council agenda - 26 september 2018
TRANSCRIPT
Page 1 of 2
Decision Report
To: Mayor and Councillors
From: Group Manager – Engineering Services
Date: Thursday, 6 September 2018
File reference: Document: 2443771
Portfolio holder: Councillor Anne Marie Spicer
Meeting date: Wednesday, 26 September 2018
Subject: Traffic Control Training
Recommendation:
THAT the report be received, and
THAT Council approve traffic control training for [six] members of service organizations in
the Paeroa, Plains & Waihi wards. The [six] trainees will be made up of [2] members per
ward.
THAT the training fees of [$X/ward] ($250 per person) be funded from the Ward Community
Grants Budget.
1 Purpose
This report seeks the Council’s approval for traffic control training of six members of service
organisations in the Paeroa, Plains & Waihi Wards.
The matter or suggested decision does involve a new activity, service, programme, project,
expenditure or other deliverable.
2 Background
When there are community events that involve traffic control such as Christmas parades or
Anzac Day Marchs the Construction and Maintenance business unit work to provide traffic
control at a cost.
By training up local members of service organisations to manage traffic under the guidance of
a safety traffic management supervisor (STMS) we can reduce the need for Hauraki District
Council Construction and Maintenance staff on the day. This will reduce the costs to the service
organisation and HDC for events.
Council Agenda 26.9.18 Page 297
Page 2 of 2
The cost for this training is $250 per person. This would end up being a cost neutral exercise
as the Council frequently contributes to the costs of the Construction and Maintenance staff to
be available for traffic control activities.
3 New deliverable
The Local Government Act 2002 now requires that all local government deliverables (whether
it be an activity, service, project, programme, grant or involve any other form of expenditure)
must align to the purpose of local government as outlined in Section 10 of the Local
Government Act.
For Council’s information, the decision involves a new expenditure or other deliverable. It is
therefore considered to be aligned with the purpose of local government as it provides:
local public service
4 Significance and Engagement Assessment
This decision does not trigger the Significance and Engagement Policy Assessment Tool and
therefore is not considered significant under the Significance and Engagement Policy 2014.
The level of engagement considered appropriate for this matter, at this point in time, is to
inform (i.e. one-way communication disseminating information) the affected parties.
5 Budget Implications
The cost of this is $250 per person. Total funds requested are [$1,500] based on [2] members
per ward or [$X / Ward].
6 Recommendation
Council should make its decision on which option to choose based on that option being the
most cost effective, and good quality option for the Hauraki District (s10 of the Local
Government Act 2002).
Service organisations participate in a variety of community events and giving six members the
training for traffic control will enable them to set up traffic control and manage traffic under
the guidance of a STMS. This would reduce the need for Construction and Maintenance staff to
be involved as traffic controllers which is currently at a cost.
We therefore recommend
THAT Council approve traffic control training for [six] members of service organizations in the
Paeroa, Plains & Waihi wards. The [six] trainees will be made up of [2] members per ward.
THAT the training fees of [$X/ward] ($250 per person) be funded from the Ward Community
Grants Budget.
Adrian de Laborde
Group Manager – Engineering Services
Council Agenda 26.9.18 Page 298
Page 1 of 5
Information Report
To: Mayor and Councillors
From: Infrastructure Systems & Planning Manager
Date: Friday, 14 September 2018
File reference: Document: 2451779
Portfolio holder: Councillor Duncan Smeaton
Meeting date: Wednesday, 26 September 2018
Subject: Solid Waste - Monthly Activity Report – August 2018
Recommendation:
THAT the report be received.
1 Summary
This report summarises performance and issues in the Solid Waste work area. The body
of the report refers to August works.
2 General
It has been business as usual without too many issues out of the ordinary emerging.
The weather always plays a part and in the middle of winter make August a challenging month.
3 Health and Safety
The compliance manager from SEL carried out an audit on Waihi and Paeroa RTS site.
The audit identified both Waihi and Paeroa RTS sites did not have appropriate fall from height barriers and the risk was too great to allow Waihi to continue operating the way
it was. The decision was made to close the site until remedial work was carried out to mitigate the risk. A new suitable barrier was installed immediately to mitigate the risk and areas adjacent to the pit were closed to the public. Kiosk staff at Paeroa were
advised to use its temporary barriers effectively to ensure the safety of its customers and staff at Paeroa RTS.
Council Agenda 26.9.18 Page 299
Page 2 of 5
4 RTS Audit:
The August audit was carried out by Rodney Barriball on his own using SEL's Vault
programme. These are snapshots in time on the day and don’t necessarily reflect the site at all times. The audit results are as follows.
