A Technical Skills
Primary + Secondary Job Responsibilities
A.1. Primary Job ResponsibilitiesHVAC
1 Cleanroom HVAC SpecificationAir classification scheme
2 Basis of design for HVAC HVAC basic design data
3 Air flow and control diagram
4 Functional description document
5 AHU and room grouping scheme layout
6 AHU and room grouping scheme sheet
7HVAC supply and return air equipment per room
sheet
8 Differerent equipment GA drawings9 BOQ
10 Room pessurization schemeRoom pressurization scheme sheet (Mention
Values)
11 heat load estimation
Air flow calculations
Trane trace 700 fluency
13 Duct design
14 Duct drawing
15Electrical Calculations for HVAC
equipment Electrical load calculations
16 AHU layoutHVAC supply and return air equipment per room
layout
Auxilliary equipment layout
18 Room pressurization scheme Room pressurization scheme layout
19 LAF unit LAF specification
Control and wiring diagram
SLD for AHU control panels
Air flow and control diagram
HVAC equipment arrangement
A
HVAC equipment arrangement17
HVAC duct drawing
0 = Not Applicable 1 = Basic knowledge 2 = Working knowl
requirement 3 = Detailed knowledge 4 = Good experience a
5 = Expert
Please contribute your views for Points A by selecting any of
Load & Air flow calculations12
Electrical Drawings for HVAC20
-
7/30/2019 Evaluation Sheet - Mechanical
2/12
21 Vendor drawings approvalApproving shop drawings submitted by vendors
Piping & packaged utility equipment
1 Piping & utility BOD
Preparation of piping & utility basis of design.
Also preparing any specialised BOD for otherapplications like tank farms, instrumentation,
Stress analysis.
2 To work on Autocad.
3 To have Basic Knowledge of PFD for utilities
4 To work on Autocad.
5 To have Basic Knowledge of P&ID for utilities
6 Pipe selection
Dimentional standards for pipes. Pressure and
temperature ratings for different piping
materials.
7Piping MOC & type selection as
per process
To select appropriate MOC for distribution
based on process and utility requirements.
8component selection as per
process
To work on different type of component used in
utilities. On different components used like
pump, vent filter, steam trap etc.
9 Instrument selectionTo work on different type of selection of
instrument for utilities.
10 Valve selectionTo have knowledge of selection of valves for
utilities.
11 Pump Head calculation pressure drop calculation for pumps.
12 Pipe sizing calculation To work on Pipe sizing for utilities
13 Hyderaulic weight calculation On hydraulic weight calculation for Piping.
14
To work on production processes, cleaning
requirements & Utility requirements of
equipments & processes. .
15
Study of production planning & On Quantities of
utilities required for different manufacturing
process
16Utility generation Equipment
sizing
Knowledge of capacity analysis, Equipment
selection & sizing
17 Pumps Pump capacity calculation and pump selection
18 Utility room bookTo have understanding on utility requirement in
each operation
19 COMPONENT LISTS Making Bill of quantities for utilities
20 PIPING Class (DS) To work on piping & accesories Data Sheets
21 Data Sheet
To work on components like tanks,filters, heat
exchangers,steam traps,pump,safety valves,
control valves, strainers etc.
22VALVE LIST AND
SPECIFICATIONSTo work on different types of selection of valves
like gate,globe,ball,butterfly,plug etc for utilities.
23 Making utility piping execution specification.
UTILITY/ PIPING P & ID'S
UTILITY CAPACITY STUDY
PROCESS FLOW DIAGRAM
(PFD)
-
7/30/2019 Evaluation Sheet - Mechanical
3/12
24To work on welding,errection & installation
procedures.
25EQUIPMENT
SPECIFICATIONS
utility equipment like Boiler, Air compressor, N2
generator, HW generator etc.& Distribution
systems for all utilities
Study of layout for making utility room book,pipe routing etc.
Pipe routing layouts
Piping isometrics
27 Vendor drawings approvalApproving shop drawings submitted by vendors
28 Hookup diagramsPreparation of hookup drawings for instruments
Identification of critical lines, providing suitable
piping supports or making suitable changes in
the piping after stress analysis
Proficiency in Caesar II
30 Design codes and standards
Awareness and proficiency in all design
standards for piping and mechanical
engineering like ASME, API, ANSI and ASTM
31 Vendor drawings approvalApproving shop drawings submitted by vendors
Process and Industrial Equipment
1 To work on Autocad.
2To have Basic Knowledge of PFD for
manufacturing process.
3 To work on Autocad.
4
5
6 PROCESS DESCRIPTIONTo work on various industrial process
requirements
7CAPACITY & CYCLE TIME
ANALYSIS
Knowledge of different processes, time taken in
each processes etc
8PROCESS AND UTILITY
EQUIPMENT LIST
Equipment size selection, Vendor for that
equipment, tentative power requirement.
9 COMPONENT LISTS Making Bill of quantity.
10EQUIPMENT
SPECIFICATIONS
Making & TS for process and industrial
equipment
11 LAYOUTSStudy of layout for making equipment list, GA
drawing checking etc.
