erin yamada resume_portfolio

7
erin yamada 22137 Burbank Blvd. #7, Woodland Hills, CA 91367 310.502.7544 [email protected] 09.00 - 06.03 09.96 - 06.00 University of California, Los Angeles_Los Angeles, CA. M. Arch I degree, 06.03. Stanford University_Stanford, CA. B. A. degree in Human Biology, 06.00. Investigated the interplay between physiology and psychology/ sociology as related to health and human performance. Overseas Program in Florence: film theory, architectural/ art history. Systematic design thinking, information design, diagramming. education 01.04 - 05.05 05.05 - 11.05 11.05 - 08.06 08.06 - 03.09 Architectural Designer, Gensler_Santa Monica, CA. Space planning, design development, construction documentation, and client presentation drawings for corporate interior, retail, museum, and educational projects. Architectural/ Interior Designer, Bush Interiors_Marina del Rey, CA. Interior design and construction administration for boutique surgery center in collaboration with client and understanding of end users. Fixture, lighting, finish, furniture selection. Architectural Designer, Barton Phelps & Associates_LA, CA. Developed innovative design concepts for residence with client collaboration. Construction documentation and consultant coordination. Job Captain, William Hefner Architecture_LA, CA. Led construction documentation and permit coordination for residential projects. Consultant coordination, code research, fixture/ lighting/ finish selection. 08.09 - 06.10 Project Architect, Hayne Architects_Malibu, CA. Participated in client meetings, led construction documentation, and collaborated with consultants, contractors, and city officials for residential projects. Code research. 12.11 - 09.12 Project Architect (Consultant), Equinox_Los Angeles, CA. Conducted interviews with club managers, collaborated with design and construction teams to develop design solutions consistent with brand. Construction documentation/ management. 08.14 - 11.14 Job Captain, Shlemmer Algaze Associates_Culver City, CA. Space planning, construction documentation, consultant coordination, construction administration for medical and corporate interior projects. 12.10 - 07.11 Project Manager (Consultant), Fleetwood Fernandez_Santa Monica, CA. Led design development, construction documentation, construction adminstration for corporate interior and residential projects. Consultant/ permit coordination. experience AutoCAD, Vectorworks, Illustrator, Photoshop, Sketch Up, Microsoft Office LEED Accredited Professional skills

Upload: erin-yamada

Post on 07-Apr-2016

223 views

Category:

Documents


0 download

DESCRIPTION

 

TRANSCRIPT

Page 1: Erin Yamada resume_portfolio

erin yamada22137 Burbank Blvd. #7, Woodland Hills, CA 91367

310.502.7544 [email protected]

09.00 - 06.03

09.96 - 06.00

University of California, Los Angeles_Los Angeles, CA. M. Arch I degree, 06.03.

Stanford University_Stanford, CA. B. A. degree in Human Biology, 06.00.

Investigated the interplay between physiology and psychology/ sociology as related to health

and human performance. Overseas Program in Florence: film theory, architectural/ art history.

Systematic design thinking, information design, diagramming.

e d u c a t i o n

01.04 - 05.05

05.05 - 11.05

11.05 - 08.06

08.06 - 03.09

Architectural Designer, Gensler_Santa Monica, CA.

Space planning, design development, construction documentation, and client presentation

drawings for corporate interior, retail, museum, and educational projects.

Architectural/ Interior Designer, Bush Interiors_Marina del Rey, CA.

Interior design and construction administration for boutique surgery center in collaboration with

client and understanding of end users. Fixture, lighting, finish, furniture selection.

Architectural Designer, Barton Phelps & Associates_LA, CA.

Developed innovative design concepts for residence with client collaboration. Construction

documentation and consultant coordination.

Job Captain, William Hefner Architecture_LA, CA.

Led construction documentation and permit coordination for residential projects. Consultant

coordination, code research, fixture/ lighting/ finish selection.

08.09 - 06.10 Project Architect, Hayne Architects_Malibu, CA.

Participated in client meetings, led construction documentation, and collaborated with

consultants, contractors, and city officials for residential projects. Code research.

12.11 - 09.12 Project Architect (Consultant), Equinox_Los Angeles, CA.

Conducted interviews with club managers, collaborated with design and construction teams to

develop design solutions consistent with brand. Construction documentation/ management.

08.14 - 11.14 Job Captain, Shlemmer Algaze Associates_Culver City, CA.

Space planning, construction documentation, consultant coordination, construction

administration for medical and corporate interior projects.

12.10 - 07.11 Project Manager (Consultant), Fleetwood Fernandez_Santa Monica, CA.