Paeroa RTS - There are three corrective actions for this site. Fall Protection - Barriers are needed for this site.
Fire Extinguishers – Extinguishers are out of date and need retesting. Tyres - Pile is large and needs removing.
Waihi RTS - There are six corrective actions for this site.
Fire Extinguishers – Fire extinguisher need retesting.
Hardstand Area – The area needs road works. Road Seal – the area in front of the DG bunker is need of repair. This is part of
the roading repair tender proposal. Landscaping, Planting, Gardens - There is rubbish in the gardens and a lot of
work is needed to improve them.
Refuse Pit – Spouting needs repair and damage to the roof needs repair. Fall Protection Barriers - The barriers are damaged as it looks like a vehicle has
reversed into the barrier pushing them over
Some positive movement in Waihi. Both sites need improvements on its assets.
Barriers and roading issues are hampering progress.
5 Kerbside
Collections here have gone well with no validated complaints. Previous complaints from Paeroa Main Street has not occurred this time and Waihi CBD area seems to be cleared
as it should be. The contractor has produced GPS screenshots that validate their claim regarding missed properties but it is still recommended that the contractor show a photo with a date stamp to prove its authenticity.
Council Agenda 26.9.18 Page 300
Page 3 of 5
6 RTS
The barriers and roading issues continue to hamper both sites. Council approved an
emergency action to install a temporary barrier to replace the previous barriers that were damaged and unable to provide adequate safety for the public and staff.
Unfortunately, this means that the outer edges are no longer useful and will have to be closed off to the public to ensure safety is paramount at this site.
Paeroa site will have to follow suit. The council will need to eliminate the risk by creating a collection area away from the edge to ensure no person is near the edge. This will
require mobile barriers and maybe additional staff to assist with traffic management for those onsite.
7 HDC Monthly RFS Totals
Excellent result this month. HDC had this result back in November last year as well.
Great effort by the contractors and customer services team.
Council Agenda 26.9.18 Page 301
Page 4 of 5
8 Transport Tonnages
Little change here. Waihi showing a slight increase while Paeroa has dropped. There is no reason for this other than it could be due to the weather conditions.
9 Diversion
Tonnages have increased here slightly. Compared to this time last year the increase is slight. Unsure as to the reason for this increase but it is not expected that this trend
will continue.
Council Agenda 26.9.18 Page 302
Page 5 of 5
Tonnages have dropped this month. This is due to China’s Blue Sky policy and it will most likely continue on this path for a while.
Waste Minimisation initiatives:
As part of an increased awareness campaign, various Councillors and HDC staff
visited both the Tirohia Landfill and the Kopu Recycling Centre. Good open
discussions were held about the operations of these businesses, recycling and waste minimisation ideas
A series of public education articles are being drafted, to run in the HDC regular
press releases in local papers and on the Council website. The idea is to build up
community awareness about the extent of the waste disposal issue, central government vs District Council involvement, recycling efforts and ideas, what can
be recycled, how it should be treated, how to minimise waste, plastic waste, composting food waste, what’s happening in school programmes and the like.
Paeroa Recycle Centre proposal. This has been developed by a group of 3 very enthusiastic district constituents who are presenting to this meeting today.
That concludes this report
Steve de Laborde Infrastructure Systems & Planning Manager
Council Agenda 26.9.18 Page 303
Page 1 of 11
Decision Report
To: Mayor and Councillors
From: Infrastructure Systems and Planning Manager
Date: Monday, 10 September 2018
File reference: Document: 2447507
Appendix A: Paeroa Reuse Centre Business Plan
Appendix B: Financial Forecasts
Appendix C: Roadmap to Recycling
Appendix D: Site Layout
Portfolio holder: Councillor Duncan Smeaton
Meeting date: Wednesday, 26 September 2018
Subject: Establishment of the Paeroa Reuse Centre
Recommendation:
THAT the report be received, and
THAT Council supports the concept of the Paeroa Reuse Centre initiative; and
THAT the Council acknowledge that, while no funding request has been made, there is likely
to be a future request for funding for the initiative.
1 Purpose
The purpose of the report is for Council to decide whether or not to support the concept of a
reuse centre in Paeroa based on the model the Seagull Centre employs in Thames.
2 Background
The proposal for a reuse centre is the work of a group of committed community members who
have seen a need for such a centre in the Hauraki District. They are knowledgeable and
passionate about protecting the environment, now and for the future, and care enough to
embark on the venture of setting one up and seeing it run successfully.
