing company code of Paşabahçe plant in the same SAP

system without losing any transactional data,

- Creating custom programs for this transition,

Page 9: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 9 of 23

Consultant’s Profile

- Activating split valuation for finished products,

- Transforming custom programs according to split valuation,

- Activating and designing INTRASTAT legal reporting,

- Sending INTRASTAT data to another SAP system to be able to take the consolidated report.

Customer Betek Chemical and Painting

Duration 1,5 Months(12.2011-01.2012)

Industry Chemical and Painting

Project Description BW 7.0 / BO XI 4.0 Project

Role BW / Business Objects Consultant

Responsibilities/

Deliverables

- Extraction of wholesaler inquiry data of Betek from file and SQL

database to BW system,

- Creation of 50 BO XI 4.0 Web Intelligence report for the inquiry

data,

Customer South Steel

Duration 1 Month(01.2012-02.2012)

Industry Iron&Steel Heavy Industries

Project Description ECC 6.04Regional Implementation Project

Role Material Management Consultant

Responsibilities/

Deliverables

- Preparation of material management business blueprint of

South Steel Company which is established in Saudi Arabia

whose billet production capacity is 1.000.000 tons/yr and rebar

production capasity is 500.000 tons/yr

Customer APS Textile Group

Duration 10 Months (01.2012-11.2012)

Industry Apparel Industry(SAP IS AFS Solution)

Project Description ECC 6.05 Regional Implementation Project

Role Material Management Consultant

Responsibilities/

Deliverables

- Implementation of ECC 6.05 Material Management module of

APS textile using AFS Industry solution of SAP,

– Design of MM and textile spesific scenarios,(subcontracting

follow-up, classification of finished products, desing of grid

structure etc.)

– Documentation of ABAP development technical specs,

- Integration with the other modules,

– Installing of Arete importing pack,

– Project team trainings,

– Documentation,

– Query design.

Customer CCI(Coca-Cola Beverage) Turkey

Duration 02.2012-07.2012

Page 10: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 10 of 23

Consultant’s Profile

Industry Food and Beverage

Project Description ECC 6.0 Custom Vendor Evaluation Project

Role Material Management Consultant

Responsibilities/

Deliverables

-Implementation of custom vendor evaluation to CCI ECC system,

-Creating framework of custom vendor evaluation process fully

integrated with puchasing, stock management and logistic invoice

management,

-Creating flexible customization tables of main and sub-criterias of

vendor evaluation process,

-Creating flexible customization of weighing according to evaluation

version,

-Creating BW reports of custom evaluation with possibility of drilling

down main score according to purchasing group, material group

and plant.

Customer Polisan Chemicals and Paints

Duration 1 Week(04.2012)

Industry Chemical and Painting

Project Description ECC Purchasing and Availbility Check

Role Material Management Consultant

Responsibilities/

Deliverables

-Design of Polisan distributor MIX process for the ECC system,

-Design and customization of stock transport order process using

storage location MRP areas,

-Design and coding of customized availability check for stock

transport orders used in MIX process

Customer Trakya Glass A.Ş.

Duration 2 Months (04.2012-06.2012)

Industry Glass Production&Processing(SAP IS-DIMP Solution)

Project Description Split Valuation Project

Role ECC 6.05 Material Management Consultant

Responsibilities/

Deliverables

-Activating split valuation for finished goods(Apprx.7500 material

codes) in a live system,

-Transforming business process according to split valuation,

-Changing custom developments according to split valuation,

-Applying custom solutions to be able to extend materials for split

valuation

Customer Trakya Glass A.Ş.

Duration 8 Months (06.2012-02.2013)

Industry Automotive Glass Manufacturing Plant (SAP IS-DIMP Solution)

Project Description ECC 6.05 Material Management Consultant

Role Lead Material Management Consultant

Page 11: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 11 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- Design of business processes of Automotive Glass Plants and

Households Glass Plants of Şişecam Group,

- Analyzing and listing differences of business processes of these

plants comparing to older SAP projects of this group,

- Desing of MM spesific scenarios,

- Design of general scenarios,

- Documentation of ABAP development technical specs,

- Integration with the other modules,

- Design of handheld terminals and barcode print-outs of

operating materials storage location,

- Project team trainings,

- Documentation.

