digimerge s1pbz2g installation manual

3
S1PBZ2G IP66 Outdoor Power Box Check www.irsecurity.com/pro for the latest compatibility list. www.irsecurity.com/pro Package Contents Dimensions (units: mm) Weight (power box only): 1.7Kg / 3.7lbs Allen Key 1pcs Power Box 1pcs Rubber Plug 1pcs Waterproof Cap 3pcs S1PBZ2G_INSTALLATION_DIAGRAM_EN_R1 Make sure to install the product in an area that can suppor t the weight of the power box plus cameras and accessories. Make sure to seal the box and all cable entrances according to the instructions in this document. Installation Power Box Overview Mounting Bolt M8x70 4pcs Anchor 4pcs Anchor Cap 4pcs Large Flat Washer 4pcs Hex Screw M6x25 4pcs Spring Washer 4pcs Small Flat Washer 4pcs 1 Loosen M6 screws (x2) on the left side of the top panel and open the power box. Loosen the M6 screws (x2) inside the power box and remove the mounting plate. M6 screws inside power box (x2) 2 Use the mounting plate to mark holes for the mounting bolts (x4) and any cables you are running through the mounting surface. Use outer holes to mount power box to wall. UP arrow on mounting plate should be pointed up and away from the mounting surface. You must leave at least 30mm of clearance from all sides of the mounting plate to leave space to install the power box. 3 Drill holes for the mounting bolts (x4) and cables. Insert the anchors (x4) and anchor caps (x4) into the holes as shown below . Run cables through the mounting surface. NOTE: If installing power box on corner mount or pole mount, attach mounting plate to the mount using the bolts supplied with the corner or pole mount. Skip to step 5. Illustrations of complete installation shown below. 1 Mounting plate 2 Bottom cover 3 Top cover 4 Electrical safety cover 5 Rail 6 Loop buckle 7 Shaft 8 Conduit cap 9 M6 screw 10 Gasket 11 Gasket 12 Rubber plug 13 14 Retaining ring Waterproof lm Bottom cover Mounting plate Anchor and anchor cap (x4) M20 P1.5 / G 1/2” 84.0 70.0 48.0 12-M6 248.0 160.0 84.0         3         0   .         0         2         9         7   .         2         1         1         9   .         0         1         7         0   .         0 8- 10.0         1         1         9   .         0         9         0   .         0         7         0   .         0         1         0         7   .         0

Upload: jmac-supply

Post on 17-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Digimerge S1PBZ2G Installation Manual

7/23/2019 Digimerge S1PBZ2G Installation Manual

http://slidepdf.com/reader/full/digimerge-s1pbz2g-installation-manual 1/2

1PBZ2G66 Outdoor Power Box

Check www.flirsecurity.com/pro for the latest compatibility l

www.flirsecurity.com/pro

Package Contents

mensions (units: mm)

eight (power box only): 1.7Kg / 3.7lbs

Allen Key 1pcs

Power Box 1pcs Rubber Plug 1pcs Waterproof

Cap 3pcs

S1PBZ2G_INSTALLATION_DIAGRAM_EN_R1

Make sure to install the product in an area that can support t

weight of the power box plus cameras and accessories.

Make sure to seal the box and all cable entrances according

the instructions in this document.

Installation

Power Box Overview

Mounting Bolt M8x70 4pcs

Anchor 4pcs

Anchor Cap 4pcs

Large Flat Washer 4pcs

Hex Screw M6x25 4pcs

Spring Washer 4pcs

Small Flat Washer 4pcs

1 Loosen M6 screws (x2) on the left side of the top panel and open the pbox. Loosen the M6 screws (x2) inside the power box and remove the

mounting plate.

M6 screws inside power box (x2)

2 Use the mounting plate to mark holes for the mounting bolts (x4) and cables you are running through the mounting surface. Use outer holes

mount power box to wall.

UP arrow on mounting plate shou

be pointed up and away from the

mounting surface.

You must leave at least 30mm of

clearance from all sides of the

mounting plate to leave space to

install the power box.

3Drill holes for the mounting bolts (x4) and cables. Insert the anchors (

and anchor caps (x4) into the holes as shown below. Run cables thro

the mounting surface.

NOTE: If installing power box on corner mount or pole mount, attach mou

plate to the mount using the bolts supplied with the corner or pole mount

to step 5. Illustrations of complete installation shown below.

1 Mounting plate

2 Bottom cover

3 Top cover

4 Electrical safety cover

5 Rail

6 Loop buckle

7 Shaft

8 Conduit cap

9 M6 screw

10 Gasket

11 Gasket

12 Rubber plug

13

14 Retaining ring

Waterproof film

Bottom cover

Mounting plate

Anchor and

anchor cap (x4)

M20 P1.5 / G 1/2”

84.070.048.0

12-M6

248.0

160.0

84.0

        3        0  .        0

        2        9        7  .        2

        1        1        9  .        0

        1        7        0  .        0

8- 10.0

        1        1        9  .        0

        9        0  .        0

        7        0  .        0

        1        0        7  .        0

Page 2: Digimerge S1PBZ2G Installation Manual

7/23/2019 Digimerge S1PBZ2G Installation Manual

http://slidepdf.com/reader/full/digimerge-s1pbz2g-installation-manual 2/2

4Place the mounting plate over the holes. Insert the mounting bolts (x4) and

large flat washers (x4) to secure the mounting plate to the mounting

surface.

5 Run cables through rear gaskets or bottom conduit holes.

You must install the connector after pushing the cable through the gasket.

You cannot push finished cables through the gaskets. The diameter of

cables run through the gaskets must be between 3.5mm and 12mm.

To run cables through rear gaskets:

1. Poke a hole in the gasket with a nail or pin.

2. Run the cable through the gasket.

3. Attach the connector to the cable on the inside of the gasket.

Follow all instructions below. Incorrect installation of cables may impact

the weatherproof rating of the power box.

To run cables through bottom conduit holes:

1. Run cable without connector through the weatherproof cap.

2. Screw weatherproof cap into one of the bottom conduit ports.3. Attach connector to cable inside power box.

6Place the power box over the mounting plate and slide into place. Tighten

the M6 screws (x2) inside the power box to secure it to the mounting plate.

M6 screws inside power box (x2)

7Run the required cabling for the camera through the rubber plug on the

cover of the power box.

Rubber plug

Install any required equipment inside the power box. Install the mount (

included) and camera (not included) to the front of the power box with t

hex screws (x4), spring washer (x4), and small flat washers (x4).

 The below images show examples of items that can be installed to the p

box. All items below are not included with power box. Check

www.flirsecurity.com/pro for the latest compatibility list.

8

9Push the top cover up about 2mm and then close the power box. Tighte

the M6 screw (x4) on the front of the power box to secure the top cover

seal the power box.

Push up to close

top cover

NOTE: Width of the rail is 35mm.

Cable

Weatherproof cap

NOTE: Bottom conduit

diameter fits size

G 1/2” or M20-P1.5.

Bottom cover

Mounting plate

Mouting bolt and

large flat washer (x4)

Connector

Gasket

Cable

Lightning

protection

module

Heater

module

A

M6 scre

Hex screw, spring

washer, and small

flat washer (x4)