The group has visited a number of these facilities around the North Island, including in Raglan,
Waitakere and Thames. They are doing a lot of research and information gathering on what
makes a successful Reuse Centre and have approached the Seagull Centre in Thames who have
offered up their business model and mentoring to ensure a successful Reuse Centre is
established. There is a cost associated with this, as will be discussed in the presentation.
Council Agenda 26.9.18 Page 304
Page 2 of 11
3 Issue and options
The issues and options are contained in Annexure A and will be spoken to by the presenter.
The main issues and requirements of Council include the following:
Free Land
Buildings
Start-up Funding
Commitment of Support
Regulatory and Consent Advice
Three options are presented with Option 1 being the preferred option. This is where the reuse
centre is situated at the RTS. In reality the centre must be close to the RTS, if not on–site, else
the idea of dropping off stuff pre-landfill doesn’t work if it is too awkward.
At this stage no financial commitment is being asked of the Council, however a start-up budget
has been proposed in Appendix B. In summary, $46,000 is required to cover operating losses in
year 1 and $61,000 is required to cover capital setup costs. Monthly operating losses are
expected to decline with time and the business is expected to start operating at a profit sometime
in year 2. However, this budget does not include any grants that the venture may qualify for. A
feasibility study will be undertaken and at this stage a report will be submitted to the Council
and will make formal representation on any funding contributions that may be required.
The group will apply for funding through avenues such as the Waste Minimisation Fund (WMF).
In recent years the WMF has granted funds to both the Coromandel Independent Living Trust
($90k) & The Seagull Centre ($220k) to set-up the same type of reuse centres. The Waste
Minimisation Fund “funds projects that promote or achieve waste minimisation. By supporting
these projects, the fund increases resource efficiency, reuse, recovery and recycling and
decreases waste to landfill.” Applications for this is in May 2019.
Smart Environmental Ltd, our contractors managing the site, are supportive of the venture and
are even prepared to commit some finances to it. However, amounts haven’t been discussed
yet. More work needs to be done on the financial sources before a paper is brought to Council
requesting any funds.
Council may wish to contribute towards the shortfall in any funding secured.
4 Budget Implications
There is currently no budget within Solid Waste activity for this venture.
5 Recommendation
The Reuse centre will provide the district with the ability to re-purpose items that would
otherwise end up in landfill. The reuse centre will provide an environmentally responsible outlet
for the repurposing of items that have yet to reach the end of their useable life.
Staff thus make the following recommendations:
1. THAT Council supports the concept of the Paeroa Reuse Centre initiative; and
2. THAT the Council acknowledge that while no funding request has been made, there is
likely to be a future request for funding for the initiative.
Steve de Laborde
Infrastructure Systems and Planning Manager
Council Agenda 26.9.18 Page 305
Page 3 of 11
Appendix A:
Paeroa Reuse Centre
Business Plan
Our Vision
Caring for the Hauraki District Environment
Caring for the People Who Live Here
Sharing Our Resources
The Paeroa Reuse Centre
A place where people can donate their unwanted, but useable items, so they can be sold and reused
and therefore reducing refuse going to landfill. We have seen an overwhelming need for a reuse centre
in the Hauraki District. We anticipate opening in 2018.
Our Purpose
To educate the public about the waste we create and how to reduce it.
To reduce the amount of reusable items going to landfill.
To share resources with local community.
To provide affordable goods.
To create paid employment.
Our Values
Protecting Our Environment
By using and promoting sustainable and environmentally friendly methods of living,
to protect our environment now and for our future generations
Walking the Talk Reusing as much as possible in our Hauraki Reuse Centre as opposed to buying new.
Inclusiveness Making our Reuse Centre accessible and welcoming to everyone in our community.
Respect Respecting that people are at different stages of the zero waste journey and to
encourage, support and help them to learn.
Bringing Community Together
To share resources, profits and goods to those in need in our community. We want all
sectors of our community to be a part of this. All ages, all abilities, all backgrounds.
Creating Friendships and Strengthening Relationships.
Who Are We?
We are local residents, ratepayers and community members who are knowledgeable and passionate
about protecting our environment now and for the future. We have seen an overwhelming need for a
reuse centre in the Hauraki District and care enough to do something about setting one up and seeing
it run successfully.
How Will We Operate?