13
VALIDATION
PLANS/REPORTS FOR
DIFFERENT SYSTEMS
Knowledge of validation
26 LAYOUTS
12
29 Stress Analysis
VALIDATION,
COORDINATION
PROCESS FLOW DIAGRAM
(PFD)
Preaperation of validation documents &
coordination between client & vendor
Process P & ID'S To have Basic Knowledge of P&ID for
manufacturing process.
SPECIFICATIONS
-
7/30/2019 Evaluation Sheet - Mechanical
4/12
14WRITING VALIDATION
PROGRAMS, DQ,IQ,OQ,PQKnowledge of DQ,IQ,OQ,PQ
15 DQ,IQ,OQ,PQ REPORTS Knowledge of DQ,IQ,OQ,PQ
16 Vendor drawings approvalApproving shop drawings submitted by vendors
Layouts
1 To work on autocad
2To have detail understanding about industrial
facilities' layout
3 Plot plan layoutTo have understanding about varios utility
equipment and develop an entire plot plan.
4Men & material movement
layoutTo identify the work flow of Industrial process
and design the layout of the facitlity accordingly.
5 Civil/Drain layoutTo generate drain routing and other plumbing
layouts.
6 Equipment layout
To work on function of various process and
industrial equipment and position them as per
the process requirement
1 PROJECT MANAGEMENT To work in a project team as per requirement.
2 Time management
3 Preperation of document list. Planning of work.
4 TENDERING Making & study of tender documents for HVAC
low side and high side, piping, Utility equipment5 Project Meeting Preparing MOM for meeting
6 PROJECT SECRETARY WORK
Making reports for project i.e. on level of
completion, Pending work, priority of work,
resource management.
7 PROJECT TRAINING Attending trainings, give training to juniors
8 Making documents as per quality attributes
9 To implement project & quality plan.
10DESIGN CRITERIA AND
PLANT DESCRIPTION
To study URS & make conceptual engineering
documents on basis of design criteria as per
international Codes, guidelines & GEP
11 TIME SCHEDULE
Making & checking discipline plan and man hour
estimation requirement for activities of
Mechanical stream.
12 COST BREAKDOWNMaking & checking costing for Mechanical
stream
13 PROJECT MEETINGSAttending & conducting meetings for
interdepartment work, with clients & vendors.
14 PROJECT TRAINING Preaparing / Identifing training needs.
QUALITY CONTROL
Others
PROJECT MANAGEMENT
Room layout of industrial
facilities.
-
7/30/2019 Evaluation Sheet - Mechanical
5/12
15 Quality Control Checking quality of documents prepared.
16 PROJECT AND QUALITY PLANTo study & prepare project & quality plan
17PROJECT QUALIFICATION
PLAN
Awareness about qualification requirement of
pharma facility. Awareness about DR,
IQ,OQ,PQ & validation documents.
B Interpersonal Relationship
B.1 Interpersonal
1 Integrity / Business Ethics Follow Code of Ethics set by SSOE
2 Achieving Goals / Targets
Achieving qualitative & quantitative goals /
targets set by SSOE for the growth of the
organisation
3 Attire
4 Flexibility
5 Communication
6 Courteous
7 Persuasive
8 Availability to others
9 Time Management / PlanningAbility to plan sub tasks very well based on an
activity allocated
10 Team Building Ability to work as a Part of a team
11On Job Knowledge Sharing
Impart job knowledge with other team members
12 Under Pressure
Ability to work under pressure and withstand
stress
13 Motivation Ability to Motivate others in all the situations
B.2.
14 Other AssignmentsAbility to work on new assignments / initiatives
over and above regular work responsibilities
B.3.
15 Creativity & InnovationParticipation in improvement and making
suggestions
Demonstrates Professionalism
B 1 = Poor 2 = Average 3 = Good / Ability to Guide Others
5 = Excellent
Please contribute your views for Points B by selecting any of
-
7/30/2019 Evaluation Sheet - Mechanical
6/12
Level
4
Skills
required by
the engineer
/ designer
Actual
Skills of the
engineer /
designer
0
0
4
0
4
0
0
00
0
0
0
0
4
4
0
0
4
4
4
0
4
4
dge and ability to meet
nd ability to train others
the options
-
7/30/2019 Evaluation Sheet - Mechanical
7/12
0
4
4
0
4
4
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-
7/30/2019 Evaluation Sheet - Mechanical
8/12
0
0
4
4
4
0
4
0
0
0
0
4
4
4
0
0
0
0
0
0
0
4
-
7/30/2019 Evaluation Sheet - Mechanical
9/12
0
0
0
4
4
4
4
4
4
4
4
0
00
0
4
0
0
0
0
0
0
0
-
7/30/2019 Evaluation Sheet - Mechanical
10/12
0
0
0
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
4 = Very Good
the options
-
7/30/2019 Evaluation Sheet - Mechanical
11/12
Designer 4
Designer 1 1 Basic knowledge
Designer 2 2 Working knowledge and ability to meet requi
Designer 3 3 Detailed knowledge
Designer 4 4 Good experience and ability to train others
Designer 5 5 Expert
Engineer 1 1
Engineer 2 2
Engineer 3 3
Engineer 4 4
Engineer 5 5
Master Engineer 5
Team leader 5
Section Manager 5
0
Engineer
Designer 1
Master Engineer 2
Team Leader 3
Section Manager 4
5
0
-
7/30/2019 Evaluation Sheet - Mechanical
12/12
ement