equipment manufacturer 500-1911 - playworld · 2020-05-28 · tower climber sliding pole post mount...
TRANSCRIPT
Equipment Manufacturer
500-1911
Peak
Equipment Manufacturer
500-1911
Peak
0.5 1.0
05'
Meters2.0 3.0
10'
TRANSFER
STATION
W/ STEP
36"
0,92M
96"
2,44M
36"
0,92M
72"
1,83M
LEG
LIFT
SPIRAL
CLIMBER
BABBLE-ON
DEEP RUNG
ARCH CLIMBER
STEEL
SLIDE
HOPSCOTCH
CLIMBER
STEEL
SLIDE
TOWER
CLIMBER
SLIDING
POLE
POST
MOUNT
BELLS
POST
MOUNT
WHEEL
TWISTED
CLIMBER
PLAYCUBES
TRANSITION
CLIMBER
PIPEWALL
W/ TELESCOPE
(deck)
STOREFRONT
(ground)
STEEL
SLIDE
STEEL
SLIDE
ADA
STAIRS
ADA
STAIRS
BABBLE-ON
HORIZONTAL
LADDER
W/ PARALLEL
BARS
54'-6"
[16.62M]
58'
[17.69M]
6'-2"
[1.88M]
6'-1"
[1.86M]
8'
[2.44M]
6'-8"
[2.03M]
8'-2"
[2.48M]
6'-8"
[2.03M]
6'-9"
[2.07M]
6'-6"
[1.98M]
6'-1"
[1.84M]
8'-7"
[2.61M]
6'-3"
[1.92M]
BEANSTALK
CLIMBER
6'-5"
[1.97M]
Total Elevated Play Activities:
Total Ground-Level Play Activities:
AccessibleElevatedActivities
AccessibleGround-Level
Activities
AccessibleGround-LevelPlay Types
Required
Provided
AD
A S
CH
EDU
LE 14
7
11
6
5
5
3
5
PLAYWORLD SYSTEMS, INC.
1000 Buffalo Road
Lewisburg, PA
17837-9795 USA
BPaper Size
DATE:
SCALE:PROJECT NO:
*PLAYGROUND SUPERVISION REQUIRED
DRAWN BY:
USER CAPACITY: AGE GROUP:
AREA: PERIMETER:
EQUIPMENT SIZE:
USE ZONE:
FALL HEIGHT:
CPSC #325ASTM F1487-
PEA
KC
AT
AL
OG
P
RE
-D
ES
IG
N
500-1911 1/8"=1'-0"
M. MERTZ
08-FEB-19
40'2" x 43'11" x 17'5"12,24M x 13,39M x 5,31M
54'6" x 58'0"16,62M x 17,69M
1,955 SqFt.181,56 SqM.
187 Ft.56,73M
8 Ft.2,44M
63 5-12
11
Posts
ZZPM0016 41 5in OD X 120in STEEL POST W/ RIVETED CAP
ZZPM0026 42 5in OD X 132in STEEL POST W/ RIVETED CAP
ZZPM0078 63 5in OD x 205in STEEL POST W/RIVETED CAP
ZZPM0128 64 5in OD x 192in STEEL POST W/RIVETED CAP
Decks & Kick Plates
ZZPM0616 25 SQUARE COATED DECK ASSEMBLY
ZZPM0619 26 HEX COATED DECK ASSEMBLY
ADA Items
ZZPM2007 17 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
ZZUN2019 18 APPROACH STEP FOR TRANSFER STATION
Slides
ZZPM2906 29 STAINLESS STEEL SLIDE- 96in DECK
ZZPM2907 110 STAINLESS STEEL SLIDE- 72in DECK
ZZPM2916 111 STAINLESS STEEL SLIDE- 36in DECK
ZZPM8090 112 SLIDING POLE (72in DECK)
Activity Panels
ZZPM4290 113 STEERING WHEEL (POST MOUNT)
ZZUN4280 114 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)
Barriers
ZZPM4090 115 CENTERLINE PIPE WALL BARRIER
ZZPM4847 116 CITYSCAPES STOREFRONT PANEL
Climbers
ZZPM7167 117 8ft TWISTED CLIMBER
ZZPM7170 118 8ft TOWER CLIMBER
ZZPM7400 119 DEEP RUNG ARCH CLIMBER (36in DECK)
ZZPM8130 120 BEANSTALK CLIMBER (72in DECK)
ZZPM8140 121 SPIRAL CLIMBER (36in DECK)
ZZPM8280 122 HOPSCOTCH CLIMBER (72in DECK)
ZZPM8939 123 TRANSITION CLIMBER- PLAYMAKER
Overhead Events
ZZPM5770 124 LEG LIFT
ZZPM6936 125 HORIZONTAL LADDER W/ PARALLEL BARS
Audible Activities
ZZPM4467 126 GROUND TO GROUND BABBLE-ON
ZZPM4556 127 7in BELL (POST MOUNT)
ZZPM4558 128 9in BELL (POST MOUNT)
Roofs & Arches
ZZPM9887 229 CARNIVAL ROOF - SMALL PERF (HEX)
ZZPM9898 230 CARNIVAL ROOF HEX CAP
Stairs and Ladders
ZZPM9170 131 24in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
ZZPM9177 132 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
Part No. Description
Design Number: 500-1911 - Bill Of Material
Peak
Ref.No. Quantity
Monday, May 04, 2020 Page of1 2 Playworld.com
Additional Tool & Maintenance Kits
ZZUN1471 133 INSTALLER HARDWARE KIT
ZZUN9910 134 SURFACING WARNING LABEL KIT
ZZUN9930 135 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
ZZXX0678 136 LABEL KIT- COMPOSITE STRUCTURE - ASTM
ZZXXGNGUID 137 GENERAL INSTALLERS GUIDE