We are in the process of forming a Charitable Trust and the Reuse Centre will be run as a Social
Enterprise. Profits and goods will be shared amongst the community. Once our Charitable Trust is
formalised we will be applying to various organisations for funding for:
Start-up costs
Buildings / Containers
Council Agenda 26.9.18 Page 306
Page 4 of 11
Site preparation
Advertising
Day to day Running Costs – Power, Utilities, Administration costs -paper /, eftpos,
Wages
Other overheads / legal requirements / Health and Safety requirements
Machinery - forklift
Vehicles for collection services
Trailer for delivery / loan
This is a new venture for us. We are doing a lot of research and information gathering on what makes
a successful Reuse Centre. We have approached the Very Successful Seagull Centre in Thames. Last
year they had a turn-over of $300,000 and employ 4.5 FTE staff. They are winners of the Sustainable
Business Award and are hugely popular as a destination in Thames. They have offered us their
business model and mentoring to ensure we can get off the ground and run a successful Reuse Centre
too. This comes at a price of over $5000 which we will have to find funding for. Their business model
includes all day to day running systems, staff management and training, Health and Safety policies
and procedures, and other relevant business management systems. We are confident that with their
plan and mentoring we will be a successful sustainable Social Enterprise that the Hauraki District can
be proud of.
Where Will It Be?
The current proposal is to incorporate it at the Paeroa Transfer Station site in Grey Street, Paeroa. We
envisage there also being a Reuse Centre in both Waihi and Ngatea in the future.
Opening Hours
Same as the Paeroa Transfer Station. Currently 12.30pm to 5.30pm every day except Wednesday
when closed. This can be reviewed as demand increases and staff are available.
How Will It Work?
Please see the accompanying maps. As we enter the Paeroa Transfer Station, there will be a pull in
area on the right for people to drop their unwanted and useable goods. Friendly staff will welcome
customers, assess what goods we can accept and then help to unload items to our sorting shed. The
customer then carries on to the transfer station weigh bridge / toll booth to pay and off load the rest
of their load to landfill. Then they carry on down the driveway and come back past the Reuse Centre
where they can safely park and spend some time learning about zero waste, community resource
recovery, enjoy the welcoming and eclectic surroundings and hopefully buy something to repurpose
or reuse once again.
Our Services
Reuse Centre Shop
Commercial Waste Recovery – Helping businesses manage their recyclable waste
Building site collections
Fix it Shed
Boomerang Bags / Learn to Sew
Sustainable Workshops on Zero Waste and Sustainability
Events – Reuse Challenge
Reused Garden Art Ramble
Competitions
Collection Point for:
Council Agenda 26.9.18 Page 307
Page 5 of 11
Plasback – silage bale wrap
E waste
Food Waste (Future)
What Goods Will We Accept?
Goods that are saleable, wanted, and are in good repair or able to be easily repaired like:
Furniture
White ware and electrical goods (test
and tagged by authorised person before
resale)
Clothing Fabrics and Textiles
Building Materials
Timber / Panels/ Boards
Firewood
Glass
Outdoor furniture
Outdoor Landscaping Materials
Plants
Gardening Supplies
Books and Music
Electronics (E Waste collection point)
Plasback liner collection point (Silage
Wraps)
Paint
Craft materials
Bric a Brac
Kitchen and Household Items
Windows and Doors
Sporting / Gym / Outdoor Recreation
Equipment
Special Items
What we Won't Accept
Recyclables already accepted at Paeroa Transfer Station
Hazardous materials
MDF products (with discretion)
Food Waste (Future project)
Who Will Run It?
The Trust will advertise and appoint a Centre Manager and employ adequate staff to run effectively
and efficiently. This will range from a minimum of 3 or 4 staff during quiet times to many more
during weekends and busy times.
1 full time staff member accepting goods at drop off point.
1 full time staff member sorting/ cleaning/ repairing items
1 full time staff member organising/ rearranging stock on shop floor
1 full time staff member retail / shop floor / customer service
All paid staff will undergo a zero waste/ recovery training workshop
All paid staff will be paid a living wage and trained to work in all areas
Volunteers will be welcomed after a training period
What Will It Look Like?
Inviting, Colourful Clean, Tidy, Organised Pleasant and Fun
Weather tight Buildings Needed for:
Shop
Point of Sale
Staff Rooms
Toilet
Fix It Shed
Clothing/ Fabric / Textiles/ Sewing Room
Furniture
Kitchen and Household Items
Council Agenda 26.9.18 Page 308
Page 6 of 11
Books / Music / DVD
Education / Workshop Room
Craft Supplies
Whiteware / Electronics
Interior Building Materials
Covered Outside Spaces for:
Landscaping Supplies
Exterior Building Materials
Plants
Windows and Doors
Paint
Glass
Plumbing Supplies
Firewood
OPTIONS
OPTION 1
A Site Plan and Engineers Report is required for Paeroa Transfer Station site. Once we know more
about the site and its stability and the services available we can be more informed in our planning.
