Eric Michael Leelandscape architecture porfolio
Where urban meets nature is where I work.
i
As a young teen I began helping my mother around the yard with creating flowerbeds and thinking about what we would put in bed to complement its surroundings. Then when the plants kept dying I began to research how to make plants grow, and tested the soil pH, and nutrients at my high school. Once I could keep the plants alive my mother got my design work with some of our neighbors, and I started composing designs on paper before I built them. This gave me a better respect for the landscape.
A year later my high school had the class do a survey to project our interests into possible careers, my top choice was landscape architecture. I had no idea what this was and began to research the profession. This is when I found the University of Kentucky’s Landscape Architecture program. Near the end of my Junior year in high school I visited the program and took their aptitude test. By the beginning of my senior year I have been accepted to the program.
I did not know that I was in love with the profession for many years before I came to college.
How I found my passion in Landscape Architecture
ii
RESUME
EducationUniversity of KentuckyDegree: Bachelor of Science in Landscape ArchitectureExpected graduation date: May 2015GPA: Fall 2014 Semester, 3.5. Cumulative, 2.97
Relevant CoursesSoils formation, soil typology, plant morphology, plant identification, urban design studios ArcGIS, water management, urban and regional planning.
Eric Michael Lee1550 Trent Blvd. Apt. 2402Lexington, Kentucky 40515p: [email protected]
SkillsAuto Cadd, Adobe Creative Suit, Microsoft Office, Sketch-up, and ArcGis. Additionally, residential planning, urban infill, comprehensive community design, regional planning, fixture selection, planting selection, parks and recreation, regional greenways, construction details, grading and drainage, stream restoration, plaza designs, signage designs, restoration, and sustainable landscape designs
Community WorksLegacy Home Spring 2012 Volunteered for installation of a class design for an assisted living home in Lexington, Ky.The Learning Center TLC Fall 2013 Volunteered for installation of a class design for an alternative high school in Lexington, Ky.KYASLA 2015 Volunteered for set up and map making during the conference in Newport, Ky.Creative Tour 2015 Partner with Vanderbelt Curb Scholars to travel and learn about different creative methods in Louisville, Ky. and St. Louis, Mo.
Eric Michael Lee / Landscape Architectureiii
Awards / AcknowledgementsAgriculture Scholarship; Fall 2010Deans List; Spring 2013, Fall 2014Interviewed for Ag Magazine 2015 Spring Edition (January)Teachers assistant for Grading and Drainage, Spring 2015
RESUME
ExperienceLandscape Architecture Department University of Kentucky May 2014 to September 2014 Position: Research / Illustrations Intern- Create presentables in ArcGIS, Photoshop, Illustrator, InDesign, & AutoCAD Phone: 859-257-7295 ext. Jayoung Koo
Cheddars April, 2011 to Present Position: Server / Bartender- Serve food and tender sales. Supervisor: Clayton C. Location: Lexington, KY - Tates Creek Phone: 859-272-0891
First Class Cut October, 2009 to October, 2010 Position: Team Manager / Founder- Over-see crew members. Supervisor: Scott Inman Location: Owensboro, KY Phone: n/a
Dr. Tom Niemanp. 859-552-3532h. [email protected] Known: 5
Dr. Ryan Hartgrovep. 859-948-3155w. [email protected] Known: 5
Dr. Jayoung Koow. [email protected] Known: 3
iv
References
Bullitt County Greenway
Shepherdsville, Kentucky
“Understand your part in the project along with everyone else’s part, so
you know and understand the entire project.”
3 Eric Michael Lee / Landscape Architecture
THE magazineSPRING 2015
Image by Steven Patton for the University of Kentucky Ag Magazine January edition. The focus of the magazine was people that were a
for the College of Agriculture, Food and Environment (CAFE). This included professors and students that are involved in projects that are unique and promote Kentucky. This article highlighted Assistant Professor Dr. Jayoung Koo and the work that she has been involved in for the past years around Kentucky. The project she is working on here is a greenway project for Bullitt County Kentucky. The plan is for a hike and bike trail to connect northern Bullitt County to Bernheim Forest in the south.