Customer Polisan Chemicals and Paints

Duration 1 Week(07.2012)

Industry Chemical and Painting

Project Description Pricing According to Goods Delivery Point

Role Material Management Consultant

Responsibilities/

Deliverables

- Project of purchase order pricing according to goods delivery point

of supplier

- Customizing partner schema to be able to choose appropriate

partner in purchase order,

- Creating new gross price condition,

- Customizing condition exclusion schema,

- Changing calculation schema,

- New pricing logic for purchase orders which has or has not

contracts.

Customer Ege Break Inc. And Ege Industry Inc.

Duration 3 Months(12.2013 – 02.2013)

Industry Automotive Spare Parts Production

Project Description ECC 6.05 Project

Role Lead Material Management Consultant

Responsibilities/

Deliverables

- Design of business processes of two automotive parts

manufacturer companies which belong to Bayraktar Group in

Turkey. (Only business blueprint part of the project)

- Design of automotive-spesific scenarios(Scheduling agreements

and schedule lines, supplier portal integration, vendor evaluation

etc.)

Customer Eti Food Production Co.

Duration 3 Months (02.2013 - 05.2013)

Industry Food Production

Project Description ECC 6.05 Project

Role Lead MM Consutant

Page 12: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 12 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- Eti is the one of the biggest food producer in Turkey and I joined

the project team just 2 months before go-live,

- Closing go-live open issues,

- Closing customer feedbacks about development and standart

scenarios using ABAP skills,

- Design of integration scenarios of:

-Receiving material versions from non-sap system

- Go-live support.

Customer Borusan Automotive Co.

Duration 02.2013 – 03.2014

Industry Automotive and Spare Parts Dealer

Project Description Whole Parts Project

Role Lead MM and WM Consultant

Responsibilities/

Deliverables

- Borusan Automotive is the only authorized BMW, MINI and Land

Rover importer in Turkey.

- Project is to design business scenarios in SAP,

- Design of whole parts import and local purchasing scenarios,

- Design of integration scenarios of :

-Sending purchase orders to BMW SAP system,

-Sending purchase order prices to AS/400 distributor system,

-Sending material master changes to AS/400 distributor

system,

-Receiving invoice data from BMW system,

-Receiving interchageability and material master data from

BMW system.

- Design of WM scenarios,

- Design of handheld terminal developments.

- Design of forecast program

Customer Eti Food Production Co.

Duration 06.2013 – 12.2013

Industry Food Production

Project Description ECC 6.05 Project

Role Lead WM Consultant

Responsibilities/

Deliverables

-Design of the business processes of 15 region spesific

warehouses,

-Desing of .Net handheld terminal interfaces,

-Design of some programs to optimize man-power in warehouse,

-Design of integration scenarios with non-SAP software

Customer Arkas Spain SA.

Duration 04.2013-08.2013

Industry Logistics

Page 13: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 13 of 23

Consultant’s Profile

Project Description SRM 5.0 Roll-out Project

Role Lead SRM Consultant

Responsibilities/

Deliverables

-Roll-out SRM project of Arkas Spain SA which is the branch of

Arkas Turkey that is one of the biggest sea logistic company in

Turkey,

-Design of some custom processes for indirect procurement,

contract and shopping cart and purchase order approvals,

-Design of technical specs of Arkas Spain spesific programs and

reports,

-Using Badis for approval and sourcing needs,

-End user training,

-Go-live activities

Customer Çolakoglu Metallurgy A.S.

Duration 11.2013 -08.2014

Industry Iron&Steel Heavy Industries

Project Description Warehouse Management Project

Role Lead WM Consultant

Responsibilities/

Deliverables

-Leading warehouse management project team members,

-Design of processes of main spare parts warehouse of 40.000

materials of Colakoglu Metallurgy A.S. which is one of the bigget

cast iron and steel manufacturer of Turkey.