For example, how wet is the ground – will it need a metal or concrete pad to site containers on or just
pavers?
Potentially containers are the cheapest option so to start we could move up to 4 x 40 foot containers
on to a stable site. These will be positioned to make efficient use of space. Consideration will be given
to neighbouring business which will be very dusty and have an impact on our operations.
Doorways will be ramped and wide to allow wheelchair access. Large windows will be fitted to allow
light and warm sun in the winter. Shade blinds can be used in summer. We would like Solar panels
erected on the roof to power lights and other electrical needs. The wooden floors will be bare for
ease of cleaning and safe manoeuvring. Shelving will be tidy and organised to present items at their
best for sale.
Between the containers there will be a clearlite roof. This will increase space, allowing a covered
outdoor area for items mostly ok outside but needing some shelter.
On the outer side of the containers we will grow vegetables, fruit or flowers. These will add to the
character and look great. Also an opportunity to teach / show people how to be creative and reuse
items in their gardens. For example, reinforcing mesh makes great trellis and supports for beans,
passionfruit and pretty climbers. Where it is not possible to grow things, it creates an opportunity for
local artists to paint a mural.
Costs: Also see attached financial budget
40-foot containers, approx. $4000 - $6000. They will need to be sited on a firm pad
Solar Panel, Window / Door Outfitting: A day’s work
Painting / Rustproofing / Visual Aesthetics:
The pros of containers:
Easily sourced, locally and plentiful.
Uniform size and dimension
Council Agenda 26.9.18 Page 309
Page 7 of 11
Cost effective
Flexible – easy to move if needed
Weather tight
Secure
Can look good with little input
The cons:
Can be cold in winter and hot in summer – need insulation or refrigerated container
Narrow space but could be overcome with putting 2 side by side and taking out internal
walls
OPTION 2
Erect a 2nd hand relocatable building on site
Purchase a building, transport it to site and rebuild
OPTION 3
Build a new purpose - built sustainable building from scratch
Community Engagement
Hauraki Community – Open Competition to all to “Name the Hauraki Reuse Centre” (Interim
Name) so it can be launched with maximum community interaction and 'ownership'
Mens' Shed – Can repair stuff and return to be sold. We can supply them with resources
OP Shops – Donate their unsaleable items – often clothing. We can recycle or repurpose items
into 'quarter fats' for quilters, rags for factories / manufacturing workshops
Builders – Donate their off-cuts and items removed in renovations. We collect and sort and
on sell to DIYers and promote reuse building materials for tiny home buildings
Businesses – We coordinate their waste to people who need it i.e. 230L plastic barrels from
manufacturing to gardeners for water storage
Youth – Build a bike / skateboard / scooter Workshop
Pull stuff apart – put it back together again
Gardeners – Reusing unusual items in the garden
What We Need
Free Land
Buildings
Start-up Funding
Seagull Centre Mentoring
Timeline
What we need from HDC
Commitment of Support
Start-up Funding
Regulatory and Consent Advice
What is the HDC expecting of us?
email: [email protected]
Council Agenda 26.9.18 Page 310
Page 8 of 11
Appendix B: Financial Forecasts
Operational Expenditure:
Council Agenda 26.9.18 Page 311
Page 9 of 11
Capital Expenditure:
Council Agenda 26.9.18 Page 312
Page 10 of 11
Appendix C:
Council Agenda 26.9.18 Page 313
Page 11 of 11
Appendix D: Site Layout
The Paeroa Refuse Transfer Station below and planned location of the
proposed Reuse Centre, right.
Council Agenda 26.9.18 Page 314
Page 1 of 3
Information Report
To:
Mayor and Councillors
From: Infrastructure Systems and Planning Manager
Date: Wednesday, 19 September 2018
File reference: M 2447850
Portfolio holder: Councillor James Thorp
Meeting date: Wednesday, 26 September 2018
Subject: District Drainage Activity Report
to 31 August 2018
Recommendation:
THAT the report be received.
Summary
This report summarises the Land Drainage Activity for the period ending 31 August 2018.
August was a typical winter’s month with adverse weather conditions. Mechanical cleaning and
vegetation control has generally stopped due to the weather and ground conditions being wet and
soggy. Drain maintenance now focuses mainly on keeping the pumps and floodgates operating
efficiently for the winter.