Trailblazer
Article by Katie Pratt,2014 4
Bullitt County Greenway
This project began in the summer of 2014 when the county government of Bullitt County approached Dr. Jayoung Koo (professor at the University of Kentucky) about doing a feasibility study to decide if there were any connections for a trail from Floyds Fork to the entrance of Bernheim Forest. The summer portion was conducted with a team of four students. All of the work depicted within was either created or modified greatly by Eric Lee. The summer internship focused on a single trail connection and also was used to gather information about the county. Additionally, the internship
allowed the team to understand the direction that the community would like for this trail to go toward in the future. The summer portion was completed during the 2014 Fall studio. In this studio the emphasis shifted from a single trail to a county wide system that would highlight Bullitt Counties amenities. This class split into 6 groups and came up with different alternatives for the community to see the potential of their town. The greenway will act as a growth boundary because of the unplanned sprawl of the population. Not only will the greenway contain the population, and connect the cities and promote them regionally.
Project Type:Regional Planning
Location:Shepherdsville, Bullitt County, Kentucky
Size:300 square miles
Time:Fifth Year - First Semester
Existing Issues:Low connectivity between cities around the county, no county parks, only 3 city parks, little public green space, and few tourist attractions.
Bullitt County
5 Eric Michael Lee / Landscape Architecture
Bird’s eye of Park System
Aerial view of The Big Level Adventure Park’s helicopter tour and Adventure Lodge. (Fall Semester)
Millanova
Con�uence
Bernheim Four Roses
Shepherdsville
Mt. Washington
Millanova
Con�uence
Bernheim Four Roses
Shepherdsville
Mt. Washington
Millanova
Con�uence
Bernheim Four Roses
Shepherdsville
Mt. Washington
Trail OptionsBullitt County
Preliminary Trails Options These trails were created using ESRI ArcGIS during the summer of 2014 for an internship with the University of Kentucky Department of Landscape Architecture. The above maps are of different trail options that the community and the team where interested in connecting. (Internship)
Flow Chart: Neighborhood Connections
Buffer Convert
to Raster
Reclass
Select
Parcels
Convert
to Raster
Reclass
Buffer Convert
to Raster
Reclass
Reclass
Raster Calculator
Cost Distance
Cost Backlink
Cost Distance
Cost Backlink
Confluence Route
Bridge Route
Stre
ams
Neig
hbor
hood
Bo
unda
ry
Slop
e Ci
ty
Boun
dary
Summer Internship 2014 These flow charts were created for Bullitt County to find a potential connector trail from the confluence of Floyds Fork and Salt River in northeastern Bullitt County, to the entrance of Bernheim Forest to the south.(Internship)
Millanova
Con�uence
Bernheim
Shepherdsville
Mt. Washington
Photoshop / Esri / Illustrator 6
7 Eric Michael Lee / Landscape Architecture
City Population Centers Bullitt County has four notable cities; (largest to smallest) Shepherdsville, Mt. Washington, Hillview, and Lebanon Junction.
Existing ConservationConservation areas in Bullitt County are very Fragmented and do not allow for an effective travel of plants and animals through the county. (Areas as shown in Bullitt County 2013 Comprehensive Plan)
County Amenities Existing places that are interesting, functional and tourism destinations. (Gathered by Karyn Loughrin)
County Greenway PlanThe focus areas were chosen to create growth boundaries around the two largest cities (Shepherdsville and Mt. Washington). This is to contain their sudden growth into the county and keep the integrity of their identity of a rural business town. (Fall Semester)
Esri / Illustrator 8
Main Trail TypeThis is an example of the main trail and the expected functions that will take place on them. There will be portions that have open lawns.
Rugged Hike & Bike TrailThe off-road type trails will be crossed by Zip-lining. These trails will be shared by experienced hikers and mountain bikers.
Natural Grassland10 Feet
Maintained Lawn
Natural Grassland Natural Grassland8 Feet
9 Eric Michael Lee / Landscape Architecture
Big Level Adventure ParkThe focus of this park was to create a rural adventurous place where the region could come and enjoy themselves. Additionally, there are connections to distilleries and wineries. Local spirits venders will have satellite shops inside the park run by them. This is a way to promote local business and tourism. (Fall Semester)
Hiking
Walking
Biking
Mountain Biking
Helicopter Tour
Trail Head
Avian Habitat
Aquatic Habitat
Terrestrial Habitat
Grassland
Forest
Plant Habitat
InDesign / Photoshop / Esri / Illustrator 10
NoLi Revitalization
Lexington, Kentucky
NoLi Revitalization
The North Limestone (NoLi) project was a design geared toward revitalizing a part of Lexington that has been in a decline for many years. This area has had many identities over it’s life, this plan would like to take the area in a new direction. One that welcomes local stores, entrepreneurs, and night life to the area. As of now the area is predominantly low income residential. Also, with unique historical industries. These include the first bus station in Lexington, Kentucky that began as a Grey Hound station in the 1950’s, and one remaining train stop, and warehouse.