-Design of handheld terminal screens,

-Design of goods receipt, goods issue and internal warehouse

processes

-Design of offline goods issue handheld terminal

Customer Valf A.S.

Duration 03.2014-06.2014

Industry Steel Casting/Machining

Project Description Custom Vendor Evaluation Project

Role Materials Management Consultant

Responsibilities/

Deliverables

- Design of custom vendor evaluation process of Valf A.S. which is one of companies of Elginkan Group,

- Creating and design of logistics information system tables which is used in this process,

- Design of custom vendor evaluation program

Customer Eti Food Production Co.

Duration 09.2014 –03.2015

Industry Food Production

Project Description ECC Custom Vendor Evaluation Project

Page 14: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 14 of 23

Consultant’s Profile

Role Lead MM Consultant

Responsibilities/

Deliverables

- Design of custom vendor evaluation process of Eti Food Production A.S. which is one of the biggest food production company in Turkey,

- Creating and design of logistics information system tables which is used in this process,

- Design of custom vendor evaluation program

Customer Dogan Holding A.S.

Duration 07.2014 – 08.2014

Industry Media

Project Description ECC Contract Management Project

Role Lead MM Consultant

Responsibilities/

Deliverables

- Contract management project which consists of purchasing based on SAP purchasing contracts,

- Design of purchasing processes according to this big picture, - Design of release procedure of purchase order and outline

agreement documents

Customer ING Bank

Duration 07.2014 – 11.2014

Industry Banking

Project Description ECC 6.05 Project

Role MM QA Consultant

Responsibilities/

Deliverables

- Supervising desing of materials management processes, - Desing of some custom materials management processes

Customer Eczacibasi Consumer Goods Group

Duration 09.2014-.....12.2014

Industry FMCG

Project Description High Level Process Modeling Project

Role Lead WM Consultant

Responsibilities/

Deliverables

-Business development project of 4 companies(Eczacıbaşı Hygiene

Company, İpek Kağıt, Eczacıbaşı Girişim, Eczacıbaşı Profesyonel)

of Eczacıbaşı Group which is one of the biggest holding company in

Turkey,

-Modeling and improvement of warehouse management related

processes which have been modeled separately before of these 4

companies,

-Preparing process flow charts and presentation

Customer Memorial Health Investments Company

Duration 09.2014-11.2014

Industry Health

Project Description High Level Process Modeling Project

Page 15: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 15 of 23

Consultant’s Profile

Role Lead MM / SRM Consultant

Responsibilities/

Deliverables

-Analyzing materials management related business processes of 3

companies(Memorial Healt Investments, Aydın Health Investments,

Merkez Farma Medicine Delivery) of Memorial Group which is the

biggest private health investment company in Turkey,

-Preparing process flow charts and presentation

Customer Memorial Health Investments Company

Duration 12.2014-12.2015

Industry Health

Project Description ECC 6.07 Project

Role Lead MM / SRM Consultant

Responsibilities/

Deliverables

-Analyzing materials management related business processes of 3

companies(Memorial Healt Investments, Aydın Health Investments,

Merkez Farma Medicine Delivery) of Memorial Group which is the

biggest private health investment company in Turkey,

-Design and analysis of integration model of SAP and Bilmed which

is used in hospital operations,

-Desing of MRP processes of floor, main warehouses and

distribution centers ,

-Preparing development programs to record of changes and errors

during purchase requisition-purchase order-goods receipt and

invoice receipt process in order to prevent future errors,

-Design of SRM related processes,

-Design and creating customer spesific LIS tables,

-Design of vendor consignment process,

-Design of other purchasing scenarios in SAP

Customer ABB Group – Dudullu Plant

Duration 03.2015-07.2015

Industry Electrical Equipment Production

Project Description Warehouse Management Project

Role Lead WM Consultant

Responsibilities/

Deliverables

-Warehouse management project of raw materials warehouse of

Dudullu plant of ABB Group,

-Business analysis and process design of warehouse,

-Design of ITS mobile handheld screens,

-Design of integration model of Hanel warehousing solution and

SAP WM

Customer ABB Group – Dilovasi Plant

Duration 12.2014-03.2015

Industry Electrical Equipment Production

Page 16: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 16 of 23

Consultant’s Profile

Project Description Warehouse Management Project

Role Lead WM Consultant

Responsibilities/

Deliverables

-Warehouse management project of raw materials warehouse of

Dilovasi plant of ABB Group,

-Business analysis and process design of warehouse,

-Design of ITS mobile handheld screens,

-Design of integration model of Hanel warehousing solution and

SAP WM

Customer Kunt Elektronik San.Tic.A.Ş.