Capital projects are being prepared for the construction season.
Operations Notebook
No drains have been sprayed in this financial year, and 350 m of the Karito drain was machine
cleaned.
Minor maintenance has been undertaken in all districts. The Roundtree culvert has been
cleared.
Routine floodgate and pump station inspections have been completed.
Floodgates and culverts have been cleared as required inclusive of Mahuta, Rawe Rawe,
Booms South, Robinsons and Ngatea flood gates.
Approximately 114 man-hours were spent on pump screen cleaning during this reporting
month.
Council Agenda 26.9.18 Page 315
Page 2 of 3
Capital Works
The capital works consist of raising stopbanks and refurbishing pumps and pump screens.
Progress to date has been focussed around project preparation. The sea inundation event of
January 5th provided evidence of where the stopbanks are low. However, current surveys are
underway and are required for design. A survey was last done in 2000 for most of the stopbanks
but a few were done in 2016. These will be compared and any relevant information will be used
in the proposed works.
There is some work required on the pumps, this includes checking the screens and the pump
windings and bearings. This work will get underway as soon as the rain abates and pumps are
able to be lifted and checked. Rawerawe pump station is not on the list, however, it has shown
signs of requiring fairly urgent refurbishment. This is an important pump as there is no floodgate
at that location and only one pump, there is no stand-by.
As can be seen the budgets allocated are quite light and may only be sufficient to raise the critical areas.
Stopbanks:
Renewals - Land Drainage Rating Area Budget
EPDD Terraces SB - $85k in total EP 85,000$
WPDD Hot Springs Canal SB F1 83,000$
WPDD Waitakaruru RB SB F1 65,000$
WPDD Foreshore SB F1 53,000$
WPDD Miranda SB F1 53,000$
WPDD Karito Canal SB F1 47,000$
WPDD Miranda North SB F1 36,000$
WPDD Maukoro Canal LB SB F2 36,000$
Grand Total - Renewals and Level of Service 458,000$
Pumps:
Renewals - Land Drainage Budget
HDC00128-WPDD Miranda Pump 36,000$
HDC00130-WPDD Hopai West Pump 16,000$
HDC00131-WPDD Central North Pump 16,000$
Grand Total - Renewals 68,000$
That concludes this report.
Steve de Laborde INFRASTRUCTURE SYSTEMS AND PLANNING MANAGER
Council Agenda 26.9.18 Page 316
Page 3 of 3
Attachment A
Location map:
The yellow lines dipict the stopbanks earmarked for works this year, a total of 38km. The red
stars represent the pumpstations owned by HDC, the others are owned by WRC.
Council Agenda 26.9.18 Page 317
Page 1 of 12
Information Report
To: Mayor and Councillors
From: Water Services Manager
Date: 3 September 2018
File reference:
Document: 2445223
Appendix A – Letter from the DHB – 29 August2018
Appendix B – Drinking Water Compliance report (Content Locker)
Appendix C – Financial report for Water supply
Appendix D – Financial report for Waste water
Appendix E - Financial report for Storm water
Portfolio holder: Councillor Harris
Meeting date: Wednesday, 26 September 2018
Subject: Water Services - Monthly Activity Report for August 2018
Recommendation:
THAT the report be received.
Summary This report summarises performance and issues in the Water Services work area. The
body of the report refers to the August works.
WATER SUPPLY
Operations Notebook
Kaimanawa water supply had a e-coli positive test result from the external contractor testing. The positive e-coli result was suspicious due to the fact the weather was fine, the Chlorine residual was good at 0.89 mg/L and pH was fine.
The Health Protection team were notified as per DWSNZ and three enumeration follow up tests were done, all coming back clear. This means we fail bacteria
compliance for the year for this plant. This rural network is on a permanent “boil water” notice.
Paeroa & Kerepehi WTP’s are having issues with the air compressors. At the
Paeroa plant the driers have stopped working and Kerepehi WTP both units are not working and we have a borrowed unit suppling air. The plan is to use renew
the Kerepehi units and use the old decommissioned units for parts for Paeroa.
Council Agenda 26.9.18 Page 318
Page 2 of 12
Waihi Catchment Risk Assessment (CRA) has been completed and sent to the
DHB with the Water Safety Plan (WSP) for approval. Kerepehi crane/gantry service has been completed.
Quarry storage level sensor has been replaced and the storage is filling ready for summer.
