NOTES: (1) Includes Design, Design Services during Construcon, Construcon, and Construcon Management Costs, escalated per the implementaon schedule. ELEMENTS OF THE LTCP PLAN 1. 2. Continue operations of the Flushing Tunnel in accordance with its operational plan Implementation of a project to mitigate foam generated from the Flushing Tunnel. EXISTING PROJECTS COST Flushing Tunnel Gowanus Pumping Station Reconstruction 1. 2. $198M STATUS Operational since 2014 Operational since 2014 ELEMENTS OF THE SUPERFUND PLAN SUPERFUND COST Probable Bid Cost: $670M Total Escalated Cost (1) : $932M 1. 2. 8 MG Tank at RH-034 4 MG Tank at OH-007 GREEN INFRASTRUCTURE Con�nue to implement Green Infrastructure Program Gowanus Pumping Staon Flushing Tunnel Gowanus Canal Improving Water Quality through Reducing Impacts of Combined Sewer Overflows* * Combined Sewer Overflow (CSO): When the sewer system is at full capacity, a diluted mixture of rain water and sewage may be released into local waterways. This is called a combined sewer overflow (CSO). LTCP was submitted to DEC on June 30, 2015. DEC approved the LTCP on March 29, 2017.

Upload: others

Post on 09-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CSO-LTCP Gowanus Canal-vs2€¦ · Post-Superfund Project 126 67 41 58 BEFORE (471 MGY) AFTER (263 MGY) AFTER (115 MGY) 179 Post-Existing Project RH-034 RH-035 OH-007 RH-031 Other

NOTES: (1) Includes Design, Design Services during Construction, Construction, and Construction Management Costs, escalated per the implementation schedule.

ELEMENTS OF THE LTCP PLAN

1.

2.

Continue operations of the Flushing

Tunnel in accordance with its operational

plan

Implementation of a project to mitigate

foam generated from the Flushing Tunnel.

EXISTING PROJECTS COST

Flushing Tunnel

Gowanus Pumping StationReconstruction

1.

2. $198M

STATUS

Operational since 2014

Operational since 2014

ELEMENTS OF THE SUPERFUND PLAN

SUPERFUND COST

Probable Bid Cost:

$670MTotal Escalated Cost (1):

$932M

1.

2.

8 MG Tank at RH-034

4 MG Tank at OH-007

GREEN INFRASTRUCTURECon�nue to implement Green Infrastructure Program

Gowanus Pumping StationFlushing Tunnel

Gowanus CanalImproving Water Quality through Reducing Impacts of Combined Sewer Overflows*

* Combined Sewer Overflow (CSO): When the sewer system is at full capacity, a diluted mixture of rain water and sewage may be released into local waterways. This is called a combined sewer overflow (CSO).

LTCP was submitted to DEC on June 30, 2015. DEC approved the LTCP on March 29, 2017.

Page 2: CSO-LTCP Gowanus Canal-vs2€¦ · Post-Superfund Project 126 67 41 58 BEFORE (471 MGY) AFTER (263 MGY) AFTER (115 MGY) 179 Post-Existing Project RH-034 RH-035 OH-007 RH-031 Other

NOTES: (1) Initiate demolition work prior to final design completion. (2) Schedule for 4 MG Tank is pending.

BENEFITS TO GOWANUS CANAL

CSO

Dis

char

ge V

olum

e (M

GY)

Pre-ExistingProject(1)

Post-SuperfundProject

126

67

41

58

BEFORE(471 MGY)

AFTER(263 MGY)

AFTER(115 MGY)

179

Post-ExistingProject

RH-034

RH-035

OH-007

RH-031

Other

8 MG Tank at RH-034

Initiate Final Design

Final Design Completion

Construction Notice to Proceed

Construction Completion

2017SUPERFUND MILESTONE SCHEDULE 2019 2021 2023 2025 20292027

1/2017

6/2020

5/2020(1)

9/2028

76% CSO Volume Reduction

44%CSO Volume

Reduction

56%CSO Volume

Reduction

137

58

46

5

17

37

46

5

17

10

Gowanus CanalImproving Water Quality through Reducing Impacts of Combined Sewer Overflows

(1) Pre-Existing Project CSO volumes reflect conditions without Waterbody Watershed Facility Plan (WWFP) Projects, Green Infrastructure and other sewer improvements.