Led design development, construction documentation, construction adminstration for

corporate interior and residential projects. Consultant/ permit coordination.

e x p e r i e n c e

AutoCAD, Vectorworks, Illustrator, Photoshop, Sketch Up, Microsoft Office

LEED Accredited Professional

s k i l l s

Page 2: Erin Yamada resume_portfolio

BAKERY/COMMUNITY CENTER_downtown

open to below

open to below open to below

open to below15

15

15

15

15

16 17

1717

17 17

22

2 29 10

12

2

34

56

7

8

11

12

13

14

9 10

1 lobby2 office3 exhibition4 bread sales5 cafe6 kitchen7 public courtyard8 bakery9 women's restroom10 men's restroom11 lockers12 private courtyard

1415 classroom16 storage17 office for classroom

a locus of community hybridity, this bakery for Homeboy Industries provides work and education for ex-cons and those at risk, as well as exhibition and commercial space for public involvement. at the interface of chinatown, olvera street, and little tokyo, the site is already charged with cultural energy. the bakery funnels in these diverse flows to provoke chance encounters and narrations. Visual, aromatic, and programmatic layering incite a continual transformative experience. a multiplicity of entries, a folding roofscape, and an extended public stair provide endless permutations of spatial and sensory fragments.

Page 3: Erin Yamada resume_portfolio

DATE

SCALE

SHEET

® COPYRIGHT 2005 WILLIAM HEFNER ARCHITECTURE AND INTERIORS INC. ALL RIGHTS RESERVED

323 931-1365 [email protected] 931-1368 fax

5820 Wilshire Boulevard, Suite 500

Los Angeles, California 90036

W I L L I A M H E F N E R

A r c h i t e c t u r e I n t e r i o r s L a n d s c a p e

INC

FIRST FLOOR PLAN

1/4" = 1'-0"

A101

WILLIAM HEFNER ARCHITECT WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHERS’ FAILURE TO OBTAIN AND/OR FOLLOW WILLIAM HEFNER ARCHITECT GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES OR CONFLICTS WHICH ARE ALLEGED.

REVISION 404 MARCH 2009

WALLACE & FRIEDMAN RESIDENCE842 GREENTREE ROAD PACIFIC PALISADES, CA 90272

9'-9"

LIVING ROOM104

101ENTRY

PANTRY107

LAUNDRY109

STO

RAG

E

APP

LIA

NC

EST

ORA

GE

KITCHEN106

2 CAR GARAGE112

HALF BATH110

MUD ROOM111

POWDER ROOM102

GLASS STORAGE

DN

UP

DINING ROOM105

FAMILY ROOM103

TV

103

104

106

107

108

109

110

111

112

113

114115

116

117

118

119

120

121

122

123

124

125

126

127

A

BCD

G

MECHANICAL SHAFT

17T AT 11 1/2"

18R AT 7.22"

26

1

21

89

2

34

14

27

14

3

14

14

2'-0" MIN

14

3'-0

"

12

13 14 15

-1-2-3

2

A2.1

1

A2.1

A2.

2

1

A2.

2

2

MECH. SHAFT

2'-0" MIN

101

5'-10" 8'-4" EQ EQ 8'-4" 5'-10"

5'-0

"5'

-0"

5'-0

"3'

-7"

4'-6

"11

"6'

-2"

1'-1

0"

2'-4

"1'

-10"

12'-3

"6'

-2"

5'-0

"1'

-2"

5'-0

"5'

-0"

6'-7

"

2'-6

"

5'-0

"5'

-0"

6'-7

"

2'-1

0"2'

-8"

5'-0

"5'

-0"

1'-1"

3'-4" 5'-1 1/2" 6'-6"

1'-2"

1'-7" 4'-10" 5'-10" 9"

EQ 5'-6" 5'-6"

2'-6"

2'-6"

14

6'-8" 18'-7"

2'-7"

19

14'-9"

14'-2"

CU

TTIN

G B

OA

RDPU

LLO

UT

TRA

SH

PULL

OU

T

SILV

ERW

ARE

& S

ERV

ING

PIEC

ES

4'-0

"

3' HIGH COUNTER

14

1

1

15'-9"

J

REF

W/D

DW

SUBZ

ERO

36"

REFR

IGER

ATO

RSU

BZER

O36

" FR

EEZE

R

DW

3456789101112

16

21T AT 11.5"

23R AT 6.70"

2'-6"

322

A3.

2

8

A5.3

1" TY P

1/4"/FT SLOPE

3A3.2

EQ

1'-3"

14

ALI

GN

ALI

GN

3

A5.4

6'-3

"

1'-9"2'-0"EQ

S4

FE

89

17 16

2'-0

"

2'-0

"

DEN / PLAYROOM108

FF = 99.58'

FF = 99.83'

FF = 99.83'

FF = 99.75'

FF = 99.75'

FF = 99.50'

W/D

105

21

WIN

E RE

F

CENTRAL VACCUUM

12" CLR

9" 5'-7" 5'-10" 5'-7"

21

5'-6

"

4'-0" 10'-0"

7"

1

BIKE RACK

BIKE RACK

14

4'-3

"

8'-4 1/2"

RECESSED CAB. RECESSED CAB.

3" SLOPE

2'-0"

14

26

EQ EQIH

1A

3.2

2'-4"

3'-3" 3'-3"

3"

1'-0

"3'

-8"

1'-2

"

4'-1

"

MANTEL ALLOWANCE $5,000 MANTEL ALLOWANCE $5,000

33 33

3

A5.4

EQ

PTD. WOOD PANEL

PTD. WOOD PANEL

PTD. WOOD PANEL EQEQ

3'-9" CLR

2'-1

"

K

23

3'-9

" C

LR

7

A5.3

2'-6

"

MIN

1A3.1

L21

LINEN CHUTE

5

A5.9

42" ISOKERNICBO #5017

16

42" ISOKERNICBO #5017

17

1

A5.7

5'-0

"5'

-0"

EQ

37ALL FIRST FLOOR

3'-1

1"

2'-8

"

5'-0"

1'-0"

CLR

MEC

H. S

HA

FT

WARMINGDRAWER

ELEVATOR

4'-8" CLR

4'-6

" C

LR 3'-8

"

ELEVATOR

37ALL PATIO

CLO

SET

129

3'-3"

3

3

3

33

48" DCSBBQ GRILL

5'-0

"

A

B

C

D

E

18'-7

"16

'-1"

8'-6

"

19'-8"6'-0"19'-8"10'-3"22'-1"

45'-4"32'-4"

3 4 5 61 2

77'-8"

16'-0

"

24'-7

"34

'-7"

59'-2

"

NEW 2x8 STUD WALL

NEW 2x6 STUD WALL (EXTERIOR)

NEW 2x6 STUD WALL (INTERIOR)

NEW 2X4 FLAT STUD WALL

SMOKE DETECTORS

CENTER LINEC L

DOORS. SEE SCHEDULEON GN

WINDOWS. SEE SCHEDULEON GN

#

#SEE PLANSFOR NUMBER

#

#

#

#

SEE PLANSFOR NUMBER

LEGEND:

A. DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN.

B. VERIFY ALL EXISTING CONDITIONS AND INFORM ARCHITECT OF ANY DISCREPANCY.

C. CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION

D. UNLESS NOTED OTHERWISE, ALL DIMENSIONS ARE TO THE FACE OF MASONRY OR FACE OF STUD.

E. INSULATION: PROVIDE R-19 MIN. INSULATION AT ALL EXTERIOR & INTERIOR WALLS, INCLUDING GARAGE. PROVIDE R-30 MIN. INSULATION AT ROOF. REFER TO TITLE 24 FOR ADDITIONAL REQUIREMENTS. PROVIDE R-30 INSULATION BETWEEN FLOORS FOR SOUND CONTROL. INSULATE AROUND PLUMBING PIPES.

F. ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING AND MECHANICAL PLANS AND INFORM ARCHITECT OF ANY DISCREPANCIES. ALL REQUIRED FURRING, SOFFITS AND CEILING JOISTS FOR VOLUME CEILINGS SHALL BE INCLUDED IN BID.

G. REFER TO REFLECTED CEILING PLANS, BUILDING SECTIONS AND INTERIOR ELEVATIONS FOR VOLUME CEILING.

H. NON- STRUCTURAL FRAMING MAY NOT BE SHOWN ON STRUCTURAL PLANS. ROUGH CARPENTER TO REVIEW ALL ARCHITECTURAL SHEETS FOR CLEAR UNDERSTANDING OF WORK TO BE INCLUDING IN BID.

I. PROVIDE DRAFTS STOPS AS REQUIRED BY SECTION 708 OF THE 1997 UBC, OR CURRENT BUILDING CODES. ENCLOSE SPACES IN STUD WALLS, PARTITIONS AND FURRED WALLS SHALL HAVE FIRE STOPS AT TOP AND BOTTOM AND AT MID-POINT IN WALLS MORE THAN 10 FEET HIGH. VERIFY WITH STRUCTURAL PLANS.

J. ALL FIRST FLOOR WALLS AND CEILING ARE SKIM COAT DRYWALL (EXCLUDING GARAGE) EXCEPT DINING ROOM AND LIVING ROOM ARE INTEGRAL COLOR PLASTER CEILING. ALL SECOND FLOOR WALLS ARE SKIM COAT DRYWALL AND PLASTER CEILING. M. WATER HEATER MUST BE STRAPPED TO WALL

N. AN APPROVED SEISMIC GAS SHUTOFF VALVE WILL BE INSTALLED ON THE FUEL GAS LINE ON THE DOWN STREAM SIDE OF THE UTILITY METER AND BE RIGIDLY CONNECTED TO THE EXTERIOR OF THE BUILDING OR STRUCTURE CONTAINING THE FUEL GAS PIPING

11

PLAN KEYNOTES:

ONE-HOUR PROTECTION REQUIRED: PROVIDE 5/8" TYPE "X" GYPSUM BD. ON ALL GARAGE WALLS, CEILING, POSTS AND BEAMS SUPPORTING DWELLING AND SHALL EXTEND FROM TOP OF CONCRETE TO, AND INCLUDE GARAGE CEILING. PROVIDE SELF-CLOSING DEVICE ON 20 MIN. DOOR (SEE DOOR SCHEDULE).PROVIDE ONE-HOUR PROTECTION AT WALLS AND CEILING UNDER STAIRS

GARAGE DOOR OPENER PUSH BUTTON SHALL BE PRE-WIRED BEFORE GYPSUM BOARD IS INSTALLED.

PROVIDE STATE FIRE MARSHALL APPROVED SMOKE ALARMS (DETECTORS) AS SHOWN. DETECTORS SHALL BE HARDWIRED TO SEPARATE CIRCUITS WITH BATTERY BACKUP. SMOKE DETECTORS SHALL BE LOCATED IN EACH SLEEPING ROOM, AND CENTRALLY LOCATED CORRIDORS GIVING DIRECT ACCESS TO SLEEPING ROOM. WHEN SLEEPING AREAS ARE ON AN UPPER LEVEL A SMOKE DETECTOR SHALL BE LOCATED IN CLOSE PROXIMITY TO STAIRWAYS. DETECTORS SHALL SOUND AN ALARM AUDIBLE IN ALL SLEEPING AREAS OF THE DWELLING UNIT WHICH THEY SERVE.EXHAUST FAN: SWITCHED TO LIGHT, AND CAPABLE OF 5 COMPLETE AIR EXCHANGESPER HOUR. VENT TO OUTSIDE AIR- SEE SPECIFICATIONS ON REFLECTED CEILING PLAN

WATER HEATER: PROVIDE 18" HIGH WOOD FRAMED PLATFORM WITH "SMITTY PAN" WITH DRAIN TO EXTERIOR LOCATION TO BE APPROVED BY ARCHIECT. STRAP TO WALL PER LACMC 94.510.5

FLOOR DRAIN

DRYER: PROVIDE WEATHER HOOD VENT WITH DAMPER TO OUTSIDE AIR. DUCT TO BE 4" FOR 14' LENGTH MAX WITH (2) ELBOWS. PER M.C. 504.3.2 & 908; PROVIDE BLOWER IF REQUIRED

WATER SOFTENER; CLOSED LOOP

SHOWER ENCLOSURE: PROVIDE TEMPERED GLASS AT ENCLOSURE; WALLS TO BEOF A NON-ABSORBANT FINISH TO A HEIGHT OF 70" AFF MINUMUM (U.N.O.)

BUILT-IN CABINET -- SEE INTERIOR ELEVATIONS AND CABINET DETAILS

WALL NICHE -- SEE INTERIOR ELEVATIONS FOR FRAMING CONDITION

MASONRY FIREBOX WITH A SELECTED BRICK PATTERN (MANTEL ALLOWANCE $5,000) (SEE INTERIOR ELEV.) & A METAL FLUE SYSTEM BUILT IN ACCORDANCE WITH THE STRUCTURAL PLANS AND THE MASONRY INSTITUTE OF AMERICAN STANDARDS. PROVIDECOMBUSTION AIR AS REQUIRED. PROVIDE FUEL GAS WITH LOOSE KEY VALVE. PROVIDE APPROVED SPARK ARRESTER AT CHIMNEY TERMINATION.HEARTH 20" DEEP (MINIMUM) WITH 12" (MINIMUM) FROM SIDES OF FIREBOX; SEE INTERIORELEVATION FOR HEIGHTS

SOAP NICHE -- SEE INTERIOR ELEVATIONS

MEDICINE CABINET

WASHER- PROVIDE RECESSED HOT AND COLD WATER AND DRAIN STANDPIPE. PROVIDE SELF PRIMING FLOOR DRAIN UNDER WASHER.

2

3

4

5

6

7

8

9

19

18

17

16

15

14

11

10

POCKET SCREENS FOR WINDOWS & DOORS -- SEE SCHEDULE21

P. PLUMBING FIXTURE HARDWARE SHALL COMPLY AS FOLLOWS: LOW FLOW (ULTRA FLUSH) TOILETS (1.6 GP FLUSH), SHOWERHEAD (2.5 GPM), AND FAUCETS (2.2 GPM) X PER WATER CONSERVATION CODE REQUIREMENTS.

Q. NOTE: ALL BATHROOMS REQUIRE NATURAL VENTILATION BY MEANS OF OPERABLE WINDOWS @ 1/20 THE FLOOR AREA OF THE ROOM, OR 1 1/2 SF MINIMUM WHICHEVER IS GREATER (NATURAL VENTILATION MAY BE SUBSTITUTED WITH MECHANICAL VENTILATION.)

R. CONNECT ALL ROOF DRAINS TO DRAINAGE SYSTEM AND DIRECT TO STREET. PER CODE.

S. PROVIDE 70 INCH HIGH NON-ABSORBENT WALL ADJACENT TO SHOWER ANDAPPROVED SHATTER-RESISTANT MATERIALS FOR SHOWER ENCLOSURE.

T. PROVIDE AN ALARM FOR DOORS TO THE DWELLING THAT FORM A PART OF THE

POOL ENCLOSURE. THE ALARM SHALL SOUND CONTINUOUSLY FOR A MIN. OF 30

SECONDS WHEN THE DOOR IS OPENED. IT SHALL AUTOMATICALLY RESET AND BE

EQUIPPED WITH A MANUAL MEANS TO DEACTIVATE (FOR 15 SECS. MAX.) FOR A

SINGLE OPENING. THE DEACTIVATION SWITCH SHALL BE AT LEAST 54" ABOVE THE

FLOOR. (RGA 14.67)

U. SLEEPING ROOMS MUST HAVE A WINDOW FOR EMERGENCY EXIT W/ SILL HEIGHT

NOT OVER 44" ABOVE FINISH FLOOR, 24" CLEAR HEIGHT, AND 20" CLEAR OPENING

WIDTH.

V. ALL HABITABLE ROOMS, EXCEPT BATHROOMS AND LAUNDRIES REQUIRENATURAL VENTILATION BY MEANS OF OPERABLE WINDOWS @ 1/20 THE

FLOORAREA OF THE ROOM, OR 5 SF MINIMUM, WHICHEVER IS GREATER.

W. THE CONSTRUCTION SHALL NOT RESTRICT A FIVE-FOOT CLEAR AND UNOBSTRUCTED ACCESS TO ANY WATER OR POWER DISTRIBUTION FACILITIES(POWER POLES, PULL BOXES, TRANSFORMERS, VAULTS, PUMPS, VALVES,

METERS,APPURTENANCES, ETC.) OR TO THE LOCATION OF THE HOOK-UP. THE CONSTRUCTION SHALL NOT BE WITHIN TEN FEET OF ANY POWER LINES

WHETHER OR NOT THE LINES ARE LOCATED ON THE PROPERTY.

X. PROVIDE 40 LUMENS/WATTS OR GREATER FOR GENERAL LIGHTING IN KITCHENS AND ROOMS WITH WATER CLOSETS. (FLOURESCENT)

Y. PROVIDE ALL NECESSARY FUEL GAS SUPPLY LINES W/ SHUT OFF VALVES TO ALL GAS FIRED OR OPERATED APPLIANCES (SEE MECHANICAL PLANS).

Z. PROVIDE ALL HOUSE WATER FILTRATION SYSTEM.

WROUGHT IRON GUARDRAIL @ 36" A.F.F., UNLESS OTHERWISE NOTED; SEE INTERIOR OREXTERIOR ELEVATION AND DETAILS FOR TYPE

23

GENERAL FLOOR PLAN NOTES:GENERAL FLOOR PLAN NOTES:

25 CONDENSER UNITS

26 SELF CLOSING DOOR

27 PIN-UP BOARD/HOMOSOTE PANEL

28 MER-THANE 300 FROM MER-KO PRODUCTS ELASTOMERIC ROOF DECK SYSTEM, ICBO #3389

29 LEAD COATED COPPER COUNTER FLASHING

30 ROOF DRAIN WITH OVERFLOW DRAIN

31 ROOF PITCH 1/4" PER FOOT MIN.

TELEPHONE/ SECURITY PANEL

AUDIO PANEL13

12

HVAC UNIT20

32 LINE OF EXHAUST HOOD ABOVE; VENT TO OUTSIDE W/ EXHAUST FANS; VERIFY VENTING REQUIREMENTS WITH MANUFACTURER

NEW CMU WALL PER STRUCTURAL

NEW 2x6 STUD WALL (INTERIOR) WITH 2" RC-1 CHANNEL AT 24" O.C. & SOUND ATTENUATION FIRE BLANKETS, DOUBLE LAYER GYP. BD. BOTH SIDES AT CLOSET, DOUBLE LAYER GYP. BD. ONE SIDE AND TILE OTHER SIDE AT MASTER SHOWER

NEW CMU WALL PER STRUCTURAL WITH 2x4 FURRED OUT STUD AND 5/8" GWB

33 ADJUSTABLE SHELVES AND POLES, SEE INTERIOR ELEVATIONS

34 STAINED WOOD HANDRAIL, SEE DETAIL FOR HEIGHT

NEW 3x4 STUD WALL

NEW 2x4 FLAT STUD WALL (INTERIOR) WITH 2" RC-1 CHANNEL AT 24" O.C. & SOUND ATTENUATION FIRE BLANKETS, DOUBLE LAYER GYP. BD. OR 7/8" PLASTER BOTH SIDES

35 CUSTOM LIFT: WINDING DRUM ELEVATOR 500 LBS DESIGNER SERIESFROM WAUPACA ELEVATOR

NEW 3-5/8" 16 GA STEEL STUDS WITH5/8" GYP. BD. INTERIOR SIDE ANDHARDIPLANK EXTERIOR SIDE

36 CLASS "4" BUILT-UP ROOFING

37 HYDRONIC RADIANT FLOOR HEATING

Page 4: Erin Yamada resume_portfolio

DATE

SCALE

SHEET

® COPYRIGHT 2005 WILLIAM HEFNER ARCHITECTURE AND INTERIORS INC. ALL RIGHTS RESERVED

323 931-1365 [email protected]

323 931-1368 fax

5820 Wilshire Boulevard, Suite 500

Los Angeles, California 90036

W I L L I A M H E F N E R

A r c h i t e c t u r e I n t e r i o r s L a n d s c a p e

INC

KITCHEN ELEVATIONS

1/2" = 1'-0"

A4.1

WILLIAM HEFNER ARCHITECT WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHERS’ FAILURE TO OBTAIN AND/OR FOLLOW WILLIAM HEFNER ARCHITECT GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES OR CONFLICTS WHICH ARE ALLEGED.

ISSUE FOR CONSTRUCTION

20 OCTOBER 2008WALLACE & FRIEDMAN RESIDENCE842 GREENTREE ROAD PACIFIC PALISADES, CA 90272WALLACE & FRIEDMAN RESIDENCE842 GREENTREE ROAD PACIFIC PALISADES, CA 90272

KITCHEN PLAN

MEASURING & MIXING BOWLSSTORAGE CONTAINERS/TUPERWARE

UTENSILS

KITCHEN PLAN

KITCHEN ELEVATION3

KITCHEN ELEVATION2

6'-3

"

10'-0

" TY

P

PLACEMATS &NAPKINS

SHELVES FOR COOKBOOKS

PLATES &GLASSES

SERVING PIECES

KIDS NEEDS

ADJ SHELVING; TYP.

KITCHEN ELEVATION1

11'-3

" TY

P

OPEN BEYOND

10'-0

"

KITCHEN ELEVATION8

STONE SHELF

H C

ADJ.VERTICAL SHELVES, TYP.

PRINTER

FILE CABINET

PLASTERED HOOD

HOOD LINER

2'-6

"2'

-0"

GLASSWARE & ADDITIONAL PLATESCOFFEE MUGS

EQ-4

3

A5.12

STN-1

MWN.I.C.

STN-1

PTD. WOOD PANEL

PTD. WOOD PANEL

3'-0

"6"

2'-6

"

6'-3

"

ALIGN

COOKING UTENSILS& HOT PADS

POTS AND PANS;TYP.

EVERYDAY PLATES & BOWLS

FLATWARE

OIL & VINEGAR RACKPULL OUT

SPICE RACK

TV

DW CUTTING BOARDPULL-OUT

PULL-OUTTRASH

SILVERWARE + PREP

KITCHEN ISLAND ELEVATION10

KITCHEN ISLAND ELEVATION9

OPEN

OPEN FOR COUNTER-STOOLS

KITCHEN ISLAND ELEVATION11

3'-0

" TY

P

NAPKIN DRAWER EACH SIDE

KITCHEN TOOLS

BAGGIES & FOIL

DISH TOWELS & PLASTICSTRASH

DW

FLU

SH

9

A5.9

11"

1 1/

2"

ALI

GN

STN-1

P8-3

EQ-3WD-3TYP

WD-3

WD-3

ADJ. SHELVES, TYP.

STN-1

PTD. WOOD FLUSH DOOR

6'-3

"

EQ-5 EQ-6

WD-3

ALIGN

STN-1

PTD. WOOD FLUSH DOOR

STN-1

EQ-4

ALIGN

BSE-1

ALIGN

BSE-1

BSE-1

WD-3

FAB-1 BEYOND

EQ-15

10'-0

"

60" WOLF RANGE

DACOR DMT2420 MICROWAVE BEHIND

KITCHEN ELEVATION4 PANTRY ELEVATION5 PANTRY ELEVATION6 PANTRY ELEVATION7

CROWN MOLDING, TYP.

UNDER CABINETLIGHT

STN-1

APPLIANCE STORAGE

PTD. WOODPANEL

WD-3

WD-3

WD-3 TYP

EQ-8

1

3

28

PANTRY107

APP

LIA

NC

EST

ORA

GE

KITCHEN106

GLASS STORAGE

UP

12

CU

TTIN

G B

OA

RDPU

LLO

UT

TRA

SH

PULL

OU

T

SILV

ERW

ARE

& S

ERV

ING

PIEC

ES

DW

SUBZ

ERO

36"

REFR

IGER

ATO

RSU

BZER

O36

" FR

EEZE

R

DW

34

21T AT 11.5"

23R AT 6.70"W

INE

REF

RECESSED CAB. RECESSED CAB.

3

A5.4

WARMINGDRAWER

STN-1

STN-1

EQ-3

EQ-6

EQ-5

EQ-7

EQ-9

EQ-12

EQ-10

AIR SWITCH

P6-1

P2-5

P2-5

STN-1

STN-1

STN-1

2'-6"

1'-4

"2"

EQ-10

AIR SWITCH

P8-2

EQ-13

2'-1

"3"

EQ-4

P8-3P8-2

EQ-13

EQ-8

9

10

11

4

5

6

7

Page 5: Erin Yamada resume_portfolio

A5.0

DATE

SCALE

DRAWN BY

® COPYRIGHT 2005 WILLIAM HEFNER ARCHITECTURE AND INTERIORS INC. ALL RIGHTS RESERVED

323 931-1365 [email protected] 931-1368 fax5820 Wilshire Boulevard, Suite 500Los Angeles, California 90036

W I L L I A M H E F N E RA r c h i t e c t u r e I n t e r i o r s L a n d s c a p e

INC

WILLIAM HEFNER ARCHITECT WAIVES ANY AND ALL RESPONSIBILITY AND LIABILITY FOR PROBLEMS WHICH ARISE FROM FAILURE TO FOLLOW THESE PLANS, SPECIFICATIONS AND DESIGN INTENT THEY CONVEY, OR FOR PROBLEMS WHICH ARISE FROM OTHERS’ FAILURE TO OBTAIN AND/OR FOLLOW WILLIAM HEFNER ARCHITECT GUIDANCE WITH RESPECT TO ANY ERRORS, OMISSIONS, INCONSISTENCIES, AMBIGUITIES OR CONFLICTS WHICH ARE ALLEGED.

842 GREENTREE ROAD, PACIFIC PALISADES, CA 90272

ROOF DETAILS

ISSUE FOR CONSTRUCTION

20 OCTOBER 2008WALLACE & FRIEDMAN RESIDENCE

SHEET

A5.0EM

DIFFUSER GLASS AT SKYLIGHTScale: 3" = 1'-0"6

NOTE:GLAZING TO BE ATTACHED TO THE SUPPORT FRAME TO PREVENT MOVEMENT BUT SHOULD BE REMOVABLE FOR MAINTAINANCE

2 1/

2"

2 1/2"

2-3/8" DIA.LAGS AT EACH LEGTO WOOD FRAMING

5/8" TYPE "X" GWB

1/4" CLEAR TEMPEREDGLASS

RUBBER GASKET

CONCEALED LIGHT FIXTURE (VERIFY CLEARANCES REQUIREDWITH MFG.) SEE RCP FOR SPECS

STAINLESS STEEL ANGLE

FOAM GLASS STOPS

2X4 FRAMING AT OPENING

2X BLOCKING AS REQ'D.

ROOF PARAPET AT GARAGEScale: 3" = 1'-0"1

TYP. ROOF PARAPETScale: 3" = 1'-0"2

CONTINUOUS "BITUTHANE" WATERPROOFING MEMBRANE

PLYWOOD ROOF SHEATHING

DOOR HEADERSEE STRUCTURAL DWGS

PAINTED WOOD GARAGE DOOR SEE SCHEDULE

SLOPE

5"

1 1/2"

2X STRIPPING AS REQ'D

MER-THANE 3000 FROM MERKOPRODUCTS, ELASTOMERIC ROOF DECKSYSTEM

7" M

IN.

"MA" FRYREGLET FLASHING

SLOPE

7"M

IN.

SELF ADHERING "BITUTHANE" WATERPROOFING MEMBRANE

7/8" STUCCO OVER MTL LATH

BUILDING PAPER

CANT STRIP

R-30 BATT INSULATION

STONE CAP

SETTING BED W/METAL LATH

SELF ADHERING "BITUTHANE" WATERPROOFING MEMBRANE

7/8" STUCCO OVER MTL LATH

BUILDING PAPER

CANT STRIP

STONE CAP

SETTING BED W/METAL LATH

MER-THANE 3000 FROM MERKOPRODUCTS, ELASTOMERIC ROOF DECKSYSTEM

"ST" FRYREGLET FLASHING

PLYWOOD ROOF SHEATHING

2X STRIPPING AS REQ'D

3'-6

"

1 1/2"

5"

STUDIO WALL SECTION DETAIL AT ROOFScale: 3" = 1'-0"10

CANT STRIP

MER-THANE 3000 FROM MERKOPRODUCTS, ELASTOMERIC ROOF DECKSYSTEM

"ST" FRYREGLET FLASHING

PLYWOOD ROOF SHEATHING

PTD. MDO

1 1/2" LT WT CONCRETE

CAULKING

R-13 BATT INSULATION

2X4 WOOD FRAMING

2X6 WOOD FRAMING

R-30 BATT INSULATION

W10X30 STEEL BEAMSEE STRUCTURAL

3.5X11.875 PSL WOOD FRAMINGSEE STRUCTURAL

5/8" GYP. BD., PTD.

BUILDING PAPER

7" M

IN

STUDIO ROOF OVERHANG SECTION DETAILScale: 3" = 1'-0"11

PLYWOOD ROOF SHEATHING

W10X12 STEEL BEAMSEE STRUCTURAL

LEAD COATEDGRAVEL STOP

1X PITCH STRIP

BUILT-UP ROOFING

WOOD FRAMINGSEE STRUCTURAL

PTD. MDO

BUILDING PAPER

5/8" PTD. GYP. BD.CASEMENT WINDOW

SEE WINDOW SCHEDULE

SLOPE 1/4"/FT

MECHOSHADE INTERIORELECTRO SHADE IN 4133 POCKET

4

4

4

MECHANICAL PAD PLATFORM AT ROOFScale: 1 1/2" = 1'-0"3

2"2"

2X BLOCKING

2X BLOCKING AROUND DRAIN

3/4" PLYWOOD DECK 4"Ø ROOF DRAIN 3"Ø OVERFLOW DRAIN

FIBER CANT

COLLAR & FLASHING FOR O.F.

"THUNDERBIRD" OR EQUAL APPROVED BY ARCHITECTROOF DRAIN (SWEETS 07710/POR)

2"

CONDITION AT PARAPET

OVERFLOW DRAIN TO BE 2" ABOVE ROOFING SURFACE. PROVIDE SEPARATE DRAIN LINES.

2" C

LEA

R

"BITUTHENE" WATERPROOFING (DASHED)

UNDER DECK CLAMP

2'-0" POCKET FOR DRAIN AND OVERFLOWROOF JOISTS PER STRUCTURAL

COORDINATE DRAIN WITH STRUCTURAL SYSTEM AND CEILING LOCATION. SLOPE AS REQ. OUTLET FOR OVERFLOW TO BE LOCATED WHERE OWNER CAN VISUALLY SEE DISCHARGE OF OVERFLOW WATER NOTING THAT ROOF DRAIN IS CLOGGED

ROOF SHEATHING PER STRUCTURAL

ROOF DRAIN AND OVERFLOWScale: 1 1/2" = 1'-0"4

SKYLIGHT AT MASTER CLOSET DETAILScale: 1 1/2" = 1'-0"5

BRISTOLIGHT CURB MOUNTED PYRAMID SKYLIGHT #AL-CM-1-P (ICBO # 2469) OR APPROVED EQUAL: INSTALLATION MUST FOLLOW BRISTOLIGHT INSTALLATION INSTRUCTIONS. SEE ROOF PLAN AND WINDOW SCHEDULE FOR SPECIFIC SIZES AND GLAZING INSTRUCTION

2-2X6, DOUBLE FRAME BOTH CEILING AND ROOF FRAMING AROUND OPENINGS

2- 2X DOUBLE FRAME ROOF JOISTS AROUNDOPENING

MER-THANE 3000 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

3/4" PLYWOOD ROOF SHEATHING2X STRIPPING AS REQ'D

5/8" TYPE "X" GWB

6A-5.0

SEE PLAN FOR WIDTH/LENGTH

CONTINUOUS "BITUTHANE" WATERPROOFING MEMBRANE

STUCCO OVER MTL LATH

CONCRETE CANT STRIP

STL BEAM, SEE STRUCTURAL

3 5/8" C CHANNEL, SEE STRUCTURAL

5/8" TYPE "X" GWB

ROOF PARAPET AT POOL HOUSEScale: 1 1/2" = 1'-0"7

METAL CAP

FIRST FLOOR ROOF AT SECOND FLOORScale: 1 1/2" = 1'-0"8

7/8" STUCCO OVER MTL LATH

"ST" FRY REGLET FLASHING

BUILDING PAPER

CANT STRIP

3/4" PLYWOOD ROOF SHEATHING

2X STRIPPING AS REQ'D

1.75X14 LVL JOISTS @ 16OC SEE STRUCT.

BATT INSULATION

5/8" TYPE "X" GWB

2X8 DOUBLE WOOD FRAMING, SEE STRUCT.

FINISH FLOOR

5/8" TYPE "X" GWB

POOLHOUSE CANOPY AT ROOFScale: 1 1/2" = 1'-0"9

NOTE:OVERFLOW SCUPPERS SHALL HAVE A MINIMUM OPENING HEIGHT OF 4", A MINIMUM AREA THREE TIMES THAT OF THE ROOF DRAIN AND SHALL BE LOCATED NOT MORE THAN 2" ABOVE THE LOW POINT OF THE ROOF.

2X 1.75X14 LVL JOISTSSEE STRUCT.

1.75X14 LVL JOISTS @ 16OC SEE STRUCT.

9'-6" CEILING HEIGHT

1 1/2" LT. WT. CONCRETE

1 1/8" PLYWOOD

WOOD CRIBBING AS REQ'D.

WIDE RIB METAL DECKING, SEE STRUCTURAL

"MASON" ISOLATOR MOUNTING OR APPROVED EQ.

PROVIDE DBL ROOF/CLG.FRAMING AROUND PERIMETERTYP. SEE STRUCTURAL

G.I. FLASHING

8" M

IN.

2X STRIPPING FOR DRAINAGE AS REQ.

FIBER CANT STRIP

MER-THANE 3000 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

ROOFING UNDERLAYMENT

EQUIPMENT W/ SPRING ISOLATORS PERMANUFACTURER'S SPECIFICATIONS

3" MIN. CLEARANCE AT EDGES, TYP.

BATT INSULATIONPER TITLE 24

2X14 WOOD FRAMING, SEE STRUCTURAL

CANT STRIP

7" M

IN

MER-THANE 3000 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

MER-THANE 3000 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

MER-THANE 3000 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

2"

2X4 DOUBLE WOOD FRAMING, SEE STRUCT.

10"

SLOPE 1/4"/FT

METAL DECKING WITH 2"MIN. LT. WT. CONCRETE SEE STRUCTURAL

LEAD COATED COPPER GUTTER

LEAD COATED COPPER FLASHING

2" MIN. LT. WT. CONCRETE

MER-THANE 300 FROM MERKO PRODUCTS, ELASTOMERIC ROOF DECK SYSTEM

1 1/2" LT. WT. CONCRETE

GREENBOARD

SLOPE 1/4"/FT

COPPER FLASHING

6X6 TUBE STEELSEE STRUCT.

STEEL FASCIASEE STRUCTURAL

STEEL WINDOWSEE SCHEDULE

METAL PANEL

STEEL CHANNELSPTD. CEMENT BOARDHARDIEBACKER 1/2" CEMENT BOARD BY JAMES HARDIE

3