Duration 04.2015-10.2015

Industry Automotive

Project Description Material Flow System Project

Role Lead WM Consultant

Responsibilities/

Deliverables

- MFS Project of one of the leading automotive spare parts manufacturer in Turkey, Kunt Elektronik ve San. Tic.A.Ş,

- Integration between MFCS which is controller software of robot and SAP WM,

- Sending pick and putaway orders to MFCS, - Management of MFCS order queue, - Management of MFCS error codes, - Sending startup and activation orders to MFCS, - Management of goods in cases on trays, trays in storage bins, - Management of trays in clean/dirty statuses,

Customer Assan Alüminyum San. Ve Tic.A.Ş.

Duration 03.2015-05.2017

Industry Alluminium Coil Manufacturer

Project Description ECC 6.07 Project

Role Lead MM Consultant

Page 17: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 17 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- Transformation project from Axapta to SAP of Assan Alluminium’s Tuzla and Dilovası plants which is the biggest alluminium coil manufacturer in Turkey and which is owned by Kibar Holding,

- Activation of SAP DIMP solution to be able to use material interchangeability,

- Activation of commodity management extensions and so management of alluminium purchasing contracts, commodity pricing, LME prices and hedging processes,

- Analyzing,designing and developing custom programs for import process

- Analyzing and designing of supplier portal functions, - Integration with non-sap systems,(Freight invoice,

weightbridge, other non-sap systems of Kibar Holding), - Activation MRO business functions and design of serialized

MRO processes.

Customer Eti Food Industries SA.

Duration 03.2015-03.2016

Industry Food Production

Project Description ECC 6.07 Project

Role Lead MM / WM Consultant

Responsibilities/

Deliverables

- Materials management roll out and warehouse management Project of Eti European which is the first international investment of Eti Gıda ,

- Roll-out customizings in scope of MM, - Design of processes of finished goods warehouse, - Design of .Net handheld terminals and tablets, - Desing of processes in WM in compatible with pallet

management module which is used for managing of finished goods pallets,

- Design of loading, picking and mixed pallet processes of pallets into trucks

Customer Hepsiburada

Duration 1 Month (02.2016-02.2016)

Industry E-Trading

Project Description Warehouse Management Documentation Project

Role Lead WM Consultant

Responsibilities/

Deliverables

- Documenting of warehouse management related processes of Hepsiburada which is one of the biggest e-trading company in Turkey,

- Documenting of goods receipt, goods issue and internal warehouse processes,

- Documenting of recommendations regarding efficiency of warehouse processes

Page 18: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 18 of 23

Consultant’s Profile

Customer Betek Chemical and Painting

Duration 2 Months(01.2016-03.2016)

Industry Chemical and Painting

Project Description Warehouse Management Project

Role Lead WM Consultant

Responsibilities/

Deliverables

- Warehouse management Project of semi-finished insulating products which is called “EPS” ,

- Roll-out customizings in scope of MM, - Design of internal warehouse processes (goods receipt of

semi-finished products, goods issue for scrap of semi-finished products, goods issue for production of finished goods, goods movements of missing semi-finished blocks)

- Design of .Net handheld terminals and label of EPS blocks, -

Customer Tat Gıda San.Tic.A.Ş.

