Ensuring Sustainability

Ensuring Sustainability

Leonellha Barreto-Dillon, seecon gmbh

Page 2: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 2

Contents

1. A Sustainable Water and Sanitation Service

2. Ensuring Long-Term Operation & Maintenance (O&M)

2.1 Definition of O&M

2.2 Design for O&M

2.3 Community Management for O&M

2.4 Organising and Planning O&M

3. Internal Follow-up of Completed Projects

3.1 Purposes of Follow-up

3.2 Follow-up Programme Design

4. Participatory Monitoring and Evaluation (PM&E)

4.1 Definitions

4.2 Principles of PM&E

4.3 Development and Implementation of PM&E

4.4 Techniques and Tools for PM&E

4.5 Advantages and Disadvantages

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

Page 3: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 3

1. A Sustainable Water and Sanitation Service

A water and sanitation service is sustainable when:

• it is functioning and being used;

• it is able to deliver an appropriate level of benefits (quality, quantity, convenience, continuity, health) to all, including the poorest women and men;• it continues to function over a prolonged period of time (which goes beyond the life span of the original equipment);

• its management is institutionalised;

• its operation, maintenance, administrative and replacement costs are covered at the local level;

• it can be operated and maintained at local level with limited but feasible external support; and

• it does not affect the environment negatively.

Find this presentation and more on: www.sswm.info

SOURCE: IRC- INTERNATIONAL WATER AND SANITATION CENTRE (2004): What is cost recovery? URL: http://www.irc.nl/page/7584 [Accessed: 28.05.2010]

Page 4: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 4

2.1 Definition of O&M

2. Ensuring Long-Term Operation & Maintenance (O&M)

Operation and maintenance (O&M) refers to all of the activities needed to run a water supply and sanitation scheme, except for the construction of new facilities.

The overall aim of O&M is to ensure efficiency, effectiveness and sustainability of water supply and sanitation facilities.

Definition of Operation:

Operation refers to the direct access to the system by the user, to the activities of any operational staff, and to the rules or by-laws which may be devised to govern who may access the system, when, and under what conditions.

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

SOURCE: CASTRO, V., MSUYA, N. And MAKOYE, C. (2009): Sustainable Community Management of Urban Water and Sanitation Schemes (A Training Manual). Nairobi: Water and Sanitation Program-Africa, World Bank.

Page 5: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 5

2.1 Definition of O&M

2. Ensuring Long-Term Operation & Maintenance (O&M)

Definition of Maintenance:

Maintenance is to do with the technical activities, planned or reactive, which are needed to keep the system working. Maintenance requires skills, tools and spare parts.

Maintenance can be classified as:

Preventive maintenance: this includes work that is planned and carried out on a regular basis to maintain and keep the infrastructure in good condition.Corrective maintenance: replacing or repairing something that was done incorrectly or that needs to be changed.

Reactive maintenance: this is a reaction to a crisis or public complaints; it normally occurs as a result of reported pipe breaks and the malfunctioning or breakdown of equipment.

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

SOURCE: CARTER, R. C. (2009): Operation and Maintenance of Rural Water Supplies. In: Perspectives N° 2. St. Gallen: Rural Water Supply Network (RWSN).

SOURCE: CASTRO, V., MSUYA, N. And MAKOYE, C. (2009): Sustainable Community Management of Urban Water and Sanitation Schemes (A Training Manual). Nairobi: Water and Sanitation Program-Africa, World Bank.

Page 6: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 6

2.2 Design for O&M

2. Ensuring Long-Term Operation & Maintenance (O&M)

The ease of operation and maintenance of a facility is central to its sustainability and must be given careful consideration in design.

Rural situation: e.g. Village Level Operation and Maintenance Management (VLOM) Urban situations: where supply systems will generally be more complex, the design and technology chosen will shape the long-term operation and maintenance.The standardisation of equipment, parts, designs, construction methods, etc., has many benefits:

Design is simpler

Choices are made from a limited range of options.

