![Page 1: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/1.jpg)
Dr Louis Gunnigan
Dublin Institute of Technology Campus Planning Team
DIT New City Centre Campus at Grangegorman
16 February 2015
![Page 2: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/2.jpg)
• Background
• Governance
• Milestones
• Challenges
• Progress
• Future Works
Agenda
![Page 3: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/3.jpg)
• 120+ years of excellence in education
• 39 locations around Dublin
• 10% of third level in Ireland
• National provider
• Applied, career-focused education
• Degree-awarding; apprenticeship to PhD
• 80% of graduates employed in
professions
• Always ranked in top 4 for CAO
applications
• Ranked in top 4% THES world rankings
Dublin Institute of Technology
20,000
students
200 part-time
programmes
4,000 graduates &
500 postgraduates
per year
85 full-time
programmes
1,800 staff
4 colleges
![Page 4: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/4.jpg)
DIT across the city
Bolton St.
Chatham Row
Cathal Brugha St.
Aungier St.
Kevin St.
Rathmines
Mountjoy Sq.
DIT before Grangegorman
![Page 5: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/5.jpg)
• To provide education that meets DIT’s social,
economic, and cultural mission.– Via student-centred learning.
– Using leading-edge technology.
– With facilities currently lacking.
Why Move?
Student Accommodation
Sports
Recreation
• Synergies and opportunities
• Consistently excellent integrated student experience
Significant costs to upgrade
existing premises
Lack of critical mass – clubs
and societies
Interdisciplinary activities
New & emerging disciplines
Modularised offerings
![Page 6: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/6.jpg)
30 Ha site in the heart of Dublin.
1.3km
City Centre Site
![Page 7: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/7.jpg)
DIT’s Part of the City
Trinity
College
UCD
DIT
DCU
![Page 8: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/8.jpg)
Project Governance
![Page 9: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/9.jpg)
Masterplan
Integration with surrounding streets
Urban scale and form
Incorporating existing protected structures
Exploiting existing landscape and views
•2009 Urban Design Award US Institute of Architects
•2009 World Architecture Festival
•2010 Chicago Athenaeum 2010 American Architecture Award
•2012 American Institute of Architects (AIA) National Honor Award for Regional & Urban Design
•2012 Honor Award - Society for College and University Planning
![Page 10: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/10.jpg)
• Comprehensive strategic planning framework for
380,000m2 of phased development
• Extensive public consultation
• Approval of SDZ by Dublin City Council
• Approval on appeal from the An Bord Pleanála
Strategic Development Zone (SDZ)
![Page 11: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/11.jpg)
DIT Milestones to date
DIT Campus Planning Office
relocates to Grangegorman
2007Preparation of Draft DIT
Strategic Briefs
DIT Campus Planning Office
Established2002
“Joining the Dots”Employment Study
May 2009
Masterplan Approved 2008
Cabinet DecisionJuly 2010
& Government
Launch September
2010
Concept planning Education
Related Lands
Transferred Feb 2012 to
GDA
SDZ Planning Approval May 2012 New
Implementation Programmes for
DIT May 2012
Government announce
revised funding
arrangementsJuly 2012
2013First building
works contracts
begin
First 1000 students arrived
Sept 2014
![Page 12: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/12.jpg)
Future DIT Milestones
DIT becomes part of Dublin
Technological University 2015/16
Central and East Quads complete10,000 students on site
Sept 2017
Greenway Hub (EHSI/Hothouse Building)
to open Q1 2016
GDA sells DIT buildings at Kevin St and
Cathal Brugha St2018
Construction begins on Student
Accommodation and Library Building
2016
West Quad (Business College)
complete 2020
Engineering and Built
Environment Quad complete
2023
![Page 13: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/13.jpg)
• Funding
• Projects
• Delivery of Development Programmes
Progress
![Page 14: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/14.jpg)
Current Principle Funding Sources
![Page 15: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/15.jpg)
1. Infrastructure, Renovation and Research
2012-2016
• 2012 Sept- Dec– brief development
– Appoint Design teams
– Initial design
• 2013 -2014– Infrastructure design and
construction
– New build for research and business incubation (Greenway Building)
• 2014 Sept – A&D, Soc Sc and Photo
students on site
• 2016 Q1 – Greenway Building complete
Development Programmes
2. PPP Development
2012-17
• 2012 Sept – Dec
– Appoint technical advisors
– Fixtures, fittings and equip
• 2013 Jan – August
– Outline design
– PPP Operational specs
• 2013 Aug – Q2 2015
– PPP procurement
• 2015-2017
– Construction
• September 2017
– 10,000 students on campus
3. Support Facilities2015-2018
• Student Accommodation
Phase 1
• Dining Hall
• Library and Academic Hub
Phase 1
• Student Centre