Part No. Description
Design Number: 500-1911 - Bill Of Material
Peak
Ref.No. Quantity
Monday, May 04, 2020 Page of2 2 Playworld.com
CertifiedZZPM00161 5in OD X 120in STEEL POST W/ RIVETED CAP
4 268.44 397 0 4.00 0.52 0
CertifiedZZPM00262 5in OD X 132in STEEL POST W/ RIVETED CAP
4 296.84 434 0 4.00 0.48 0
CertifiedZZPM00783 5in OD x 205in STEEL POST W/RIVETED CAP6 691.26 980 0 6.00 0.78 0
CertifiedZZPM01284 5in OD x 192in STEEL POST W/RIVETED CAP6 637.86 921 0 6.00 0.72 0
CertifiedZZPM06165 SQUARE COATED DECK ASSEMBLY 2 180.72 441 8 2.00 0.00 0
CertifiedZZPM06196 HEX COATED DECK ASSEMBLY 2 457.44 1,275 16 4.00 0.00 0
CertifiedZZPM20077 TRANSFER STATION w/TALL GUARDRAIL (36in DECK)
1 155.24 329 2 2.00 0.09 0
CertifiedZZUN20198 APPROACH STEP FOR TRANSFER STATION1 35.83 72 1 1.00 0.04 0
CertifiedZZPM29069 STAINLESS STEEL SLIDE- 96in DECK2 435.80 896 4 8.00 0.12 2
CertifiedZZPM290710 STAINLESS STEEL SLIDE- 72in DECK1 186.00 368 2 4.00 0.06 1
CertifiedZZPM291611 STAINLESS STEEL SLIDE- 36in DECK1 129.90 286 2 4.00 0.06 1
CertifiedZZPM809012 SLIDING POLE (72in DECK) 1 71.37 178 1 1.00 0.03 1
CertifiedZZPM429013 STEERING WHEEL (POST MOUNT) 1 8.67 47 1 0.25 0.00 1
CertifiedZZUN428014 TELESCOPE (PIPE WALL MOUNT FOR 4in RUNG CENTERS)
1 12.33 61 1 0.50 0.00 1
CertifiedZZPM409015 CENTERLINE PIPE WALL BARRIER 1 37.22 95 0 0.50 0.00 0
CertifiedZZPM484716 CITYSCAPES STOREFRONT PANEL 1 45.30 349 2 1.50 0.00 1
CertifiedZZPM716717 8ft TWISTED CLIMBER 1 142.07 263 2 2.00 0.60 1
CertifiedZZPM717018 8ft TOWER CLIMBER 1 126.96 277 2 2.00 0.90 1
CertifiedZZPM740019 DEEP RUNG ARCH CLIMBER (36in DECK)1 95.42 197 2 2.00 0.06 1
CertifiedZZPM813020 BEANSTALK CLIMBER (72in DECK) 1 103.79 439 2 1.50 0.03 1
CertifiedZZPM814021 SPIRAL CLIMBER (36in DECK) 1 91.17 197 2 1.50 0.04 1
CertifiedZZPM828022 HOPSCOTCH CLIMBER (72in DECK) 1 101.06 186 2 2.00 0.06 1
N/AZZPM893923 TRANSITION CLIMBER- PLAYMAKER 1 60.14 233 2 2.50 0.00 1
CertifiedZZPM577024 LEG LIFT 1 7.20 33 1 0.50 0.00 1
CertifiedZZPM693625 HORIZONTAL LADDER W/ PARALLEL BARS1 136.23 273 1 1.00 0.00 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1911 - Compliance and Technical Data
Peak
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
Monday, May 04, 2020 Page of1 3 Playworld.com
CertifiedZZPM446726 GROUND TO GROUND BABBLE-ON 1 45.47 248 2 1.50 0.00 1
CertifiedZZPM455627 7in BELL (POST MOUNT) 1 4.93 43 1 0.25 0.00 1
CertifiedZZPM455828 9in BELL (POST MOUNT) 1 6.53 47 1 0.25 0.00 1
CertifiedZZPM988729 CARNIVAL ROOF - SMALL PERF (HEX)2 536.74 1,526 0 6.00 0.00 0
CertifiedZZPM989830 CARNIVAL ROOF HEX CAP 2 12.22 294 0 0.50 0.00 0
CertifiedZZPM917031 24in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 174.86 374 1 2.00 0.00 0
CertifiedZZPM917732 36in ACCESSIBLE STEPPED PLATFORM (DECK TO DECK)
1 286.99 640 2 1.50 0.00 0
N/AZZUN147133 INSTALLER HARDWARE KIT 1 57
CertifiedZZUN991034 SURFACING WARNING LABEL KIT 1 0.05 1 0 0.25 0.00 0
N/AZZUN993035 PIPE SYSTEMS MAINTENANCE KIT W/ AEROSOL
1 90
N/AZZXX067836 LABEL KIT- COMPOSITE STRUCTURE - ASTM1 0.04 TBD 0 0.08 0.00 0
N/AZZXXGNGUID37 GENERAL INSTALLERS GUIDE 1 1
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1911 - Compliance and Technical Data
Peak
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
952 2,157 12,545 63 76.08 4.595,582.09 20Totals:
13 Metric Tons971 Kg428 Kg2,511.94 Kg 3.49 m3
Monday, May 04, 2020 Page of2 3 Playworld.com
DescriptionConcrete
(Yds3)
TotalWeight
(lbs) Users
Design Number: 500-1911 - Compliance and Technical Data
Peak
Pre-Consumer
Recycled Content(lbs)
CO2eFootprint
(kgs)InstallHours
Ref.No.
Reference Document: ASTM F1487
UnitASTMStatus
ActivePlay
Events
Post-
Part No. Qty.
The lay-out for this custom playscape, design number 500-1911, has been configured to meet the requirements of the ASTM F1487 standard. In addition, each of the above components listed as "Certified" have been tested and are IPEMA certified. Components listed as "Not Applicable" do not fall within the scope of the ASTM F1487 standard and have not been tested. IPEMA certification can be verified on the IPEMA website, www.ipema.org. In the interest of playground safety, IPEMA provides a Third Party Certification Service which validates compliance.
The CO2e (carbon footprint given in Kilograms and Metric Tons) listed above is a measure of the environmental impact this play structure represents from harvesting raw materials to the time it leaves our shipping dock. Playworld Systems nurtures a total corporate culture that is focused on eliminating carbon producing processes and products, reducing our use of precious raw materials, reusing materials whenever possible and recycling materials at every opportunity. Playworld Systems elected to adopt the Publicly Available Specification; PAS 2050 as published by the British Standards Institute and sponsored by Defra and the Carbon Trust. The PAS 2050 has gained international acceptance as a specification that measures the greenhouse gas emissions in services and goods throughout their entire life cycle.
The lay-out was also designed to meet the 2010 Standards published 15-Sep-2010, by the Department of Justice when installed over a properly maintained surfacing material that is in compliance with ASTM F1951 "Accessibility of Surface Systems Under and Around Playground Equipment" as well as ASTM F1292, "Impact Attenuation of Surfacing Materials Within the Use Zone of Playground Equipment", appropriate for the fall height of the structure.
Installation times are based on one experienced installer. A crew of three experienced individuals can perform the installation within the given time, each member working 1/3 of the given hours. [Eg. Installation Time = 30 hours. For a crew of three, each member will work 10 hours on the installation for a total of 30 hours on the project.]
A measurement, in pounds, that qualifies the amount of material that was captured as waste and diverted from landfill during an initial manufacturing process and is being redirected to a separate manufacturing process to become a different product. E.g. 100% of our Aluminum Tubing is made from captured waste material during the manufacturing process of extruded Aluminum products such as rods, flat bars and H-channels.
A measurement, in pounds, that qualifies the amount of material that was once another product that has completed its lifecycle and has been diverted from a landfill as a solid waste through recycling and is now being used in a Playworld Systems' product. E.g. **20% to 40% of the steel in our steel tubing and sheet steel have been diverted from landfills. Automobiles are scrapped and recyclable steel is purchased by the steel mill that produces our raw product.** The amount of Post-Consumer recycled steel fluctuates daily based on the availability of the recycled steel.
ASTM F1487
2010 ADA Standards for Accessible Design
Installation Times
Carbon Footprint
Pre-Consumer Recycle Content
Post-Consumer Recycle Content
Monday, May 04, 2020 Page of3 3 Playworld.com