Requires lower skills level

Limits the range of spare parts.

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

SOURCE: LSHTM/WEDC –LONDON SCHOOL OF HYGIENE & TROPICAL MEDICINE AND WATER, ENGINEERING AND DEVELOPMENT CENTRE- (1998): Guidance Manual on Water Supply and Sanitation Programmes. London: WEDC.

Page 7: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 7

2.3 Community Management for O&M

2. Ensuring Long-Term Operation & Maintenance (O&M)

To ensure the sustainability of the sanitation and improved water solution, it is necessary to have a community ownership and

management approach, making the end-users directly responsible for the operation and maintenance of the installed facilities.

Owner’s manual: prepared by the contractor or engineer giving an integral framework for operation and maintenance

Capacity Building to ensure proper O&M:

-Household level: Training of end-users (e.g. UDD toilets)

-District level: communities and their organisations (CBOs)

-NGOs: training of trainers

-Local technicians and care-takers

-Private operators or local engineering companies

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

Page 8: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 8

2.4 Organising and Planning O&M

2. Ensuring Long-Term Operation & Maintenance (O&M)

The aspects to be organised are:

What? When? Who? With what?

Find this presentation and more on: www.sswm.info

O&M Requirements of a septic tank SOURCE: Adapted from CASTRO et al 2009

Page 9: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 9

3.1 Purposes of Follow-up

3. Internal Follow-up of Completed Projects

The continuous monitoring of the activities by the project implementers.

Control of projects and their impact.

Maintain decision-making flexibility and promote an adaptative management approach

Purposes:

Improved scientific and technical knowledge

Improve public awareness and acceptance

Find this presentation and more on: www.sswm.info

SOURCE: MORRISON-SAUNDERS, A. and ARTS, J. (2004): Assessing Impact, Handbook of EIA and SEA Follow-up. London: Earthscan.

Page 10: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 10

3.2 Follow-up Programme Design

1. Determination of need and scope: In this step you should define the scope of the follow-up issues (what is to be supervised), specially the indicators that will help you to keep an eye on the project.

2. Defining tools, methodology and time-plan: This means the type of activities, such as visits to the project site, laboratory tests, interviews with the stakeholders and the frequency and time span of these activities

3. Financing the follow-up programme: One option is to cover the costs through beneficiaries’ contribution, in case there is a component of cost-recovery through end-user’s services. Another option is to cover the costs of the mandays, laboratory tests, field visits with the overheads or the annual budget of the organisation.

3. Internal Follow-up of Completed Projects

Find this presentation and more on: www.sswm.info

Page 11: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 11

3.2 Follow-up Programme Design

4. Determination of roles and responsibilities: The most important issue to take care of is to assign completed projects to your staff members.

5. Gathering data and evaluation: Once the project is completed, and the internal follow-up starts, make sure to plan and integrate the visits, communication with stakeholders, laboratory analysis, etc. in your day-to-day activities. Evaluation should be carried out as it is a critical step in the process.

6. Reporting : To ensure that reporting of results is not neglected, it is recommended that a formal reporting and evaluation process be developed. In order to avoid extra work and allow for comparison, make sure to develop a simple template for all the members of the staff to report about their internal follow-up activities and the evaluation.

3. Internal Follow-up of Completed Projects

Find this presentation and more on: www.sswm.info

Page 12: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 12

3.2 Follow-up Programme Design

The follow-up reports should include:

Short description of the project

Location of the project

Contact person in the project site (with contact information)

Description of the follow-up mechanisms (e.g. field visit, lab test, etc.)

Issues or problems identified

Results

Data analysis and evaluation

Corrective measurements undertaken

Further actions proposed to deal with the issue

Lessons learned

3. Internal Follow-up of Completed Projects

Find this presentation and more on: www.sswm.info

Page 13: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 13

More Tips for the Follow-up phase:

1. Always budget for a follow-up programme including costs for staff, assessments, baselines, monitoring systems and evaluation.

