Experience teaches us that experimental activities are veryimportant and necessary every time the electric phenomenaare complex and the choices related to the project seem tobe very difficult. It is convenient for the electric equipmentto be tested in different conditions according to theinternational standards, to check not only the electric,dielectric, thermal and mechanic performance but also theperformance related to safety and life cycle. The complianceto IEC/EU Standards is an essential requirement and we areable to guarantee it. A higher reliability and a longer lifetime of products can open the way to the success. Siemens,thanks to the SVEPPI laboratory and related test capabilitiesallows you to carry out several kinds of electrical andmechanical tests. The tests are carried out according to themain technical standards. Built in the early 50ies it is locatedclosed to Terna Substation of Scorzè and connected witha dedicated 220 KV bay.
Test Capability Maximum ratings
CB MV - HV Up to 550 kV - 50 kA
DS MV - HV Up to 550 kV - 50 kA
Transformers MV Up to 5 MVA
Switch Boards Up to 52 kV
CT/VT MV - HV
Switches Up to 36 kV - 800 A
Insulators for overhead lines Up to 550 kV - 50 kA
Accessories for power MV cables Up to 36 kV
Post Insulator Up to 550 kV
Reactors LV-MV Up to 50 kA
Bushings Up to 550 kV - 50 kA
• the above list isn't fully exhaustive of the kind of apparata that can be tested, nor of the variety of tests which can be carried out• feasibility of each single test should however be requested to the laboratory for confirmation• for any IEC Standard referred test, the corresponding test feasibility in CEI EN related Standards is provided
Making and breaking current
Short time withstand currentand peak withstand tests.
Making and breaking due toelectrostaticallyand electromagneticallyinduced current
Arcing due to internal fault
AC power arc test
Ability to withstand short circuit
Making and breaking tests
Power testsPlant of 1500 MVA power short circuit, supplied directly from 220 kV national grid.Direct test voltage range beetwen 7 - 115 kV up to 63 kA, 130 kAp
Device & Standard
Circuit Breakers Standard IEC 62271-100
Circuit Breakers Standard IEC 62271-100
Disconnectors Standard IEC 62271-102
AC metal enclosed IEC 62271-200
Current Transformers IEC 60044-1
Switches IEC 60265-1
Disconnectors IEC 62271-102
AC metal enclosed IEC 62271-200
Insulators for overhead lines Technical report IEC 61467
Power Transformer MT/BT IEC 60076-5/11
Switches IEC 60265-1
Device range
Up to 24 kV 12.5 kAUp to 12 kV 20 kA
Single phase: up 50 kA 3s 63 kA 1s 130 kApThree phases: up to 50 kA 1s 130 kAp
Up to 420 kV
Up to 52 kV 50 kA
Up to 550 kV 31.5 kAUp to 245 kV 50 kA
Up to 5 MVA MT/BT
Up to 36 kV 800 A 12.5 kAUp to 24 kV 800 A 16kA
Dielectric testRange of the plant: Power Frequency 850 kV 1200 KVA
Lightning impulse 2200 kV 75 kJSwitching impulse 1600 kV 75 Kj
Environmental testClimatic room
Mechanical and environmetal tests
Operation at the temperature limits
Operation under severe ice conditions
Circuit Breakers Standard IEC 62271-100
Disconnectors Standard IEC 62271-102
-40 °C + 55 °C
-40 °C + 55 °C10 mm - 20mm
Withstand Power Frequency test
Withstand Lightning impulse test(full & chopped)
Withstand Switching impulse test
RIV Test
Corona Test
Partial discharge
Withstand Power Frequency test
Withstand Lightning impulse test
Circuit Breakers Standard IEC 62271-100
Disconnectors Standard IEC 62271-102
Current & VoltageTransformers IEC 60044-1
Inductive Transformer IEC 60044-2
Setting Insulator for overhead lines
Switch Boards IEC 62271-200
Switches IEC 60265
Up to 550 kV
Up to 52 kV
Temperature Rise, mechanical and on site tests
Rise temperaturetest
Mechanical test
Circuit Breakers Standard IEC 62271-101
Disconnectors Standard IEC 62271-102
Switch boards Standard IEC 62271-200
Switches IEC 60265-1
Circuit Breakers Standard IEC 62271-101
Disconnectors Standard IEC 62271-102Standard IEC 62271-200
Switches IEC 60265-1
Up to 4000 A single phase
Up to 3150 A three phases
• Measurement of operating times of circuit breakers and disconnecting switches in GIS or AIS installations
• Measurement of the resistance of the main circuit.
• Dielectric tests on auxiliary and control circuits.
• SF6 tightness tests
• Measurement of the moisture content for SF6
• Measurement of transformation ratio for instrument transformers and power transformers
• Tests on protection relays (excluding distance protection)
• Measurement of inductance for line traps and power transformers
• Measurement of capacitance
• Measurement of dielectric dissipation factor
• Power frequency voltage tests up to 580 kV
• Switching impulse voltage tests up to 950 kV
• Thermography
• Leakage current measuring for surge arresters
On site test
Siemens S.p.A.Energy Transmission & Distribution ServicesLaboratorio SVEPPIVia A. Volta, 34/a - 30037 Scorzé (VE) ItalyPhone (VE) +39 041 894 5092Phone (MI) +39 02 24365021
[email protected]/serviceEXP
Laboratory SVEPPI buildings
To view the accredited testsgo to the site www.accredia.it
and click on "Banche dati"