The design would increase vegetation by over 75 percent, slow traffic, increase walkability, and bikeability. There are a few interested parties invested in the future of the area. One of which was the NoLi Community Development Corporation (NoLi CDC) that worked toward bringing new businesses to the area, as well as, turning homes to promote residential growth. This design will phase in the programmatic elements to make the transition more cost effective, and allow for potential investors to see and experience the change. This site would then act as a catalysis for the surrounding neighborhoods.
Project Type:Urban Planning / Revitalization
Location:North Limestone RoadLexington, Kentucky
Size:5.3 acres
Time:Fourth Year - Second Semester
Existing Issues:Vacant buildings, low income housing, little businesses, and food desert.
North Limestone
13 Eric Michael Lee / Landscape Architecture
Pedestrian Corridor
Illustrating new shops and the new corridor for pedestrian traffic, including a crosswalk with a different paving pattern.
Nor
th B
road
way
Loudon Avenue
Lim
esto
ne
Bryan Avenue
Nor
th B
road
way
Loudon Avenue
Lim
esto
neBryan Avenue
Nor
th B
road
way
Loudon Avenue
Lim
esto
ne
Bryan Avenue
Existing Sidewalks: This diagram illustrates the disconnect of the sidewalks on the site. This was noted as a major problem for connectivity in and around the site. This road is wide and is underutilized.
Existing Vegetation: There is very little vegetation on the site, which made the site hot in the summer, and very cold and windy in the winter.
Underutilized Buildings: Some of these buildings are being used and others are vacant. The buildings that are being used are not being used fully. They are focused around the intersection.
InDesign / Photoshop / Illustrator 14
Phase III: This phase makes all spaces permanent. The warehouse is sub-divided into shops, Bryan Ave has trees planted in the ground. Fresh Food Mart becomes an actual building. Additionally, alternative trails are built. Brick Crosswalks and bike lanes are painted in colorfully.
Nor
th B
road
way
Loudon Avenue
Lim
esto
ne
Bryan Avenue
Phase I: This phase introduces streetscape planting, standard painted crosswalks, pop-up farmers market in parking lot, and painted vacant store fronts.
15 Eric Michael Lee / Landscape Architecture
Fresh Food Mart
Restore Wooded Area
Alternative Path then the Sidewalk
Rooftop Diner Patio
Rooftop Diner Patio
Phase II: Phase II created more permanent spaces, by adding medians to the road, a structure to the farmers market, painting colorful and marketable crosswalks, closing Bryan Ave. to through traffic.
Nor
th B
road
way
Loudon Avenue
Lim
esto
ne
Bryan Avenue
Sub-divided Shops
Bryan Ave. Closed for Pedestrians
Brick Crosswalks
Pedestrian Corridor
InDesign / Photoshop / Illustrator 16
Bryan Ave. Corridor
Displaying the Bryan Avenue pedestrian corridor. This corridor will be home to Night Markets, and will attract local vendors also, be the ground for seasonal beirgarten, offering local brews and foods.
17 Eric Michael Lee / Landscape Architecture
Phase I Phase II Phase III
Bryan Ave.
Hand Render / InDesign / Photoshop / Illustrator 18Loudon Ave. Corridor
Rainfall
Soak In
Excess Water
Christ Church Campus Plan
Lexington, Kentucky
Christ Church Campus Plan
Christ Church Cathedral is the oldest church in Lexington, Kentucky established in 1796. The church has been acquiring property to accommodate its’ expansion in congregation and community works. The church has asked for a comprehensive plan for the future growth of the church and their current needs. This design meets all of their requirements, notably more safer accessible parking, outdoor green space, and outdoor venue for their renowned choir. Christ Church is located in downtown Lexington, this is an interesting challenge. The goal is to bring people from
downtown venues to the site. During services, members of the congregation walk up to a 3/4 mile from their parking. This is a problem, the fact that a church of this size does not have ample parking for its members. Granted parking in a downtown setting is hard to come by, this will be a constraint in the program forcing logical parking vertical. The key is for the parking to not over power the church in height or architecture. The next task that is pressing is safe crossing from parking to services. This plan achieves this with a change in road materials and colors.
Project Type:Urban Planning / Campus Planning
Location:166 Market StreetLexington, Kentucky
Size:3.2 acres
Time:Fourth Year - Second Semester
Existing Issues:Low connectivity between church owned properties. Poor circulation, and vehicle traffic. Parking is only large enough for 1/3of the congregation.
Christ Church Cathedral
21 Eric Michael Lee / Landscape Architecture
Amphitheater
View from the top the amphitheater down to the event stage. The event space is mainly for the churches choir.
Pedestrian Crossing This diagram shows where pedestrians cross the roads surrounding Christ Church Cathedral on days of service. The darker the color, the higher frequency of foot traffic crossing the roadway. The less frequent foot traffic will be lighter. Pedestrians do not always cross at crosswalks, they will j-walk from the garage or from on-street parking or adjacent parking lots. This creates a major safety problem.
PARKING GARAGE
CHURCH
PARKING GARAGE
CHURCH
Existing Patterns Shown is the speed of the roadways adjacent to Christ Church Cathedral, and their direction. Additionally, where painted-in or visible crosswalks are located. As you can see, there is not a cross walk in the location of the majority of the foot traffic is concentrated. This is something that will be addressed in the design. The roadway that does not have a crossing is two lanes and the average actual speed of the vehicles is 39. (Speed recorded in group by Eric Lee)
Actual Pedestrian Crossing
Crosswalks and Speed
Sketchup / InDesign / Photoshop / Illustrator 22
23 Eric Michael Lee / Landscape Architecture
Campus Master Plan
7
8
9
3
2
1
4
56
Apartment Rooftop Patio accessible to residents of the apartment and the customers from the first floor cafe. From the rooftop you have great views of downtown.
Kids Rooftop Playground available to the congregation from within the building. Also there is a seating area for the parents.
1
2
3
4
5
6
7
8
9
Drop-off
Apartment Rooftop
Rooftop Playground
Christ Church
Pedestrian Way
Brick Crosswalk
3 Story Parking
Outdoor Stage
Amphitheater
2
3
InDesign / Photoshop / Illustrator 24
25 Eric Michael Lee / Landscape Architecture
Park Space Graffiti
Public space with a park feel to bring people into the site and give the community a gathering place that is comfortable.
Blocking Views is used to create spaces that separate you from the downtown setting to direct your attention. Additionally, the berm and vegetation block traffic (if you are in the space) and the parking (if you are outside the space).
Pedestrian Vista between the apartment (left) and school (right)buildings. This space has been changed from vehicle dominated to pedestrian only. Before it was purely functional and now will provide seating, water features, human scale vegetation, and patio space for the cafe. The rail on the rooftops is glass to allow for people to see out and down into the pedestrian vista.
Market Street Drop-off is the new drop-off that allows for the congregation to enter into a new reception area to allow for a safer campus. This entry takes you directly to the services area. The location of the drop-off allows for a vehicle to drop off their loved ones and drive around the block to park in the garage. This building is the school, office space, daycare and playground (roof). This makes the interior space as versatile as the exterior.
Amphitheater Berm doubles as seating for the churches choir and open lawn for picnics, lounging, meeting, vendor space, outdoor classrooms, and many more. This space has the volume to handle large groups and smaller niches for more personal gatherings.
Hand Render / Sketchup / InDesign / Photoshop / Illustrator 26
Technical Drawings
Lexington, Kentucky
Technical Drawings
29
Grading and Drainage
30
The Learning Center
Outdoor Cafe and classroom for an alternative high school in Lexington, Kentucky. The project was designed by Qianhui Miao in the Materials and Methods course at the university of Kentucky. Her design was picked by the school out of the class. The class then divided into groups to construct her design. I, along with a few other students constructed the drystone walls, with the supervision of the Drystone Conservancy in Lexington.
4 feet
1 foot
1 foot
1 foot
Foundation 4"
Tie stone
6" Batter
Crushed stone core
Cap stone ~3"
Coping
2 feet28 inches
9-12"
PRO
DU
CED
BY
AN
AU
TOD
ESK
ED
UC
ATI
ON
AL
PRO
DU
CT
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
PRO
DU
CED
BY A
N A
UTO
DESK
EDU
CA
TION
AL PR
OD
UC
T
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCT
Drystone Wall Detail
31 Eric Michael Lee / Landscape Architecture
32
Step 1: Foundation
Seating
Permeable Concrete
Step 2: Batter
Step 3: Cap & Coping
Wider then the intended wall to prevent tipping
Batter at 6:1 (angle of wall). One foot intervals (vertically) place tie that runs the width of wall 18” O.C. (length).
Cap covers the entire top of wall. Placed on top is the coping, 1 foot tall.