2. Include follow-up in the work plan and proposal, if possible.

3. Develop a follow-up plan and focus on just a few indicators.

4. Develop data collection and management processes-these should be made as simple as possible to ensure utilisation and should also capture staff roles and responsibilities.

5. Regularly hold meetings to reflect on monitoring and evaluation data- the emphasis here should be learning and building feedback into the programme.6. Share results with beneficiaries and other stakeholders-avoid reporting only upwards.

7. Conduct a baseline at the beginning of the project/programme and final evaluation at the end so that results can be systematically captured

3. Internal Follow-up of Completed Projects

Find this presentation and more on: www.sswm.info

SOURCE: INTERNATIONAL FEDERATION OF RED CROSS AND RED CRESCENT SOCIETIES (2007): Monitoring and Evaluation in a nutshell. URL: http://participation.110mb.com/PCD/M%20and%20E%20guide%20final.pdf[Accessed on 31.05.2010]

Page 14: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 14

4.1 Definitions

Definition of monitoring

Monitoring is a continuous process of collecting and analysing information to compare how well a project, programme or policy is being implemented against expected results.

Definition of evaluation

Evaluation is the systematic and objective assessment of an ongoing or completed project, programme or policy, its design, implementation and results. Evaluation determines the relevance and fulfilment of objectives, efficiency, effectiveness, impact and sustainability.

4. Participatory Monitoring and Evaluation

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

SOURCE: L. Barreto Dillon

Page 15: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 15

4.1 Definitions

Definition of participatory monitoring & evaluation

Participatory monitoring & evaluation (PM&E) is a process through which stakeholders at various levels engage in monitoring or evaluating a particular project, program or policy, share control over the content, the process and the results of the M&E activity and engage in taking or identifying corrective actions. PM&E focuses on the active engagement of primary stakeholders

The stakeholder groups typically involved in a participatory M&E activity include:

the end users of project goods and services, including both men and women at the community level;

intermediary organisations, including NGOs;

private sector businesses involved in the project; and

government staff at all levels

4. Participatory Monitoring and Evaluation

Find this presentation and more on: www.sswm.info

SOURCE: L. Barreto Dillon

SOURCE: THE WORLD BANK (2010a): Participatory Monitoring and Evaluation, in Topics: Participation and Civic Engagement URL: http://go.worldbank.org/G966Z73P30 [Accessed on 27.05.2010]

Page 16: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 16

4.2 Principles of Participatory Monitoring & Evaluation

Local people are active participants—not just sources of information.

4. Participatory Monitoring and Evaluation

Stakeholders evaluate, outsiders facilitate.

Focus on building stakeholder capacity for analysis and problem-solving.

Process builds commitment to implementing any recommended corrective actions.

Find this presentation and more on: www.sswm.info

SOURCE: RIETBERGEN-MC CRACKEN, J. and NARAYAN, D. (1998): Participation and Social Assessment: Tools and Techniques. Washington, D.D: The International Bank for Reconstruction and Development, the World Bank.

Page 17: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 17

4.3 Development and Implementation of PM&E

Step 1: Planning the PM&E process and determining objectives and indicators

4. Participatory Monitoring and Evaluation

Step 2: Gathering data

Step 3: Analyzing data

Step 4: Sharing the information and defining actions to be taken

Find this presentation and more on: www.sswm.info

SOURCE: AUBEL, J. (2004): Strategic Report 9, Participatory Monitoring & Evaluation for Hygiene Improvement, Beyond the Toolbox: What else is required for effective PM&E? A literature Review. Washington, D.C: Office of Health, Infectious Diseases and Nutrition, Bureau for Global Health U.S. Agency for International Development.