Duration 16 Months(09.2016-02.2018)

Industry Food Production and Marketing

Project Description S/4 Hana 1610 Project

Role Lead MM Consultant

Responsibilities/

Deliverables

- Hana S/4 project of Tat Gıda and Duzey Marketing which is company of Koç Group,

- Design of milk spesific procurement processes of SEK (2 plants),

- Design of vegatable spesific procurement processes of Tat (2 plants),

- Design of wheat procurement process of Pastavilla(1 plant), - Design of MM processess of finished good distribution center

of Tat Gıda, - Design of MM processes of 7 finished good distribution center

of Düzey Pazarlama, - Transport management(TM ), EWM (Extended WM ) ve GAtp

related process designs, - Design of business workflows and integrations between SAP

and EBA, - Design of SAP- Solvoyo (which is a sales-planning tool)

integration scenarios, - Design of integration scenario between SAP and weighbridge, - Design of import processes of Düzey pazarlama and Tat Gıda.

Customer Assan Port Operator Inc.

Duration 2 Months

Industry Port Management

Project Description ECC 6.07 Purchasing Project

Role Lead MM Consultant

Page 19: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 19 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- Purchasing project of Assan Port Company which is one of the member of Kibar Holding company,

- Designing process of purchase order and purchase requisition integrated with EBA which is a workflow software, ,

- Design of KPI reports, - Design of purchase order, request for quotation in Adobe

Forms, - Design of ECC reports.

Customer Klöckner Pentaplast Istanbul

Duration 4 Months

Industry Plastic Film Production

Project Description ECC 6.07 Roll-Out Project

Role WM Consultant

Responsibilities/

Deliverables

- Roll-out Project of Klöckner Pentaplast GmbH Germany in Turkey-Istanbul,

- Final preparation and program tests, - Master data mapping, - Initial stock upload activities according to master data

mapping, - Go-live support

Customer Tarfaş Agricultural Support Co.

Duration 6 Months(10.2017-04.2018)

Industry Agricultural Production and Farming

Project Description ECC 6.07 Project

Role Lead MM Consultant

Responsibilities/

Deliverables

- Full-Cycle SAP Project of Tarfaş which is agricultural support company of Sütaş group which is leading dairy products company in Turkey,

- Design of agricultural procurement processes of Tarfaş, - Design of agricultural production related procurement

processes, - Design of integration processes between SAP and Novi Farm

which is specialized software to manage herd, - Design of farming related procurement processes, - Design of integration processes between SAP and EBA which

is used for workflow processes.

Customer Umur Printing

Duration 2 Months(02.2018-04.2018)

Industry Printing and Stationery

Project Description S/4 Hana 1709 High Level Design Project

Role Lead MM Consultant

Page 20: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 20 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- High level process design project of Umur Printing, Umur Stationery, Ankara Form, Printaş, AntForm and Ofmark which all belong to Umur group which is the biggest printing company in Turkey,

- Design and review of stationery procurement and stock management processes ,

- Design and review of printing related procurement and stock management processes,

- Design and review of integration processes between SAP and non-SAP systems,

- Review and re-design of gap processes between 6.0 and S/4 Hana

Customer Opet Petroleum

Duration 1 Month(04.2018-08.2018)

Industry Oil&Gas

Project Description S/4 Hana 1709 Project

Role Lead MM& IS Oil Consultant

Responsibilities/

Deliverables

- Opet is a Turkish petroleum company engaged in the sale of commercial and industrial fuels, mineral oils, retail sales, warehousing and international sales,

- Design and review of purchasing processes of industrial fuels using F&A pricing,

- Design and review of exchange agreements between Opet and other retail salers,

- Design and review of hydrocarbon product management processes like quantity conversion interface(QCI), silo management,

- Design and review of trader’s and scheduler’s workbench(TSW) related processes like nomination, ticketing, scheduling and stock projection.

Customer Star Refinery(1st Phase)

Duration 7 Months(08.2018-03.2019)

Industry Oil&Gas – Refinery

Project Description S/4 Hana 1709 Is Oil-HPM Project

Role IS Oil Consultant

Page 21: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 21 of 23

Consultant’s Profile

Responsibilities/

Deliverables

- Star refinery is an investment of SOCAR group which heavily produces naphta and derivatives, diesel and jet fuel for domestic and export sales,

- Co-design and review of all developments prepared by IS Oil consultants,

- Designing TDP(Tariffs, Duties and Permits) related developments and enhancements according to local regulations ,

- Design of legal reports which is requested by EPDK(Energy Market Regulation Agency of Turkey),

- Design of data declaration infrastructure and interfaces to EPDK which must be sent per half an hour, daily and monthly basis,

- Giving support for the 1st phase of the Project in CPE(Commodity Price Engine), HPM(Including QCI interface and silo management).