Compliance with the Drinking Water Standards
The final report was received from The District Health Board. For the
confirmation letter and full report see Appendix A & B. Council received full
compliance for the Kerepehi, Paeroa and Waihi Plants. Turbidity and reporting issues caused Waitakaruru and Kaimanawa to fail on Protozoa.
Council Agenda 26.9.18 Page 319
Page 3 of 12
Comments on the report:
The Waitakaruru plant is currently being upgraded and Council will have better
control after the upgrade to manage these incidents. There is therefore no
action required to address the failure.
The Kaimanawa plant has failed but it should be remembered that that particular network is under a permanent boil water notice because Council recognize that it cannot ensure compliance all the time. The concerns around
the timeframes for the connection of Kaimanawa are noted and will be responded to.
The Catchment Risk Assessments(CRA) has been identified as an issue. The CRA for Waihi has been completed and submitted. The Waitakaruru CRA is currently being done. The Water Safety plan for Waihi has been submitted and
staff are currently responding to queries from the DHB. The comment for quality incident reports have been noted and staff has already
started using the new online incident system.
Overall is it an improvement and Council was commended for the work it has done to consolidate the different non- compliant supplies.
Capital Works
Project Status Update
Waitakaruru Water
Treatment Plant Upgrade
Most of the works has been completed. The plant is
currently being commissioned.
Connection of the Kaimanawa Network
A report is being prepared to Council on three options for rendering the services and will provide guidance to the Council on the best way forward.
Proactive Water Main Replacement
The pipe replacements designs are currently being finalised.
Council Agenda 26.9.18 Page 320
Page 4 of 12
Plains Storage Tank kits have arrived and construction has started. Problems are being experienced with the foundations and the teams are working through it at the moment.
Water meter replacement programme
An expression of interest has been advertised. So far we have had enquiries from three suppliers.
Waitakaruru Intake The riparian planting has been completed
September/October Planned Works
Waitakaruru WTP electrical upgrade
2 x BA sets have been ordered and waiting for delivery. Waitakaruru bores to have pumps removed and boreholes sealed Waitakaruru WTP roof to be sealed
Dell raw water, damaged booster pump to be repaired Catchment Risk Assessments, (CRA Waitakaruru is due)
Pricing for de- sludging of Waitakaruru waste water ponds District wide UPS service WaterNZ Performance Review
Consent compliance reports
Financial Report for Water
The financial reporting – including capital reporting of key projects is included in
Appendix C.
Council Agenda 26.9.18 Page 321
Page 5 of 12
WASTEWATER
Operations Notebook
Carrying out repairs to sewer pipe in Taylors Avenue
Capital Works
Project Status Update
Karangahake Gorge sewer line.
C&M are finalising their Traffic Management Plans and plan to start this work in September. All the materials has been procured and delivered.
Waihi East Sewer Manholes C&M is busy pricing this work.
September / October Planned Works
Procurement of the lifting beam structures
Construction of the Karangahake sewer main WaterNZ Performance Review Consent compliance reports
Financial Report for Wastewater
The financial reporting – including capital reporting of key projects is included in
Appendix D.
Council Agenda 26.9.18 Page 322
Page 6 of 12
STORMWATER
Operations Notebook
Carried out camera work at Normanby Road, Victoria Street, Thorp Street, and
Willoughby Street. Some defects have been identified that will have to be actioned in summer.
Kaiaua – Inspected flood gates
Ngatea – Carried out Spraying and machine cleaning Ngatea - Cleared Ngatea town gate.
Carried out camera works and jetting for Andrews Street and Normanby Road Paeroa.
September / October Planned Works
Piping of the drain in Pipiroa Road. Finalise report on stormwater problem at 166 Normanby Road
WaterNZ Performance Review Consent compliance reports
Financial Report for Wastewater
The financial reporting included in Appendix E.
EJ Wentzel
WATER SERVICES MANAGER
Council Agenda 26.9.18 Page 323
Page 7 of 12
Council Agenda 26.9.18 Page 324
Page 8 of 12
APPENDIX C
Water Financial MeasuresKey Indicators for the 2 months ending 31/08/2018
Operating Revenue (excluding Rates) Operating Expenditure Capital Expenditure
-Favourable YTD 233$ Favourable YTD 4,888$ Unfavourable YTD 362,799-$ YTD budget -$ YTD budget 569,763$ YTD budget 366,116$
Full year budget -$ Full year budget 7,172,616$ Full year budget 2,196,730$
Full year forecast 233$ Full year forecast 7,167,728$ Full year forecast 2,559,529$
233$ 564,875$ 728,915$
0 50 100 150 200 250 300 350
Fixed Costs
Headworks
Major Maintenance
Other
Pumpstations
Reticulation
Treatment
Thousands
Operating Expenditure
YTD Actual YTD Budget
RevenueRates income excluded from this report.
ExpenditureNo significant variances to report on to date.
Capital ExpenditureCapital expenditure is tracking above the current budget profile. The majority of this variance is considered to be a profiling matter.
0 100 200 300 400 500 600 700 800
Water
Thousands
Capital Expenditure
YTD Actuals YTD Budget
Council Agenda 26.9.18 Page 325
Page 9 of 12
Water – Major Capital Projects 2018/19 Project Status project cost
(actual)
2018/19
Project budget to
30/6/2019
Comments or risks
Plains Reticulation Treated Water Storage 99,515 Project approved by Council in 2017 spread over two years.
Unspent budget from 2017/18 of $2,359,884 needs to be carried
over to current year.
The project us underway, the tank components have been delivered
to site and foundation work will start shortly. Construction
completion estimated March 2018.
Kaimanawa Connection with Plains or
Paeroa
10,787 - Project approved by Council in 2017 spread over two years.
Unspent budget from 2017/18 of $1,894,699 needs to be carried
over to current year.
Project is tracking within budget but is well behind the programmed
schedule
Plains Waitakaruru Upgrade to DWS
566,939 850,000 The upgrade is currently undergoing commissioning and the project
should be completed in late September / early October 2018.
Council Agenda 26.9.18 Page 326
Page 10 of 12
APPENDIX D
Wastewater Financial MeasuresKey Indicators for the 2 months ending 31/08/2018
Operating Revenue (excluding Rates) Operating Expenditure Capital Expenditure
-Unfavourable YTD 25,644-$ Favourable YTD 82,498$ Favourable YTD 248,464$ YTD budget 48,450$ YTD budget 326,408$ YTD budget 262,846$
Full year budget 290,700$ Full year budget 3,327,736$ Full year budget 1,577,087$
Full year forecast 265,056$ Full year forecast 3,245,238$ Full year forecast 1,328,623$
22,806$ 243,910$ 14,382$
0 20 40 60 80 100 120
Fixed Costs
Major Maintenance
Other
Pumpstations
Reticulation
Treatment
Thousands
Operating Expenditure
YTD Actuals YTD Budget
RevenueRates income excluded from this report.
ExpenditureMajor maintenance and other general management costs tracking below budget.
Capital ExpenditureCapital expenditure is tracking below the current budget profile. The majority of this variance is considered to be a profiling matter.
0 50 100 150 200 250 300
Wastewater
Thousands
Capital Expenditure
YTD Actuals YTD Budget
Council Agenda 26.9.18 Page 327
Page 11 of 12
Wastewater – Major Capital Projects 2018/19
Project Status project cost (actual)
2018/19
Project budget
to 30/6/201
9
Comments or risks
Karangahake to Paeroa Wastewater Line
11,211 474,000 Project approved by Council in 2017 spread over two years. Unspent budget from 2017/18 of $829,405 needs to be
carried over to current year.
Paeroa - Pipe Renewals Hydraulic
500,000 Unspent budget from 2017/18 of $1,257,000 needs to be
carried over to current year.
The investigation and associated options report for this project
is currently being prepared. Depending on the final solution,
this project will either be completed in 2018/19 or will be
spread over several years.
Council Agenda 26.9.18 Page 328
Page 12 of 12
APPENDIX E
Storm water Financial MeasuresKey Indicators for the 2 months ending 31/08/2018
Operating Revenue (excluding Rates) Operating Expenditure Capital Expenditure
-Favourable YTD -$ Favourable YTD 9,827$ Unfavourable YTD 14,488-$ YTD budget -$ YTD budget 76,386$ YTD budget 20,830$
Full year budget -$ Full year budget 831,841$ Full year budget 125,000$
Full year forecast -$ Full year forecast 822,014$ Full year forecast 139,488$
-$ 66,559$ 35,318$
0 5 10 15 20
Floodgates
Maintenance/Fencing/Culverts
Mechanical Cleaning
Other
Pumps
Vegetation Control
Thousands
Operating Expenditure
YTD Actual YTD Budget
Revenue
ExpenditureNo significant variances to report on to date.
Capital ExpenditureCapital expenditure is tracking above the current budget profile. The majority of this variance is considered to be a profiling matter.
0 5 10 15 20 25 30 35 40
Stormwater
Thousands
Capital Expenditure
YTD Actuals YTD Budget
Council Agenda 26.9.18 Page 329