• Energy Centre
• Broadstone Gate
• Indoor Sports Phase 1
4. Subsequent
2017-2023
• Student Accommodation Phase 2
• Science Park
• Sports Phase 2
• Prussia Street Gate
• Library and Academic Hub Phase 2
• Business (West Quad)
• Engineering/Built Environment
![Page 16: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/16.jpg)
Pre-Planning
Grangegorman Works Packages – Status at February 2015
Procurement / Construction
Design/Planning
Completed
Future Works Packages
Site Infrastructure & Public Realm
HSE
Community
Nursing Unit
DIT Student
Accommodation
Phase 1
DIT Foodhall
Prussia St
GateEnergy
Centre
DIT
Academic
Hub Ph1
DIT Indoor
Sports Ph1
DOES
Primary
School
DIT Central Quad
DIT East QuadBroadstone
GateHSE Primary
Care
DIT
Greenway
Hub
DIT
Broombridge
Phase 1
DIT
Stabilisation
Works
Dublin Bus
Bus Park
DIT PPP
DIT
Adaptive Reuse
Clock Tower
DIT Demolitions
Contracts 1 & 2
DIT
Adaptive Reuse
Contracts 1 & 2
HSE
Phoenix Centre
DIT Eng/BE
Quad
DIT
Student
Centre
DIT West
Quad
DIT Student
Accommodation
Phase 2
DIT
Adaptive Reuse
Contract 3
![Page 17: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/17.jpg)
Grangegorman 2008
![Page 18: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/18.jpg)
Grangegorman 2015
![Page 19: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/19.jpg)
Demolition– complete
Stabilisation– Underway
Site Infrastructure works
SIPR- West side substantially complete
- Smithfield SW drain Completed
- Works on East side of site advanced
LUAS works Bus parking structure SIPR Stabilisation of Lower House
![Page 20: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/20.jpg)
Energy Distribution
Primary Underground Services Utilities Route - Masterplan
Primary Underground Services Utilities Route - Tranche 1 &
Masterplan
T
P
P
EXISTING ESBN SUBSTATION (HSE)
PROPOSED ESBN SUBSTATION (WEST)
TEMPORARY EXISTING ESBN SUBSTATION
(MORTUARY BLD)
PROPOSED ESBN SUBSTATION (EAST)
FUTURE ENERGY CENTRECOMMUNICATIONS ROOM B (MORTUARY
BLD)
COMMUNICATIONS ROOM A
(TOP HOUSE)
NATURAL GAS TIE-IN POINT (TBC)
INCOMING CABLE CHAMBER
![Page 21: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/21.jpg)
Adaptive Reuse
![Page 22: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/22.jpg)
Adaptive Reuse
![Page 23: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/23.jpg)
North House Studios
Adaptive Reuse
![Page 24: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/24.jpg)
North House
Adaptive reuse
![Page 25: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/25.jpg)
Adaptive Reuse – (Cluster Buildings)
![Page 26: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/26.jpg)
Adaptive Reuse – Cluster Buildings
![Page 27: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/27.jpg)
Adaptive Reuse - Design vs Actual
![Page 28: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/28.jpg)
DIT Campus – Phase 1 Handover
• Handover from GDA to DIT on 1st September
• Full occupation by DIT on 15th September
![Page 29: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/29.jpg)
Complete Q1 2016
Floor Area 4,700m2
Design & Build Contract
Greenway HubGreenway Hub (ESHI and Hothouse)
![Page 30: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/30.jpg)
East Quad
• ~16,000 m2
• ~3,000 students
• Creative arts and digital
media
Programme 2 - PPP Development (2012-17)
Central Quad
• ~34000m2
• ~7,000 students
• Consolidation of science,
health, food, tourism,
electrical/electronic
engineering
![Page 31: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/31.jpg)
Phase 3 - New Construction Works up to 2018
HSE Primary Care
DOES Educate Together
Primary School
DIT Central Quad
DIT Student Accommodation Phase 1
& Dining Hall and Student Centre
DIT East Quad
DIT Academic Hub Phase 1
DIT Energy Centre Phase 1
DIT Sports Centre Phase 1
RPA LUAS
Broadstone Gate
Prussia St Gate
![Page 32: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/32.jpg)
• Sports Phase 2 (6,000m2)
• Academic Hub Phase 2 (5,000m2)
• Relocation of Focus Building (3,000m2)
• Business Quad (8,500m2)
• Engineering/Built Environment Quad (27,000m2)
• Other Learning spaces (7,000m2)
• Second Dining Hall (7,500m2)
• Refurb of remaining of protected structures (2,000m2)
• 900 further Student Beds (total 57,000m2)
• Retail (3,600m2)
• Maintenance/Services/Utilities (2,800m2)
• Industry/Incubation Centre (10,800m2)
• Additional research space (6,300m2)
• Additional performance space (3,600m2)
• Further Expansion spaces (34,000m2)
(All areas provisional)
Programmes 4, 5 and beyond
![Page 33: DIT New City Centre Campus at Grangegorman · DIT New City Centre Campus at Grangegorman ... •2009 World Architecture Festival •2010 Chicago Athenaeum 2010 ... DIT Sports Centre](https://reader031.vdocument.in/reader031/viewer/2022022518/5b0af3717f8b9a99488d004b/html5/thumbnails/33.jpg)
• Huge programme of works
• Diverse contract types
• Multiple funding sources required
• All current milestones achieved
• On time to achieve 2017 milestone
• Enormous programme of works over next 4/5 years
Conclusion
http://www.dit.ie/grangegorman/