Customer Star Refinery(2nd Phase)

Duration 6 Month(03.2019-..)

Industry Oil&Gas – Refinery

Project Description S/4 Hana 1709 IS Oil TSW Project

Role IS Oil Consultant

Responsibilities/

Deliverables

- Design of PAR(Production accounting and reconciliation) cockpit to post production confirmations, consumptions and movements between silos,

- Co-design and review of all developments prepared by IS Oil consultants,

- Providing TSW-CPE integration, - Adoption of user exit and developments which was finished in

1st phase into TSW applications, - Gain/loss process and development design in all logistic

processes of refinery, - Design of IS Oil KPI report interfaces to be sent to IRIS

(Integrated refinery information system) system, - Giving support for the 1st phase of the Project in

CPE(Commodity Price Engine), HPM(Including QCI interface and silo management).

Other SAP Experiences

Enterprise Application Consultant and

MM/WM Solution Expert Golive

Consulting(12.2014-10.2017)

-Solution expert in materials management,

warehouse management modules,

- System design, configuration, project team

training, test works,

-Go-live preparation works,

-Pre-sales activities and case studies,

-Quality checks of ongoing projects,

Page 22: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 22 of 23

Consultant’s Profile

Enterprise Application Consultant and

MM/WM Unit Manager , Acron

Consulting, Istanbul

(02.2013-12-2014)

- Unit Manager of Materials Management,

Warehouse Management and Supplier

Relationship Management modules,

- Responsible for,

o System design, configuration, project

team training, test works,

o Go-live preparation works,

o Pre-sales activities and case studies,

o MM team management and training

plans,

o Quality checks of ongoing projects,

o Preparing monthly/weekly work

schedules of MM/WM team

- He has official materials management and

supplier relationship management consultant

certificate.

Materials Management Trainer ,

Medyasoft SAP Training Centre ,

Istanbul

(09.2012-10.2015)

- Materials management trainer at Medyasoft

which is the only authorized SAP training centre

in Turkey

- Specialized in training documents TSCM50 and

TSCM52

Enterprise Application Consultant, Arete

Consulting, Istanbul

• (02.2007 – 02.2013)

- Materials management(MM) consulting,

- Business information warehouse(BW)

consulting,

- Business Objects (BO) consulting,

- Warehouse management(WM) consulting,

- Supplier Relationship Management (SRM)

consulting

- Responsible for,

o System design, configuration, project

team training, test works,

o Go-live preparation works,

o Pre-sales activities and case studies,

- He has official material management and

supplier relationship management consultant

certificate.

Production Planning Engineering , Al-

Kor Makine Imalat. San. Tic.,

İstanbul

• (04.2006-02.2007)

- Production Planning Engineering - Monthly, weekly capasity analsys, - Material requirements planning, - Preparation of monthly,weekls and daily production

Page 23: Consultant’s Profile · Page 3 of 23 Consultant’s Profile SAP Project Experiences Customer Besler-Oil Production Company of Ulker Group Duration 11 Months(02.2007-01.2008) Industry

Page 23 of 23

Consultant’s Profile

plans of injection,press and Assemble departments - Preparation of Production Plans - Preparation of machine loadings, - Method engineering, - Preparation of production lines, - Preparation of efficiency rates of production lines, - Preparation of machine time studies and operator of assemble department

- Production line simulation studies(With Promodel program)

- Supply chain controlling, - Preparation of Annual Production Budget - Preparation of annual raw material budget, - Comparing of annual capasity-annual machine loading of assemble, injection and press departments,

- Preparation of annual subcontracting work budget

Personel Information

Industrial Engineering Kocaeli University – Kocaeli,Turkey

Nationality Turkish

City Istanbul, Turkey

Language English – Fluent