Page 18: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 18

4.4 Techniques and tools for PM&E

Participatory Rural Appraisal: visual methods, often to analyse “before and after” situations, through the use of community mapping, problem ranking, wealth ranking, seasonal and daily time charts, and other tools.

4. Participatory Monitoring and Evaluation

SARAR: interactive and visual-based methods to facilitate community discussion with such methods as pocket charts, three pile sorting, and “story with a gap.”

Beneficiary Assessment: conversational interviewing and focus group discussions on changes and impacts.

Other techniques:

•Visual self-evaluation tools

•Testimonials

•Photographing the evidence

•Community records and indicators

Find this presentation and more on: www.sswm.info

SOURCE: RIETBERGEN-MC CRACKEN, J. and NARAYAN, D. (1998): Participation and Social Assessment: Tools and Techniques. Washington, D.D: The International Bank for Reconstruction and Development, the World Bank.

Page 19: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 19

4.5 Advantages and Disadvantages

Advantages

Increases the reliability of evaluation

Allows for flexibility

Strengthens ownership

Widens the knowledge base necessary for assessing and correcting

Increases the motivation of stakeholders

Creates trust in Local Government policy and action

Contributes to the learning of all involved.

4. Participatory Monitoring and Evaluation

Disadvantages:

Needs skilled facilitator

Can be dominated by strong voices in the community

Can be time consuming - needs genuine commitment.

Needs the support of donors as does not always use traditional indicators.

Those responsible for implementation of certain projects may not want the administration or public to learn about failures or mistakes due to a fear of disciplinary action.

Find this presentation and more on: www.sswm.info

Page 20: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 20

References

20

Find this presentation and more on: www.sswm.info

AUBEL, J. (2004): Strategic Report 9, Participatory Monitoring & Evaluation for Hygiene Improvement, Beyond the Toolbox: What else is required for effective PM&E? A literature Review. Washington, D.C: Office of Health, Infectious Diseases and Nutrition, Bureau for Global Health U.S. Agency for International Development.

CARTER, R. C. (2009): Operation and Maintenance of Rural Water Supplies. In: Perspectives N° 2. St. Gallen: Rural Water Supply Network (RWSN).

CASTRO, V., MSUYA, N. And MAKOYE, C. (2009): Sustainable Community Management of Urban Water and Sanitation Schemes (A Training Manual). Nairobi: Water and Sanitation Program-Africa, World Bank.

IRC- INTERNATIONAL WATER AND SANITATION CENTRE (2004): What is cost recovery? URL: http://www.irc.nl/page/7584. [Accessed: 28.05.2010]

INTERNATIONAL FEDERATION OF RED CROSS AND RED CRESCENT SOCIETIES (2007): Monitoring and Evaluation in a nutshell. Downloaded from URL:http://participation.110mb.com/PCD/M%20and%20E%20guide%20final.pdf [Accessed on 31.05.2010]

LSHTM/WEDC –LONDON SCHOOL OF HYGIENE & TROPICAL MEDICINE AND WATER, ENGINEERING AND DEVELOPMENT CENTRE- (1998): Guidance Manual on Water Supply and Sanitation Programmes. London: WEDC.

MORRISON-SAUNDERS, A. and ARTS, J. (2004): Assessing Impact, Handbook of EIA and SEA Follow-up. London: Earthscan.

RIETBERGEN-MC CRACKEN, J. and NARAYAN, D. (1998): Participation and Social Assessment: Tools and Techniques. Washington, D.D: The International Bank for Reconstruction and Development, the World Bank.

THE WORLD BANK (2010a): Participatory Monitoring and Evaluation, in Topics: Participation and Civic Engagement URL: http://go.worldbank.org/G966Z73P30 [Accessed on 27.05.2010]

Page 21: Ensuring Sustainability Leonellha Barreto-Dillon, seecon gmbh

Ensuring Sustainability 21

“Linking up Sustainable Sanitation, Water Management & Agriculture”

SSWM is an initiative supported by:

Compiled by: